[go: up one dir, main page]

RU2001126020A - A method of developing an oil field - Google Patents

A method of developing an oil field

Info

Publication number
RU2001126020A
RU2001126020A RU2001126020/03A RU2001126020A RU2001126020A RU 2001126020 A RU2001126020 A RU 2001126020A RU 2001126020/03 A RU2001126020/03 A RU 2001126020/03A RU 2001126020 A RU2001126020 A RU 2001126020A RU 2001126020 A RU2001126020 A RU 2001126020A
Authority
RU
Russia
Prior art keywords
sidetracks
drilled
injection
formation
wells
Prior art date
Application number
RU2001126020/03A
Other languages
Russian (ru)
Other versions
RU2213857C2 (en
Inventor
Леонид Михайлович Рузин
Original Assignee
ООО "ЛУКОЙЛ-Коми"
Filing date
Publication date
Application filed by ООО "ЛУКОЙЛ-Коми" filed Critical ООО "ЛУКОЙЛ-Коми"
Priority to RU2001126020A priority Critical patent/RU2213857C2/en
Priority claimed from RU2001126020A external-priority patent/RU2213857C2/en
Publication of RU2001126020A publication Critical patent/RU2001126020A/en
Application granted granted Critical
Publication of RU2213857C2 publication Critical patent/RU2213857C2/en

Links

Claims (5)

1. Способ разработки нефтяного месторождения, включающий бурение вертикальных скважин с боковыми стволами, закачку теплоносителя в пласт через боковые стволы и отбор через них нефти, отличающийся тем, что вертикальные скважины бурят до подошвы нижнего объекта с размещением их по одной из площадных систем, при этом до начала площадной закачки рабочего агента, например, воды в пласт, бурят боковые стволы в каждой вертикальной скважине в каждом эксплуатационном объекте пласта, затем осуществляют последовательную отработку боковых стволов путем подачи в них теплоносителя с последующим отбором через боковые стволы нефти до снижения дебита скважины до минимально рентабельного уровня, причем циклы закачки пара и отбора нефти повторяют до предельно допустимого обводнения добываемой продукции.1. A method of developing an oil field, including drilling vertical wells with sidetracks, pumping coolant into the formation through sidetracks and taking oil through them, characterized in that the vertical wells are drilled to the bottom of the lower object with their placement in one of the areal systems, before the on-site injection of the working agent, for example, water into the formation, the sidetracks are drilled in each vertical well in each production facility of the formation, then the sidetracks are sequentially worked out Uteem coolant flow therein, followed by selection through the lateral holes of oil well production to reduce to a minimum viable level, the cycles of steam injection and extraction of oil repeated until the maximum allowable water cut. 2. Способ по п.1, отличающийся тем, что при наличии гидродинамической связи между эксплуатационными объектами отработку боковых стволов осуществляют последовательно снизу вверх.2. The method according to claim 1, characterized in that in the presence of a hydrodynamic connection between production facilities, sidetracks are worked out sequentially from the bottom up. 3. Способ по п.1, отличающийся тем, что на период отработки боковых стволов пробуренные боковые стволы, кроме отрабатываемых, временно изолируют, например, пакером.3. The method according to claim 1, characterized in that for the period of mining the sidetracks, the drilled sidetracks, in addition to the drilled ones, are temporarily isolated, for example, by a packer. 4. Способ по п.1, отличающийся тем, что перед площадной закачкой в пласт рабочего агента, например, воды, в боковых стволах добывающих скважин удаляют изоляцию.4. The method according to claim 1, characterized in that before the areal injection of a working agent, for example, water, into the formation, the insulation is removed in the sidetracks of the production wells. 5. Способ по п.1, отличающийся тем, что перед площадной закачкой в пласт рабочего агента, например, воды боковые стволы нагнетательных скважин изолируют от вертикального ствола.5. The method according to claim 1, characterized in that before the site injection into the reservoir of a working agent, for example, water, the lateral shafts of injection wells are isolated from the vertical wellbore.
RU2001126020A 2001-09-24 2001-09-24 Method of oil deposit development RU2213857C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001126020A RU2213857C2 (en) 2001-09-24 2001-09-24 Method of oil deposit development

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001126020A RU2213857C2 (en) 2001-09-24 2001-09-24 Method of oil deposit development

Publications (2)

Publication Number Publication Date
RU2001126020A true RU2001126020A (en) 2003-07-10
RU2213857C2 RU2213857C2 (en) 2003-10-10

Family

ID=31988395

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001126020A RU2213857C2 (en) 2001-09-24 2001-09-24 Method of oil deposit development

Country Status (1)

Country Link
RU (1) RU2213857C2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2315166C1 (en) * 2006-06-05 2008-01-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Well construction method
RU2315167C1 (en) * 2006-06-08 2008-01-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for multilateral well construction
RU2318109C1 (en) * 2006-06-08 2008-02-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method for multihedral well construction
RU2318973C1 (en) * 2006-08-28 2008-03-10 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Multilateral well construction method
RU2419717C1 (en) * 2009-12-01 2011-05-27 Юлия Владимировна Иванова Procedure for fan-like interval-by-interval operation of oil producing wells
RU2445453C1 (en) * 2010-09-03 2012-03-20 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of deposit of high-viscosity and heavy crude oil with thermal impact
RU2446277C1 (en) * 2010-10-05 2012-03-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Development method of high-viscosity oil and bitumen deposit
RU2483207C2 (en) * 2011-07-29 2013-05-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Development method of fractured high-viscosity oil deposit
RU2459935C1 (en) * 2011-10-31 2012-08-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Multi-site oil deposit development method
RU2513390C1 (en) * 2013-06-24 2014-04-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2559983C1 (en) * 2014-06-17 2015-08-20 Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" ООО "ЛУКОЙЛ-Инжиниринг" Method of high-viscosity massive oil pool development

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3946809A (en) * 1974-12-19 1976-03-30 Exxon Production Research Company Oil recovery by combination steam stimulation and electrical heating
RU2049913C1 (en) * 1991-03-13 1995-12-10 Иван Николаевич Стрижов Method for development of oil gas fields
RU2066744C1 (en) * 1993-06-17 1996-09-20 Александр Константинович Шевченко Method for intensification of oil recovery
RU2070284C1 (en) * 1994-07-13 1996-12-10 Акционерное общество закрытого типа "Новые нефтяные технологии - КУРС" Method for development of oil deposits
RU2163292C2 (en) * 1998-12-21 2001-02-20 Позднышев Геннадий Николаевич Method of development of high-viscosity and heavy oil deposits

Similar Documents

Publication Publication Date Title
RU2338863C2 (en) Method and system of facilitating access to underground zone from ground surface
RU2139417C1 (en) Oil production method
CA2903661C (en) Method of completing and producing long lateral wellbores
RU2114289C1 (en) Method for development of deposit with high-viscosity oil
RU2001126020A (en) A method of developing an oil field
RU2007148901A (en) CAVITY DRILLING SYSTEM
RU2176021C2 (en) Method of forming directed vertical or horizontal fracture in formation fracturing
Hettkamp et al. Electricity production from hot rocks
RU2054530C1 (en) Design of underground multihole well, method for its construction and method for its operation
RU98046U1 (en) DEVICE FOR MULTIPLE WELL FOR A FAN INTERVAL PRODUCTION OF PRODUCTIVE LAYERS
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
RU2004125481A (en) METHOD FOR DEVELOPING DEPOSITS OF A MULTI-PLASTIC OIL DEPOSIT WITH WATER OIL ZONES AND / OR MASSIVE TYPE
RU2225938C1 (en) Methods for exploiting oil extracting wells
RU2550642C1 (en) Method of oil field development with horizontal wells
SU1566046A1 (en) Method of degassing series of coal strata
RU2638672C1 (en) Method for drilling out downhole equipment with use of flexible pipe
RU2143060C1 (en) Method of secondary development of high-viscosity oil field
RU2443853C1 (en) Development method of oil deposit with oil-water zones
RU2021477C1 (en) Method for well construction
RU2242594C1 (en) Method for extraction of sedimentologically screened oil-saturated lens by one well
RU2347893C1 (en) Heterogeneous oil field development method
RU2181430C1 (en) Method of oil pool development
RU2600255C1 (en) Method of further development of oil deposit
RU2268356C1 (en) Method for thermal action application to highly-viscous oil deposit
RU2165518C1 (en) Process of completion of wells