KR200188813Y1 - Collection apparatus for sludge of dry pit - Google Patents
Collection apparatus for sludge of dry pit Download PDFInfo
- Publication number
- KR200188813Y1 KR200188813Y1 KR2019990029930U KR19990029930U KR200188813Y1 KR 200188813 Y1 KR200188813 Y1 KR 200188813Y1 KR 2019990029930 U KR2019990029930 U KR 2019990029930U KR 19990029930 U KR19990029930 U KR 19990029930U KR 200188813 Y1 KR200188813 Y1 KR 200188813Y1
- Authority
- KR
- South Korea
- Prior art keywords
- sludge
- dry pit
- dry
- pond
- pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B3/00—General features in the manufacture of pig-iron
- C21B3/04—Recovery of by-products, e.g. slag
- C21B3/06—Treatment of liquid slag
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D43/00—Mechanical cleaning, e.g. skimming of molten metals
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Treatment Of Sludge (AREA)
Abstract
본 고안은 드라이 피트에 있어서, 슬래그 냉각 작업시 발생하는 순환 냉각수 중에 혼입된 슬러지 를 용이하게 처리하는 드라이 피트의 슬러지 수거장치에 관한 것으로서 그 기술적인 구성은, 드라이피트의 일측에 연결되는 드라이 피트 배수로 내측에 삽입되어 괴재를 수거토록 호이스트로 연결되는 스크린과, 상기 드라이 피트 배관에 연결되는 드라이 피트 폰드에 슬러지를 침전토록 설치되는 모터에 연결되는 브러쉬및, 상기 드라이 피트 폰드의 저면에 설치되어 그 일측에 펌프와 첵밸브가 설치되는 이송용 배관이 연결되는 침전조와, 상기 이송용배관에 연결되어 레일의 상측에서 이송토록 설치되어 상측에 드레인구가 형성되는 저장탱크를 포함하여 구성되는 것을 요지로 한다.The present invention relates to a sludge collection device of a dry pit for easily treating sludge mixed in circulating cooling water generated during a slag cooling operation, the technical configuration of which is a dry pit drainage connected to one side of the dry pit. A brush inserted into the screen and connected to a hoist to collect the aggregates, a brush connected to a motor installed to settle sludge in the dry pit pond connected to the dry pit pipe, and one side of the dry pit pond It consists of a sedimentation tank connected to the transfer pipe is installed in the pump and the check valve, and a storage tank connected to the transfer pipe is installed so as to transfer from the upper side of the rail to form a drain hole on the upper side. .
Description
본 고안은 용광료 내에서 배출된 용융물 중 슬래그 (SLAG)의 괴재처리(매립용)시에 드라이 피트 폰드(DRY PIT POND) 하부에 누적되는 침전물 수거장치에 관한 것으로서, 이는특히 슬래그 냉각 작업시 발생하는 순환 냉각수 중에 혼입된 슬러지 를 용이하게 처리하는 드라이 피트의 슬러지 수거장치에 관한 것이다.The present invention relates to a sediment collecting device that accumulates in the lower part of the dry pit pond during the aggregate treatment (SL) of slag in the melt discharged from the molten material, which occurs especially during slag cooling operation. It relates to a sludge collection device of a dry pit to easily process the sludge mixed in the circulating cooling water.
일반적으로 용광로의 출선구로부터 일발 개공기에 의해 굴착하여 굴착한 응용물은 출선구로 배출하기 시작하여 대탕도에서 스키머(SKIMMER)에 의해 분리되고, 이때 비중이 무거운 용선은 후공정인 제강공장으로 보내고, 가벼운 슬래그(SLAG)는 수재(시멘트 원료) 또는 괴재(매립용)처리하고 있다. 괴재처리 요구시 드라이 피트(DRY PIT)로 유도시는 피트의 내측에 슬래그가 고이게 된다.In general, applications excavated and excavated by a single opener from the exit of the blast furnace are discharged to the exit and separated by SKIMMER at Daetang Island. The light slag (SLAG) is treated with water (cement raw material) or aggregate (for landfill). When the aggregate treatment is requested, slag builds up inside the pit when guided to the dry pit.
싱기 드라이 피트(DRY PIT)내로 슬래그 유입시는 폭발 가능성이 높기 때문에 살수를 멈추게한 후 출선구 용융물 배출 종료가 끝나면 작업자 판단에 따라 슬래그 살수장치인 드라이 피트 펌프(DRY PIT PUMP)를 4개의 드라이 피트 중 슬래그 저장한 곳에 집중 살수하게 하여 순환식으로 연속 슬래그를 냉각시키고 있다.When slag flows into the dry pits, there is a high possibility of explosion, so after stopping the spraying and finishing the exit melt discharge, dry dry pump (DRY PIT PUMP), which is a slag sprayer Concentrated watering where the slag is stored in the middle, the continuous slag is cooled by circulation.
이대, 드라이 피트 폰드(DRY PIT RETURN POND) 내 저장된 물(WATER)은 순수한 물이 아니고 혼탁수(물+슬러지+오폐수)로 혼합(MIXING)되어 드라이 피트 폰드(15)(16)내 혼탁수가 침전되어 시간이 지날수록 폰드 내 고착 및 펌프 흡입측에 막혀 펌프 기동에 문제가 되고 있어 슬러지 제거 장치를 개발하고자 한다.The water stored in DRY PIT RETURN POND is not pure water but mixed with turbid water (water + sludge + waste water), and the turbid water in the dry fit pond 15 and 16 is precipitated. As time goes by, it becomes a problem in starting the pump due to sticking in the pond and clogging on the suction side of the pump.
용광로의 부산물인 슬래그(12)는 일정한 간격으로 연속적으로 배출되고 있으며, 배출된 슬래그는 즉시 냉각시켜야 한다. 그것은 냉각 효과가 좋아야만이 신속하게 괴재처리가 가능하므로 해서 항시 주상별 드라이 피트 2개층 1개의 피트(PIT)가 만수위시 교체할 수 있는 대기상태로 되어 있어야 한다.The slag 12, which is a byproduct of the furnace, is continuously discharged at regular intervals, and the discharged slag must be cooled immediately. It should be good for the cooling effect so that it can be processed quickly quickly. Therefore, the PIT should be in a standby state that can be replaced at full water level.
이러한 반복적인 드라이 피트(DRY PIT) 슬래그(SLAG) 냉각수는 항시 연속적으로 집수 및 살수(13)를 되풀이해야 한다. 이 과정에서 드라이피트(8-1)(8-2)로 살수할 시 일부분은 고열에 증발되고, 그외는 다시 드라이피트 폰드(15)(16)로 회수되어 저장된 물은 다시 펌프에 의해 살수시킨다.This repetitive DRY PIT slag coolant must repeat the catch and sprinkle 13 at all times continuously. In this process, when water is sprinkled with dry feet (8-1) and (8-2), a part of the water is evaporated at a high temperature, and the water is recovered by dry feet ponds (15) and (16) again, and the stored water is sprinkled again by a pump. .
이때, 드라이 피트 슬래그(12)를 냉각시킬 때 폰드 바닥으로 냉각수가 흘러 배수로(14)로 유입시 표면을 긁거나 미세한 슬러지가 혼입되어 냉각수와 동반하여 배수로 통해 드라이 피트 폰드(DRY PIT POND) 내로 슬러지(19)가 침투하게 된다.At this time, when the dry pit slag 12 is cooled, the coolant flows to the bottom of the pond, and when it enters the drain 14, the surface is scratched or fine sludge is mixed with the coolant and the sludge into the dry pit pond through the drain. (19) will penetrate.
유입된 슬러지(19)는 드라이 피트 1차 폰드(15)에서 2차 폰드(16)까지 누적되어 폰드 용량(면적) 축소로 냉각수 물량이 절반으로 줄어들 뿐만 아니라 슬래그 자체에서 발생한 고열로 냉각시 살수된 물은 고온수로 (냉각수 온도 80℃ 이상으로 증기 현상이 발생되어 살수시 육안으로 식별하기 어려울 정도이다.) 슬래그 살수(13) 효과도 떨어지고, 또한, 펌프 배관(PUMP LINE)(17)내 슬러지 부착(SCALE)으로 펌핑(PUMPING) 부족 및 잦은 설비 고장과, 드라이 피트 폰드 내 물량이 적어 실제 드라이 피트 슬래그(DRY PIT SLAG) 냉각 효과 저하로 장비로 슬래그를 파쇄할시 시간 지연 및 작업부하가 존재하고 있다.The introduced sludge 19 accumulates from the dry pit primary pond 15 to the secondary pond 16 to reduce the amount of cooling water by half due to the reduction of the pond capacity (area), as well as the water sprinkled during cooling due to the high temperature generated from the slag itself. Water is a hot water furnace (a steam phenomenon occurs at a cooling water temperature of 80 ° C. or higher, which makes it hard to discern the naked eye when spraying water). Slag spraying (13) is also less effective, and the sludge in the pump line (PUMP LINE) 17 is reduced. Lack of pumping due to attachment and frequent equipment failures, and the small amount of dry pit pond, which reduces the actual dry pit slag cooling effect.There is a time delay and work load when crushing slag with equipment. Doing.
이러한 문제 발생때마다 조업중, 굴삭기(20), 바륨카(21) 등 장비 지원을 받아 짧은 시간 내 슬러지(19)를 제거와 동시에 슬래그 살수(냉각)작업할 수 있도록 조치가 되어야 하는데 드라이 피트 폰드(DRY PIT POND) 살수 중 슬러지(SLLIDGE)가 계속 누적되고 있는 것이 현실이다.Whenever this problem occurs during operation, it is necessary to take measures to be able to remove the sludge 19 in a short period of time and cool down the slag at the same time by receiving equipment support such as excavator 20 and barium car 21. (DRY PIT POND) SLLIDGE is accumulating in the water.
상기와 같은 장비 지원은 조업의 영향이 미치지 않는 상태에서 작업 조건을 맞춰야 하기 때문에, 첫째: 슬러지 제거 작업은 지상이 아니고 지하 피트 폰드이기에 사람이 직접 들어가 장비 사용 조건에 맞춰주어야 한다. 그렇게 하기 위해서는 드라이 피트 폰드 내 집수되어 있는 물(WATER)은 완전히 1,2차 폰드까지 물을 제거해야 슬러지(19) 제거작업이 가능하다 폰드 내부에 고온수 물이 차 있으면 작업자가 내부에 들어갈 수가 없고, 바륨카(21) 작업시 호스를 잡아줘야 슬러지 제거 가능하며, 또 폰드(POND) 내부의 코너부에는 장비 사용이 불가능하며 코너부 고착 슬러지는 사람에 의해 수작업으로 슬러지(19)를 바닥 중앙부에 모아 바륨카 (21)로 처리가 용이하도록 하는 작업이며, 둘째: 드라이 피트 냉각처리를 장시간 사용함에 따라 슬러지는 먼저 1차 폰드(15)에서 슬러지가 쌓이면 2차 폰드(16)까지 흘러가 절반 이상으로 슬러지(SLLIDGE)가 누적되어 펌프 흡입구가 보이지 않는 등 잦은 펌프 고장으로 장시간 정비 지연시는 펌프 흡입구 주위 슬러지 고착현상 등 펌프 가동을 할 수가 없으며, 또 슬러지가 폰드 내부에 누적시는 펌프를 가동하여 드라이 피트측 슬래그 살수시 살수 노즐부 막힘으로서 냉각작업 저하로 괴재(슬래그)처리시 페로다(굴착 장비)에 의해 차량 승차시 슬래그 덩어리가 파쇄되지 않아 불덩어리로 남아 있어 괴재처리시 문제가 되고 또한, 살수작업 할 때마다 살수 노즐 분 청소작업으로 고온구에 의한 화상 위험도 있고, 폰드 내 슬러지 제거작업시 마다 펌프 흡입구 주위에 공치구로 파쇄하여 흡입구 관통작업이 많은 시간이 소요될 뿐만 아니라 정비작업 지연시는 드라이 피트 슬래그 냉각 작업에 지장을 초래하고 누적된 슬러지(19) 성분은 시멘트처럼 딱딱한 돌덩어리처럼 고착되어 장비를 사용해도 쉽게 슬러지가 파쇄되지 않아 작업시 시간이 지연되는 문제점이 있는 것이다.The above equipment support must be adapted to the working conditions without the impact of the operation. Firstly: the sludge removal operation is not underground, but underground pit ponds, so people have to enter and adapt the equipment. In order to do this, the water collected in the dry pit pond should be completely removed to the first and second ponds so that the sludge 19 can be removed. No sludge can be removed by holding a hose when working barium car 21. Also, the equipment can not be used in the corner part inside the POND, and the sludge 19 is manually removed by the corner fixing sludge. To collect the barium car 21, and to facilitate the treatment with the barium car 21. Secondly, as the dry pit cooling treatment is used for a long time, the sludge first flows from the primary pond 15 to the secondary pond 16 when the sludge is accumulated. SLLIDGE accumulates and the pump inlet is not visible. If the pump is delayed for a long time due to frequent pump failures, the pump may operate such as sludge sticking around the pump inlet. When sludge accumulates inside the pond, the pump is operated, and the spray nozzle is clogged when the dry pit-side slag is sprayed and the cooling work is reduced. Is a fireball because it is not crushed and becomes a problem during the treatment of the lump, and there is a risk of burns due to the hot water spout by spraying the spraying nozzle every time the spraying work. Not only does the inlet penetrating work take a lot of time, but also delays in maintenance work cause trouble in the cooling of the dry pit slag, and the accumulated sludge (19) is fixed like a hard stone mass like cement, so that the sludge is not easily broken even by using the equipment. There is a problem that the time delay when working.
본 고안은 상기와 같은 문제점을 해결하기 위해 안출된 것으로서 그 목적은, 용광로의 부산물인 슬래그 냉각 처리시 발생되는 슬러지를 배수로와 드라이 피트 폰드 내에서 효과적이고 연속적으로 침전, 포집하는 드라이 피트의 슬러지 수거장치를 제공하는데 있다.The present invention was devised to solve the above problems, and its purpose is to collect sludge of dry pit, which effectively and continuously settles and collects sludge generated in slag cooling process, which is a by-product of blast furnace, in drainage and dry pit pond. To provide a device.
도1은 일반적인 드라이 피트 살수장치를 도시한 개략도1 is a schematic view showing a typical dry pit sprinkler
도2는 종래의 드라이 피트 살수장치에서 슬러지 제거작업의 상태도Figure 2 is a state diagram of the sludge removal operation in the conventional dry pit sprinkler
도3은 본 고안에 따른 드라이 피트의 슬러지 처리상태를 도시한 사시도Figure 3 is a perspective view showing a sludge treatment state of the dry pit according to the present invention
도4는 본 고안에 따른 드라이 피트의 슬러지 수거장치를 도시한 요부 사시도Figure 4 is a perspective view of the main part showing a sludge collection device of a dry fit according to the present invention
도5는 본 고안에 따른 배수로 여과장치를 도시한 개략도Figure 5 is a schematic diagram showing a drain filtration device according to the present invention
도6A,B는 본 고안에 따른 브러쉬와 슬러지 저장탱크를 도시한 사시도6A and 6B are perspective views showing a brush and a sludge storage tank according to the present invention.
*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
8-1, 8-2 드라이 피트(DRY PIT)8-1, 8-2 dry fit
14 드라이 피트 배수로14 dry pit drains
15 드라이 피트 1차 폰드15 dry fit primary ponds
16 드라이 피트 2차 폰드16 dry fit secondary ponds
17 슬래그 냉각수 펌프17 slag coolant pump
18 슬래그 냉각 흡입구18 slag cooling inlet
19 드라이 피트 폰드내 고착슬러지Adhesion sludge in 19 dry fitting pond
22 스크린(괴재 덩어리 제거용)22 screen (for removing lumps)
23 스크린 평량기23 screen weighing machine
27-1, 27-2, 27-3 슬러지 저장 탱크27-1, 27-2, 27-3 sludge storage tank
28 플루우트28 flute
32-1, 32-2 슬러지 압송 펌프32-1, 32-2 sludge pressure pump
상기와 같은 목적을 달성하기 위한 기술적인 구성은, 드라이피트의 일측에 연결되는 드라이 피트 배수로 내측에 삽입되어 괴재를 수거토록 호이스트로 연결되는 스크린과, 상기 드라이 피트 배관에 연결되는 드라이 피트 폰드에 슬러지를 침전토록 설치되는 모터에 연결되는 브러쉬및, 상기 드라이 피트 폰드의 저면에 설치되어 그 일측에 펌프와 첵밸브가 설치되는 이송용 배관이 연결되는 침전조와, 상기 이송용배관에 연결되어 레일의 상측에서 이송토록 설치되고, 드레인구가 형성되는 저장탱크를 포함하여 구성되는 드라이 피트의 슬러지 수거장치를 마련함에 의한다.Technical configuration for achieving the above object is, the screen is inserted into the dry pit drainage connected to one side of the dry pit connected to the hoist to collect the aggregates, and the dry pit pond connected to the dry pit pipe Brush is connected to the motor is installed to settle the sediment, the sedimentation tank is connected to the transfer pipe is installed on the bottom surface of the dry fit pond and the pump and the check valve is installed on one side, the upper side of the rail connected to the transfer pipe By providing a sludge collecting device of the dry pit is installed so as to transfer from, and comprises a storage tank in which a drain hole is formed.
이하, 첨부된 도면에 의거하여 본 고안의 실시예를 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described based on the accompanying drawings.
도3은 본 고안에 따른 드라이 피트의 슬러지 처리상태를 도시한 사시도이고, 도4는 본 고안에 따른 드라이 피트의 슬러지 수거장치를 도시한 요부 사시도이며, 도5는 본 고안에 따른 배수로 여과장치를 도시한 개략도이고, 도6A,B는 본 고안에 따른 브러쉬와 슬러지 저장탱크를 도시한 사시도로서 본 고안은, 용광로 드라이 피트 배수로(14)에 괴덩어리를 1차적으로 포집할 수 있도록 철망으로 제작한 스크린(22)부와, 포집 이동된 슬러지를 저장 운반할 수 있는 슬러지 저장 탱크(27-1)(27-1)(27-3)부와 배수로에서 스크린을 통과한 슬러지를 침전 정화시키는 원형 형태의 폰드로 구성되어 있다.Figure 3 is a perspective view showing a sludge treatment state of the dry pit according to the present invention, Figure 4 is a perspective view showing the main portion of the sludge collection device of the dry pit according to the present invention, Figure 5 is a drain filtration device according to the present invention 6A and B are perspective views showing a brush and a sludge storage tank according to the present invention, and the present invention is made of a wire mesh so as to primarily collect lumps in a furnace dry pit drain 14. The sludge storage tanks 27-1, 27-1, 27-3, which are capable of storing and transporting the collected sludge, and the sludge that has passed through the screen in the drainage passage are formed in a circular shape. It consists of a pond.
상기 스크린부는 도5와 같이, 괴덩어리를 1차적으로 포집하는 배수로(14) 내부에 사각형 형태의 철망으로 된 스크린(22)을 배수로 높이만큼 설치하고, 이 스크린은 사각의 모서리에 호이스트(24) 고리에 연결할 수 있도록 걸고리를 부착하였으며, 스크린(22)과 호이스크(24)를 연결하는 와이어 로프(50)와 체인(51) 구성되어지며, 또한 배수로 스크린(22) 하부에는 괴덩어리를 평량할 수 있는 평량기(23)가 있고, 평량기(23)와 호이스트(24)를 제어하는 제어판(25)이 호이스트 측면벽에 설치되어 있다.The screen portion, as shown in Figure 5, is installed inside the drainage channel 14 to collect the lump primarily rectangular screen 22 of the wire mesh to the drainage height, this screen is a hoist 24 in the corner of the square Hooks are attached to connect the hook, and the wire rope 50 and the chain 51 connecting the screen 22 and the hosk 24 are configured. There is a weighing machine 23, and a control panel 25 for controlling the weighing machine 23 and the hoist 24 is provided on the hoist side wall.
한편, 도6과 같이 슬러지 저장탱크(27-1)(27-2)(27-3)는 3대가 있으며 각각의 탱크를 둥근 사각형 형태로 철판으로 제작되었으며 탱크 하부에는 차량으로 이동시 운반이 용이하게 레일(54)이 깔려 있고 슬러지 탱크(27-1)(27-2)(27-3) 4귀에는 슬러지 이동용 차와 결합이 가능하도록 걸고리(55)가 있다.On the other hand, as shown in Figure 6, there are three sludge storage tanks 27-1, 27-2, 27-3, each tank is made of steel plate in a rounded square shape, and the lower part of the tank is easy to carry when moving to a vehicle. The rail 54 is laid and four ears of sludge tanks 27-1, 27-2 and 27-3 are provided with hooks 55 so as to be able to engage with sludge moving cars.
슬러지 저장탱크(27-1)(27-2)(27-3) 상부에는 슬러지가 유입되는 유입구(53)와 유입된 슬러지의 만수 위를 감지하는 플루우트(28) 그리고 슬러지와 함께 혼입된 물이 드레인 되는 드레인구(29)와 스크린으로 구성되어 있다.Sludge storage tank (27-1) (27-2) (27-3) in the upper portion of the sludge inflow inlet 53, the flute (28) to detect the full water level of the introduced sludge and the water mixed with the sludge It consists of the drain port 29 which drains, and a screen.
상기 도4는, 드라이 피트 배수로(14)에서 유입된 혼탁수 중에 슬러지는 침전 포집시키고, 정화된 물만 2차 폰드로 유입되게 하여 드라이 피트 냉각수로 연속 재사용되게 하는 장치로서 슬러지를 침전조(26)로 침전시키는 상중하 계단식으로 구성되어 360도 회전하는 브러쉬(36)와 이를 회전시키는 모터와 감속기(37) 그리고 회전축(55) 및 이를 지지하는 고정축(39) 베어링(41)으로 구성되어 있으며, 브러쉬(36)의 원만한 회전을 위하여 지지대(38) 하부에는 바퀴가 부착되어 있다.4 is a device for collecting sludge in the turbidity water introduced from the dry pit drain 14 and allowing only purified water to flow into the secondary pond so that the sludge is continuously reused as dry pit cooling water. It is composed of a brush 36, which rotates 360 degrees, which is set up in a step-down step to settle, a motor and a reducer 37 that rotates it, and a rotating shaft 55 and a fixed shaft 39 bearing 41 supporting the brush. Wheels are attached to the bottom of the support 38 for smooth rotation of the 36.
스러지가 침전되는 침전조(26)는 사각의 폰드로서 지하에 설치되어 있으며 퇴적된 슬러지를 감지하는 하한 리미트와 상한 리미트가 있다.The sedimentation tank 26 in which the sludge is settled is installed in the basement as a rectangular pond and has a lower limit and an upper limit for detecting the sludge deposited.
상,하한 리미트의 신호를 받아 슬러지 저장탱크(27-1)(27-2)(27-3)로 펌핑하는 배관(46)으로 연결된 펌프(32-1)(32-2) 2기와 펌프(PUMP)의 전후단 밸브(33-1)(33-2)(34-1)(34-2) 그리고 펌핑된 슬러지의 역류를 방지하는 체크 밸브(42-1)( 42-2)와 슬러지 저장탱크의 자동밸브(32-1)(32-2)(32-3) 그리고 원형의 폰드(15)와 침전조(26) 슬러지 저장탱크 자동밸브등을 종합 제어하는 제어판(45)으로 구성되어 있다.Two pumps (32-1) (32-2) connected to a pipe (46) pumping the sludge storage tanks (27-1), (27-2), and (27-3) in response to signals of the upper and lower limits. PUMP) front and rear valves 33-1, 33-2, 34-1 and 34-2, and check valves 42-1 and 42-2 to prevent backflow of pumped sludge and sludge storage It consists of the automatic valves 32-1, 32-2, 32-3 of tanks, and the control panel 45 which comprehensively controls the round pond pond 15, the sedimentation tank 26 sludge storage tank automatic valves, etc.
이와 같이 구성된 본 고안의 작용에 관하여 설명하면 다음과 같다.Referring to the operation of the present invention configured as described above are as follows.
도3 내지도6에 도시된 바와 같이, 드라이 피트 배수로(14)에서 폰드(15)(16)로 슬러지(19) 유입시 1차적으로 괴덩어리를 폰드 내부로 침투가 되지 않도록 스크린(SCREEN)(22)을 설치하여 포집하며, 스크린(22) 내부의 괴덩어리 무게(WEIGHT) 측정은 평량기(LOAD SHELL)(23)를 스크린 사각 모서리에 설치하여 평량하며, 0.3Ton 검출 이상시 자동 감지센서에 의해 5ton 호이스트(HOIST)(24) 검지기 조작판넬(25)에서 경보가 울리면 주상 머드건 운전실과 동시에 울리게하여 작업자가 확인할 수 있도록 하고, 배수로 스크린(SCREEN)(22)은 호이스트(24) 작동에 의해 들어올라 오게 되는데 배수로(14) 지면에서 재상 배수로 상단까지 1m 높이 들어 올려서 우측 90도 방향으로 회전되도록 한다.As shown in FIGS. 3 to 6, when the sludge 19 is introduced into the ponds 15 and 16 from the dry pit drain 14, the screen SCREEN is prevented from infiltrating into the pond. 22) is installed and collected, and the weight measurement of WEIGHT inside the screen 22 is carried out by installing a LOAD SHELL 23 at the square corner of the screen. 5ton hoist (HOIST) (24) When the alarm from the detector operation panel 25, it will ring at the same time as the column mud gun cab for the operator to check, the drainage screen (SCREEN) 22 by the hoist 24 operation It is to be lifted up to 1 m high to the top of the drainage drain from the ground (14) ground to rotate in the direction of 90 degrees to the right.
그후, 예비 스크린을 배수로(14)에 설치하고 기존 스크린(22)에 포집된 괴덩어리는 드라이 피트 괴재처리에 분송처리 하도록 차량에 의해 드라이 피트 내부에 운반처리한다.Thereafter, the preliminary screen is installed in the drainage path 14, and the lumps collected on the existing screen 22 are transported inside the dry pit by the vehicle so as to distribute the dry pit aggregate processing.
도4에 도시된 바와 같이, 드라이 피트 1차 폰드(15) 내부 구조는 타원형으로 폰드를 설계하여 냉각수의 혼탁수에 유입한 스러지(19)를 1차 폰드(15) 내에 포집하도록 설계를 개선하여 집수된 침전조(26) 슬러지는 자동 제어검지기인 상하한 리미트에 의해 펌프(32-1)(32-2)가 가동되어 펌핑(PUMPING)된 슬러지는 폐기처리용 저장 탱크(SLLIDGE RESERVOIR TANK)(27-1)(27-2)(27-3)로 이송되도록 한 슬러지 이송처리 장치이다.As shown in FIG. 4, the dry pit primary pond 15 internal structure is designed to be elliptical to improve the design to collect the sludge 19 introduced into the turbid water of the coolant within the primary pond 15. The sludge collected in the sedimentation tank 26 is operated by pumps 32-1 and 32-2 by upper and lower limits, which are automatic control detectors, and the pumped sludge is a waste disposal storage tank (SLLIDGE RESERVOIR TANK) ( It is a sludge conveyance processing apparatus which is conveyed to 27-1) (27-2) and 27-3.
드라이 피트 1차 폰드(POND)(15) 바닥 하부에 침전조(26)를 설치하여 1차 폰드(15)에서 슬러지 제거 처리가 되도록 한 것이다.The settling tank 26 is installed at the bottom of the dry pit primary pond (POND) 15 so that sludge removal treatment is performed on the primary pond 15.
드라이 피트 배수로(14)에서 회수(RETURN)되는 물은 1차적으로 먼저 스크린(SCREEN)(22)에서 괴재덩어리를 회수하고 드라이 피트 폰드(15)(16) 내로 유입하는 혼탁수(이하, '슬래그 살수한 ANAF과 시크너 폰드에서 옹버 프로우된 물이 혼합되어 드라이 피트 폰드로 회수하여 순환식으로 슬래그를 냉각시키는 것을 말함)는 드라이 피트 1차 폰드(15)에서 슬러지를 포집, 처리가 되도록 하여 2차 폰드(16)측으로 슬러지가 유입되지 않도록 한 설비관리 개선 장치인데 1차 폰드(15)측은 타원형으로 된 드라이 피트 폰드(DRY PIT POND)로 냉각수에 혼합된 슬러지를 침전조(26) 바닥으로 서서히 가라앉게 회전이 계속되도록 모터(37)에 의해 턴테이블 형태의 슬러지 제거용 블러쉬(36)가 상, 중, 하로 회전된다.The water that is returned in the dry pit drain 14 is primarily the turbid water recovered from the screen 22 and the turbid water flowing into the dry pit ponds 15 and 16 (hereinafter referred to as 'slag'). ANAF and sprinkled ponds, which are mixed with water from the adversary, are recovered to dry pit ponds and circulated to cool the slag.The sludge is collected and treated in the dry pit primary ponds 15. The facility management improvement device prevents sludge from flowing into the secondary pond 16. The primary pond 15 is an elliptical dry pit pond. The sludge mixed with the cooling water is gradually added to the bottom of the settling tank 26. The turntable-type sludge removal blush 36 is rotated up, middle, and down by the motor 37 so that the rotation continues to sink.
1차 폰드(POND)(15) 바닥으로 슬러지가 연속 침전되어 침전조(26)에 쌓이게 되면 상한 리미트(35-2)가 슬러지 이동용 탱크(27-1)(27-2)(27-3)로 펌핑하는 선택된 압송 펌프(33-1)(33-2) 중의 1대에 신호를 보내 가동되게 된다.Sludge is continuously deposited to the bottom of the primary POND 15 so as to accumulate in the settling tank 26. The upper limit limit 35-2 signals to one of the selected pump pumps 33-1 and 33-2 that pumps to the sludge transfer tanks 27-1, 27-2 and 27-3. It is activated.
슬러지 압송 펌핑 중 하한 리미트가 작동되면 압송펌프(32-1)(32-2)는 자동 스톱되면서 체크밸브(42-1)(42-2)가 작동되면서 슬러지는 억류가 되지 않는다.When the lower limit limit of the sludge pumping pump is operated, the pump pumps 32-1 and 32-2 are automatically stopped while the check valves 42-1 and 42-2 are operated so that the sludge is not detained.
본 고안의 도6과 같이, 이송용 배관(46)을 통하여 압송된 슬러지는 슬러지 저장탱크(27-1)(27-2)(27-3)에 저장되는데, 탱크 상부에 설치된 플루우트(28) 신호를 받아 슬러지가 일정량 차면 자동밸브(31-1)(31-2)(31-3)에 의해 닫히고 다음 탱크의 밸브가 자동으로 열리면서 이송되어 오는 슬러지를 자동으로 연속수선 되면서 슬러지 상부에 고여지는 물은 드레인구(29)를 통하여 자동배출된다.As shown in Figure 6 of the present invention, the sludge conveyed through the conveying pipe 46 is stored in the sludge storage tank (27-1) (27-2) (27-3), the flute 28 installed on the tank top ) When the sludge is filled by a certain amount, it is closed by the automatic valve (31-1) (31-2) (31-3) and the valve of the next tank is opened automatically. The release water is automatically discharged through the drain port 29.
슬러지 저장탱크(27-1)(7-2)(27-3)는 슬러지가 가득 차게 되면 차량을 이용하여 슬러지 처리장응로 이송할 수 있도록 하였다. 이 모든 작용이 자동적으로 제어판(45)에서 제어하도록 하였다.The sludge storage tanks 27-1, 7-2, and 27-3 were able to transport the sludge to the sludge treatment plant when the sludge became full. All these actions were controlled automatically by the control panel 45.
이상과 같이 본 고안에 따른 드라이 피트의 슬러지 수거장치에 의하면, 드라이 피트 폰드내 슬러지 고착으로 인해 피트폰드 냉각수 수위 저하, 장비 지원 요청, 인력 지원, 설비 고장으로 정비작업 가중, 슬래그 냉각 효과 저하 등 설비관리 문제시되어 왔던 것을 본 고안장치에 의해 드라이 피트 폰드와 드라이 피트 슬래그 냉각처리 효율성을 높이고 슬러지 회수장치 구조물 개선으로 설비 고장방지와 슬러지 고착방지를 해소하므로서 드라이 피트 슬래그 냉각 효과를 갖추고자 하는데 있다.As described above, according to the sludge collection device of the dry pit according to the present invention, due to the sludge stuck in the dry pit pond, the pit pond cooling water level is reduced, equipment support request, manpower support, equipment failure, weighted maintenance work, deterioration of the slag cooling effect The management problem has been to improve the efficiency of the dry pit pond and dry pit slag cooling treatment by improving the sludge recovery device structure by improving the efficiency of the dry pit pond and dry pit slag structure to achieve a dry pit slag cooling effect.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR2019990029930U KR200188813Y1 (en) | 1999-12-28 | 1999-12-28 | Collection apparatus for sludge of dry pit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR2019990029930U KR200188813Y1 (en) | 1999-12-28 | 1999-12-28 | Collection apparatus for sludge of dry pit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| KR200188813Y1 true KR200188813Y1 (en) | 2000-07-15 |
Family
ID=19603922
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR2019990029930U Expired - Fee Related KR200188813Y1 (en) | 1999-12-28 | 1999-12-28 | Collection apparatus for sludge of dry pit |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR200188813Y1 (en) |
-
1999
- 1999-12-28 KR KR2019990029930U patent/KR200188813Y1/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202336462U (en) | Oilfield settlement tank rotary jet automatic mud discharge device | |
| KR101498072B1 (en) | Apparatus for treating rainwater | |
| CN205677053U (en) | Municipal drainage pipeline is removed contamination system | |
| CN110448940A (en) | A kind of water treatment plant's water for drainage slurry system and processing method | |
| JP5950315B2 (en) | Sand removal apparatus and sand removal method for sewage settling basin | |
| KR200188813Y1 (en) | Collection apparatus for sludge of dry pit | |
| KR100670034B1 (en) | Rectangle Removal Device of Rectangle Settlement Paper | |
| CN107354949A (en) | Water recycling system for foundation pits of subway stations adjacent to high slopes | |
| CN108266224B (en) | Underground coal mine sump dredging process and equipment thereof | |
| CN1177063C (en) | A blast furnace slag treatment system | |
| JP2018150153A (en) | Cleaning treatment system for non-waste water type conveyor belt | |
| CN211273867U (en) | Concrete tank car carwash sewage recovery system | |
| KR100775953B1 (en) | Dredging car | |
| CN210545324U (en) | A processing apparatus for building waste | |
| CN210206167U (en) | Concrete waste water recovery system | |
| CN219399944U (en) | Cleaning and circulating system of fly ash mixing mill | |
| KR0133350Y1 (en) | Spray apparatus of sludge hopper for sedimentation basin | |
| JP6727027B2 (en) | Sand removal equipment for sand basins | |
| CN218842220U (en) | Wind-water slag quenching device | |
| CN110217908A (en) | A kind of industrial tail water environment protection treating system | |
| CN109306871A (en) | A kind of system and method increasing mine sump capacity | |
| CN209405762U (en) | A kind of construction site rainwater reuse device | |
| CN208389463U (en) | A kind of water for drainage slurry system | |
| CN209228405U (en) | A kind of system increasing mine sump capacity | |
| CN209098350U (en) | A kind of online desilting system of mine sump |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| UA0108 | Application for utility model registration |
St.27 status event code: A-0-1-A10-A12-nap-UA0108 |
|
| UR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-UR1002 Fee payment year number: 1 |
|
| REGI | Registration of establishment | ||
| UR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-UR0701 |
|
| UG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-UG1601 |
|
| FPAY | Annual fee payment |
Payment date: 20010427 Year of fee payment: 3 |
|
| UR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-UR1001 Fee payment year number: 2 |
|
| UN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-UN2301 St.27 status event code: A-5-5-R10-R11-asn-UN2301 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| UC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-UC1903 Not in force date: 20030502 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| UC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-UC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20030502 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18 | Changes to party contact information recorded |
Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |