RU2008114100A - STEAM GAS INSTALLATION - Google Patents

STEAM GAS INSTALLATION Download PDF

Info

Publication number
RU2008114100A
RU2008114100A RU2008114100/06A RU2008114100A RU2008114100A RU 2008114100 A RU2008114100 A RU 2008114100A RU 2008114100/06 A RU2008114100/06 A RU 2008114100/06A RU 2008114100 A RU2008114100 A RU 2008114100A RU 2008114100 A RU2008114100 A RU 2008114100A
Authority
RU
Russia
Prior art keywords
steam
output
input
superheater
communicated
Prior art date
Application number
RU2008114100/06A
Other languages
Russian (ru)
Other versions
RU2391517C2 (en
Inventor
Михаил Аркадьевич Верткин (RU)
Михаил Аркадьевич Верткин
Original Assignee
Открытое Акционерное Общество "Энергомашкорпорация" (RU)
Открытое акционерное общество "Энергомашкорпорация"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Энергомашкорпорация" (RU), Открытое акционерное общество "Энергомашкорпорация" filed Critical Открытое Акционерное Общество "Энергомашкорпорация" (RU)
Priority to RU2008114100/06A priority Critical patent/RU2391517C2/en
Publication of RU2008114100A publication Critical patent/RU2008114100A/en
Application granted granted Critical
Publication of RU2391517C2 publication Critical patent/RU2391517C2/en

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

ПТУ, содержащая газотурбинную установку (ГТУ), паровой котел-утилизатор (КУ) с парогенерирующими контурами двух давлений, содержащими экономайзерные и испарительные поверхности двух давлений и перегреватель пара высокого давления (в.д.), паротурбинную установку с конденсатором и двумя паровыми турбинами, первая из которых на входе по пару сообщена с выходом перегревателя пара в.д. по пару, вторая паровая турбина на выходе по пару сообщена с входом по пару конденсатора, сообщенного на выходе по конденсату с входом КУ по конденсату, и промежуточный перегреватель пара, сообщенный на входе по пару с выходом первой паровой турбины по пару, на выходе по пару - с входом второй паровой турбины по пару, отличающаяся тем, что промежуточный перегреватель пара выполнен в виде водяного пароперегревателя и сообщен на входе по пару также с выходом КУ по пару н.д., на входе и выходе по греющей воде - соответственно, с выходом и входом экономайзера в.д. КУ по воде.A technical and vocational school containing a gas turbine installation (GTU), a steam recovery boiler (KU) with two-pressure steam generating circuits containing economizing and evaporating surfaces of two pressures and a high-pressure steam superheater (HP), a steam turbine installation with a condenser and two steam turbines, the first of which is coupled at the steam inlet with the outlet of the steam superheater in pairs, the second steam turbine in the steam output is connected to the steam input of the condenser communicated at the condensate output with the condensate inlet KU, and the intermediate steam superheater communicated at the steam input with the output of the first steam turbine in steam, at the steam output - with the input of the second steam turbine in steam, characterized in that the intermediate steam superheater is made in the form of a water superheater and communicated at the steam input also with the output of the boiler for a couple of s.a., at the input and output of heating water, respectively, with the output and input e nomayzera E KU on water.

Claims (1)

ПТУ, содержащая газотурбинную установку (ГТУ), паровой котел-утилизатор (КУ) с парогенерирующими контурами двух давлений, содержащими экономайзерные и испарительные поверхности двух давлений и перегреватель пара высокого давления (в.д.), паротурбинную установку с конденсатором и двумя паровыми турбинами, первая из которых на входе по пару сообщена с выходом перегревателя пара в.д. по пару, вторая паровая турбина на выходе по пару сообщена с входом по пару конденсатора, сообщенного на выходе по конденсату с входом КУ по конденсату, и промежуточный перегреватель пара, сообщенный на входе по пару с выходом первой паровой турбины по пару, на выходе по пару - с входом второй паровой турбины по пару, отличающаяся тем, что промежуточный перегреватель пара выполнен в виде водяного пароперегревателя и сообщен на входе по пару также с выходом КУ по пару н.д., на входе и выходе по греющей воде - соответственно, с выходом и входом экономайзера в.д. КУ по воде. A technical and vocational school containing a gas turbine installation (GTU), a steam recovery boiler (KU) with two-pressure steam generating circuits containing economizing and evaporating surfaces of two pressures and a high-pressure steam superheater (HP), a steam turbine installation with a condenser and two steam turbines, the first of which is coupled at the steam inlet with the outlet of the steam superheater in pairs, the second steam turbine in the steam output is connected to the steam input of the condenser communicated at the condensate output with the condensate inlet KU, and the intermediate steam superheater communicated at the steam input with the output of the first steam turbine in steam, at the steam output - with the input of the second steam turbine in steam, characterized in that the intermediate steam superheater is made in the form of a water superheater and communicated at the steam input also with the output of the boiler for a couple of s.a., at the input and output of heating water, respectively, with the output and input e nomayzera E KU on water.
RU2008114100/06A 2008-04-09 2008-04-09 Steam-gas installation RU2391517C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2008114100/06A RU2391517C2 (en) 2008-04-09 2008-04-09 Steam-gas installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2008114100/06A RU2391517C2 (en) 2008-04-09 2008-04-09 Steam-gas installation

Publications (2)

Publication Number Publication Date
RU2008114100A true RU2008114100A (en) 2009-12-20
RU2391517C2 RU2391517C2 (en) 2010-06-10

Family

ID=41625249

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2008114100/06A RU2391517C2 (en) 2008-04-09 2008-04-09 Steam-gas installation

Country Status (1)

Country Link
RU (1) RU2391517C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2553477C2 (en) * 2013-01-23 2015-06-20 Аркадий Ефимович Зарянкин Combined-cycle plant
RU2715073C1 (en) * 2019-07-18 2020-02-25 федеральное государственное автономное образовательное учреждение высшего образования "Санкт-Петербургский политехнический университет Петра Великого" (ФГАОУ ВО "СПбПУ") Combined cycle gas turbine with cooled diffuser

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996036793A1 (en) * 1995-05-18 1996-11-21 Westinghouse Electric Corporation Steam injected gas turbine system with steam compressor
DE19619470C1 (en) * 1996-05-14 1997-09-25 Siemens Ag Combined gas-and-steam turbine installation
RU2124134C1 (en) * 1998-02-13 1998-12-27 Буров Валерий Дмитриевич Combination steam-gas power plant and method of its operation
RU2237815C2 (en) * 2002-06-07 2004-10-10 Морев Валерий Григорьевич Method of and device for obtaining useful energy in combination cycle (versions)

Also Published As

Publication number Publication date
RU2391517C2 (en) 2010-06-10

Similar Documents

Publication Publication Date Title
Ihm et al. Energy cost comparison between MSF, MED and SWRO: Case studies for dual purpose plants
WO2008078436A1 (en) Cement burning plant waste heat power generation system
WO2006131283A3 (en) Steam generation plant and method for operation and retrofitting of a steam generation plant
BRPI0900749A2 (en) optimized steam cycle using a reheated double pressure recovery boiler
US20090094983A1 (en) Steam turbine cycle
WO2011139438A3 (en) Energy recovery and steam supply for power augmentation in a combined cycle power generation system
CN102562179A (en) Organic Rankine cycle power generation system with liquid ejection device
RU2012105280A (en) STEAM TURBINE UNIT WITH STEAM TURBINE ASSEMBLY AND USER OF TECHNOLOGICAL STEAM AND METHOD OF OPERATION
RU2011116163A (en) STEAM POWER PLANT FOR ELECTRIC POWER GENERATION
RU2012145608A (en) STEAM GAS INSTALLATION
RU2008114100A (en) STEAM GAS INSTALLATION
JP6243700B2 (en) Combined cycle power plant with absorption heat converter
RU2013104191A (en) STEAM INPUT ASSEMBLY FOR COMBINED CYCLE SYSTEM (OPTIONS)
CN207194972U (en) A power cycle system for liquefied natural gas cold energy power generation
CN104848596B (en) Membrane type thermodynamic circulation device and method using low-grade heat source
CN102510932A (en) Steam power plant
US8820077B2 (en) Saturated steam thermodynamic cycle for a turbine and an associated installation
RU2012145607A (en) STEAM GAS INSTALLATION
RU2009109733A (en) STEAM-GAS UNIT WITH STEAM TURBINE COMPRESSOR ACTUATOR AND REGENERATIVE GAS TURBINE
RU2561776C2 (en) Combined-cycle plant
RU2686541C1 (en) Steam-gas plant
RU2565945C2 (en) Combined heat power plant with open district heating system
RU2013152919A (en) STEAM GAS INSTALLATION
RU2553477C2 (en) Combined-cycle plant
RU2339820C1 (en) Thermal power plant

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20140410