JPH07108759B2 - Retractable crane - Google Patents

Retractable crane

Info

Publication number
JPH07108759B2
JPH07108759B2 JP63159181A JP15918188A JPH07108759B2 JP H07108759 B2 JPH07108759 B2 JP H07108759B2 JP 63159181 A JP63159181 A JP 63159181A JP 15918188 A JP15918188 A JP 15918188A JP H07108759 B2 JPH07108759 B2 JP H07108759B2
Authority
JP
Japan
Prior art keywords
sheave
link
boom
rope
top boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP63159181A
Other languages
Japanese (ja)
Other versions
JPH0213598A (en
Inventor
清 五味
清志 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP63159181A priority Critical patent/JPH07108759B2/en
Publication of JPH0213598A publication Critical patent/JPH0213598A/en
Publication of JPH07108759B2 publication Critical patent/JPH07108759B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は引込みクレーンにおいて、コンテナ荷役を行う
ための引込みクレーンに関するものである。
Description: [Industrial field of use] The present invention relates to a retractable crane for loading and unloading a container in a retractable crane.

〔従来の技術〕[Conventional technology]

引込みクレーンは、基台上に設けられたマスト、このマ
スト下部に回動自在に取付けられたメインブーム、この
メインブーム先端に回動自在に装着され、かつ吊荷を支
持するトップブーム、このトップブームの他端側をマッ
ト側に引張るテンションブームと、トップブームの先端
に設けられたシーブに巻回された巻上ロープによって吊
持される吊具、巻上ロープを巻上げるドラム、メインブ
ームの押出し引込みを行なう引込装置などを具備してい
る。このような引込みクレーンは、例えば、特開昭54−
67955号,特開昭54−122551号,特開昭55−35765号など
に明らかである。
The retractable crane consists of a mast provided on the base, a main boom rotatably attached to the lower part of the mast, a top boom that is rotatably attached to the tip of the main boom, and supports a suspended load. The tension boom that pulls the other end of the boom to the mat side, the lifting device that is suspended by the hoisting rope that is wound around the sheave provided at the tip of the top boom, the drum that hoists the hoisting rope, and the main boom It is equipped with a retraction device that performs extrusion retraction. Such a retractable crane is disclosed, for example, in JP-A-54-54.
67955, JP-A-54-122551 and JP-A-55-35765.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

このような引込みクレーンは一般にバケットやフックを
吊って荷役を行うように用いられる。
Such a retracting crane is generally used to carry a cargo by hanging a bucket or a hook.

従来、コンテナを吊る場合には、トップブームの下方に
平行に第1のリンクを設け、この第1のリンクとトップ
ブームの先端との間を第2のリンクで接続し、第1のリ
ンクと第2のリンクとの接続点に第2のシーブを設け、
トップブームの先端のシーブから直接に2本のロープを
吊下げ、他の2本のロープを前記先端のシーブから前記
第2のシーブを経由して吊下げ、4点吊りを行うように
している。
Conventionally, when suspending a container, a first link is provided in parallel below the top boom, and the first link and the tip of the top boom are connected by a second link, and the first link is connected to the first link. A second sheave is provided at the connection point with the second link,
Two ropes are hung directly from the sheave at the tip of the top boom, and the other two ropes are hung from the sheave at the tip via the second sheave to perform four-point suspension. .

一方、バケットやフックを吊る場合には、前記第1のリ
ンク、第2のリンク、第2のシーブを除き、4本のロー
プを先端のシーブから直接吊下げるようにしている。
On the other hand, when suspending a bucket or a hook, the four ropes are directly suspended from the sheave at the tip excluding the first link, the second link, and the second sheave.

メインブームの引込みに伴い荷物がほぼ水平に移動する
クレーンを水平引込みクレーンと云う。
A crane in which luggage moves almost horizontally as the main boom retracts is called a horizontal retract crane.

荷物が水平に移動すると云うことは、荷物を等速で、引
込み、押出しするためのエネルギーを必要としない。
The fact that the load moves horizontally does not require energy to pull in and push the load at a constant speed.

しかし、完全な水平軌跡を得るには機構が複雑となり実
用的でない。
However, the mechanism is complicated to obtain a perfect horizontal trajectory, which is not practical.

従来、近似的に水平となる機構を採用していたが、バケ
ット荷役およびフック荷役においては特に問題になるこ
とがなかった。
Conventionally, a mechanism that is approximately horizontal has been adopted, but there has been no particular problem in bucket cargo handling and hook cargo handling.

コンテナ荷役において4点吊を行う場合は、コンテナが
長尺であるためこの軌跡が重要な問題となってくる。
This locus becomes an important issue when four-point suspension is performed during container handling because the container is long.

完全な水平軌跡でないために、引込動作において、4点
吊の吊点の位置が変化するため、コンテナが長手方向に
傾き、地切りおよび着床時に非常に危険であった。
Since it is not a completely horizontal trajectory, the positions of the four hanging points change during the retracting operation, so the container tilts in the longitudinal direction, which is very dangerous during ground cutting and landing.

また、荷役を容易にするために吊具の傾転が望まれてい
る。
In addition, tilting of the hanger is desired in order to facilitate cargo handling.

本発明の目的は、4点吊を行う場合に、実用上問題とな
らない程度に完全な水平軌跡に近づけると共に、吊り具
の傾転を容易に行えるようにすることにある。
An object of the present invention is to make a four-point suspension approach a completely horizontal trajectory to such an extent that it is not a problem in practical use, and to make it possible to tilt the suspending tool easily.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

上記目的は、トップブームの先端にリンクを設け、トッ
プブームの先端のシーブを経由した4本のロープのう
ち、2本はそのまま吊具に連結し、他の2本のロープを
リンクに設けた2つのシーブを経由して吊具に連結し、
マストの下部に連結した2本のロープをマストの中間に
設置した第5のシーブ、メインブームとトップブームと
の連結点の近傍のシーブを経由して前記リンクの先端に
連結し、前記第5のシーブを移動可能に設けることによ
って、達成できる。
For the above purpose, a link is provided at the tip of the top boom, two of the four ropes that have passed through the sheaves at the tip of the top boom are directly connected to the hanger, and the other two ropes are provided at the link. Connect to the hanger via two sheaves,
Two ropes connected to the lower part of the mast are connected to the tip of the link via a fifth sheave installed in the middle of the mast and a sheave near the connection point between the main boom and the top boom, This can be achieved by movably providing the sheave of.

〔作 用〕[Work]

マストに設置した第5のシーブの位置はリンクに設置し
たシーブの上下方向の位置が、メインブームの引込み、
押出しによって、旋回半径が変化しても変化の少ない位
置に決めているため、吊具が旋回して、吊具(コンテ
ナ)の長手方向がブーム方向に一致した状態で地切りお
よび着床しても傾きが少ないため特に問題とならない。
The position of the fifth sheave installed on the mast is the vertical position of the sheave installed on the link.
Since it is set to a position that does not change much even if the turning radius changes due to extrusion, the lifting tool turns and the grounding and landing are performed with the longitudinal direction of the lifting tool (container) aligned with the boom direction. Since there is little inclination, there is no particular problem.

また、前記シーブを移動させれば、吊具が傾転する。Also, if the sheave is moved, the hanger tilts.

〔実 施 例〕〔Example〕

以下、本発明の詳細を図に示す一実施例により説明す
る。
Hereinafter, details of the present invention will be described with reference to an embodiment shown in the drawings.

第1図において、1は走行体2に載置した旋回体であ
り、水平面で旋回する。旋回体1には以下の装置が載っ
ている。5はメインブームで、引込装置6によって回動
する。引込装置6はマスト7に取付けている。メインブ
ーム5の先端にはトップブーム8が回動自在に取付けら
れている。トップブーム8の後端とマスト7との間はテ
ンションブーム9で連結している。10は釣合用の錘であ
る。
In FIG. 1, reference numeral 1 is a revolving structure mounted on a traveling structure 2 and revolving in a horizontal plane. The following device is mounted on the revolving structure 1. A main boom 5 is rotated by the retracting device 6. The retracting device 6 is attached to the mast 7. A top boom 8 is rotatably attached to the tip of the main boom 5. A tension boom 9 connects the rear end of the top boom 8 and the mast 7. 10 is a counterweight.

第1図〜第6図に示すように、マスト7の側面先端、ト
ップブーム8の後端および先端には4本のロープ15a,15
b,15c,15dの通るスーブ16,17,18,19がそれぞれ設けてあ
る。シーブ16,17,18,19はそれぞれ四つのシーブからな
る。外側のシーブ19a,19dを通るロープ15a,15dをドラム
21に巻取るようにしている。内側のシーブ19b,19cを通
るロープ15b,15cをドラム22に巻取るようにしている。2
5はトップブーム8の先端からリンク26で吊下げたシー
ブであり、旋回体2に設置したドラム27のロープ28で操
作される。ロープ28はマスト7に設置したシーブ69から
メインブーム5に沿って張られ、メインブーム5の先端
のシーブ29を通ってリンク30に連結している。リンク30
はシーブ25と同軸で連結している。シーブ25,29,69はお
のおの二つからなり、ロープ15a,15dの鉛直下に設置し
ている。ドラム21,22,27はおのおの単独で運転できる。
ドラム21と22は同期して運転できる。
As shown in FIG. 1 to FIG. 6, four ropes 15a, 15 are provided at the side end of the mast 7, the rear end and the end of the top boom 8.
Subs, 17, 17, 18, and 19 through which b, 15c, and 15d pass are provided, respectively. The sheaves 16,17,18,19 each consist of four sheaves. Drum rope 15a, 15d passing through outer sheave 19a, 19d
I'm trying to wind it up to 21. The ropes 15b and 15c passing through the inner sheaves 19b and 19c are wound around the drum 22. 2
Reference numeral 5 denotes a sheave suspended from the tip of the top boom 8 by a link 26, and is operated by a rope 28 of a drum 27 installed on the revolving structure 2. The rope 28 is stretched from the sheave 69 installed on the mast 7 along the main boom 5, and is connected to the link 30 through the sheave 29 at the tip of the main boom 5. Link 30
Is coaxially connected to the sheave 25. The sheaves 25, 29, 69 each consist of two pieces, and are installed vertically below the ropes 15a, 15d. Each of the drums 21, 22, 27 can be operated independently.
The drums 21 and 22 can be operated in synchronization.

トップブーム8の先端のシーブ25の周囲の構成につい
て、第7図,第11図により説明する。以後の説明はシー
ブ15a側について説明するが、シーブ19d側も原則として
同様の構成である。トップブーム8の先端のシーブ19と
同軸上にリンク26を回転自在に設置している。リンク26
の先端にはシーブ25、およびリンク30を回動自在に設置
している。シーブ25とリンク30は同軸である。リンク30
の先端にロープ28を接続している。
The structure around the sheave 25 at the tip of the top boom 8 will be described with reference to FIGS. 7 and 11. In the following description, the sheave 15a side will be described, but the sheave 19d side also has a similar configuration in principle. A link 26 is rotatably installed coaxially with the sheave 19 at the tip of the top boom 8. Link 26
A sheave 25 and a link 30 are rotatably installed at the tip of the. The sheave 25 and the link 30 are coaxial. Link 30
The rope 28 is connected to the tip of.

第11図(A)のように、リンク26はシーブ15aを中心と
してその両側において軸31に取付けてある。リンク26の
断面はH状である。
As shown in FIG. 11 (A), the link 26 is attached to the shaft 31 on both sides of the sheave 15a as a center. The cross section of the link 26 is H-shaped.

第11図(D)のように、リンク26の中心にシーブ25が位
置し、リンク26の両側にリンク30が位置している。板36
を軸35の凹部に挿入してリンク26にボルト37で固定し、
軸35の回転および移動を防止している。リンク30は2枚
の板からなるもので、左右2枚の板をスペーサを介して
ボルト41で固定して一体にしている。
As shown in FIG. 11D, the sheave 25 is located at the center of the link 26, and the links 30 are located on both sides of the link 26. Board 36
Insert into the recess of shaft 35 and fix to link 26 with bolt 37,
The rotation and movement of the shaft 35 are prevented. The link 30 is composed of two plates, and the left and right two plates are fixed by bolts 41 via spacers to be integrated.

リンク26の上面側にはロープ15aを支持可能なローラ43
を設けている。ローラ43は定常時にはロープ15aやシー
ブ26に接することはないが、近接して設置している。第
11図(C)、(D)のようにローラ43を支持する軸44の
長さLはリンク30の幅lよりも十分に長い。またローラ
43はリンク30の左右の板の内に入ることができる。
A roller 43 capable of supporting the rope 15a is provided on the upper surface side of the link 26.
Is provided. The roller 43 does not come into contact with the rope 15a or the sheave 26 in a steady state, but they are installed close to each other. First
As shown in FIGS. 11C and 11D, the length L of the shaft 44 that supports the roller 43 is sufficiently longer than the width 1 of the link 30. Also roller
43 can enter into the left and right plates of the link 30.

ロープ15a,15b,15c,15dの吊具への連結端には、例えば
コッタとケットからなる連結金具を設けている。第2
図,第3図の15fはスプレッダ50やバケット51の吊具の
ブラケットにピンを介して連結した部分を示している。
第3図のバケット51の開閉用のシーブ52や第4図のフッ
ク53のシーブ54に対しては、おのおののロープ55の連結
金具の間をロープ55で連結している。15gはこの連結部
を示している。連結部15gは両方のロープの金具にピン
を通して連結したものである。
At the connecting ends of the ropes 15a, 15b, 15c, 15d to the hanger, connecting fittings including, for example, a cotter and a ket are provided. Second
Reference numeral 15f in FIGS. 3 and 4 shows a portion connected to the bracket of the suspender of the spreader 50 and the bucket 51 via a pin.
The sheave 52 for opening and closing the bucket 51 of FIG. 3 and the sheave 54 of the hook 53 of FIG. 4 are connected by ropes 55 between the connecting fittings of the ropes 55, respectively. 15g shows this connection. The connecting portion 15g is formed by connecting pins to the metal fittings of both ropes.

かかる構成における荷役作業について説明する。The cargo handling work in such a configuration will be described.

先ず、ロープ15a,15dをシーブ19a,19dからシーブ25a,25
bにかけて吊下げる。この場合、第11図(B)の如くリ
ンク26の穴48から通し、ローラ43を取付ける。リンク30
にロープ28を連結する。ロープ15b,15cはシーブ19b,19c
から吊下げる。
First, the ropes 15a and 15d are moved from the sheaves 19a and 19d to the sheaves 25a and 25d.
Suspend over b. In this case, the roller 43 is attached through the hole 48 of the link 26 as shown in FIG. 11 (B). Link 30
Connect the rope 28 to. Rope 15b, 15c is sheave 19b, 19c
Hang from.

コンテナ用の吊具としてのスプレッダ50を吊下げる場合
には、ロープ28をドラム27でも巻上げると共にロープ15
b,15cをドラム22で巻上げてスプレッダが水平になる程
度に引張っておく。ドラム27はその状態で固定する。シ
ーブ25をロープ28で引張っているので、ロープ15a,15d
はロープ15b,15cに対してほぼ平行に吊下がることにな
り、4点吊りのための吊点間隔を保持できるものであ
る。
When suspending the spreader 50 as a suspender for the container, the rope 28 is also wound on the drum 27 and the rope 15
Wind up b and 15c on the drum 22 and pull them so that the spreader becomes horizontal. The drum 27 is fixed in that state. Since sheave 25 is pulled by rope 28, ropes 15a, 15d
Means that the ropes are suspended substantially parallel to the ropes 15b and 15c, and the spacing between the suspension points for suspending four points can be maintained.

そして、ドラム21,22を同期して運転することにより、
スプレッダ50の高さを調節できるものである。
Then, by operating the drums 21 and 22 in synchronization,
The height of the spreader 50 can be adjusted.

引込装置6の運転によってスプレッダ50はほぼ水平に移
動させられる。この場合、トップブーム8とメインブー
ム5との連結点にシーブ29を設けていれば、スプレッダ
50は傾斜することはない。しかし、トップブーム8の回
動中心にシーブ29を設けることは困難であるので、第5
図の如く、トップブーム8の回動中心49とシーブ29の取
付け位置(トップブーム8に設けている)場合は、ロー
プ28の長さが一定であるとスプレッダ50は傾斜する。
The spreader 50 is moved substantially horizontally by the operation of the retractor 6. In this case, if the sheave 29 is provided at the connection point between the top boom 8 and the main boom 5, the spreader
The 50 never tilts. However, it is difficult to provide the sheave 29 at the center of rotation of the top boom 8.
As shown in the figure, when the rotation center 49 of the top boom 8 and the sheave 29 are mounted (provided on the top boom 8), the spreader 50 tilts if the length of the rope 28 is constant.

構造的に取付け容易な位置にシーブ29を取付けて、スプ
レッダ50の傾斜量が実害のない程度の位置にシーブ69を
設置する。
The sheave 29 is mounted at a position where it is structurally easy to install, and the sheave 69 is installed at a position where the amount of inclination of the spreader 50 is not harmful.

次に、バケット51やフック53を吊る場合について説明す
る。この場合は、第3図,第4図に示すようにドラム27
を用いてロープ28を十分に緩める。そして、シーブ52,5
4用のロープ55を結合すると共に、吊具に連結する。ド
ラム21,22を適宜運転してバケット51やフック53が水平
になるようにロープ15の長さを調整する。吊具を吊上げ
るとロープ15a,15dの張力によってシーブ25は第9図、
第10図の如くシーブ19よりも外側に移動し、ロープ15a,
15dは垂直に吊下がる。
Next, the case of suspending the bucket 51 and the hook 53 will be described. In this case, as shown in FIG. 3 and FIG.
Loosen the rope 28 sufficiently using. And sheave 52,5
The rope 55 for 4 is connected and also connected to the hanger. The length of the rope 15 is adjusted so that the bucket 51 and the hook 53 are horizontal by operating the drums 21 and 22 as appropriate. When the hoisting equipment is hoisted up, the sheave 25 is moved by the tension of the ropes 15a and 15d, as shown in FIG.
As shown in Fig. 10, it moves to the outside of the sheave 19 and the rope 15a,
15d hangs vertically.

トップブーム8を最小半径にした場合は、第10図に示す
如く、シーブ25はシーブ18,19を接続する中心線Pより
も外側に位置するので、ロープ28をシーブ25の軸35に直
接取付けると、ロープ28がシーブ19a,19dに接触した
り、シーブ19a,19bとトップブーム8との間に入り込ん
だりし、ロープ28が損傷する。
When the top boom 8 is set to the minimum radius, as shown in FIG. 10, the sheave 25 is located outside the center line P connecting the sheaves 18 and 19, so that the rope 28 is directly attached to the shaft 35 of the sheave 25. Then, the rope 28 comes into contact with the sheaves 19a and 19d, or enters between the sheaves 19a and 19b and the top boom 8, and the rope 28 is damaged.

このため、リンク30を設けて、ロープ28がシーブ19より
も内側に位置するようにしたものである。但し、リンク
30はロープ28によって引張られてリンク26に平行になろ
うとする。リンク30の重量はロープ28よりも軽く、ドラ
ム27−シーブ29間の方がシーブ29−シーブ25間よりも長
いためである。そこで、軸44の長さLをリンク30の幅l
よりも長くして、リンク30が軸44に当ってリンク26に平
行にならないようにしている。これによってロープ28は
シーブ19よりも内側に常に位置するものである。
Therefore, the link 30 is provided so that the rope 28 is located inside the sheave 19. However, the link
30 is pulled by rope 28 and tends to be parallel to link 26. This is because the weight of the link 30 is lighter than the rope 28, and the distance between the drum 27 and the sheave 29 is longer than that between the sheave 29 and the sheave 25. Therefore, the length L of the shaft 44 is set to the width l of the link 30.
Longer so that link 30 does not strike axis 44 and be parallel to link 26. As a result, the rope 28 is always located inside the sheave 19.

トップブーム8を内側から外側へ(又はその逆)延して
停めると、シーブ25からロープ15a,15bが外れる可能性
があり、ローラ43でこれを防止している。このローラ43
の軸44を前記リンク30の位置決めのストッパとして兼用
しているので、部材を少くでき、軽量で安価にできるも
のである。
When the top boom 8 is extended from the inner side to the outer side (or vice versa) and stopped, the ropes 15a and 15b may come off from the sheave 25, and the roller 43 prevents this. This roller 43
Since the shaft 44 is also used as a positioning stopper for the link 30, the number of members can be reduced, and the weight and cost can be reduced.

以上の如く、4点吊りするためのシーブ25をロープ28に
よって操作するようにしているので、吊具の交換の場合
の吊点の変更を極めて容易にかつ安全に行うことができ
るものである。
As described above, since the sheave 25 for hanging four points is operated by the rope 28, it is possible to change the hanging points extremely easily and safely when replacing the hanging tool.

また、シーブ25とロープ28との間にリンク30を設け、か
つこのリンク30の角度調整用のストッパ(軸44)をリン
ク26に設けているので、バケットやフックを吊った場合
にロープ28がシーブ19に接触するのを防止できるもので
ある。なお、リンク30はシーブ25と同軸である必要はな
い。またストッパとしては、第8図のようにブーム8の
ロープ28側にローラ70を突出させて設け、ロープ28がシ
ーブ19に接触しないようにすることも考えられる。もち
ろんリンク30がリンク26に平行にならないようにするた
めのストッパは必要である。
Further, since the link 30 is provided between the sheave 25 and the rope 28, and the stopper (shaft 44) for adjusting the angle of the link 30 is provided on the link 26, the rope 28 will not move when the bucket or hook is hung. It is possible to prevent contact with the sheave 19. The link 30 need not be coaxial with the sheave 25. As a stopper, a roller 70 may be provided so as to project to the rope 28 side of the boom 8 so as to prevent the rope 28 from coming into contact with the sheave 19, as shown in FIG. Of course, a stopper is required to prevent the link 30 from being parallel to the link 26.

また、前記ストッパをはずれ止め用のローラ43の軸と兼
用しているので、安価にできるものである。
Further, since the stopper is also used as the shaft of the roller 43 for preventing the disengagement, the cost can be reduced.

フック53等の2点吊りの場合にシーブ25をロープ28で引
張って、シーブ19,25から吊具(フック53)までのロー
プを斜めに配置して使用することもできる。
In the case of two-point suspension of the hook 53 or the like, the sheave 25 can be pulled by the rope 28 so that the rope from the sheaves 19 and 25 to the suspender (hook 53) can be diagonally arranged and used.

さて、シーブ29とドラム27との間にシーブ69を設置して
いるので、メインブーム5の起伏角度がいかほどであっ
てもスプレッダ50の水平度をほぼ一定に保つことができ
るものである。ドラム27をシーブ69の位置に設けても良
いが、大きなドラム27をシーブ69の位置に設けることは
実際上不可能である。シーブ69はそれよりも小さいの
で、最適な位置に容易に設置できるものである。
Since the sheave 69 is installed between the sheave 29 and the drum 27, the levelness of the spreader 50 can be kept substantially constant regardless of the hoisting angle of the main boom 5. The drum 27 may be provided at the position of the sheave 69, but it is practically impossible to provide the large drum 27 at the position of the sheave 69. Since the sheave 69 is smaller than that, it can be easily installed in the optimum position.

ダブルリンク式クレーンの各リンクの長さの決定や吊具
の軌跡は、周知のように トライ アンド エラー で
求めている。シーブ69の最適位置の算出もこれと同様で
ある。
As is well known, the length of each link of the double-link type crane and the trajectory of the hanger are obtained by trial and error. The calculation of the optimum position of the sheave 69 is similar to this.

第2図,第3図,第4図に示す他の実施例について説明
する。シーブ69,69は軸方向に駆動装置(例えばシリン
ダ装置70,70)で移動できるようになっている。スプレ
ッダ50を着床させる際にスプレッダ50が傾斜していれ
ば、運転者は駆動装置70,70を駆動させ、シーブ69,69の
位置を変えることにより、スプレッダ50の傾斜量を補正
する。二つの駆動装置70,70は同時に同一量だけ動作
し、二つのシーブ69,69の間隔を縮めたり、離したりす
る。
Another embodiment shown in FIGS. 2, 3, and 4 will be described. The sheaves 69, 69 are movable in the axial direction by a drive device (for example, cylinder devices 70, 70). If the spreader 50 is tilted when the spreader 50 is landed on the floor, the driver drives the drive devices 70, 70 to change the positions of the sheaves 69, 69 to correct the tilt amount of the spreader 50. The two drive devices 70, 70 operate at the same time by the same amount to reduce or separate the two sheaves 69, 69 from each other.

なお、シーブ69,69を半径方向に移動させても良い。The sheaves 69, 69 may be moved in the radial direction.

〔発明の効果〕〔The invention's effect〕

本発明によれば、4点吊りを行う場合に、実用上問題と
ならない程度に完全な水平軌跡に近づけることができ、
吊り具の長手方向の傾きが少なくなり、地切りおよび着
床時においても安全な作業ができる。また、吊具の傾転
も容易にできるものである。
According to the present invention, when four-point suspension is performed, it is possible to approach a completely horizontal locus to the extent that there is no practical problem.
The slant in the longitudinal direction of the suspension is reduced, and safe work can be performed even when cutting the ground and landing. In addition, tilting of the hanging device can be easily performed.

【図面の簡単な説明】 第1図は引込みクレーンの全体正面図、第2図はスプレ
ッダを吊る場合のロープの配置を示す斜視図、第3図は
バケットを吊る場合のロープの配置を示す斜視図、第4
図はフックを吊る場合のロープの配置を示す斜視図、第
5図はトップブームの周辺の正面図、第6図はトップブ
ームのシーブの配置を示す図、第7図はスプレッダを吊
った場合でトップブームを最大半径にした場合のトップ
ブームの先端の正面図、第8図はスプレッダを吊った場
合でトップブームを最小半径にした場合のトップブーム
の先端の正面図、第9図はフックを吊った場合でトップ
ブームを最大半径にした場合のトップブームの先端の正
面図、第10図はフックを吊った場合でトップブームを最
小半径にした場合のトップブームの先端の正面図、第11
図は第7図のA−B−C線に沿う断面図である。 2……旋回体、5……メインブーム、6……引込装置、
7……マスト、8……トップブーム、9……テンション
ブーム、15,15a,15b,15c,15d……ロープ、16,17,18,19,
19a,19b,19c,19d,25,29……シーブ、21,22,27……ドラ
ム、28……ロープ、43……ガイドローラ、44……軸、50
……スプレッダ、51……バケット、53……フック、69…
…ガイドシーブ
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an overall front view of a retractable crane, FIG. 2 is a perspective view showing the arrangement of ropes when suspending a spreader, and FIG. 3 is a perspective view showing the arrangement of ropes when suspending a bucket. Figure, 4th
The figure is a perspective view showing the arrangement of ropes when suspending the hook, Fig. 5 is a front view around the top boom, Fig. 6 is a view showing the arrangement of sheaves of the top boom, and Fig. 7 is a case where the spreader is suspended. Fig. 8 is a front view of the tip of the top boom when the top boom is at the maximum radius. Fig. 8 is a front view of the tip of the top boom when the spreader is hung and the top boom is at the minimum radius. Fig. 9 is a hook. Front view of the tip of the top boom when the top boom is set to the maximum radius when hanging the hook, and Fig. 10 is a front view of the tip of the top boom when the hook is hung and the top boom is set to the minimum radius. 11
The drawing is a sectional view taken along the line ABC in FIG. 2 ... Revolving structure, 5 ... Main boom, 6 ... Retractor,
7 …… Mast, 8 …… Top boom, 9 …… Tension boom, 15,15a, 15b, 15c, 15d …… Rope, 16,17,18,19,
19a, 19b, 19c, 19d, 25,29 …… sheave, 21,22,27 …… drum, 28 …… rope, 43 …… guide roller, 44 …… axis, 50
…… Spreader, 51 …… Bucket, 53 …… Hook, 69…
… Guide sheave

フロントページの続き (56)参考文献 特開 昭59−108693(JP,A) 特開 昭61−81390(JP,A) 特開 昭61−119595(JP,A)Continuation of front page (56) Reference JP-A-59-108693 (JP, A) JP-A-61-81390 (JP, A) JP-A-61-119595 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】マストと、マストの下部に上下方向に回転
自在に取付けたメインブームと、メインブームの先端に
回動自在に取付けたトップブームと、トップブームの後
端とマストの上部との間に回動自在に取り付けたテンシ
ョンブームと、該トップブームの先端から上下方向に回
動自在に吊下げたリンクと、からなり、 前記マストに設置したドラムから繰り出した4本のロー
プを、該マストの上部の4つの第1のシーブ、前記テン
ションブームと前記トップブームとの連結点の4つの第
2のシーブ、前記トップブームの先端の4つの第3のシ
ーブを順次経由させて吊り下げ、該4本のロープのうち
2本のロープは前記第3のシーブを経由した後、前記リ
ンクの先端の第4のシーブを経由して吊り下げており、 前記マストの下部に設置した2本のロープを、前記マス
トの中間に設置した2つの第5のシーブ、前記メインブ
ームと前記トップブームとの連結点の近傍の2つの第6
のシーブを順次経由して前記リンクの先端側に連結して
おり、 前記第5のシーブを移動させる移動手段を設けているこ
と、 を特徴とする引込クレーン。
1. A mast, a main boom rotatably attached to a lower portion of the mast in a vertical direction, a top boom rotatably attached to an end of the main boom, a rear end of the top boom and an upper portion of the mast. A tension boom that is rotatably attached between the top boom and a link that is rotatably hung vertically from the tip of the top boom, and the four ropes extended from the drum installed on the mast are The four first sheaves on the upper part of the mast, the four second sheaves at the connection point between the tension boom and the top boom, and the four third sheaves at the tip of the top boom are hung through in order, Of the four ropes, two ropes are hung via the third sheave and then the fourth sheave at the tip of the link, and are installed at the bottom of the mast. The rope, two fifth sheave installed in the middle of the mast, the two in the vicinity of the connecting point between the main boom and the top boom 6
And a moving means for moving the fifth sheave, wherein the retractable crane is connected to the tip end side of the link via the sheaves in sequence.
JP63159181A 1988-06-29 1988-06-29 Retractable crane Expired - Fee Related JPH07108759B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63159181A JPH07108759B2 (en) 1988-06-29 1988-06-29 Retractable crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63159181A JPH07108759B2 (en) 1988-06-29 1988-06-29 Retractable crane

Publications (2)

Publication Number Publication Date
JPH0213598A JPH0213598A (en) 1990-01-17
JPH07108759B2 true JPH07108759B2 (en) 1995-11-22

Family

ID=15688077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63159181A Expired - Fee Related JPH07108759B2 (en) 1988-06-29 1988-06-29 Retractable crane

Country Status (1)

Country Link
JP (1) JPH07108759B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59108693A (en) * 1982-12-15 1984-06-23 株式会社日立製作所 Device for stabilizing and supporting hung load of double link type leading-in crane

Also Published As

Publication number Publication date
JPH0213598A (en) 1990-01-17

Similar Documents

Publication Publication Date Title
US3971478A (en) Overhead crane with lifting beam provided with C-shaped claws
JPH02182696A (en) Crane and attachment for increasing hoisting capacity thereof
CN113321139B (en) Lifting hook assembly and lifting machinery
US4381060A (en) Ring supported mobile tower crane
US20140175039A1 (en) Construction Machinery Body
KR20010021248A (en) Crane apparatus
US4762240A (en) Articulating crane
JPH07108759B2 (en) Retractable crane
JP6956627B2 (en) Lifting device with horizontal jib
JP2552019Y2 (en) Lifting device
JP3268260B2 (en) Double link crane
JP2749157B2 (en) Retractable crane
JP2022064507A (en) Connection beam for crane and connection beam mounting method for crane
JPH04213593A (en) Level luffing crane
JPH04213592A (en) retractable crane
JPS6181390A (en) retraction crane
US3952886A (en) Arrangement for stabilizing an aircraft during loading and unloading operations
JPH027874B2 (en)
JPH07117976A (en) Suspension cargo rotation preventing device for cargo suspending device for crane
JPH0192198A (en) Method and equipment for mounting and dismounting jib to crane
JPH0536354B2 (en)
JPH04213591A (en) retractable crane
JPH0210079B2 (en)
JPH04213590A (en) retractable crane
JPH0797182A (en) Hoist type tower crane