Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marengo Flavio Bollo, Ciamarra Bruno AlecchifiledCriticalMarengo Flavio Bollo
Priority to PE2010000316ApriorityCriticalpatent/PE20120091A1/es
Publication of PE20120091A1publicationCriticalpatent/PE20120091A1/es
DICHO SISTEMA CONSTRUCTIVO COMBINA ELEMENTOS DE CONCRETO ARMADO EN PANELES PARA MUROS Y PANELES PARA TECHOS SOLDADOS ENTRE SI. DICHO SISTEMA CONSTRUCTIVO CONSISTE EN QUE LA CIMENTACION QUE SE EMPLEA ES UNA LOSA SIMPLE SOBRE LA CUAL SE PONEN LOS PANELES SOLDADOS ENTRE SI CON PUNTOS CORRIDOS DE SOLDADURA
PE2010000316A2010-07-212010-07-21Sistema constructivo "panel-panel" para la fabricacion de viviendas y sus elementos basicos
PE20120091A1
(es)