RS63858B1 - BOILER ROOM, BOILER ROOM OPERATION PROCEDURE AND BOILER ROOM USE - Google Patents
BOILER ROOM, BOILER ROOM OPERATION PROCEDURE AND BOILER ROOM USEInfo
- Publication number
- RS63858B1 RS63858B1 RS20221082A RSP20221082A RS63858B1 RS 63858 B1 RS63858 B1 RS 63858B1 RS 20221082 A RS20221082 A RS 20221082A RS P20221082 A RSP20221082 A RS P20221082A RS 63858 B1 RS63858 B1 RS 63858B1
- Authority
- RS
- Serbia
- Prior art keywords
- drums
- boiler
- boiler room
- water
- steam
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/22—Drums; Headers; Accessories therefor
- F22B37/225—Arrangements on drums or collectors for fixing tubes or for connecting collectors to each other
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B21/00—Water-tube boilers of vertical or steeply-inclined type, i.e. the water-tube sets being arranged vertically or substantially vertically
- F22B21/34—Water-tube boilers of vertical or steeply-inclined type, i.e. the water-tube sets being arranged vertically or substantially vertically built-up from water tubes grouped in panel form surrounding the combustion chamber, i.e. radiation boilers
- F22B21/36—Water-tube boilers of vertical or steeply-inclined type, i.e. the water-tube sets being arranged vertically or substantially vertically built-up from water tubes grouped in panel form surrounding the combustion chamber, i.e. radiation boilers involving an upper drum or headers mounted at the top of the combustion chamber
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
Opis Description
[0001] Pronalazak se odnosi na kotlarnicu sa najmanje dva gornja bubnja, na koju se takođe poziva kao na kotao sa brzim startom. [0001] The invention relates to a boiler room with at least two upper drums, which is also referred to as a boiler with a quick start.
[0002] Na trenutnom promenljivom tržištu energijom, fleksibilno snabdevanje postrojenja za proizvodnju struje postaje sve relevantnije i kotlarnice se moraju prilagoditi tim uslovima. Glavna ograničenja za regularno brzo startovanje kotlarnica ili ciklus brzog opterećenja jesu komponente sa debelim zidovima kao što su bubnjevi i kolektori. Debljine zidova određuju se radnim pritiskom i visokim pritiscima koji se traže radi optimizovanja efikasnosti. Komponente sa debelim zidovima moraju se zagrevati polako usled termičkog stresa do koga dolazi, i to je u direktnom sukobu sa brzim startovanjem i ciklusom opterećenja. Zbog svoje konstrukcije, kotlovi sa prinudnom cirkulacijom nemaju bubanj, već umesto njega imaju kolektore sa debelim zidom, međutim, takvi sistemi se gotovo isključivo upotrebljavaju u velikim elektranama sa nadkritičnim parametrima pare. U podkritičnim primenama, npr. industrijskoj tehnologiji, decentralizovanim postrojenjima za proizvodnju struje, postrojenjima sa gasnim turbinama za proizvodnju struje sa kotlovima na otpadnu toplotu i elektranama do približno 350 MW, upotreba kotlova sa prirodnom cirkulacijom i prinudnom cirkulacijom jeste dominantna i pod visokim pritiskom oni imaju komponente bubnja i kolektora sa debelim zidovima. [0002] In the current changing energy market, flexible supply of electricity production plants is becoming more and more relevant and boiler plants must adapt to those conditions. The main limitations for regular rapid start-up of boiler plants or rapid load cycling are thick-walled components such as drums and headers. Wall thicknesses are determined by operating pressure and the high pressures required to optimize efficiency. Thick-walled components must warm up slowly due to the thermal stress they incur, and this is in direct conflict with rapid start-up and load cycling. Due to their construction, boilers with forced circulation do not have a drum, but instead have collectors with a thick wall, however, such systems are almost exclusively used in large power plants with supercritical steam parameters. In subcritical applications, e.g. industrial technology, decentralized power generation plants, gas turbine power generation plants with waste heat boilers and power plants up to approximately 350 MW, the use of natural circulation and forced circulation boilers is dominant and at high pressure they have drum and collector components with thick walls.
[0003] DE 971951 B opisuje kotao sa dva gornja bubnja. On obuhvata dva odvojena sistema, tj. dva bubnja se upotrebljavaju u dva odvojena sistema vodenog ciklusa. Dokumenti FR 621429 A, US 4262 637 A, DE 975718 C takođe prikazuju sistem kotla sa dva gornja bubnja. [0003] DE 971951 B describes a boiler with two upper drums. It includes two separate systems, i.e. two drums are used in two separate water cycle systems. Documents FR 621429 A, US 4262 637 A, DE 975718 C also show a boiler system with two upper drums.
Opis pronalaska: Description of the invention:
[0004] Patentni zahtev 1 opisuje kotlarnicu prema pronalasku. Pronalazak se odnosi na kotlarnicu za zagrevanje medijuma, posebno kotao sa prirodnom cirkulacijom ili prinudnom cirkulacijom ili kotao na otpadnu toplotu, posebno poželjno kotao sa ugaonim cevima, koji obuhvata silazne cevi, kolektore, razdelnike i uzlazna cev, koji obrazuju barem deo ciklusa medijuma koji treba zagrevati, pri čemu se najmanje dva bubnja povezuju sa cilusom radi separacije smeše voda-para u paru i vodu. [0004] Patent claim 1 describes a boiler house according to the invention. The invention relates to a boiler room for heating the medium, especially a boiler with natural circulation or forced circulation or a waste heat boiler, especially preferably a boiler with angled tubes, which includes down pipes, collectors, distributors and an up pipe, which form at least part of the cycle of the medium to be heated, where at least two drums are connected to the cylinder for the separation of the water-steam mixture into steam and water.
[0005] Pronalazak se odnosi posebno na kotao sa prirodnom i prinudnom cirkulacijom koji sagoreva čvrsta i/ili tečna i/ili gasovita goriva, kao i na kotlarnice na otpadnu toplotu sa jednim ili više stupnjeva pod pritiskom . [0005] The invention relates in particular to a boiler with natural and forced circulation that burns solid and/or liquid and/or gaseous fuels, as well as to waste heat boilers with one or more stages under pressure.
[0006] Kako bi se debljina zida svela na minimum, ovaj pronalazak predlaže raspodelu zapremine bubnja preko najmanje 2 gornja bubnja. [0006] In order to minimize the wall thickness, this invention proposes to distribute the volume of the drum over at least 2 upper drums.
[0007] Poželjno, sistem je sistem sa dva bubnja koji se upotrebljava posebno za zagrevanje vode za svrhu proizvodnje tople vode i/ili vodene pare. [0007] Preferably, the system is a two-drum system that is used specifically for heating water for the purpose of producing hot water and/or steam.
[0008] U kotlu sa ugaonim cevima, telo pod pritskom kotla formira se čvrstim, pravougaono postavljenim okvirom silaznih cevi, kolektora i razdelnika. Poslednja dva se zavaruju na zidove cevi nepropusne za dimne gasove , formirajući samostalo telo cevi . Ono podupire sebe i sve zavarene ili odvojeno poduprte grejne površine. Opterećenje se prenosi na osnove preko četiri silazne cevi na uglovima, ako je neophodno takođe preko dodatnih silaznih cevi na stranama. Separacija smeše vodapara već se odvija u predseparatorima, izvan bubnja. Odatle, para prolazi kroz prenosne cevi do bubnja i smeša voda-para teče kroz predseparatore direktno do bubnja. Preostala voda zaobilazi sud i teče kroz povratne cevi naniže do razdelnika. [0008] In a boiler with corner tubes, the body under the pressure of the boiler is formed by a solid, rectangular frame of down pipes, collectors and distributors. The last two are welded to the pipe walls impermeable to flue gases, forming an independent pipe body. It supports itself and any welded or separately supported heating surfaces. The load is transferred to the foundations via four down pipes on the corners, if necessary also via additional down pipes on the sides. The separation of the water vapor mixture already takes place in the pre-separators, outside the drum. From there, the steam passes through transfer pipes to the drum and the water-steam mixture flows through the pre-separators directly to the drum. The remaining water bypasses the vessel and flows through the return pipes downwards to the distributor.
[0009] U kotlu za separaciju pare traži se definisana zapremina. U kotlu sa ugaonim cevima, moguće je raspodeliti tu zapreminu preko nekoliko malih zapremina umesto jedne velike zapremine. Ta zapremina se deli između najmanje dva postavljena bubnja, koji su fluidno povezani. [0009] A defined volume is required in a boiler for steam separation. In a boiler with angle tubes, it is possible to distribute that volume over several small volumes instead of one large volume. That volume is divided between at least two stacked drums, which are fluidly connected.
[0010] Mogu se postaviti više od dva bubnja, do bilo kog broja bubnjeva. U tom slučaju, spremljene cevi mogu preuzeti funkciju bubnja, stvarajući „višestruki bubanj “. Postoje mnoga mesta na kojima se para odvaja od vode, kao što su bočni zidovi kolektora. [0010] More than two drums can be placed, up to any number of drums. In this case, the stored pipes can take over the function of the drum, creating a "multiple drum". There are many places where the steam separates from the water, such as the side walls of the collector.
[0011] U sistemu prema pronalasku, posebno, isti pritisak primenjuje se u oba ili svim bubnjevima i svi bubnjevi se povezuju sa istim sistemom vodenog ciklusa. Usled priključka na strani vode i pare, oba ili svi bubnjevi imaju isti pritisak i povezani su za isti stupanj pritiska. [0011] In the system according to the invention, in particular, the same pressure is applied in both or all drums and all drums are connected to the same water cycle system. Due to the connection on the water and steam side, both or all drums have the same pressure and are connected for the same pressure rating.
[0012] Prema pronalasku, odnos prečnika D prema debljini zida s bubnja iznosi D/s ≥ 15. Poželjno, D/s ≥ 18. U jednom izvođenju pronalaska, D/s iznosi 20 do 22. [0012] According to the invention, the ratio of the diameter D to the thickness of the drum wall is D/s ≥ 15. Preferably, D/s ≥ 18. In one embodiment of the invention, D/s is 20 to 22.
[0013] Poželjno, najmanje jedan od bubnjeva ima funkciju kolektora. [0013] Preferably, at least one of the drums has a collector function.
[0014] To jest, najmanje jedan kolektor smeše projektovan je kao bubanj. Kolektor smeše može biti projektovan sa prednjim ili zadnjim ispustom. Ekstrakcija pare iz kolektora smeše može se odvijati u kolektoru pare. Poželjno, postavlja se nekoliko kolektora, čija je debljina zidova redukovana u odnosu na konvencionalni bubanj. Ako se nekoliko kolektora smeše projektuje kao bubanj, moguće je izostaviti postavljanje konvencionalnog bubnja. U tom slučaju, rezultat je kotao sa ugaonim cevima bez bubnja u kome se zapremina za separaciju pare/vode obezbeđuje u nekoliko kolektora smeše projektovanih kao bubnjevi. [0014] That is, at least one mixture collector is designed as a drum. The mixture collector can be designed with a front or rear outlet. Extraction of steam from the mixture header can take place in the steam header. Preferably, several collectors are placed, whose wall thickness is reduced compared to a conventional drum. If several mixture collectors are designed as a drum, it is possible to omit the installation of a conventional drum. In this case, the result is a drumless angle tube boiler in which the steam/water separation volume is provided in several mixture headers designed as drums.
[0015] Prema pronalasku, bubnjevi se postavljaju u delu kotlarnice sa visokim pritiskom, tj. u delu postrojenja projektovanom za rad iznad 40 bara. [0015] According to the invention, the drums are placed in the part of the boiler room with high pressure, ie. in the part of the plant designed for operation above 40 bar.
[0016] Međutim, ne isključuje se da se bubnjevi projektovani prema pronalasku takođe postavljaju u području sa niskim pritiskom. Takođe je moguće postavljanje na različitim stupnjevima pritiska. [0016] However, it is not excluded that the drums designed according to the invention are also placed in a low-pressure area. It is also possible to set it at different pressure levels.
[0017] Prema pronalasku, prečnik D bubnjeva u odnosu na dužinu L bubnjeva iznosi: D/L = 0,03 do 0,5, posebno 0,05 do 0,3. [0017] According to the invention, the diameter D of the drums in relation to the length L of the drums amounts to: D/L = 0.03 to 0.5, especially 0.05 to 0.3.
[0018] Poželjno, prečnik D bubnjeva u odnosu na dužinu bubnjeva iznosi: D/L = 0,1 do 0,2. [0018] Preferably, the diameter D of the drums in relation to the length of the drums is: D/L = 0.1 to 0.2.
[0019] Pronalazak se dalje odnosi na postupak rada kotlarnice prema pronalasku, u kome se toplota proizvodi u kotlarnici i prenosi na medijum, posebno na vodu, u ciklusu i separacija smeše voda-para u paru i vodu izvodi se u oba bubnja. [0019] The invention further relates to the operation process of the boiler house according to the invention, in which heat is produced in the boiler house and transferred to the medium, especially to water, in a cycle and the separation of the water-steam mixture into steam and water is carried out in both drums.
[0020] Pronalazak se dalje odnosi na upotrebu kotlarnice prema pronalasku za proizvodnju toplote i prenošenja toplote na medijum, posebno na vodu. [0020] The invention further relates to the use of the boiler house according to the invention for the production of heat and the transfer of heat to the medium, especially to water.
[0021] Glavna prednost raspodele zapremine prema pronalasku jeste u redukovanju prečnika bubnja i, posledično, debljine zida bubnja. Druga prednost sitema jeste u redukovanoj masi kotla, pošto su dva gornja bubnja lakša od jednog velikog bubnja usled redukovane debljine zida u svakom. Uz to, dva gornja bubnja poboljšavaju vreme povlačenja, tj, izjednačavju vreme povlačenja (vreme između maksimalnog i minimalnog nivoa vode u bubnju) sa manjim prečnikom bubnja i debljinom zida bubnja. [0021] The main advantage of the volume distribution according to the invention is in reducing the diameter of the drum and, consequently, the thickness of the drum wall. Another advantage of the system is the reduced mass of the boiler, since the two upper drums are lighter than one large drum due to the reduced wall thickness in each. In addition, the two upper drums improve the draw time, ie, equalize the draw time (the time between the maximum and minimum water level in the drum) with a smaller drum diameter and drum wall thickness.
[0022] Može biti lakše upotrebiti konvencionalne prefabrikovane cevi, koje su mnogo jednostavnije i manje skupe za proizvodnju i instaliranje. Zavareni bubnjevi mogu ne biti potrebni, što redukuje troškove i trud. Zavareni bubnjevi su teški i skupi za proizvodnju zbog svoje veličine i neophodne stabilnosti, i moraju se zadovoljiti visoki zahtevi s obzirom na statiku i stabilnost pritiska. [0022] It may be easier to use conventional prefabricated pipes, which are much simpler and less expensive to manufacture and install. Welded drums may not be required, which reduces costs and effort. Welded drums are difficult and expensive to manufacture due to their size and the necessary stability, and high requirements regarding statics and pressure stability must be met.
[0023] Moguća je niska apsolutna debljina zida, koja omogućava brzo startovanje i isključivanje u kratkom vremenu do 1 minuta, pošto je rezultujući termički stres u cevima mnogo niži od onog u bubnjevima sa debelim zidom usled manje debljine zida. Debljina zida zavisi od spoljnog prečnika. [0023] A low absolute wall thickness is possible, which enables fast start-up and shutdown in a short time of up to 1 minute, since the resulting thermal stress in the tubes is much lower than that in thick-walled drums due to the smaller wall thickness. The wall thickness depends on the outer diameter.
[0024] Brzo startovanje i isključivanje posebno je ključno u gasnim i parnim procesima kao i u upotrebi solarne toplotne energije, pošto dolazi do brzih promena opterećenja. [0024] Fast start-up and shutdown is particularly crucial in gas and steam processes as well as in the use of solar thermal energy, as there are rapid load changes.
[0025] Odigrava se bolja i brža separacija pare, pošto je apsolutna visina nivoa vode vodene faze iz koje treba izdvojiti paru niža. [0025] A better and faster steam separation takes place, since the absolute height of the water level of the aqueous phase from which the steam should be separated is lower.
[0026] Posledično, može se redukovati upotreba pumpi. [0026] Consequently, the use of pumps can be reduced.
Opis slika: Description of the pictures:
[0027] Slike 1 i 2 pokazuju konvencionalne konstrukcije kotlova sa ugaonim cevima kao stanje tehnike. Može se videti da su moguće drugačije veličine bubnja. [0027] Figures 1 and 2 show conventional constructions of angle tube boilers as state of the art. It can be seen that different drum sizes are possible.
[0028] Kotlovi sa ugaonim cevima obuhvataju bubanj 1 kao i nekoliko silaznih cevi 2, redom. Na gornjoj strani, oni obuhvataju prelivnu cev 3 i kolektore 4 smeše, a na nižoj strani, obuhvataju razdelnike 5. [0028] Angle tube boilers include a drum 1 as well as several downcomers 2, respectively. On the upper side, they include the overflow pipe 3 and the collectors 4 of the mixture, and on the lower side, they include the distributors 5.
[0029] Slika 3 pokazuje kotao sa ugaonim cevima prema pronalasku sa dva iznad postavljenog bubnja 1. Oni su u fluidnoj vezi i postavljeni u istom ciklusu vode-pare. Može se videti da dva bubnja 1 obezbeđuju istu zapreminu kao veliki bubanj 1 na Sl.2, ali sa manjim debljinama zida. Osim toga, masa bubnjeva 1 ovde je redukovana i iznosi samo 148,2 t u poređenju sa konstrukcijom na Sl.2 sa 161,7 t. [0029] Fig. 3 shows a boiler with angle tubes according to the invention with two superimposed drum 1. They are in fluid connection and placed in the same water-steam cycle. It can be seen that the two drums 1 provide the same volume as the large drum 1 in Fig.2, but with smaller wall thicknesses. In addition, the mass of drums 1 is reduced here and is only 148.2 t compared to the construction in Fig. 2 with 161.7 t.
[0030] Sl.4 pokazuje kotao sa ugaonim cevima prema pronalasku u pogledu u perspektivi. Gore levo, u odeljku sa visokim pritiskom, vide se dva bubnja 1, dok je gore desno, u odeljku sa niskim pritiskom, postavljen samo jedan bubanj 1. [0030] Fig. 4 shows a boiler with angle tubes according to the invention in a perspective view. In the upper left, in the high pressure compartment, two drums 1 are seen, while in the upper right, in the low pressure compartment, only one drum 1 is installed.
[0031] Kotlovi sa ugaonim cevima pokazani na Slikama 3 i 4 takođe obuhvataju više silaznih cevi 2. Na gornjoj strani oni obuhvataju prelivnu cev 3 i kolektor 4 smeše, a na donjoj strani obuhvataju razdelnike 5. Međutim, za razliku od konvencionalnih kotlova sa ugaonim cevima, oni imaju dva bubnja 1 na gornjoj strani. [0031] The angle tube boilers shown in Figures 3 and 4 also include several downcomers 2. On the upper side they include an overflow pipe 3 and a mixture collector 4, and on the lower side they include distributors 5. However, unlike conventional angle tube boilers, they have two drums 1 on the upper side.
Spisak pozivnih oznaka Callsign list
[0032] [0032]
1 Bubanj 1 Drum
2 Silazna cev 2 Downpipe
3 Prelivna cev 3 Overflow pipe
4 Kolektor smeše 4 Mixture collector
5 Razdelnik 5 Divider
Claims (4)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102016109631 | 2016-05-25 | ||
| EP17172310.9A EP3252375B1 (en) | 2016-05-25 | 2017-05-22 | Boiler plant, method for operating a boiler plant and use of a boiler plant |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| RS63858B1 true RS63858B1 (en) | 2023-01-31 |
Family
ID=58772417
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RS20221082A RS63858B1 (en) | 2016-05-25 | 2017-05-22 | BOILER ROOM, BOILER ROOM OPERATION PROCEDURE AND BOILER ROOM USE |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP3252375B1 (en) |
| DK (1) | DK3252375T3 (en) |
| ES (1) | ES2932027T3 (en) |
| PL (1) | PL3252375T3 (en) |
| RS (1) | RS63858B1 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR621429A (en) * | 1926-07-17 | 1927-05-11 | Ets Delaunay Belleville Sa | Steam boiler |
| DE975718C (en) * | 1949-11-01 | 1962-06-20 | Ferdinand Lentjes | Water tube boiler |
| DE971951C (en) | 1953-04-18 | 1959-04-23 | Ver Kesselwerke Ag | Radiation boiler for high performance with two top drums |
| US4262637A (en) * | 1979-08-09 | 1981-04-21 | The Babcock & Wilcox Company | Vapor generator |
-
2017
- 2017-05-22 PL PL17172310.9T patent/PL3252375T3/en unknown
- 2017-05-22 ES ES17172310T patent/ES2932027T3/en active Active
- 2017-05-22 RS RS20221082A patent/RS63858B1/en unknown
- 2017-05-22 EP EP17172310.9A patent/EP3252375B1/en active Active
- 2017-05-22 DK DK17172310.9T patent/DK3252375T3/en active
Also Published As
| Publication number | Publication date |
|---|---|
| EP3252375B1 (en) | 2022-08-31 |
| DK3252375T3 (en) | 2022-12-05 |
| ES2932027T3 (en) | 2023-01-09 |
| PL3252375T3 (en) | 2022-12-27 |
| EP3252375A1 (en) | 2017-12-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9134041B2 (en) | Vapor vacuum condensing boiler designs | |
| CN101968043B (en) | Solar thermal power generation system | |
| EP2689185B1 (en) | Method and configuration to reduce fatigue in steam drums | |
| KR101710229B1 (en) | Heat recovery steam generator and multidrum evaporator | |
| CN104633649B (en) | Auxiliary steam supply system in solar power facility | |
| US20110197830A1 (en) | Continuous steam generator | |
| US11709024B2 (en) | Thermal energy battery | |
| CN106338056B (en) | A kind of horizontal side burning formula coil arrangement Quick steam generating system | |
| AU2009290998B2 (en) | Continuous steam generator | |
| US20190226718A1 (en) | Unpressurized horizontal electric storage tank water heater | |
| RS63858B1 (en) | BOILER ROOM, BOILER ROOM OPERATION PROCEDURE AND BOILER ROOM USE | |
| US10100680B2 (en) | Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step | |
| JP5345217B2 (en) | Once-through boiler | |
| RU2602649C2 (en) | Steam turbine npp | |
| JP2012207852A (en) | Boiler | |
| CN201269622Y (en) | Multi-stage energy-saving system of clean fuel industrial boiler | |
| RU2467254C1 (en) | Deaeration membrane expansion tank | |
| RU2515877C2 (en) | Industrial monotube steam generator | |
| US20160025331A1 (en) | Condensate preheater for waste heat steam generator | |
| KR101989723B1 (en) | Waste heat steam generator | |
| US20190154359A1 (en) | Combustion heating apparatus | |
| RU155185U1 (en) | STEAM-WATER HEAT EXCHANGER | |
| RU149574U1 (en) | STEAM-WATER HEAT EXCHANGER | |
| RU133256U1 (en) | VERTICAL DRUM STEAM RECOVERY BOILER WITH SECTED WATER HEATING SURFACES | |
| CN103946642B (en) | High-efficiency solar receptor |