[go: up one dir, main page]

SU1170044A1 - Pile - Google Patents

Pile Download PDF

Info

Publication number
SU1170044A1
SU1170044A1 SU833628756A SU3628756A SU1170044A1 SU 1170044 A1 SU1170044 A1 SU 1170044A1 SU 833628756 A SU833628756 A SU 833628756A SU 3628756 A SU3628756 A SU 3628756A SU 1170044 A1 SU1170044 A1 SU 1170044A1
Authority
SU
USSR - Soviet Union
Prior art keywords
concrete
barrel
layer
bulk material
pile
Prior art date
Application number
SU833628756A
Other languages
Russian (ru)
Inventor
Виктор Михайлович Нестеренко
Original Assignee
Всесоюзный центральный научно-исследовательский и проектный институт "Гипронисельпром"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный центральный научно-исследовательский и проектный институт "Гипронисельпром" filed Critical Всесоюзный центральный научно-исследовательский и проектный институт "Гипронисельпром"
Priority to SU833628756A priority Critical patent/SU1170044A1/en
Application granted granted Critical
Publication of SU1170044A1 publication Critical patent/SU1170044A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

СВАЯ, включающа  сборный железобетонный ствол и набивную оболочку, размещенную вокруг ствола, отличающа с  тем. что, с целью повышени  несущей способности , набивна  оболочка выполнена многослойной из расположенных коаксиально на рассто нии друг от друга бетонны.х слоев и размещенных между ними прослоек сыпучего материала, приче.м железобетонный ствол установлен в верхней части внутреннего бетонного сло  оболочки и отделен от нижней его части поперечной бетонной ,i.iiафрагмой и слоем сыпучего материала. tc N NPIL including a precast concrete barrel and a stuffed jacket placed around the barrel, characterized in that. that, in order to increase the carrying capacity, the stuffed casing is made of a multi-layered concrete layers coaxially spaced from each other and interlayers of bulk material placed between them, and a reinforced concrete trunk is installed in the upper part of the inner concrete casing layer and separated from the lower its parts are transverse concrete, the i.ii frame and the layer of bulk material. tc N N

Description

Изобретение относитс  к строительству и используетс  при устройстве свайных фундаментов под колонны производственных сельскохоз йственных и других зданий.The invention relates to the construction and is used in the construction of pile foundations for columns of industrial agricultural and other buildings.

Цель изобретени  - повышение несущей способности сваи.The purpose of the invention is to increase the bearing capacity of the pile.

На фиг. 1 изображена сва , продольный разрез; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - разрез Б-Б на фиг. 1; на фиг. 4-8 - этапы возведени  сваи.FIG. 1 shows a pile, longitudinal section; in fig. 2 shows section A-A in FIG. one; in fig. 3 shows a section BB in FIG. one; in fig. 4-8 are the stages of pile construction.

Сва  содержит железобетонный ствол 1, набивную оболочку 2, размещенную вокруг ствола и объединенную с ним. Набивна  оболочка выполнена многослойной из расположенных коаксиально на рассто нии друг от друга бетонных слоев 3 и размещенных между ними прослоек сыпучего материала 4 (например грунта, песка или другого аналогичного материала). Железобетонный ствол 1 установлен в верхней части внутреннего бетонного сло  3 оболочки и отделен от нижней его части поперечной бетонной диафрагмой 5 и слоем сыпучего материала 4.Sva contains a reinforced concrete shaft 1, a padded shell 2 placed around the shaft and combined with it. The padded casing is made of a multilayer of concrete layers 3 spaced coaxially from each other and interlayers of bulk material 4 arranged between them (for example, soil, sand, or other similar material). Reinforced concrete barrel 1 is installed in the upper part of the inner concrete layer 3 of the shell and is separated from its lower part by a transverse concrete diaphragm 5 and a layer of bulk material 4.

Сва  возводитс  следующим образом.The pile is erected as follows.

На спланированной строительной площадке с помощью круглого или квадратного полого штампа 6, погружаемого в грунт методом вибровдавливани , статического вдавливани  или забивки, образуют на заданную глубину скважины 7 с одновременным созданием уплотненной зоны 8. После погружени  штампа б его извлекают, а образованную скважину заполн ют бетонной смесью 9 на всю глубину. В случае устройства таких свай в обводненных грунтах полый штамп используют в качестве обсадной трубы, через которую производ т заполнение скважины материалом снизу вверх. После заполнени  скважины до усть  производ т обратное погружение штампа в скважину на первоначальную глубину. За одинAt the planned construction site, using a round or square hollow die 6, which is immersed in the soil by vibration, static indentation or driving, form well 7 at a predetermined depth while simultaneously creating a compacted zone 8. After the die is immersed, it is removed and the resulting hole is filled with concrete a mixture of 9 to the full depth. In the case of arranging such piles in flooded soils, a hollow die is used as a casing through which the well is filled with material from the bottom up. After filling up the well, the die is reversed into the well to its original depth. For one

5 или несколько проходов штампа 6 в грунтовом массиве формуют замкнутую оболочку из бетонного сло  3 и образуют уплотненную зону 8. Дл  создани  грунтовой или песчанной уплотненной прослойки образующуюс  в бетоне полость с размерами, равными размерам штампа, заполн ют грунтом, песком или другим аналогичным материалом 10 по принципу, описанному выше, и формуют также за один или несколько проходов штампа прослойку сыпучего материала 4, под воздействием которой бетонный слой 3 вытесн етс  в грунтовый массив с одновременным его улотнением, некоторым уменьшением толщины стенки и увеличением объема уплотненного грунта. Таким образом, в грунтовом массиве фор.муетс  набивна  оболочка, выполненна  многослойной из расположенных коаксиально на рассто нии друг от друга бетонных слоев и размещенных между ними прослоек сыпучего материала. Заключительный этап устройства сваи состоит в заполнении сыпучим материалом и уплотнении прослойки сыпучего материала 4 (фиг. 1) на 1/2-2/3 ее глубины, заполнении остальной части бетонной смесью, в которую погружают железобетонный ствол до заданной отметки. После схватывани  бетона образуетс  сва  с5 or several passes of the stamp 6 in the soil mass form a closed shell of the concrete layer 3 and form a compacted zone 8. To create a ground or sand packed compacted layer, the cavity formed in the concrete with dimensions equal to the size of the stamp is filled with soil, sand or other similar material 10 according to the principle described above, and in one or several punch passes, an interlayer of bulk material 4 is formed, under the influence of which the concrete layer 3 is displaced into the soil mass with its simultaneous compacting, which decreasing wall thickness and increase in the volume of compacted soil. Thus, a padded casing is formed in the soil mass. The casing is made of a multi-layer concrete layers arranged coaxially at a distance from each other and interlayers of bulk material placed between them. The final stage of the pile device consists in filling the bulk material and compacting the interlayer of bulk material 4 (Fig. 1) 1 / 2-2 / 3 of its depth, filling the rest of the concrete mix into which the reinforced concrete shaft is immersed to a predetermined mark. After the concrete has set, a pile is formed

0 повышенной несущей способностью, которую можно назначать дифференцировано в зависимости от количества бетонных слоев и прослоек из сыпучего материала между ними.0 increased bearing capacity, which can be assigned differentiated depending on the number of concrete layers and layers of bulk material between them.

л-лll

5-65-6

Claims (1)

СВАЯ, включающая сборный железобетонный ствол и набивную оболочку, размещенную вокруг ствола, отличающаяся тем. что, с целью повышения несущей способности, набивная оболочка выполнена многослойной из расположенных коаксиально на расстоянии друг от друга бетонных слоев и размещенных между ними прослоек сыпучего материала, причем железобетонный ствол установлен в верхней части внутреннего бетонного слоя оболочки и отделен от нижней его части поперечной бетонной диафрагмой и слоем сыпучего материала.Pile, including precast reinforced concrete barrel and a stuffed shell placed around the barrel, characterized in that. that, in order to increase the bearing capacity, the stuffed shell is made of a multilayer of concrete layers located coaxially at a distance from each other and interlayers of granular material placed between them, and the reinforced concrete barrel is installed in the upper part of the inner concrete layer of the shell and is separated from its lower part by a transverse concrete diaphragm and a layer of bulk material. Фиг.·!Fig. ·! (66(66
SU833628756A 1983-08-01 1983-08-01 Pile SU1170044A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833628756A SU1170044A1 (en) 1983-08-01 1983-08-01 Pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833628756A SU1170044A1 (en) 1983-08-01 1983-08-01 Pile

Publications (1)

Publication Number Publication Date
SU1170044A1 true SU1170044A1 (en) 1985-07-30

Family

ID=21076873

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833628756A SU1170044A1 (en) 1983-08-01 1983-08-01 Pile

Country Status (1)

Country Link
SU (1) SU1170044A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2528331C1 (en) * 2013-03-27 2014-09-10 Александр Васильевич Веселов Pile and method of its erection
RU2640059C1 (en) * 2016-12-28 2017-12-26 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Method of manufacturing drill-driven pile
RU2640467C1 (en) * 2017-04-10 2018-01-09 Александр Семёнович Ковалёв Method of arranging driven pile
RU2753295C1 (en) * 2020-11-10 2021-08-12 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for pile construction in macro-porous soils

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Метелюк Н. С. и др. Сваи и свайные фундаменты. Справочное пособие, Киев: Будивельник, 1977, с. 37, рис. 1.18. *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2528331C1 (en) * 2013-03-27 2014-09-10 Александр Васильевич Веселов Pile and method of its erection
RU2640059C1 (en) * 2016-12-28 2017-12-26 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Method of manufacturing drill-driven pile
RU2640467C1 (en) * 2017-04-10 2018-01-09 Александр Семёнович Ковалёв Method of arranging driven pile
RU2753295C1 (en) * 2020-11-10 2021-08-12 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for pile construction in macro-porous soils

Similar Documents

Publication Publication Date Title
JPH0699975B2 (en) How to form a concrete floor to support a building
SU1170044A1 (en) Pile
JP3594385B2 (en) Seismic isolation structure of structure
RU2601630C2 (en) Method of pile drive device
RU95112815A (en) METHOD FOR CONSTRUCTING STACKED PILES
SU1677180A1 (en) Method of manufacturing reinforced cast-in-place pile
RU2081240C1 (en) Method for erecting cast-in-place pile
SU1606613A1 (en) Method of errecting cast-in-place pile
CN206570789U (en) A kind of structure for being applied to build retaining wall in Mud Ground
SU903484A1 (en) Method of reinforcing foundation
SU1544891A1 (en) Method of constructing cement-earth pile
SU850801A1 (en) Sagging soil compacting method
RU2047689C1 (en) "kvasha" pile and method for deepening in soil
JP3808552B2 (en) Form for constructing underwater caisson, underwater caisson and construction method thereof
SU1765299A1 (en) Method of erecting bored piles
RU2241098C1 (en) Method for increasing load-bearing capacity of cast-in-place pile
SU1763573A1 (en) Method of erecting cast-in-place pile
SU887735A1 (en) Foundation construction method
US4815244A (en) Concrete block wall insulation system
JPH0437955Y2 (en)
SU1760014A1 (en) Method for preparation of building foundation on loose ground
SU1201417A1 (en) Method of improving soil at the base of foundation
SU727767A1 (en) Three-dimensional member of retaining walls
SU1263751A1 (en) Method of constructing a foundation
SU1035137A1 (en) Pile foundation