[go: up one dir, main page]

RU2009140799A - METHOD FOR ESTABLISHING AN INTEGRATED FENCING DAM - Google Patents

METHOD FOR ESTABLISHING AN INTEGRATED FENCING DAM Download PDF

Info

Publication number
RU2009140799A
RU2009140799A RU2009140799/21A RU2009140799A RU2009140799A RU 2009140799 A RU2009140799 A RU 2009140799A RU 2009140799/21 A RU2009140799/21 A RU 2009140799/21A RU 2009140799 A RU2009140799 A RU 2009140799A RU 2009140799 A RU2009140799 A RU 2009140799A
Authority
RU
Russia
Prior art keywords
tails
dam
tiered
alluvial
stored
Prior art date
Application number
RU2009140799/21A
Other languages
Russian (ru)
Other versions
RU2421568C1 (en
Inventor
Алан Батразович Лолаев (RU)
Алан Батразович Лолаев
Арам Петрович Акопов (RU)
Арам Петрович Акопов
Алексан Хачатурович Оганесян (RU)
Алексан Хачатурович Оганесян
Максим Николаевич Сумин (RU)
Максим Николаевич Сумин
Original Assignee
Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт
Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет)(СКГМИ (ГТУ)
Учреждение Российской академии наук Центр геофизических исследований Владикавказского научного центра РАН и Правительства Республик
Учреждение Российской Академии Наук Центр геофизических исследований Владикавказского Научного Центра РАН и Правительства Республики Северная Осетия-Алания (УРАН ЦГИ ВНЦ ВНЦ РАН РСО-А)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт, Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет)(СКГМИ (ГТУ), Учреждение Российской академии наук Центр геофизических исследований Владикавказского научного центра РАН и Правительства Республик, Учреждение Российской Академии Наук Центр геофизических исследований Владикавказского Научного Центра РАН и Правительства Республики Северная Осетия-Алания (УРАН ЦГИ ВНЦ ВНЦ РАН РСО-А) filed Critical Государственное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт
Priority to RU2009140799/21A priority Critical patent/RU2421568C1/en
Publication of RU2009140799A publication Critical patent/RU2009140799A/en
Application granted granted Critical
Publication of RU2421568C1 publication Critical patent/RU2421568C1/en

Links

Landscapes

  • Treatment Of Sludge (AREA)
  • Revetment (AREA)

Abstract

Способ возведения намывной ограждающей дамбы, включающий отсыпку и поярусное наращивание ограждающей и разделительной дамб, прокладку магистрального и распределительного пульпопровода, поярусный рассредоточенный намыв хвостов на пляж, отличающийся тем, что наращивание разделительной дамбы осуществляют поярусным размещением фильтрующего экрана из нетканого геотекстильного материала перпендикулярно фронту распространения потока в соответствии с заданным объемом складируемых хвостов на расстоянии, определяемом по формуле ! , ! где: a - расстояние, на котором размещают экран, м; ! V - объем складируемых хвостов, м3; ! b - ширина пляжа, м; ! h - высота намываемого яруса, м. A method of erecting an alluvial enclosing dam, including dumping and tiered extension of the enclosing and dividing dams, laying a main and distribution slurry pipeline, a tiered diffuse alluvial of tails to the beach, characterized in that the dividing dam is built up by tiered placement of a filter screen from a nonwoven geotextile material perpendicular to the perpendicular in accordance with a given volume of stored tails at a distance determined by the formula! ! where: a is the distance at which the screen is placed, m; ! V is the volume of stored tails, m3; ! b - beach width, m; ! h - the height of the reclaimed tier, m

Claims (1)

Способ возведения намывной ограждающей дамбы, включающий отсыпку и поярусное наращивание ограждающей и разделительной дамб, прокладку магистрального и распределительного пульпопровода, поярусный рассредоточенный намыв хвостов на пляж, отличающийся тем, что наращивание разделительной дамбы осуществляют поярусным размещением фильтрующего экрана из нетканого геотекстильного материала перпендикулярно фронту распространения потока в соответствии с заданным объемом складируемых хвостов на расстоянии, определяемом по формулеA method of erecting an alluvial enclosing dam, including dumping and tiered extension of the enclosing and dividing dams, laying a main and distribution slurry pipeline, a tiered diffuse alluvial of tails to the beach, characterized in that the dividing dam is built up by tiered placement of a filter screen from a nonwoven geotextile material perpendicular to the perpendicular according to a given volume of stored tails at a distance determined by the formula
Figure 00000001
,
Figure 00000001
,
где: a - расстояние, на котором размещают экран, м;where: a is the distance at which the screen is placed, m; V - объем складируемых хвостов, м3;V is the volume of stored tails, m 3 ; b - ширина пляжа, м;b - beach width, m; h - высота намываемого яруса, м. h - the height of the reclaimed tier, m
RU2009140799/21A 2009-11-03 2009-11-03 Method of erecting of washed up protective dam RU2421568C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2009140799/21A RU2421568C1 (en) 2009-11-03 2009-11-03 Method of erecting of washed up protective dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2009140799/21A RU2421568C1 (en) 2009-11-03 2009-11-03 Method of erecting of washed up protective dam

Publications (2)

Publication Number Publication Date
RU2009140799A true RU2009140799A (en) 2011-05-10
RU2421568C1 RU2421568C1 (en) 2011-06-20

Family

ID=44732305

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2009140799/21A RU2421568C1 (en) 2009-11-03 2009-11-03 Method of erecting of washed up protective dam

Country Status (1)

Country Link
RU (1) RU2421568C1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360467A (en) * 2018-03-07 2018-08-03 中钢集团马鞍山矿山研究院有限公司 A kind of new process for building the artificial dry beach of Tailings Dam in extremely frigid zones heap
CN108457280A (en) * 2018-03-07 2018-08-28 中钢集团马鞍山矿山研究院有限公司 The new method on the artificial dry beach of Tailings Dam is built using cyclone heap in extremely frigid zones

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2486310C1 (en) * 2011-12-05 2013-06-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Северо-Кавказский горно-металлургический институт (государственный технологический университет) (СКГМИ (ГТУ)) Method of up sludge pond dam
CN110670546B (en) * 2019-10-18 2021-03-26 付文堂 Method for building dam by bidirectional permeation and reverse laying of seepage drainage arrises

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2562111B1 (en) * 1984-03-30 1988-08-05 Poteur Michel DEVICE FOR SEALING VERTICALLY OR SLIGHTLY INCLINED SPEAKERS
SU1198149A1 (en) * 1984-05-03 1985-12-15 Тюменский инженерно-строительный институт Method of hydraulic deposition of narrow-profile earth structures
SU1521812A1 (en) * 1987-11-17 1989-11-15 Государственный научно-исследовательский и проектный институт нефтяной и газовой промышленности им.В.И.Муравленко Method of hydraulic deposition of narrow profile structures
RU2039152C1 (en) * 1992-08-20 1995-07-09 Василий Петрович Ягин Method for hydraulic storage of grained waste products in worked-out quarry
RU2176700C1 (en) * 2000-03-14 2001-12-10 Кириенко Юрий Егорович Method for protecting territory from flooding
RU2186902C1 (en) * 2000-12-09 2002-08-10 Акционерная компания "АЛРОСА" (Закрытое акционерное общество) Process of erection of alluvial man-made deposit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360467A (en) * 2018-03-07 2018-08-03 中钢集团马鞍山矿山研究院有限公司 A kind of new process for building the artificial dry beach of Tailings Dam in extremely frigid zones heap
CN108457280A (en) * 2018-03-07 2018-08-28 中钢集团马鞍山矿山研究院有限公司 The new method on the artificial dry beach of Tailings Dam is built using cyclone heap in extremely frigid zones
CN108457280B (en) * 2018-03-07 2020-01-17 中钢集团马鞍山矿山研究院有限公司 Novel method for piling up artificial dry beach of tailing pond by using cyclone in alpine region
CN108360467B (en) * 2018-03-07 2020-01-17 中钢集团马鞍山矿山研究院有限公司 Novel process for piling artificial dry beach of tailing pond in alpine region

Also Published As

Publication number Publication date
RU2421568C1 (en) 2011-06-20

Similar Documents

Publication Publication Date Title
RU2009140799A (en) METHOD FOR ESTABLISHING AN INTEGRATED FENCING DAM
CN102864789A (en) Retaining wall drainage system and construction method thereof
CN205604097U (en) Stone mar leader is blocked to side slope
CN103266633B (en) A kind of hydrometallurgy tailings storehouse antiseep sewer drains off floodwaters method
CN211421033U (en) An ecological slope protection structure for water conservancy projects
RU2011112135A (en) METHOD FOR PROTECTING SLOPES FROM WATER EROSION
RU103821U1 (en) DEVICE FOR THE RELEASE OF PURIFIED WASTE WATER IN WATERS
RU2654718C1 (en) Method for alluvial dam erection
RU2010132456A (en) METHOD FOR CREATING AN ANTI-FILTRATION COVERING
CN205205916U (en) System is reformed transform to reservoir deposits crystallizing field river system
CN103866778A (en) Soft soil foundation deep foundation pit dewatering treatment method and structure
RU2012135664A (en) METHOD FOR ESTABLISHING A SUB-BASED FILTERING DRAINAGE OF A COMBINED DESIGN
RU2010108291A (en) COMPLEX OF HYDROTECHNICAL STRUCTURES FOR PREVENTING FLOODING OF TERRITORIES BELOW THE DAM OF THE KRASNODAR HYDROGROUND ON THE KUBAN RIVER
JP2013217052A (en) Revetment slope protection structure and revetment construction method using the structure
CN209227626U (en) A kind of heavy metal pollution Tailings Dam governing system
CN203222805U (en) Internal-supporting type deep foundation pit latticed column well-point rainfall system
CN204634751U (en) A kind of layering draining overflow-type cultivating pool
CN104196005A (en) Efficient and anti-blocking water-bearing stratum supply device
CN211472537U (en) An intercepting trough structure for intercepting natural incoming water and groundwater
RU137288U1 (en) DEVICE FOR FIELD OF STYLE AND DRYING OF Lump fuel peat
CN209854653U (en) Ecological city river course stereoplasm high retaining wall structure
RU131747U1 (en) ANTI-FILTRATION SCREEN
CN205857213U (en) Catch pit precipitation anti-fouler
RU2012118684A (en) METHOD FOR ESTABLISHING UNDERGROUND HORIZONTAL DRAINAGE OF THE COMBINED DESIGN
CN210462036U (en) Temporary water supply and drainage pipeline connecting device for building

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20151104