RU2009117012A - METHOD FOR BUILDING A PIPE DRAINAGE - Google Patents
METHOD FOR BUILDING A PIPE DRAINAGE Download PDFInfo
- Publication number
- RU2009117012A RU2009117012A RU2009117012/03A RU2009117012A RU2009117012A RU 2009117012 A RU2009117012 A RU 2009117012A RU 2009117012/03 A RU2009117012/03 A RU 2009117012/03A RU 2009117012 A RU2009117012 A RU 2009117012A RU 2009117012 A RU2009117012 A RU 2009117012A
- Authority
- RU
- Russia
- Prior art keywords
- mattresses
- drainage pipes
- drainage
- around
- slope
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract 3
- 238000001914 filtration Methods 0.000 claims abstract 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract 2
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Revetment (AREA)
Abstract
Способ возведения трубчатого дренажа земляных сооружений, состоящий из перфорированных водосборных труб, приемной и отводящей частей, отличающийся тем, что приемную часть выполняют из гибких тюфяков, состоящих из сетчатых оболочек и дренирующего заполнителя, который изготавливают из плотных рядов легких фашин, завернутых в геосетку, причем гибкие тюфяки укладывают вокруг водосборных перфорированных труб нормально к направлению фильтрационного потока, при этом на расстоянии длины тюфяков дополнительно вокруг водосборных труб устраивают кольца жесткости с высотой ребра, равной толщине водоприемной части, и по ее окружности по всей площади обтягивают габионную сетку и прикрепляют ее к кольцам жесткости, а отводящую часть выполняют из аналогичных тюфяков, но расположенных на определенном расстоянии друг от друга по направлению фильтрационного потока и с уклоном от водосборных труб до подошвы низового откоса. A method of erecting a tubular drainage of earthworks, consisting of perforated drainage pipes, a receiving and a discharge part, characterized in that the receiving part is made of flexible mattresses consisting of mesh shells and a drainage aggregate, which is made of dense rows of light fascines wrapped in a geogrid, flexible mattresses are laid around perforated drainage pipes normally to the direction of the filtration flow, while at a distance of the length of the mattresses additionally around the drainage pipes stiffening rings are wound with a rib height equal to the thickness of the water receiving part, and around its circumference they fit a gabion net and attach it to stiffening rings, and the outlet part is made of similar mattresses, but located at a certain distance from each other in the direction of the filtration flow and with a slope from the drainage pipes to the bottom of the bottom slope.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2009117012/03A RU2412303C2 (en) | 2009-05-04 | 2009-05-04 | Method to erect tubular drain |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| RU2009117012/03A RU2412303C2 (en) | 2009-05-04 | 2009-05-04 | Method to erect tubular drain |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| RU2009117012A true RU2009117012A (en) | 2010-11-10 |
| RU2412303C2 RU2412303C2 (en) | 2011-02-20 |
Family
ID=44025796
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2009117012/03A RU2412303C2 (en) | 2009-05-04 | 2009-05-04 | Method to erect tubular drain |
Country Status (1)
| Country | Link |
|---|---|
| RU (1) | RU2412303C2 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU77032A1 (en) * | 1948-02-16 | 1948-11-30 | П.И. Гордиенко | Spillway over the dam |
| NL8005159A (en) * | 1980-09-15 | 1982-04-01 | Nicolon Nv | PROTECTIVE MAT FOR EROSION. |
| SU1337457A1 (en) * | 1984-10-02 | 1987-09-15 | Всесоюзный научно-исследовательский институт транспортного строительства | Protective coating of slope |
| RU2016166C1 (en) * | 1990-06-11 | 1994-07-15 | Белорусская государственная политехническая академия | Drainage device |
-
2009
- 2009-05-04 RU RU2009117012/03A patent/RU2412303C2/en not_active IP Right Cessation
Also Published As
| Publication number | Publication date |
|---|---|
| RU2412303C2 (en) | 2011-02-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7641283B2 (en) | Expandable perforated pipe | |
| RU2009117012A (en) | METHOD FOR BUILDING A PIPE DRAINAGE | |
| RU2006127239A (en) | METHOD FOR ESTABLISHING SUPPORT WALLS FROM GABIONS | |
| RU2008133950A (en) | TUBULAR DRAINAGE | |
| RU2012137318A (en) | METHOD FOR ESTABLISHING HORIZONTAL UNDERGROUND UNDERGROUND DRAINAGE OF THE COMBINED DESIGN | |
| RU2012135661A (en) | HORIZONTAL UNDERGROUND DRAINAGE OF THE COMBINED DESIGN | |
| RU2012135660A (en) | SUB-BASED FILTERING DRAINAGE OF THE COMBINED DESIGN | |
| RU147607U1 (en) | DRAINAGE CASSETTE | |
| RU2012135664A (en) | METHOD FOR ESTABLISHING A SUB-BASED FILTERING DRAINAGE OF A COMBINED DESIGN | |
| RU2009104881A (en) | METHOD FOR HORIZONTAL DRAINAGE CONSTRUCTION | |
| RU2012118605A (en) | METHOD FOR ESTABLISHING AN ANTI-SLIDING STRUCTURE OF A COMBINED DESIGN | |
| RU2013106347A (en) | ANTI-SLIDING STRUCTURE OF THE COMBINED DESIGN | |
| RU2512031C2 (en) | Method of erection of underground horizontal water intake of combined structure | |
| RU2513183C2 (en) | Underground horizontal water intake of combined design | |
| CN103981836B (en) | Construction method of wet land type river bank check net retaining wall | |
| KR101376239B1 (en) | Spiral closed conduit for cultivation | |
| RU2009104909A (en) | METHOD FOR ESTABLISHING A GABION FOOTSTONE BIO POSITIVE DESIGN | |
| RU2659438C1 (en) | Culvert for protection of roads from land runoff and sediments | |
| RU2400596C1 (en) | Combined drainage of biopositive design | |
| RU2008133945A (en) | BIO-POSITIVE STRUCTURE DRAINAGE | |
| CN105089134A (en) | Drained water filtering landscape channel | |
| RU2392373C1 (en) | Horizontal drainage of earth works | |
| CN216739677U (en) | Side slope anchor cable combined drainage system | |
| CN211773290U (en) | A diversion facility with both water purification and fish nest functions | |
| RU2601802C1 (en) | Erection method of batter drainage earth structures |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20110505 |