JPH11117316A - Temporary cofferdam structure - Google Patents
Temporary cofferdam structureInfo
- Publication number
- JPH11117316A JPH11117316A JP27711997A JP27711997A JPH11117316A JP H11117316 A JPH11117316 A JP H11117316A JP 27711997 A JP27711997 A JP 27711997A JP 27711997 A JP27711997 A JP 27711997A JP H11117316 A JPH11117316 A JP H11117316A
- Authority
- JP
- Japan
- Prior art keywords
- temporary
- base portion
- precast panel
- footing
- temporary closing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 21
- 230000002093 peripheral effect Effects 0.000 claims abstract description 13
- 238000010276 construction Methods 0.000 claims description 13
- 239000003566 sealing material Substances 0.000 claims description 7
- 238000004078 waterproofing Methods 0.000 claims description 3
- 230000000903 blocking effect Effects 0.000 claims 1
- 238000005192 partition Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 11
- 230000002787 reinforcement Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 239000002184 metal Substances 0.000 description 3
- 238000003911 water pollution Methods 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009418 renovation Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003475 lamination Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、仮締切構造体に関
し、特に、水中構造物の修理,補強などの改修を行う際
に好適な仮締切構造体に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a temporary shutoff structure, and more particularly to a temporary shutoff structure suitable for repairing an underwater structure such as repairing and reinforcing.
【0002】[0002]
【従来の技術】地震などによる構造物の損傷および崩壊
などの被害は、陸上部の構造物に留まらず、河川や海上
部に構築されている水中構造物、例えば、橋梁基礎や護
岸などにも及んでいる。2. Description of the Related Art Damage such as damage and collapse of structures due to earthquakes is not limited to land-based structures, but also to underwater structures constructed on rivers and seas, such as bridge foundations and seawalls. Has been reached.
【0003】このような水中構造物が被害を受けた場合
にも陸上構造物と同様に、耐震補強対策を施す必要があ
る。河川や海上にある水中構造物に耐震補強を実施する
際には、構造物の周囲から水を排除して、ドライな環境
で作業を行う必要があることから、従来、二重締切工を
用いる工法が一般的に採用されている。[0003] Even when such underwater structures are damaged, it is necessary to take seismic reinforcement measures in the same manner as onshore structures. Conventionally, when performing seismic reinforcement of underwater structures on rivers and seas, it is necessary to remove water from the surroundings of the structure and work in a dry environment. The construction method is generally adopted.
【0004】この二重締切工法の代表的な施工状態を図
10に示している。同図に示した二重締切工法は、橋脚
1の補強改修工事を行う場合の適用例であり、フーチン
グ2の外周を取り囲むようにして仮締切工3が構築され
る。FIG. 10 shows a typical construction state of the double closing method. The double closing method shown in the figure is an example of an application in the case of carrying out reinforcement and repair work of the pier 1, and the temporary closing 3 is constructed so as to surround the outer periphery of the footing 2.
【0005】仮締切工3は、フーチング2の外周側の水
底地盤中に矢板を打設して形成した内,外壁3a,3b
と、この内,外壁3a,3b間を連結する複数のタイロ
ッド3cとから構成されている。[0005] Temporary cut-off work 3 includes inner and outer walls 3a, 3b formed by driving sheet piles into the underwater ground on the outer peripheral side of the footing 2.
And a plurality of tie rods 3c connecting between the inner and outer walls 3a and 3b.
【0006】この仮締切工3では、内,外壁3a,3b
間に中詰め土砂4を充填することにより、止水性と安定
性とを確保して、内壁3a内の水を排除することでドラ
イ状態にし、橋脚1の外周に補強工5を施す改修工事が
行われる。In this temporary closing work 3, the inner and outer walls 3a, 3b
The renovation work to secure the water stoppage and the stability by filling the middle filling earth and sand 4 in between, to make it dry by removing the water in the inner wall 3a, and to carry out the reinforcement work 5 on the outer periphery of the pier 1 Done.
【0007】しかしながら、このような従来の二重締切
工法には、以下に説明する技術的な課題があった。However, such a conventional double closing method has the following technical problems.
【0008】[0008]
【発明が解決しようとする課題】すなわち、前述した二
重締切工法では、矢板の打設,撤去を伴うため、組立,
解体に時間と手間が掛かり、仮設構造物の築造,撤去費
用が全体の工費中に大きな割合を占めるという問題があ
った。That is, in the above-mentioned double closing method, the sheet pile is driven and removed.
Dismantling takes time and effort, and construction and removal costs for temporary structures account for a large proportion of the total construction costs.
【0009】また、図10に示したように、橋梁上部の
桁下に矢板を打設する際には、クリアランスの関係から
長尺物の施工が困難になるため、短尺物の継ぎ足しとな
り、使用機械の制限も受けるので、より一層施工に時間
がかかるという問題もあった。Further, as shown in FIG. 10, when a sheet pile is driven under a girder at the top of a bridge, it becomes difficult to construct a long object due to clearance. There is also a problem that the construction takes more time because of the limitations of the machine.
【0010】さらに、二重締切工法では、広い面積を長
期間占有することになるので、流水の阻害および水上交
通の妨げになり、通年施工が困難になるという問題もあ
った。In addition, the double closing method occupies a large area for a long period of time, which hinders running water and hinders water traffic, and has a problem that it is difficult to perform construction year-round.
【0011】さらに、中詰め土砂4を充填すると、砂の
投入,撤去時に水質汚濁問題が発生する恐れがあった。
そこで、本発明者らは、このような問題が解決できる仮
締切工法を開発し、特願平9−178603号で既に提
案している。Further, when the earth filling 4 is filled, there is a possibility that a problem of water pollution may occur when the sand is charged or removed.
Therefore, the present inventors have developed a temporary closing method capable of solving such a problem, and have already proposed it in Japanese Patent Application No. Hei 9-178603.
【0012】この出願にかかる工法は、プレキャストパ
ネルを用いることにより、組立,解体を容易にし、か
つ、水質汚濁の問題も解決するものであるが、その後の
検討によると、次のような問題があった。The construction method according to this application makes it easy to assemble and disassemble by using a precast panel and solves the problem of water pollution. However, according to the subsequent studies, the following problems are found. there were.
【0013】前記出願にかかる仮締切工法では、プレキ
ャストパネルを積層状態に組立てた仮締切工を基礎部分
の上部に載置して、定着アンカーを用いてプレストレス
力を導入することによりこれらを一体化させる。In the temporary closing method according to the above-mentioned application, a temporary closing work in which precast panels are assembled in a laminated state is placed on the upper portion of a base portion, and a prestressing force is introduced using a fixing anchor to integrate them. To
【0014】ところが、このような構成では、基礎部分
の天端面が傾斜していたり、あるいは、天端面に凹凸が
あったり、さらには、天端面に埋込み金具が突出してい
ると、止水材との密着性に欠け良好な止水効果が得られ
ないという問題があった。However, in such a configuration, if the top end face of the base portion is inclined, or if the top end face has irregularities, or if the embedded metal fitting protrudes from the top end face, the water stopping material and However, there was a problem in that a good water stopping effect could not be obtained due to lack of adhesion.
【0015】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、良
好な止水効果が得られる仮締切構造体を提供することに
ある。The present invention has been made in view of such conventional problems, and an object of the present invention is to provide a temporary shutoff structure capable of obtaining a good water stopping effect.
【0016】[0016]
【課題を解決するための手段】上記目的を達成するため
に、本発明は、橋梁基礎などの水中構造物の外周を仮締
切工で囲撓し、前記仮締切工の内部を排水して、前記水
中構造物の修理,補強などの改修を行う仮締切構造体に
おいて、前記仮締切工は、施工現場において、周及び上
下方向の各接合部分にシール材を介在させて、前記水中
構造物の外周に筒状に積層される複数のプレキャストパ
ネルを備え、積層された前記プレキャストパネルを、前
記水中構造物の基礎部分上に載置して、前記基礎部分に
一端が定着された複数の定着アンカーにプレストレス力
を導入して、前記基礎部分と一体化させることにより構
築されるものであり、前記基礎部分上に載置される1段
目の前記プレキャストパネルの下端面と前記基礎部分の
上端面との間に止水用モルタル層を設けた。このように
構成した仮締切構造体によれば、プレキャストパネル
は、予め工場生産することができるので、高品質のもの
が得られるとともに、組立,解体が簡単になり、水質汚
濁の問題も発生しないし、基礎部分上に載置される1段
目のプレキャストパネルの下端面と基礎部分の上端面と
の間に止水用モルタル層を設けているので、基礎部分の
天端面に傾斜,凹凸,埋込み金具の突出などがあって
も、両者間の止水性を確保することができる。前記プレ
キャストパネルは、周方向に連結された状態で外周面を
画成するスキンプレートと、前記スキンプレートの周方
向の端縁に垂設固定された複数の縦梁と、前記スキンプ
レートの上下方向の端縁にあって、その内面に沿って固
設され、連結状態で環状に形成される複数の横梁とを備
え、1段目に配置される前記プレキャストパネルの前記
横梁の下面に、前記基礎部分の外周に沿って延びるスカ
ート部を設け、前記横梁とスカート部及び基礎部分の外
周面とで隔成された空間内にモルタルを充填することに
より前記止水用モルタル層を確実に形成することができ
る。前記スカート部の下端を水底地盤中に貫入するとと
もに、前記横梁の下面側に、先端側が前記基礎部分の上
面に摺接して、前記空間の内方側を隔成する可撓性部材
を設けることができる。この構成によれば、モルタル層
の形成材料の流出を防ぐことができる。前記縦梁には、
前記プレキャストパネルを周方向に連結した際に、連結
したプレキャストパネルの水平移動を許容する凹凸嵌合
からなるヒンジ構造部を設けることができる。この構成
によれば、ヒンジ構造部の形状が単純なので、加工が容
易に行える。In order to achieve the above object, the present invention provides a method for bending a perimeter of an underwater structure such as a bridge foundation with a temporary deadline, draining the inside of the temporary deadline, In the temporary closing structure for repairing and repairing the underwater structure, the temporary closing work includes, at a construction site, interposing a sealing material at each joint in a circumferential direction and a vertical direction to form the underwater structure. A plurality of precast panels stacked in a cylindrical shape on the outer periphery, the stacked precast panels are mounted on a base portion of the underwater structure, and a plurality of anchors having one end fixed to the base portion. And a prestressing force is introduced into the base portion to be integrated with the base portion, and the lower end face of the first-stage precast panel placed on the base portion and the base portion are Stop between the end face It provided the use mortar layer. According to the temporary closing structure constructed as described above, the precast panel can be manufactured in advance at the factory, so that a high-quality one can be obtained, assembling and dismantling are simplified, and there is no problem of water pollution. The mortar layer for waterproofing is provided between the lower end surface of the first-stage precast panel placed on the base portion and the upper end surface of the base portion. Even if there is a projection of the embedding metal fitting, it is possible to ensure the waterproofness between the two. The precast panel includes a skin plate that defines an outer peripheral surface in a state where the skin plate is connected in a circumferential direction, a plurality of vertical beams vertically fixed to a circumferential edge of the skin plate, and a vertical direction of the skin plate. A plurality of cross beams which are fixed along the inner surface of the precast panel and are formed along the inner surface of the precast panel arranged in the first stage. Providing a skirt portion extending along the outer periphery of the portion, and filling the mortar into a space separated by the cross beam and the outer peripheral surface of the skirt portion and the base portion, thereby reliably forming the mortar layer for waterproofing. Can be. A lower end of the skirt portion penetrates into the underwater ground, and a flexible member is provided on the lower surface side of the cross beam, the leading end side of which is in sliding contact with the upper surface of the base portion to separate the inner side of the space. Can be. According to this configuration, it is possible to prevent the material for forming the mortar layer from flowing out. In the vertical beam,
When the precast panels are connected in the circumferential direction, a hinge structure portion having a concave-convex fitting allowing horizontal movement of the connected precast panels can be provided. According to this configuration, since the shape of the hinge structure is simple, the processing can be easily performed.
【0017】[0017]
【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付図面を参照にして詳細に説明する。図1
から図9は、本発明にかかる仮締切構造体の一実施例を
示している。同図に示す仮締切構造体は、水中構造物で
ある橋梁10の修理,補強などの改修工事を行う際に適
用した場合を例示している。Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG.
9 show an embodiment of the temporary closing structure according to the present invention. The temporary deadline structure shown in the figure illustrates an example in which the structure is applied to a repair work such as repair and reinforcement of a bridge 10 which is an underwater structure.
【0018】橋梁10は、橋脚12と、その下端に一体
的に形成された基礎部分であるフーチング14とを備え
ている。橋脚12は、その水平断面が略円形のものであ
り、フーチング14は、平面形状が円形に形成されてい
て、その下端の一部が水底地盤16中に埋没している。The bridge 10 includes a pier 12 and a footing 14 which is a foundation formed integrally with a lower end thereof. The pier 12 has a substantially circular horizontal section, and the footing 14 has a circular planar shape, and a part of the lower end is buried in the underwater ground 16.
【0019】本実施例の仮締切工18は、橋脚12の外
周を囲撓するように設置され、その内部側の水を排水し
て、橋脚12の外周にドライな環境条件を創出するため
に使用される。The temporary closing work 18 of the present embodiment is installed so as to bend the outer periphery of the pier 12 and drains water on the inner side thereof to create dry environmental conditions on the outer periphery of the pier 12. used.
【0020】仮締切工18は、橋脚12と同形状の同心
円状の構造体であって、橋脚12の鉛直方向および周方
向に沿って分断された実質的に同一構成の複数のプレキ
ャストパネル20を主要構成部材としている。円筒状に
組立てられた仮締切工18と橋脚12との間には、リン
グ状支保工42が介装されている。The temporary cutoff 18 is a concentric structure having the same shape as the pier 12 and includes a plurality of precast panels 20 having substantially the same configuration and divided along the vertical direction and the circumferential direction of the pier 12. It is a main component. A ring-shaped support 42 is interposed between the temporary deadline 18 and the pier 12 assembled in a cylindrical shape.
【0021】各プレキャストパネル20は、本実施例の
場合には、円を等角度間隔で4分割された形状になって
いて、図3にその詳細を示すように、スキンプレート2
0aと、複数の縦梁20bと、一対の横梁20cと、複
数の縦リブ20dとを有している。In this embodiment, each precast panel 20 has a shape obtained by dividing a circle into four at equal angular intervals, and as shown in FIG.
0a, a plurality of vertical beams 20b, a pair of horizontal beams 20c, and a plurality of vertical ribs 20d.
【0022】スキンプレート20aは、円弧状に屈曲し
ていて、プレキャスパネル20を周および鉛直方向に連
結した際に、円筒状になって、仮締切工18の外周面を
隔成する。The skin plate 20a is bent in an arc shape, and when the pre-cas panel 20 is connected in the circumferential and vertical directions, it becomes cylindrical and separates the outer peripheral surface of the temporary closing work 18.
【0023】縦梁20bは、スキンプレート20aの周
方向の両端と、その中央部分に配置されていて、スキン
プレート20aの内面の鉛直方向に固設されている。ス
キンプレート20aの両端に固設された一対の縦梁20
bの外周面には、後述するヒンジ構造部を構成する凹部
20eと凸部20fが、鉛直方向に沿って設けられてい
る。The vertical beams 20b are arranged at both ends in the circumferential direction of the skin plate 20a and at the center thereof, and are fixed in the vertical direction on the inner surface of the skin plate 20a. A pair of longitudinal beams 20 fixed to both ends of the skin plate 20a
A concave portion 20e and a convex portion 20f constituting a hinge structure portion described later are provided on the outer peripheral surface of b in the vertical direction.
【0024】一対の横梁20cは、円弧状の平板から構
成され、スキンプレート20aおよび縦梁20bの上下
方向の端面に固設されている。この横梁20cは、プレ
キャストパネル20を周鉛直方向に連結した際に環状と
なり、仮締切工18の強度を補強する。なお、この横梁
20cは、一対に限ることはなく、スキンプレート20
aの上下方向の中間に設けてもよい。The pair of cross beams 20c are formed of circular flat plates, and are fixed to the vertical end faces of the skin plate 20a and the vertical beams 20b. The cross beam 20 c becomes annular when the precast panel 20 is connected in the circumferential vertical direction, and reinforces the strength of the temporary closing work 18. The cross beam 20c is not limited to a pair, but may be a skin plate 20c.
It may be provided in the middle of the vertical direction of a.
【0025】また、第1段目に配置されるプレキャスト
パネル20の下方の各横梁20cには、後述するモルタ
ル充填用空間を確保するためのアンカーボルト28の挿
通孔20gが貫通形成されている。なお、図3に符号2
0hで示した部分は、プレキャストパネル20を上下方
向に連結する際に使用されるボルトの挿通孔である。Each of the horizontal beams 20c below the precast panel 20 arranged in the first stage has a through hole 20g for an anchor bolt 28 for securing a mortar filling space described later. Note that FIG.
The portion indicated by 0h is an insertion hole for a bolt used when connecting the precast panel 20 in the vertical direction.
【0026】縦リブ20dは、スキンプレート20aの
内周面側にあって、その鉛直方向に延設固定され、スキ
ンプレート20aの強度を補強している。なお、この縦
リブ20dは、例えば、スキンプレート20aの厚みを
大きくした場合などには、必ずしも必要としない。The vertical rib 20d is located on the inner peripheral surface side of the skin plate 20a and is extended and fixed in the vertical direction to reinforce the strength of the skin plate 20a. Note that the vertical rib 20d is not always necessary when, for example, the thickness of the skin plate 20a is increased.
【0027】リング状支保工42は、仮締切工18の上
下方向に所定の間隔を隔てて段状に設置され、その詳細
を図4,5に示すように、橋脚12の外周面に当接する
内リング材42aと、環状に組立てられたプレキャスト
パネル20の縦梁20bの内面に当接する外リング材4
2bと、内,外リング材42a,42b間に架設された
複数の切梁42cとを備えている。The ring-shaped shoring 42 is installed in a stepped manner at a predetermined interval in the vertical direction of the temporary cofferdam 18, and abuts against the outer peripheral surface of the pier 12 as shown in FIGS. The inner ring member 42a and the outer ring member 4 which comes into contact with the inner surface of the longitudinal beam 20b of the precast panel 20 assembled in an annular shape.
2b and a plurality of cutting beams 42c provided between the inner and outer ring members 42a and 42b.
【0028】このように構成されたリング状支保工42
は、プレキャストパネル20と同様に、周方向に分断し
て、予めプレキャスト製品として製作され、施工現場に
運搬した後に環状に組立られる。The ring-shaped support 42 constructed as described above
As in the case of the precast panel 20, is divided in the circumferential direction, manufactured in advance as a precast product, transported to a construction site, and assembled into a ring.
【0029】この場合、内,外リング材42a,42b
の内径及び外径は、予め橋脚12の外径と仮締切工18
の縦梁20bの内径とにそれぞれ合わせて設計される
が、内,外リング材42a,42bと橋脚12乃至は縦
梁20bとの間に隙間があれば、隙間に楔や高圧気体が
封入された袋体などの間隔調整材44を挿入することに
より、両者間を密着させる。In this case, the inner and outer ring members 42a, 42b
The inner and outer diameters of the bridge pier 12 and the temporary
Is designed in accordance with the inner diameter of the vertical beam 20b. If there is a gap between the inner and outer ring members 42a and 42b and the pier 12 or the vertical beam 20b, a wedge or a high-pressure gas is filled in the gap. By inserting an interval adjusting member 44 such as a closed bag, the two are brought into close contact with each other.
【0030】次に、上記構成のプレキャストパネル20
を用いて、仮締切工18を組立てる手順について説明す
る。仮締切工18を組立てる際には、プレキャストパネ
ル20およびリング状支保工42は、橋梁10の改修現
場近傍の製作ヤードで製造され、橋梁10の近傍まで運
搬される。Next, the precast panel 20 having the above structure
The procedure for assembling the temporary closing work 18 will be described with reference to FIG. When assembling the temporary closing work 18, the precast panel 20 and the ring-shaped support structure 42 are manufactured in a production yard near the repair site of the bridge 10 and transported to the vicinity of the bridge 10.
【0031】一方、フーチング14には、図6および図
7に示すように、下端がフーチング14に貫入固設され
たアンカーボルト28が周方向に所定の間隔を隔てて植
設される。On the other hand, as shown in FIGS. 6 and 7, an anchor bolt 28 whose lower end is fixedly penetrated into the footing 14 is planted at a predetermined interval in the circumferential direction.
【0032】運搬された、プレキャストパネル20およ
びリング状支保工42は、まず、図6に示すように、リ
ング状支保工42が環状に組立てられ、橋脚12の外周
に設置され、吊りワイヤー60により海面上に支持され
る。The transported precast panel 20 and ring-shaped support 42 are first assembled into a ring-shaped support 42 as shown in FIG. 6 and installed on the outer periphery of the pier 12. Supported on sea level.
【0033】リング状支保工42の設置が終了すると、
その外リング材42bをガイドとして、外リング材42
bの外周側にプレキャストパネル20の1段分を周方向
に連結して組立てる。When the installation of the ring-shaped support 42 is completed,
Using the outer ring member 42b as a guide,
One stage of the precast panel 20 is connected to the outer peripheral side of b in the circumferential direction and assembled.
【0034】図8には、プレキャストパネル20の分断
位置での連結状態が示されている。同図に示した連結状
態は、周方向に隣接する縦梁20b間に、止水シール材
34、具体的には、止水用ゴム板を介装し、予め縦梁2
0bに穿設されている貫通孔内にボルト36を挿通し
て、ナット38を螺着することで行われる。FIG. 8 shows a connected state of the precast panel 20 at the dividing position. In the connection state shown in the figure, a water-stop sealing material 34, specifically, a water-stop rubber plate is interposed between the vertical beams 20b adjacent in the circumferential direction.
This is performed by inserting a bolt 36 into a through hole drilled in Ob and screwing a nut 38.
【0035】止水シール材34は、縦梁20bに設けら
れている凹,凸部20e,fの両端側に配置される。プ
レキャストパネル20の周方向の端部に配置された各縦
梁20bには、それぞれ相互に嵌合可能な凹,凸部20
e,fが設けられている。この凹,凸部20e,fは、
周方向に隣接する縦梁20bを連結した際に、ヒンジ構
造部を構成する。The water-stopping sealing material 34 is disposed at both ends of the concave and convex portions 20e and 20f provided on the vertical beam 20b. Each longitudinal beam 20b arranged at the circumferential end of the precast panel 20 has concave and convex portions 20 which can be fitted to each other.
e and f are provided. These concave and convex portions 20e, f
When the longitudinal beams 20b adjacent in the circumferential direction are connected, a hinge structure is formed.
【0036】この場合、ボルト36が挿入される貫通孔
は、水平方向にボルト36の直径よりも長く形成されて
いて、ボルト36とナット38とで連結されたプレキャ
ストパネル20が、水平方向に移動できるようになって
いる。In this case, the through hole into which the bolt 36 is inserted is formed to be longer than the diameter of the bolt 36 in the horizontal direction, and the precast panel 20 connected by the bolt 36 and the nut 38 moves in the horizontal direction. I can do it.
【0037】ボルト36,ナット38の結合により、4
個のプレキャストパネル20が周方向に連結されて、1
段分の環状部分が形成されると、組立てられた部分を沈
設した後に、その上段側に同様な方法により、プレキャ
ストパネル20を順次積層し、分断位置を同様にボルト
ナット36,38により連結する。By connecting the bolt 36 and the nut 38, 4
Pieces of precast panels 20 are connected in the circumferential direction,
When the annular portion for the step is formed, after the assembled part is laid down, the precast panels 20 are sequentially laminated on the upper side by the same method, and the dividing positions are similarly connected by the bolts and nuts 36 and 38. .
【0038】なお、図8中に符号40で示した部材は、
連結される一方の縦梁20bの一方に設けられた裏当板
であって、この裏当板40は、パネル20を周方向に組
付ける際のガイドとして用いる。The member indicated by reference numeral 40 in FIG.
A backing plate provided on one of the linked vertical beams 20b, and the backing plate 40 is used as a guide when the panel 20 is assembled in the circumferential direction.
【0039】このようなプレキャストパネル20の組立
に際して、プレキャストパネル20は、例えば、図6に
示すように、浮体や桟橋などの浮台62により支持して
行い、リング状支保工42は、図6に示した位置に留
め、各プレキャストパネル20を環状に組立てる際のガ
イドとして使用する。At the time of assembling the precast panel 20, the precast panel 20 is supported by a float 62 such as a floating body or a pier as shown in FIG. 6, for example. And used as a guide when assembling each precast panel 20 in an annular shape.
【0040】このとき、上下方向に位置するプレキャス
トパネル20の横梁20c間には、図9に示すように、
シール材35を介在させて、横梁20c間をボルトナッ
トで緊結する。At this time, as shown in FIG. 9, between the cross beams 20c of the precast panel 20 positioned in the vertical direction,
With the sealing member 35 interposed, the cross beams 20c are tightened with bolts and nuts.
【0041】以上のようなプレキャストパネル20の組
立を継続して行い、1段目のプレキャストパネル20が
フーチング14の上面近傍に到達すると、図7に示すよ
うに、フーチング14に植設されているアンカーボルト
28を、横梁20cの挿通孔20g内に挿入させて、ア
ンカーボルト28を横梁20cに溶接やナットを螺着す
ることなどにより固設する。The assembly of the precast panel 20 as described above is continued, and when the first-stage precast panel 20 reaches the vicinity of the upper surface of the footing 14, it is implanted in the footing 14 as shown in FIG. The anchor bolt 28 is inserted into the insertion hole 20g of the cross beam 20c, and the anchor bolt 28 is fixed to the cross beam 20c by welding or screwing a nut.
【0042】このときのアンカーボルト28の固設位置
は、横梁20cの下面が、フーチング14の上面から上
方に所定間隔隔てた位置になるようにして、止水モルタ
ル層24の充填間隔を確保する。At this time, the anchor bolt 28 is fixed at such a position that the lower surface of the cross beam 20c is located at a predetermined distance above the upper surface of the footing 14 to secure the filling interval of the water stopping mortar layer 24. .
【0043】止水モルタル層24は、1段目のパネル2
0の横梁20cの下面側に固設され、フーチング14の
側面に沿って下方に延びるスカート部26と、フーチン
グ14の上及び側面で画成される空間内にモルタルを充
填することにより形成される。The waterproof mortar layer 24 is formed by the first-stage panel 2
A skirt portion 26 fixed to the lower surface of the cross beam 20c and extending downward along the side surface of the footing 14, and is formed by filling mortar into a space defined by the upper and side surfaces of the footing 14. .
【0044】スカート部26は、フーチング14上に載
置されるパネル20の1段目にのみ設けられていて、プ
レキャストパネル20を環状に組立てた際に、フーチン
グ14の側面から所定の間隔を隔てて、その側面を環状
に囲繞するようになる。The skirt portion 26 is provided only at the first stage of the panel 20 placed on the footing 14. When the precast panel 20 is assembled in an annular shape, the skirt portion 26 is separated from the side surface of the footing 14 by a predetermined distance. As a result, the side surface is annularly surrounded.
【0045】この場合、スカート部26の下端側の一部
が水底地盤16中に貫入するように設置し、必要に応じ
て地盤16上に埋戻し土を覆設することで、空間内に充
填したモルタルの外方への流出を防止する。スカート部
26の背面側には、補強プレート27が固設されてい
る。In this case, a part of the lower end of the skirt portion 26 is installed so as to penetrate into the underwater ground 16, and if necessary, the backfill soil is laid on the ground 16 to fill the space. To prevent the mortar from flowing out. On the back side of the skirt 26, a reinforcing plate 27 is fixedly provided.
【0046】また、充填したモルタルが内方側に流出す
ることを防ぐために、横梁20cの内側にゴム板などの
可撓性部材30を固着しておき、この可撓性部材30の
先端側を紐などで内側に引張ることなどにより、可撓性
部材30の先端がフーチング14の上面に沿って屈曲さ
せるようにする。Further, in order to prevent the filled mortar from flowing inward, a flexible member 30 such as a rubber plate is fixed inside the cross beam 20c, and the distal end side of the flexible member 30 is fixed. The distal end of the flexible member 30 is bent along the upper surface of the footing 14 by, for example, being pulled inward with a string or the like.
【0047】止水用モルタル層24を形成するためのモ
ルタルは、横梁20cを一端が貫通するように設けられ
た注入管32を介して注入される。止水モルタル層24
が形成されると、プレキャストパネル20の組立作業が
再開され、所定の段数のプレキャストパネル20の積層
連結が終了すると、プレキャストパネル20と橋脚12
との間にリング状支保工42が設置される。The mortar for forming the water stopping mortar layer 24 is injected through an injection pipe 32 provided so that one end penetrates the cross beam 20c. Water stop mortar layer 24
Is formed, the assembling work of the precast panel 20 is restarted, and when the lamination connection of the precast panel 20 of the predetermined number of stages is completed, the precast panel 20 and the pier 12 are connected.
A ring-shaped support 42 is installed between the two.
【0048】リング状支保工42の設置位置は、本実施
例の場合には、図4に示すように、プレキャストパネル
20の周方向の分断位置、すなわち、縦梁20cの位置
に切梁42cが対応するように設定される。In the case of the present embodiment, as shown in FIG. 4, the ring-shaped supporter 42 is installed at a position where the precast panel 20 is divided in the circumferential direction, that is, at the position of the vertical beam 20c. It is set to correspond.
【0049】また、リング状支保工42は、構築する仮
締切工18の大きさや高さなどに対応して、鉛直方向に
多段状に設置される。支保工42を設置して、積層され
た仮締切工18の安定性が確保されると、積層連結され
たプレキャストパネル20とフーチング14とが一体化
された止水構造の仮締切工18が完成する。The ring-shaped supports 42 are installed in multiple stages in the vertical direction corresponding to the size and height of the temporary closing work 18 to be constructed. When the support 42 is installed and the stability of the laminated temporary cutoff 18 is secured, the temporary cutoff 18 having a water-stop structure in which the laminated and connected precast panel 20 and footing 14 are integrated is completed. I do.
【0050】仮締切工18が完成すると、内部の水を排
水して、橋脚12の周囲にドライな作業空間を創り出
し、橋脚12やフーチング14の補強などの改修作業が
行われ、改修作業が終了すると、仮締切工18内に水を
導入して、組立時と逆の作業を行うことにより、仮締切
工18の解体,撤去が行われる。When the temporary closing work 18 is completed, the internal water is drained, a dry working space is created around the pier 12, and repair work such as reinforcement of the pier 12 and the footing 14 is performed, and the repair work is completed. Then, water is introduced into the temporary cofferdam 18 and the work reverse to that at the time of assembly is performed, so that the temporary cofferdam 18 is dismantled and removed.
【0051】さて、以上のように構成された仮締切構造
体によれば、仮締切工18の主要部分となるプレキャス
トパネル20は、予め工場生産するので、高品質なもの
が得られるとともに、これを水中構造物の改修現場まで
運搬した後に、周方向の分断部分および上下方向の接合
部分にシール材34,35を介在させて環状に組立て、
アンカーボルト28によりフーチング14に固定して構
築するので、矢板の打設などのような現場工事が非常に
少なく、このため仮締切工18を簡単かつ迅速に構築す
ることができる。According to the temporary closing structure constructed as described above, the precast panel 20, which is a main part of the temporary closing work 18, is manufactured in advance in a factory, so that a high-quality panel can be obtained. After being transported to the underwater structure rehabilitation site, it is assembled into a ring with sealing materials 34 and 35 interposed between the circumferentially divided portion and the vertically joined portion,
Since the construction is fixed to the footing 14 by the anchor bolts 28, the number of site works such as the driving of a sheet pile is extremely small, and thus the temporary closing work 18 can be constructed easily and quickly.
【0052】また、改修工事後の撤去も簡単に行え、急
速施工に適したものとなる。さらに、本実施例の場合に
は、仮締切工18をフーチング14の上面側に構築し、
従来の仮締切工のように二重構造と異なり、一重構造な
ので、仮締切工18は、フーチング14の大きさよりも
小さくなり、広い面積を占有しないので、水上交通の障
害にならない。また、本発明の仮締切工18は、中詰め
土砂が不要になるので、水質を汚濁することもない。Further, removal after the renovation work can be easily performed, which is suitable for rapid construction. Further, in the case of the present embodiment, the temporary closing work 18 is constructed on the upper surface side of the footing 14,
Unlike the conventional temporary closing work, which is a single structure unlike a double structure, the temporary closing work 18 is smaller than the size of the footing 14 and does not occupy a large area, so that it does not hinder water traffic. In addition, the temporary closing work 18 of the present invention does not need to be filled with soil, so that the water quality is not polluted.
【0053】以上の作用効果に加えて本実施例の場合に
は、フーチング14上に載置される1段目のプレキャス
トパネル20の下端面とフーチング14の上端面との間
に止水用モルタル層24を設けているので、フーチング
14の天端面に傾斜,凹凸,埋込み金具の突出などがあ
っても、両者間の止水性を確保することができる。In the present embodiment, in addition to the above-described functions and effects, the water stopping mortar is provided between the lower end surface of the first-stage precast panel 20 mounted on the footing 14 and the upper end surface of the footing 14. Since the layer 24 is provided, even if the top end surface of the footing 14 has an inclination, unevenness, protrusion of an embedded metal fitting, or the like, the waterproofness between the two can be ensured.
【0054】またさらに、本実施例の場合には、プレキ
ャストパネル20を周方向に連結した際に、連結したプ
レキャストパネル20の水平移動を許容するヒンジ構造
部となる凹,凸部20e,fを設けているので、仮締切
工18に偏荷重が加わった際に、仮締切工18に曲げ応
力が作用しないようにすることができる。Further, in the case of this embodiment, when the precast panels 20 are connected in the circumferential direction, the concave and convex portions 20e and 20f serving as hinge structures for allowing the connected precast panels 20 to move horizontally are formed. Since it is provided, it is possible to prevent the bending stress from acting on the temporary closing 18 when an unbalanced load is applied to the temporary closing 18.
【0055】この場合、凹凸嵌合のヒンジ構造部は、形
状が単純で加工が簡単に行え、経済的な面で非常に有利
になる。In this case, the hinge structure of the concave-convex fitting has a simple shape, can be easily processed, and is very advantageous in terms of economy.
【0056】なお、上記実施例では、円形断面の仮締切
工18を例示したが、本発明の実施は、この形状に限定
されることはなく、例えば、多角形状や楕円形状,長円
形状にも適用することができる。In the above-described embodiment, the temporary closing work 18 having a circular cross section is exemplified. However, the present invention is not limited to this shape. For example, the temporary closing work 18 may be formed into a polygonal shape, an elliptical shape, or an oval shape. Can also be applied.
【0057】また、プレキャストパネル20の周方向の
分割数も4に限ることはなく、構築しようとする仮締切
工の大きさに応じて適宜選択することができる。The number of divisions of the precast panel 20 in the circumferential direction is not limited to four, and can be appropriately selected according to the size of the temporary closing work to be constructed.
【0058】[0058]
【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる仮締締切構造体によれば、以下の作用効
果が得られる。 .プレキャストパネルは、工場生産が可能であり、こ
のため高品質なものが得られるとともに、その転用も可
能なので、経済的な面でも有利になる。 .一重構造で、コンパクトな構造なため、急速施工に
適し、かつ、広い占有面積を必要としないので、経済的
であり、水上交通の妨げにならない。 .フーレキャストパネルの下端面と基礎部分の上端面
との間に形成する止水用モルタル層は、硬化するまでは
流動性を有しているので、基礎部分の天端面の凹凸や傾
斜などの変形に追随することができ、パネルと基礎部分
との間が良好に密着し、十分な止水効果が得られる。As described above in detail in the embodiments,
According to the temporary closing structure according to the present invention, the following operational effects can be obtained. . The precast panel can be manufactured in a factory, so that a high-quality panel can be obtained, and the precast panel can be diverted, which is advantageous in terms of economy. . Since it has a single structure and a compact structure, it is suitable for rapid construction and does not require a large occupation area, so it is economical and does not hinder water traffic. . The water-stopping mortar layer formed between the lower end face of the cast cast panel and the upper end face of the foundation has fluidity until it hardens, so deformation such as unevenness and inclination of the top end face of the foundation And a good adhesion between the panel and the base portion, and a sufficient water stopping effect can be obtained.
【図1】この発明にかかる仮締切構造体の組立状態の半
断面図である。FIG. 1 is a half sectional view of an assembly state of a temporary closing structure according to the present invention.
【図2】図1の上面図である。FIG. 2 is a top view of FIG.
【図3】図1に示した仮締切構造体で用いるプレキャス
トパネルの斜視図である。FIG. 3 is a perspective view of a precast panel used in the temporary closing structure shown in FIG.
【図4】図2の要部拡大図である。FIG. 4 is an enlarged view of a main part of FIG. 2;
【図5】図1のA部拡大図である。FIG. 5 is an enlarged view of a portion A in FIG. 1;
【図6】この発明にかかる仮締切構造体の組立て状態の
説明図である。FIG. 6 is an explanatory view of an assembled state of the temporary closing structure according to the present invention.
【図7】図1のB部拡大図である。FIG. 7 is an enlarged view of a portion B in FIG. 1;
【図8】図2のC部拡大図である。FIG. 8 is an enlarged view of a portion C in FIG. 2;
【図9】図1のD部拡大図である。FIG. 9 is an enlarged view of a part D in FIG. 1;
【図10】従来の二重締切工法の一例を示す平面および
断面説明図である。FIG. 10 is a plan view and a sectional view showing an example of a conventional double cutoff method.
10 橋梁 12 橋脚 14 フーチング 18 仮締切工 20 プレキャストパネル 20a スキンプレート 20b 縦梁 20c 横梁 20d 縦リブ 24 止水用モルタル層 26 スカート部 28 アンカーボルト 32 注入管 34 止水シール材 35 シール材 42 リング状支保工 DESCRIPTION OF SYMBOLS 10 Bridge 12 Bridge pier 14 Footing 18 Temporary closing 20 Precast panel 20a Skin plate 20b Vertical beam 20c Horizontal beam 20d Vertical rib 24 Waterproof mortar layer 26 Skirt part 28 Anchor bolt 32 Injection pipe 34 Waterproof sealing material 35 Sealing material 42 Ring shape Shoring
Claims (4)
切工で囲撓し、前記仮締切工の内部を排水して、前記水
中構造物の修理,補強などの改修を行う仮締切構造体に
おいて、 前記仮締切工は、施工現場において、周及び上下方向の
各接合部分にシール材を介在させて、前記水中構造物の
外周に筒状に積層される複数のプレキャストパネルを備
え、 積層された前記プレキャストパネルを、前記水中構造物
の基礎部分上に設置して、前記基礎部分に一端が定着さ
れた複数のアンカーにより前記基礎部分と一体化させる
ことにより構築されるものであり、 前記基礎部分上に積層される1段目の前記プレキャスト
パネルの下端面と前記基礎部分の上端面との間に止水用
モルタル層を設けたことを特徴とする仮締切構造体。1. A temporary deadline structure in which the outer periphery of an underwater structure such as a bridge foundation is bent by a temporary deadline, and the inside of the temporary deadline is drained to repair or reinforce the underwater structure. In the body, the temporary closing work includes a plurality of precast panels that are laminated in a tubular shape on the outer periphery of the underwater structure with a sealing material interposed at each joint in the circumferential and vertical directions at a construction site, The precast panel is installed on a base portion of the underwater structure, and is constructed by integrating the base portion with a plurality of anchors each having one end fixed to the base portion, A temporary closing structure, wherein a mortar layer for waterproofing is provided between a lower end surface of the first-stage precast panel laminated on a base portion and an upper end surface of the base portion.
結された状態で外周面を画成するスキンプレートと、 前記スキンプレートの周方向の端縁に垂設固定された複
数の縦梁と、 前記スキンプレートの上下方向の端縁にあって、その内
面に沿って固設され、連結状態で環状に形成される複数
の横梁とを備え、 1段目に配置される前記プレキャストパネルの前記横梁
の下面に、前記基礎部分の外周に沿って延びるスカート
部を設け、 前記横梁とスカート部及び基礎部分の外周面とで隔成さ
れた空間内にモルタルを充填することにより前記止水用
モルタル層を形成することを特徴とする請求項1記載の
仮締切構造体。2. The precast panel, wherein a skin plate defining an outer peripheral surface in a state of being connected in a circumferential direction, a plurality of vertical beams vertically fixed to a peripheral edge of the skin plate, A plurality of cross beams which are fixed along the inner surface of the skin plate in the up-down direction and are formed in an annular shape in a connected state; On the lower surface, a skirt portion extending along the outer periphery of the base portion is provided, and the water blocking mortar layer is filled by filling mortar in a space separated by the cross beam and the outer peripheral surface of the skirt portion and the base portion. The temporary closing structure according to claim 1, wherein the temporary closing structure is formed.
入するとともに、前記横梁の下面側に、先端側が前記基
礎部分の上面に摺接して、前記空間の内方側を隔成する
可撓性部材を設けたことを特徴とする請求項2記載の仮
締切構造体。3. A flexible member that penetrates a lower end of the skirt portion into the underwater ground, and has a front end side slidably in contact with a lower surface side of the cross beam and an upper surface of the base portion to separate an inner side of the space. The temporary closing structure according to claim 2, further comprising a sex member.
を周方向に連結した際に、連結したプレキャストパネル
の水平移動を許容する凹凸嵌合からなるヒンジ構造部を
設けたことを特徴とする請求項2記載の仮締切構造体。4. The vertical beam is provided with a hinge structure portion having a concave-convex fitting that allows horizontal movement of the connected precast panel when the precast panel is connected in the circumferential direction. Item 4. The temporary closing structure according to Item 2.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27711997A JP3928226B2 (en) | 1997-10-09 | 1997-10-09 | Temporary deadline structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27711997A JP3928226B2 (en) | 1997-10-09 | 1997-10-09 | Temporary deadline structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH11117316A true JPH11117316A (en) | 1999-04-27 |
| JP3928226B2 JP3928226B2 (en) | 2007-06-13 |
Family
ID=17579059
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP27711997A Expired - Lifetime JP3928226B2 (en) | 1997-10-09 | 1997-10-09 | Temporary deadline structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3928226B2 (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006249771A (en) * | 2005-03-10 | 2006-09-21 | Ohbayashi Corp | Water cut-off structure of temporary closing work and its water cut-off method |
| JP2007205077A (en) * | 2006-02-03 | 2007-08-16 | Shimizu Corp | Temporary deadline construction method |
| JP2007327244A (en) * | 2006-06-08 | 2007-12-20 | Kajima Corp | Temporary closing method and structure of underwater structure |
| JP2009019449A (en) * | 2007-07-13 | 2009-01-29 | Hirose & Co Ltd | Water cut-off structure for cofferdam and water cut-off method |
| JP2009068196A (en) * | 2007-09-11 | 2009-04-02 | Toyo Constr Co Ltd | Temporary wall construction method using steel segments |
| CN114991067A (en) * | 2022-05-23 | 2022-09-02 | 青岛西海岸市政工程有限公司 | Sluice construction is with having quick water blocking function's transition bridge |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105839653B (en) * | 2016-05-18 | 2018-06-08 | 中铁隧道集团二处有限公司 | A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system |
-
1997
- 1997-10-09 JP JP27711997A patent/JP3928226B2/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006249771A (en) * | 2005-03-10 | 2006-09-21 | Ohbayashi Corp | Water cut-off structure of temporary closing work and its water cut-off method |
| JP2007205077A (en) * | 2006-02-03 | 2007-08-16 | Shimizu Corp | Temporary deadline construction method |
| JP2007327244A (en) * | 2006-06-08 | 2007-12-20 | Kajima Corp | Temporary closing method and structure of underwater structure |
| JP2009019449A (en) * | 2007-07-13 | 2009-01-29 | Hirose & Co Ltd | Water cut-off structure for cofferdam and water cut-off method |
| JP2009068196A (en) * | 2007-09-11 | 2009-04-02 | Toyo Constr Co Ltd | Temporary wall construction method using steel segments |
| CN114991067A (en) * | 2022-05-23 | 2022-09-02 | 青岛西海岸市政工程有限公司 | Sluice construction is with having quick water blocking function's transition bridge |
| CN114991067B (en) * | 2022-05-23 | 2024-04-02 | 青岛西海岸市政工程有限公司 | Transition bridge with rapid water blocking function for sluice construction |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3928226B2 (en) | 2007-06-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3928225B2 (en) | Temporary deadline structure | |
| JP4793634B2 (en) | Temporary deadline construction method | |
| JP4698491B2 (en) | Temporary closing method and structure of underwater structure | |
| JP3054635B2 (en) | Construction method of attached structure | |
| JP3379391B2 (en) | Temporary deadline method and temporary deadline structure | |
| JP3928226B2 (en) | Temporary deadline structure | |
| JP2000265484A (en) | Construction method of underground structure by PCa pile ground wall | |
| JP2001107319A (en) | Aseismic reinforcing method of pier and aseismic reinforced structure | |
| JP4944691B2 (en) | Water stop structure and water stop method for temporary closing | |
| JP3903548B2 (en) | Hanging scaffold | |
| JPH06146305A (en) | Underwater foundation and installation method thereof | |
| KR100999410B1 (en) | Prefabricated bandages using perforated beams and prefabricated sleeves and underground structures for continuous construction of underground retaining walls using them | |
| JP3788245B2 (en) | Temporary deadline construction method | |
| JP7574372B2 (en) | Compression device and compression method for rock surrounding an underground structure, and underground structure integrated with the rock | |
| JP4475116B2 (en) | Vertical shaft structure and its construction method | |
| JP3387436B2 (en) | Temporary deadline method and temporary deadline structure | |
| CN115045338A (en) | Prestressed reinforcement assembly type multi-loop straight-through cable inspection well and construction method thereof | |
| JP2005240430A (en) | Building foundation and construction method | |
| JPH0324541B2 (en) | ||
| CN221276619U (en) | Foundation pit supporting structure and building foundation pit | |
| JPH1082055A (en) | Method of earthquake-resisting pile foundation construction | |
| JP4604771B2 (en) | Water shutoff structure and water stop method for temporary closing | |
| JP2005264500A (en) | Cofferdam structure and cofferdam closure method for underwater existing structure | |
| JPH073813A (en) | Construction of building foundation | |
| JP2006009258A (en) | Column-beam joining structure, construction method of column-beam joining structure, construction method of underground structure and building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040827 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060925 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061003 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061201 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070213 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070226 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100316 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110316 Year of fee payment: 4 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110316 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120316 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130316 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130316 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140316 Year of fee payment: 7 |
|
| EXPY | Cancellation because of completion of term |