SU114803A2 - Butt connection of precast concrete elements - Google Patents

Butt connection of precast concrete elements

Info

Publication number
SU114803A2
SU114803A2 SU588234A SU588234A SU114803A2 SU 114803 A2 SU114803 A2 SU 114803A2 SU 588234 A SU588234 A SU 588234A SU 588234 A SU588234 A SU 588234A SU 114803 A2 SU114803 A2 SU 114803A2
Authority
SU
USSR - Soviet Union
Prior art keywords
bolts
precast concrete
concrete elements
butt connection
steel
Prior art date
Application number
SU588234A
Other languages
Russian (ru)
Inventor
В.И. Гнедовский
Original Assignee
В.И. Гнедовский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by В.И. Гнедовский filed Critical В.И. Гнедовский
Priority to SU588234A priority Critical patent/SU114803A2/en
Application granted granted Critical
Publication of SU114803A2 publication Critical patent/SU114803A2/en

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

В ОСНОВНОМ авт. св. № 108940 списано стыковое соединение элементов сборных железобетонных конструкций с применением металлических накладок и поперечных болтов, заделанных цементным раствором в металлические трубки, в которых, с целью исключени  работы- болтов на срез и см тие, кажда  металлическа  накладка зажата между гайками и втулками, навинченными на концы болтов, причем усилие от накладок передаетс  бетону через стальные трубки, в концы которых вход т втулки.BASIC Auth. St. No. 108940 decommissioned butt joining of prefabricated reinforced concrete structures using metal plates and transverse bolts embedded with cement mortar in metal tubes, in which, in order to avoid working bolts for shearing and removal, each metal pad is clamped between nuts and bushings screwed on the ends of the bolts, with the force from the pads being transferred to the concrete through steel pipes, at the ends of which there are bushings.

Стыковые соединени  вызывают значительный расход высокопрочной стали на изготовление болтов, соедин ющих накладки. Butt joints cause a significant consumption of high-strength steel for the manufacture of bolts connecting the plates.

В предлагаемом стыковом соединении расход высокопрочной стали значительно сокращен без ущерба дл  прочности конструкции. Достигаетс  это выполнением болтов, соедин ющих накладки со стыкуемыми элементами, составными из трех частей, причем только две крайние части каждого болта изготовл ютс  из высокопрочной стали, а средн   часть его - из обычной стали.In the proposed butt joint, the consumption of high-strength steel is significantly reduced without compromising the strength of the structure. This is achieved by making the bolts connecting the plates with the joined elements made up of three parts, only two extreme parts of each bolt are made of high-strength steel, and the middle part of it is made of ordinary steel.

На фиг. 1 изображено примерное выполнение предлагаемого стыкового соединени  в разрезе по продольной оси соедин емых элементов; на фиг. 2 - показан разрез но АА на фиг 1; на фиг. 3 - разрез по ББ на фиг. 1; на фиг. 4 - в увеличенном масщтабе болт, соедин ющий накладки .FIG. Figure 1 shows an exemplary embodiment of the proposed butt joint in section along the longitudinal axis of the connected elements; in fig. 2 shows a section but AA in FIG. 1; in fig. 3 is a section through BB in FIG. one; in fig. 4 - on a larger scale, a bolt connecting the pads.

Предлагаемое стыковое соединение элементов сборных железобетонных конструкций состоит из металлических накладок 1, стальных трубок 2, шайб 3, втулок 4, болтов 5 из высокопрочной стали, болтов 6 из стали обычной, арматурных сеток 7, хомутов 8 R 9.The proposed joint connection of prefabricated reinforced concrete structures consists of metal plates 1, steel pipes 2, washers 3, bushings 4, bolts 5 of high strength steel, bolts 6 of ordinary steel, rebar 7, clamps 8 R 9.

.№ 114803.№ 114803

Усилие в стыке воспринимаетс  металлическими накладками / посредством сил трени , возникающих вследствие нат жени  болтов 5. Последние ввинчиваютс  во втулки 4 и через них передают усилие металлическим трубкам 2, а те в свою очередь - бетону. Втулки 4 соедин ютс  между собой болтами 6. Кольцевое пространство между трубками и болтами заполн етс  высокопрочным цементным раствором.The force at the joint is perceived by metal plates / through the forces of friction arising due to the tension of the bolts 5. The latter are screwed into the sleeves 4 and through them transmit the force to the metal tubes 2, and those in turn to the concrete. The sleeves 4 are interconnected by bolts 6. The annular space between the tubes and the bolts is filled with high-strength cement mortar.

Дл  лучшего распределени  усили , передаваемого трубками 2 на бетон, и повышени  его сопротивлени  сжатию применены арматурные сетки 7 и хомуты 8 к 9.In order to better distribute the force transmitted by the tubes 2 to the concrete, and to increase its resistance to compression, reinforcement meshes 7 and clamps 8 to 9 are used.

Изготовление элементов стыкового соединени  производитс  следуюшим образом.The manufacture of the butt joint elements is carried out as follows.

Весь каркас, собранный из трубок 2 с втулками 4, болтов 6, сеток 7 и хомутов 8 к 9 устанавливаетс  в опалубку и после сборки остальной арматуры бетонируетс .The entire frame, assembled from tubes 2 with bushings 4, bolts 6, grids 7 and clamps 8 to 9, is installed in the formwork and, after the rest of the reinforcement has been assembled, is concreted.

Отверсти  в накладках дл  пропуска болтов делаютс  с необходимыми допусками, т. е. превышают диаметр болтов, вследствие этого работа болтов на срез и смытие исключаетс .The holes in the lugs for the passage of the bolts are made with the necessary tolerances, i.e., they exceed the diameter of the bolts, as a result of which the work of the bolts for shearing and washing is excluded.

Болты 5 став тс  в процессе монтажа, что устран ет наличие выступающих из конструкции закладных частей. Болты 5 из высокопрочной стали, подвергаютс  закалке и отпуску. Шайбы 3 и втулки 4 изготовл ютс  из закаленной стали. Втулки 4 имеют внутреннюю нарезку дл  соединени  их болтами 6 и ввинчивани  в них болтов 5. Нарезка на болтах 6 делаетс  только на их концах; в средней же их части, т. е. между внутренними гран ми втулок 4, нарезок нет.Bolts 5 are placed during installation, which eliminates the presence of protruding parts from the structure. The bolts 5 are of high strength steel, subjected to quenching and tempering. The washers 3 and the sleeves 4 are made of hardened steel. The sleeves 4 are internally threaded for bolting 6 together and screwing bolts 5 into them. The threading on bolts 6 is done only at their ends; in their middle part, i.e., between the inner edges of the sleeves 4, there are no cuts.

Монтаж стыка заключаетс  в постановке накладок, ввинчивании болтов 5 во втулки 4 и завинчивании их определенным крут щим моментом . Благодар  этому накладки зажимаютс  между шайбами 3 и втулками 4 в болтах 5 возникает раст жение, а в соприкасающихс  плоскост х между шайбами и накладками трение достигает такой величины , что усилие от накладок воспринимаетс  болтами через силы трени .The assembly of the joint consists in setting the pads, screwing the bolts 5 into the sleeves 4 and screwing them at a certain torque. Due to this, the linings are clamped between the washers 3 and the sleeves 4 in the bolts 5, stretching occurs, and in the contacting planes between the washers and the linings the friction reaches such a value that the force from the linings is perceived by the bolts through the friction forces.

Предварительные напр жени  в бетоне и арматуре создаютс  нат жением арматурных пучков, помешенных в трубки W и заканчивающихс  анкерами //, опирающимис  на листы 12.The prestresses in the concrete and the reinforcement are created by the tension of the reinforcement beams placed in the tubes W and terminated by anchors // supported on the sheets 12.

На месте работ по окончании сборки и нат жени  болтов элементы конструкции сразу же вступают в работу.At the site of completion of the assembly and tensioning of the bolts, the structural elements immediately come into operation.

Предмет изобретени Subject invention

Стыковое соединение элементов сборных железобетонных конструкций по авт. св. Alb 108940, отличающеес  тем, что, с целью замены высокопрочной стали обычной без ущерба дл  прочности конструкции, болты, соедин ющие накладки со стыкуемыми элементами, выполнены составными из трех частей, причем две крайние части каждого болта изготавливаютс  ИЗ высокопрочной стали, а средн   часть его - из обычной стали.Butt joint of precast concrete elements according to ed. St. Alb 108940, characterized in that, in order to replace high-strength steel with ordinary steel without sacrificing structural strength, the bolts connecting the pads with the abutting elements are made of three parts, the two extreme parts of each bolt being made of high-strength steel, and its middle part - from ordinary steel.

tfitfi

2727

r.r.

5J5J

11eleven

Фиг. 1FIG. one

Разрез no fifl Cut no fifl

Разрез по66 , ЛАптп пЯ Section 66, Lapt F

SU588234A 1957-12-20 1957-12-20 Butt connection of precast concrete elements SU114803A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU588234A SU114803A2 (en) 1957-12-20 1957-12-20 Butt connection of precast concrete elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU588234A SU114803A2 (en) 1957-12-20 1957-12-20 Butt connection of precast concrete elements

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU108940A Addition SU36965A1 (en) 1932-05-10 1932-05-10 Pickup

Publications (1)

Publication Number Publication Date
SU114803A2 true SU114803A2 (en) 1958-11-30

Family

ID=48406531

Family Applications (1)

Application Number Title Priority Date Filing Date
SU588234A SU114803A2 (en) 1957-12-20 1957-12-20 Butt connection of precast concrete elements

Country Status (1)

Country Link
SU (1) SU114803A2 (en)

Similar Documents

Publication Publication Date Title
CN106400954A (en) Steel beam-steel pipe concrete column joint based on damage control concept
CN103590322A (en) Shear force connecting part, combination beam comprising same and construction method of combination beam
KR102274029B1 (en) Method for reinforcing the Earthquake of a concrete columns
CN208137145U (en) The buckling-restrained unilateral connecting node of formula beam column built from concrete
CN107254937B (en) A kind of assembled energy consumption girder connection of built-in X-shaped low-yield structural steel connecting member
WO2020098452A1 (en) Anti-seismic and energy-consuming fabricated beam-column joint structure located in plastic zone
CN105484514A (en) Method for strengthening circular reinforced concrete pier column
CN114517562A (en) Steel bar anchoring system and method
KR20180069554A (en) Prestressed steel circular tube girder with partial filled concrete and structure construction method by using it
CN107338735B (en) The damaged replaceable energy-consuming device of chain type
CN105544415A (en) Concrete bridge reinforcing method and structure
CN111851737A (en) Prefabricated concrete frame beam-column dry connection joint
US3260024A (en) Prestressed girder
CN104929292B (en) A kind of profiled sheet of use prestressing without bondn and the compoboard of concrete
SU114803A2 (en) Butt connection of precast concrete elements
RU160846U1 (en) PRELIMINARY-TENSIONED REINFORCED-MONOLITHIC REINFORCED CONCRETE PLATE OF THE ROADWAY OF THE UNRACKED STEEL-REINFORCED CONCRETE BRIDGE
KR100274141B1 (en) Manufacturing method of preplex composite beem by divisional method
JP6310648B2 (en) Joint structure of reinforced concrete member and steel member
SU108940A2 (en) Butt connection of precast concrete elements
CN105569368A (en) Annular steel plate strengthening device for reinforced concrete column with circular cross section
RU2056490C1 (en) Method for making prestressed reinforced concrete members
CN105986545A (en) Prefabricated composite beam segment connecting structure and application thereof
CN108678408B (en) A reinforced concrete beam prestressed steel wire rope reinforcement device
EA028789B1 (en) Joint of prefabricated reinforced concrete columns of the frame "arkos-2014" and method of performing the same
TW202221204A (en) Steel bar anchoring system and method wherein the system includes a steel bar, an anchoring head and a bolt