RU2588108C1 - Horizontal well completion method - Google Patents
Horizontal well completion method Download PDFInfo
- Publication number
- RU2588108C1 RU2588108C1 RU2015142139/03A RU2015142139A RU2588108C1 RU 2588108 C1 RU2588108 C1 RU 2588108C1 RU 2015142139/03 A RU2015142139/03 A RU 2015142139/03A RU 2015142139 A RU2015142139 A RU 2015142139A RU 2588108 C1 RU2588108 C1 RU 2588108C1
- Authority
- RU
- Russia
- Prior art keywords
- well
- horizontal
- wellbore
- acid
- solution
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 239000002253 acid Substances 0.000 claims abstract description 59
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 23
- 239000004094 surface-active agent Substances 0.000 claims abstract description 21
- 238000005086 pumping Methods 0.000 claims abstract description 19
- 239000011435 rock Substances 0.000 claims abstract description 17
- 230000000694 effects Effects 0.000 claims abstract description 12
- 238000004519 manufacturing process Methods 0.000 claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 11
- 239000011261 inert gas Substances 0.000 claims abstract description 10
- 238000006243 chemical reaction Methods 0.000 claims abstract description 9
- 238000005406 washing Methods 0.000 claims abstract description 8
- 238000011010 flushing procedure Methods 0.000 claims abstract description 5
- 238000005520 cutting process Methods 0.000 claims abstract description 4
- 239000000243 solution Substances 0.000 claims description 54
- 239000012530 fluid Substances 0.000 claims description 14
- 239000007864 aqueous solution Substances 0.000 claims description 9
- 230000008878 coupling Effects 0.000 claims description 8
- 238000010168 coupling process Methods 0.000 claims description 8
- 238000005859 coupling reaction Methods 0.000 claims description 8
- 238000005070 sampling Methods 0.000 claims description 2
- 238000003825 pressing Methods 0.000 claims 1
- 239000011229 interlayer Substances 0.000 abstract description 7
- 238000010306 acid treatment Methods 0.000 abstract description 6
- 239000008398 formation water Substances 0.000 abstract description 3
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 abstract description 2
- 238000005755 formation reaction Methods 0.000 abstract 3
- 239000007788 liquid Substances 0.000 abstract 2
- 238000004891 communication Methods 0.000 abstract 1
- 238000000605 extraction Methods 0.000 abstract 1
- 239000007789 gas Substances 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 238000005553 drilling Methods 0.000 description 4
- 238000004861 thermometry Methods 0.000 description 3
- VEXZGXHMUGYJMC-UHFFFAOYSA-N Hydrochloric acid Chemical compound Cl VEXZGXHMUGYJMC-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 230000000740 bleeding effect Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000011282 treatment Methods 0.000 description 1
Abstract
Description
Изобретение относится к нефтедобывающей промышленности и может найти применение при интенсификации добычи нефти из продуктивного карбонатного пласта, вскрытого скважиной с открытым горизонтальным стволом.The invention relates to the oil industry and may find application in the intensification of oil production from a productive carbonate formation, opened by a well with an open horizontal wellbore.
Известен способ заканчивания скважины, в котором производят закачку в горизонтальный открытый ствол скважины раствора кислоты в режиме гидромониторного воздействия, гидромониторное воздействие осуществляют посредством гидромониторной насадки, размещенной на конце гибкой безмуфтовой трубы. Насадку размещают на забое ствола скважины. Прокачивают раствор кислоты циркуляцией с устьем скважины, одновременно с циркуляцией раствора кислоты поднимают из скважины гибкую безмуфтовую трубу со скоростью, не большей скорости заполнения ствола скважины раствором кислоты. После заполнения горизонтального ствола раствором кислоты продавливают раствор кислоты в пласт со ступенчатым подъемом давления и выдержкой на каждой ступени. Снова спускают гибкую безмуфтовую трубу с насадкой на забой скважины и повторяют операции по заполнению ствола скважины раствором кислоты и продавливанию. Проводят технологическую выдержку для реакции раствора кислоты с породой. Поднимают гибкую безмуфтовую трубу в интервал прокачки инертного газа, прокачивают инертный газ, снимают кривую восстановления уровня. Проводят цикличное глушение скважины в режиме «закачка воды - выдержка - стравливание нефти» до полного стравливания нефти, спускают глубинный насос и запускают скважину в работу (патент РФ №2490442, опубл. 20.08.2013).There is a known method of well completion in which an acid solution is injected into a horizontal open wellbore in a hydromonitoring mode, the hydromonitoring effect is carried out by means of a nozzle placed at the end of a flexible sleeveless pipe. The nozzle is placed on the bottom of the wellbore. The acid solution is pumped by circulation with the wellhead; simultaneously with the circulation of the acid solution, a flexible sleeveless pipe is lifted from the well with a speed not exceeding the rate of filling the wellbore with an acid solution. After filling the horizontal well with an acid solution, the acid solution is pushed into the formation with a stepwise increase in pressure and exposure at each stage. The flexible sleeveless pipe with the nozzle for the bottom of the well is lowered again and the operations of filling the wellbore with an acid solution and forcing are repeated. Carry out technological exposure for the reaction of the acid solution with the rock. A flexible sleeveless pipe is raised to the inert gas pumping interval, the inert gas is pumped, and the level recovery curve is taken. The wells are cycled killing in the “water injection - holding - oil bleeding” mode until the oil is completely bled, the downhole pump is lowered and the well is put into operation (RF patent No. 2490442, published on 08/20/2013).
Недостатком способа является то, что при кислотной обработке кислота реагирует с породой неравномерно по длине горизонтального ствола.The disadvantage of this method is that during acid treatment, the acid reacts with the rock unevenly along the length of the horizontal trunk.
Наиболее близким к предложенному изобретению по технической сущности является способ заканчивания скважины, включающий прокачку раствора кислоты циркуляцией с устьем скважины посредством гидромониторной насадки, размещенной на конце гибкой безмуфтовой трубы, одновременно с циркуляцией раствора кислоты подъем из скважины гибкой безмуфтовой трубы со скоростью, не большей скорости заполнения ствола скважины раствором кислоты, после заполнения горизонтального ствола раствором кислоты продавку раствора кислоты в пласт со ступенчатым подъемом давления и выдержкой на каждой ступени, проведение технологической выдержки для реакции раствора кислоты с породой, прокачку инертного газа, фиксирование кривой восстановления уровня, глушение скважины и освоение скважины, согласно изобретению, предварительно в скважину в интервал башмака эксплуатационной колонны спускают колонну насосно-компрессорных труб с пусковыми муфтами и с воронкой на конце, гибкую безмуфтовую трубу с гидромониторной насадкой спускают внутри колонны насосно-компрессорных туб, перед продавкой кислоты в пласт горизонтальный ствол скважины при открытом затрубном пространстве заполняют через гибкую безмуфтовую трубу водным раствором поверхностно-активного вещества, при закрытом затрубном пространстве выполняют продавку водного раствора поверхностно-активного вещества в пласт, проводят технологическую выдержку до всплытия нефти в скважину, затем по затрубному пространству производят продавку раствора кислоты, проводят технологическую выдержку для реакции раствора кислоты с породой, промывают ствол скважины, поднимают из скважины гибкую безмуфтовую трубу с гидромониторной насадкой, а прокачку инертного газа проводят по затрубному пространству с отбором жидкости по колонне насосно-компрессорных труб, после освоения скважины проводят геофизические исследования горизонтального ствола на гибкой трубе методами термометрии и дебитометрии, после получения результатов исследования выявляют «неработающие» интервалы и, сопоставляя геофизический материал сданными окончательного каротажа, определяют «неработающие» интервалы горизонтального ствола, имеющие высокие фильтрационно-емкостные свойства, спуском гибкой безмуфтовой трубы устанавливают гидромониторную насадку в данных интервалах горизонтального ствола, упирают конец гидромониторной насадки в стенку горизонтального ствола и осуществляют циркуляцию раствора кислоты через гибкую безмуфтовую трубу, гидромониторную насадку и колонну насосно-компрессорных труб до образования в породе углубления (канала) и увеличения площади поверхности интервала воздействия, затем по затрубному пространству производят продавку раствора кислоты, проводят технологическую выдержку для реакции раствора кислоты с породой, поднимают из скважины гибкую безмуфтовую трубу с гидромониторной насадкой, а прокачку инертного газа проводят по затрубному пространству с отбором жидкости по колонне насосно-компрессорных труб (патент РФ №2541986, опубл. 20.02.2015 - прототип).Closest to the proposed invention in technical essence is a method of completing a well, comprising pumping an acid solution by circulation with the wellhead by means of a nozzle placed at the end of a flexible sleeveless pipe, while circulating the acid solution, lifting a flexible sleeveless pipe from a well at a speed not exceeding the filling rate the wellbore with an acid solution, after filling the horizontal wellbore with an acid solution, pushing the acid solution into the formation with a stepwise by raising the pressure and holding at each stage, carrying out technological exposure for the reaction of the acid solution with the rock, pumping inert gas, fixing the level recovery curve, killing the well and developing the well, according to the invention, the tubing string is lowered into the well of the shoe of the production string first with start-up couplings and a funnel at the end, a flexible sleeveless coupling pipe with a hydraulic nozzle is lowered inside the tubing string before selling acid in the formation, the horizontal wellbore with an open annular space is filled through a flexible sleeveless pipe with an aqueous solution of a surfactant, with a closed annular space, an aqueous solution of a surfactant is forced into the formation, technological exposure is carried out until oil floats into the well, then the annulus is produced squeezing the acid solution, carry out technological exposure for the reaction of the acid solution with the rock, wash the wellbore, lift from the wells They have a flexible sleeveless pipe with a hydraulic nozzle, and inert gas is pumped through the annulus with fluid withdrawal along the tubing string, after the well is developed, geophysical studies of the horizontal wellbore on the flexible pipe are carried out using thermometry and debitometry methods, after obtaining the results of the study, “idle” are detected intervals and, comparing the geophysical material with final logs, determine the "idle" horizontal well intervals having high e filtration-capacitive properties, by installing a flexible sleeveless pipe, install a hydraulic monitor nozzle in these horizontal hole intervals, press the end of the hydraulic nozzle against the horizontal barrel wall and circulate the acid solution through a flexible sleeveless pipe, hydraulic monitor nozzle and tubing string until a well is formed in the rock (channel) and an increase in the surface area of the exposure interval, then an acid solution is forced through the annulus, ny exposure process for the reaction of acid with the rock, raised from the well clutchless flexible tube with a jetting nozzle, and pumping the inert gas is conducted from the annulus fluid by a column selection tubing (RF patent №2541986, publ. 02/20/2015 - prototype).
При реализации известного способа обеспечивается равномерность кислотного воздействия по длине горизонтального ствола, однако при этом не возникает гидродинамическая связь с пропластками, не охваченными кислотным воздействием.When implementing the known method, the uniformity of the acid effect is ensured along the length of the horizontal wellbore, however, there is no hydrodynamic connection with the interlayers not covered by the acid effect.
В предложенном изобретении решается задача повышения эффективности кислотной обработки скважины за счет создания гидродинамической связи с пропластками, не охваченными кислотным воздействием.The proposed invention solves the problem of increasing the efficiency of acid treatment of the well by creating a hydrodynamic connection with interlayers not covered by acid exposure.
Задача решается тем, что в способе заканчивания горизонтальной скважины, включающем спуск колонны насосно-компрессорных труб с пусковыми муфтами и с воронкой на конце, размещение воронки в интервале башмака эксплуатационной колонны, спуск гибкой безмуфтовой трубы с гидромониторной насадкой на конце внутри колонны насосно-компрессорных труб, ввод гидромониторной насадки в горизонтальный необсаженный ствол скважины и размещение на забое скважины, при открытой межтрубной задвижке на устье скважины прокачку раствора кислоты с созданием расхода, обеспечивающего эффект «резания» породы, при открытой затрубной задвижке по безмуфтовой трубе заполнение горизонтального ствола скважины водным раствором поверхностно-активного вещества, закрытие затрубной задвижки и продавливание раствора поверхностно-активного вещества по безмуфтовой трубе в пласт, закрытие задвижки на трубном пространстве гибкой безмуфтовой трубы, при закрытом межтрубном и трубном пространстве по затрубному пространству продавку раствора кислоты, находящегося в стволе скважины, в пласт со ступенчатым подъемом давления и выдержкой на каждой ступени, проведение технологической выдержки для реакции раствора кислоты с породой, промывку ствола скважины, подъем гибкой безмуфтовой трубы из скважины, прокачку инертного газа по затрубному пространству с отбором жидкости по колонне насосно-компрессорных труб, закачку в скважину жидкости глушения, освоение скважины, согласно изобретению, предварительно в горизонтальном стволе размещают компоновку с долотом, равным диаметру горизонтального ствола, с приводом, промывают горизонтальный ствол скважины с вращением и рассхаживанием компоновки прямой промывкой 0,1-0,3%-ным раствором поверхностно-активного вещества в пластовой воде в объеме не менее 25 м3 до чистой воды, поднимают компоновку в вертикальный ствол скважины и выдерживают в течение 30 минут, после этого шаблонируют горизонтальный ствол скважины компоновкой до забоя, а при прокачке раствора кислоты через гибкую безмуфтовую трубу прокачку кислоты производят при давлении не менее 20 МПа и расходе не менее 3 л/с.The problem is solved in that in a method for completing a horizontal well, including lowering a tubing string with start-up couplings and with a funnel at the end, placing a funnel in the interval of the shoe of the production string, lowering a flexible sleeveless coupling pipe with a hydraulic nozzle at the end inside the tubing string , introducing a hydraulic nozzle into a horizontal open-hole wellbore and placing it at the bottom of the well, with an open annular valve at the wellhead pumping an acid solution with the creation of flow rate, providing the effect of "cutting" the rock, with an open annular valve through a sleeveless pipe, filling the horizontal wellbore with an aqueous solution of a surfactant, closing the annular valve and forcing a solution of surfactant through a sleeveless pipe into the formation, closing the valve on the pipe space with a flexible couplingless pipes, with a closed annulus and tube space through the annulus pushing the solution of acid in the wellbore into the formation with a stepped increasing pressure and holding at each stage, carrying out technological exposure for the reaction of the acid solution with the rock, flushing the wellbore, lifting the flexible sleeveless pipe from the well, pumping inert gas through the annulus with fluid sampling along the tubing string, pumping the kill fluid into the well , development of a well, according to the invention, preliminarily, in a horizontal well, an arrangement with a bit equal to the diameter of the horizontal well is placed, with a drive, the horizontal well is washed wells with rotation and pacing of the layout by direct washing with a 0.1-0.3% solution of a surfactant in produced water in a volume of at least 25 m 3 to clean water, lift the assembly into a vertical wellbore and hold for 30 minutes, after that, the horizontal wellbore is patterned by the layout before the bottom, and when pumping the acid solution through a flexible sleeveless pipe, the acid is pumped at a pressure of at least 20 MPa and a flow rate of at least 3 l / s.
Сущность изобретенияSUMMARY OF THE INVENTION
В связи с активным развитием бурения горизонтальных скважин различной конструкции и их протяженности для повышения их эффективности на сегодняшний день назрела потребность совершенствования технологий кислотной обработки горизонтальных стволов. Одной из причин низкой эффективности производства обработок в горизонтальных стволах по традиционной технологии является то, что в процессе обработки не достигается гидродинамическая связь с пропластками, не охваченными кислотным воздействием.In connection with the active development of the drilling of horizontal wells of various designs and their lengths to increase their efficiency, today there is a need to improve the technology of acid treatment of horizontal wells. One of the reasons for the low efficiency of the production of treatments in horizontal boreholes using traditional technology is that during the processing the hydrodynamic connection with interlayers not covered by acid exposure is not achieved.
В предложенном изобретении решается задача повышения эффективности кислотной обработки скважины за счет создания гидродинамической связи с пропластками, не охваченных кислотным воздействием. Задача решается следующим образом.The proposed invention solves the problem of increasing the efficiency of acid treatment of the well by creating a hydrodynamic connection with the interlayers not covered by acid exposure. The problem is solved as follows.
В горизонтальном стволе скважины размещают компоновку с долотом, равным диаметру горизонтального ствола, с приводом. Прокачивают через компоновку 0,1-0,3%-ный раствор поверхностно-активного вещества в пластовой воде в объеме не менее 25 м3 до чистой воды, тем самым промывают горизонтальный ствол скважины. Одновременно промывочный раствор вызывает вращение долота. При этом перемещают компоновку с долотом вдоль горизонтального ствола скважины с вращением, т.е. осуществляют расхаживание компоновки с прямой промывкой. За счет этого несколько увеличивается диаметр горизонтального ствола. Но основной эффект от расхаживания возникает вследствие проникновения в околоскважинную зону за счет воздействия ударных нагрузок от долота промывочного раствора. Промывочный раствор, являясь «родным» к пластовой жидкости, т.к. основан на пластовой воде данной залежи, создает в порах коллектора околоскважинной зоны проницаемость, равную начальной, бывшей до бурения и нарушенной при бурении кольматирующим воздействием бурового раствора и долота. Поднимают компоновку в вертикальный ствол скважины и выдерживают в течение 30 минут. При этом в горизонтальном стволе скважины прекращаются все перетоки промывочного раствора и пластовой жидкости из пласта. Шаблонируют горизонтальный ствол скважины компоновкой до забоя, т.е. до дальнего конца горизонтального ствола, с промывкой для удаления возможно оставшихся в стволе скважины частиц породы. Поднимают компоновку из скважины.In a horizontal wellbore, an arrangement with a bit equal to the diameter of the horizontal wellbore is placed with a drive. A 0.1-0.3% solution of a surfactant in formation water is pumped through the assembly in a volume of at least 25 m 3 to clean water, thereby washing the horizontal wellbore. At the same time, the wash solution causes the bit to rotate. In this case, the arrangement with the bit is moved along the horizontal wellbore with rotation, i.e. pacing layouts with direct flushing. Due to this, the diameter of the horizontal trunk is slightly increased. But the main effect of pacing occurs due to penetration into the near-wellbore zone due to the impact of shock loads from the bit of the washing solution. Wash solution, being "native" to the reservoir fluid, because It is based on the formation water of this reservoir and creates permeability in the pores of the near-wellbore reservoir collector equal to the initial, prior to drilling and disrupted by the clogging effect of the drilling fluid and bit during drilling. Raise the layout in a vertical wellbore and incubated for 30 minutes. At the same time, in the horizontal wellbore, all flows of the wash solution and formation fluid from the formation cease. A horizontal wellbore is patterned with the layout before the bottom, i.e. to the far end of the horizontal wellbore, with flushing to remove any rock particles remaining in the wellbore. Raise the layout from the well.
В скважину спускают колонну насосно-компрессорных труб с пусковыми муфтами и с воронкой на конце. Воронку размещают в интервале башмака эксплуатационной колонны. Внутри колонны насосно-компрессорных труб спускают гибкую безмуфтовую трубу с гидромониторной насадкой на конце. Гидромониторную насадку выводят в горизонтальный не обсаженный ствол скважины и размещают на забое скважины. При открытой межтрубной задвижке на устье скважины прокачивают раствор кислоты с созданием расхода, обеспечивающего эффект «резания» породы. Объем раствора кислоты выбирают равным объему затрубного пространства скважины. При прокачке раствора кислоты через гибкую безмуфтовую трубу прокачку кислоты производят при давлении не менее 20 МПа и расходе не менее 3 л/с. Как показали исследования такой режим обеспечивает максимальный эффект от гидромониторного воздействия. Одновременно с подачей раствора кислоты перемещают по горизонтальному стволу скважины гибкую безмуфтовую трубу. При необходимости аналогичным способом повторяют кислотно-гидромониторное воздействие на пласт до 3 раз.A string of tubing with start-up couplings and a funnel at the end is lowered into the well. The funnel is placed in the interval of the shoe casing. A flexible sleeveless pipe with a hydraulic nozzle at the end is lowered inside the tubing string. The hydraulic monitor nozzle is brought into a horizontal uncased wellbore and placed on the bottom of the well. With an open annular valve at the wellhead, an acid solution is pumped to create a flow rate that provides the effect of "cutting" the rock. The volume of the acid solution is chosen equal to the volume of the annulus of the well. When pumping an acid solution through a flexible sleeveless pipe, acid is pumped at a pressure of at least 20 MPa and a flow rate of at least 3 l / s. As studies have shown, such a regime provides the maximum effect from hydromonitor exposure. Simultaneously with the supply of the acid solution, a flexible sleeveless pipe is moved along the horizontal wellbore. If necessary, the acid-hydromonitor impact on the formation is repeated in a similar manner up to 3 times.
Межтрубное пространство представляет собой пространство между гибкой безмуфтовой трубой и колонной насосно-компрессорных труб. Затрубное пространство представляет собой пространство между колонной насосно-компрессорных труб и эксплуатационной колонной скважины. Трубное пространство представляет собой пространство гибкой безмуфтовой трубы в скважине.The annulus is the space between the flexible sleeveless pipe and the tubing string. The annulus is the space between the tubing string and the production well string. The pipe space is the space of a flexible sleeveless pipe in the well.
Гидромониторную насадку снова размещают на забое скважины, при открытой затрубной задвижке по безмуфтовой трубе заполняют горизонтальный ствол скважины водным раствором поверхностно-активного вещества. Закрывают затрубную задвижку и продавливают раствор поверхностно-активного вещества по безмуфтовой трубе в пласт.The hydraulic monitor nozzle is again placed on the bottom of the well, with an open annular valve through a sleeveless pipe, the horizontal wellbore is filled with an aqueous solution of a surfactant. The annular valve is closed and the surfactant solution is forced through the sleeveless pipe into the formation.
В качестве раствора поверхностно-активного вещества используют водный раствор концентрации, достаточной для отмывания нефти от породы. Как правило, такая концентрация равна 0,1% и более. В качестве поверхностно-активного вещества используют любое, способное отмывать нефть, например, МЛ-81Б, МЛ-72, ОП-7 и т.п.An aqueous solution of a concentration sufficient to wash the oil from the rock is used as a surfactant solution. As a rule, this concentration is 0.1% or more. As a surfactant, any one capable of washing off oil is used, for example, ML-81B, ML-72, OP-7, etc.
Закрывают задвижку на трубном пространстве, т.е. на гибкой безмуфтовой трубе. При закрытом межтрубном и трубном пространстве по затрубному пространству производят продавку раствора кислоты, находящегося в стволе скважины, в пласт. Продавливают раствор кислоты в пласт со ступенчатым подъемом давления и выдержкой на каждой ступени. При продавке раствора кислоты, находящегося в стволе скважины, в пласт продавку производят со ступенчатым подъемом давления и технологической выдержкой на каждой ступени. Подъем давления производят с возрастанием давления от ступени к ступени от 3 до 6 МПа, проводят технологическую выдержку на каждой ступени до снижения давления до 2 МПа.Close the valve on the pipe space, i.e. on a flexible sleeveless pipe. With a closed annulus and tube space through the annulus, the acid solution in the wellbore is forced into the formation. The acid solution is pushed into the formation with a stepwise increase in pressure and exposure at each stage. When pushing an acid solution located in the wellbore into the formation, the pushing is performed with a stepwise increase in pressure and technological exposure at each stage. The pressure rise is carried out with increasing pressure from a stage to a stage from 3 to 6 MPa, technological exposure at each stage is carried out until the pressure drops to 2 MPa.
Проводят технологическую выдержку для реакции раствора кислоты с породой преимущественно в течение 2-4 часов. Проводят промывку ствола скважины, поднимают гибкую безмуфтовую трубу из скважины.Spend technological exposure for the reaction of the acid solution with the rock mainly within 2-4 hours. The wellbore is flushed, a flexible sleeveless pipe is lifted from the well.
Производят прокачку инертного газа по затрубному пространству с отбором жидкости по колонне насосно-компрессорных труб. Закачивают в скважину жидкость глушения. После освоения скважины проводят геофизические исследования горизонтального ствола на гибкой трубе методами термометрии и дебитометрии.Inert gas is pumped through the annulus with fluid withdrawal along the tubing string. Killing fluid is pumped into the well. After well development, geophysical studies of a horizontal wellbore on a flexible pipe are carried out using methods of thermometry and debitometry.
В результате удается повысить дебит скважины за счет создания гидродинамической связи с пропластками, не охваченными кислотным воздействием.As a result, it is possible to increase the flow rate of the well by creating a hydrodynamic connection with interlayers not covered by acid exposure.
Пример конкретного выполненияConcrete example
Проводят работы на нефтедобывающей скважине с горизонтальным стволом длиной 200 на глубине 1432 м. Диаметр горизонтального ствола составляет 144 мм. Скважина заполнена жидкостью глушения. Башмак 114 мм эксплуатационной колонны находится на глубине 1232 м. Ниже подошвы продуктивного пласта на 5 м расположен водонасыщенный пласт.Work is being carried out on an oil well with a horizontal wellbore 200 in length at a depth of 1,432 m. The diameter of the horizontal wellbore is 144 mm. The well is filled with a kill fluid. The 114 mm shoe of the production casing is located at a depth of 1232 m. A water-saturated formation is located 5 m below the bottom of the productive formation.
В скважину на колонне буровых труб спускают долото Ф32СП-95, производят монтаж механического ротора. Осуществляют расхаживание компоновки с прямой промывкой, прокачкой через компоновку раствора поверхностно-активного вещества МЛ-81Б в пластовой воде в объеме 25 м3 до чистой воды. При прокачке концентрацию поверхностно-активного вещества в растворе поддерживают в пределах 0,1-0,3%. Поднимают компоновку в вертикальный ствол скважины и выдерживают в течение 30 минут. После этого шаблонируют горизонтальный ствол скважины компоновкой до забоя с промывкой используемым выше раствором поверхностно-активного вещества.The F32SP-95 bit is lowered into the well on the drill pipe string, and the mechanical rotor is installed. Carry out the layout with direct washing, pumping through the layout of a solution of the surfactant ML-81B in produced water in a volume of 25 m 3 to clean water. When pumping, the concentration of surfactant in the solution is maintained in the range of 0.1-0.3%. Raise the layout in a vertical wellbore and incubated for 30 minutes. After that, the horizontal wellbore is patterned by the layout before the bottom with washing with the surfactant solution used above.
В скважину спускают колонну насосно-компрессорных труб с пусковыми муфтами и с воронкой на конце. Воронку размещают в интервале башмака эксплуатационной колонны. Гибкую безмуфтовую трубу с гидромониторной насадкой спускают внутри колонны насосно-компрессорных туб.A string of tubing with start-up couplings and a funnel at the end is lowered into the well. The funnel is placed in the interval of the shoe casing. A flexible sleeveless pipe with a hydraulic nozzle is lowered inside the tubing string.
В горизонтальный не обсаженный ствол скважины спускают гибкую безмуфтовую трубу диаметром 38 мм с гидромониторной насадкой на конце. Насадку размещают на забое ствола скважины. При открытой затрубной задвижке на устье скважины прокачивают 15%-ный раствор соляной кислоты циркуляцией с устьем скважины. При прокачке раствора кислоты через гибкую безмуфтовую трубу прокачку кислоты производят при давлении 22 МПа и расходе 4 л/с.A flexible, sleeveless pipe 38 mm in diameter with a jet nozzle at the end is lowered into a horizontal open-cased wellbore. The nozzle is placed on the bottom of the wellbore. With an open annular valve at the wellhead, a 15% hydrochloric acid solution is circulated with the wellhead. When pumping an acid solution through a flexible sleeveless pipe, acid is pumped at a pressure of 22 MPa and a flow rate of 4 l / s.
Объем раствора кислоты выбирают равным объему затрубного пространства скважины, т.е. равным 4,4 м3. Одновременно с подачей раствора кислоты перемещают по горизонтальному стволу гибкую безмуфтовую трубу. При открытой затрубной задвижке горизонтальный ствол скважины заполняют по гибкой безмуфтовой трубе водным раствором поверхностно-активного вещества - 0,1% водным раствором МЛ-81Б. При закрытой затрубной задвижке по гибкой безмуфтовой трубе выполняют продавку водного раствора поверхностно-активного вещества в пласт. По затрубному пространству производят продавку раствора кислоты в пласт со ступенчатым подъемом давления и выдержкой на каждой ступени в следующем режиме: 3 МПа - 15 минут до снижения давления до 2 МПа, 3 МПа - 15 минут до снижения давления до 2 МПа, 4 МПа - 20 минут до снижения давления до 2 МПа, 5 МПа - 25 минут до снижения давления до 2 МПа, 6 МПа - 30 минут до снижения давления до 2 МПа. Проводят технологическую выдержку 3 часа для реакции раствора кислоты с породой.The volume of the acid solution is chosen equal to the volume of the annulus of the well, i.e. equal to 4.4 m 3 . Simultaneously with the supply of the acid solution, a flexible sleeveless pipe is moved along the horizontal shaft. With the annular valve open, the horizontal wellbore is filled through a flexible sleeveless pipe with an aqueous solution of a surfactant — 0.1% aqueous solution of ML-81B. With a closed annular valve through a flexible sleeveless pipe, an aqueous solution of a surfactant is forced into the formation. Acid annulus is injected with an acid solution into the formation with a stepwise increase in pressure and holding at each stage in the following mode: 3 MPa - 15 minutes until the pressure drops to 2 MPa, 3 MPa - 15 minutes until the pressure drops to 2 MPa, 4 MPa - 20 minutes to reduce the pressure to 2 MPa, 5 MPa - 25 minutes to reduce the pressure to 2 MPa, 6 MPa - 30 minutes to reduce the pressure to 2 MPa. Spend technological exposure 3 hours for the reaction of the acid solution with the rock.
Промывают скважину. Производят прокачку инертного газа по затрубному пространству с отбором жидкости по колонне насосно-компрессорных труб. Закачивают в скважину жидкость глушения. После освоения скважины проводят геофизические исследования горизонтального ствола на гибкой трубе методами термометрии и дебитометрии.Washed well. Inert gas is pumped through the annulus with fluid withdrawal along the tubing string. Killing fluid is pumped into the well. After well development, geophysical studies of a horizontal wellbore on a flexible pipe are carried out using methods of thermometry and debitometry.
В результате дебит скважины составил 20 м3/сут при 10% обводненности добываемой продукции - нефти. Дебит нефти сохраняется в течение 2 лет эксплуатации скважины. Снижение дебита по прототипу наблюдается в течение первых 6 месяцев эксплуатации скважины.As a result, the flow rate of the well was 20 m 3 / day at 10% water cut of the produced products - oil. Oil production is maintained for 2 years of well operation. A decrease in the production rate of the prototype is observed during the first 6 months of well operation.
Применение предложенного способа позволит решить задачу повышения эффективности кислотной обработки скважины за счет создания гидродинамической связи с пропластками, не охваченными кислотным воздействием.The application of the proposed method will allow to solve the problem of increasing the efficiency of acid treatment of the well by creating a hydrodynamic connection with interlayers not covered by acid exposure.
Claims (1)
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2588108C1 true RU2588108C1 (en) | 2016-06-27 |
Family
ID=
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2708743C1 (en) * | 2019-04-30 | 2019-12-11 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling offshoots from an openhole well horizontal part |
| RU2709263C1 (en) * | 2019-04-30 | 2019-12-17 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling and development of offshoots from horizontal well |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5297628A (en) * | 1991-10-24 | 1994-03-29 | Mobil Oil Corporation | Simultaneous matrix acidizing using acids with different densities |
| RU2205950C1 (en) * | 2001-10-04 | 2003-06-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of treatment of producing carbonate formation |
| RU2261991C1 (en) * | 2004-10-12 | 2005-10-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well bottom zone treatment method |
| RU2318999C1 (en) * | 2007-03-01 | 2008-03-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for horizontal well bottom zone interval treatment |
| RU2326232C2 (en) * | 2006-03-29 | 2008-06-10 | ООО "Научно-исследовательский институт природных газов и газовых технологий-ВНИИГАЗ" | Well completion process |
| RU2541988C1 (en) * | 2014-03-03 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well completion method |
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5297628A (en) * | 1991-10-24 | 1994-03-29 | Mobil Oil Corporation | Simultaneous matrix acidizing using acids with different densities |
| RU2205950C1 (en) * | 2001-10-04 | 2003-06-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of treatment of producing carbonate formation |
| RU2261991C1 (en) * | 2004-10-12 | 2005-10-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well bottom zone treatment method |
| RU2326232C2 (en) * | 2006-03-29 | 2008-06-10 | ООО "Научно-исследовательский институт природных газов и газовых технологий-ВНИИГАЗ" | Well completion process |
| RU2318999C1 (en) * | 2007-03-01 | 2008-03-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for horizontal well bottom zone interval treatment |
| RU2541988C1 (en) * | 2014-03-03 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well completion method |
Non-Patent Citations (1)
| Title |
|---|
| ЛОГИНОВ Б. Г. и др. Руководство по кислотным обработкам скважин, Москва, "Недра", 1966, с. 13-17. * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2708743C1 (en) * | 2019-04-30 | 2019-12-11 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling offshoots from an openhole well horizontal part |
| RU2709263C1 (en) * | 2019-04-30 | 2019-12-17 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Method of drilling and development of offshoots from horizontal well |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9428988B2 (en) | Hydrocarbon well and technique for perforating casing toe | |
| EA018230B1 (en) | Method of fracturing a formation | |
| RU2512216C1 (en) | Treatment method of bottomhole zone | |
| RU2490442C1 (en) | Method for well completion | |
| RU2581589C1 (en) | Method for development of multi-hole branched horizontal well | |
| RU2232263C2 (en) | Method for extracting of high-viscosity oil | |
| RU2599156C1 (en) | Method of interval treatment of bottom hole zone of horizontal well shaft | |
| RU2588108C1 (en) | Horizontal well completion method | |
| RU2261991C1 (en) | Well bottom zone treatment method | |
| RU2534262C1 (en) | Interval treatment method of bottom-hole zone of oil-gas well formations | |
| RU2534555C1 (en) | Interval isolation method of brine water influx in horizontal wells | |
| RU2499134C2 (en) | Method of development of oil pool located above gas pool and separated therefrom by impermeable parting | |
| RU2593281C1 (en) | Well completion method, exposing productive formation, located in isolation from water-bearing formation | |
| RU2541986C1 (en) | Well completion method | |
| RU2626496C1 (en) | Plugs removing method from perforated shank holes while pumping horizontal well in bitumen deposit | |
| RU2560018C1 (en) | Water flow isolation technique in uncased horizontal borehole section of producing well | |
| RU2599155C1 (en) | Method of treatment of bottom-hole zone of the horizontal shafts of boreholes, opening carbonate collector | |
| RU2237805C1 (en) | Method for treatment of face-adjacent well zone | |
| RU2415258C1 (en) | Procedure for treatment of bottomhole zone of producer | |
| RU2425961C1 (en) | Well operation method | |
| RU2335621C1 (en) | Method of horizontal well operation | |
| RU2465442C1 (en) | Method of lifting water from wells | |
| RU2787163C1 (en) | Method for drilling a well with an exposed reservoir | |
| RU2558090C1 (en) | Horizontal well operation method | |
| RU2698354C1 (en) | Well development method after treatment of bottomhole formation zone |