[go: up one dir, main page]

JPH11282922A - Certified Long-Term Care Management System - Google Patents

Certified Long-Term Care Management System

Info

Publication number
JPH11282922A
JPH11282922A JP8702598A JP8702598A JPH11282922A JP H11282922 A JPH11282922 A JP H11282922A JP 8702598 A JP8702598 A JP 8702598A JP 8702598 A JP8702598 A JP 8702598A JP H11282922 A JPH11282922 A JP H11282922A
Authority
JP
Japan
Prior art keywords
date
committee
examination
certification
function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8702598A
Other languages
Japanese (ja)
Inventor
Ikuko Kozai
郁子 古在
Koichi Sugiyama
晃一 杉山
Tomotsune Narisei
智常 成清
Katsuaki Nakahara
克明 中原
Yasushi Ando
靖 安藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP8702598A priority Critical patent/JPH11282922A/en
Publication of JPH11282922A publication Critical patent/JPH11282922A/en
Pending legal-status Critical Current

Links

Landscapes

  • Medical Treatment And Welfare Office Work (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

(57)【要約】 【課題】 介護保険の要介護認定を管理するシステムに
おいて、申請受付の日によって決まる認定通知期限日を
守るために、できるだけ申請受付時に認定審査会の日を
決定するようにする。 【解決手段】 クライアント1のAP6は、申請者の認
定通知期限日から所定の日数を減算して認定審査会の目
標日を決定し、サーバ2へ審査会日程テーブル13の検
索要求を発行する。サーバ2のAP7は、審査会の識別
子と予定日との対応を記憶する審査会日程テーブル13
を検索して結果をクライアント1へ送信する。AP6
は、審査会目標日以前で直近の予定日をもつ審査会を割
り当てて審査会名と予定日を表示装置3に表示する。次
にAP6は、割り当てた審査会予定日を期限として審査
会予定日以前の訪問調査予定日とかかりつけ医の意見書
入手期限日を決定する。
(57) [Summary] [Problem] In a system for managing long-term care insurance certification for long-term care insurance, in order to comply with the certification notice deadline determined by the date of application reception, determine the date of the certification examination committee at the time of application reception as much as possible. I do. An AP (6) of a client (1) determines a target date of an accreditation examination board by subtracting a predetermined number of days from an approval notice expiration date of an applicant, and issues a search request of an examination committee schedule table (13) to a server (2). The AP 7 of the server 2 stores the association between the identifier of the examination committee and the scheduled date in the examination committee schedule table 13
And sends the result to the client 1. AP6
Assigns the examination committee having the latest scheduled date before the examination committee target date, and displays the examination committee name and the scheduled date on the display device 3. Next, the AP 6 determines the scheduled date of the on-site survey before the scheduled date of the screening committee and the deadline for obtaining the opinion book of the GP, with the allocated scheduled screening date as the deadline.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、介護保険の要介護
認定事務を管理するシステムに係わり、特に各申請者に
対して認定審査会を割り当て、訪問調査予定日とかかり
つけ医の意見書入手期限日を決定し、これら日程の進捗
管理をするシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for managing certification work for long-term care for long-term care insurance. The present invention relates to a system for determining dates and managing the progress of these dates.

【0002】[0002]

【従来の技術】介護保険法が制定され、介護保険制度が
確立された。この制度では、介護を受けたい高齢者が市
町村の窓口に申請して認定審査を受けると、認定された
要介護度に応じて在宅サービスまたは施設のサービスの
いくつかを享受できる。認定審査は学識経験者等で構成
される認定審査会によって行われるが、この認定審査会
に提出する資料として訪問調査結果とかかりつけ医の意
見書が必要とされる。認定審査の結果は申請者に通知さ
れるが、申請受付の日から起算して認定通知の発行を3
0日以内で行うよう決められている。また要介護認定の
有効期間は3〜6ケ月となっており、給付を受け続ける
ためには認定更新を行う必要がある。
2. Description of the Related Art The Long-Term Care Insurance Law was enacted, and the Long-Term Care Insurance System was established. Under this system, when an elderly person who wants to receive nursing care submits an application to a municipal office and undergoes an accreditation review, they can enjoy some of the services at home or at facilities depending on the degree of nursing care required. The accreditation examination is conducted by an accreditation committee consisting of academic experts, and the documents submitted to this accreditation committee require the results of a visit survey and a written opinion of the GP. Applicants will be notified of the results of the accreditation examination.
It is decided to do it within 0 days. In addition, the validity period of certification for long-term care is 3 to 6 months, and it is necessary to renew the certification in order to continue receiving benefits.

【0003】以上のように自治体は各申請者に対して認
定審査会を割り当て、調査員による訪問調査とかかりつ
け医の意見書入手の進捗管理をする必要がある。人口1
0万人の自治体を想定すると、寝たきり状態の高齢者の
割合が2%と言われているので、認定の更新を含めて年
間4,000件程度の認定審査をしなければならない計
算になる。また各申請者について上記の認定通知期限を
遵守しなければならず、効率的な運用管理が必要であ
る。
[0003] As described above, the local government must assign a certification examination committee to each applicant and manage the progress of the visit survey by the investigator and the acquisition of the opinion of the GP. Population 1
Assuming that there are 100,000 local governments, the ratio of bedridden elderly people is said to be 2%, so it is necessary to perform about 4,000 certification examinations annually, including renewal of certification. In addition, each applicant must comply with the above certification notice deadline, and efficient operation management is required.

【0004】なお介護サービスの事務処理システムとし
て関連するものには、例えば特開平9−245095号
公報に記載された技術等がある。
[0004] Incidentally, as a system related to the business processing system of the nursing care service, there is, for example, a technique described in Japanese Patent Application Laid-Open No. 9-245095.

【0005】[0005]

【発明が解決しようとする課題】以上述べたように、自
治体は各申請者について認定通知期限日までに訪問調
査、かかりつけ医の意見書入手及び認定審査を済ませて
認定通知書を作成するよう管理しなければならず、効率
の良い管理システムが課題となる。
[Problems to be Solved by the Invention] As mentioned above, the local government manages each applicant by completing a visit survey, obtaining the opinion of the GP and obtaining a certification report by the certification notice deadline, and preparing a certification notice. And an efficient management system becomes an issue.

【0006】本発明の目的は、できるだけ申請受付時に
認定審査日を決定するようにして認定通知期限を守るよ
う管理するシステムを提供することにある。
[0006] An object of the present invention is to provide a system for determining a certification examination date at the time of receiving an application as much as possible and managing the certification notice deadline.

【0007】本発明の他の目的は、申請受付時に認定審
査日を決定できない場合や訪問調査又は意見書入手の遅
れに伴って認定審査の予定日を再割当てする場合に対処
するために、申請受付とは独立して審査会割当てを実行
するシステムを提供することにある。
[0007] Another object of the present invention is to deal with cases where it is not possible to determine the certification review date at the time of receiving the application, or when the scheduled date for certification review is reassigned due to a delay in on-site surveys or obtaining opinions. An object of the present invention is to provide a system for executing a board assignment independently of a reception desk.

【0008】[0008]

【課題を解決するための手段】本発明は、電子計算機を
利用する要介護認定事務管理システムであり、特に計算
機で実行するプログラムを格納する記憶媒体であり、こ
のプログラムは、申請受付日と申請受付日によって決ま
る認定通知期限日との間にありいずれか一方の日から所
定の日数隔たった認定審査会の目標日を決定する機能、
および決定した審査会目標日を期限として審査会目標日
以前の訪問調査予定日とかかりつけ医の意見書入手期限
日を決定する機能を有することを特徴とする。
SUMMARY OF THE INVENTION The present invention is a business administration system for the certification of need for long-term care using an electronic computer, and more particularly, a storage medium for storing a program to be executed by the computer. A function to determine the target date of the certification committee, which is between the certification notice deadline date determined by the reception date and a predetermined number of days from either date,
In addition, it has a function to determine the scheduled date of a visit and a deadline for obtaining a written opinion of a family doctor before the target date of the screening committee with the determined target date of the screening committee as a deadline.

【0009】また本発明のプログラムは、申請受付日と
申請受付日によって決まる認定通知期限日との間にあり
いずれか一方の日から所定の日数隔たった認定審査会の
目標日を決定する機能、審査会の識別子と予定日との対
応を記憶する審査会日程テーブルを検索する機能、審査
会目標日以前で直近の予定日をもつ審査会を割り当てて
表示する機能、および割り当てた審査会予定日を期限と
して審査会予定日以前の訪問調査予定日とかかりつけ医
の意見書入手期限日を決定する機能を有することを特徴
とする。
Further, the program of the present invention has a function of determining a target date of a certification review board which is between an application reception date and a certification notification deadline date determined by the application reception date and is separated by a predetermined number of days from one of the dates. A function to search the screening committee schedule table that stores the correspondence between the screening committee identifier and the scheduled date, a function to assign and display the screening committee with the latest scheduled date before the screening committee target date, and the allocated screening committee scheduled date It is characterized by having a function to determine the scheduled date of the visit survey before the scheduled date of the examination committee and the date of obtaining the written opinion of the GP.

【0010】さらに本発明のプログラムは、申請受付の
済んだ申請者に対応して認定審査会の割当て状況を格納
するテーブルを検索して審査会未割当ての申請者を取得
し表示する機能、審査会の識別子と予定日との対応を記
憶する審査会日程テーブルを取得し審査対象者の登録数
と定員からの残数のうちの少なくとも1つとともに表示
する機能、審査会未割当ての申請者と審査会の1つが選
択されたとき、選択された申請者に選択された審査会を
割り当てる機能、および選択された審査会の登録数と残
数のうちの少なくとも1つを更新する機能を有すること
を特徴とする。
[0010] Furthermore, the program according to the present invention searches for a table storing the assignment status of the accredited examination committee corresponding to the applicants who have received the application, and acquires and displays the applicants who have not been assigned the examination committee. A function to acquire the examination committee schedule table that stores the correspondence between the meeting identifier and the scheduled date and display it along with at least one of the number of registered candidates and the remaining number from the capacity. A function to assign the selected applicant to the selected applicant when one of the applicants is selected, and to update at least one of the registered number and remaining number of the selected applicant It is characterized by.

【0011】[0011]

【発明の実施の形態】以下、本発明の一実施形態につい
て図面を用いて詳細に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to the drawings.

【0012】図1は、要介護認定業務の流れを示す図で
ある。要介護の申請に対応して申請受付処理を行い、訪
問調査、かかりつけ医の意見書入手及び認定審査のスケ
ジュールを作成する。次に各申請者について訪問調査を
行うとともにかかりつけ医意見書の入手を行い、訪問調
査及び意見書入手を終えた後に審査会に認定審査を依頼
するために参考資料を準備する。次に認定審査会によっ
て申請者の審査を行った後、認定結果をデータベースに
登録し、申請者向けに認定通知を発行する。図1に示す
業務のうち2重枠で囲んだ業務は自治体の業務であり、
電子計算機の支援によって実行される。訪問調査は訪問
調査員によって実行され、かかりつけ医意見書は申請者
のかかりつけ医師によって作成される。また認定審査は
学識経験者など専門家で構成される審査会によって実行
される。申請受付から認定通知までを30日以内で遂行
されねばならず、全体の進捗管理は自治体によって計算
機の支援を受けながら実行される。
FIG. 1 is a diagram showing the flow of the work requiring certification for nursing care. In response to the application for nursing care, the application will be processed, and a schedule will be created for a visit survey, obtaining the opinion of the GP, and a certification review. Next, we will conduct a visit survey for each applicant and obtain the opinion of the GP, and after completing the visit survey and obtaining the opinion document, prepare reference materials to request the examination committee to conduct a certification review. Next, after the applicant is examined by the accreditation committee, the accreditation result is registered in the database, and a certification notice is issued to the applicant. Among the services shown in FIG. 1, the services surrounded by a double frame are local government services,
Performed with the assistance of a computer. The visit is conducted by the visitor and the GP is prepared by the applicant's GP. The certification examination is conducted by a judging committee consisting of experts such as academic experts. The process from application acceptance to certification notification must be performed within 30 days, and the overall progress management is performed by the local government with the support of the computer.

【0013】図2は、自治体に設置される要介護認定の
ための事務管理システムの構成図である。システムは少
なくとも1台のクライアント1、サーバ2及び両者を接
続するLAN,WANなどの伝送路10から構成され
る。クライアント1はパソコン等の計算機であり、その
処理装置には表示装置3、入力装置4及びプリンタ5が
接続される。表示装置3は、申請者の個人情報、かかり
つけ医の情報、審査会日程、調査員スケジュール等を表
示し、データを入力するための領域や計算機に指示を与
えるためのボタン等を表示する装置である。入力装置4
は、表示画面上の入力領域を介してデータを入力したり
表示画面を介して計算機に指示を与えるためのキーボー
ド、マウス等の装置である。プリンタ5は、審査会用資
料、認定通知書などを出力するための印刷装置である。
クライアント1の処理装置の主記憶装置上にはアプリケ
ーションプログラム(AP)6、グラフィカル・ユーザ
インタフェース(GUI)、通信制御部のプログラム部
分などが格納され、処理装置によって実行される。AP
6は表示装置3上に各処理のための表示画面を表示し、
入力装置4を介する操作者の指示に従って申請受付処
理、審査会割当て処理、申請者ごとの進捗管理の処理、
認定審査会用資料作成の処理、認定結果登録と認定通知
発行の処理などを実行するプログラムである。またAP
6は、サーバ2が保有するデータベースやテーブルに対
し検索要求及び登録・更新要求を発行する。GUIは表
示装置3及び入力装置4とAP6との間に介在し、マン
マシン・インタフェースを提供するプログラムである。
通信制御部は、AP6と伝送路10との間に介在し、A
P6とサーバ2との間の情報の送受信を制御する。
FIG. 2 is a block diagram of an office management system installed in a local government for certification of need for long-term care. The system includes at least one client 1, a server 2, and a transmission line 10 such as a LAN or WAN connecting the two. The client 1 is a computer such as a personal computer, and a display device 3, an input device 4, and a printer 5 are connected to the processing device. The display device 3 is a device that displays personal information of the applicant, information of a family doctor, examination schedule, investigator schedule, and the like, and displays an area for inputting data, a button for giving an instruction to a computer, and the like. is there. Input device 4
Is a device such as a keyboard and a mouse for inputting data through an input area on the display screen and giving instructions to the computer through the display screen. The printer 5 is a printing device for outputting examination committee materials, certification notices, and the like.
An application program (AP) 6, a graphical user interface (GUI), a program part of a communication control unit, and the like are stored in a main storage device of the processing device of the client 1, and are executed by the processing device. AP
6 displays a display screen for each process on the display device 3,
Application acceptance processing, examination board allocation processing, progress management processing for each applicant, according to the instructions of the operator via the input device 4,
It is a program that executes processing for creating materials for the certification examination committee, registration of certification results, and processing for issuing certification notices. Also AP
Reference numeral 6 issues a search request and a registration / update request to a database or table held by the server 2. The GUI is a program interposed between the display device 3 and the input device 4 and the AP 6 to provide a man-machine interface.
The communication control unit is interposed between the AP 6 and the transmission path 10,
It controls transmission and reception of information between P6 and server 2.

【0014】サーバ2は、サーバ専用機、パソコン等の
計算機であり、その処理装置には被保険者データベース
11、審査会テーブル12、審査会日程テーブル13、
受給者テーブル14、進捗管理テーブル15、調査員日
程テーブル16等を格納する記憶装置を接続する。被保
険者データベース11は、各被保険者の個人情報を格納
するデータベースである。審査会テーブル12は、実施
可能な審査会の名称を登録するテーブルである。審査会
日程テーブル13は、開催予定の審査会の予定日を格納
するテーブルである。受給者テーブル14は、申請者の
認定結果を格納するテーブルである。進捗管理テーブル
15は、各申請者ごとに審査会予定、訪問調査の実施及
び意見書入手の進捗状況を管理するためのテーブルであ
る。調査員日程テーブル16は、訪問調査員のスケジュ
ールを格納するテーブルである。サーバ2の処理装置の
主記憶装置上にはAP7、データベース管理システム
(DBMS)、通信制御部のプログラム部分等が格納さ
れ、処理装置によって実行される。AP7は、クライア
ント1からの検索要求又は登録・更新要求に応答して指
定されたキーによってデータベース又はテーブルを検索
し、該当するデータをクライアント1へ送信したり、指
定されたデータをデータベース又はテーブルに登録又は
更新するプログラムである。DBMSはAP7と記憶装
置上のデータベース/テーブルとの間に介在し、データ
ベース/テーブルへのアクセスを管理するプログラムで
ある。通信制御部は、AP7と伝送路10との間に介在
し、AP7とクライアント1との間の情報の送受信を制
御する。
The server 2 is a computer such as a server dedicated machine or a personal computer, and its processing device includes an insured person database 11, a screening committee table 12, a screening schedule table 13,
A storage device for storing the recipient table 14, the progress management table 15, the surveyor schedule table 16, and the like is connected. The insured person database 11 is a database that stores personal information of each insured person. The examination committee table 12 is a table in which the names of executable examination committees are registered. The examination committee schedule table 13 is a table for storing the scheduled date of the examination committee scheduled to be held. The recipient table 14 is a table that stores the result of the certification of the applicant. The progress management table 15 is a table for managing the schedule of the examination committee, the implementation of the visit survey, and the progress of obtaining the opinion paper for each applicant. The researcher schedule table 16 is a table that stores the schedule of the visiting researcher. The AP 7, the database management system (DBMS), the program part of the communication control unit, and the like are stored in the main storage device of the processing device of the server 2, and are executed by the processing device. The AP 7 searches the database or table using the specified key in response to the search request or the registration / update request from the client 1 and transmits the corresponding data to the client 1 or stores the specified data in the database or table. A program to register or update. The DBMS is a program that intervenes between the AP 7 and the database / table on the storage device and manages access to the database / table. The communication control unit is interposed between the AP 7 and the transmission path 10 and controls transmission and reception of information between the AP 7 and the client 1.

【0015】AP6を記憶媒体に格納し、クライアント
1の図示しない駆動装置を介してクライアント1の主記
憶装置に読み込むか又はプログラム転送によってクライ
アント1の主記憶装置に転送し、クライアント1の処理
装置によって実行することが可能である。AP7につい
ても同様に記憶媒体に格納し、サーバ2の図示しない駆
動装置を介してサーバ2の主記憶装置に読み込むか又は
プログラム転送によってサーバ2の主記憶装置に転送
し、サーバ2の処理装置によって実行することが可能で
ある。AP6とAP7とを合わせたものを要介護認定事
務管理システムとして1個又は2個以上の記憶媒体に格
納し、同様にAP6をクライアント1の記憶装置に格納
し、AP7をサーバ2の記憶装置に格納し各々処理装置
によって実行することが可能である。クライアント1と
サーバ2を同一の計算機とし、AP6とAP7を1つの
統合したAPとして実行してもよい。
The AP 6 is stored in a storage medium and read into the main memory of the client 1 via a drive unit (not shown) of the client 1 or transferred to the main memory of the client 1 by program transfer. It is possible to do. Similarly, the AP 7 is stored in a storage medium and read into the main storage of the server 2 via a drive unit (not shown) of the server 2 or transferred to the main storage of the server 2 by program transfer. It is possible to do. The combination of AP6 and AP7 is stored in one or two or more storage media as a care-required business administration management system. Similarly, AP6 is stored in the storage device of client 1, and AP7 is stored in the storage device of server 2. Each can be stored and executed by a processing device. The client 1 and the server 2 may be the same computer, and the AP 6 and the AP 7 may be executed as one integrated AP.

【0016】被保険者データベース11は、介護保険の
各被保険者について被保険者番号、氏名、性別、生年月
日、住所、電話番号などの個人情報を保持する。
The insured person database 11 holds personal information such as the insured person number, name, gender, date of birth, address, and telephone number for each insured person of long-term care insurance.

【0017】図3(a)は、審査会テーブル12のデー
タ構成を示す図である。審査会テーブル12は審査会の
名称とその審査会番号との対応を登録する。図3(b)
は、審査会日程テーブル13のデータ構成を示す図であ
る。審査会日程テーブル13の各レコードは、審査会実
施番号、審査会番号、実施予定日、登録数及び残数から
構成される。審査会実施番号は審査会の開催予定に対応
して割り当てられる番号、審査会番号は審査会テーブル
12に登録された審査会の番号である。審査会実施番号
及び審査会番号を合わせて審査会の識別子とみることが
できる。実施予定日は審査会の予定日である。登録数は
その審査会を割り当てられた申請者の数、残数はその審
査会を割当て可能な申請者の数であり、定員(基準人
数)から登録数を引いた数である。残数が負となること
もあり得る。
FIG. 3A is a diagram showing a data structure of the examination committee table 12. As shown in FIG. The examination committee table 12 registers the correspondence between the name of the examination committee and the examination committee number. FIG. 3 (b)
FIG. 6 is a diagram showing a data configuration of the examination committee schedule table 13. Each record of the examination committee schedule table 13 is composed of an examination committee execution number, an examination committee number, a scheduled execution date, the number of registrations, and the remaining number. The examination committee execution number is a number assigned according to the schedule of the examination committee, and the examination committee number is the number of the examination committee registered in the examination committee table 12. The examination committee execution number and the examination committee number can be regarded as the examination committee identifier. The scheduled implementation date is the scheduled date for the examination committee. The number of registrations is the number of applicants to which the examination committee is assigned, and the remaining number is the number of applicants to which the examination committee can be assigned, and is the number obtained by subtracting the number of registrations from the capacity (reference number). The remaining number can be negative.

【0018】図4は、受給者テーブル14のデータ構成
を示す図である。受給者テーブル14の各レコードは、
申請者ごとに被保険者番号、かかりつけ医情報、要介護
度及びサービス内容の詳細を格納する。被保険者番号及
びかかりつけ医情報は申請時に設定される情報、要介護
度及びサービス内容は審査認定の後に設定される情報で
ある。
FIG. 4 is a diagram showing a data structure of the recipient table 14. Each record of the recipient table 14 is
The details of the insured person number, family doctor information, degree of need for nursing care and service contents are stored for each applicant. The insured person number and the family doctor information are information set at the time of application, and the degree of nursing care and service content are information set after the examination and approval.

【0019】図5は、進捗管理テーブル15のデータ構
成を示す図である。進捗管理テーブル15の各進捗管理
レコードは、申請者対応に設けられ、審査会実施番号、
被保険者番号、申請日、審査会目標日、審査会予定日、
訪問調査予定日、訪問調査実施日、意見書入手期限日及
び意見書入手日を格納する。審査会実施番号は審査会日
程テーブル13に登録された審査会実施番号、被保険者
番号は申請者の被保険者番号、申請日は申請受付をした
日、審査会目標日は申請日又は認定通知期限から機械的
に計算された認定審査の期限、審査会予定日は割り当て
られた審査会の実施予定日、訪問調査予定日は申請受付
時に割り振られた訪問調査の予定日、訪問調査実施日は
訪問調査を実施した日、意見書入手期限日は申請受付時
に割り振られたかかりつけ医の意見書の入手期限、意見
書入手日は実際に意見書を入手した日を格納する。本例
では進捗管理レコードは申請日の順に配列されている。
FIG. 5 is a diagram showing a data structure of the progress management table 15. Each progress management record in the progress management table 15 is provided for the applicant, and the examination committee execution number,
Insured person number, application date, target date of screening committee, scheduled date of screening committee,
Stores the scheduled visit survey date, the date of the visit survey, the deadline for obtaining the opinion document, and the date of obtaining the opinion document. The examination committee execution number is the examination committee execution number registered in the examination committee schedule table 13, the insured person number is the insured person number of the applicant, the application date is the date on which the application was accepted, the examination committee target date is the application date or accreditation. The deadline for the accreditation screening, which is calculated mechanically from the notification deadline, the scheduled date for the screening session, the scheduled date for the assigned screening session, the scheduled date for the site survey, the scheduled date for the site survey assigned at the time of application submission, and the date for the site survey Stores the date on which the visit was conducted, the deadline for obtaining the written opinion, the deadline for obtaining the opinion of the family doctor assigned at the time of receiving the application, and the date for obtaining the written opinion stores the date on which the written opinion was actually obtained. In this example, the progress management records are arranged in order of application date.

【0020】調査員日程テーブル16は、各訪問調査員
の毎日のスケジュールを午前、午後のように時間帯に区
分して設定するものであり、調査員個人の予定でビジー
の時間帯、訪問調査のためにビジーの時間帯および訪問
調査のために空きの時間帯の3種類に区分される。訪問
調査のために割り当てられた時間帯には割り当てられた
申請者の被保険者番号を格納する。
The investigator schedule table 16 is used to set the daily schedule of each visiting investigator by dividing it into time periods such as morning and afternoon. Are divided into three types: busy time zones and free time zones for visiting surveys. The insured number of the assigned applicant is stored in the time slot assigned for the visit survey.

【0021】図6は、表示装置3に表示される申請受付
画面のデータ構成の例を示す図である。被保険者No、氏
名、性別、生年月日及び住所は、申請者の個人情報であ
る。申請情報領域の申請年月日は申請受付の日付を示
し、「内容」は新規の申請、更新の申請、申請情報の変
更を区分するものである。居住地及び電話番号は申請者
の住所と電話番号を入力する領域である。手続きに来た
人の欄は、手続きに来た人の氏名、電話番号及び本人と
の関係を入力する領域である。「登録」ボタンは申請情
報の登録を指示するためのボタン、「次画面」ボタンは
審査会の割当て、訪問調査日の設定、かかりつけ医情報
の入力と意見書入手期限日の設定をするために次画面に
移るよう指示するボタン、「終了」ボタンは業務の終了
を指示するためのボタン、「戻る」ボタンは申請受付処
理を終了して初期画面に戻るよう指示するためのボタン
である。
FIG. 6 is a diagram showing an example of the data structure of the application reception screen displayed on the display device 3. As shown in FIG. The insured person No., name, gender, date of birth and address are the applicant's personal information. The application date in the application information area indicates the date of application reception, and the “content” classifies a new application, an update application, and a change in application information. The place of residence and telephone number are areas for entering the applicant's address and telephone number. The column of the person who came to the procedure is an area for inputting the name, telephone number, and the relationship with the person who came to the procedure. The "Register" button is for instructing registration of application information, and the "Next Screen" button is for assigning a review board, setting a visit survey date, entering GP information, and setting a deadline for obtaining a written opinion. The button for instructing to move to the next screen, the "end" button is a button for instructing the end of the job, and the "return" button is a button for instructing to end the application acceptance processing and return to the initial screen.

【0022】図7は、申請受付時に審査会割当てを行う
場合の審査会割当て画面のデータ構成例を示す図であ
る。緊急度は要介護認定を急ぐか否かの事情に応じて設
定するフラグである。審査会割当て領域の審査会目標日
は認定通知期限日から機械的に計算した目標日である。
審査会名及び実施予定日は割り当てた審査会名及びその
実施予定日を表示する。審査会割当て領域には審査会目
標日の直近に開催予定の審査会の予定日及びその前後の
審査会の予定日の一覧を表示し、各審査会の登録申請者
の登録数又は残数を表示する。「割当て」ボタンは審査
会の割当てを指示するためのボタン、「終了」ボタンは
業務の終了を指示するためのボタン、「戻る」ボタンは
審査会割当て処理を終了して元の申請受付画面に戻るよ
う指示するためのボタンである。
FIG. 7 is a diagram showing an example of a data structure of a screening committee allocation screen when a screening committee is allocated at the time of receiving an application. The urgency is a flag that is set in accordance with the circumstances of whether or not urgent need of nursing care certification is required. The target date of the screening committee assigned area is the target date calculated mechanically from the certification notification deadline date.
The name of the examination committee and the scheduled date of the examination indicate the name of the assigned examination committee and the scheduled date of the meeting. A list of the scheduled date of the Board scheduled to be held most recently and the scheduled date of the Board before and after the Board will be displayed in the Board allocated area, and the number of registered applicants or the remaining number of applicants for each Board will be displayed. indicate. The "Assign" button is a button for instructing the assignment of the jury, the "End" button is a button for instructing the end of the work, and the "Return" button is to end the examination allotment process and return to the original application acceptance screen. A button for instructing to return.

【0023】図8は、申請受付処理を行うAP6の処理
手順を示すフローチャートである。初期画面のメニュー
中の申請受付処理が指示されると、AP6は申請受付画
面を表示装置3上に表示する(ステップ31)。次にA
P6は申請情報の入力を受ける(ステップ32)。入力
装置4を介して被保険者番号が入力されると、AP6は
サーバ2へ被保険者データベース11の検索要求を発行
する。AP7はDBMSを介して指定された被保険者番
号によって被保険者データベース11を検索し、該当す
る被保険者の氏名、性別、生年月日、住所及び電話番号
を取得し、クライアント1に送信する。AP6は受信し
た情報を申請受付画面上に表示する。また表示された住
所、電話番号そのままか又は修正入力が行われ、手続き
に来た人の氏名、電話番号及び本人との関係が入力され
る。申請年月日が入力されたとき、AP6は認定通知期
限日を計算する(ステップ33)。認定通知期限日は申
請日から30日目の日付である。「次画面」ボタンが押
下され、次の画面で審査会割当てが選択されると、認定
審査会割当ての処理を行う(ステップ34)。
FIG. 8 is a flowchart showing a processing procedure of the AP 6 for performing an application receiving process. When the application receiving process in the menu of the initial screen is instructed, the AP 6 displays the application receiving screen on the display device 3 (step 31). Then A
P6 receives input of application information (step 32). When the insured person number is input via the input device 4, the AP 6 issues a request for searching the insured person database 11 to the server 2. The AP 7 searches the insured person database 11 by the insured number specified via the DBMS, acquires the name, gender, date of birth, address, and telephone number of the corresponding insured person, and transmits it to the client 1. . The AP 6 displays the received information on the application reception screen. In addition, the displayed address and telephone number are input as they are or are corrected, and the name, telephone number and the relationship with the person who came to the procedure are input. When the application date has been entered, the AP 6 calculates a certification notification expiration date (step 33). The certification notice deadline is the 30th day from the date of application. When the "next screen" button is pressed and the examination board assignment is selected on the next screen, the processing of the certification examination board assignment is performed (step 34).

【0024】図9は、認定審査会割当ての処理の詳細手
順を示すフローチャートである。まずAP6は、認定通
知期限日を基にして審査会目標日を計算し、審査会割当
て画面の審査会目標日の欄に表示する(ステップ4
1)。審査会目標日は認定通知期限日−X日であり、X
は自治体ごとにあらかじめ設定されるパラメータであ
る。なお審査会目標日を申請日+(30−Y)のよう
に、申請日に所定の(30−Y)日を加えてもよい。表
示画面を介して高い緊急度レベルが指定されるとXまた
は(30−Y)として緊急の場合のパラメータを使用す
る。次にAP6は審査会目標日をサーバ2へ送り審査会
日程テーブル13の検索要求を発行し(ステップ4
2)、審査会予定日を取得する(ステップ43)。AP
7は審査会日程テーブル13を検索して目標日の当日ま
たは直前に開催予定の審査会およびその前後の審査会の
審査会実施番号、審査会番号、実施予定日および登録数
(又は残数)を取得してクライアント1に送信する。A
P6は目標日の当日または直前の審査会の審査会名と実
施予定日を表示画面上に表示する(ステップ44)。こ
の時点で表示される実施予定日は候補日である。また取
得した審査会実施予定一覧を表示画面上に表示し、候補
日の審査会情報を強調表示する(ステップ45)。操作
員は各審査会の予定日と登録数(又は残数)をみて候補
とは別の審査会を選択することができる。候補とは別の
審査会が選択された場合には、選択された審査会情報を
強調表示し、候補とした審査会名と実施予定日の表示を
選択された審査会名と実施予定日によって更新する。こ
のようにして審査会予定日が決定され、「割当て」ボタ
ンが押下されると、AP6は審査会予定日が設定された
ものとみなし(ステップ46)、審査会実施番号をサー
バ2へ送り審査会日程テーブル13の更新を要求する
(ステップ47)。AP7は指定された審査会実施番号
を基にして審査会日程テーブル13を検索し、該当する
レコードの登録数を+1し、残数を−1する更新を行
う。「戻る」ボタンが押下されたとき、前の画面に戻
る。
FIG. 9 is a flowchart showing a detailed procedure of the process of assigning a certification review board. First, the AP 6 calculates the target date of the screening committee based on the expiration date of the certification notification, and displays it in the target date of the screening committee on the screening committee allocation screen (step 4).
1). The target date for the examination committee is the certification notification deadline date-X days.
Is a parameter set in advance for each local government. It should be noted that a predetermined (30-Y) day may be added to the application day, such as the application date + (30-Y). When a high urgency level is designated via the display screen, the urgent parameter is used as X or (30-Y). Next, the AP 6 sends the examination committee target date to the server 2 and issues a search request for the examination committee schedule table 13 (step 4).
2), obtain the scheduled date of the examination committee (step 43). AP
Reference numeral 7 refers to the examination committee schedule table 13 and retrieves the examination committee scheduled to be held on or immediately before the target date and the examination committee execution numbers before and after the examination committee, the examination committee number, the scheduled execution date, and the number of registrations (or the remaining number). Is acquired and transmitted to the client 1. A
P6 displays the name of the examination committee on the day of the target date or the examination committee immediately before and the scheduled execution date on the display screen (step 44). The scheduled execution date displayed at this time is a candidate date. In addition, the obtained list of examination committee execution schedules is displayed on the display screen, and the examination committee information on the candidate day is highlighted (step 45). The operator can select a screening committee different from the candidates based on the scheduled date of each screening committee and the number of registrations (or the remaining number). If a screening committee different from the candidate is selected, the information of the selected screening committee is highlighted, and the display of the candidate screening committee and the scheduled date is based on the selected screening committee name and the scheduled date. Update. When the scheduled date of the examination committee is determined in this way and the “assign” button is pressed, the AP 6 considers that the scheduled date of the examination committee has been set (step 46), and sends the examination committee execution number to the server 2 for examination. An update of the meeting schedule table 13 is requested (step 47). The AP 7 searches the examination committee schedule table 13 based on the designated examination committee execution number, and updates the number of registered records by +1 and the remaining number by -1. When the “return” button is pressed, the screen returns to the previous screen.

【0025】次に図8のフローチャートに戻り、「次画
面」ボタンによって遷移する次の画面で訪問調査が選択
されると、AP6は訪問調査日の設定を行う(ステップ
35)。画面を訪問調査予定を設定する領域に表示変更
し、申請者の審査会予定日(設定の場合)又は審査会候
補日の前日までの毎日のスケジュールを午前、午後のよ
うに時間帯に区分して設定する領域を表示装置3上に表
示する。入力装置4を介して申請者のビジーの時間帯又
は空きの時間帯が指示入力されると、AP6は最終日付
をサーバ2へ送り調査員日程テーブル16の検索要求を
発行する。AP7は調査員日程テーブル16を検索して
指定された日付までの訪問調査員のスケジュールを取り
出してクライアント1に送信する。AP6は各日の時間
帯ごとに申請者の空き状態と各調査員の空き状態の突き
合わせをして両者が空き状態の時間帯を抽出して調査員
氏名と空きの時間帯候補をすべて表示する。入力装置4
を介していずれかの調査員氏名と空きの時間帯が選択さ
れたとき、訪問調査予定日が設定されたものとみなし、
被保険者番号、調査員氏名、予定日及び時間帯をサーバ
2へ送り調査員日程テーブル16の更新要求を発行す
る。AP7は調査員日程テーブル16を検索して指定さ
れた調査員の指定された予定日及び時間帯に指定された
被保険者番号を格納する。
Next, returning to the flowchart of FIG. 8, when the visit survey is selected on the next screen to which the "next screen" button transits, the AP 6 sets a visit survey date (step 35). Change the screen display to the area where the scheduled visit survey is set, and classify the daily schedule up to the scheduled date of the applicant's screening meeting (if setting) or the day before the candidate screening candidate's day into morning and afternoon time zones. The area to be set is displayed on the display device 3. When a busy time zone or a vacant time zone of the applicant is instructed and input through the input device 4, the AP 6 sends the final date to the server 2 and issues a search request of the investigator schedule table 16. The AP 7 searches the surveyor schedule table 16 to extract the schedule of the visiting surveyor up to the designated date, and transmits the schedule to the client 1. The AP 6 compares the vacant state of the applicant with the vacant state of each investigator for each time period of each day, extracts the vacant time period for both, and displays all the investigator names and vacant time period candidates. . Input device 4
When any of the investigator's name and available time are selected via, it is assumed that the scheduled visit survey date has been set,
The insured person number, the investigator's name, the scheduled date and the time zone are sent to the server 2 and an update request for the investigator schedule table 16 is issued. The AP 7 searches the surveyor schedule table 16 and stores the designated insured person number on the designated scheduled date and time zone of the designated surveyor.

【0026】「次画面」ボタンによって遷移する次の画
面でかかりつけ医が選択されると、AP6は画面をかか
りつけ医情報を入力し意見書入手期限を設定する領域に
表示変更し、かかりつけ医情報の入力を受け付け、意見
書入手期限日を設定する(ステップ36)。「登録」ボ
タンが押下されたとき、AP6は被保険者番号、入力さ
れた申請情報、かかりつけ医情報、審査会目標日、審査
会実施番号(予定日が設定された場合)、訪問調査予定
日及び意見書入手期限日をサーバ2へ送り、被保険者デ
ータベース11、受給者テーブル14及び進捗管理テー
ブル15の登録・更新要求を発行する(ステップ3
7)。AP7は指定された被保険者番号によつて被保険
者データベース11を検索し、申請者の住所及び電話番
号を更新する。また受給者テーブル14に新しいレコー
ドを追加し、被保険者番号とかかりつけ医情報を登録す
る。また進捗管理テーブル15に新しいレコードを追加
し、審査会実施番号(設定の場合)、被保険者番号、申
請日、審査会目標日、審査会予定日(設定の場合)、訪
問調査予定日及び意見書入手期限日を登録する。
When the family doctor is selected on the next screen which is changed by the "next screen" button, the AP 6 changes the display to an area for inputting the family doctor information and setting a time limit for obtaining a written opinion, and displaying the family doctor information. The input is accepted, and the opinion document expiration date is set (step 36). When the “Register” button is pressed, the AP 6 will receive the insured person number, input application information, GP information, examination target date, examination committee execution number (if the scheduled date is set), and scheduled visit survey date. And the date of obtaining the written opinion is sent to the server 2, and a request for registration / update of the insured person database 11, the recipient table 14, and the progress management table 15 is issued (step 3).
7). The AP 7 searches the insured person database 11 according to the designated insured person number, and updates the applicant's address and telephone number. In addition, a new record is added to the recipient table 14, and the insured person number and the family doctor information are registered. In addition, a new record is added to the progress management table 15, and the examination committee execution number (if set), insured person number, application date, examination committee target date, scheduled examination committee date (if set), scheduled visit survey date, Register the date of obtaining opinion.

【0027】以上の処理手順は新規の申請の場合の受付
処理手順であるが、更新申請及び申請の変更の場合も同
様の処理手順となる。「更新」は過去に申請され認定さ
れた申請者の定期的な再認定の処理であり、「変更」は
更新期間の途中であるが要介護度に変更が生じる可能性
のある場合などの再認定の処理である。「更新」や「変
更」の場合には、受給者テーブル14に申請者のレコー
ドが保存されていれば、かかりつけ医情報を取得して申
請受付画面の申請情報領域に表示することができる。ま
た受給者テーブル14及び進捗管理テーブル15に申請
者のレコードが保存されていれば、保存されているレコ
ードを直接更新するか又は保存されているレコードを削
除してから同一申請者の新しいレコードの追加を行う。
Although the above processing procedure is a reception processing procedure for a new application, the same processing procedure is applied to an update application and an application change. “Renewal” is the process of periodic recertification of applicants who have been applied for and certified in the past, and “Change” is a process in the middle of the renewal period but there is a possibility that the degree of nursing care may change. This is a certification process. In the case of "update" or "change", if the record of the applicant is stored in the recipient table 14, the family doctor information can be acquired and displayed in the application information area of the application reception screen. If the record of the applicant is stored in the recipient table 14 and the progress management table 15, the stored record is directly updated or the stored record is deleted and the new record of the same applicant is deleted. Make an addition.

【0028】訪問調査が実施されたとき又はかかりつけ
医の意見書を入手したとき、その実績を進捗管理テーブ
ル15に登録する場合、および認定審査、訪問調査、意
見書入手の進捗状況を管理するために、入力装置4から
の指示に応じてAP6はサーバ2から進捗管理テーブル
15を取得し、データを編集して表示装置3上に表示す
る。申請者の訪問調査実施日または意見書入手日が入力
されると、AP6はサーバ2へ進捗管理テーブル15の
更新要求を発行し、進捗管理テーブル15の該当するレ
コードの訪問調査実施日または意見書入手日の実績を格
納する。またAP6は各申請者の審査会予定日をチェッ
クし、審査会予定日が処理当日以前であるにもかかわら
ず訪問調査実施日又は意見書入手日いずれかの記録のな
い申請者の審査会予定日を削除して未割当て状態に変更
するようサーバ2へ進捗管理テーブル15の更新要求を
発行する。また割当てを削除した審査会についてその登
録数及び残数を更新するようサーバ2へ審査会日程テー
ブル13の更新要求を発行する。
When the visit survey is performed or when the opinion of the family doctor is obtained, the results are registered in the progress management table 15, and the progress of the certification examination, the visit survey, and the acquisition of the opinion document are managed. In response to the instruction from the input device 4, the AP 6 acquires the progress management table 15 from the server 2, edits the data, and displays the data on the display device 3. When the visitor survey execution date or opinion acquisition date of the applicant is input, the AP 6 issues an update request for the progress management table 15 to the server 2 and the visit survey implementation date or statement of the corresponding record in the progress management table 15 is issued. Stores the actual date of acquisition. In addition, AP6 checks the scheduled date of the screening of each applicant, and the scheduled date of the screening of the applicant who has no record of either the date of the visit survey or the date of obtaining the opinion even though the scheduled date of the screening is before the processing date An update request for the progress management table 15 is issued to the server 2 so that the date is deleted and the status is changed to the unassigned state. In addition, a request for updating the examination committee schedule table 13 is issued to the server 2 so as to update the registration number and the remaining number of the examination committee whose assignment has been deleted.

【0029】図10は、申請受付処理とは独立して申請
者の審査会割当てを行う場合の審査会割当て画面のデー
タ構成例を示す図である。「審査会未割当て者一覧」領
域は、検索結果を表示する領域であり、各対象者につい
て審査会目標日、被保険者番号、氏名及び送付可状態を
表示する。送付可とは、訪問調査及び意見書入手の済ん
だ状態をいう。また「審査会日程一覧」領域は、認定審
査会の予定日、審査会名、登録数及び残数の一覧を表示
する。「割当て」ボタンは対象者と審査会が選択された
状態で有効であり、審査会割当てを指示するためのボタ
ン、「終了」ボタンは業務の終了を指示するためのボタ
ン、「戻る」ボタンは審査会割当て処理を終了して初期
画面に戻るよう指示するためのボタンである。
FIG. 10 is a diagram showing an example of the data structure of a screening committee assignment screen when the screening committee is assigned to the applicant independently of the application receiving process. The “List of unassigned members of the examination committee” is an area for displaying the search results, and displays the target date of the examination committee, the insured person number, the name, and the state in which sending is possible for each target person. "Sendable" means the state after the visit survey and the opinion document have been obtained. In the “List of Examination Committee Schedule” area, a list of the scheduled date of the certification examination committee, the name of the examination committee, the number of registrations, and the remaining number are displayed. The “Assign” button is valid when the target person and the examination committee are selected, the button to instruct the examination committee assignment, the “End” button is to instruct the end of the work, and the “Return” button is It is a button for instructing to end the examination board allocation process and return to the initial screen.

【0030】図11は、申請受付処理とは独立して申請
者の審査会割当てを行うAP6の処理の流れを示すフロ
ーチャートである。この処理は申請受付処理の中で審査
会割当てを行わなかった申請者及びすでに審査会割当て
を行ったが訪問調査又は意見書入手が予定日又は期限日
より遅れ、審査会の再割当てが必要な申請者に対して実
行される。初期画面のメニュー中の審査会割当て処理が
指示されると、AP6は審査会割当て画面を表示装置3
上に表示する(ステップ51)。AP6は進捗管理テー
ブル15の検索要求を発行する(ステップ52)。AP
7は被保険者データベース11及び進捗管理テーブル1
5を検索し、審査会予定日の設定がなく処理当日以後の
審査会目標日をもつ申請者の進捗管理レコードを取得す
る。次にAP7は、未割当て申請者の審査目標日、被保
険者番号、氏名及び送付可状態をもつ未割当て者レコー
ドを一括してクライアント1へ送信する。AP6はこれ
らの未割当て者レコードを受信し、審査目標日の古いも
のから順に配列されるようソートして表示装置3上の審
査会未割当て者一覧領域に表示する(ステップ53)。
次にAP6はサーバ2へ審査会日程テーブル13の検索
要求を発行する(ステップ54)。AP7は審査会日程
テーブル13を検索し、実施予定日が処理日以後である
レコードを抽出してクライアント1へ送信する。AP6
は受信した情報を審査会日程一覧領域に表示する(ステ
ップ55)。
FIG. 11 is a flowchart showing the flow of the process of the AP 6 for allocating the examination committee of the applicant independently of the application acceptance process. In this process, applicants who did not make a screening committee assignment in the application reception process and who have already made a screening committee assignment but the visit survey or opinion acquisition is later than the scheduled date or deadline, and it is necessary to reassign the screening committee. Executed for the applicant. When the examination board assignment process in the menu on the initial screen is instructed, the AP 6 displays the examination board assignment screen on the display device 3.
It is displayed above (step 51). The AP 6 issues a search request for the progress management table 15 (step 52). AP
7 is an insured person database 11 and a progress management table 1
5 to retrieve the progress management record of the applicant who has no scheduled examination day and has a target day for the examination day after the processing day. Next, the AP 7 collectively transmits to the client 1 the unassigned person record having the examination target date of the unassigned applicant, the insured person number, the name, and the sendable state. The AP 6 receives these unassigned person records, sorts them so that they are arranged in order from the oldest examination target date, and displays them in the examination committee unassigned person list area on the display device 3 (step 53).
Next, the AP 6 issues a search request for the examination schedule table 13 to the server 2 (step 54). The AP 7 searches the examination committee schedule table 13, extracts records whose scheduled execution date is after the processing date, and transmits the records to the client 1. AP6
Displays the received information in the examination meeting schedule list area (step 55).

【0031】入力装置4を介して1人又は複数の審査会
未割当て者と審査会が選択された状態で「割当て」ボタ
ンが押下されると(ステップ56割当て)、AP6は選
択された申請者について審査会予定日が設定されたもの
とみなし(ステップ57)、審査会実施番号をサーバ2
へ送り、審査会日程テーブル13の更新要求を発行する
(ステップ58)。AP7は指定された審査会実施番号
によって審査会日程テーブル13を検索し、該当するレ
コードの登録数を選択した申請者の数だけ加算し、残数
を同数だけ減算する更新を行う。また被保険者番号及び
審査会実施番号をサーバ2へ送り、進捗管理テーブル1
5の更新要求を発行する(ステップ59)。AP7は指
定された被保険者番号によって進捗管理テーブル15を
検索し、該当する進捗管理レコードの審査会実施番号と
審査会予定日を設定する。審査会予定日は審査会実施番
号によって審査会日程テーブル13を検索することによ
って取得される。次にAP6は審査会予定日の設定の済
んだ申請者を削除した審査会未割当て者一覧を再表示す
る(ステップ60)。「終了」又は「戻る」ボタンが押
下されたとき(ステップ56終了・戻る)、審査会割当
て処理を終了する。
When one or a plurality of unassigned reviewers and the reviewer are selected via the input device 4 and the “assign” button is pressed (assignment in step 56), the AP 6 is assigned to the selected applicant. It is considered that the scheduled date of the examination committee has been set (step 57), and the examination committee execution number is set to the server 2.
And issues an update request for the examination committee schedule table 13 (step 58). The AP 7 searches the examination committee schedule table 13 according to the designated examination committee execution number, updates the number of registered records by the number of selected applicants, and subtracts the remaining number by the same number. Also, the insured person number and the examination committee execution number are sent to the server 2, and the progress management table 1
5 is issued (step 59). The AP 7 searches the progress management table 15 based on the designated insured person number, and sets the examination committee execution number and the scheduled examination committee date of the corresponding progress management record. The scheduled date of the examination committee is obtained by searching the examination committee schedule table 13 by the examination committee execution number. Next, the AP 6 redisplays the list of unassigned examiners who has deleted the applicant for whom the scheduled examination date has been set (step 60). When the “end” or “return” button is pressed (step 56 ends / returns), the examination board allocation process ends.

【0032】図12は、認定審査依頼をするための資料
作成をする処理の流れを示すフローチャートである。初
期画面のメニュー中の審査会用資料作成処理が指示され
ると、AP6は審査会用資料作成画面を表示装置3上に
表示する(ステップ71)。次にAP6はサーバ2へ審
査会日程テーブル13の検索要求を発行する(ステップ
72)。AP7は審査会日程テーブル13を検索し、実
施予定日が処理日以後であるレコードを抽出してクライ
アント1へ送信する。AP6は受信した情報を資料作成
画面上の審査会開催予定一覧領域に表示する(ステップ
73)。いずれかの審査会が選択されると(ステップ7
4)、AP6は審査会実施番号をサーバ2へ送り、進捗
管理テーブル15の検索要求を発行する(ステップ7
5)。AP7は指定された審査会実施番号によって進捗
管理テーブル15を検索し、該当する進捗管理レコード
を抽出する。また被保険者データベース11を検索して
該当する被保険者番号に対応する氏名を取得し、各進捗
管理レコードに被保険者氏名を付加してクライアント1
へ送信する。AP6は審査対象者一覧の先頭の申請者か
ら順に対象者を選択し(ステップ76)、対象者一覧の
終端でなければ(ステップ77NO)、対応する進捗管
理レコードの訪問調査実施日と意見書入手日の実績を取
得する(ステップ78)。両実績が設定されていれば
(ステップ79YES)、該当する対象者の情報を選択
し(ステップ80)、ステップ76に戻る。いずれかの
実績が設定されていなければ(ステップ79NO)、該
当する対象者を審査不可として選択せずにステップ76
に戻る。このようにして対象者のすべてについて審査可
/審査不可についての判定の処理を終え、対象者一覧の
終端に達したとき(ステップ77YES)、AP6は両
実績のそろった対象者の情報を資料作成画面上の審査対
象者一覧領域に表示する(ステップ81)。各審査対象
者について被保険者番号及び氏名を表示する。
FIG. 12 is a flowchart showing the flow of a process for creating a material for requesting a certification examination. When the process of creating the examination committee material in the menu on the initial screen is instructed, the AP 6 displays the examination committee material creation screen on the display device 3 (step 71). Next, the AP 6 issues a search request for the examination committee schedule table 13 to the server 2 (step 72). The AP 7 searches the examination committee schedule table 13, extracts records whose scheduled execution date is after the processing date, and transmits the records to the client 1. The AP 6 displays the received information in the examination meeting schedule list area on the material creation screen (step 73). If any jury is selected (Step 7
4), AP 6 sends the examination committee execution number to server 2 and issues a search request for progress management table 15 (step 7).
5). The AP 7 searches the progress management table 15 based on the designated examination committee execution number, and extracts a corresponding progress management record. The insured person database 11 is searched to obtain the name corresponding to the corresponding insured person number, and the insured person name is added to each progress management record, and the client 1
Send to The AP 6 selects the subjects in order from the top applicant in the list of subjects to be examined (step 76), and if it is not the end of the list of subjects (step 77 NO), obtains the visit survey execution date and the written opinion of the corresponding progress management record The result of the day is acquired (step 78). If both results have been set (step 79YES), the information of the corresponding target person is selected (step 80), and the process returns to step 76. If any of the results is not set (NO in step 79), the corresponding target person is not selected as non-examination and step 76 is not selected.
Return to In this way, when the process of judging whether or not all the subjects can be judged is completed and the end of the subject list is reached (step 77 YES), the AP 6 prepares information on the information of the subject having both achievements. It is displayed in the list of candidates for examination on the screen (step 81). The insured person number and name are displayed for each candidate.

【0033】入力装置4を介して印刷指示があれば、審
査可能な対象者の被保険者番号を抽出し、抽出した被保
険者番号をサーバ2へ送り被保険者データベース11及
び受給者テーブル14の検索要求を発行し、対象者の情
報を取得した後、プリンタ5上に審査資料を出力する
(ステップ82)。AP7は指定された被保険者番号に
よって被保険者データベース11及び受給者テーブル1
4を検索し、該当する氏名、性別、生年月日、かかりつ
け医の情報等を取得してクライアント1へ送信する。A
P6は受信した情報を基にして審査資料を作成し出力す
る。
If there is a print instruction through the input device 4, the insured person number of the examiner who can be examined is extracted, and the extracted insured person number is sent to the server 2 and the insured person database 11 and the recipient table 14 are sent. Is issued, and after obtaining the information of the subject, the examination material is output on the printer 5 (step 82). The AP 7 uses the designated insured person number and the insured person database 11 and the beneficiary table 1
4 is retrieved, the corresponding name, gender, date of birth, information of the GP, etc. are acquired and transmitted to the client 1. A
P6 creates and outputs examination materials based on the received information.

【0034】以上のようにして認定審査の済んだ申請者
については、表示装置3上に認定結果登録画面を表示
し、上記のように選択された認定審査会から対象者一覧
を表示し、各対象者について決定した要介護度等の情報
が入力されると、AP6はサーバ2へ受給者テーブル1
4の更新要求を発行して入力された情報を該当する被保
険者のレコードに格納する。また各申請者について認定
通知書を作成しプリンタ5上に出力する。
For the applicants who have completed the certification examination as described above, a certification result registration screen is displayed on the display device 3 and a list of subjects from the certification examination committee selected as described above is displayed. When information such as the degree of care required determined for the target person is input, the AP 6 sends the recipient table 1 to the server 2.
The information entered by issuing the update request of No. 4 is stored in the record of the corresponding insured person. In addition, a certification notice is created for each applicant and output to the printer 5.

【0035】なおAP6とAP7の機能分担については
上記実施形態に限定されるものではなく、他方のAPの
分担が可能である。例えばステップ33の認定通知期限
日の計算をAP7で実行してもよい。同様にステップ4
1の審査会目標日の計算をAP7で実行してもよい。ま
たステップ53の残日数の計算をAP6が行ってもよ
い。またステップ53の未割当て者レコードのソートを
AP7が行ってもよい。さらにAP6及びAP7を合わ
せた統合されたAPを同一計算機上で実行するようなシ
ステムも可能である。
The function sharing between the AP 6 and the AP 7 is not limited to the above embodiment, and the other AP can be shared. For example, the calculation of the certification notification expiration date in step 33 may be executed by the AP 7. Step 4
The calculation of one examination committee target date may be executed by the AP 7. The AP 6 may calculate the number of remaining days in step 53. The AP 7 may sort the unassigned person records in step 53. Further, a system in which an integrated AP combining AP6 and AP7 is executed on the same computer is also possible.

【0036】[0036]

【発明の効果】以上述べたように本発明によれば、でき
るだけ申請受付時に認定審査会の予定日を決定するよう
にしたので、割り当てた審査会予定日を守れるか否かに
ついて早い時期に判断でき、対策することができる。ま
た申請受付処理、訪問調査及び意見書入手の進捗状況に
応じて申請受付とは切り離して審査会割当てを行えるよ
うにしたので、申請受付後の審査会割当て及び再割当て
をフォローすることができる。さらに各審査会の対象者
の登録数又は定員からの残数を管理し、操作員が登録数
又は残数をみながら審査会割当てを実行できるようにす
るとともに、申請者の数に対して審査会の数が充分か否
かを判断できる。
As described above, according to the present invention, the scheduled date of the certification examination committee is determined as much as possible at the time of application acceptance, so that it is determined at an early stage whether or not the assigned examination committee scheduled date can be met. Yes, you can take countermeasures. Also, according to the progress of the application reception processing, the visit survey, and the obtaining of the opinion document, the examination committee allocation can be performed separately from the application reception, so that the examination committee allocation and the reassignment after the application reception can be followed. In addition, the number of registered persons or the remaining number of persons from each screening committee is managed, so that operators can execute the screening committee allocation while checking the number of registered persons or the remaining number, and review the number of applicants. You can judge whether the number of meetings is sufficient.

【図面の簡単な説明】[Brief description of the drawings]

【図1】要介護認定業務の流れを示す図である。BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a diagram showing a flow of a certification work for requiring long-term care.

【図2】実施形態の要介護認定管理システムの構成図で
ある。
FIG. 2 is a configuration diagram of a care-required certification management system of the embodiment.

【図3】実施形態の審査会テーブル12及び審査会日程
テーブル13のデータ構成図である。
FIG. 3 is a data configuration diagram of a screening committee table 12 and a screening schedule table 13 of the embodiment.

【図4】実施形態の受給者テーブル14のデータ構成図
である。
FIG. 4 is a data configuration diagram of a recipient table 14 according to the embodiment.

【図5】実施形態の進捗管理テーブル15のデータ構成
図である。
FIG. 5 is a data configuration diagram of a progress management table 15 according to the embodiment.

【図6】申請受付画面のデータ構成例を示す図である。FIG. 6 is a diagram illustrating a data configuration example of an application reception screen.

【図7】申請受付時の審査会割当て画面のデータ構成例
を示す図である。
FIG. 7 is a diagram showing an example of a data configuration of a screening committee assignment screen at the time of receiving an application.

【図8】実施形態の申請受付処理の流れを示すフローチ
ャートである。
FIG. 8 is a flowchart illustrating a flow of an application receiving process according to the embodiment.

【図9】実施形態の認定審査会割当て処理の流れを示す
フローチャートである。
FIG. 9 is a flowchart illustrating the flow of a certification board assignment process according to the embodiment.

【図10】審査会割当て画面のデータ構成例を示す図で
ある。
FIG. 10 is a diagram showing a data configuration example of a screening committee assignment screen.

【図11】実施形態の申請受付から独立した認定審査会
割当て処理の流れを示すフローチャートである。
FIG. 11 is a flowchart illustrating a flow of an accreditation board assignment process independent of application reception according to the embodiment.

【図12】実施形態の認定審査依頼処理の流れを示すフ
ローチャートである。
FIG. 12 is a flowchart illustrating a flow of a certification examination request process according to the embodiment.

【符号の説明】[Explanation of symbols]

1:クライアント、2:サーバ、6,7:AP、13:
審査会日程テーブル、14:受給者テーブル、15:進
捗管理テーブル
1: Client, 2: Server, 6, 7: AP, 13:
Examination meeting schedule table, 14: recipient table, 15: progress management table

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成10年12月24日[Submission date] December 24, 1998

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0007[Correction target item name] 0007

【補正方法】削除[Correction method] Deleted

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0008[Correction target item name] 0008

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0008】[0008]

【課題を解決するための手段】本発明は、電子計算機を
利用する要介護認定事務管理システムであり、特に計算
機で実行するプログラムを格納する記憶媒体であり、こ
のプログラムは、申請受付日と申請受付日によって決ま
る認定通知期限日との間にありいずれか一方の日から所
定の日数隔たった認定審査会の目標日を設定する機能、
および認定審査会の目標日以前の訪問調査予定日とかか
りつけ医の意見書入手期限日を設定する機能を有するこ
とを特徴とする。
SUMMARY OF THE INVENTION The present invention is a business administration system for the certification of need for long-term care using an electronic computer, and more particularly, a storage medium for storing a program to be executed by the computer. A function to set the target date of the certification review board that is between the date of the certification notice determined by the reception date and a predetermined number of days from either date,
And the scheduled date of the visit survey before the target date of the certification committee
It is characterized by having a function of setting the date of expiration of obtaining a written opinion of a doctor .

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0009】また本発明は、介護保険の申請者に関する
情報と申請受付日を入力する手段と、介護保険の申請受
付日と申請受付日によって決まる認定通知期限日との間
にありいずれか一方の日から所定の日数隔たった認定審
査会の目標日を表示する手段と、この認定審査会の目標
日以前の訪問調査予定日とかかりつけ医の意見書入手期
限日を設定する手段とを有する介護保険管理装置を特徴
とする
The present invention also relates to a care insurance applicant.
Means to enter information and the date of application
Between the date of application and the expiration date of the certification notice determined by the date of receiving the application
At a certain number of days from one of the days
Means for indicating the target date of the board and the goals of this certification board
Scheduled visit date before the date and the period for obtaining the opinion of the GP
Features a long-term care insurance management device having means for setting a date limit
And

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0010[Correction target item name] 0010

【補正方法】削除[Correction method] Deleted

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中原 克明 東京都江東区新砂一丁目6番27号 株式会 社日立製作所公共情報事業部内 (72)発明者 安藤 靖 東京都江東区新砂一丁目6番27号 株式会 社日立製作所公共情報事業部内 ──────────────────────────────────────────────────の Continuing on the front page (72) Inventor Katsuaki Nakahara 1-6-27 Shinsuna, Koto-ku, Tokyo Inside the Public Information Division, Hitachi, Ltd. (72) Inventor Yasushi Yasushi 1-6-1 Shinsuna, Koto-ku, Tokyo No. 27 Inside Public Information Division, Hitachi, Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】コンピュータ読み取り可能な記憶媒体上に
実体化されたプログラムであり、該プログラムは介護保
険の要介護認定事務を管理するプログラムであって下記
機能を含む: (a)申請受付日と申請受付日によって決まる認定通知
期限日との間にありいずれか一方の日から所定の日数隔
たった認定審査会の目標日を決定する機能、及び(b)
決定した審査会目標日を期限として審査会目標日以前の
訪問調査予定日とかかりつけ医の意見書入手期限日を決
定する機能。
1. A program embodied on a computer-readable storage medium, the program managing a long-term care insurance certification business of long-term care insurance, and includes the following functions: A function to determine the target date of the certification review board, which is between the date of application notification and which is determined by the application acceptance date and is separated by a predetermined number of days from either date, and (b)
A function to determine the scheduled date of a visit and a deadline for obtaining a written opinion from a GP, with the determined target date for the screening as a deadline.
【請求項2】コンピュータ読み取り可能な記憶媒体上に
実体化されたプログラムであり、該プログラムは介護保
険の要介護認定事務を管理するプログラムであって下記
機能を含む: (a)申請受付日と申請受付日によって決まる認定通知
期限日との間にありいずれか一方の日から所定の日数隔
たった認定審査会の目標日を決定する機能、(b)審査
会の識別子と予定日との対応を記憶する審査会日程テー
ブルを検索する機能、(c)審査会目標日以前で直近の
予定日をもつ審査会を割り当てて表示する機能、及び
(d)割り当てた審査会予定日を期限として審査会予定
日以前の訪問調査予定日とかかりつけ医の意見書入手期
限日を決定する機能。
2. A program embodied on a computer readable storage medium for managing a long-term care insurance certification work required by a long-term care insurance, including the following functions: A function to determine the target date of the certification committee, which is between the certification notification deadline date determined by the application acceptance date and a predetermined number of days apart from either date, (b) The correspondence between the committee's identifier and the scheduled date A function to search the screening committee schedule table to be stored, (c) a function to allocate and display the screening committee with the latest scheduled date before the target date of the screening committee, and (d) a screening committee with the assigned scheduled screening committee date as a deadline. A function to determine the scheduled date of the visit before the scheduled date and the deadline for obtaining the opinion of the GP.
【請求項3】コンピュータ読み取り可能な記憶媒体上に
実体化されたクライアント機能をもつプログラムであ
り、該プログラムは介護保険の要介護認定事務を管理す
るプログラムであって下記機能を含む: (a)申請受付日と申請受付日によって決まる認定通知
期限日との間にありいずれか一方の日から所定の日数隔
たった認定審査会の目標日を決定する機能、(b)審査
会の識別子と予定日との対応を外部のサーバに照会する
機能、(c)審査会目標日以前で直近の予定日をもつ審
査会を割り当てて表示する機能、及び(d)割り当てた
審査会予定日を期限として審査会予定日以前の訪問調査
予定日とかかりつけ医の意見書入手期限日を決定する機
能。
3. A program having a client function embodied on a computer-readable storage medium, wherein the program manages a business requiring long-term care certification for long-term care insurance, and includes the following functions: A function to determine the target date of the certification committee, which is between the application acceptance date and the certification notification deadline date determined by the application acceptance date and is separated by a predetermined number of days from one of the dates, (b) the identifier of the examination committee and the scheduled date (C) A function to assign and display a review committee with the latest scheduled date before the target date of the review committee, and (d) A review with the assigned scheduled review date as the deadline A function to determine the date of scheduled visit visits before the scheduled date of the meeting and the deadline for obtaining the opinion of the GP.
【請求項4】コンピュータ読み取り可能な記憶媒体上に
実体化されたプログラムであり、該プログラムは介護保
険の要介護認定事務を管理するプログラムであって下記
機能を含む: (a)申請受付の済んだ申請者に対応して認定審査会の
割当て状況を格納するテーブルを検索して審査会未割当
ての申請者を取得し表示する機能、(b)審査会の識別
子と予定日との対応を記憶する審査会日程テーブルを取
得し審査対象者の登録数と定員からの残数のうちの少な
くとも1つとともに表示する機能、(c)審査会未割当
ての申請者と審査会の1つが選択されたとき、選択され
た申請者に選択された審査会を割り当てる機能、及び
(d)選択された審査会の登録数と定員からの残数のう
ちの少なくとも1つを更新する機能。
4. A program embodied on a computer-readable storage medium, the program managing a care-requiring certification affair of a long-term care insurance, and includes the following functions: A function to retrieve and display applicants who have not been assigned a screening committee by searching a table that stores the status of allocation of the certification board corresponding to the applicant, and (b) memorize the correspondence between the identifier of the screening committee and the scheduled date A function to acquire the examination committee schedule table to be displayed and display it together with at least one of the number of registered persons and the remaining number of persons to be examined, (c) One of the applicants who have not been allocated to the examination committee and one of the examination committees have been selected A function of assigning the selected examination committee to the selected applicant, and (d) a function of updating at least one of the number of registered examination committees and the remaining number from the capacity.
【請求項5】コンピュータ読み取り可能な記憶媒体上に
実体化されたクライアント機能をもつプログラムであ
り、該プログラムは介護保険の要介護認定事務を管理す
るプログラムであって下記機能を含む: (a)認定審査会が未割当ての申請者を外部のサーバに
照会し、審査会未割当て者一覧を表示する機能、(b)
審査会の識別子、予定日及び審査対象者の登録数と定員
からの残数のうちの少なくとも1つの対応を外部のサー
バに照会し、審査会一覧を表示する機能、(c)審査会
未割当ての申請者と審査会の1つが選択されたとき、外
部のサーバに選択された申請者を審査会割当て済に更新
するよう要求する機能、及び(d)外部のサーバに選択
された審査会の登録数と定員からの残数のうちの少なく
とも1つを更新するよう要求する機能。
5. A program having a client function embodied on a computer-readable storage medium, wherein the program manages a business requiring long-term care certification for long-term care insurance, and includes the following functions: A function in which the accredited review board refers to an external server for unassigned applicants and displays a list of unassigned applicants, (b)
A function to query the external server for at least one of the identifier of the examination committee, the scheduled date, the number of registrations of the persons to be examined, and the remaining number from the capacity, and to display a list of examination committees, (c) unassigned examination committees A function of requesting an external server to update the selected applicant to a panel assigned when one of the applicants and the panel is selected, and (d) a function of the panel selected by the external server. A function to request that at least one of the registered number and the remaining number from the capacity be updated.
JP8702598A 1998-03-31 1998-03-31 Certified Long-Term Care Management System Pending JPH11282922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8702598A JPH11282922A (en) 1998-03-31 1998-03-31 Certified Long-Term Care Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8702598A JPH11282922A (en) 1998-03-31 1998-03-31 Certified Long-Term Care Management System

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP10366951A Division JPH11288440A (en) 1998-12-24 1998-12-24 Care insurance certification office management device
JP11221648A Division JP2000040107A (en) 1999-08-04 1999-08-04 Certified Long-Term Care Management System

Publications (1)

Publication Number Publication Date
JPH11282922A true JPH11282922A (en) 1999-10-15

Family

ID=13903427

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8702598A Pending JPH11282922A (en) 1998-03-31 1998-03-31 Certified Long-Term Care Management System

Country Status (1)

Country Link
JP (1) JPH11282922A (en)

Similar Documents

Publication Publication Date Title
US6978268B2 (en) Healthcare organization central record and record identifier management system
JP4109452B2 (en) Job offer / job hunting information processing system
US8000979B2 (en) Automated patient management system
US20060129445A1 (en) System and method for scheduling a litigation event
US20020026329A1 (en) Health care information system
US20140180704A1 (en) Automated patient management system
JP2008077276A (en) Intellectual property management system, intellectual property management method and intellectual property management program
JP3920522B2 (en) Trademark service processing method, system, and recording medium
JP2024159132A (en) Home medical care/nursing care schedule providing system, home medical care/nursing care schedule providing method and program
JPH11282922A (en) Certified Long-Term Care Management System
JP2000040107A (en) Certified Long-Term Care Management System
JPH11288440A (en) Care insurance certification office management device
JP4080687B2 (en) Server apparatus for electronic procedure system
JP2002149903A (en) General customer service support system, its method, its program, and recording medium recording the program
JP2002041738A (en) Work allocation support system and work allocating method using the same system
JP2006235849A (en) Home care service processing support system
US20050177396A1 (en) Method and apparatus for performing concurrent patient coding for hospitals
JP7732701B1 (en) Progress management system, its control method, and program
JP2001350843A (en) Nursing information processing system
JP7486061B1 (en) Nursing care and/or medical support system, program, computer device, and information processing method
JP7681081B1 (en) Program, system and method
Badger et al. Report of the SAC Working Group on External Review of Library of Congress Vocabularies
JP2025079575A (en) Business support device, business support method, and business support program
JP2002342487A (en) System for supporting job of certifying long-term care need method for processing job of certifying long-term care need and storage medium
JP2001022771A (en) Notification destination information management system and method, and recording medium recording the processing program