[go: up one dir, main page]

SU1051222A1 - Casing repair method - Google Patents

Casing repair method Download PDF

Info

Publication number
SU1051222A1
SU1051222A1 SU823460547A SU3460547A SU1051222A1 SU 1051222 A1 SU1051222 A1 SU 1051222A1 SU 823460547 A SU823460547 A SU 823460547A SU 3460547 A SU3460547 A SU 3460547A SU 1051222 A1 SU1051222 A1 SU 1051222A1
Authority
SU
USSR - Soviet Union
Prior art keywords
nozzle
additional
tool
main
casing
Prior art date
Application number
SU823460547A
Other languages
Russian (ru)
Inventor
Василий Петрович Панков
Станислав Федорович Петров
Марк Лазаревич Кисельман
Виктор Иванович Мишин
Сергей Михайлович Никитин
Original Assignee
Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам filed Critical Всесоюзный научно-исследовательский институт по креплению скважин и буровым растворам
Priority to SU823460547A priority Critical patent/SU1051222A1/en
Application granted granted Critical
Publication of SU1051222A1 publication Critical patent/SU1051222A1/en

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

Изобретение относитс  к нефт ной и газовой пром-сти и предназначено дл  ликвидации негерметичности в обсадных колоннах скважин„ Цель повышение надежности ремонта обсадной колонны Дл  этого дополнительный патрубок спускают после спуска и расширени  основного и размещают с зазором относительно торца После чего расшир ют обращенную к основному концевую часть дополнительного патрубка о Смещают дополнительный патрубок до упора в основной патрубок Затем расшир ют оставшуюс  часть дополнительного патрубка. При использовании данного способа повьш1аетс  надежность перекрыти  нарушенного интервала обсадной колонны 10 илThe invention relates to oil and gas fields and is intended to eliminate leakage in casing strings. “The purpose is to increase the reliability of casing repair. To do this, the additional pipe is lowered after lowering and expanding the main pipe and positioned with a gap relative to the end face. part of the additional nozzle O Shift the additional nozzle until it stops at the main nozzle Then the remaining part of the additional nozzle is expanded. When using this method, the reliability of the overlap of the broken interval of the casing string 10 or less increases.

Description

Изобретение относитс  к способам, примен емым дл  ликвидации негерметичности в обсадных колоннах скважин нефт ной и газовой промьшшенноси, в частности, при капитальном ремонте обсадных колонн„The invention relates to methods used to eliminate leakage in the casing of oil and gas wells, in particular, in the overhaul of casing "

Целью изобретени   вл етс  повышение надежности ремонта обсадной колонны The aim of the invention is to improve the reliability of casing repair

На фиг. 1-5 изображена последовательность операгщй по способу при работе снизу вверх; на фиг, 6-10 - то же при работе сверху вниз сFIG. 1-5 depict the sequence of the operand by the method when working from the bottom up; Fig 6-10 - the same when working from top to bottom with

Способ включает последовательность операций с инструментом 1, например, радиально-расшир ющейс  головкой Инструмент, опускают в скважину на трубах 2 к месту 3 нарушени .обсадной колонны с дополнительным гофрированным патрубком 4 и упором 5 Установленный ранее основной пластьфь в виде гофрированного патрубка 6 зан л положение , показанное на фиг 1, место 3 нарушени  обсадной колоннь осталось неперекрытым, начина  от головы патрубка 6 и выше Дополнительный гофрированньй патрубок 4 опускаетс  к ранее установленному патрубку 6 и размещаетс  с зазором от него по торцу .The method includes a sequence of operations with the tool 1, for example, a radially expanding head of the Tool, lowered into the well on the pipes 2 to the location 3 of the disturbance of the casing with an additional corrugated pipe 4 and the stop 5 Previously installed main face in the form of a corrugated pipe 6 , shown in Fig. 1, the casing disturbance place 3 remains uncovered, starting from the head of the nozzle 6 and above. The additional corrugated nozzle 4 is lowered to the previously installed nozzle 6 and placed with gap from it on the butt.

Claims (1)

Затем в трубах 2 создают давление жидкости, равное 1/3 рабочего давлени  В это врем  инструмент 1 |рас1шр ет обращенную к основному концевую часть дополнительного патрубка в пределах, показанных на фиг 11, то есть не полностью Сцепление пластыр  с колонной произойдет лишь по выступам При всем этом прот жка инструмента 1 в пластыре (фиг 2) составл ет начальнзпо часть его длины Это позволит легко сдвинуть его вниз упором 5 до контакта к ранее установленный патрубок 6 без нахйестки 3 1 ( фиго Зд 4) и перекрыть интервал между HiiMif дополпительныь патрубком 4 После этого давление жидкости в инстр т енте 1 снижают до нул . Радиальные нагрузки инструмента 1 на патрубок 4 уменьшаютс  и он переводитс  Б начальное положенр е (сЬиГоЗ) Упором 5 смещают патрубок 4 вниз до упора Б ранее установленный патрубок б, перекрыва  интервал нарушени  (фиг,, 4), Пшкн   часть патрубка 4 упираетс  в верхнюю часть ранее установленного патрубка 6с В месте соединени  получаетс  герметичное соединение двух тонкостенных патрубков, показанное на фиг„ 5с, После этого инструмент 1 прот гивают через патрубок 4 до выхода из него (фиг 5)с . В производстве работ по установке патрубка в обсадной колонне есть вариант , когда патрубок расшир етс  инструментом 1 сверху вниз , Последовательность операций по способу в этом случае аналогична первому варианту, .только дополнительный Jli-KTS2 патрубок 4 устанавлнвшот зат жкой . труб 2 вверх до упора в ранее установленный патрубок 6 в осадной колонне (фиг. 6-10)„ Таким образом,- использу  данный способ соединени  патрубков можно повысить надежность перекрыти  нарушенного интервала обсадной колонны Формула изобретени  Способ ремонта обсадной колонны, включающий спуск в скважину, расширение и установку встык основного и дополнительного патрубков, отличающийс  тем., что, с целью повышени  надежности ремонта обсадной колонны, дополнительньй патрубок спускают после спуска и расширени  основного и размещают с зазором относительно торца последнего, после че-. го расшир ют обращенную к основному концевую часть дополнительного патрубка , смещают его до упора в основной , а затем расшир ют оставшуюс  часть дополнительного патрубка„ S .6Then, in pipes 2, a fluid pressure of 1/3 of the working pressure is created. At this time, tool 1 \ expands the additional end pipe facing the main end within the limits shown in FIG. 11, i.e. not fully. Adhesion of the patch to the column will occur only along the protrusions. With all this, the tool 1 in the patch (figure 2) makes up the initial part of its length. This will allow it to be easily moved down by the stop 5 to the contact to the previously installed branch pipe 6 without the top 3 3 (figo Rear 4) and cover the interval between the HiiMif additional patch. 4 ubkom Thereafter, the fluid pressure in instr ente r 1 is reduced to zero. The radial loads of tool 1 on nozzle 4 are reduced and it is transferred to B initial position (curvature). Stopper 5 moves nozzle 4 down to abutment B previously installed nozzle b, overlapping the spacing interval (FIG 4), part of the nozzle 4 abuts the upper part previously installed nozzle 6c. At the junction, a tight connection of two thin-walled nozzles, shown in Fig. 5c, is obtained. After that, tool 1 is pulled through nozzle 4 until it exits (Fig. 5) c. In the casing installation, there is an option where the nozzle is expanded from tool 1 from top to bottom. The sequence of operations according to the method in this case is the same as the first option, only the additional Jli-KTS2 nozzle 4 is set tight. pipes 2 up to the stop in the previously installed pipe 6 in the siege column (Fig. 6-10). Thus, using this method of connecting the pipes, it is possible to increase the reliability of closing the broken casing interval. Formula of the invention The method of casing repair, including the descent into the well, expansion and butt-up of the main and additional nozzles, characterized in that, in order to improve the reliability of the casing repair, the additional nozzle is lowered after the descent and expansion of the main one and is placed with a gap m relative to the end of the latter, after che. The first end portion of the additional nozzle, which is facing the main end, is extended, shifted to the main abutment, and then the remaining part of the additional end piece "S .6 .at u./u. / /.S/.S .ff.ff /г.//g./
SU823460547A 1982-07-01 1982-07-01 Casing repair method SU1051222A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823460547A SU1051222A1 (en) 1982-07-01 1982-07-01 Casing repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823460547A SU1051222A1 (en) 1982-07-01 1982-07-01 Casing repair method

Publications (1)

Publication Number Publication Date
SU1051222A1 true SU1051222A1 (en) 1983-10-30

Family

ID=21019203

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823460547A SU1051222A1 (en) 1982-07-01 1982-07-01 Casing repair method

Country Status (1)

Country Link
SU (1) SU1051222A1 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6354373B1 (en) * 1997-11-26 2002-03-12 Schlumberger Technology Corporation Expandable tubing for a well bore hole and method of expanding
US6470966B2 (en) 1998-12-07 2002-10-29 Robert Lance Cook Apparatus for forming wellbore casing
US6557640B1 (en) 1998-12-07 2003-05-06 Shell Oil Company Lubrication and self-cleaning system for expansion mandrel
US6568471B1 (en) 1999-02-26 2003-05-27 Shell Oil Company Liner hanger
US6575240B1 (en) 1998-12-07 2003-06-10 Shell Oil Company System and method for driving pipe
US6604763B1 (en) 1998-12-07 2003-08-12 Shell Oil Company Expandable connector
US6634431B2 (en) 1998-11-16 2003-10-21 Robert Lance Cook Isolation of subterranean zones
US6640903B1 (en) 1998-12-07 2003-11-04 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6712154B2 (en) 1998-11-16 2004-03-30 Enventure Global Technology Isolation of subterranean zones
US6725919B2 (en) 1998-12-07 2004-04-27 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6823937B1 (en) 1998-12-07 2004-11-30 Shell Oil Company Wellhead
US6892819B2 (en) 1998-12-07 2005-05-17 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US7100685B2 (en) * 2000-10-02 2006-09-05 Enventure Global Technology Mono-diameter wellbore casing
RU2338053C2 (en) * 2007-02-08 2008-11-10 Николай Александрович Богатов Method of tubing repair
RU2354803C1 (en) * 2008-06-07 2009-05-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for well repair
RU2563520C2 (en) * 2010-02-22 2015-09-20 Веллтек А/С Tubular assembly
RU2580956C2 (en) * 2010-08-31 2016-04-10 Веллтек А/С Sealing system

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6354373B1 (en) * 1997-11-26 2002-03-12 Schlumberger Technology Corporation Expandable tubing for a well bore hole and method of expanding
US6634431B2 (en) 1998-11-16 2003-10-21 Robert Lance Cook Isolation of subterranean zones
US6712154B2 (en) 1998-11-16 2004-03-30 Enventure Global Technology Isolation of subterranean zones
US7357188B1 (en) 1998-12-07 2008-04-15 Shell Oil Company Mono-diameter wellbore casing
US6758278B2 (en) 1998-12-07 2004-07-06 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6604763B1 (en) 1998-12-07 2003-08-12 Shell Oil Company Expandable connector
US6631760B2 (en) 1998-12-07 2003-10-14 Shell Oil Company Tie back liner for a well system
US7665532B2 (en) 1998-12-07 2010-02-23 Shell Oil Company Pipeline
US6470966B2 (en) 1998-12-07 2002-10-29 Robert Lance Cook Apparatus for forming wellbore casing
US7240728B2 (en) 1998-12-07 2007-07-10 Shell Oil Company Expandable tubulars with a radial passage and wall portions with different wall thicknesses
US6640903B1 (en) 1998-12-07 2003-11-04 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6892819B2 (en) 1998-12-07 2005-05-17 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6823937B1 (en) 1998-12-07 2004-11-30 Shell Oil Company Wellhead
US6557640B1 (en) 1998-12-07 2003-05-06 Shell Oil Company Lubrication and self-cleaning system for expansion mandrel
US6725919B2 (en) 1998-12-07 2004-04-27 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6739392B2 (en) 1998-12-07 2004-05-25 Shell Oil Company Forming a wellbore casing while simultaneously drilling a wellbore
US6575240B1 (en) 1998-12-07 2003-06-10 Shell Oil Company System and method for driving pipe
US6705395B2 (en) 1999-02-26 2004-03-16 Shell Oil Company Wellbore casing
US6684947B2 (en) 1999-02-26 2004-02-03 Shell Oil Company Apparatus for radially expanding a tubular member
US6568471B1 (en) 1999-02-26 2003-05-27 Shell Oil Company Liner hanger
US6631769B2 (en) 1999-02-26 2003-10-14 Shell Oil Company Method of operating an apparatus for radially expanding a tubular member
US6631759B2 (en) 1999-02-26 2003-10-14 Shell Oil Company Apparatus for radially expanding a tubular member
US7100685B2 (en) * 2000-10-02 2006-09-05 Enventure Global Technology Mono-diameter wellbore casing
RU2338053C2 (en) * 2007-02-08 2008-11-10 Николай Александрович Богатов Method of tubing repair
RU2354803C1 (en) * 2008-06-07 2009-05-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for well repair
RU2563520C2 (en) * 2010-02-22 2015-09-20 Веллтек А/С Tubular assembly
US9194218B2 (en) 2010-02-22 2015-11-24 Welltec A/S Tubular assembly
RU2580956C2 (en) * 2010-08-31 2016-04-10 Веллтек А/С Sealing system
US9447651B2 (en) 2010-08-31 2016-09-20 Welltec A/S Sealing system

Similar Documents

Publication Publication Date Title
SU1051222A1 (en) Casing repair method
SU1686124A1 (en) Casing repairs method
EA200000179A1 (en) METHOD OF CREATING ZONAL INSULATION BETWEEN THE INTERNAL AND EXTERNAL PARTS OF THE WELLS SYSTEM
US2907351A (en) Means for protecting well casing from corrosion
SU1747673A1 (en) Device for application of patch liner to casing pipe
US4318668A (en) Seal means for a gas turbine engine
FR2403451A1 (en) FLOATING SEAL FOR TURBOMACHINE BLADE AND BLADE SO OBTAINED
UA73296C2 (en) Method for formation of secondary side stems in a well system and a well system
FR2351250A1 (en) FLUID CIRCULATION SEALING DEVICE FOR TURBO-MACHINES, ESPECIALLY FOR GAS TURBINE REACTION ENGINES
JPS5847558B2 (en) Packing device for wellhead structures
SE7703468L (en) SET AND APPLIANCE FOR FIXING A TUB-SLEEVED SLEEVE
SU1200609A1 (en) Nozzle unit of gas turbine
SU1712581A1 (en) Trouble zone isolator
SU1694863A1 (en) Valve device for wells
SU1712584A1 (en) Packer
SU1446279A1 (en) Method of determining unsealed state of rod pump - tubing system
SU1121402A1 (en) Method of determining inter-string gas manifestations in oil and gas wells
RU96108473A (en) METHOD FOR THERMAL INSULATION OF AN EXPRESSIVE WELL
CN209280213U (en) The auxiliary tool of single hop hydraulic pressure Leakage Test
SU560971A1 (en) Device for installing a metal plaster inside a pipe
RU2044861C1 (en) Casing pipe for well casing
CN220649905U (en) A pressure test flange
CN205581375U (en) Fixed protection device of cable is spread to companion's pipe
CN1055147C (en) Oil well pore path crack cleaning equipment and treating method
RU93048569A (en) ELEVATOR HEAT-INSULATED PIPE