RU2012155924A - GAS TURBINE ENERGY INSTALLATION FOR EXTERNAL COMBUSTION - Google Patents
GAS TURBINE ENERGY INSTALLATION FOR EXTERNAL COMBUSTION Download PDFInfo
- Publication number
- RU2012155924A RU2012155924A RU2012155924/06A RU2012155924A RU2012155924A RU 2012155924 A RU2012155924 A RU 2012155924A RU 2012155924/06 A RU2012155924/06 A RU 2012155924/06A RU 2012155924 A RU2012155924 A RU 2012155924A RU 2012155924 A RU2012155924 A RU 2012155924A
- Authority
- RU
- Russia
- Prior art keywords
- turbine
- gas turbine
- heat exchanger
- external combustion
- energy installation
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract 5
- 238000002485 combustion reaction Methods 0.000 title claims abstract 3
- RLQJEEJISHYWON-UHFFFAOYSA-N flonicamid Chemical compound FC(F)(F)C1=CC=NC=C1C(=O)NCC#N RLQJEEJISHYWON-UHFFFAOYSA-N 0.000 title 1
- 239000012530 fluid Substances 0.000 claims abstract 4
- 238000010438 heat treatment Methods 0.000 claims abstract 4
Landscapes
- Engine Equipment That Uses Special Cycles (AREA)
- Air Supply (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
1. Газотурбинная установка внешнего сгорания, содержащая компрессор, как минимум одно внешнее устройство разогрева рабочего тела, турбину, отличающаяся тем, что внешнее устройство разогрева рабочего тела выполнено в виде воздушного теплообменника и топки, при этом выход компрессора соединен трубопроводом с входом в теплообменник, а выход теплообменника соединен с входом турбины.2. Установка по п.1, отличающаяся тем, что выход из турбины соединен с топкой.1. A gas turbine installation of external combustion, comprising a compressor, at least one external device for heating the working fluid, a turbine, characterized in that the external device for heating the working fluid is made in the form of an air heat exchanger and a furnace, while the compressor output is connected by a pipe to the inlet of the heat exchanger, and the heat exchanger output is connected to the turbine inlet. 2. Installation according to claim 1, characterized in that the exit from the turbine is connected to the furnace.
Claims (2)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| UAA201209350U UA83318U (en) | 2012-07-30 | 2012-07-30 | External combustion gas-turbine power plant |
| UAA201209350 | 2012-07-30 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RU2012155924A true RU2012155924A (en) | 2014-06-27 |
Family
ID=51216004
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2012155924/06A RU2012155924A (en) | 2012-07-30 | 2012-12-21 | GAS TURBINE ENERGY INSTALLATION FOR EXTERNAL COMBUSTION |
Country Status (2)
| Country | Link |
|---|---|
| RU (1) | RU2012155924A (en) |
| UA (1) | UA83318U (en) |
-
2012
- 2012-07-30 UA UAA201209350U patent/UA83318U/en unknown
- 2012-12-21 RU RU2012155924/06A patent/RU2012155924A/en not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| UA83318U (en) | 2013-09-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EA201190014A1 (en) | EXTERNAL COMBUSTION GAS TURBINE WITH ROTATING REGENERATIVE HEAT EXCHANGER | |
| EA201390473A1 (en) | BOILER-UTILIZER | |
| EA201790620A1 (en) | HEAT DISTRIBUTION INSTALLATION AND POWER PLANT | |
| CN203547925U (en) | Gas-steam combined cycle power plant | |
| RU2012155924A (en) | GAS TURBINE ENERGY INSTALLATION FOR EXTERNAL COMBUSTION | |
| RU2010123751A (en) | AUTONOMOUS MULTIFUNCTIONAL POWER INSTALLATION | |
| EA201692024A1 (en) | IMPROVING THE EFFICIENCY AND SPEED OF REGULATING A GAS TURBINE THROUGH THE USE OF THE AUXILIARY AIR SYSTEM | |
| RU2015153843A (en) | Gas pumping unit with heat recovery system | |
| RU2584749C1 (en) | Turbo compressor power plant | |
| RU2013159095A (en) | GAS-TURBINE ENGINE DISCONTINUOUS SYSTEM | |
| RU2012145927A (en) | GAS TURBINE UNIT WITH HEAT PUMP | |
| RU2011108395A (en) | REGENERATOR INTEGRATED IN THE GAS TURBINE INSTALLATION | |
| CN204693361U (en) | A kind of steam generator | |
| CN203672162U (en) | Waste heat utilization device for coal series kaolinite calcinator | |
| RU2012121732A (en) | STEAM GAS INSTALLATION | |
| RU2011128427A (en) | GAS TURBINE ENGINE | |
| WO2014011244A3 (en) | Non-combustion energy source and configuration for brayton cycle heat engines | |
| UA95191C2 (en) | Boiler plant | |
| UA111457C2 (en) | Boiler installation | |
| RU2012118454A (en) | ENERGY INSTALLATION | |
| RU2012154621A (en) | HEAT AND POWER INSTALLATION | |
| UA111948C2 (en) | GAS-Vapor-turbine installation with cooling of cyclic air | |
| RU2012126893A (en) | DETANDER-GENERATOR POWER PLANT | |
| RU2012100590A (en) | METHOD OF SUPPORTING THE WORK OF A WATER BOILER ON NATURAL DRAW | |
| RU2011126570A (en) | HEAT ELECTRIC STATION |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FA92 | Acknowledgement of application withdrawn (lack of supplementary materials submitted) |
Effective date: 20140617 |