[go: up one dir, main page]

RU2006112058A - METHOD OF ESTABLISHING SEMI-DAM OF BIO POSITIVE DESIGN - Google Patents

METHOD OF ESTABLISHING SEMI-DAM OF BIO POSITIVE DESIGN Download PDF

Info

Publication number
RU2006112058A
RU2006112058A RU2006112058/03A RU2006112058A RU2006112058A RU 2006112058 A RU2006112058 A RU 2006112058A RU 2006112058/03 A RU2006112058/03 A RU 2006112058/03A RU 2006112058 A RU2006112058 A RU 2006112058A RU 2006112058 A RU2006112058 A RU 2006112058A
Authority
RU
Russia
Prior art keywords
dam
mattresses
bags
biopositive
semi
Prior art date
Application number
RU2006112058/03A
Other languages
Russian (ru)
Other versions
RU2319805C2 (en
Inventor
Салигаджи Омарович Курбанов (RU)
Салигаджи Омарович Курбанов
Камиль Салигаджиевич Курбанов (RU)
Камиль Салигаджиевич Курбанов
Ахмед Абдулкеримович Созаев (RU)
Ахмед Абдулкеримович Созаев
Original Assignee
Общество с ограниченной ответственностью Научно-производственна фирма "Берег" (RU)
Общество с ограниченной ответственностью Научно-производственная фирма "БЕРЕГ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью Научно-производственна фирма "Берег" (RU), Общество с ограниченной ответственностью Научно-производственная фирма "БЕРЕГ" filed Critical Общество с ограниченной ответственностью Научно-производственна фирма "Берег" (RU)
Priority to RU2006112058/03A priority Critical patent/RU2319805C2/en
Publication of RU2006112058A publication Critical patent/RU2006112058A/en
Application granted granted Critical
Publication of RU2319805C2 publication Critical patent/RU2319805C2/en

Links

Landscapes

  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Claims (3)

1. Способ возведения полузапруды биопозитивной конструкции, включающий монтаж деревянных ряж и укладку габионных тюфяков, отличающийся тем, что тюфяки выполняют биопозитивной конструкции из мешков с растительным грунтом и легких фашин, уложенных послойно в сетчатые оболочки призматических ячеек ряжевого каркаса сооружения, при этом в начале укладывают по периметру сооружения в каждую ячейку плотный слой из легких фашин, в основание - горизонтально по направлению полузапруды, по бокам - вертикально с прикреплением их к сетке, а внутренняя часть каждой ячейки до верху заполняют слоями из мешков с растительным грунтом, плотно перевязанных сверху и соединенных между собой, по верху мешков укладывают сплошной ряд из легких фашин, сверху которого обтягивают габионную сетку с прикреплением ее к боковым слоям сетки.1. A method of erecting a semi-dam of a biopositive design, including the installation of wooden crib and laying gabion mattresses, characterized in that the mattresses carry a biopositive construction of bags with vegetable soil and light fascia, layered in layers in the mesh shells of the prismatic cells of the cage’s frame, while laying at the beginning along the perimeter of the structure in each cell there is a dense layer of light fascin, to the base - horizontally in the direction of the half-dam, on the sides - vertically with their attachment to the grid, and the inner I fill the part of each cell to the top with layers of bags with vegetable soil, tightly tied on top and connected to each other, a continuous row of light fascines is laid on top of the bags, on top of which a gabion net is wrapped with its attachment to the side layers of the grid. 2. Способ возведения полузапруды биопозитивной конструкции по п.1, отличающийся тем, вокруг головной части полузапруды вплотную к ряжевым стенкам и на расстоянии друг от друга забиваются деревянные сваи соединенные между собой и габионными тюфяками с помощью арматурной проволоки, прочно прикрепленной к анкеру, устроенной в береговом откосе, а береговой откос между полузапрудами укрепляется габионными тюфяками, состоящими из легких фашин.2. The method of erecting a semi-dam of a biopositive construction according to claim 1, characterized in that around the head of the half-dam close to the mantle walls and at a distance from each other, wooden piles are hammered together and by gabion mattresses using reinforcing wire firmly attached to the anchor, arranged in the coastal slope, and the coastal slope between the half-dams is strengthened by gabion mattresses, consisting of light fascin. 3. Способ возведения полузапруды биопозитивной конструкции по п.1, отличающийся тем, что перед укладкой в тюфяки ряжевого каркаса мешки боковых и верхних рядов заполняют плодородным грунтом с добавлением семян многолетних трав и кустарников с развитой корневой системой.3. The method of erecting semi-dams of the biopositive structure according to claim 1, characterized in that before laying the mattress frame in the mattresses, the bags of the lateral and upper rows are filled with fertile soil with the addition of seeds of perennial grasses and shrubs with a developed root system.
RU2006112058/03A 2006-04-11 2006-04-11 Method for bio-positive spur dike erection RU2319805C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2006112058/03A RU2319805C2 (en) 2006-04-11 2006-04-11 Method for bio-positive spur dike erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2006112058/03A RU2319805C2 (en) 2006-04-11 2006-04-11 Method for bio-positive spur dike erection

Publications (2)

Publication Number Publication Date
RU2006112058A true RU2006112058A (en) 2007-11-10
RU2319805C2 RU2319805C2 (en) 2008-03-20

Family

ID=38957756

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2006112058/03A RU2319805C2 (en) 2006-04-11 2006-04-11 Method for bio-positive spur dike erection

Country Status (1)

Country Link
RU (1) RU2319805C2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306676A (en) * 2018-11-13 2019-02-05 四川港航建设工程有限公司 The construction method of bank slump reparation structure
CN110158540A (en) * 2019-05-14 2019-08-23 兴源环境科技股份有限公司 A kind of riverbed in mountains and rivers river and the construction method of shore protection
CN113322888A (en) * 2021-06-04 2021-08-31 中国水利水电科学研究院 Willow leaf bank habitat restoration method based on temporary nutrient storage

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101713182B (en) * 2009-11-18 2011-06-08 河海大学 Method for forming ecological embankment of vertical revetment live branch bundles
CN102628259A (en) * 2011-05-18 2012-08-08 上海嘉洁生态型混凝土草坪有限公司 Water bank simulated natural ecological protective member
CN104831688A (en) * 2015-05-14 2015-08-12 广西梧州运龙港船机械制造有限公司 Method for cofferdam construction

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1370180A1 (en) * 1986-01-17 1988-01-30 Ивано-Франковский Институт Нефти И Газа Foundation of road-protecting structure
SU1758143A1 (en) * 1990-06-21 1992-08-30 Проектно-Конструкторский Технологический Институт Министерства Лесной Промышленности Усср Jet-directing semi-dam
RU2076168C1 (en) * 1993-01-11 1997-03-27 Курбанов Салигаджи Омарович Dike dam and method of its construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109306676A (en) * 2018-11-13 2019-02-05 四川港航建设工程有限公司 The construction method of bank slump reparation structure
CN109306676B (en) * 2018-11-13 2020-07-14 四川港航建设工程有限公司 Construction method of landslide repairing structure
CN110158540A (en) * 2019-05-14 2019-08-23 兴源环境科技股份有限公司 A kind of riverbed in mountains and rivers river and the construction method of shore protection
CN113322888A (en) * 2021-06-04 2021-08-31 中国水利水电科学研究院 Willow leaf bank habitat restoration method based on temporary nutrient storage

Also Published As

Publication number Publication date
RU2319805C2 (en) 2008-03-20

Similar Documents

Publication Publication Date Title
CN102051867A (en) Green ecological flexible channel revetment structure
CN202012066U (en) Flexible green ecological channel revetment structure
CN106818277B (en) Wind and wave resistant planting system in coastal intertidal zone and its construction method
RU2006112058A (en) METHOD OF ESTABLISHING SEMI-DAM OF BIO POSITIVE DESIGN
RU2006111924A (en) METHOD FOR ESTABLISHING BIO POSITIVE FASTENING
CA3089551C (en) Vegetation partition wire mesh including nonwoven fabric, and slope greening method using same
CN111593749B (en) Ecological bag slope protection system
KR20160048614A (en) A greening block using wire fabric
RU2006127239A (en) METHOD FOR ESTABLISHING SUPPORT WALLS FROM GABIONS
KR101166491B1 (en) Ecological block breast wall
CN104278684B (en) A kind of protecting slope ecology method of geotechnical grid and tapetum fibrosum combination and structure
RU2001122331A (en) Fashenny cellular fastening
KR101694502B1 (en) Gabion adjustable the angle of inclination and construction method
CN212801575U (en) Ecological bag slope protection system
CN117071609B (en) A method for constructing a soil-sinking ecological retaining structure and slope ecological environment
RU2399717C1 (en) Retaining walls of biopositive design
CN207608880U (en) Box ecoscape barricade
KR101187777B1 (en) A planting block that can be applicale artificial ground green
JP2008144440A (en) Earth retaining structure and earth retaining construction method
KR100862209B1 (en) Construction of Low Reservoir with Square Coil Roll
KR20160024568A (en) An Assembly of block and mattress for slope greening
RU2009104909A (en) METHOD FOR ESTABLISHING A GABION FOOTSTONE BIO POSITIVE DESIGN
RU2007123084A (en) METHOD FOR ESTABLISHING A SLOPE MOUNTING OF A BIO POSITIVE DESIGN
KR20140123350A (en) Soil bag for vegetation and the fence building method which uses
RU2336388C2 (en) Dam dike of composite design

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20080412