RU52919U1 - DEVICE FOR HYDRAULIC TURNING A GAS WELL - Google Patents
DEVICE FOR HYDRAULIC TURNING A GAS WELL Download PDFInfo
- Publication number
- RU52919U1 RU52919U1 RU2005134543/22U RU2005134543U RU52919U1 RU 52919 U1 RU52919 U1 RU 52919U1 RU 2005134543/22 U RU2005134543/22 U RU 2005134543/22U RU 2005134543 U RU2005134543 U RU 2005134543U RU 52919 U1 RU52919 U1 RU 52919U1
- Authority
- RU
- Russia
- Prior art keywords
- pressure
- hydraulic fracturing
- packer
- high pressure
- tubing
- Prior art date
Links
- 239000000725 suspension Substances 0.000 claims abstract description 17
- 238000009434 installation Methods 0.000 claims abstract description 10
- 230000015556 catabolic process Effects 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract 1
- 241000191291 Abies alba Species 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 102000018616 Apolipoproteins B Human genes 0.000 description 1
- 108010027006 Apolipoproteins B Proteins 0.000 description 1
- XUKUURHRXDUEBC-KAYWLYCHSA-N Atorvastatin Chemical compound C=1C=CC=CC=1C1=C(C=2C=CC(F)=CC=2)N(CC[C@@H](O)C[C@@H](O)CC(O)=O)C(C(C)C)=C1C(=O)NC1=CC=CC=C1 XUKUURHRXDUEBC-KAYWLYCHSA-N 0.000 description 1
- 241000566515 Nedra Species 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Pipe Accessories (AREA)
Abstract
Устройство для гидравлического разрыва пласта газовой скважины относится к нефтегазодобывающей промышленности, а именно к устройствам для проведения гидравлического разрыва пласта в газовых скважинах. Технический результат - снижение времени на монтажные работы перед и после гидравлического разрыва пласта, сокращение времени нахождения скважины в бездействующем фонде. Устройство для гидравлического разрыва пласта газовой скважины содержит колонну насосно-компрессорных труб с пакером высокого давления, устьевое оборудование высокого давления с обвязывающими трубопроводами. Колонна насосно-компрессорных труб дополнительно оборудована циркуляционным клапаном, размещенным выше пакера, и подвешена на подвесном патрубке, закрепленным над устьевой арматурой. В качестве устьевой арматуры используется преветорная установка, При этом на подвесном патрубке размещен отсекающий элемент высокого давления, а выше и ниже него - быстроразъемные соединения. Длина подвесного патрубка определяется удлинением колонны насосно-компрессорных труб под собственным весом в процессе срыва пакера после проведенного гидравлического разрыва пласта. В качестве отсекающего элемента высокого давления применяется задвижка высокого давления или шаровой кран высокого давления.A device for hydraulic fracturing of a gas well relates to the oil and gas industry, namely, devices for conducting hydraulic fracturing in gas wells. EFFECT: reduced time for installation work before and after hydraulic fracturing, reduced time spent by a well in an idle fund. A device for hydraulic fracturing of a gas well contains a column of tubing with a high pressure packer, wellhead equipment with high pressure piping. The tubing string is additionally equipped with a circulation valve located above the packer and suspended on a suspension pipe mounted above the wellhead. A pre-installation is used as wellhead fittings. At the same time, a high-pressure shut-off element is placed on the suspension pipe, and quick-disconnect connections are located above and below it. The length of the suspension pipe is determined by the elongation of the tubing string under its own weight during the breakdown of the packer after the hydraulic fracturing. As a high-pressure shut-off element, a high-pressure valve or a high-pressure ball valve is used.
Description
Устройство для гидравлического разрыва пласта газовой скважины относится к нефтегазодобывающей промышленности, а именно к устройствам для проведения гидравлического разрыва пласта в газовых скважинах.A device for hydraulic fracturing of a gas well relates to the oil and gas industry, namely, devices for conducting hydraulic fracturing in gas wells.
При гидравлическом разрыве пласта газовых скважин применяется специальная фонтанная арматура, рассчитанная на высокое давление в 2 раза, как минимум, превышающее давление предполагаемого разрыва, а также колонна насосно-компрессорных труб, оборудованная пакером. Перед гидравлическим разрывом пласта демонтируется старая фонтанная арматура, монтируется противовыбросовое оборудование, извлекается лифтовая колонна, находящаяся в скважине, спускается колонна насосно-компрессорных труб с пакером высокого давления, демонтируется противовыбросовое оборудование, монтируется специальная фонтанная арматура высокого давления. Только после этого проводится гидравлический разрыв пласта, а затем все вышеперечисленные операции необходимо провести в обратной последовательности.For hydraulic fracturing of gas wells, special fountain fittings are used, designed for a high pressure of 2 times, at least higher than the pressure of the expected fracture, as well as a tubing string equipped with a packer. Before hydraulic fracturing, the old fountain fittings are dismantled, blowout equipment is installed, the lift column located in the well is removed, the tubing string with high pressure packer is lowered, the blowout equipment is dismantled, and special high pressure fountain fittings are mounted. Only after this, hydraulic fracturing is carried out, and then all of the above operations must be carried out in the reverse order.
Известно устройство, применяемое для гидравлического разрыва пласта газовой скважины, включающее колонну насосно-компрессорных труб с пакером высокого давления, устьевое оборудование высокого давления с обвязывающими трубопроводами [Коротаев Ю.П. Эксплуатация газовых месторождений. - М.: Недра, 1975. - С.374-377].A device is known that is used for hydraulic fracturing of a gas well, including a tubing string with a high pressure packer, wellhead equipment with high pressure piping [Korotaev Yu.P. The exploitation of gas fields. - M .: Nedra, 1975. - S.374-377].
Недостатком устройства является большая трудоемкость монтажных работ перед гидравлическим разрывом пласта и после него.The disadvantage of this device is the high complexity of installation work before hydraulic fracturing and after it.
Задача, стоящая при создании устройства, состоит в разработке надежного и безотказного в работе механизма, обеспечивающего снижение затрат на монтажные работы перед и после гидравлического разрыва пласта.The challenge facing the creation of the device is to develop a reliable and trouble-free mechanism that provides reduced installation costs before and after hydraulic fracturing.
Достигаемый технический результат состоит в снижении времени на монтажные работы перед и после гидравлического разрыва пласта, а следовательно, в сокращении времени нахождения скважины в бездействующем фонде.Achievable technical result consists in reducing the time for installation work before and after hydraulic fracturing, and therefore, in reducing the time spent by the well in an idle fund.
Поставленная задача и технический результат достигаются тем, что в известном устройстве для гидравлического разрыва пласта газовой скважины, содержащее колонну насосно-компрессорных труб с пакером высокого давления, устьевое оборудование высокого давления с обвязывающими трубопроводами, включающее трубную головку, в отличие от прототипа колонна насосно-компрессорных труб дополнительно оборудована циркуляционным клапаном, размещенным выше пакера высокого давления, и подвешена The task and the technical result are achieved by the fact that in the known device for hydraulic fracturing of a gas well containing a column of tubing with a high pressure packer, wellhead equipment with high pressure binding pipelines, including a pipe head, in contrast to the prototype tubing string pipes are additionally equipped with a circulation valve located above the high-pressure packer and suspended
на подвесном патрубке, закрепленным над трубной головкой, на которой установлена преветорная установка, при этом на подвесном патрубке размещен отсекающий элемент высокого давления, а выше и ниже него - быстроразъемные соединения, длина подвесного патрубка определяется удлинением колонны насосно-компрессорных труб под собственным весом в процессе срыва пакера после проведенного гидравлического разрыва пласта, а в качестве отсекающего элемента высокого давления применяется задвижка высокого давления или шаровой кран высокого давления.on the suspension pipe mounted above the pipe head on which the pre-installation is installed, while the high pressure shut-off element is placed on the suspension pipe, and quick disconnect connections above and below it, the length of the suspension pipe is determined by the elongation of the tubing string under its own weight in the process packer breakdown after hydraulic fracturing, and as a high-pressure shut-off element, a high-pressure valve or a high-pressure ball valve is used i.
На фиг.1 показано заявляемое устройство, на фиг.2 - узел подвески колонны насосно-компрессорных труб на подвесном патрубке.Figure 1 shows the inventive device, figure 2 is a node of the suspension string tubing on the hanging pipe.
Устройство для гидравлического разрыва пласта газовой скважины состоит из колонны насосно-компрессорных труб 1 с пакером высокого давления 2 и циркуляционным клапаном 3, размещенным выше пакера 2, превенторной установки 4 с надпревенторной катушкой 5 и подвесного патрубка 6 с переводником 7, подвесным фланцем 8, отсекающим элементом высокого давления 9 и быстроразъемными соединениями 10, размещенными выше и ниже отсекающего элемента высокого давления 9. В качестве отсекающего элемента высокого давления 9 применяется отсекающая задвижка или шаровой кран высокого давления. При этом колонна насосно-компрессорных труб 1 с пакером высокого давления 2 и циркуляционным клапаном 3 размещена во внутренней полости превенторной установки 4 и подвешена через переводник 7 на подвесном патрубке 6, закрепленном с помощью подвесного фланца 8 на надпревенторной катушке 5. Длина подвесного патрубка 6 определяется удлинением колонны насосно-компрессорных труб 1 под собственным весом в процессе срыва пакера высокого давления 2 после проведенного гидравлического разрыва пласта. Устройство обвязывается трубопроводами 11 и 12.A device for hydraulic fracturing of a gas well consists of a tubing string 1 with a high-pressure packer 2 and a circulation valve 3 located above the packer 2, a preventer installation 4 with a super-prestress coil 5 and a suspension pipe 6 with an adapter 7, a hanging flange 8, cutting off a high-pressure element 9 and quick-release couplings 10 located above and below the high-pressure shut-off element 9. As a high-pressure shut-off element 9, a shut-off valve or ApoB high pressure valve. At the same time, the tubing string 1 with the high-pressure packer 2 and the circulation valve 3 is placed in the inner cavity of the preventer unit 4 and suspended through an adapter 7 on the suspension pipe 6, mounted using the hanging flange 8 on the over-heater coil 5. The length of the suspension pipe 6 is determined lengthening the tubing string 1 under its own weight in the process of disruption of the high-pressure packer 2 after the hydraulic fracturing. The device is tied with pipelines 11 and 12.
Устройство работает следующим образом.The device operates as follows.
После глушения скважины, демонтажа устьевого оборудования, а именно: демонтажа фонтанной елки старой, ранее установленной на скважине, фонтанной арматуры, монтажа на корпусе трубной головки 13 старой фонтанной арматуры превенторной установки 4 и извлечения лифтовой колонны, находящейся в скважине, проводят спуск в скважину через превенторную установку 4 колонны насосно-компрессорных труб 1 с пакером высокого давления 3 и циркуляционным клапаном 4. Колонну насосно-компрессорных труб 1 подвешивают через переводник 7 на подвесном патрубке 6, который закрепляют с помощью подвесного фланца 8 на надпревенторной катушке 5. Переводник 7 предназначен для подвески на подвесном патрубке 6 колонны насосно-компрессорных труб 1 разного диаметра, в зависимости от технологической After killing the well, dismantling the wellhead equipment, namely: dismantling the old tree, previously installed on the well, Christmas tree, installing on the body of the pipe head 13 of the old Christmas tree reinforcing unit 4 and removing the elevator column located in the well, run down the well through preventive installation 4 columns of tubing 1 with a high pressure packer 3 and a circulation valve 4. The column of tubing 1 is suspended through a sub 7 on the suspension pipe 6, to which is fixed with a hanging flange 8 on a pre-vent coil 5. The sub 7 is designed for suspension on a suspension pipe 6 of a column of tubing 1 of different diameters, depending on the technological
необходимости. Устройство обвязывают трубопроводами: выкидным 11 и контроля за затрубным пространством скважины 12. К подвесному патрубку 6 через верхнее быстроразъемное соединение 10 присоединяют линию нагнетания (не показано). Подачей жидкости через линию нагнетания от насосной установки приводят пакер высокого давления 2 в рабочее состояние, когда он перекрывает затрубное пространство скважины, герметично отсекая забой скважины от устья. Нагнетанием жидкости разрыва проводят гидравлический разрыв пласта и закрепляют образовавшиеся трещины проппантом. После завершения гидравлического разрыва пласта проводят выравнивание плотностей жидкостей в трубном и затрубном пространствах скважины путем открытия циркуляционного клапана 3, а затем - срыв пакера высокого давления 2 натяжением колонны насосно-компрессорных труб 1 вверх с помощью подъемного агрегата после раскрепления подвесного фланца 8 с надпревенторной катушкой 5. Создание циркуляции обеспечивает противофонтанную безопасность при срыве и подъеме пакера высокого давления 2. Длина подвесного патрубка 6 обеспечивает захват его элеватором и вытяжку колонны насосно-компрессорных труб 1 до упора в ограничителе подъема подъемного агрегата.necessary. The device is tied with pipelines: flow 11 and control of the annular space of the well 12. To the suspension pipe 6 through the upper quick disconnect 10 connect the discharge line (not shown). By supplying liquid through the injection line from the pump unit, the high-pressure packer 2 is brought into operation when it overlaps the annulus of the well, hermetically cutting off the bottom of the well from the wellhead. Hydraulic fracturing is carried out by injection of the fracturing fluid and the formed cracks are fixed with proppant. After completion of the hydraulic fracturing, the fluid densities are balanced in the pipe and annular spaces of the well by opening the circulation valve 3, and then the high-pressure packer 2 is pulled up by pulling the tubing string 1 upward using a lifting unit after unfastening the hanging flange 8 with the over-prestress coil 5 The creation of circulation provides uncontrolled safety during the breakdown and lifting of the high-pressure packer 2. The length of the suspension pipe 6 ensures the capture of its ele Ator and hood tubing string 1 until it stops at stopper lifting the hoisting machine.
Устройство позволяет сократить время на монтажные работы перед и после гидравлического разрыва пласта при обеспечении безопасности производства работ, уменьшить время нахождения скважины в бездействующем фонде.The device allows to reduce the time for installation work before and after hydraulic fracturing while ensuring the safety of work, to reduce the time spent by the well in an idle fund.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2005134543/22U RU52919U1 (en) | 2005-11-07 | 2005-11-07 | DEVICE FOR HYDRAULIC TURNING A GAS WELL |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2005134543/22U RU52919U1 (en) | 2005-11-07 | 2005-11-07 | DEVICE FOR HYDRAULIC TURNING A GAS WELL |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU52919U1 true RU52919U1 (en) | 2006-04-27 |
Family
ID=36656100
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2005134543/22U RU52919U1 (en) | 2005-11-07 | 2005-11-07 | DEVICE FOR HYDRAULIC TURNING A GAS WELL |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU52919U1 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| USD756792S1 (en) * | 2013-05-17 | 2016-05-24 | Nestec S.A. | Container |
| RU2651716C1 (en) * | 2016-12-09 | 2018-04-23 | Общество с ограниченной ответственностью "Газпром проектирование" | Method for upgrading gas-condensate well |
| US11384876B2 (en) | 2020-07-07 | 2022-07-12 | Safoco, Inc. | Fluid conduit connector system |
| US11519536B2 (en) | 2020-07-07 | 2022-12-06 | Safoco, Inc. | Fluid conduit connector system |
| US11530601B2 (en) | 2020-07-07 | 2022-12-20 | Safoco, Inc. | Fluid conduit connector system |
-
2005
- 2005-11-07 RU RU2005134543/22U patent/RU52919U1/en not_active IP Right Cessation
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| USD756792S1 (en) * | 2013-05-17 | 2016-05-24 | Nestec S.A. | Container |
| RU2651716C1 (en) * | 2016-12-09 | 2018-04-23 | Общество с ограниченной ответственностью "Газпром проектирование" | Method for upgrading gas-condensate well |
| US11384876B2 (en) | 2020-07-07 | 2022-07-12 | Safoco, Inc. | Fluid conduit connector system |
| US11519536B2 (en) | 2020-07-07 | 2022-12-06 | Safoco, Inc. | Fluid conduit connector system |
| US11530601B2 (en) | 2020-07-07 | 2022-12-20 | Safoco, Inc. | Fluid conduit connector system |
| US11852267B2 (en) | 2020-07-07 | 2023-12-26 | Safoco, Inc. | Fluid conduit connector system |
| US11905811B2 (en) | 2020-07-07 | 2024-02-20 | Safoco, Inc. | Fluid conduit connector system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7438126B2 (en) | Apparatus for controlling a tool having a mandrel that must be stroked into or out of a well | |
| EP2236739B1 (en) | Well unloading package | |
| CN105804680B (en) | A kind of oil gas field workover operation device with pressure and method | |
| US20140352976A1 (en) | Method And An Apparatus For Retrieving A Tubing From A Well | |
| CN102777156A (en) | Fracturing method for multi-interval oil and gas wells | |
| US10760347B2 (en) | System and method for offline suspension or cementing of tubulars | |
| CN107859499A (en) | A pressure working device | |
| CN104975818B (en) | Equipment and technology for lifting and lowering oil pipes | |
| CN205605156U (en) | Workover device is pressed in oil gas field area | |
| CN103597167B (en) | To underwater well for the method and apparatus being applied to the liquid of kill-job and de-sludging | |
| RU52919U1 (en) | DEVICE FOR HYDRAULIC TURNING A GAS WELL | |
| US7150327B2 (en) | Workover unit and method of utilizing same | |
| CN206158656U (en) | A pressure working device | |
| RU2301885C1 (en) | Method for hydraulic fracturing of reservoir in gas well | |
| CN110219610A (en) | A kind of shale gas horizontal well is pumped by bridging device | |
| RU2236560C2 (en) | Method for oil extraction | |
| RU2631517C1 (en) | Method for mechanised pump operation of wells and device for its implementation | |
| RU2250978C1 (en) | Method for extraction of lifting pipes column from a well | |
| CN110685616B (en) | Well repairing operation method for low-permeability water-sensitive oil well | |
| RU2324050C2 (en) | Method of hydrolic fracturing of formation of condensate borehole | |
| RU2829313C1 (en) | Device for sealing at wellhead of two-lift arrangement of downhole equipment | |
| CN111133168B (en) | Running seabed water-proof pipe column | |
| RU2800177C1 (en) | Method for operating well equipped with electric submersible pump under conditions complicated by formation of asphaltene-resin-paraffin deposits, and device for its implementation | |
| RU2651716C1 (en) | Method for upgrading gas-condensate well | |
| CN105298427B (en) | Mechanical wellhead suspension device and integrated device for self-spraying, turning and mining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Utility model has become invalid (non-payment of fees) |
Effective date: 20081108 |