[go: up one dir, main page]

KR200286856Y1 - Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant - Google Patents

Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant Download PDF

Info

Publication number
KR200286856Y1
KR200286856Y1 KR2020020015080U KR20020015080U KR200286856Y1 KR 200286856 Y1 KR200286856 Y1 KR 200286856Y1 KR 2020020015080 U KR2020020015080 U KR 2020020015080U KR 20020015080 U KR20020015080 U KR 20020015080U KR 200286856 Y1 KR200286856 Y1 KR 200286856Y1
Authority
KR
South Korea
Prior art keywords
blind flange
flange
blind
tube
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR2020020015080U
Other languages
Korean (ko)
Inventor
조성은
Original Assignee
주식회사 무진기연
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 무진기연 filed Critical 주식회사 무진기연
Priority to KR2020020015080U priority Critical patent/KR200286856Y1/en
Application granted granted Critical
Publication of KR200286856Y1 publication Critical patent/KR200286856Y1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)

Abstract

본 고안은 원자력 발전소에서 격납용기 건물과 사용후연료 건물간에 설치된 핵연료 이송용 튜브의 격납용기측 플랜지를 밀폐하기 위한 블라인드 플랜지를 신속하고 안전하게 개폐할 수 있는 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치를 제공하기 위한 것으로서, 핵연료를 이송하거나 블라인드 플랜지에 밀착된 실(23)이 떨어지도록 블라인드 플랜지(2)를 요동시키는 링기어(22)를 가진 블라인드 플랜지로 하고, 튜브(6)의 플랜지(61) 앞에는 상기한 링기어(22) 장착형 블라인드 플랜지(2)가 수직으로 드나들 수 있게 안장시키는 블라인드 플랜지 시트(1)를 부착하며, 튜브(6)의 플랜지(61) 앞 좌우에는 나란히 안내기둥(5)을 설치하여 블라인드 플랜지(2)가 매달린 블라인드 플랜지 잠금수단(3)을 수직으로 정숙하게 오르내릴 수 있도록 설치함과 동시에 상기 블라인드 잠금수단(3) 위쪽에 블라인드 플랜지 잠금수단(3)과 블라인드 플랜지(2)를 인상 또는 인하시키는 블라인드 플랜지 인상수단(4)을 설치한 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치를 특징으로 한다.The present invention provides a blind flange automatic opening and closing device for a fuel transport tube that can quickly and safely open and close a blind flange for sealing a containment side flange of a fuel transport tube installed between a containment building and a spent fuel building in a nuclear power plant. For the purpose of the present invention, a blind flange having a ring gear 22 which swings the blind flange 2 so as to transfer the fuel or the seal 23 in close contact with the blind flange falls, and in front of the flange 61 of the tube 6. A blind flange seat (1) is mounted to allow the ring gear (22) mounted blind flange (2) to enter vertically, and a guide column (5) is arranged side by side in front of the flange (61) of the tube (6). While the blind flange (2) is installed so that the blind flange locking means (3) suspended vertically and quietly A blind flange automatic opening and closing device for a nuclear fuel transfer tube of a nuclear power plant provided with a blind flange locking means (3) and a blind flange lifting means (4) for raising or lowering the blind flange (2) above the blind locking means (3). It features.

Description

원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치{Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant}Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant}

본 고안은 원자력 발전소의 격납용기 건물과 사용후연료 건물간에 설치된 핵연료 이송용 튜브의 격납용기측 플랜지를 밀봉하는 블라인드 플랜지의 개폐작업과 실 교체작업을 안전하고 신속하게 수행할 수 있게 한 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치에 관한 것이다.The present invention provides a safe and quick operation for the opening and closing of the blind flange and seal replacement of the containment side flange of the fuel transport tube installed between the containment building and the spent fuel building of the nuclear power plant. A blind flange automatic switchgear for a nuclear fuel transfer tube.

도 1에서, 원자력 발전소의 격납용기 건물(a)과 사용후연료 건물(b)간에는 핵연료 이송용 튜브(c)가 설치되어 있다. 또, 격납용기 건물(a)쪽 튜브에는 게이트밸브(d)를 설치하고 사용후연료 건물(b)쪽 튜브단에는 블라인드 플랜지(e)를 설치한다. 블라인드 플랜지(e)는 격납용기 건물(a)의 내외부를 방사능적으로 안전하게차단하는 플랜지 커버이다.In Fig. 1, a nuclear fuel transfer tube (c) is provided between a containment building (a) and a spent fuel building (b) of a nuclear power plant. In addition, a gate valve (d) is installed in the tube of the containment building (a) and a blind flange (e) is installed in the tube end of the spent fuel building (b). The blind flange (e) is a flange cover for radioactively and safely blocking the inside and outside of the containment building (a).

그리고 사용후연료 건물(b)쪽에는 작업자가 내려가서 보울트를 풀고 블라인드 플랜지(e)를 열어 연료를 이송시킨 다음에 다시 내려가 블라인드 플랜지(e)로 튜브(c)를 차단하는 작업을 수행하기 위한 맨홀(f)도 설치되어 있다.Then, the worker goes down to the spent fuel building (b) to release the bolt, open the blind flange (e) to transfer the fuel, and then go back down to block the tube (c) with the blind flange (e). The manhole f is also provided.

도 2에서, 종래에는 튜브(c)의 플랜지(g)에 힌지(h)를 부착하여 스윙아암(i)을 설치하고, 스윙아암(i)에 블라인드 플랜지(e)의 정점을 부착하며, 플랜지(g)와 블라인드 플랜지(e)는 가장자리에 방사상으로 천공된 체결공을 맞추고 보울트(j)로 체결하도록 되어 있다. 보울트(j)의 체결수는 무려 20개에 이른다.In FIG. 2, the swing arm i is conventionally attached by attaching a hinge h to the flange g of the tube c, and the top of the blind flange e is attached to the swing arm i, and the flange (g) and blind flange (e) are adapted to fit radially perforated fastening holes at the edges and fasten with bolts (j). The number of fastenings of the bolt j is as high as 20.

이런 구조의 종래 원자로의 핵연료 이송 블라인드 플랜지는 작업자에The nuclear fuel delivery blind flange of this type of conventional reactor is

의해 개폐되는 수동식으로서, 핵연료 이송 작업이 더디기 때문에 비능률적이다. 또, 블라인드 플랜지는 핵연료를 재장전하는 수조 중에서도 가장 낮은 곳에 위치하므로 핵연료를 이송하기 전에 사전조치로 방사능 유출을 방지하기 위해 채워 넣은 물을 배수하더라도 완전 배수는 곤란하다. 그래서 방사능 오염도가 가장 높다. 이런 곳에서 블라인드 플랜지를 개폐하는 데 장시간을 소요하면 작업자가 방사능에 피복될 개연성이 다분하고, 공간선량율도 상대적으로 높기 때문에 우려하지 않을 수 없다. 블라인드 플랜지에 설치된 실을 교체할 때도 마찬가지다. 대규모 원자력 발전소의 경우에는 반경이 더 큰 튜브와 블라인드 플랜지를 사용하는 관계로 보울트 체결수가 더많기 때문에 방사능의 과피폭이 심히 우려된다.It is a manual type, which is opened and closed by, and is inefficient because the fuel transfer operation is slow. In addition, since the blind flange is located at the lowest position among the tanks for reloading the fuel, it is difficult to completely drain the water even if the filled water is drained to prevent radioactive leakage before the fuel is transferred. Therefore, radioactive contamination is the highest. If such a long time is required to open and close the blind flange in such a place, the operator is likely to cover the radioactivity, and the space dose rate is relatively high. The same is true when replacing a seal installed on a blind flange. In large nuclear power plants, the use of larger radii tubes and blind flanges means more bolt fastening, which is a significant concern for overexposure to radiation.

본 고안은 원자력 발전소에서 격납용기 건물과 사용후연료 건물간에 설치된 핵연료 이송용 튜브의 격납용기측 플랜지를 밀폐하기 위한 블라인드 플랜지를 신속하고 안전하게 개폐할 수 있는 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치를 제공하기 위한 것이다.The present invention is to automatically open and close the blind flange for the nuclear fuel transfer tube of the nuclear power plant which can quickly and safely open and close the blind flange for sealing the container side flange of the nuclear fuel transfer tube installed between the containment building and the spent fuel building in the nuclear power plant. It is for providing a device.

이 과제는, 핵연료를 이송하거나 블라인드 플랜지 튜브의 플랜지에 밀착된 실이 떨어지도록 블라인드 플랜지를 요동시키는 링기어를 가진 블라인드 플랜지로 하고, 튜브의 플랜지 앞에는 상기한 링기어 장착형 블라인드 플랜지가 수직으로 드나들게 안장시킬 수 있는 블라인드 플랜지 시트를 부착하며, 튜브의 플랜지 앞 좌우에는 안내기둥을 설치하여 블라인드 플랜지가 매달린 블라인드 플랜지 잠금수단을 수직으로 정숙하게 오르내릴 수 있도록 설치함과 동시에 상기 블라인드 잠금수단과 함께 블라인드 플랜지를 인상 또는 인하시키는 블라인드 플랜지 인상수단을 설치한 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치로 달성하게 된다.The task is to have a blind flange with ring gear that swings the blind flange so that the seals are transferred to the fuel or the seals close to the flange of the blind flange tube. A blind flange seat that can be saddle is attached, and guide pillars are installed on the left and right sides of the flange of the tube so that the blind flange locking means suspended from the blind flange can be installed vertically and quietly, and the blind lock means together with the blind locking means. A blind flange automatic switchgear for a nuclear fuel transfer tube of a nuclear power plant equipped with a blind flange raising means for raising or lowering a flange is achieved.

도 1은 격납용기 건물과 사용후연료 건물 사이에 설치된 핵연료이송 튜브의 구조도1 is a structural diagram of a fuel transfer tube installed between a containment building and a spent fuel building

도 2는 종래 블라인드 플랜지의 설치예시도2 is an installation example of a conventional blind flange

도 3은 핵연료 이송 튜브의 플랜지측에 본 고안에 의한 블라인드 플 랜지 자동 개폐장치가 설치된 상태의 종단측면도Figure 3 is a longitudinal sectional side view of the blind flange automatic opening and closing device according to the present invention is installed on the flange side of the nuclear fuel transfer tube

도 4는 도 3의 우측에서 본 비절개 정면도4 is a front view of the non-incision, seen from the right side of FIG.

도 5는 블라인드 플랜지 시트에 블라인드 플랜지가 들어 앉아 밀폐한 상태의 단면확대도Figure 5 is an enlarged cross-sectional view of the blind flange seated in a blind flange seat seated

도 6은 블라인드 플랜지 시트의 사시도6 is a perspective view of a blind flange sheet

도 7은 블라인드 플랜지가 인상된 상태의 정면도7 is a front view of a state in which the blind flange is raised;

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 블라인드 플랜지 시트 2 : 블라인드 플랜지1: blind flange seat 2: blind flange

3 : 블라인드 플랜지 잠금수단 4 : 블라인드 플랜지 인상수단3: blind flange locking means 4: blind flange lifting means

5 : 안내기둥 6 : 튜브5: guide pillar 6: tube

8 : 현수보울트 11 : 플랜지좌8: Suspension bolt 11: Flange seat

12 : 기어좌 13 : 턱12: gear seat 13: jaw

14,24 : 구배면 21 : 축14,24: gradient surface 21: axis

22 : 링기어 31 : 대차22: ring gear 31: bogie

32 : 에어모터 34a,b : 에어 실린더32: air motor 34a, b: air cylinder

35 : 시트 가이드 41 : 모터35: seat guide 41: motor

42 : 드럼 43 : 로우프42: Drum 43: Rope

61 : 플랜지61: flange

도 3과 도 4에서, 본 고안에서 제안하는 블라인드 플랜지 자동 개폐장치는 블라인드 플랜지 시트(1)와 개량형 블라인드 플랜지(2), 블라인드 플랜지 잠금수단(3) 그리고 블라인드 플랜지 인상수단(4) 및 안내기둥(5)과의 조합체다.3 and 4, the automatic blind flange opening and closing device proposed in the present invention is the blind flange seat (1) and the improved blind flange (2), blind flange locking means (3) and blind flange lifting means (4) and guide pillar It is a combination with (5).

도 5 및 도 6과 함께 살펴 보면, 블라인드 플랜지 시트(1)는 튜브(6)의 플랜지(61)에 하반부를 체결하여 블라인드 플랜지(2)를 수직으로 내려 앉히고 또한 수직으로 인상될 수 있게 지지하는 것으로, 내측단에는 블라인드 플랜지(2)의 하반부가 밀착되게 들어 앉을 하반원형 블라인드 플랜지좌(11)가 형성되어 있고, 블라인드 플랜지좌(11)의 외측에는 하반원형 기어좌(12)가 형성되어 있다. 기어좌(12)는 블라인드 플랜지(2)의 외면에 결합된 링기어(22)가 들어가 앉을 자리다.5 and 6, the blind flange sheet 1 fastens the lower half to the flange 61 of the tube 6 so that the blind flange 2 can be vertically lowered and supported to be vertically lifted. The lower half circular blind flange seat 11 is formed in the inner end so that the lower half part of the blind flange 2 may closely contact, and the lower half circular gear seat 12 is formed outside the blind flange seat 11. . The gear seat 12 is a seat for the ring gear 22 coupled to the outer surface of the blind flange 2 to enter.

또, 링기어좌(12)의 외곽에 형성되어 링기어좌(12)에 들어 앉은 링기어가 외측으로 빠지지 못하게 보호하는 턱(13)은 블라인드 플랜지좌(11)와 기어좌(12)와는 달리 환상으로 형성하여 거기에 들어 앉은 링기어(22)의 외면을 지지토록 한다. 상기 턱(13)의 내측 모서리는 구배면(14)으로 형성한다. 이 구배면(14)은 링기어 결합형 블라인드 플랜지(2)를 들어 앉혔을 때 링기어(22)의 외면 모서리에 부여된 구배면(24)이 튜브(6)의 플랜지(61)쪽으로 미끄러져 블라인드 플랜지(2)가 플랜지(61)에 밀착되도록 유도한다. 그리고 블라인드 플랜지 시트(1)의 내측면에는 기존의 플랜지(61)의 하반부에 천공된 체결공(62)에 상응하는 체결공(15)을 천공한다.In addition, the jaw 13 formed at the outer side of the ring gear seat 12 to protect the ring gear seated in the ring gear seat 12 from falling outwardly has an annular shape unlike the blind flange seat 11 and the gear seat 12. It forms and supports the outer surface of the ring gear 22 which sat in it. The inner edge of the jaw 13 is formed with a gradient surface 14. This gradient surface 14 slides toward the flange 61 of the tube 6 when the gradient surface 24 provided at the outer edge of the ring gear 22 is lifted when the ring gear engagement blind flange 2 is seated. The blind flange 2 is brought into close contact with the flange 61. In addition, the inner surface of the blind flange sheet 1 drills a fastening hole 15 corresponding to the fastening hole 62 drilled in the lower half of the existing flange 61.

도 3과 도 5에서, 블라인드 플랜지(2)는 이면에 축(21)을 갖고 있다. 축(21)은 링기어(22)를 끼워 붙이는데 쓰인다. 블라인드 플랜지(2)의 내측면에 부착된 것은 환상 실(23)이다.3 and 5, the blind flange 2 has a shaft 21 on the back surface. The shaft 21 is used for fitting the ring gear 22. Attached to the inner side of the blind flange 2 is the annular seal 23.

링기어(22)는 블라인드 플랜지 잠금수단(3)의 구동기어(33)에 맞물려 에어모터(32)의 구동력으로 블라인드 플랜지(2)를 원주방향으로 엇갈리게 반복 회전시켜 플랜지(51)에 대한 이맞춤 및 밀착과 밀착상태를 해제하는 데 쓰이는 동력중계수단이다. 링기어(22)의 외면 바깥 모서리는 상기한 구배면(14)에 대응하는 구배면(24)으로 형성한다. 이 구배면(24)은 블라인드 플랜지 시트(1)에 블라인드 플랜지(2)를 들어 앉힐 때 그 구배면(14)을 미끄럼타고 플랜지(51)쪽으로 접근케 하므로서 자동으로 조심되고 또한 밀착되도록 유도도 하는 것이다.The ring gear 22 is engaged with the drive gear 33 of the blind flange locking means 3 and rotates the blind flange 2 alternately in the circumferential direction with the driving force of the air motor 32 so as to be engaged with the flange 51. And it is a power relay means used to release the close contact and close contact. The outer edge of the outer surface of the ring gear 22 is formed with a gradient surface 24 corresponding to the above-described gradient surface 14. This sloped surface 24 is guided automatically and carefully by sliding the sloped surface 14 and approaching the flange 51 when the blind flange 2 is seated in the blind flange seat 1. will be.

도 3과 도 4에서, 블라인드 플랜지 잠금수단(3)은 블라인드 플랜지 시트(1)에 들어 앉은 블라인드 플랜지(2)를 튜브(6)의 플랜지(61)에 밀착되도록 잠그고, 블라인드 플랜지(2)를 인상하기 전에는 좌우에서 압을 가해 튜브(6)의 플랜지(61)에 실이 밀착된 블라인드 플랜지(2)가 떨어지게 하여 인상하기 쉽게 조작하기 위한 것으로서, 대차(31)와 에어모터(32), 구동기어(33), 에어 실린더(34a,b), 시트 가이드(35) 그리고 로우프 걸이(36)와 슬리브(37a,b)로 구성된다.In FIGS. 3 and 4, the blind flange locking means 3 locks the blind flange 2 seated in the blind flange seat 1 to be in close contact with the flange 61 of the tube 6, and the blind flange 2 is closed. Before pulling up, the blind flange 2 in which the seal is in close contact with the flange 61 of the tube 6 is pushed down from the left and right side so as to easily be pulled up, and the trolley 31 and the air motor 32 are driven. Gear 33, air cylinders 34a and b, seat guide 35 and rope hook 36 and sleeves 37a and b.

대차(31)는 블라인드 플랜지 잠금수단(3)의 모든 구성요소를 탑재하면서 블라인드 플랜지(2)를 매달아 지지하는 것으로, 인상수단(4)에 의해 수직으로 올려지고 내려진다. 대차(31)의 바닥 복판에는 블라인드 플랜지(2)를 매단현수보울트(8)를 헐겁게 내리 끼워서 지지하는 현수공(38)을 천공한다.The trolley 31 hangs and supports the blind flange 2 while mounting all the components of the blind flange locking means 3, and is raised and lowered vertically by the pulling means 4. In the bottom deck of the trolley | bogie 31, the suspension hole 38 which loosely supports the suspended flange 2 by hanging the hanging suspension bolt 8 is drilled.

에어모터(32)는 구동기어(33)를 정역회전시켜 링기어(22)를 구동함으로서 플랜지(61)에 밀착된 블라인드 플랜지(2)를 자동조심되도록 밀착시키고 또는 플랜지(61)로부터 블라인드 플랜지(2)를 떨어지게 하는 구동수단이다. 구동기어(33)는 에어모터(32)의 모터축에 설치된다. 구동기어(33)의 동력은 감속기어(39a,b)를 거쳐 감속된 후 링기어(22)에 전달되도록 한다.The air motor 32 rotates the drive gear 33 forward and backward to drive the ring gear 22 so that the blind flange 2 closely attached to the flange 61 is brought into close contact with each other so as to be self-aligned or from the flange 61 to the blind flange ( 2) It is a driving means to drop. The drive gear 33 is installed on the motor shaft of the air motor 32. The power of the drive gear 33 is decelerated through the reduction gears 39a and b and then transmitted to the ring gear 22.

에어 실린더(34a,b)는 대차(31) 상에서 블라인드 플랜지(2)를 원주방향으로움직여 플랜지(61)의 중심에 블라인드 플랜지(2)의 중심을 맞추는 원점조절용이며, 블라인드 플랜지(2)의 정점을 기준으로 원주방향으로 등거리에서 향심방향으로 설치하고, 각 에어 실린더(34a,b)의 램(38′) 선단은 블라인드 플랜지(2)의 주면에 상시 닿아 있게 한다.Air cylinders 34a and b are for homing the blind flange 2 on the trolley 31 by circumferentially moving the blind flange 2 to the center of the flange 61, and the apex of the blind flange 2 It is installed in the circumferential direction in the circumferential direction on the basis of the reference, and the front end of the ram (38 ') of each air cylinder (34a, b) is always in contact with the main surface of the blind flange (2).

블라인드 플랜지 시트(1)의 하반부는 튜브(6)의 플랜지(61)에 보울트(7)에 의해 체결되어 든든하지만, 상반부는 아무데도 고정되어 있지 아니하므로 하반부에 비해 안정감이 낮다. 특히 블라인드 플랜지(2)가 안착된 상태에서는 더 그렇다. 시트 가이드(35)는 이런 우려를 불식하는 데 필요하다. 시트 가이드(35)는 블라인드 플랜지 잠금수단(3)이 내려진 상태에서 블라인드 플랜지 시트(1)의 상반부 외면을 지지하여 블라인드 플랜지(2)에 의한 플랜지(61) 밀폐상태를 안정시키는 것이다. 이러한 시트 가이드(35)는 블라인드 플랜지 시트(1)의 상반부만 지지하면 되므로 원형 링의 상반부를 취한 형태로 한다. 이 시트 가이드(35)는 대차(1)의 외면 하단에 보울트(9)로 체결한다.Although the lower half of the blind flange sheet 1 is fastened by the bolt 7 to the flange 61 of the tube 6, since the upper half is not fixed anywhere, the stability is lower than the lower half. This is especially true when the blind flange 2 is seated. The seat guide 35 is necessary to dispel this concern. The seat guide 35 supports the outer surface of the upper half of the blind flange seat 1 in a state where the blind flange locking means 3 is lowered to stabilize the flange 61 sealed by the blind flange 2. Since the seat guide 35 only needs to support the upper half of the blind flange sheet 1, it takes the upper half of a circular ring. The seat guide 35 is fastened to the lower end of the bogie 1 with a bolt 9.

대차(31)의 정점에 부착된 로우프 걸이(36)는 블라인드 플랜지 인상수단(4)에서 내려진 로우프(43)에 매단다. 그리고 대차(31)와 시트 가이드(35)의 양측에는 안내기둥(5)을 타고 다니는 슬리브(37a,b)를 부착하여 정숙하게 승강토록 한다.The rope hook 36 attached to the apex of the bogie 31 is suspended from the rope 43 lowered from the blind flange pulling means 4. And both sides of the trolley 31 and the seat guide 35 is attached to the sleeve (37a, b) that rides around the guide pillar (5) so as to raise and lower silently.

블라인드 플랜지 인상수단(4)은 안내기둥(5)의 상단부에 고정배치하여 블라인드 플랜지(2)가 매달린 블라인드 플랜지 잠금수단(3)을 끌어올리고 또는 내려주는 것으로, 모터(41)와 로우프 드럼(42) 및 로우프 드럼(42)에 감긴 로우프(43)로 이루어진 윈치이다.The blind flange lifting means 4 is fixed to the upper end of the guide column 5 to raise or lower the blind flange locking means 3 on which the blind flange 2 is suspended. The motor 41 and the rope drum 42 ) And a winch 43 wound around the rope drum 42.

안내기둥(5)은 튜브(6)의 플랜지(61)의 양옆 바로 앞에 나란히 세워서 블라인드 플랜지 잠금수단(3)이 승강할 때 바른 자세로 순탄하게 오르내리도록 안내하는 것이다.The guide column 5 stands side by side immediately in front of both sides of the flange 61 of the tube 6 to guide the blind flange locking means 3 to move up and down smoothly in the right posture ascending and descending.

현수보울트(8)는 머리(81)를 대차(31)의 현수공(38)에 턱걸림되도록 내리 끼워서 블라인드 플랜지(2)의 정부에 체결하는 것이다.Suspension bolt (8) is to fasten the head 81 to the jaw of the suspension hole 38 of the bogie 31 to fasten to the government of the blind flange (2).

도 7에서, 인상수단(4)을 가동하여 로우프(43)를 감아들이면 블라인드 플랜지 잠금수단(3)이 인상되고, 블라인드 플랜지 잠금수단(3)은 블라인드 플랜지(2)를 끌고 간다. 이러한 블라인드 플랜지(2)의 인상은 플랜지(61)가 완전히 개방될 때까지 실시하여 튜브(6)를 통하여 이루어지는 핵연료의 이송작업에 장애가 없도록 하고, 실(23)을 교체할 경우에는 플랜지(61) 위로 완전히 블라인드 플랜지(2)를 인상한다.In FIG. 7, the blind flange locking means 3 is pulled up by moving the pulling means 4 to wind the rope 43, and the blind flange locking means 3 pulls the blind flange 2. The lifting of the blind flange 2 is carried out until the flange 61 is fully opened so that there is no obstacle in the transfer of nuclear fuel through the tube 6, and the flange 61 is replaced when the seal 23 is replaced. Raise the blind flange (2) completely up.

플랜지(61)를 밀폐하고 있던 블라인드 플랜지(2)는 곧바로 인상하는 것은 무리다. 플랜지(61)에 대한 블라인드 플랜지(2)의 밀폐상태는 대부분 플랜지(61)에 실(23)이 달라붙어 있다. 그러므로 인상하기 전에 플랜지(61)에서 블라인드 플랜지(2)를 떨어 뜨려야 한다. 이럴 때, 에어모터(32)를 활용한다. 즉, 에어모터(32)를 정역구동한다. 그러면 그 동력은 구동기어(33)와 감속기어(39a,b)를 거쳐 링기어(22)에 전달돼 블라인드 플랜지(2)를 좌우로 흔들어서 플랜지(61)에 달라붙은 실(23)이 떨어지게 한다. 이렇게 실(23)이 완전히 떨어진 후에 인상수단(4)으로 인상해야만 실(23)도 보호되고 블라인드 플랜지(2)도 수월하게 인상할 수 있게 된다.It is unreasonable to raise the blind flange 2 which sealed the flange 61 immediately. In the sealed state of the blind flange 2 with respect to the flange 61, the seal 23 adheres to the flange 61 mostly. Therefore, the blind flange 2 must be dropped from the flange 61 before pulling up. In this case, the air motor 32 is utilized. In other words, the air motor 32 is driven forward and backward. Then, the power is transmitted to the ring gear 22 through the drive gear 33 and the reduction gears 39a and b to shake the blind flange 2 from side to side so that the seal 23 adhering to the flange 61 falls. . Thus, after the seal 23 is completely dropped, the seal 23 must be pulled up by the pulling means 4 so that the seal 23 can be protected and the blind flange 2 can be easily pulled up.

핵연료를 이송한 후, 또는 실(23)을 교체 장전한 후에는 끌어 올려진 블라인드 플랜지(2)를 내려서 도 3과 같이 블라인드 플랜지 시트(1)에 들어 앉히고 플랜지(61)를 밀폐하게 된다. 이렇게 플랜지(61)가 밀폐되는 과정에서, 블라인드 플랜지 시트(1)의 블라인드 플랜지좌(11)에는 블라인드 플랜지(2)가 안착되고 기어좌(12)에는 링기어(22)가 들어 앉는다. 이때, 링기어(22)의 구배면(24)은 블라인드 플랜지 시트(1)의 구배면(14)에서 미끄러져 플랜지(61)로 다가서게 된다. 이에 따라 블라인드 플랜지(2)는 저절로 플랜지(61)에 바짝 다가서 밀착되어 그대로 잠가지게 된다.After transferring the nuclear fuel, or after replacing and reloading the seal 23, the pulled up blind flange 2 is lowered to be seated in the blind flange sheet 1 as shown in FIG. 3 and the flange 61 is sealed. In the process of sealing the flange 61, the blind flange 2 is seated on the blind flange seat 11 of the blind flange seat 1, and the ring gear 22 sits on the gear seat 12. At this time, the gradient surface 24 of the ring gear 22 slides on the gradient surface 14 of the blind flange sheet 1 and approaches the flange 61. Accordingly, the blind flange 2 automatically closes to the flange 61 by itself and is locked as it is.

또한, 이때 블라인드 플랜지(2)의 중심이 플랜지(61)의 중심에 일치되지 아니한 경우에는 에어실린더(34a,b)에 축차적으로 공압을 가해 블라인드 플랜지(2)가 원주방향으로 요동치게 하는 조작을 통하여 원점을 맞춘다.At this time, when the center of the blind flange 2 does not coincide with the center of the flange 61, the air cylinders 34a and b are sequentially applied with air pressure to cause the blind flange 2 to swing in the circumferential direction. Set the origin through

이상 설명한대로, 본 고안에 의하면 원자력 발전소에서 격납용기 건물과 사용후연료 건물간에 설치된 핵연료 이송용 튜브의 격납용기측 플랜지를 개폐하는 블라인드 플랜지를, 지상에서의 블라인드 플랜지 잠금수단과 인상수단을 활용하여 매우 신속하게 여닫을 수 있다.As described above, according to the present invention, a blind flange for opening and closing the containment container side flange of a nuclear fuel transport tube installed between the containment building and the spent fuel building in a nuclear power plant, by using the blind flange locking means and the pulling means on the ground Can open and close very quickly.

또, 지상에서 짧은 시간에 블라인드 플랜지를 열어 핵연료를 이송하거나 노휴된 실을 교체 장전할 수 있어 핵연료 이송작업 또는 실 교체장전작업시간 동안 작업자가 방사능에 피복될 개연성이 아주 낮으므로 안전하다.In addition, the blind flange can be opened in a short time on the ground to transfer nuclear fuel or replace the unloaded seal, so it is safe because the operator is very unlikely to be coated on the radioactivity during the nuclear fuel transfer or the thread replacement loading operation.

Claims (3)

하반원형 블라인드 플랜지좌(11)의 외측에 하반원형 기어좌(12)를 갖고 상기 기어좌(12)의 외측에는 안쪽 모서리가 구배면(14)으로 된 환상 턱(13)을 가지며 튜브(6)의 플랜지(61)에 하반부를 고정하도록 된 블라인드 플랜지 시트(1)와;The lower semicircular blind flange seat 11 has a lower semicircular gear seat 12 and an outer edge of the gear seat 12 has an annular jaw 13 whose inner edge is a gradient surface 14 and a tube 6. A blind flange sheet (1) adapted to fix the lower half to the flange (61) of the; 외면에 동심원상으로 형성된 축(21)에 상기 구배면(14)에 대응하는 구배면(24)이 형성된 링기어(22)를 끼워 고정한 블라인드 플랜지(2)와;A blind flange (2) in which a ring gear (22) having a gradient surface (24) corresponding to the gradient surface (14) is fitted to a shaft (21) formed concentrically on an outer surface thereof; 대차(31)에 상기 링기어(22) 구동용 에어모터(32)와 블라인드 플랜지(2)의 원점조절용 에어 실린더(34a,b), 외면에 부착된 상반원형 시트 가이드(35) 및 정점에 부착된 로우프 걸이(36)로 이루어진 블라인드 플랜지 잠금수단(3)과;Attached to the bogie 31, the air motor 32 for driving the ring gear 22 and the air cylinders 34a and b for the origin adjustment of the blind flange 2, the upper semicircular seat guide 35 attached to the outer surface, and the apex. Blind flange locking means (3) comprising a rope hook (36); 모터(41)와 드럼(42) 및 로우프(43)로 이루어진 블라인드 플랜지 인상수단(4)과;Blind flange lifting means 4 composed of a motor 41, a drum 42, and a rope 43; 튜브(6)의 플랜지(61) 앞 좌우에 나란히 설치되어 블라인드 플랜지 잠금수단(3)과 블라인드 플랜지(2)의 승강을 안내하는 안내기둥(5)과;A guide column 5 installed side by side in front of the flange 61 of the tube 6 to guide the lifting and lowering of the blind flange locking means 3 and the blind flange 2; 상기 대차(31)의 바닥에 천공된 현수공(38)에 내리끼워 걸쳐서 블라인드 플랜지(2)의 정점에 체결하는 현수보울트(8)로 구성한 것을 특징으로 하는 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치.Blind flange automatic for nuclear fuel transfer tube of the nuclear power plant, characterized in that it consists of a suspension bolt (8) fastened to the top of the blind flange (2) hanging over the suspension hole 38 drilled on the bottom of the bogie (31) Switchgear. 제1항에 있어서, 상기 대차(31)에 안내기둥(5)용 슬리브(37a)를 부착한 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치.2. A blind flange automatic opening and closing device for a nuclear fuel transfer tube according to claim 1, wherein a sleeve (37a) for a guide column (5) is attached to the cart (31). 제1항에 있어서, 상기 시트 가이드(35)에 안내기둥(5)용 슬리브(37b)를 부착한 원자력 발전소의 핵연료 이송 튜브용 블라인드 플랜지 자동 개폐장치.The blind flange automatic opening and closing device according to claim 1, wherein a sleeve (37b) for a guide column (5) is attached to the seat guide (35).
KR2020020015080U 2002-05-17 2002-05-17 Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant Expired - Fee Related KR200286856Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020015080U KR200286856Y1 (en) 2002-05-17 2002-05-17 Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020015080U KR200286856Y1 (en) 2002-05-17 2002-05-17 Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0027269A Division KR100447454B1 (en) 2002-05-17 2002-05-17 Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant

Publications (1)

Publication Number Publication Date
KR200286856Y1 true KR200286856Y1 (en) 2002-08-27

Family

ID=73084174

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020015080U Expired - Fee Related KR200286856Y1 (en) 2002-05-17 2002-05-17 Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant

Country Status (1)

Country Link
KR (1) KR200286856Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100599817B1 (en) 2004-08-24 2006-07-14 주식회사 무진기연 Blind Flange for Nuclear Fuel Transfer Pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100599817B1 (en) 2004-08-24 2006-07-14 주식회사 무진기연 Blind Flange for Nuclear Fuel Transfer Pipe

Similar Documents

Publication Publication Date Title
US4519519A (en) Fuel transfer tube quick opening hatch
US6252922B1 (en) Method of handling a nuclear reactor and an apparatus used in the handling method
US6068427A (en) System and method for replacement of components on sea bottom-based installations
US6412221B1 (en) Catalyst door system
KR200286856Y1 (en) Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant
US6674828B1 (en) Safe lift and process for transporting canisters of spent nuclear fuel
KR100447454B1 (en) Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant
SK5096A3 (en) Rinse tank outlet-fitting
KR200286855Y1 (en) Automatic open-close apparatus of blind flange for nuclear fuel forwarding tube for nuclear power plant
US6788755B2 (en) Safe lift and process for transporting canisters of spent nuclear fuel
JP4068266B2 (en) Removal method of reactor pressure vessel structure
CN111710449A (en) Device for replacing radioactive waste filter element of ocean nuclear power platform
US4028176A (en) Nuclear reactor installation
CN218580704U (en) Well lid auxiliary opening and closing device and well body
CN119181522B (en) Waste grouting fixing device and waste grouting fixing method
JPH11311693A (en) Reactor pressure vessel unloading method and unloading switchgear
CN114758807A (en) Packaging container, automatic capping device, automatic capping system and method
JPH1010289A (en) Radioactive waste transport container
CN218029717U (en) Civil air defense engineering is with straining poison device
US4786209A (en) Method for maintenance of valves included in a subsea production system for oil and gas
JP3106190B1 (en) Reactor containment vessel and reactor transfer method
US5577084A (en) Apparatus for removing and installing a recirculation pump in a pressure housing
JP7770281B2 (en) Driving force transmission device, isolation valve unit attachment/detachment device and method
KR920003954B1 (en) Remote closure of the drum
JPS6331033Y2 (en)

Legal Events

Date Code Title Description
U107 Dual application of utility model
UA0107 Dual application for utility model registration

St.27 status event code: A-0-1-A10-A12-nap-UA0107

UR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-UR1002

Fee payment year number: 1

REGI Registration of establishment
UR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-UR0701

UG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-UG1601

UR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-UR1001

Fee payment year number: 2

T201 Request for technology evaluation of utility model
UT0201 Request for technical evaluation

St.27 status event code: A-5-5-W10-W00-oth-UT0201

T701 Written decision to grant on technology evaluation
UT0701 Decision on maintenance of utility model

St.27 status event code: A-5-4-M10-M11-oth-UT0701

L14-X000 Surrender of ip right requested

St.27 status event code: A-4-5-L10-L14-rvc-X000

H15-X000 Ip right surrendered

St.27 status event code: N-4-6-H10-H15-oth-X000

L14-X000 Surrender of ip right requested

St.27 status event code: A-4-5-L10-L14-rvc-X000

LAPS Lapse due to unpaid annual fee
UC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-UC1903

Not in force date: 20050813

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

UC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-UC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20050813

UN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-UN2301

St.27 status event code: A-5-5-R10-R11-asn-UN2301