[go: up one dir, main page]

JP6744071B2 - Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program - Google Patents

Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program Download PDF

Info

Publication number
JP6744071B2
JP6744071B2 JP2014261451A JP2014261451A JP6744071B2 JP 6744071 B2 JP6744071 B2 JP 6744071B2 JP 2014261451 A JP2014261451 A JP 2014261451A JP 2014261451 A JP2014261451 A JP 2014261451A JP 6744071 B2 JP6744071 B2 JP 6744071B2
Authority
JP
Japan
Prior art keywords
load
power consumption
target load
information
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014261451A
Other languages
Japanese (ja)
Other versions
JP2016123189A (en
Inventor
三好 秀和
秀和 三好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2014261451A priority Critical patent/JP6744071B2/en
Publication of JP2016123189A publication Critical patent/JP2016123189A/en
Application granted granted Critical
Publication of JP6744071B2 publication Critical patent/JP6744071B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、需要家装置、電力消費管理装置、電力消費管理システム、電力消費管理方法および電力消費管理プログラムに関し、特に、電力需要施設における電力消費を抑制する需要家装置、電力消費管理装置、電力消費管理システム、電力消費管理方法および電力消費管理プログラムに関する。 The present invention relates to a consumer device, a power consumption management device, a power consumption management system, a power consumption management method, and a power consumption management program, and in particular, a consumer device, a power consumption management device, and a power control device that suppress power consumption in a power demand facility. The present invention relates to a consumption management system, a power consumption management method, and a power consumption management program.

従来、電力需給が逼迫している場合等に一般家庭およびオフィス等の電力需要施設における電力消費が抑制されるように、電力需要施設における電力消費を管理するシステムが開発されている。 Conventionally, a system for managing power consumption in a power demand facility has been developed so that the power consumption in a power demand facility such as a general home or an office is suppressed when the power demand and supply are tight.

たとえば、特許文献1(特開2012−205358号公報)には、以下のような技術が開示されている。すなわち、電力管理システムは、予め登録された複数の参加者を含むコミュニティに関する参加者リストを保持する保持部と、電力削減制御の実行の要否を判定する判定部と、電力削減制御の実行が必要であると判定部が判定した場合に、参加者リストに含まれている複数の参加者の中から、電力削減制御の対象となる一以上の対象者を選定する選定部と、選定部によって選定された対象者に関して、電力削減制御を実行する制御部と、電力削減制御が実行された対象者に対して、削減電力に基づく特典を付与する付与部とを備える。 For example, Patent Document 1 (JP 2012-205358 A) discloses the following technique. That is, the power management system includes a holding unit that holds a participant list regarding a community including a plurality of pre-registered participants, a determination unit that determines whether or not to execute power reduction control, and a power reduction control execution unit. When the determination unit determines that it is necessary, the selection unit that selects one or more target persons for power reduction control from the plurality of participants included in the participant list, and the selection unit. A control unit that executes power reduction control for the selected target person, and a granting unit that grants a privilege based on the reduced power to the target person for whom the power reduction control has been executed.

また、節電を目的として、ビル等の電力需要施設へのBEMS(Building Energy Management System)の導入が行われている。 In addition, for the purpose of power saving, BEMS (Building Energy Management System) has been introduced to power demand facilities such as buildings.

BEMSとは、電力需要施設における消費電力量を監視し、電力需要施設における機器または設備等の運転状態を管理することによって、電力需要施設における電力消費の抑制を図るためのシステムである。 BEMS is a system for suppressing power consumption in a power demand facility by monitoring the amount of power consumed in the power demand facility and managing the operating state of devices or equipment in the power demand facility.

BEMSは、たとえばアグリゲータと呼ばれる事業者によって導入される。アグリゲータは、BEMSを導入した電力需要施設に対してエネルギー管理支援サービスを提供する。 BEMS is introduced by a business operator called an aggregator, for example. The aggregator provides an energy management support service to a power demand facility in which BEMS is introduced.

特開2012−205358号公報JP 2012-205358 A 特開2013−161144号公報JP, 2013-161144, A

電力会社および系統運用会社等の系統側事業者は、多くの電力需要施設にBEMSが導入されることにより、全体的な電力需要を広範囲に調整することが容易となる。 By introducing BEMS to many power demand facilities, grid side operators such as power companies and grid operation companies can easily adjust the overall power demand over a wide range.

たとえば、系統側事業者は、電力需給の逼迫が予測される場合に、アグリゲータに対して予め節電要請を行なう。そして、アグリゲータは、電力需要施設の需要家に対して節電要請を行なう。 For example, when the power supply/demand is predicted to be tight, the system side business operator requests the aggregator to save power in advance. Then, the aggregator makes a power saving request to the customers of the power demanding facilities.

しかしながら、アグリゲータが節電要請を行っても、節電要請の対象期間において当該節電要請に従った電力消費の抑制が需要家の電力需要施設において行われない場合がある。このような場合、十分な節電が行われなくなり、電力需給が逼迫してしまうことがある。 However, even if the aggregator makes a power saving request, there is a case where the power consumption facility of the consumer does not suppress the power consumption according to the power saving request in the target period of the power saving request. In such a case, sufficient power saving may not be performed and power supply and demand may be tight.

この発明は、上述の課題を解決するためになされたもので、その目的は、電力需要施設における電力消費の抑制をより確実に行わせることが可能な需要家装置、電力消費管理装置、電力消費管理システム、電力消費管理方法および電力消費管理プログラムを提供することである。 The present invention has been made to solve the above-described problems, and an object thereof is to provide a consumer device, a power consumption management device, and a power consumption device that can more reliably suppress power consumption in a power demanding facility. A management system, a power consumption management method, and a power consumption management program are provided.

(1)上記課題を解決するために、この発明のある局面に係わる需要家装置は、電力需要施設における1または複数の負荷を制御可能な需要家装置であって、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信する受信部と、上記受信部によって受信された上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制する制御部とを備える。 (1) In order to solve the above problems, a consumer device according to an aspect of the present invention is a consumer device capable of controlling one or a plurality of loads in a power demanding facility, and is an object of suppressing power consumption. The power consumption of the target load is suppressed by controlling the receiving unit that receives the target load information indicating the target load that is the above-mentioned load and the target load that is indicated by the target load information received by the receiving unit. And a control unit.

(11)上記課題を解決するために、この発明のある局面に係わる電力消費管理装置は、電力需要施設における電力消費を管理する電力消費管理装置であって、電力系統側から電力消費に関する電力管理情報を取得する管理情報取得部と、上記管理情報取得部によって取得された上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定する負荷決定部と、上記負荷決定部によって決定された上記対象負荷を示す対象負荷情報を需要家装置へ送信する送信部とを備える。 (11) In order to solve the above problems, a power consumption management device according to an aspect of the present invention is a power consumption management device that manages power consumption in a power demand facility, and power management relating to power consumption from a power system side. A management information acquisition unit that acquires information, a load determination unit that determines a target load that is a load that should be a target of power consumption suppression based on the power management information acquired by the management information acquisition unit, and the load And a transmission unit that transmits the target load information indicating the target load determined by the determination unit to the consumer device.

(17)上記課題を解決するために、この発明のある局面に係わる電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、上記電力需要施設における1または複数の負荷を制御可能な需要家装置とを備え、上記電力消費管理装置は、電力消費の抑制対象とすべき負荷である対象負荷を示す対象負荷情報を上記需要家装置へ送信し、上記需要家装置は、上記対象負荷情報を上記電力消費管理装置から受信し、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制する。 (17) In order to solve the above problems, a power consumption management system according to an aspect of the present invention includes a power consumption management device that manages power consumption in a power demanding facility, and one or more loads in the power demanding facility. With a controllable consumer device, the power consumption management device transmits target load information indicating a target load that is a load to be a target of power consumption suppression to the consumer device, and the consumer device is The power consumption of the target load is suppressed by receiving the target load information from the power consumption management device and controlling the target load indicated by the received target load information.

(18)上記課題を解決するために、この発明のある局面に係わる電力消費管理方法は、電力需要施設における1または複数の負荷を制御可能な需要家装置における電力消費管理方法であって、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信するステップと、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制するステップとを含む。 (18) In order to solve the above problems, a power consumption management method according to an aspect of the present invention is a power consumption management method in a consumer device capable of controlling one or more loads in a power demand facility. Suppressing the power consumption of the target load by controlling the target load indicated by the received target load information, the step of receiving the target load information indicating the target load that is the load whose consumption is to be suppressed. And steps.

(19)上記課題を解決するために、この発明の他の局面に係わる電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、電力系統側から電力消費に関する電力管理情報を取得するステップと、取得した上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、決定した上記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを含む。 (19) In order to solve the above problems, a power consumption management method according to another aspect of the present invention is a power consumption management method in a power consumption management device that manages power consumption in a power demand facility, and is a power system side. From the step of obtaining power management information regarding power consumption from the above, based on the obtained power management information, the step of determining the target load that is the load that should be the target of power consumption suppression, and the target showing the determined target load Transmitting load information to the consumer device.

(20)上記課題を解決するために、この発明のある局面に係わる電力消費管理プログラムは、電力需要施設における1または複数の負荷を制御可能な需要家装置において用いられる電力消費管理プログラムであって、コンピュータに、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信するステップと、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制するステップとを実行させるためのプログラムである。 (20) In order to solve the above problems, a power consumption management program according to an aspect of the present invention is a power consumption management program used in a consumer device capable of controlling one or more loads in a power demanding facility. , A step of receiving target load information indicating a target load that is the load that should be the target of power consumption suppression, and controlling the target load indicated by the received target load information It is a program for executing the step of suppressing power consumption.

(21)上記課題を解決するために、この発明の他の局面に係わる電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、電力系統側から電力消費に関する電力管理情報を取得するステップと、取得した上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、決定した上記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを実行させるためのプログラムである。 (21) In order to solve the above problems, a power consumption management program according to another aspect of the present invention is a power consumption management program used in a power consumption management device that manages power consumption in a power demand facility, In the step of acquiring power management information regarding power consumption from the power system side, based on the acquired power management information, a step of determining a target load that is a load that should be a target of power consumption suppression, and the above-mentioned determined And a step of transmitting target load information indicating the target load to the consumer device.

本発明は、このような特徴的な処理部を備える需要家装置として実現できるだけでなく、需要家装置の一部または全部を実現する半導体集積回路として実現することができる。 The present invention can be realized not only as a consumer device including such a characteristic processing unit, but also as a semiconductor integrated circuit that realizes a part or all of the consumer device.

また、本発明は、このような特徴的な処理部を備える電力消費管理装置として実現できるだけでなく、電力消費管理装置の一部または全部を実現する半導体集積回路として実現することができる。 Further, the present invention can be realized not only as a power consumption management device including such a characteristic processing unit but also as a semiconductor integrated circuit that realizes part or all of the power consumption management device.

また、本発明は、このような特徴的な処理部を備える電力消費管理システムとして実現できるだけでなく、電力消費管理システムの一部または全部を実現する半導体集積回路として実現することができる。 Further, the present invention can be realized not only as a power consumption management system including such a characteristic processing unit, but also as a semiconductor integrated circuit that realizes part or all of the power consumption management system.

本発明によれば、電力需要施設における電力消費の抑制をより確実に行わせることができる。 According to the present invention, it is possible to more reliably suppress the power consumption in the power demanding facility.

図1は、本発明の第1の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 1 is a diagram showing a configuration of a power consumption management system according to a first embodiment of the present invention. 図2は、本発明の第1の実施の形態に係る電力消費管理システムの適用例を示す図である。FIG. 2 is a diagram showing an application example of the power consumption management system according to the first embodiment of the present invention. 図3は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。FIG. 3 is a diagram showing a configuration of a power consumption management device in the power consumption management system according to the first embodiment of the present invention. 図4は、本発明の第1の実施の形態に係る電力消費管理装置における記憶部が保持するDLCマッピングテーブルの一例を示す図である。FIG. 4 is a diagram showing an example of a DLC mapping table held by the storage unit in the power consumption management device according to the first embodiment of the present invention. 図5は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費の抑制の一例を示す図である。FIG. 5: is a figure which shows an example of the suppression of the power consumption in the power consumption management system which concerns on the 1st Embodiment of this invention. 図6は、本発明の第1の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。FIG. 6 is a diagram showing a configuration of a consumer device in the power consumption management system according to the first embodiment of the present invention. 図7は、本発明の第1の実施の形態に係る需要家装置における記憶部が保持する負荷制御テーブルの一例を示す図である。FIG. 7: is a figure which shows an example of the load control table which the memory|storage part in the consumer device which concerns on the 1st Embodiment of this invention hold|maintains. 図8は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 8: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 1st Embodiment of this invention. 図9は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費管理装置の変形例の構成を示す図である。FIG. 9: is a figure which shows the structure of the modification of the power consumption management apparatus in the power consumption management system which concerns on the 1st Embodiment of this invention. 図10は、本発明の第1の実施の形態に係る電力消費管理システムにおける需要家装置の変形例の構成を示す図である。FIG. 10: is a figure which shows the structure of the modification of the consumer device in the power consumption management system which concerns on the 1st Embodiment of this invention. 図11は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの他の例を示す図である。FIG. 11: is a figure which shows the other example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 1st Embodiment of this invention. 図12は、本発明の第1の実施の形態に係る電力消費管理システムの変形例における需要家装置の変形例の構成を示す図である。FIG. 12: is a figure which shows the structure of the modification of a consumer device in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention. 図13は、本発明の第1の実施の形態に係る電力消費管理システムの変形例におけるLAN接点変換器の構成を示す図である。FIG. 13: is a figure which shows the structure of the LAN contact converter in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention. 図14は、本発明の第1の実施の形態に係る電力消費管理システムの変形例における負荷の構成を示す図である。FIG. 14: is a figure which shows the structure of the load in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention. 図15は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの他の例を示す図である。FIG. 15 is a diagram showing another example of the sequence of the power consumption suppressing process in the power consumption management system according to the first embodiment of the present invention. 図16は、本発明の第2の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。FIG. 16: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 2nd Embodiment of this invention. 図17は、本発明の第2の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。FIG. 17: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 2nd Embodiment of this invention. 図18は、本発明の第2の実施の形態に係る電力消費管理システムにおける新規負荷登録処理のシーケンスの一例を示す図である。FIG. 18 is a diagram showing an example of a sequence of new load registration processing in the power consumption management system according to the second embodiment of the present invention. 図19は、本発明の第2の実施の形態に係る電力消費管理システムにおける負荷抹消処理のシーケンスの一例を示す図である。FIG. 19 is a diagram showing an example of a sequence of load erasing processing in the power consumption management system according to the second embodiment of the present invention. 図20は、本発明の第3の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。FIG. 20: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 3rd Embodiment of this invention. 図21は、本発明の第3の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。FIG. 21: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 3rd Embodiment of this invention. 図22は、本発明の第3の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 22: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 3rd Embodiment of this invention. 図23は、本発明の第4の実施の形態に係る電力消費管理システムの適用例を示す図である。FIG. 23 is a diagram showing an application example of the power consumption management system according to the fourth embodiment of the present invention. 図24は、本発明の第4の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。FIG. 24: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 4th Embodiment of this invention. 図25は、本発明の第4の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。FIG. 25: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 4th Embodiment of this invention. 図26は、本発明の第4の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。FIG. 26: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 4th Embodiment of this invention.

最初に、本発明の実施形態の内容を列記して説明する。 First, the contents of the embodiments of the present invention will be listed and described.

(1)本発明の実施の形態に係る需要家装置は、電力需要施設における1または複数の負荷を制御可能な需要家装置であって、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信する受信部と、上記受信部によって受信された上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制する制御部とを備える。 (1) A consumer device according to an embodiment of the present invention is a consumer device capable of controlling one or a plurality of loads in a power demanding facility, and is a target load that is the above-mentioned load to be a target of power consumption suppression. And a control unit that controls the target load indicated by the target load information received by the receiving unit to suppress power consumption of the target load.

このように、たとえば、アグリゲータ側の装置から受信した対象負荷情報の示す対象負荷を制御する構成により、アグリゲータ側の装置は、需要家の電力需要施設における対象負荷を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況をより確実に回避することができる。また、需要家装置は対象負荷情報に従って対象負荷を制御する構成であればよいので、需要家装置の構成を簡素化することができる。 In this way, for example, by the configuration that controls the target load indicated by the target load information received from the aggregator-side device, the aggregator-side device can specify the target load in the power demand facility of the consumer. It is possible to more reliably suppress the power consumption in the power demand facility of the house. As a result, it is possible to more reliably avoid the situation where the power supply and demand are tight. Further, the consumer device only needs to have a configuration that controls the target load according to the target load information, and therefore the configuration of the consumer device can be simplified.

(2)好ましくは、上記受信部は、さらに、上記対象負荷の制御内容を示す制御情報を受信し、上記制御部は、上記制御情報の示す上記制御内容に従って上記対象負荷を制御する。 (2) Preferably, the receiving unit further receives control information indicating the control content of the target load, and the control unit controls the target load according to the control content of the control information.

このように、たとえば、アグリゲータ側の装置から受信した制御情報の示す内容の制御を対象負荷に対して行う構成により、アグリゲータ側の装置は、電力需要施設における対象負荷の制御内容を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。また、需要家装置は制御情報に従って対象負荷を制御する構成であればよいので、需要家装置の構成を簡素化することができる。また、たとえば、アグリゲータ側の装置において対象負荷に対する制御のバリエーションを増やすことができる。これにより、対象負荷の制御を繊細に行うことができるので、電力消費の抑制量をより細かく調整することができる。また、対象負荷の種類に応じた制御を行うことができるので、需要家の電力需要施設における節電の弊害を緩和することができる。具体的には、たとえば空調装置に対しては、オフする制御の代わりに設定値を変更する制御を行うことで、電力消費を抑制しながら居住環境の不快さの程度を緩和することができる。 In this way, for example, with the configuration in which the content indicated by the control information received from the aggregator-side device is controlled for the target load, the aggregator-side device can specify the control content of the target load in the power demand facility. Therefore, it is possible to more reliably suppress the power consumption in the power demanding facility of the customer. Moreover, since the consumer device only needs to be configured to control the target load according to the control information, the configuration of the consumer device can be simplified. Further, for example, it is possible to increase the variation of control for the target load in the aggregator side device. As a result, the target load can be delicately controlled, and the amount of suppression of power consumption can be adjusted more finely. Further, since control can be performed according to the type of target load, it is possible to mitigate the harmful effect of power saving in the power demanding facility of the customer. Specifically, for example, by controlling the air conditioner to change the set value instead of turning it off, it is possible to reduce the degree of discomfort in the living environment while suppressing power consumption.

(3)好ましくは、上記需要家装置は、さらに、1または複数の上記負荷との通信方法に関する情報を記憶する記憶部を備え、上記制御部は、上記対象負荷との通信方法に関する情報を上記記憶部から取得し、取得した上記通信方法を用いて上記対象負荷を制御する。 (3) Preferably, the consumer device further includes a storage unit that stores information regarding a communication method with one or a plurality of the loads, and the control unit includes information regarding a communication method with the target load. The target load is acquired from the storage unit, and the target load is controlled using the acquired communication method.

このような構成により、たとえば、アグリゲータ側の装置が対象負荷と直接通信することができない場合においても、アグリゲータ側の装置は、需要家装置を介して対象負荷と通信を行うことができるので、当該対象負荷を容易に制御することができる。 With such a configuration, for example, even when the device on the aggregator side cannot directly communicate with the target load, the device on the aggregator side can communicate with the target load via the consumer device. The target load can be easily controlled.

(4)好ましくは、上記需要家装置は、さらに、上記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を送信する送信部を備え、上記受信部は、さらに、上記新規負荷が登録された旨を示す応答情報を受信する。 (4) Preferably, the consumer device further includes a transmission unit that transmits load information regarding a new load that is a load that should be newly registered in the power demand facility, and the reception unit further includes the new load. The response information indicating that the load is registered is received.

このような構成により、需要家装置における処理によってたとえばアグリゲータ側の装置に新規負荷を登録することができるので、アグリゲータ側の装置を操作して新規負荷を登録するというオペレータの負担を軽減し、かつ新規負荷の登録を迅速に行うことができる。また、登録情報を含むテーブルのメンテナンス処理の負荷を軽減することができる。 With such a configuration, it is possible to register a new load in the aggregator side device, for example, by processing in the consumer device, thus reducing the operator's burden of operating the aggregator side device to register the new load, and It is possible to quickly register a new load. Further, it is possible to reduce the load of maintenance processing of the table including the registration information.

(5)好ましくは、上記需要家装置は、さらに、上記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を送信する送信部を備え、上記受信部は、さらに、上記新規負荷が登録された旨を示す応答情報を受信し、上記需要家装置は、さらに、1または複数の上記負荷との通信方法に関する情報を記憶する記憶部と、上記受信部によって受信された上記応答情報に対応する上記新規負荷との通信方法に関する情報を上記記憶部に保存する更新部とを備える。 (5) Preferably, the consumer device further includes a transmission unit that transmits load information regarding a new load that is a load that should be newly registered in the power demand facility, and the reception unit further includes the new load. The consumer device receives response information indicating that the load is registered, the consumer device further stores a storage unit that stores information regarding a communication method with one or more of the loads, and the response received by the receiving unit. And an updating unit that stores information about a communication method with the new load corresponding to the information in the storage unit.

このように、たとえば、アグリゲータ側の装置に新規負荷が登録されたことに応答して新規負荷との通信方法に関する情報を記憶部に保存する構成により、アグリゲータ側の装置における登録内容と記憶部における保存内容との同期をとることができる。 In this way, for example, by the configuration in which the information on the communication method with the new load is stored in the storage unit in response to the registration of the new load in the aggregator side device, the registered contents and the storage unit in the aggregator side device are stored. It can be synchronized with the saved contents.

(6)好ましくは、上記需要家装置は、さらに、上記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信する送信部を備え、上記受信部は、さらに、上記抹消対象負荷の登録が抹消された旨を示す応答情報を受信する。 (6) Preferably, the consumer device further includes a transmission unit that transmits load information regarding a deletion target load that is a load whose registration should be deleted in the power demand facility, and the reception unit further includes The response information indicating that the registration of the load to be deleted is deleted is received.

このような構成により、需要家装置における処理によってたとえばアグリゲータ側の装置から抹消対象負荷を抹消することができるので、アグリゲータ側の装置を操作して抹消対象負荷を抹消するというオペレータの負担を軽減し、かつ抹消対象負荷の抹消を迅速に行うことができる。また、登録情報を含むテーブルのメンテナンス処理の負荷を軽減することができる。 With such a configuration, the load to be deleted can be deleted from the device on the aggregator side by the processing in the consumer device, so that the operator's burden of operating the device on the aggregator side to delete the load to be deleted is reduced. In addition, the load to be deleted can be deleted quickly. Further, it is possible to reduce the load of maintenance processing of the table including the registration information.

(7)好ましくは、上記需要家装置は、さらに、上記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信する送信部を備え、上記受信部は、さらに、上記抹消対象負荷の登録が抹消された旨を示す応答情報を受信し、上記需要家装置は、さらに、1または複数の上記負荷との通信方法に関する情報を記憶する記憶部と、上記受信部によって受信された上記応答情報に対応する上記抹消対象負荷との通信方法に関する情報を上記記憶部から削除する更新部とを備える。 (7) Preferably, the consumer device further includes a transmission unit that transmits load information regarding a deletion target load that is a load whose registration should be deleted in the power demand facility, and the reception unit further includes: The consumer device receives the response information indicating that the registration of the load to be deleted is deleted, and the consumer device further receives a storage unit that stores information on a communication method with one or more of the loads, and the reception unit. And an updating unit that deletes, from the storage unit, information about a communication method with the deletion target load corresponding to the response information that has been generated.

このように、たとえば、アグリゲータ側の装置から抹消対象負荷が抹消されたことに応答して抹消対象負荷との通信方法に関する情報を記憶部から削除する構成により、アグリゲータ側の装置における登録内容と記憶部における保存内容との同期をとることができる。 In this way, for example, by the configuration in which the information on the communication method with the deletion target load is deleted from the storage unit in response to the deletion target load being deleted from the aggregator side device, the registration contents and the storage in the aggregator side device are stored. It can be synchronized with the contents stored in the department.

(8)好ましくは、上記需要家装置は、さらに、上記対象負荷の動作状態を示す状態情報を取得する状態情報取得部と、上記状態情報取得部によって取得された上記状態情報を送信する送信部とを備える。 (8) Preferably, the consumer device further includes a status information acquisition unit that acquires status information indicating an operation status of the target load, and a transmission unit that transmits the status information acquired by the status information acquisition unit. With.

このような構成により、需要家装置の動作状態をたとえばアグリゲータ側の装置へ通知することができるので、アグリゲータ側の装置は、需要家装置の動作状態に基づいて、たとえば対象負荷の電力消費を抑制する制御に対してフィードバックをかけることができる。 With such a configuration, the operating state of the consumer device can be notified to, for example, the device on the aggregator side. Therefore, the device on the aggregator side suppresses the power consumption of the target load based on the operating state of the consumer device, for example. Feedback can be applied to the control.

(9)好ましくは、上記需要家装置は、さらに、上記電力需要施設における電力消費量を示す電力消費情報を取得する消費情報取得部と、上記消費情報取得部によって取得された上記電力消費情報を送信する送信部とを備える。 (9) Preferably, the consumer device further includes a consumption information acquisition unit that acquires power consumption information indicating power consumption in the power demand facility, and the power consumption information acquired by the consumption information acquisition unit. And a transmitting unit for transmitting.

このような構成により、需要家装置の電力消費量をたとえばアグリゲータ側の装置へ通知することができるので、アグリゲータ側の装置は、電力消費量に基づいて、対象負荷の電力消費を抑制する制御に対してフィードバックをかけることができる。 With such a configuration, the power consumption of the consumer device can be notified to, for example, the device on the aggregator side. Therefore, the device on the aggregator side can control the power consumption of the target load based on the power consumption. You can give feedback to them.

(10)好ましくは、上記制御部は、電力消費の抑制の対象期間の開始タイミングにおいて上記対象負荷の制御を開始し、上記制御部は、上記対象期間の終了タイミングにおいて上記対象負荷の制御を終了するか、または上記対象期間の終了に関する情報を出力する。 (10) Preferably, the control unit starts the control of the target load at the start timing of the target period of power consumption suppression, and the control unit ends the control of the target load at the end timing of the target period. Or output information about the end of the target period.

このような構成により、対象負荷の制御を対象期間の開始タイミングより前の状態に自動で戻すことができるので、需要家の負担を軽減することができる。また、対象負荷の電力消費を抑制する制御が終了したことを通知することができる。 With such a configuration, the control of the target load can be automatically returned to the state prior to the start timing of the target period, so that the burden on the consumer can be reduced. Further, it is possible to notify that the control for suppressing the power consumption of the target load has ended.

(11)本発明の実施の形態に係る電力消費管理装置は、電力需要施設における電力消費を管理する電力消費管理装置であって、電力系統側から電力消費に関する電力管理情報を取得する管理情報取得部と、上記管理情報取得部によって取得された上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定する負荷決定部と、上記負荷決定部によって決定された上記対象負荷を示す対象負荷情報を需要家装置へ送信する送信部とを備える。 (11) A power consumption management device according to an embodiment of the present invention is a power consumption management device that manages power consumption in a power demand facility, and management information acquisition that acquires power management information related to power consumption from a power grid side. Unit, a load determination unit that determines a target load that is a load that should be a target of power consumption suppression based on the power management information acquired by the management information acquisition unit, and the load determination unit that determines the load And a transmission unit that transmits the target load information indicating the target load to the consumer device.

このような構成により、需要家の電力需要施設における対象負荷を電力消費管理装置において指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。 With such a configuration, the target load in the power demand facility of the consumer can be specified in the power consumption management device, so that the power consumption in the power demand facility of the consumer can be suppressed more reliably. As a result, it is possible to avoid a situation where the power supply and demand are tight.

(12)好ましくは、上記電力消費管理装置は、さらに、上記対象負荷の候補に関する情報を記憶する記憶部を備え、上記負荷決定部は、上記電力管理情報に基づいて上記記憶部における上記対象負荷の候補の中から上記対象負荷を決定する。 (12) Preferably, the power consumption management device further includes a storage unit that stores information regarding the target load candidates, and the load determination unit includes the target load in the storage unit based on the power management information. The target load is determined from among the candidates.

このような構成により、たとえば複数の電力需要施設における対象負荷の候補の中から対象負荷をそれぞれ指定することができるので、電力消費管理システム全体として最適な電力消費の抑制を行うことができる。また、対象負荷の候補をたとえば需要家により電力消費管理装置に設定することができるので、対象負荷の候補を、電力消費を抑制する制御を需要家が容認できる負荷に限定することができる。これにより、節電要請の対象期間における需要家の電力需要施設における不便さを軽減することができる。 With such a configuration, the target load can be specified from among the target load candidates in a plurality of power demanding facilities, so that the optimum power consumption can be suppressed as the entire power consumption management system. Moreover, since the target load candidate can be set in the power consumption management device by the consumer, for example, the target load candidate can be limited to a load that allows the consumer to control the power consumption suppression. As a result, it is possible to reduce the inconvenience of the customer in the power demanding facility during the target period of the power saving request.

(13)好ましくは、上記負荷決定部は、さらに、上記電力管理情報に基づいて、上記対象負荷の制御内容を決定し、上記送信部は、さらに、上記負荷決定部によって決定された上記制御内容を示す制御情報を上記需要家装置へ送信する。 (13) Preferably, the load determination unit further determines control content of the target load based on the power management information, and the transmission unit further determines the control content determined by the load determination unit. Is transmitted to the consumer device.

このような構成により、電力需要施設における対象負荷の制御内容を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。また、たとえば複数の電力需要施設における対象負荷の制御内容をそれぞれ指定することができるので、電力消費管理システム全体としてより最適な電力消費の抑制を行うことができる。また、たとえば、アグリゲータ側の装置において対象負荷に対する制御のバリエーションを増やすことができる。これにより、対象負荷の制御を繊細に行うことができるので、電力消費の抑制量をより細かく調整することができる。また、対象負荷の種類に応じた制御を行うことができるので、需要家の電力需要施設における節電の弊害を緩和することができる。具体的には、たとえば空調装置に対しては、オフする制御の代わりに設定値を変更する制御を行うことで、電力消費を抑制しながら居住環境の不快さの程度を緩和することができる。 With such a configuration, it is possible to specify the control content of the target load in the power demanding facility, so that it is possible to more reliably suppress the power consumption in the power demanding facility of the consumer. Further, for example, since the control contents of the target load in each of the plurality of power demanding facilities can be designated, the power consumption management system as a whole can suppress the power consumption more optimally. Further, for example, it is possible to increase the variation of control for the target load in the aggregator side device. As a result, the target load can be delicately controlled, and the amount of suppression of power consumption can be adjusted more finely. Further, since control can be performed according to the type of target load, it is possible to mitigate the harmful effect of power saving in the power demanding facility of the customer. Specifically, for example, by controlling the air conditioner to change the set value instead of turning it off, it is possible to reduce the degree of discomfort in the living environment while suppressing power consumption.

(14)好ましくは、上記電力消費管理装置は、さらに、上記対象負荷の動作状態を示す状態情報を上記需要家装置から受信する受信部と、上記受信部によって受信された上記状態情報に基づいて、上記対象負荷に対する上記需要家装置の制御を評価する評価部とを備える。 (14) Preferably, the power consumption management device further includes a receiving unit that receives state information indicating an operating state of the target load from the consumer device, and the state information received by the receiving unit. And an evaluation unit that evaluates the control of the consumer device with respect to the target load.

このような構成により、対象負荷に対する需要家装置の制御の評価結果に基づいて、たとえば現在の需要家装置の動作状態に応じた内容の制御へ変更することができる。 With such a configuration, based on the evaluation result of the control of the consumer device with respect to the target load, for example, the control can be changed to the control according to the current operation state of the consumer device.

(15)好ましくは、上記電力消費管理装置は、さらに、上記電力需要施設における電力消費量を示す電力消費情報を上記需要家装置から受信する受信部と、上記受信部によって受信された電力消費情報の示す上記電力消費量、および上記電力管理情報の示す電力消費の目標を比較し、比較した結果に基づいて上記対象負荷に対する上記需要家装置の制御を評価する評価部とを備える。 (15) Preferably, the power consumption management device further receives a power consumption information indicating a power consumption amount in the power demanding facility from the consumer device, and power consumption information received by the reception unit. And an evaluation unit that evaluates the control of the consumer device with respect to the target load based on the comparison result.

このような構成により、対象負荷に対する需要家装置の制御の、需要家装置の電力消費量に基づく適切な評価結果を用いて、たとえば需要家装置の電力消費量を電力管理情報の示す電力消費の目標により近づける制御を行うことができる。 With such a configuration, by using an appropriate evaluation result of the control of the consumer device for the target load based on the power consumption of the consumer device, for example, the power consumption of the consumer device It is possible to perform control to bring the target closer.

(16)より好ましくは、上記電力消費管理装置は、さらに、上記対象負荷の候補に関する情報を記憶する記憶部と、上記評価部による上記制御の評価結果に基づいて、上記記憶部における上記対象負荷の候補の中から抹消すべき上記対象負荷を決定し、決定した上記対象負荷に関する情報を上記記憶部から削除する削除部とを備える。 (16) More preferably, the power consumption management device further stores the target load in the storage unit based on a storage unit that stores information about the target load candidate and an evaluation result of the control by the evaluation unit. The target load to be deleted is determined from the candidates, and the deletion unit that deletes information on the determined target load from the storage unit.

このような構成により、たとえば制御性が悪い対象負荷の候補を記憶部から削除することができるので、記憶部における対象負荷の候補において制御性が良い対象負荷の候補の割合を増やすことができる。また、たとえば電力消費の抑制能力が低い対象負荷の候補を記憶部から削除することができるので、記憶部における対象負荷の候補において電力消費の抑制能力が高い対象負荷の候補の割合を増やすことができる。 With such a configuration, for example, target load candidates having poor controllability can be deleted from the storage unit, so that the ratio of target load candidates having good controllability can be increased among the target load candidates in the storage unit. Further, for example, target load candidates having low power consumption suppressing ability can be deleted from the storage unit, so that it is possible to increase the ratio of target load candidates having high power consumption suppressing ability among the target load candidates in the storage unit. it can.

(17)本発明の実施の形態に係る電力消費管理システムは、電力需要施設における電力消費を管理する電力消費管理装置と、上記電力需要施設における1または複数の負荷を制御可能な需要家装置とを備え、上記電力消費管理装置は、電力消費の抑制対象とすべき負荷である対象負荷を示す対象負荷情報を上記需要家装置へ送信し、上記需要家装置は、上記対象負荷情報を上記電力消費管理装置から受信し、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制する。 (17) A power consumption management system according to an embodiment of the present invention includes a power consumption management device that manages power consumption in a power demand facility, and a consumer device that can control one or a plurality of loads in the power demand facility. The power consumption management device transmits target load information indicating a target load that is a load to be suppressed of power consumption to the consumer device, and the consumer device transmits the target load information to the power consumption. The power consumption of the target load is suppressed by controlling the target load indicated by the received target load information received from the consumption management device.

このように、電力消費管理装置から送信される対象負荷情報の示す対象負荷を需要家装置が制御する構成により、電力消費管理装置は、需要家の電力需要施設における対象負荷を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。また、需要家装置は対象負荷情報に従って対象負荷を制御する構成であればよいので、需要家装置の構成を簡素化することができる。 As described above, with the configuration in which the consumer device controls the target load indicated by the target load information transmitted from the power consumption management device, the power consumption management device can specify the target load in the power demand facility of the consumer. Therefore, it is possible to more reliably suppress the power consumption in the power demanding facility of the consumer. As a result, it is possible to avoid a situation where the power supply and demand are tight. Further, the consumer device only needs to have a configuration that controls the target load according to the target load information, and therefore the configuration of the consumer device can be simplified.

(18)本発明の実施の形態に係る電力消費管理方法は、電力需要施設における1または複数の負荷を制御可能な需要家装置における電力消費管理方法であって、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信するステップと、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制するステップとを含む。 (18) A power consumption management method according to an embodiment of the present invention is a power consumption management method in a consumer device capable of controlling one or more loads in a power demand facility, and should be a target of power consumption suppression. The method includes the steps of receiving target load information indicating the target load that is the load, and controlling the target load indicated by the received target load information to suppress the power consumption of the target load.

このように、たとえば、アグリゲータ側の装置から受信した対象負荷情報の示す対象負荷を制御する構成により、アグリゲータ側の装置は、需要家の電力需要施設における対象負荷を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況をより確実に回避することができる。また、需要家装置は対象負荷情報に従って対象負荷を制御する構成であればよいので、需要家装置の構成を簡素化することができる。 In this way, for example, by the configuration that controls the target load indicated by the target load information received from the aggregator-side device, the aggregator-side device can specify the target load in the power demand facility of the consumer. It is possible to more reliably suppress the power consumption in the power demand facility of the house. As a result, it is possible to more reliably avoid the situation where the power supply and demand are tight. Further, the consumer device only needs to have a configuration that controls the target load according to the target load information, and therefore the configuration of the consumer device can be simplified.

(19)本発明の実施の形態に係る電力消費管理方法は、電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、電力系統側から電力消費に関する電力管理情報を取得するステップと、取得した上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、決定した上記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを含む。 (19) A power consumption management method according to an embodiment of the present invention is a power consumption management method in a power consumption management device that manages power consumption in a power demanding facility, in which power management information on power consumption is supplied from a power system side. Based on the acquired step and the acquired power management information, a step of determining a target load that is a load that should be a target of power consumption suppression, and the target load information indicating the determined target load is transmitted to the consumer device. And a step of performing.

このような構成により、需要家の電力需要施設における対象負荷を電力消費管理装置において指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。 With such a configuration, the target load in the power demand facility of the consumer can be specified in the power consumption management device, so that the power consumption in the power demand facility of the consumer can be suppressed more reliably. As a result, it is possible to avoid a situation where the power supply and demand are tight.

(20)本発明の実施の形態に係る電力消費管理プログラムは、電力需要施設における1または複数の負荷を制御可能な需要家装置において用いられる電力消費管理プログラムであって、コンピュータに、電力消費の抑制対象とすべき上記負荷である対象負荷を示す対象負荷情報を受信するステップと、受信した上記対象負荷情報の示す上記対象負荷を制御することにより、上記対象負荷の電力消費を抑制するステップとを実行させるためのプログラムである。 (20) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a consumer device capable of controlling one or a plurality of loads in a power demand facility. A step of receiving target load information indicating a target load that is the load to be suppressed, and a step of suppressing power consumption of the target load by controlling the target load indicated by the received target load information. Is a program for executing.

このように、たとえば、アグリゲータ側の装置から受信した対象負荷情報の示す対象負荷を制御する構成により、アグリゲータ側の装置は、需要家の電力需要施設における対象負荷を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況をより確実に回避することができる。また、需要家装置は対象負荷情報に従って対象負荷を制御する構成であればよいので、需要家装置の構成を簡素化することができる。 In this way, for example, by the configuration that controls the target load indicated by the target load information received from the aggregator-side device, the aggregator-side device can specify the target load in the power demand facility of the consumer. It is possible to more reliably suppress the power consumption in the power demand facility of the house. As a result, it is possible to more reliably avoid the situation where the power supply and demand are tight. Further, the consumer device only needs to have a configuration that controls the target load according to the target load information, and therefore the configuration of the consumer device can be simplified.

(21)本発明の実施の形態に係る電力消費管理プログラムは、電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータに、電力系統側から電力消費に関する電力管理情報を取得するステップと、取得した上記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、決定した上記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを実行させるためのプログラムである。 (21) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a power consumption management device that manages power consumption in a power demanding facility, in which a computer consumes power from the power grid side. Acquiring the power management information regarding the power consumption, the step of determining the target load that is the load that should be the target of power consumption suppression based on the acquired power management information, and the target load information indicating the determined target load. It is a program for performing the step of transmitting to the consumer device.

このような構成により、需要家の電力需要施設における対象負荷を電力消費管理装置において指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。 With such a configuration, the target load in the power demand facility of the consumer can be specified in the power consumption management device, so that the power consumption in the power demand facility of the consumer can be suppressed more reliably. As a result, it is possible to avoid a situation where the power supply and demand are tight.

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施の形態の少なくとも一部を任意に組み合わせてもよい。 Embodiments of the present invention will be described below with reference to the drawings. It should be noted that the same or corresponding parts in the drawings are designated by the same reference numerals and the description thereof will not be repeated. Further, at least a part of the embodiments described below may be arbitrarily combined.

<第1の実施の形態>
[構成および基本動作]
図1は、本発明の第1の実施の形態に係る電力消費管理システムの構成を示す図である。
<First Embodiment>
[Configuration and basic operation]
FIG. 1 is a diagram showing a configuration of a power consumption management system according to a first embodiment of the present invention.

図1を参照して、電力消費管理システム301は、系統側管理装置151と、電力消費管理装置101と、需要家装置202A,202B,202Cと、高負荷203A,203B,203Cと、低負荷204A,204B,204Cとを備える。 Referring to FIG. 1, a power consumption management system 301 includes a power system management device 151, a power consumption management device 101, consumer devices 202A, 202B, 202C, high loads 203A, 203B, 203C, and a low load 204A. , 204B, 204C.

以下、需要家装置202A,202B,202Cの各々を、需要家装置202とも称する。高負荷203A,203B,203Cの各々を、高負荷203とも称する。低負荷204A,204B,204Cの各々を、低負荷204とも称する。高負荷203および低負荷204の各々を、負荷205とも称する。 Hereinafter, each of the consumer devices 202A, 202B, 202C is also referred to as a consumer device 202. Each of the high loads 203A, 203B, and 203C is also referred to as a high load 203. Each of the low loads 204A, 204B, and 204C is also referred to as the low load 204. Each of the high load 203 and the low load 204 is also referred to as a load 205.

図1では、3つの需要家装置202を代表的に示しているが、さらに多数または少数の需要家装置202が設けられてもよい。また、需要家装置202に対応して1つの高負荷203を代表的に示しているが、さらに多数または少数の高負荷203が需要家装置202に対応して設けられてもよい。また、需要家装置202に対応して1つの低負荷204を代表的に示しているが、さらに多数または少数の低負荷204が需要家装置202に対応して設けられてもよい。 Although three consumer devices 202 are representatively shown in FIG. 1, a larger number or a smaller number of consumer devices 202 may be provided. Further, although one high load 203 is representatively shown corresponding to the consumer device 202, a larger number or a smaller number of high loads 203 may be provided corresponding to the consumer device 202. Further, although one low load 204 is representatively shown corresponding to the consumer device 202, a larger number or a smaller number of low load 204 may be provided corresponding to the consumer device 202.

系統側管理装置151は、電力系統側である電力会社または系統運用会社等によって運用され、電力消費に関する電力管理情報を含むDR(Demand Response)要請信号を電力消費管理装置101へ送信する。電力管理情報は、たとえば、電力消費の抑制の対象期間(以下、DR期間とも称する。)の開始タイミングであるDR開始タイミングおよびDR期間の長さ、ならびに依頼電力量、電力消費の削減依頼量または削減レベルの少なくともいずれか一つを含む。なお、電力管理情報には、DR期間の長さの代わりにDR期間の終了タイミングであるDR終了タイミングが含まれていてもよい。 The grid-side management device 151 is operated by a power company on the power grid side, a grid operating company, or the like, and transmits a DR (Demand Response) request signal including power management information regarding power consumption to the power consumption management device 101. The power management information is, for example, the DR start timing and the length of the DR period, which are the start timings of the target period of power consumption suppression (hereinafter, also referred to as the DR period), the requested power amount, the power consumption reduction request amount, or At least one of the reduction levels is included. The power management information may include DR end timing, which is the end timing of the DR period, instead of the length of the DR period.

需要家装置202は、電力会社から電力の供給を受けるビル、工場または一般家庭等の電力需要施設において用いられる。需要家装置202は、電力需要施設ごとに1つ設けられてもよいし、電力需要施設ごとに複数設けられてもよい。電力会社は、たとえば発電事業者または電力小売り事業者である。 The consumer device 202 is used in a power demanding facility such as a building, a factory, or a general household that receives power from a power company. One consumer device 202 may be provided for each power demand facility, or a plurality of consumer devices 202 may be provided for each power demand facility. A power company is, for example, a power producer or a power retailer.

需要家装置202は、電力需要施設における1または複数の負荷205を制御可能である。負荷205は、二次電池をエネルギー源とする二次電池式電気自動車およびプラグインハイブリッドカー、ならびに照明、テレビおよび空調装置等の電気機器である。 The consumer device 202 can control one or more loads 205 in the power demand facility. The load 205 is a secondary battery-type electric vehicle and a plug-in hybrid car that use a secondary battery as an energy source, and electric equipment such as lighting, a television, and an air conditioner.

より詳細には、需要家装置202は、電気機器の動作を制御することによって消費電力の削減を図るためのBEMS(Building Energy Management System)またはHEMS(Home Energy Management System)等のシステムにおいて用いられる装置であり、たとえばアグリゲータによって導入される。 More specifically, the consumer device 202 is a device used in a system such as a BEMS (Building Energy Management System) or a HEMS (Home Energy Management System) for reducing power consumption by controlling the operation of an electric device. And is introduced by, for example, an aggregator.

電力消費管理装置101は、たとえばアグリゲータによって運用され、1または複数の需要家装置202と通信を行なうことにより、1または複数の電力需要施設における電力消費を管理する。電力消費管理装置101は、たとえば、需要家装置202が設けられる電力需要施設から遠隔の場所に設置されることが多い。 The power consumption management apparatus 101 is operated by, for example, an aggregator, and communicates with one or a plurality of customer apparatuses 202 to manage power consumption in one or a plurality of power demanding facilities. The power consumption management device 101 is often installed, for example, at a location remote from the power demand facility in which the consumer device 202 is provided.

[課題]
たとえば、電力消費管理装置101は、系統側管理装置151からDR要請信号を受信すると、受信したDR要請信号に含まれる電力管理情報に基づいて、電力消費に関する指示情報を1または複数の需要家装置202に通知する指示処理を行なう。
[Task]
For example, when the power consumption management apparatus 101 receives the DR request signal from the grid side management apparatus 151, the power consumption management apparatus 101 outputs instruction information regarding power consumption to one or more consumer devices based on the power management information included in the received DR request signal. An instruction process for notifying 202 is performed.

より詳細には、電力消費管理装置101は、たとえば、電力管理情報に基づいて、電力消費を抑制すべき節電期間、および抑制すべき電力量である抑制量を節電目標として示す指示情報を1または複数の需要家装置202へ通知する。なお、節電目標は、抑制すべき電力量に限らず、たとえば削減率または削減割合であってもよい。 More specifically, the power consumption management apparatus 101 sets, for example, 1 or 1 based on the power management information, the power saving period in which the power consumption should be suppressed, and the instruction information indicating the power saving amount as the power saving target. Notify the plurality of consumer devices 202. The power saving target is not limited to the amount of power to be suppressed, and may be a reduction rate or a reduction rate, for example.

需要家装置202は、電力消費管理装置101から指示情報を受信すると、受信した指示情報に基づいて、自己が制御可能な1または複数の負荷205に対して節電のための制御を行うか否かの判断を行う。この判断は、たとえば需要家装置202の節電ポリシーに従って行われる。すなわち、需要家装置202が主体的に負荷205を制御する。そして、需要家装置202は、節電のための制御対象とすべきと判断した負荷205に、節電を行わせるための制御指示を出力する。 When the consumer device 202 receives the instruction information from the power consumption management device 101, whether or not to perform power saving control for one or more loads 205 that can be controlled by the consumer device 202 based on the received instruction information. Make a decision. This determination is performed according to the power saving policy of the consumer device 202, for example. That is, the consumer device 202 independently controls the load 205. Then, the consumer device 202 outputs a control instruction for performing power saving to the load 205 that is determined to be a control target for power saving.

具体的には、需要家装置202Aは、たとえば、自己の節電ポリシーに従って、高負荷203Aの制御を行うと判断して高負荷203Aに制御指示を出力する一方、低負荷204Aの制御を行わないと判断する。 Specifically, the consumer device 202A determines to control the high load 203A in accordance with its own power saving policy, for example, and outputs a control instruction to the high load 203A, but does not control the low load 204A. to decide.

また、需要家装置202Bは、たとえば、自己の節電ポリシーに従って、高負荷203Bの制御を行わないと判断する一方、低負荷204Bの制御を行うと判断して低負荷204Bに制御指示を出力する。 Further, the consumer device 202B determines that the high load 203B is not controlled, for example, according to its own power saving policy, while determining that the low load 204B is controlled and outputs a control instruction to the low load 204B.

また、需要家装置202Cは、たとえば、自己の節電ポリシーに従って、高負荷203Cおよび低負荷204Cの両方の制御を行わないと判断する。 Further, the consumer device 202C determines not to control both the high load 203C and the low load 204C according to its own power saving policy, for example.

すなわち、この例では、負荷205に対する節電のための制御に関する判断が需要家装置202において行われることから、電力消費管理装置101からの指示情報に対する電力需要施設における節電は、需要家装置202に大きく依存することになる。 That is, in this example, since the consumer device 202 makes a determination regarding control for power saving with respect to the load 205, the power saving in the power demanding facility with respect to the instruction information from the power consumption management device 101 is largely performed by the consumer device 202. Will depend on you.

そこで、本発明の実施の形態に係る電力消費管理システム301における電力消費管理装置101および需要家装置202では、以下のような構成および動作により、このような課題を解決する。 Therefore, in the power consumption management device 101 and the consumer device 202 in the power consumption management system 301 according to the embodiment of the present invention, such a problem is solved by the following configurations and operations.

[電力消費管理システムの適用例]
図2は、本発明の第1の実施の形態に係る電力消費管理システムの適用例を示す図である。
[Application example of power consumption management system]
FIG. 2 is a diagram showing an application example of the power consumption management system according to the first embodiment of the present invention.

図2を参照して、電力会社の施設には、たとえばサーバである系統側管理装置151が設けられている。アグリゲータの施設には、たとえばDRAS(Demand Response Automation Server)である電力消費管理装置101が設けられている。各需要家のうちの1つである需要家AAAの施設には、たとえば計測装置および制御装置の機能を有する需要家装置202と、LAN(Local Area Network)接点変換器207と、前述の負荷205である負荷205A〜205Eとが設けられている。以下、負荷205A,205B,205C,205D,205Eの識別子すなわちIDは、それぞれAAA−1,AAA−2,AAA−3,AAA−4,AAA−5である。また、「需要家AAA」における「AAA」は、需要家AAAのIDを示すものとする。 Referring to FIG. 2, a facility side management device 151, which is, for example, a server, is provided in the facility of the electric power company. The facility of the aggregator is provided with a power consumption management device 101, which is, for example, a DRAS (Demand Response Automation Server). In the facility of the customer AAA, which is one of the customers, for example, a customer device 202 having the functions of a measuring device and a control device, a LAN (Local Area Network) contact converter 207, and the load 205 described above. Loads 205A to 205E are provided. Hereinafter, the identifiers or IDs of the loads 205A, 205B, 205C, 205D, and 205E are AAA-1, AAA-2, AAA-3, AAA-4, and AAA-5, respectively. Further, “AAA” in “consumer AAA” indicates the ID of the consumer AAA.

たとえば、負荷205A,205B,205C,205Eは、二次電池式電気自動車、プラグインハイブリッドカー、照明、およびテレビ等、オンまたはオフの制御を受け付け可能な負荷である。また、たとえば、負荷205Dは、空調装置等、設定値の受け付けおよびオンまたはオフの制御を受け付け可能な負荷である。 For example, the loads 205A, 205B, 205C, and 205E are rechargeable battery-powered electric vehicles, plug-in hybrid vehicles, lighting, televisions, and the like that can accept ON or OFF control. Further, for example, the load 205D is a load such as an air conditioner capable of receiving the setting value and receiving the ON/OFF control.

系統側管理装置151は、たとえば、卸電力価格が高騰または電力需給が逼迫した場合において、電力管理情報を含むDR要請信号をたとえばインターネット10経由で電力消費管理装置101へ送信する。 The system-side management device 151 transmits a DR request signal including power management information to the power consumption management device 101 via the Internet 10, for example, when the wholesale power price rises or power supply/demand is tight.

[電力消費管理装置]
図3は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。
[Power consumption management device]
FIG. 3 is a diagram showing a configuration of a power consumption management device in the power consumption management system according to the first embodiment of the present invention.

図3を参照して、電力消費管理装置101は、受信部22と、送信部23と、管理情報取得部24と、負荷決定部25と、記憶部26とを備える。 With reference to FIG. 3, the power consumption management apparatus 101 includes a reception unit 22, a transmission unit 23, a management information acquisition unit 24, a load determination unit 25, and a storage unit 26.

管理情報取得部24は、電力系統側から電力消費に関する電力管理情報を取得する。より詳細には、受信部22は、系統側管理装置151からDR要請信号をインターネット10経由で受信すると、受信したDR要請信号を管理情報取得部24へ出力する。 The management information acquisition unit 24 acquires power management information regarding power consumption from the power system side. More specifically, when the reception unit 22 receives a DR request signal from the system-side management device 151 via the Internet 10, the reception unit 22 outputs the received DR request signal to the management information acquisition unit 24.

管理情報取得部24は、受信部22からDR要請信号を受けると、受けたDR要請信号から電力管理情報を取得し、取得した電力管理情報を負荷決定部25へ出力する。 When the management information acquisition unit 24 receives the DR request signal from the reception unit 22, the management information acquisition unit 24 acquires power management information from the received DR request signal and outputs the acquired power management information to the load determination unit 25.

図4は、本発明の第1の実施の形態に係る電力消費管理装置における記憶部が保持するDLC(Direct Load Control)マッピングテーブルの一例を示す図である。 FIG. 4 is a diagram showing an example of a DLC (Direct Load Control) mapping table held by the storage unit in the power consumption management device according to the first embodiment of the present invention.

図4を参照して、記憶部26は、電力消費の抑制対象とすべき負荷205(以下、対象負荷205とも称する。)の候補に関する情報を含むDLCマッピングテーブルTbl1を記憶する。 With reference to FIG. 4, the storage unit 26 stores a DLC mapping table Tbl1 including information about candidates for a load 205 (hereinafter, also referred to as a target load 205) to be a target of power consumption suppression.

具体的には、DLCマッピングテーブルTbl1には、1または複数の節電パターンが、節電指示を与えるべき需要家の候補である需要家候補のIDに対応付けられている。たとえば、図4に示すように、DLCマッピングテーブルTbl1には、1または複数の節電パターンが、節電指示を与えるべき需要家の候補である需要家候補のIDごとにまとめられている。節電パターンは、対象負荷205の候補である対象負荷候補のID(以下、対象負荷候補IDとも称する。)と、当該対象負荷候補が抑制可能な電力量を示す抑制可能量と、当該対象負荷候補に与えるべき制御内容とを含む。 Specifically, in the DLC mapping table Tbl1, one or a plurality of power saving patterns are associated with the IDs of the customer candidates that are the candidates of the customers who should give the power saving instruction. For example, as shown in FIG. 4, in the DLC mapping table Tbl1, one or a plurality of power saving patterns are collected for each ID of a customer candidate that is a candidate of a customer to whom a power saving instruction should be given. The power saving pattern includes an ID of a target load candidate that is a candidate for the target load 205 (hereinafter, also referred to as a target load candidate ID), a curable amount indicating a power amount that the target load candidate can suppress, and the target load candidate. And the control content to be given to.

DLCマッピングテーブルTbl1の内容は、たとえば、アグリゲータにおけるオペレータにより入力される。 The content of the DLC mapping table Tbl1 is input by, for example, an operator in the aggregator.

また、記憶部26は、たとえば需要家のIDと当該需要家の需要家装置202のアドレスとの対応関係を示すアドレス表を保持している。 The storage unit 26 also holds, for example, an address table showing a correspondence relationship between a customer ID and an address of the customer device 202 of the customer.

[需要家の選択]
負荷決定部25は、たとえば、管理情報取得部24から電力管理情報を受けると、記憶部26からDLCマッピングテーブルTbl1を取得し、取得したDLCマッピングテーブルTbl1の内容に基づいて需要家を選択する。
[Customer selection]
For example, when the load determination unit 25 receives the power management information from the management information acquisition unit 24, the load determination unit 25 acquires the DLC mapping table Tbl1 from the storage unit 26 and selects a customer based on the acquired contents of the DLC mapping table Tbl1.

具体的には、負荷決定部25は、以下のいずれかの方法を用いて、DLCマッピングテーブルTbl1に含まれる需要家候補の中から節電対象の需要家である対象需要家を選択する。なお、DLCマッピングテーブルTbl1は、複数の需要家候補を含む内容に限らず、1人の需要家候補を含む内容であってもよい。この場合、負荷決定部25は、たとえば当該1人の需要家候補を対象需要家として決定する。 Specifically, the load determining unit 25 uses one of the following methods to select a target customer that is a power saving target customer from the customer candidates included in the DLC mapping table Tbl1. Note that the DLC mapping table Tbl1 is not limited to the content including a plurality of customer candidates, but may be the content including one customer candidate. In this case, the load determining unit 25 determines, for example, the one customer candidate as the target customer.

たとえば、負荷決定部25は、DLCマッピングテーブルTbl1における需要家候補のすべてを対象需要家として選択する。 For example, the load determination unit 25 selects all the customer candidates in the DLC mapping table Tbl1 as the target customers.

また、たとえば、各需要家候補に優先度が付与されている場合、負荷決定部25は、当該優先度に応じて需要家候補の中から対象需要家を選択する。このような優先度は、たとえば、電力需要施設ごとの契約等に基づいて各需要家候補に付与される。 Further, for example, when priority is given to each customer candidate, the load determination unit 25 selects a target customer from the customer candidates according to the priority. Such a priority is given to each customer candidate based on, for example, a contract for each power demand facility.

また、たとえば、負荷決定部25は、DLCマッピングテーブルTbl1における需要家候補の中から輪番で対象需要家を選択する。 In addition, for example, the load determination unit 25 selects the target customer from the customer candidates in the DLC mapping table Tbl1 by rotating numbers.

また、たとえば、負荷決定部25は、DLCマッピングテーブルTbl1における需要家候補の中からランダムに対象需要家を選択する。 Further, for example, the load determination unit 25 randomly selects a target customer from the customer candidates in the DLC mapping table Tbl1.

また、たとえば、負荷決定部25は、DLCマッピングテーブルTbl1における需要家候補の中から、各需要家候補の住所情報を用いること等により、郵便番号単位、市町村および番地単位、変電所単位、トランス単位、天気予報の地域エリア単位、又は仮想的な任意のグループ単位で対象需要家を選択する。 In addition, for example, the load determining unit 25 uses the address information of each customer candidate from the customer candidates in the DLC mapping table Tbl1 to determine, for example, a postal code unit, a municipality and address unit, a substation unit, and a transformer unit. , A target customer is selected in units of local areas of the weather forecast or in units of virtually any group.

図5は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費の抑制の一例を示す図である。 FIG. 5: is a figure which shows an example of the suppression of the power consumption in the power consumption management system which concerns on the 1st Embodiment of this invention.

図5を参照して、たとえば、負荷決定部25は、DLCマッピングテーブルTbl1における需要家候補の中から、各需要家候補の電力需要施設における過去の抑制量の実績値に基づいて対象需要家を選択する。 With reference to FIG. 5, for example, the load determination unit 25 selects a target customer from among the customer candidates in the DLC mapping table Tbl1 based on the actual value of the past suppression amount in the power demanding facility of each customer candidate. select.

より詳細には、たとえば、系統側管理装置151は、電力需給の逼迫が予想される場合、節電期間B、および節電期間Bにおける消費電力量の上限値である依頼電力量Aを決定する。そして、系統側管理装置151は、節電期間Bの開始タイミング、節電期間Bの長さ、および依頼電力量Aを含む電力管理情報をDR要請信号に含めて電力消費管理装置101へ送信する。 More specifically, for example, the grid-side management device 151 determines the power saving period B and the requested power amount A that is the upper limit value of the power consumption during the power saving period B when power supply and demand are expected to be tight. Then, the system-side management device 151 includes power management information including the start timing of the power saving period B, the length of the power saving period B, and the requested power amount A in the DR request signal and transmits the DR request signal to the power consumption management device 101.

管理情報取得部24は、系統側管理装置151から受信部22経由でDR要請信号を受信すると、受信したDR要請信号から電力管理情報を取得し、取得した電力管理情報を負荷決定部25へ出力する。 When the management information acquisition unit 24 receives a DR request signal from the grid-side management device 151 via the reception unit 22, the management information acquisition unit 24 acquires power management information from the received DR request signal and outputs the acquired power management information to the load determination unit 25. To do.

負荷決定部25は、たとえば、管理情報取得部24から電力管理情報を受けると、受けた電力管理情報から節電期間Bの開始タイミング、節電期間Bの長さ、および依頼電力量Aを取得する。 For example, when the load determining unit 25 receives the power management information from the management information acquiring unit 24, the load determining unit 25 acquires the start timing of the power saving period B, the length of the power saving period B, and the requested power amount A from the received power management information.

負荷決定部25は、たとえば、各電力需要施設における消費電力量の想定値の総和である想定総電力量Cを系統側管理装置151から受信部22および管理情報取得部24経由で受信するか、または保持している。想定総電力量Cは、たとえば、ベースラインと呼ばれる、電力消費を抑制しなかった場合の電力消費量であり、過去の電力消費データ等に基づいて算出される。 Whether the load determining unit 25 receives, for example, the estimated total amount of electric power C, which is the sum of the estimated values of the amount of electric power consumption in each power demand facility, from the system side management apparatus 151 via the reception unit 22 and the management information acquisition unit 24, Or hold. The assumed total amount of electric power C is, for example, the amount of electric power that is called a baseline when the electric power consumption is not suppressed, and is calculated based on past electric power consumption data and the like.

想定総電力量Cから依頼電力量Aを減算した結果が、電力消費管理装置101が配下の各需要家装置202に要請すべき総依頼抑制量Dすなわち削減依頼量である。 The result of subtracting the requested power amount A from the estimated total power amount C is the total request suppression amount D, that is, the reduction request amount, which the power consumption management apparatus 101 should request to each of the subordinate consumer devices 202.

以下、電力需要施設の選択および想定総抑制量の算出の具体例について詳細に説明する。 Hereinafter, a specific example of selecting the power demand facility and calculating the assumed total suppression amount will be described in detail.

負荷決定部25は、たとえば以下の(A1)〜(A3)および(B)のいずれかの方法を用いる。 The load determination unit 25 uses, for example, one of the following methods (A1) to (A3) and (B).

方法(A1)〜(A3)では、負荷決定部25は、複数の需要家候補の各電力需要施設における過去の抑制量の実績値に基づいて、電力需要施設の選択すなわち対象需要家の選択を行なう。 In the methods (A1) to (A3), the load determination unit 25 selects the power demanding facility, that is, the target consumer based on the actual value of the past suppression amount in each power demanding facility of the plurality of consumer candidates. To do.

より詳細には、負荷決定部25は、各電力需要施設において過去に実際に行われた抑制量を所定時間たとえば30分単位で集計し、この単位時間ごとに抑制量の平均値、分散値または最大値を算出する。 More specifically, the load determination unit 25 collects the amount of suppression actually performed in the past at each power demand facility in a unit of a predetermined time, for example, 30 minutes, and the average value, the dispersion value, or the suppression value for each unit time is calculated. Calculate the maximum value.

(A1)節電期間Bの時間帯、たとえば13:00〜16:00の時間帯における単位時間当たりの抑制量の平均値の総和(以下、平均総和とも称する。)を求め、平均総和が大きい電力需要施設から順に選択していき、選択したN件(Nは1以上の整数)の電力需要施設の平均総和の合計が総依頼抑制量Dを超えるまで電力需要施設を選択する。このように、平均総和が大きい電力需要施設から順に選択することにより、電力需要施設の選択の妥当性を高めることができる。 (A1) The sum of the average values of the suppression amounts per unit time in the time zone of the power saving period B, for example, in the time zone of 13:00 to 16:00 (hereinafter, also referred to as the average sum) is calculated, and the power having a large average sum is obtained. The power demanding facilities are selected in order from the demanding facilities, and the power demanding facilities are selected until the total of the average sum of the selected N power demanding facilities (N is an integer of 1 or more) exceeds the total requested suppression amount D. As described above, by sequentially selecting the power demanding facilities having the largest average sum, it is possible to enhance the relevance of the selection of the power demanding facilities.

(A2)節電期間Bの時間帯、たとえば13:00〜16:00の時間帯における単位時間当たりの抑制量の分散値の総和を求め、当該総和が小さい電力需要施設から順に選択していき、選択したN件(Nは1以上の整数)の電力需要施設の平均総和の合計が総依頼抑制量Dを超えるまで電力需要施設を選択する。このように、分散値の総和が小さい電力需要施設から順に選択することにより、抑制量のばらつきにより各電力需要施設における抑制量の総和が総依頼抑制量Dを超えなくなる事態の発生を抑制することができる。 (A2) The sum of the variance values of the suppression amount per unit time in the time zone of the power saving period B, for example, the time zone of 13:00 to 16:00 is obtained, and the power demanding facilities having the smallest sum are sequentially selected, The power demanding facilities are selected until the total of the average sum of the selected N power demanding facilities (N is an integer of 1 or more) exceeds the total requested suppression amount D. In this way, by sequentially selecting the power demanding facilities with the smallest total sum of variance values, it is possible to suppress the occurrence of a situation in which the sum of the restraint amounts at each power demand facility does not exceed the total requested restraint amount D due to the variation of the restraint amounts. You can

(A3)節電期間Bの時間帯、たとえば13:00〜16:00の時間帯における単位時間当たりの抑制量の最大値の総和を求め、当該総和が大きい電力需要施設から順に選択していき、選択したN件(Nは1以上の整数)の電力需要施設の平均総和の合計が総依頼抑制量Dを超えるまで電力需要施設を選択する。このように、最大値が大きい電力需要施設から順に選択することにより、選択される電力需要施設の数をより少なくすることができる。 (A3) The sum of the maximum values of the suppression amount per unit time in the time zone of the power saving period B, for example, the time zone of 13:00 to 16:00 is obtained, and the power demanding facilities having the highest sum are sequentially selected, The power demanding facilities are selected until the total of the average sum of the selected N power demanding facilities (N is an integer of 1 or more) exceeds the total requested suppression amount D. As described above, by sequentially selecting the power demanding facilities having the largest maximum value, the number of selected power demanding facilities can be further reduced.

方法(B)では、負荷決定部25は、予測に基づいて、電力需要施設の選択すなわち対象需要家の選択を行なう。 In the method (B), the load determining unit 25 selects the power demanding facility, that is, the target consumer based on the prediction.

より詳細には、負荷決定部25は、たとえば、電力消費の非抑制依頼時における過去の消費電力量の実績、当該実績の得られたときの気象情報、および節電期間Bにおける気象予報情報に基づいて、節電期間Bにおける電力需要施設ごとの想定電力量Mを算出する。 More specifically, the load determination unit 25 is based on, for example, the past record of the amount of power consumption at the time of the non-suppression request of the power consumption, the weather information when the record is obtained, and the weather forecast information in the power saving period B. Then, the estimated power amount M for each power demand facility in the power saving period B is calculated.

具体的には、負荷決定部25は、たとえば、気象予報情報から電力需要施設における負荷205の制御内容を予測することにより、節電期間Bにおける電力需要施設の想定電力量Mを算出する。各電力需要施設の想定電力量Mの総和を算出することにより、想定総電力量Cが得られる。 Specifically, the load determination unit 25 calculates the estimated power amount M of the power demanding facility in the power saving period B by predicting the control content of the load 205 in the power demanding facility from the weather forecast information, for example. The estimated total amount of electric power C is obtained by calculating the sum of the estimated amount of electric power M of each power demand facility.

次に、負荷決定部25は、たとえば、節電期間Bにおいて想定される負荷205に対する制御内容と電力需要施設における気象予報情報とに基づいて電力需要施設ごとの想定抑制量Kを算出する。上記制御内容は、たとえば、需要家装置202から取得した抑制依頼時における負荷205に対する制御内容から得られる。 Next, the load determination unit 25 calculates the assumed suppression amount K for each power demand facility based on the control content for the load 205 assumed in the power saving period B and the weather forecast information at the power demand facility, for example. The control content is obtained from the control content for the load 205 at the time of the suppression request acquired from the consumer device 202, for example.

[対象負荷および制御内容の決定]
以下、負荷決定部25が、上記方法を用いて需要家候補の中から対象需要家を選択した結果、選択した対象需要家の中にたとえば需要家AAAが含まれている状況を想定する。そして、負荷決定部25が需要家AAAにおける対象負荷および制御内容の決定を行う場合について説明する。
[Determination of target load and control content]
Hereinafter, it is assumed that the load determination unit 25 selects a target customer from the customer candidates using the above method, and as a result, for example, the customer AAA is included in the selected target customers. Then, the case where the load determining unit 25 determines the target load and the control content in the customer AAA will be described.

負荷決定部25は、管理情報取得部24によって取得された電力管理情報に基づいて、対象負荷205を決定する。 The load determination unit 25 determines the target load 205 based on the power management information acquired by the management information acquisition unit 24.

具体的には、負荷決定部25は、たとえば、電力管理情報に基づいて、記憶部26において記憶されている対象負荷候補の中から対象負荷205を決定する。また、負荷決定部25は、たとえば、電力管理情報に基づいて、対象負荷205の制御内容を決定する。 Specifically, the load determination unit 25 determines the target load 205 from the target load candidates stored in the storage unit 26 based on the power management information, for example. In addition, the load determining unit 25 determines the control content of the target load 205 based on the power management information, for example.

より詳細には、負荷決定部25は、DLCマッピングテーブルTbl1を用いて以下の処理を行う。すなわち、負荷決定部25は、たとえば、電力管理情報に含まれる依頼電力量、電力消費の削減依頼量または削減レベルを満たすように対象負荷205を決定するとともに、当該対象負荷205に与えるべき制御内容を決定する。 More specifically, the load determining unit 25 performs the following processing using the DLC mapping table Tbl1. That is, for example, the load determining unit 25 determines the target load 205 so as to satisfy the requested power amount, the power consumption reduction request amount, or the reduction level included in the power management information, and the control content to be given to the target load 205. To decide.

以下、負荷決定部25が、電力消費の削減依頼量を満たすように対象負荷205を決定するとともに、当該対象負荷205に与えるべき制御内容を決定する場合について説明する。 Hereinafter, a case will be described in which the load determination unit 25 determines the target load 205 so as to satisfy the power consumption reduction request amount and also determines the control content to be given to the target load 205.

なお、依頼電力量、電力消費の削減依頼量または削減レベルは、予め契約により定められていてもよい。 The requested power amount, the requested power consumption reduction amount, or the reduction level may be determined in advance by contract.

具体的には、負荷決定部25は、たとえば、DLCマッピングテーブルTbl1を用いて、選択した需要家AAAに対応する1または複数の節電パターンの中から、削減依頼量を満たすような節電パターン(以下、対象節電パターンとも称する。)を選択する。 Specifically, the load determining unit 25 uses, for example, the DLC mapping table Tbl1 to select a power-saving pattern (hereinafter referred to as a power-saving pattern that satisfies the reduction request amount from one or a plurality of power-saving patterns corresponding to the selected customer AAA. , Target power saving pattern).

なお、DLCマッピングテーブルTbl1には、需要家AAAに対応して1つの節電パターンが含まれていてもよい。この場合、負荷決定部25は、たとえば当該1つの節電パターンを対象節電パターンとして選択する。 Note that the DLC mapping table Tbl1 may include one power saving pattern corresponding to the customer AAA. In this case, the load determining unit 25 selects, for example, the one power saving pattern as the target power saving pattern.

たとえば、負荷決定部25は、以下のいずれかの方法を用いて、DLCマッピングテーブルTbl1に含まれる節電パターンの中から対象節電パターンを選択する。 For example, the load determination unit 25 selects the target power saving pattern from the power saving patterns included in the DLC mapping table Tbl1 using any of the following methods.

すなわち、負荷決定部25は、たとえば需要家AAAに対応する節電パターンのすべてを対象節電パターンとして選択する。 That is, the load determining unit 25 selects, for example, all of the power saving patterns corresponding to the customer AAA as the target power saving pattern.

また、たとえば、各節電パターンに予め優先度が付与されている場合、負荷決定部25は、当該優先度に応じて節電パターンを決定する。具体的には、負荷決定部25は、たとえば、優先度が高い節電パターンから順に選択していき、選択した節電パターンに含まれる抑制可能量の合計が削減依頼量を超えるまで節電パターンを選択する。そして、負荷決定部25は、選択した節電パターンを対象節電パターンとして決定する。このような優先度は、たとえば需要家により付与される。 Further, for example, when a priority is given to each power saving pattern in advance, the load determining unit 25 determines the power saving pattern according to the priority. Specifically, for example, the load determining unit 25 selects power saving patterns in descending order of priority, and selects power saving patterns until the total of the curable amounts included in the selected power saving patterns exceeds the reduction request amount. .. Then, the load determination unit 25 determines the selected power saving pattern as the target power saving pattern. Such a priority is given by, for example, a consumer.

また、たとえば、負荷決定部25は、抑制可能量の大きさに応じて節電パターンを決定する。具体的には、負荷決定部25は、抑制可能量が大きい節電パターンから順に選択していき、選択した節電パターンに含まれる抑制可能量の合計が削減依頼量を超えるまで節電パターンを選択する。そして、負荷決定部25は、選択した節電パターンを対象節電パターンとして決定する。 Further, for example, the load determination unit 25 determines the power saving pattern according to the size of the restrainable amount. Specifically, the load determining unit 25 selects power saving patterns in order from the largest suppressible amount, and selects the power saving pattern until the total of the suppressible amounts included in the selected power saving patterns exceeds the reduction request amount. Then, the load determination unit 25 determines the selected power saving pattern as the target power saving pattern.

また、負荷決定部25は、たとえば節電パターンの中から輪番で節電パターンを選択し、選択した節電パターンを対象節電パターンとして決定する。 In addition, the load determining unit 25 selects a power saving pattern by, for example, a ring number from the power saving patterns, and determines the selected power saving pattern as the target power saving pattern.

また、負荷決定部25は、たとえば節電パターンの中からランダムに節電パターンを選択し、選択した節電パターンを対象節電パターンとして決定する。 Further, the load determining unit 25 randomly selects a power saving pattern from the power saving patterns, for example, and determines the selected power saving pattern as the target power saving pattern.

たとえば、負荷決定部25は、上記の方法のうちいずれかの方法を用いて「対象負荷候補ID:AAA−1,抑制可能量:100W,制御内容:オフ」および「対象負荷候補ID:AAA−4,抑制可能量:300W,制御内容:設定値を3℃上げる」を対象節電パターンとして決定する。 For example, the load determining unit 25 uses any one of the above methods, “target load candidate ID: AAA-1, suppressible amount: 100 W, control content: OFF” and “target load candidate ID: AAA-”. 4, controllable amount: 300 W, control content: increase set value by 3° C.” is determined as the target power saving pattern.

負荷決定部25は、決定した対象負荷205を示す対象負荷情報、および決定した制御内容を示す制御情報を生成する。具体的には、負荷決定部25は、決定した対象節電パターンから対象負荷候補IDおよび制御内容を取得し、取得した対象負荷候補IDを示す対象負荷情報と当該対象負荷候補に対する制御内容を示す制御情報とを含む対象負荷制御情報を生成する。 The load determining unit 25 generates target load information indicating the determined target load 205 and control information indicating the determined control content. Specifically, the load determining unit 25 acquires the target load candidate ID and the control content from the determined target power saving pattern, and controls the target load information indicating the acquired target load candidate ID and the control content for the target load candidate. And target load control information including the information.

対象負荷制御情報の内容は、たとえば「対象負荷ID:AAA−1,制御内容:オフ」および「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」である。 The contents of the target load control information are, for example, "target load ID: AAA-1, control content: off" and "target load ID: AAA-4, control content: increase set value by 3°C".

また、負荷決定部25は、電力管理情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さを含むDR期間情報を生成する。 In addition, the load determining unit 25 acquires the DR start timing and the length of the DR period from the power management information, and generates the DR period information including the acquired DR start timing and the length of the DR period.

負荷決定部25は、たとえば記憶部26におけるアドレス表を参照し、需要家AAAの需要家装置202のアドレスを取得する。負荷決定部25は、生成した対象負荷制御情報およびDR期間情報ならびに需要家AAAの需要家装置202のアドレスを送信部23へ出力する。 The load determining unit 25 refers to the address table in the storage unit 26, for example, and acquires the address of the consumer device 202 of the consumer AAA. The load determining unit 25 outputs the generated target load control information, the DR period information, and the address of the consumer device 202 of the consumer AAA to the transmitting unit 23.

たとえば、送信部23は、負荷決定部25から対象負荷制御情報およびDR期間情報ならびに需要家AAAの需要家装置202のアドレスを受けると、受けたアドレスを宛先として、対象負荷制御情報およびDR期間情報を含むDLC信号を需要家AAAの需要家装置202へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the target load control information and the DR period information and the address of the customer device 202 of the customer AAA from the load determination unit 25, the target load control information and the DR period information are addressed to the received address. A DLC signal including the above is transmitted to the customer device 202 of the customer AAA via the Internet 10.

[需要家装置]
図6は、本発明の第1の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。
[Customer equipment]
FIG. 6 is a diagram showing a configuration of a consumer device in the power consumption management system according to the first embodiment of the present invention.

図6を参照して、需要家装置202は、受信部42と、送信部43と、制御部44と、記憶部45と、カウンタ46と、表示部47とを備える。 With reference to FIG. 6, the consumer device 202 includes a reception unit 42, a transmission unit 43, a control unit 44, a storage unit 45, a counter 46, and a display unit 47.

需要家装置202におけるカウンタ46は、たとえば、水晶振動子を用いた発振回路等により生成されるクロックパルスをカウントし、カウントした値を保持する。表示部47は、たとえばディスプレイであり、制御部44による制御に従って、需要家に伝達すべき情報を表示する。送信部43は、LAN11を介して負荷205と通信を行うことが可能である。 The counter 46 in the consumer device 202 counts clock pulses generated by, for example, an oscillation circuit using a crystal oscillator, and holds the counted value. The display unit 47 is, for example, a display, and displays the information to be transmitted to the customer under the control of the control unit 44. The transmission unit 43 can communicate with the load 205 via the LAN 11.

受信部42は、たとえば、電力消費の抑制対象とすべき負荷205である対象負荷205を示す対象負荷情報を受信する。また、受信部42は、たとえば、対象負荷205の制御内容を示す制御情報を受信する。 The receiving unit 42 receives, for example, target load information indicating the target load 205, which is the load 205 to be the target of power consumption suppression. Further, the receiving unit 42 receives, for example, control information indicating the control content of the target load 205.

具体的には、受信部42は、たとえば、電力消費管理装置101からDLC信号をインターネット10経由で受信すると、受信したDLC信号から対象負荷制御情報およびDR期間情報を取得し、取得した対象負荷制御情報およびDR期間情報を制御部44へ出力する。 Specifically, for example, when the receiving unit 42 receives a DLC signal from the power consumption management device 101 via the Internet 10, the receiving unit 42 acquires target load control information and DR period information from the received DLC signal, and acquires the target load control. The information and the DR period information are output to the control unit 44.

図7は、本発明の第1の実施の形態に係る需要家装置における記憶部が保持する負荷制御テーブルの一例を示す図である。 FIG. 7: is a figure which shows an example of the load control table which the memory|storage part in the consumer device which concerns on the 1st Embodiment of this invention hold|maintains.

図7を参照して、記憶部45は、1または複数の負荷205との通信方法に関する情報を含む負荷制御テーブルTbl2を記憶する。 With reference to FIG. 7, the storage unit 45 stores a load control table Tbl2 including information on a communication method with one or more loads 205.

具体的には、負荷制御テーブルTbl2には、対象負荷205との通信方法である接続I/F(インタフェース)および当該対象負荷205の制御方法が、対象負荷205のID(以下、対象負荷IDとも称する。)ごとにまとめられている。 Specifically, in the load control table Tbl2, the connection I/F (interface) that is a communication method with the target load 205 and the control method of the target load 205 are the ID of the target load 205 (hereinafter, also referred to as the target load ID). It is summarized by each.

「接続I/F」は、たとえば物理的なインタフェースを示している。接続I/Fには、たとえば「接点」、「Ethernet(登録商標)」および「WiFi(登録商標)」がある。 The “connection I/F” indicates a physical interface, for example. The connection I/F includes, for example, "contact", "Ethernet (registered trademark)", and "WiFi (registered trademark)".

「接点」は、たとえば接点信号制御を行うための接続I/Fである。「Ethernet」は、たとえばイーサネット(登録商標)規格に従ってLAN11を介して有線のネットワーク制御を行うための接続I/Fである。「WiFi」は、たとえばWiFi規格に従って無線LANを介して無線のネットワーク制御を行うための接続I/Fである。 The "contact" is, for example, a connection I/F for performing contact signal control. “Ethernet” is a connection I/F for performing wired network control via the LAN 11 according to the Ethernet (registered trademark) standard, for example. “WiFi” is a connection I/F for performing wireless network control via a wireless LAN according to the WiFi standard, for example.

「制御方法」は、たとえば接続I/Fの示す物理的なインタフェースを用いて信号または情報を負荷205へ送信するための信号伝達方法または情報伝達方法を示している。制御方法には、たとえば「接点信号のOn/Off」、「標準プロトコル」および「メーカ独自プロトコル」がある。 The “control method” indicates, for example, a signal transmission method or an information transmission method for transmitting a signal or information to the load 205 using a physical interface indicated by the connection I/F. The control method includes, for example, “contact signal On/Off”, “standard protocol”, and “maker's original protocol”.

「接点信号のOn/Off」は、たとえば対象負荷205である電気機器のスイッチをオンまたはオフするための接点信号を負荷205へ送信するための信号伝達方法である。 “Contact signal On/Off” is a signal transmission method for transmitting a contact signal for turning on or off a switch of an electric device that is the target load 205 to the load 205, for example.

「標準プロトコル」は、たとえば、対象負荷205を制御するための情報である制御命令を当該対象負荷205へ送信するための情報伝達方法であり、具体的にはECHONETLite(登録商標)規格に従う通信プロトコル(以下、エコネットプロトコルとも称する。)である。なお、「標準プロトコル」は、エコネットプロトコルに限らず、標準規格として用いられているプロトコルであればよい。 The “standard protocol” is, for example, an information transmission method for transmitting a control command, which is information for controlling the target load 205, to the target load 205, and specifically, a communication protocol according to the ECHONET Lite (registered trademark) standard. (Hereinafter, also referred to as Econet Protocol). The "standard protocol" is not limited to the ECONET protocol, and may be any protocol used as a standard.

「メーカ独自プロトコル」は、たとえば、対象負荷205をオンまたはオフする制御を行うための情報である制御命令を、当該対象負荷205に対して接点信号制御を行うLAN接点変換器207へ送信するための情報伝達方法であり、具体的にはLAN接点変換器207を製造したメーカが独自に作成した規格に従う通信プロトコルである。 The “manufacturer original protocol” is, for example, for transmitting a control command, which is information for performing control for turning on or off the target load 205, to the LAN contact converter 207 that performs contact signal control for the target load 205. Information transmission method, specifically, a communication protocol conforming to the standard originally created by the manufacturer of the LAN contact converter 207.

接点信号制御は、たとえば「接点信号のOn/Off」の示す信号伝達方法を用いる制御である。ネットワーク制御は、たとえば、「標準プロトコル」または「メーカ独自プロトコル」の示す情報伝達方法を用いる制御である。なお、接点信号制御は、たとえば制御を行う装置と制御を受ける装置とが同じ施設に位置する場合に可能となる。 The contact signal control is, for example, control using a signal transmission method indicated by “contact signal On/Off”. The network control is, for example, control using an information transmission method indicated by the “standard protocol” or the “maker's original protocol”. The contact signal control can be performed, for example, when the control device and the control device are located in the same facility.

LAN接点変換器207は、たとえば、需要家装置202から制御命令を受信すると、受信した制御命令に基づいて、接点信号制御を行うことにより対象負荷205をオンまたはオフする。 For example, when the LAN contact converter 207 receives a control command from the consumer device 202, the LAN contact converter 207 turns on or off the target load 205 by performing contact signal control based on the received control command.

制御部44は、受信部42によって受信された対象負荷情報の示す対象負荷205を制御することにより、対象負荷205の電力消費を抑制する。また、制御部44は、制御情報の示す制御内容に従って対象負荷205を制御する。 The control unit 44 suppresses the power consumption of the target load 205 by controlling the target load 205 indicated by the target load information received by the receiving unit 42. The control unit 44 also controls the target load 205 according to the control content indicated by the control information.

具体的には、制御部44は、受信部42から対象負荷制御情報およびDR期間情報を受けると、以下の処理を行う。 Specifically, when the control unit 44 receives the target load control information and the DR period information from the reception unit 42, the control unit 44 performs the following processing.

すなわち、制御部44は、DR期間情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さに基づいてDR終了タイミングを演算する。 That is, the control unit 44 acquires the DR start timing and the length of the DR period from the DR period information, and calculates the DR end timing based on the acquired DR start timing and the length of the DR period.

そして、制御部44は、たとえば、カウンタ46のカウント値を監視し、DR開始タイミングが到来するまで待機する。制御部44は、たとえば、カウンタ46のカウント値からDR開始タイミングが到来したことを認識すると、DR期間であることを示す画面を表示部47に表示させる。 Then, the control unit 44, for example, monitors the count value of the counter 46 and waits until the DR start timing arrives. For example, when the control unit 44 recognizes that the DR start timing has arrived from the count value of the counter 46, the control unit 44 causes the display unit 47 to display a screen indicating that it is the DR period.

また、制御部44は、DR開始タイミングにおいて対象負荷205の制御を開始する。より詳細には、制御部44は、対象負荷205との通信方法に関する情報を記憶部45から取得し、取得した通信方法を用いて対象負荷205を制御する。 Further, the control unit 44 starts controlling the target load 205 at the DR start timing. More specifically, the control unit 44 acquires information regarding the communication method with the target load 205 from the storage unit 45, and controls the target load 205 using the acquired communication method.

具体的には、制御部44は、たとえば、受信部42から受けた対象負荷制御情報から対象負荷IDおよび対応の制御内容を取得する。より詳細には、制御部44は、たとえば「対象負荷ID:AAA−1,制御内容:オフ」および「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」を取得する。 Specifically, the control unit 44 acquires the target load ID and the corresponding control content from the target load control information received from the receiving unit 42, for example. More specifically, the control unit 44 acquires, for example, “target load ID: AAA-1, control content: OFF” and “target load ID: AAA-4, control content: increase set value by 3° C.”.

また、制御部44は、たとえば、記憶部45における負荷制御テーブルTbl2を参照する。そして、制御部44は、たとえば、対象負荷制御情報に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法の情報を負荷制御テーブルTbl2から取得する。 The control unit 44 also refers to the load control table Tbl2 in the storage unit 45, for example. Then, the control unit 44 acquires the information on the connection I/F and the control method corresponding to the target load ID from the load control table Tbl2 based on the target load control information, for example.

具体的には、制御部44は、たとえば、「対象負荷ID:AAA−1,制御内容:オフ」に対応する接続I/Fおよび制御方法としてそれぞれ「接点」および「接点信号のOn/Off」を取得する。 Specifically, the control unit 44, for example, as a connection I/F and a control method corresponding to “target load ID: AAA-1, control content: OFF” and “contact” and “contact signal On/Off”, respectively. To get.

また、制御部44は、たとえば、「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」に対応する接続I/Fおよび制御方法としてそれぞれ「Ethernet」および「標準プロトコル」を取得する。 Further, the control unit 44 acquires, for example, “Ethernet” and “standard protocol” as the connection I/F and control method corresponding to “target load ID: AAA-4, control content: increase set value by 3° C.”, respectively. To do.

そして、制御部44は、たとえば、DR開始タイミングにおいて、対象負荷IDおよび対応の制御内容、ならびに対象負荷IDに対応する接続I/Fおよび制御方法に基づいて、接点信号または制御命令を負荷205へ送信する。 Then, for example, at the DR start timing, the control unit 44 sends a contact signal or a control command to the load 205 based on the target load ID and the corresponding control content, and the connection I/F and the control method corresponding to the target load ID. Send.

具体的には、制御部44は、たとえば対象負荷IDに対応する対象負荷205のアドレスを保持している。なお、対象負荷IDが対象負荷205のアドレス自体であってもよい。 Specifically, the control unit 44 holds, for example, the address of the target load 205 corresponding to the target load ID. The target load ID may be the address itself of the target load 205.

制御部44は、たとえば、DR開始タイミングにおいて、「対象負荷ID:AAA−1,制御内容:オフ」と対応の「接点」および「接点信号のOn/Off」とに基づいて、スイッチをオフするための接点信号を「AAA−1」の負荷205Aへ送信する。これにより、負荷205Aのスイッチがオフされる制御が制御部44により開始される。 For example, at the DR start timing, the control unit 44 turns off the switch based on "target load ID: AAA-1, control content: off" and the corresponding "contact" and "contact signal On/Off". To the load 205A of "AAA-1". As a result, the control unit 44 starts the control for turning off the switch of the load 205A.

また、制御部44は、たとえば、DR開始タイミングにおいて、「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」と対応の「Ethernet」および「標準プロトコル」とに基づいて、「設定値を3℃上げる」ことを示す制御命令を、イーサネット規格に従って、「AAA−4」の負荷205Dへ送信部43およびLAN11経由で送信する。これにより、負荷205Dの設定温度が3℃上げられる制御が制御部44により開始される。 In addition, for example, at the DR start timing, the control unit 44, based on “target load ID: AAA-4, control content: increase set value by 3° C.” and corresponding “Ethernet” and “standard protocol”, A control command indicating "increase the set value by 3° C." is transmitted to the load 205D of "AAA-4" via the transmission unit 43 and the LAN 11 according to the Ethernet standard. As a result, the control unit 44 starts control to raise the set temperature of the load 205D by 3°C.

制御部44は、たとえば、対象負荷制御情報に基づく対象負荷205の制御を行った後、たとえば、カウンタ46のカウント値からDR終了タイミングが到来したことを認識すると以下の処理を行う。 For example, after controlling the target load 205 based on the target load control information, the control unit 44 performs the following processing when recognizing that the DR end timing has arrived from the count value of the counter 46, for example.

すなわち、制御部44は、たとえば、DR終了タイミングにおいて対象負荷205の制御を終了する。 That is, the control unit 44 ends the control of the target load 205 at the DR end timing, for example.

具体的には、制御部44は、たとえば、負荷205Aの制御状態をDR開始タイミングより前の状態に戻すために、「対象負荷ID:AAA−1,制御内容:オフ」と対応の「接点」および「接点信号のOn/Off」とに基づいて、スイッチをオンするための接点信号を「AAA−1」の負荷205Aへ送信する。 Specifically, for example, in order to return the control state of the load 205A to the state before the DR start timing, the control unit 44 has a "contact point" corresponding to "target load ID: AAA-1, control content: OFF". A contact signal for turning on the switch is transmitted to the load 205A of "AAA-1" based on "and On/Off of contact signal".

また、制御部44は、たとえば、負荷205Dの制御状態をDR開始タイミングより前の状態に戻すために、「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」と対応の「Ethernet」および「標準プロトコル」とに基づいて、「設定値を3℃下げる」ことを示す制御命令を、イーサネット規格に従って、「AAA−4」の負荷205Dへ送信部43およびLAN11経由で送信する。 Further, for example, in order to return the control state of the load 205D to the state before the DR start timing, the control unit 44 corresponds to “target load ID: AAA-4, control content: increase set value by 3° C.”. Based on Ethernet and standard protocol, a control command indicating "decrease setting value by 3°C" is transmitted to the load 205D of "AAA-4" via the transmission unit 43 and LAN 11 according to the Ethernet standard.

ここで、たとえば、対象負荷205が電熱器等の熱を発生する機器である場合において、DR開始タイミングにおいて制御部44により電熱器のスイッチがオフされた後、電熱器が転倒してしまった状況を想定する。 Here, for example, in the case where the target load 205 is a device that generates heat such as an electric heater, a situation in which the electric heater falls over after the control unit 44 switches off the electric heater at the DR start timing. Assume

このような状況において、DR終了タイミングにおいて制御部44により電熱器のスイッチがオンされると、電熱器は転倒した状態において熱を発生してしまうことがある。 In such a situation, when the control unit 44 turns on the switch of the electric heater at the DR end timing, the electric heater may generate heat in the overturned state.

したがって、DR終了タイミングにおいて負荷205の制御状態をDR開始タイミングより前の状態に戻す処理は、制御部44により行われる構成に限らず、需要家等の人手により行われる構成であってもよい。 Therefore, the process of returning the control state of the load 205 to the state before the DR start timing at the DR end timing is not limited to the configuration performed by the control unit 44, and may be performed manually by a consumer or the like.

また、制御部44は、たとえば、DR期間の終了に関する情報を出力する。具体的には、制御部44は、たとえば、DR期間が終了したことを示す画面を表示部47に表示させる。 Further, the control unit 44 outputs, for example, information regarding the end of the DR period. Specifically, the control unit 44 causes the display unit 47 to display a screen indicating that the DR period has ended, for example.

[動作]
図8は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。
[motion]
FIG. 8: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 1st Embodiment of this invention.

電力消費管理システム301における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンス図の各ステップの一部または全部を含むプログラムを図示しないメモリからそれぞれ読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。 Each device in the power consumption management system 301 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including some or all of the steps of the following sequence diagram from a memory (not shown). .. The programs of these plural devices can be installed from the outside. The programs of these plural devices are distributed in the state of being stored in the recording medium.

図8を参照して、まず、系統側管理装置151は、電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行なうべきであると判断し、電力管理情報を含むDR要請信号を電力消費管理装置101へ送信する(ステップS102)。 Referring to FIG. 8, first, the grid-side management device 151 predicts the power demand, determines that the power consumption should be suppressed when the power demand and supply are likely to be tight, and determines the power management information. The DR request signal containing the DR request signal is transmitted to the power consumption management apparatus 101 (step S102).

次に、電力消費管理装置101は、受信したDR要請信号に含まれる電力管理情報に基づいて、DLCマッピングテーブルTbl1に含まれる節電パターンの中から対象節電パターンを決定する(ステップS104)。 Next, the power consumption management apparatus 101 determines a target power saving pattern from the power saving patterns included in the DLC mapping table Tbl1 based on the power management information included in the received DR request signal (step S104).

次に、電力消費管理装置101は、決定した対象節電パターンに含まれる対象負荷候補IDおよび対応の制御内容を含む対象負荷制御情報を生成するとともに、電力管理情報からDR期間情報を生成する。そして、電力消費管理装置101は、生成した対象負荷制御情報およびDR期間情報を含むDLC信号を需要家装置202へ送信する(ステップS106)。 Next, the power consumption management apparatus 101 generates the target load control information including the target load candidate ID included in the determined target power saving pattern and the corresponding control content, and also generates the DR period information from the power management information. Then, the power consumption management apparatus 101 transmits a DLC signal including the generated target load control information and DR period information to the consumer device 202 (step S106).

次に、需要家装置202は、電力消費管理装置101からDLC信号を受信すると、受信したDLC信号から対象負荷制御情報およびDR期間情報を取得する。そして、需要家装置202は、取得した対象負荷制御情報、および負荷制御テーブルTbl2の内容に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する(ステップS108)。 Next, when the consumer device 202 receives the DLC signal from the power consumption management device 101, the consumer device 202 acquires the target load control information and the DR period information from the received DLC signal. Then, the consumer device 202 acquires the connection I/F and the control method corresponding to the target load ID based on the acquired target load control information and the content of the load control table Tbl2 (step S108).

次に、需要家装置202は、DR期間情報からDR開始タイミングを取得し、DR開始タイミングまで待機する(ステップS110)。 Next, the consumer device 202 acquires the DR start timing from the DR period information and waits until the DR start timing (step S110).

次に、需要家装置202は、カウンタ46のカウント値からDR開始タイミングが到来したことを認識する(ステップS112)。 Next, the consumer device 202 recognizes that the DR start timing has arrived from the count value of the counter 46 (step S112).

次に、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS114)。 Next, the consumer device 202 transmits a contact signal for turning off the switch to the load 205A corresponding to the target load ID based on the acquired target load control information, the connection I/F, and the control method (step). S114).

また、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、「設定値を3℃上げる」ことを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS116)。 In addition, the consumer device 202, based on the acquired target load control information, the connection I/F, and the control method, sends a control command indicating “increase the set value by 3° C.” to the target load ID according to the Ethernet standard. It transmits to the corresponding load 205D (step S116).

次に、需要家装置202は、カウンタ46のカウント値からDR終了タイミングが到来したことを認識する(ステップS118)。 Next, the consumer device 202 recognizes from the count value of the counter 46 that the DR end timing has arrived (step S118).

次に、需要家装置202は、負荷205Aの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオンするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS120)。 Next, the consumer device 202 turns on the switch based on the target load control information and the connection I/F and the control method in order to return the control state of the load 205A to the state before the DR start timing. The contact signal is transmitted to the load 205A corresponding to the target load ID (step S120).

また、需要家装置202は、負荷205Dの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、「設定値を3℃下げる」ことを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS122)。 Further, the consumer device 202, in order to return the control state of the load 205D to the state before the DR start timing, “decreases the set value by 3° C.” based on the target load control information, the connection I/F, and the control method. According to the Ethernet standard, is transmitted to the load 205D corresponding to the target load ID (step S122).

このように、需要家装置202がDR期間を管理する構成により、DR期間の管理処理の負担を需要家装置202に分散することができる。 In this way, by the configuration in which the customer device 202 manages the DR period, the load of management processing in the DR period can be distributed to the customer devices 202.

[変形例1]
図9は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費管理装置の変形例の構成を示す図である。
[Modification 1]
FIG. 9: is a figure which shows the structure of the modification of the power consumption management apparatus in the power consumption management system which concerns on the 1st Embodiment of this invention.

図9を参照して、電力消費管理装置101の変形例である電力消費管理装置111は、図3に示す電力消費管理装置101と比べて、さらに、カウンタ27を備える。 Referring to FIG. 9, power consumption management apparatus 111, which is a modification of power consumption management apparatus 101, further includes counter 27, as compared with power consumption management apparatus 101 shown in FIG. 3.

電力消費管理装置111における受信部22、送信部23、管理情報取得部24、負荷決定部25および記憶部26の動作は、図3に示す電力消費管理装置101における受信部22、送信部23、管理情報取得部24、負荷決定部25および記憶部26とそれぞれ同様である。カウンタ27の動作は、図6に示す需要家装置202におけるカウンタ46と同様である。 The operation of the reception unit 22, the transmission unit 23, the management information acquisition unit 24, the load determination unit 25, and the storage unit 26 in the power consumption management device 111 is performed by the reception unit 22, the transmission unit 23, and the reception unit 22 in the power consumption management device 101 illustrated in FIG. The management information acquisition unit 24, the load determination unit 25, and the storage unit 26 are similar to each other. The operation of the counter 27 is similar to that of the counter 46 in the consumer device 202 shown in FIG.

図10は、本発明の第1の実施の形態に係る電力消費管理システムにおける需要家装置の変形例の構成を示す図である。 FIG. 10: is a figure which shows the structure of the modification of the consumer device in the power consumption management system which concerns on the 1st Embodiment of this invention.

図10を参照して、需要家装置202の変形例である需要家装置212は、図6に示す需要家装置202と比べて、カウンタ46を備えない。 Referring to FIG. 10, consumer device 212, which is a modified example of consumer device 202, does not include counter 46 as compared with consumer device 202 shown in FIG. 6.

需要家装置212における受信部42、送信部43、制御部44、記憶部45および表示部47の動作は、図6に示す需要家装置202における受信部42、送信部43、制御部44、記憶部45および表示部47とそれぞれ同様である。 The operations of the reception unit 42, the transmission unit 43, the control unit 44, the storage unit 45, and the display unit 47 in the consumer device 212 are the same as those of the reception unit 42, the transmission unit 43, the control unit 44, and the storage unit in the consumer device 202 illustrated in FIG. It is similar to the unit 45 and the display unit 47, respectively.

再び図9を参照して、負荷決定部25は、たとえば、管理情報取得部24から電力管理情報を受けると、DLCマッピングテーブルTbl1に含まれる節電パターンの中から対象節電パターンを決定する。 Referring again to FIG. 9, when the load determining unit 25 receives the power management information from the management information acquiring unit 24, for example, the load determining unit 25 determines the target power saving pattern from the power saving patterns included in the DLC mapping table Tbl1.

負荷決定部25は、決定した対象節電パターンから対象負荷候補IDおよび制御内容を取得し、取得した対象負荷候補を示す対象負荷情報と当該対象負荷候補に対する制御内容を示す制御情報とを含む対象負荷制御情報を生成する。 The load determination unit 25 acquires the target load candidate ID and the control content from the determined target power saving pattern, and the target load including the target load information indicating the acquired target load candidate and the control information indicating the control content for the target load candidate. Generate control information.

また、負荷決定部25は、電力管理情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さに基づいてDR終了タイミングを演算する。そして、負荷決定部25は、たとえば、カウンタ27のカウント値を監視し、DR開始タイミングが到来するまで待機する。 The load determining unit 25 also acquires the DR start timing and the length of the DR period from the power management information, and calculates the DR end timing based on the acquired DR start timing and the length of the DR period. Then, the load determination unit 25, for example, monitors the count value of the counter 27 and waits until the DR start timing arrives.

負荷決定部25は、たとえば、カウンタ27のカウント値からDR開始タイミングが到来したことを認識すると、生成した対象負荷制御情報、および需要家AAAの需要家装置202のアドレスを送信部23へ出力する。 For example, when the load determining unit 25 recognizes that the DR start timing has arrived from the count value of the counter 27, the load determining unit 25 outputs the generated target load control information and the address of the consumer device 202 of the consumer AAA to the transmitting unit 23. ..

たとえば、送信部23は、負荷決定部25から対象負荷制御情報および需要家AAAの需要家装置202のアドレスを受けると、受けたアドレスを宛先として、対象負荷制御情報を含むDLC信号を需要家AAAの需要家装置212へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the target load control information and the address of the customer device 202 of the customer AAA from the load determination unit 25, the transmission unit 23 sets the received address as a destination and sends the DLC signal including the target load control information to the customer AAA. To the consumer device 212 of the above via the Internet 10.

また、負荷決定部25は、たとえば、対象負荷制御情報およびアドレスを送信部23へ出力した後、カウンタ27のカウント値からDR終了タイミングが到来したことを認識すると、節電の解除を示す解除命令および需要家AAAの需要家装置212のアドレスを送信部23へ出力する。 Further, for example, when the load determining unit 25 recognizes that the DR end timing has arrived from the count value of the counter 27 after outputting the target load control information and the address to the transmitting unit 23, the load determining unit 25 releases the power saving command and the cancel command. The address of the customer device 212 of the customer AAA is output to the transmission unit 23.

たとえば、送信部23は、負荷決定部25から解除命令および需要家AAAの需要家装置212のアドレスを受けると、受けたアドレスを宛先として、解除命令を含む解除信号を需要家AAAの需要家装置212へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the cancellation command and the address of the consumer device 212 of the customer AAA from the load determination unit 25, the cancellation signal including the cancellation command is addressed to the received address and the consumer device of the consumer AAA is received. 212 to the Internet via the Internet 10.

再び図10を参照して、需要家装置212は、たとえば、電力消費管理装置111からDLC信号をインターネット10経由で受信するまで待機している。 Referring to FIG. 10 again, consumer device 212 waits, for example, until it receives a DLC signal from power consumption management device 111 via Internet 10.

受信部42は、たとえば、電力消費管理装置111からDLC信号をインターネット10経由で受信すると、受信したDLC信号から対象負荷制御情報を取得し、取得した対象負荷制御情報を制御部44へ出力する。 When receiving the DLC signal from the power consumption management apparatus 111 via the Internet 10, the reception unit 42 acquires the target load control information from the received DLC signal and outputs the acquired target load control information to the control unit 44.

制御部44は、たとえば、受信部42から対象負荷制御情報を受けると、DR期間であることを示す画面を表示部47に表示させる。 For example, when the control unit 44 receives the target load control information from the reception unit 42, the control unit 44 causes the display unit 47 to display a screen indicating that it is the DR period.

そして、制御部44は、たとえば、受信部42から受けた対象負荷制御情報から対象負荷IDおよび対応の制御内容を取得する。 Then, the control unit 44 acquires the target load ID and the corresponding control content from the target load control information received from the receiving unit 42, for example.

また、制御部44は、たとえば、記憶部45における負荷制御テーブルTbl2を参照する。そして、制御部44は、たとえば、対象負荷制御情報に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する。 The control unit 44 also refers to the load control table Tbl2 in the storage unit 45, for example. Then, the control unit 44 acquires, for example, the connection I/F and the control method corresponding to the target load ID based on the target load control information.

そして、制御部44は、たとえば、対象負荷IDおよび対応の制御内容、ならびに対象負荷IDに対応する接続I/Fおよび制御方法に基づいて、接点信号または制御命令を負荷205へ送信する。 Then, the control unit 44 transmits a contact signal or a control command to the load 205 based on, for example, the target load ID and the corresponding control content, and the connection I/F and the control method corresponding to the target load ID.

また、受信部42は、たとえば、電力消費管理装置111から解除信号をインターネット10経由で受信すると、受信した解除信号から解除命令を取得し、取得した解除命令を制御部44へ出力する。 In addition, for example, when receiving a cancellation signal from the power consumption management device 111 via the Internet 10, the reception unit 42 acquires a cancellation command from the received cancellation signal, and outputs the acquired cancellation command to the control unit 44.

制御部44は、たとえば、受信部42から解除命令を受けると、対象負荷205の制御を終了する。また、制御部44は、たとえばDR期間の終了に関する情報を出力する、具体的には、DR期間が終了したことを示す画面を表示部47に表示させる。 For example, the control unit 44 ends the control of the target load 205 when receiving the release command from the reception unit 42. Further, the control unit 44 outputs, for example, information regarding the end of the DR period, and more specifically, causes the display unit 47 to display a screen indicating that the DR period has ended.

なお、DR終了タイミングにおいて負荷205の制御状態をDR開始タイミングより前の状態に戻す処理は、制御部44により行われる構成に限らず、需要家等の人手により行われる構成であってもよい。 The process of returning the control state of the load 205 to the state before the DR start timing at the DR end timing is not limited to the configuration performed by the control unit 44, and may be performed manually by a consumer or the like.

[変形例1の動作]
図11は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの他の例を示す図である。
[Operation of Modification 1]
FIG. 11: is a figure which shows the other example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 1st Embodiment of this invention.

図11を参照して、まず、系統側管理装置151は、電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行なうべきであると判断し、電力管理情報を含むDR要請信号を電力消費管理装置111へ送信する(ステップS152)。 With reference to FIG. 11, first, the grid-side management device 151 predicts the power demand, determines that power consumption should be suppressed when there is a high possibility that the power demand and supply will be tight, and the power management information is displayed. The DR request signal containing the DR request signal is transmitted to the power consumption management apparatus 111 (step S152).

次に、電力消費管理装置111は、受信したDR要請信号に含まれる電力管理情報に基づいて、DLCマッピングテーブルTbl1に含まれる節電パターンの中から対象節電パターンを決定する(ステップS154)。 Next, the power consumption management apparatus 111 determines a target power saving pattern from the power saving patterns included in the DLC mapping table Tbl1 based on the power management information included in the received DR request signal (step S154).

次に、電力消費管理装置111は、決定した対象節電パターンに含まれる対象負荷候補IDおよび対応の制御内容を含む対象負荷制御情報を生成するとともに、以下の処理を行う。すなわち、電力消費管理装置111は、電力管理情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さに基づいてDR終了タイミングを演算する。そして、電力消費管理装置111は、DR開始タイミングまで待機する(ステップS156)。 Next, the power consumption management apparatus 111 generates the target load control information including the target load candidate ID included in the determined target power saving pattern and the corresponding control content, and also performs the following processing. That is, the power consumption management apparatus 111 acquires the DR start timing and the length of the DR period from the power management information, and calculates the DR end timing based on the acquired DR start timing and the length of the DR period. Then, the power consumption management apparatus 111 waits until the DR start timing (step S156).

次に、電力消費管理装置111は、カウンタ27のカウント値からDR開始タイミングが到来したことを認識する(ステップS158)。 Next, the power consumption management apparatus 111 recognizes that the DR start timing has arrived from the count value of the counter 27 (step S158).

次に、電力消費管理装置111は、生成した対象負荷制御情報を含むDLC信号を需要家装置212へ送信する(ステップS160)。 Next, the power consumption management apparatus 111 transmits the DLC signal including the generated target load control information to the consumer device 212 (step S160).

次に、需要家装置212は、電力消費管理装置111からDLC信号を受信すると、受信したDLC信号から対象負荷制御情報を取得する。そして、需要家装置212は、取得した対象負荷制御情報、および負荷制御テーブルTbl2の内容に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する(ステップS162)。 Next, when the consumer device 212 receives the DLC signal from the power consumption management device 111, the consumer device 212 acquires the target load control information from the received DLC signal. Then, the consumer device 212 acquires the connection I/F and the control method corresponding to the target load ID based on the acquired target load control information and the content of the load control table Tbl2 (step S162).

次に、需要家装置212は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS164)。 Next, the consumer device 212 transmits a contact signal for turning off the switch to the load 205A corresponding to the target load ID, based on the acquired target load control information, the connection I/F, and the control method (step). S164).

また、需要家装置212は、取得した対象負荷制御情報、接続I/Fおよび制御方法に基づいて、「設定値を3℃上げる」ことを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS166)。 In addition, the consumer device 212 responds to the target load ID according to the Ethernet standard by issuing a control command indicating “increase the set value by 3° C.” based on the acquired target load control information, connection I/F, and control method. To the load 205D to be operated (step S166).

次に、電力消費管理装置111は、カウンタ27のカウント値からDR終了タイミングが到来したことを認識する(ステップS168)。 Next, the power consumption management apparatus 111 recognizes that the DR end timing has arrived from the count value of the counter 27 (step S168).

次に、電力消費管理装置111は、解除命令を含む解除信号を需要家装置212へ送信する(ステップS170)。 Next, the power consumption management apparatus 111 transmits the cancellation|release signal containing a cancellation|release command to the consumer device 212 (step S170).

次に、需要家装置212は、電力消費管理装置111から解除信号を受信すると、受信した解除信号から解除命令を取得し、取得した解除命令に基づいて以下の処理を行う。すなわち、需要家装置212は、負荷205Aの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオンするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS172)。 Next, when the consumer device 212 receives the cancellation signal from the power consumption management device 111, the consumer device 212 acquires a cancellation command from the received cancellation signal, and performs the following processing based on the acquired cancellation command. That is, in order to return the control state of the load 205A to the state before the DR start timing, the consumer device 212 has a contact for turning on the switch based on the target load control information and the connection I/F and the control method. The signal is transmitted to the load 205A corresponding to the target load ID (step S172).

また、需要家装置212は、負荷205Dの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、「設定値を3℃下げる」ことを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS174)。 Further, the consumer device 212 returns the control state of the load 205D to the state before the DR start timing, based on the target load control information, the connection I/F, and the control method, “decrease the set value by 3° C.” According to the Ethernet standard, is transmitted to the load 205D corresponding to the target load ID (step S174).

このように、電力消費管理装置111がDR期間を管理する構成により、需要家装置212におけるカウンタ46等のDR期間を管理するための構成を不要にすることができるので、需要家装置212のコストダウンを図ることができる。また、DLC信号に含める情報量を削減することができるので、通信回線における情報伝送の負担を軽減することができる。 As described above, with the configuration in which the power consumption management apparatus 111 manages the DR period, the configuration for managing the DR period, such as the counter 46 in the consumer device 212, can be eliminated, so that the cost of the consumer device 212 can be reduced. Can be down. Further, since the amount of information included in the DLC signal can be reduced, it is possible to reduce the burden of information transmission on the communication line.

[変形例2]
本発明の第1の実施の形態に係る電力消費管理システムの変形例2は、図3に示す電力消費管理装置101と、図6に示す需要家装置202の変形例である需要家装置222とを備える。
[Modification 2]
A modified example 2 of the power consumption management system according to the first embodiment of the present invention includes a power consumption management device 101 shown in FIG. 3 and a consumer device 222 which is a modified example of the consumer device 202 shown in FIG. Equipped with.

図12は、本発明の第1の実施の形態に係る電力消費管理システムの変形例における需要家装置の変形例の構成を示す図である。 FIG. 12: is a figure which shows the structure of the modification of a consumer device in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention.

図12を参照して、変形例2に係る電力消費管理システムでは、需要家装置222は、図6に示す需要家装置202と比べて、カウンタ46を備えない。 With reference to FIG. 12, in the power consumption management system according to the second modification, consumer device 222 does not include counter 46 as compared with consumer device 202 shown in FIG. 6.

需要家装置212における受信部42、送信部43、制御部44、記憶部45および表示部47の動作は、図6に示す需要家装置202における受信部42、送信部43、制御部44、記憶部45および表示部47とそれぞれ同様である。 The operations of the reception unit 42, the transmission unit 43, the control unit 44, the storage unit 45, and the display unit 47 in the consumer device 212 are the same as those of the reception unit 42, the transmission unit 43, the control unit 44, and the storage unit in the consumer device 202 illustrated in FIG. It is similar to the unit 45 and the display unit 47, respectively.

需要家装置222における制御部44は、受信部42によって受信された対象負荷情報の示す対象負荷205を制御することにより、対象負荷205の電力消費を抑制する。また、制御部44は、制御情報の示す制御内容に従って対象負荷205を制御する。 The control unit 44 in the consumer device 222 controls the target load 205 indicated by the target load information received by the receiving unit 42, thereby suppressing the power consumption of the target load 205. The control unit 44 also controls the target load 205 according to the control content indicated by the control information.

また、制御部44は、対象負荷205との通信方法に関する情報を記憶部45から取得し、取得した通信方法を用いて対象負荷205を制御する。 Further, the control unit 44 acquires information regarding a communication method with the target load 205 from the storage unit 45, and controls the target load 205 using the acquired communication method.

具体的には、制御部44は、受信部42から対象負荷制御情報およびDR期間情報を受けると、以下の処理を行う。 Specifically, when the control unit 44 receives the target load control information and the DR period information from the reception unit 42, the control unit 44 performs the following processing.

すなわち、制御部44は、たとえば、対象負荷制御情報から対象負荷IDおよび対応の制御内容を取得する。ここでは、制御部44は、たとえば「対象負荷ID:AAA−2,制御内容:オフ」および「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」を取得する。 That is, the control unit 44 acquires the target load ID and the corresponding control content from the target load control information, for example. Here, the control unit 44 acquires, for example, "target load ID: AAA-2, control content: OFF" and "target load ID: AAA-4, control content: increase set value by 3°C".

また、制御部44は、たとえば、記憶部45における負荷制御テーブルTbl2を参照する。そして、制御部44は、たとえば、対象負荷制御情報に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法の情報を負荷制御テーブルTbl2から取得する。 The control unit 44 also refers to the load control table Tbl2 in the storage unit 45, for example. Then, the control unit 44 acquires the information on the connection I/F and the control method corresponding to the target load ID from the load control table Tbl2 based on the target load control information, for example.

具体的には、制御部44は、たとえば、「対象負荷ID:AAA−2,制御内容:オフ」に対応する接続I/Fおよび制御方法としてそれぞれ「Ethernet」および「メーカ独自プロトコル」を取得する。 Specifically, the control unit 44 acquires, for example, "Ethernet" and "maker-specific protocol" as the connection I/F and control method corresponding to "target load ID: AAA-2, control content: OFF", respectively. ..

また、制御部44は、たとえば、「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」に対応する接続I/Fおよび制御方法としてそれぞれ「Ethernet」および「標準プロトコル」を取得する。 Further, the control unit 44 acquires, for example, “Ethernet” and “standard protocol” as the connection I/F and control method corresponding to “target load ID: AAA-4, control content: increase set value by 3° C.”, respectively. To do.

そして、制御部44は、たとえば、対象負荷IDおよび対応の制御内容、ならびに対象負荷IDに対応する接続I/Fおよび制御方法に基づいて、制御命令を負荷205へ送信する。 Then, the control unit 44 transmits a control command to the load 205 based on, for example, the target load ID and the corresponding control content, and the connection I/F and the control method corresponding to the target load ID.

具体的には、制御部44は、たとえば、「対象負荷ID:AAA−2」に対応する対象負荷制御情報である「対象負荷ID:AAA−2,制御内容:オフ」、およびDR期間情報を含む情報を制御命令A2として生成する。 Specifically, for example, the control unit 44 displays the target load control information corresponding to the “target load ID: AAA-2”, “target load ID: AAA-2, control content: off”, and DR period information. The included information is generated as the control command A2.

そして、制御部44は、たとえば、「対象負荷ID:AAA−2」に対応する「Ethernet」および「メーカ独自プロトコル」に基づいて、生成した制御命令A2をイーサネット規格に従って、対象負荷IDに対応する負荷205Bに対して接点信号制御を行うLAN接点変換器207へ送信する。 Then, the control unit 44 responds to the target load ID in accordance with the Ethernet control of the generated control command A2 based on, for example, "Ethernet" corresponding to "target load ID: AAA-2" and "maker's original protocol". It transmits to the LAN contact converter 207 which performs contact signal control with respect to the load 205B.

また、制御部44は、たとえば、「対象負荷ID:AAA−4」に対応する対象負荷制御情報である「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」、およびDR期間情報を含む情報を制御命令A4として生成する。 Further, the control unit 44, for example, is the target load control information corresponding to the "target load ID: AAA-4", "target load ID: AAA-4, control content: increase set value by 3° C.", and DR period. Information including information is generated as the control command A4.

そして、制御部44は、たとえば、「対象負荷ID:AAA−4」に対応する「Ethernet」および「標準プロトコル」に基づいて、生成した制御命令A4をイーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する。 Then, the control unit 44, for example, based on the "Ethernet" and the "standard protocol" corresponding to the "target load ID: AAA-4", the generated control command A4 according to the Ethernet standard, the load corresponding to the target load ID. Send to 205D.

[LAN接点変換器207]
図13は、本発明の第1の実施の形態に係る電力消費管理システムの変形例におけるLAN接点変換器の構成を示す図である。
[LAN contact converter 207]
FIG. 13: is a figure which shows the structure of the LAN contact converter in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention.

図13を参照して、変形例2に係る電力消費管理システムでは、LAN接点変換器207は、カウンタ61と、制御部62と、受信部63とを含む。カウンタ61の動作は、図6に示す需要家装置202におけるカウンタ46と同様である。 With reference to FIG. 13, in the power consumption management system according to the second modification, LAN contact converter 207 includes a counter 61, a control unit 62, and a receiving unit 63. The operation of the counter 61 is similar to that of the counter 46 in the consumer device 202 shown in FIG.

LAN接点変換器207における受信部63は、需要家装置222から制御命令A2を受信すると、受信した制御命令A2を制御部62へ出力する。 Upon receiving the control command A2 from the consumer device 222, the reception unit 63 of the LAN contact converter 207 outputs the received control command A2 to the control unit 62.

制御部62は、受信部63から制御命令A2を受けると、受けた制御命令A2から対象負荷制御情報およびDR期間情報を取得する。 Upon receiving the control command A2 from the receiving unit 63, the control unit 62 acquires the target load control information and the DR period information from the received control command A2.

制御部62は、DR期間情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さに基づいてDR終了タイミングを演算する。 The control unit 62 acquires the DR start timing and the length of the DR period from the DR period information, and calculates the DR end timing based on the acquired DR start timing and the length of the DR period.

そして、制御部62は、たとえば、カウンタ61のカウント値を監視し、DR開始タイミングが到来するまで待機する。制御部62は、たとえば、カウンタ61のカウント値からDR開始タイミングが到来したことを認識すると、対象負荷205の制御を開始する。 Then, the control unit 62 monitors, for example, the count value of the counter 61 and waits until the DR start timing arrives. For example, when the control unit 62 recognizes that the DR start timing has arrived from the count value of the counter 61, the control unit 62 starts controlling the target load 205.

より詳細には、制御部62は、対象負荷制御情報が示す「対象負荷ID:AAA−2,制御内容:オフ」に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Bへ送信する。これにより、負荷205Bのスイッチをオフする制御が制御部62により開始される。 More specifically, the control unit 62 sends a contact signal for turning off the switch to the load corresponding to the target load ID, based on “target load ID: AAA-2, control content: OFF” indicated by the target load control information. 205B. As a result, the control unit 62 starts control to turn off the switch of the load 205B.

制御部62は、たとえば、対象負荷制御情報に基づく対象負荷205Bの制御を行った後、たとえば、カウンタ61のカウント値からDR終了タイミングが到来したことを認識すると以下の処理を行う。 After controlling the target load 205B based on the target load control information, for example, the control unit 62 recognizes that the DR end timing has come from the count value of the counter 61, and then performs the following process.

すなわち、制御部62は、たとえば、DR終了タイミングにおいて対象負荷205Bの制御を終了する。 That is, the control unit 62 ends the control of the target load 205B at the DR end timing, for example.

具体的には、制御部62は、たとえば、負荷205Bの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報が示す「対象負荷ID:AAA−2,制御内容:オフ」に基づいて、スイッチをオンするための接点信号を対象負荷IDに対応する負荷205Bへ送信する。 Specifically, for example, in order to return the control state of the load 205B to the state before the DR start timing, the control unit 62 indicates “target load ID: AAA-2, control content: off” indicated by the target load control information. Based on the above, the contact signal for turning on the switch is transmitted to the load 205B corresponding to the target load ID.

[負荷205D]
図14は、本発明の第1の実施の形態に係る電力消費管理システムの変形例における負荷の構成を示す図である。
[Load 205D]
FIG. 14: is a figure which shows the structure of the load in the modification of the power consumption management system which concerns on the 1st Embodiment of this invention.

図14を参照して、変形例2に係る電力消費管理システムでは、負荷205Dは、カウンタ71と、制御部72、受信部73とを含む。カウンタ71の動作は、図6に示す需要家装置202におけるカウンタ46と同様である。 With reference to FIG. 14, in the power consumption management system according to the second modification, the load 205D includes a counter 71, a control unit 72, and a receiving unit 73. The operation of the counter 71 is similar to that of the counter 46 in the consumer device 202 shown in FIG.

負荷205Dにおける受信部73は、需要家装置222から制御命令A4を受信すると、受信した制御命令A4を制御部72へ出力する。 Upon receiving the control command A4 from the consumer device 222, the receiving unit 73 in the load 205D outputs the received control command A4 to the control unit 72.

制御部72は、受信部73から制御命令A4を受けると、受けた制御命令A4から対象負荷制御情報およびDR期間情報を取得する。 Upon receiving the control command A4 from the receiving unit 73, the control unit 72 acquires the target load control information and the DR period information from the received control command A4.

制御部72は、DR期間情報からDR開始タイミングおよびDR期間の長さを取得し、取得したDR開始タイミングおよびDR期間の長さに基づいてDR終了タイミングを演算する。 The control unit 72 acquires the DR start timing and the length of the DR period from the DR period information, and calculates the DR end timing based on the acquired DR start timing and the length of the DR period.

そして、制御部72は、たとえば、カウンタ71のカウント値を監視し、DR開始タイミングが到来するまで待機する。制御部72は、たとえば、カウンタ71のカウント値からDR開始タイミングが到来したことを認識すると、自己の負荷205Dの制御を開始する。 Then, the control unit 72, for example, monitors the count value of the counter 71 and waits until the DR start timing arrives. When recognizing that the DR start timing has arrived from the count value of the counter 71, for example, the control unit 72 starts controlling its own load 205D.

より詳細には、制御部72は、対象負荷制御情報が示す「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」に基づいて、自己の負荷205Dの設定値を3℃上げる処理を行うことで、自己の電力消費を抑制する制御を開始する。 More specifically, the control unit 72 increases the set value of its own load 205D by 3° C. based on “target load ID: AAA-4, control content: increase set value by 3° C.” indicated by the target load control information. By performing the process, the control for suppressing its own power consumption is started.

制御部72は、たとえば、対象負荷制御情報に基づく自己の負荷205Dの制御を行った後、たとえば、カウンタ71のカウント値からDR終了タイミングが到来したことを認識すると以下の処理を行う。 For example, after controlling the own load 205D based on the target load control information, the control unit 72 performs the following processing when recognizing that the DR end timing has arrived from the count value of the counter 71, for example.

すなわち、制御部72は、たとえば、DR終了タイミングにおいて自己の負荷205Dの制御を終了する。 That is, the control unit 72 ends control of its own load 205D at the DR end timing, for example.

具体的には、制御部72は、たとえば、自己の負荷205Dの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報が示す「対象負荷ID:AAA−4,制御内容:設定値を3℃上げる」に基づいて、自己の負荷205Dの設定値を3℃下げる処理を行うことで、自己の電力消費を抑制する制御を終了する。 Specifically, for example, in order to return the control state of the load 205D of the control unit 72 to the state before the DR start timing, the control unit 72 indicates “target load ID: AAA-4, control content: By increasing the set value by 3° C.”, the control for suppressing the own power consumption is ended by performing the process of decreasing the set value of the own load 205D by 3° C.

[変形例2の動作]
図15は、本発明の第1の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの他の例を示す図である。
[Operation of Modification 2]
FIG. 15 is a diagram showing another example of the sequence of the power consumption suppressing process in the power consumption management system according to the first embodiment of the present invention.

図15を参照して、まず、系統側管理装置151は、電力需要を予測し、電力需給が逼迫する可能性が高い場合、電力消費の抑制を行なうべきであると判断し、電力管理情報を含むDR要請信号を電力消費管理装置101へ送信する(ステップS502)。 Referring to FIG. 15, first, the grid-side management device 151 predicts the power demand, determines that the power consumption should be suppressed when the power demand and supply are likely to be tight, and determines the power management information. The DR request signal including the signal is transmitted to the power consumption management apparatus 101 (step S502).

次に、電力消費管理装置101は、受信したDR要請信号に含まれる電力管理情報に基づいて、DLCマッピングテーブルTbl1に含まれる節電パターンの中から対象節電パターンを決定する(ステップS504)。 Next, the power consumption management apparatus 101 determines a target power saving pattern from the power saving patterns included in the DLC mapping table Tbl1 based on the power management information included in the received DR request signal (step S504).

次に、電力消費管理装置101は、決定した対象節電パターンに含まれる対象負荷候補IDおよび対応の制御内容を含む対象負荷制御情報を生成するとともに、電力管理情報からDR期間情報を生成する。そして、電力消費管理装置101は、生成した対象負荷制御情報およびDR期間情報を含むDLC信号を需要家装置222へ送信する(ステップS506)。 Next, the power consumption management apparatus 101 generates the target load control information including the target load candidate ID included in the determined target power saving pattern and the corresponding control content, and also generates the DR period information from the power management information. Then, the power consumption management apparatus 101 transmits the generated DLC signal including the target load control information and the DR period information to the consumer device 222 (step S506).

次に、需要家装置222は、電力消費管理装置101からDLC信号を受信すると、受信したDLC信号から対象負荷制御情報およびDR期間情報を取得する。そして、需要家装置222は、取得した対象負荷制御情報、および負荷制御テーブルTbl2の内容に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する(ステップS508)。 Next, when the consumer device 222 receives the DLC signal from the power consumption management device 101, the consumer device 222 acquires the target load control information and the DR period information from the received DLC signal. Then, the consumer device 222 acquires the connection I/F and the control method corresponding to the target load ID based on the acquired target load control information and the content of the load control table Tbl2 (step S508).

次に、需要家装置222は、対象負荷制御情報およびDR期間情報から制御命令A2を生成し、「対象負荷ID:AAA−2」に対応する接続I/Fおよび制御方法に基づいて、生成した制御命令A2をイーサネット規格に従って、対象負荷IDに対応する負荷205Bに対して接点信号制御を行うLAN接点変換器207へ送信する(ステップS510)。 Next, the consumer device 222 generates the control command A2 from the target load control information and the DR period information, and generates it based on the connection I/F and the control method corresponding to the “target load ID: AAA-2”. According to the Ethernet standard, the control command A2 is transmitted to the LAN contact converter 207 that performs contact signal control for the load 205B corresponding to the target load ID (step S510).

また、需要家装置222は、対象負荷制御情報およびDR期間情報から制御命令A4を生成し、「対象負荷ID:AAA−4」に対応する接続I/Fおよび制御方法に基づいて、生成した制御命令A4をイーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS512)。 Further, the consumer device 222 generates the control command A4 from the target load control information and the DR period information, and based on the connection I/F and the control method corresponding to the “target load ID: AAA-4”, the generated control. The command A4 is transmitted to the load 205D corresponding to the target load ID according to the Ethernet standard (step S512).

次に、LAN接点変換器207は、需要家装置222から制御命令A2を受信すると、受信した制御命令A2から対象負荷制御情報およびDR期間情報を取得する。そして、LAN接点変換器207は、DR期間情報からDR開始タイミングを取得し、DR開始タイミングまで待機する(ステップS514)。 Next, when the LAN contact converter 207 receives the control command A2 from the consumer device 222, the LAN contact converter 207 acquires the target load control information and the DR period information from the received control command A2. Then, the LAN contact converter 207 acquires the DR start timing from the DR period information and waits until the DR start timing (step S514).

また、負荷205Dは、需要家装置222から制御命令A4を受信すると、受信した制御命令A4から対象負荷制御情報およびDR期間情報を取得する。そして、負荷205Dは、DR期間情報からDR開始タイミングを取得し、DR開始タイミングまで待機する(ステップS516)。 When the load 205D receives the control command A4 from the consumer device 222, the load 205D acquires the target load control information and the DR period information from the received control command A4. Then, the load 205D acquires the DR start timing from the DR period information and waits until the DR start timing (step S516).

次に、LAN接点変換器207は、カウンタ61のカウント値からDR開始タイミングが到来したことを認識する(ステップS518)。 Next, the LAN contact converter 207 recognizes from the count value of the counter 61 that the DR start timing has arrived (step S518).

また、負荷205Dは、カウンタ71のカウント値からDR開始タイミングが到来したことを認識する(ステップS520)。 Further, the load 205D recognizes that the DR start timing has arrived from the count value of the counter 71 (step S520).

次に、LAN接点変換器207は、取得した対象負荷制御情報に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Bへ送信する(ステップS522)。 Next, the LAN contact converter 207 transmits a contact signal for turning off the switch to the load 205B corresponding to the target load ID based on the acquired target load control information (step S522).

また、負荷205Dは、取得した対象負荷制御情報に基づいて、自己の設定値を3℃上げる処理を行うことで、自己の電力消費を抑制する制御を開始する(ステップS524)。 In addition, the load 205D starts control to suppress its own power consumption by performing a process of increasing its own set value by 3° C. based on the acquired target load control information (step S524).

次に、LAN接点変換器207は、カウンタ61のカウント値からDR終了タイミングが到来したことを認識する(ステップS526)。 Next, the LAN contact converter 207 recognizes from the count value of the counter 61 that the DR end timing has arrived (step S526).

また、負荷205Dは、カウンタ71のカウント値からDR終了タイミングが到来したことを認識する(ステップS528)。 Further, the load 205D recognizes that the DR end timing has arrived from the count value of the counter 71 (step S528).

次に、LAN接点変換器207は、負荷205Bの制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報に基づいて、スイッチをオンするための接点信号を対象負荷IDに対応する負荷205Bへ送信する(ステップS530)。 Next, the LAN contact converter 207 corresponds the contact signal for turning on the switch to the target load ID based on the target load control information in order to return the control state of the load 205B to the state before the DR start timing. To the load 205B to be operated (step S530).

また、負荷205Dは、自己の制御状態をDR開始タイミングより前の状態に戻すために、対象負荷制御情報に基づいて、自己の設定値を3℃下げる処理を行うことで、自己の電力消費を抑制する制御を終了する(ステップS532)。 Also, the load 205D reduces its own power consumption by performing a process of lowering its own set value by 3° C. based on the target load control information in order to return its control state to the state before the DR start timing. The suppression control ends (step S532).

このように、対象負荷205がDR期間を管理する構成により、DR期間の管理処理の負担を対象負荷205に分散することができる。 As described above, with the configuration in which the target load 205 manages the DR period, the load of management processing in the DR period can be distributed to the target load 205.

なお、本発明の第1の実施の形態に係る電力消費管理装置は、対象負荷情報および制御情報を需要家装置202へ送信する構成であるとしたが、これに限定するものではない。電力消費管理装置101は、制御情報を需要家装置202へ送信しない構成であってもよい。この場合、対象負荷205の制御内容は、たとえば需要家装置202により決定される。 The power consumption management device according to the first embodiment of the present invention is configured to transmit the target load information and the control information to the consumer device 202, but the configuration is not limited to this. The power consumption management apparatus 101 may be configured not to transmit the control information to the consumer device 202. In this case, the control content of the target load 205 is determined by the consumer device 202, for example.

ところで、節電要請の対象期間において当該節電要請に従った電力消費の抑制が需要家の電力需要施設において行われない場合がある。このような場合、十分な節電が行われなくなり、電力需給が逼迫してしまうことがある。 By the way, in the target period of the power saving request, the power consumption may not be suppressed in the power demanding facility of the customer in accordance with the power saving request. In such a case, sufficient power saving may not be performed and power supply and demand may be tight.

これに対して、本発明の第1の実施の形態に係る需要家装置は、電力需要施設における1または複数の負荷205を制御可能である。受信部42は、電力消費の抑制対象とすべき負荷205である対象負荷205を示す対象負荷情報を受信する。制御部44は、受信部42によって受信された対象負荷情報の示す対象負荷205を制御することにより、対象負荷205の電力消費を抑制する。 On the other hand, the consumer device according to the first embodiment of the present invention can control one or a plurality of loads 205 in the power demanding facility. The receiving unit 42 receives target load information indicating the target load 205, which is the load 205 to be the target of power consumption suppression. The control unit 44 suppresses the power consumption of the target load 205 by controlling the target load 205 indicated by the target load information received by the receiving unit 42.

このように、たとえば、アグリゲータ側の装置から受信した対象負荷情報の示す対象負荷205を制御する構成により、アグリゲータ側の装置は、需要家の電力需要施設における対象負荷205を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況をより確実に回避することができる。また、需要家装置202は対象負荷情報に従って対象負荷205を制御する構成であればよいので、需要家装置202の構成を簡素化することができる。 In this way, for example, the configuration that controls the target load 205 indicated by the target load information received from the aggregator-side device allows the aggregator-side device to specify the target load 205 in the power demand facility of the consumer. Therefore, it is possible to more reliably suppress the power consumption in the power demanding facility of the customer. As a result, it is possible to more reliably avoid the situation where the power supply and demand are tight. Further, the consumer device 202 only needs to have a configuration that controls the target load 205 according to the target load information, and thus the configuration of the consumer device 202 can be simplified.

ここで、需要家装置202が主体的に負荷205を制御する代わりに、たとえば、電力消費管理装置101が、遠隔から主体的に負荷205を制御する場合、負荷205が電力消費管理装置101と通信可能な構成である必要がある。 Here, instead of the consumer device 202 independently controlling the load 205, for example, when the power consumption management device 101 remotely and remotely controls the load 205, the load 205 communicates with the power consumption management device 101. It must be possible.

具体的には、負荷205を制御する方法として、たとえば、接点信号制御、ネットワーク制御およびリモコン制御を用いる方法が考えられる。 Specifically, as a method for controlling the load 205, for example, a method using contact signal control, network control, and remote control can be considered.

より詳細には、接点信号制御は、制御を行う装置と制御を受ける装置とが同じ電力需要施設に位置する場合に可能となる。したがって、たとえば、電力需要施設から遠隔の場所に設置された電力消費管理装置101が、接点信号を用いて当該電力需要施設に設けられている負荷205を主体的に制御することは困難である。 More specifically, contact signal control is possible when the device that performs control and the device that receives control are located in the same power demand facility. Therefore, for example, it is difficult for the power consumption management apparatus 101 installed at a location remote from the power demanding facility to independently control the load 205 provided in the power demanding facility using the contact signal.

また、電力需要施設における負荷205はエコネットプロトコルをサポートしている場合が多いので、エコネットプロトコルは、電力需要施設における需要家装置202および負荷205間における通信に用いられる。 In addition, since the load 205 in the power demand facility often supports the ECONET protocol, the ECONET protocol is used for communication between the consumer device 202 and the load 205 in the power demand facility.

一方、電力消費管理装置101がサポートしている通信プロトコルは、エコネットプロトコルと異なる通信プロトコルである場合が多い。すなわち、電力消費管理装置101と負荷205とが通信を行うための標準のプロトコルが存在しないため、電力消費管理装置101が、ネットワーク制御により遠隔から主体的に負荷205を制御することは困難である。 On the other hand, the communication protocol supported by the power consumption management apparatus 101 is often a communication protocol different from the econet protocol. That is, since there is no standard protocol for the power consumption management device 101 and the load 205 to communicate with each other, it is difficult for the power consumption management device 101 to remotely control the load 205 by network control. ..

また、リモコン制御は、たとえば、赤外線または電波を用いる制御である。たとえば、電力需要施設から遠隔の場所に設置された電力消費管理装置101が赤外線または電波を送信しても、送信された赤外線または電波を当該電力需要施設に設けられている負荷205まで到達させることが困難である場合が多い。したがって、電力消費管理装置101がリモコン制御により遠隔から主体的に負荷205を制御することは困難である。 Further, the remote control is, for example, control using infrared rays or radio waves. For example, even if the power consumption management apparatus 101 installed at a location remote from the power demand facility transmits infrared rays or radio waves, the transmitted infrared rays or radio waves can reach the load 205 provided in the power demand facility. Is often difficult. Therefore, it is difficult for the power consumption management apparatus 101 to remotely control the load 205 by remote control.

すなわち、接点信号制御、ネットワーク制御およびリモコン制御は、電力需要施設の近傍の限定された領域において負荷205を制御可能な方法であるため、電力消費管理装置101がリモコン制御により遠隔から主体的に負荷205を制御することは困難である。 That is, since the contact signal control, the network control, and the remote control are methods that can control the load 205 in a limited area near the power demanding facility, the power consumption management apparatus 101 independently and remotely controls the load 205 by remote control. Controlling 205 is difficult.

これに対して、本発明の第1の実施の形態に係る需要家装置では、アグリゲータ側の装置から受信した対象負荷情報の示す対象負荷205を制御する構成により、電力消費管理装置101が遠隔から主体的に負荷205を制御することができる。 On the other hand, in the consumer device according to the first embodiment of the present invention, the power consumption management device 101 is remotely controlled by the configuration that controls the target load 205 indicated by the target load information received from the aggregator side device. The load 205 can be controlled independently.

また、本発明の第1の実施の形態に係る需要家装置では、受信部42は、さらに、対象負荷205の制御内容を示す制御情報を受信する。制御部44は、制御情報の示す制御内容に従って対象負荷205を制御する。 Further, in the consumer device according to the first embodiment of the present invention, the reception unit 42 further receives control information indicating the control content of the target load 205. The control unit 44 controls the target load 205 according to the control content indicated by the control information.

このように、たとえば、アグリゲータ側の装置から受信した制御情報の示す内容の制御を対象負荷205に対して行う構成により、アグリゲータ側の装置は、電力需要施設における対象負荷205の制御内容を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。また、需要家装置202は制御情報に従って対象負荷205を制御する構成であればよいので、需要家装置202の構成を簡素化することができる。また、たとえば、アグリゲータ側の装置において対象負荷205に対する制御のバリエーションを増やすことができる。これにより、対象負荷205の制御を繊細に行うことができるので、電力消費の抑制量をより細かく調整することができる。また、対象負荷205の種類に応じた制御を行うことができるので、需要家の電力需要施設における節電の弊害を緩和することができる。具体的には、たとえば空調装置に対しては、オフする制御の代わりに設定値を変更する制御を行うことで、電力消費を抑制しながら居住環境の不快さの程度を緩和することができる。 In this way, for example, with the configuration in which the target load 205 is controlled by the content indicated by the control information received from the aggregator-side device, the aggregator-side device specifies the control content of the target load 205 in the power demand facility. Therefore, it is possible to more reliably suppress the power consumption in the power demanding facility of the customer. Further, the consumer device 202 may be configured to control the target load 205 according to the control information, and thus the configuration of the consumer device 202 can be simplified. Further, for example, it is possible to increase the variation of the control for the target load 205 in the aggregator side device. As a result, the target load 205 can be delicately controlled, and the amount of power consumption suppression can be adjusted more finely. Further, since the control can be performed according to the type of the target load 205, it is possible to mitigate the harmful effect of power saving in the power demanding facility of the consumer. Specifically, for example, by controlling the air conditioner to change the set value instead of turning it off, it is possible to reduce the degree of discomfort in the living environment while suppressing power consumption.

また、本発明の第1の実施の形態に係る需要家装置では、記憶部45は、1または複数の負荷205との通信方法に関する情報を記憶する。制御部44は、対象負荷205との通信方法に関する情報を記憶部45から取得し、取得した通信方法を用いて対象負荷205を制御する。 Further, in the consumer device according to the first embodiment of the present invention, the storage unit 45 stores information regarding a communication method with one or a plurality of loads 205. The control unit 44 acquires information regarding the communication method with the target load 205 from the storage unit 45, and controls the target load 205 using the acquired communication method.

このような構成により、たとえば、アグリゲータ側の装置が対象負荷205と直接通信することができない場合においても、アグリゲータ側の装置は、需要家装置202を介して対象負荷205と通信を行うことができるので、当該対象負荷205を容易に制御することができる。 With such a configuration, for example, even when the device on the aggregator side cannot directly communicate with the target load 205, the device on the aggregator side can communicate with the target load 205 via the consumer device 202. Therefore, the target load 205 can be easily controlled.

また、本発明の第1の実施の形態に係る需要家装置では、制御部44は、電力消費の抑制の対象期間であるDR期間の開始タイミングにおいて対象負荷205の制御を開始する。そして、制御部44は、DR期間の終了タイミングにおいて対象負荷205の制御を終了するか、またはDR期間の終了に関する情報を出力する。 In the consumer device according to the first embodiment of the present invention, the control unit 44 starts controlling the target load 205 at the start timing of the DR period, which is the target period for suppressing power consumption. Then, the control unit 44 ends the control of the target load 205 at the end timing of the DR period, or outputs information regarding the end of the DR period.

このような構成により、対象負荷205の制御をDR期間の開始タイミングより前の状態に自動で戻すことができるので、需要家の負担を軽減することができる。また、対象負荷205の電力消費を抑制する制御が終了したことを通知することができる。 With such a configuration, the control of the target load 205 can be automatically returned to the state before the start timing of the DR period, so that the burden on the consumer can be reduced. Further, it is possible to notify that the control for suppressing the power consumption of the target load 205 has ended.

また、本発明の第1の実施の形態に係る電力消費管理装置は、電力需要施設における電力消費を管理する。管理情報取得部24は、電力系統側から電力消費に関する電力管理情報を取得する。負荷決定部25は、管理情報取得部24によって取得された電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷205を決定する。そして、送信部23は、負荷決定部25によって決定された対象負荷205を示す対象負荷情報を需要家装置202へ送信する。 Further, the power consumption management device according to the first embodiment of the present invention manages power consumption in a power demanding facility. The management information acquisition unit 24 acquires power management information regarding power consumption from the power system side. The load determination unit 25 determines the target load 205, which is the load to be the target of power consumption suppression, based on the power management information acquired by the management information acquisition unit 24. Then, the transmission unit 23 transmits the target load information indicating the target load 205 determined by the load determination unit 25 to the consumer device 202.

このような構成により、需要家の電力需要施設における対象負荷205を電力消費管理装置101において指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。 With such a configuration, the target load 205 in the power demand facility of the consumer can be specified in the power consumption management device 101, so that the power consumption in the power demand facility of the consumer can be suppressed more reliably. .. As a result, it is possible to avoid a situation where the power supply and demand are tight.

また、本発明の第1の実施の形態に係る電力消費管理装置では、記憶部26は、対象負荷205の候補に関する情報を記憶する。そして、負荷決定部25は、電力管理情報に基づいて記憶部26における対象負荷205の候補の中から対象負荷205を決定する。 Further, in the power consumption management device according to the first embodiment of the present invention, the storage unit 26 stores information regarding candidates for the target load 205. Then, the load determination unit 25 determines the target load 205 from the candidates for the target load 205 in the storage unit 26 based on the power management information.

このような構成により、たとえば複数の電力需要施設における対象負荷205の候補の中から対象負荷205をそれぞれ指定することができるので、電力消費管理システム301全体として最適な電力消費の抑制を行うことができる。また、対象負荷205の候補をたとえば需要家により電力消費管理装置101に設定することができるので、対象負荷205の候補を、電力消費を抑制する制御を需要家が容認できる負荷205に限定することができる。これにより、節電要請の対象期間における需要家の電力需要施設における不便さを軽減することができる。 With such a configuration, the target load 205 can be specified from among the candidates for the target load 205 in a plurality of power demanding facilities, so that the optimum power consumption can be suppressed as the entire power consumption management system 301. it can. In addition, since a candidate for the target load 205 can be set in the power consumption management apparatus 101 by the consumer, for example, the candidate for the target load 205 is limited to the load 205 that allows the consumer to control the power consumption. You can As a result, it is possible to reduce the inconvenience of the customer in the power demanding facility during the target period of the power saving request.

また、本発明の第1の実施の形態に係る電力消費管理装置では、負荷決定部25は、さらに、電力管理情報に基づいて、対象負荷205の制御内容を決定する。そして、送信部23は、さらに、負荷決定部25によって決定された制御内容を示す制御情報を需要家装置202へ送信する。 In addition, in the power consumption management device according to the first embodiment of the present invention, the load determination unit 25 further determines the control content of the target load 205 based on the power management information. Then, the transmission unit 23 further transmits control information indicating the control content determined by the load determination unit 25 to the consumer device 202.

このような構成により、電力需要施設における対象負荷205の制御内容を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。また、たとえば複数の電力需要施設における対象負荷205の制御内容をそれぞれ指定することができるので、電力消費管理システム301全体としてより最適な電力消費の抑制を行うことができる。また、たとえば、アグリゲータ側の装置において対象負荷205に対する制御のバリエーションを増やすことができる。これにより、対象負荷205の制御を繊細に行うことができるので、電力消費の抑制量をより細かく調整することができる。また、対象負荷205の種類に応じた制御を行うことができるので、需要家の電力需要施設における節電の弊害を緩和することができる。具体的には、たとえば空調装置に対しては、オフする制御の代わりに設定値を変更する制御を行うことで、電力消費を抑制しながら居住環境の不快さの程度を緩和することができる。 With such a configuration, it is possible to specify the control content of the target load 205 in the power demanding facility, so that it is possible to more reliably suppress the power consumption in the power demanding facility of the consumer. Further, for example, the control content of the target load 205 in each of a plurality of power demanding facilities can be specified, so that the power consumption management system 301 as a whole can suppress power consumption more optimally. Further, for example, it is possible to increase the variation of the control for the target load 205 in the aggregator side device. As a result, the target load 205 can be delicately controlled, and the amount of power consumption suppression can be adjusted more finely. Further, since the control can be performed according to the type of the target load 205, it is possible to mitigate the harmful effect of power saving in the power demanding facility of the consumer. Specifically, for example, by controlling the air conditioner to change the set value instead of turning it off, it is possible to reduce the degree of discomfort in the living environment while suppressing power consumption.

また、本発明の第1の実施の形態に係る電力消費管理システムでは、電力消費管理装置101は、電力消費の抑制対象とすべき負荷205である対象負荷205を示す対象負荷情報を需要家装置202へ送信する。そして、需要家装置202は、対象負荷情報を電力消費管理装置101から受信し、受信した対象負荷情報の示す対象負荷205を制御することにより、対象負荷の電力消費を抑制する。 In addition, in the power consumption management system according to the first embodiment of the present invention, the power consumption management apparatus 101 outputs the target load information indicating the target load 205, which is the load 205 to be the target of power consumption suppression, to the consumer device. Send to 202. Then, the consumer device 202 receives the target load information from the power consumption management device 101, and controls the target load 205 indicated by the received target load information to suppress the power consumption of the target load.

このように、電力消費管理装置101から送信される対象負荷情報の示す対象負荷205を需要家装置202が制御する構成により、電力消費管理装置101は、需要家の電力需要施設における対象負荷205を指定することができるので、需要家の電力需要施設における電力消費の抑制をより確実に行わせることができる。これにより、電力需給が逼迫してしまう状況を回避することができる。また、需要家装置202は対象負荷情報に従って対象負荷205を制御する構成であればよいので、需要家装置202の構成を簡素化することができる。 In this way, by the configuration in which the consumer device 202 controls the target load 205 indicated by the target load information transmitted from the power consumption management device 101, the power consumption management device 101 controls the target load 205 in the power demand facility of the consumer. Since it can be designated, it is possible to more reliably suppress the power consumption in the power demanding facility of the consumer. As a result, it is possible to avoid a situation where the power supply and demand are tight. Further, the consumer device 202 only needs to have a configuration that controls the target load 205 according to the target load information, and thus the configuration of the consumer device 202 can be simplified.

次に、本発明の他の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。 Next, another embodiment of the present invention will be described with reference to the drawings. It should be noted that the same or corresponding parts in the drawings are designated by the same reference numerals and the description thereof will not be repeated.

<第2の実施の形態>
本実施の形態は、第1の実施の形態に係る電力消費管理システムと比べて負荷に関する情報を更新する電力消費管理システムに関する。以下で説明する内容以外は第1の実施の形態に係る電力消費管理システムと同様である。
<Second Embodiment>
The present embodiment relates to a power consumption management system that updates information regarding a load as compared with the power consumption management system according to the first embodiment. The power consumption management system according to the first embodiment is the same as the power consumption management system according to the first embodiment except for the contents described below.

図16は、本発明の第2の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。 FIG. 16: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 2nd Embodiment of this invention.

図16を参照して、需要家装置202は、本発明の第1の実施の形態に係る需要家装置と比べて、さらに、更新部48と、負荷情報受け付け部49とを備える。 Referring to FIG. 16, consumer device 202 further includes an updating unit 48 and a load information accepting unit 49, as compared with the consumer device according to the first embodiment of the present invention.

図17は、本発明の第2の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。 FIG. 17: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 2nd Embodiment of this invention.

図17を参照して、電力消費管理装置101は、本発明の第1の実施の形態に係る電力消費管理装置と比べて、さらに、更新部28を備える。 With reference to FIG. 17, the power consumption management apparatus 101 further includes an updating unit 28 as compared with the power consumption management apparatus according to the first embodiment of the present invention.

[新たな負荷205の登録]
再び図16を参照して、需要家装置202における負荷情報受け付け部49は、たとえばディスプレイの表示画面に組合せて設けられるタッチパネル、またはキーボードであり、需要家の操作を受け付ける。
[Registration of new load 205]
Referring again to FIG. 16, load information accepting unit 49 in consumer device 202 is, for example, a touch panel or a keyboard provided in combination with the display screen of the display, and accepts the operation of the consumer.

需要家は、たとえば、電力需要施設において節電制御の対象にしようとする新たな負荷205があるときは、当該新たな負荷205について、以下の内容を登録する。 For example, when there is a new load 205 to be the target of power saving control in the power demand facility, the consumer registers the following contents for the new load 205.

すなわち、需要家は、たとえば、負荷情報受け付け部49を操作して当該新たな負荷205のID(以下、新規負荷IDとも称する。)、抑制可能量、制御内容、制御I/Fおよび制御方法を入力する。 That is, the consumer operates, for example, the load information receiving unit 49 to specify the ID of the new load 205 (hereinafter, also referred to as a new load ID), the controllable amount, the control content, the control I/F, and the control method. input.

負荷情報受け付け部49は、たとえば、需要家の操作を受け付け、受け付けた操作の内容に基づく入力情報を作成し、作成した入力情報を更新部48へ出力する。 The load information receiving unit 49 receives, for example, an operation by a customer, creates input information based on the content of the received operation, and outputs the created input information to the updating unit 48.

更新部48は、たとえば自己の需要家装置202のアドレスおよび電力消費管理装置101のアドレスを保持している。 The update unit 48 holds, for example, the address of its own customer device 202 and the address of the power consumption management device 101.

更新部48は、負荷情報受け付け部49から入力情報を受けると、以下の処理を行う。すなわち、更新部48は、たとえば、入力情報のうち新規負荷ID、抑制可能量および制御内容を含む新規負荷情報を生成する。新規負荷情報は、このような内容に限らず、電力需要施設において新たに登録すべき負荷205である新規負荷205、に関する負荷情報であればよい。 Upon receiving the input information from the load information receiving unit 49, the updating unit 48 performs the following processing. That is, the update unit 48 generates, for example, new load information including the new load ID, the suppressible amount, and the control content in the input information. The new load information is not limited to such contents, and may be load information regarding the new load 205, which is the load 205 to be newly registered in the power demanding facility.

また、更新部48は、たとえば、入力情報のうち新規負荷ID、制御I/Fおよび制御方法を一時的に保持しておく。 Further, the updating unit 48 temporarily holds, for example, the new load ID, the control I/F, and the control method in the input information.

更新部48は、たとえば、自己の需要家装置202のアドレス、新規負荷情報および電力消費管理装置101のアドレスを送信部43へ出力する。 The updating unit 48 outputs, for example, the address of its own customer device 202, the new load information, and the address of the power consumption management device 101 to the transmitting unit 43.

たとえば、送信部43は、更新部48から需要家装置202のアドレス、新規負荷情報および電力消費管理装置101のアドレスを受けると、電力消費管理装置101のアドレスを宛先として、需要家装置202のアドレスおよび新規負荷情報を含む登録信号を電力消費管理装置101へインターネット10経由で送信する。 For example, when the transmitting unit 43 receives the address of the consumer device 202, the new load information, and the address of the power consumption management device 101 from the updating unit 48, the address of the consumer device 202 is addressed to the address of the power consumption management device 101. And a registration signal including the new load information is transmitted to the power consumption management apparatus 101 via the Internet 10.

再び図17を参照して、電力消費管理装置101における受信部22は、需要家装置202から登録信号をインターネット10経由で受信すると、受信した登録信号を更新部28へ出力する。 Referring to FIG. 17 again, when receiving unit 22 in power consumption management device 101 receives a registration signal from consumer device 202 via Internet 10, it outputs the received registration signal to updating unit 28.

更新部28は、受信部22から登録信号を受けると、受けた登録信号から送信元の需要家装置202のアドレスおよび新規負荷情報を取得し、取得した新規負荷情報から新規負荷ID、抑制可能量および制御内容を取得する。 Upon receiving the registration signal from the reception unit 22, the update unit 28 acquires the address of the transmission-source consumer device 202 and the new load information from the received registration signal, and based on the acquired new load information, the new load ID and the controllable amount. And get the control content.

更新部28は、たとえば記憶部26におけるアドレス表を参照し、受信部22から受けた送信元の需要家装置202のアドレスに対応する需要家のIDを取得する。 The updating unit 28 refers to the address table in the storage unit 26, for example, and acquires the ID of the customer corresponding to the address of the customer device 202 of the transmission source received from the receiving unit 22.

そして、更新部28は、取得した需要家のIDと新規負荷ID、抑制可能量および制御内容とを対応付けて記憶部26におけるDLCマッピングテーブルTbl1に書き込み、新規負荷205を登録する。 Then, the updating unit 28 associates the acquired customer ID with the new load ID, the controllable amount, and the control content, writes them in the DLC mapping table Tbl1 in the storage unit 26, and registers the new load 205.

そして、更新部28は、新規負荷205が登録された旨を示す応答情報、および送信元の需要家装置202のアドレスを送信部23へ出力する。 Then, the updating unit 28 outputs the response information indicating that the new load 205 is registered, and the address of the consumer device 202 that is the transmission source, to the transmission unit 23.

たとえば、送信部23は、更新部28から応答情報および送信元の需要家装置202のアドレスを受けると、受けたアドレスを宛先として、応答情報を含む応答信号を新規負荷情報の送信元の需要家装置202へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the response information and the address of the transmission source consumer device 202 from the updating unit 28, the transmission unit 23 sends a response signal including the response information to the consumer of the transmission source of the new load information with the received address as the destination. Send to device 202 via Internet 10.

再び図16を参照して、需要家装置202における受信部42は、たとえば、電力消費管理装置101から応答信号をインターネット10経由で受信すると、受信した応答信号から応答情報を取得し、取得した応答情報を更新部48へ出力する。 Referring again to FIG. 16, when the reception unit 42 in the consumer device 202 receives a response signal from the power consumption management device 101 via the Internet 10, for example, the reception unit 42 acquires response information from the received response signal, and acquires the response. The information is output to the updating unit 48.

更新部48は、受信部42から応答情報を受けると、受けた応答情報に対応する新規負荷205との通信方法に関する情報を記憶部45に保存する。 Upon receiving the response information from the receiving unit 42, the updating unit 48 stores the information about the communication method with the new load 205 corresponding to the received response information in the storage unit 45.

具体的には、更新部48は、たとえば、一時的に保持しておいた新規負荷ID、制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2に書き込む。 Specifically, for example, the updating unit 48 writes the temporarily stored new load ID, control I/F, and control method in the load control table Tbl2 in the storage unit 45.

[新たな負荷205を登録する際の動作]
図18は、本発明の第2の実施の形態に係る電力消費管理システムにおける新規負荷登録処理のシーケンスの一例を示す図である。
[Operation when registering new load 205]
FIG. 18 is a diagram showing an example of a sequence of new load registration processing in the power consumption management system according to the second embodiment of the present invention.

図18を参照して、まず、需要家装置202は、電力需要施設において節電制御の対象にしようとする新たな負荷205の新規負荷ID、抑制可能量、制御内容、制御I/Fおよび制御方法を需要家から受け付ける(ステップS202)。 With reference to FIG. 18, first, the consumer device 202 has a new load ID, a suppressible amount, a control content, a control I/F, and a control method of a new load 205 to be a target of power saving control in a power demanding facility. Is received from the consumer (step S202).

次に、需要家装置202は、新規負荷ID、抑制可能量、制御内容、制御I/Fおよび制御方法を受け付けて、以下の処理を行う。すなわち、需要家装置202は、新規負荷ID、抑制可能量および制御内容を含む新規負荷情報を作成し、作成した新規負荷情報、および自己の需要家装置202のアドレスを含む登録信号を電力消費管理装置101へ送信する。また、需要家装置202は、新規負荷ID、制御I/Fおよび制御方法を一時的に保持しておく(ステップS204)。 Next, the consumer device 202 receives the new load ID, the controllable amount, the control content, the control I/F, and the control method, and performs the following processing. That is, the consumer device 202 creates new load information including a new load ID, a controllable amount, and control content, and manages the power consumption management of the created new load information and a registration signal including the address of the own consumer device 202. Send to the device 101. Further, the consumer device 202 temporarily holds the new load ID, the control I/F, and the control method (step S204).

次に、電力消費管理装置101は、需要家装置202から登録信号を受信すると、受信した登録信号から新規負荷情報、および送信元の需要家装置202のアドレスを取得する。電力消費管理装置101は、送信元の需要家装置202のアドレスに基づいて対応の需要家のIDを取得する。そして、電力消費管理装置101は、取得した需要家のIDと新規負荷情報とを対応付けて記憶部26におけるDLCマッピングテーブルTbl1に書き込む(ステップS206)。 Next, when the power consumption management apparatus 101 receives the registration signal from the customer apparatus 202, the power consumption management apparatus 101 acquires new load information and the address of the sender customer apparatus 202 from the received registration signal. The power consumption management apparatus 101 acquires the ID of the corresponding customer based on the address of the customer apparatus 202 that is the transmission source. Then, the power consumption management apparatus 101 associates the acquired customer ID with the new load information and writes them in the DLC mapping table Tbl1 in the storage unit 26 (step S206).

次に、電力消費管理装置101は、応答情報を含む応答信号を送信元の需要家装置202へインターネット10経由で送信する(ステップS208)。 Next, the power consumption management apparatus 101 transmits a response signal including response information to the consumer device 202 that is the transmission source via the Internet 10 (step S208).

次に、需要家装置202は、電力消費管理装置101から応答情報を含む応答信号を受信すると、一時的に保持しておいた新規負荷ID、制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2に書き込む(ステップS210)。 Next, when the consumer device 202 receives the response signal including the response information from the power consumption management device 101, the consumer device 202 stores the temporarily stored new load ID, control I/F, and control method in the storage unit 45. The data is written in the control table Tbl2 (step S210).

[負荷205の抹消]
再び図16を参照して、需要家は、たとえば、電力需要施設において節電制御の対象から除外したい負荷205があるときは、当該負荷205について、以下の内容を登録する。
[Delete load 205]
Referring again to FIG. 16, when there is a load 205 to be excluded from the power saving control targets in the power demanding facility, for example, the consumer registers the following contents for the load 205.

具体的には、需要家は、たとえば、負荷情報受け付け部49を操作して、当該除外したい負荷205のID(以下、抹消対象負荷IDとも称する。)を入力する。 Specifically, the consumer operates, for example, the load information receiving unit 49 to input the ID of the load 205 to be excluded (hereinafter, also referred to as a deletion target load ID).

負荷情報受け付け部49は、たとえば、需要家の操作を受け付け、受け付けた操作の内容に基づく入力情報を作成し、作成した入力情報を更新部48へ出力する。 The load information receiving unit 49 receives, for example, an operation by a customer, creates input information based on the content of the received operation, and outputs the created input information to the updating unit 48.

更新部48は、負荷情報受け付け部49から入力情報を受けると、受けた入力情報から抹消対象負荷IDを抹消対象負荷情報として取得する。抹消対象負荷情報は、抹消対象負荷IDに限らず、電力需要施設において登録を抹消すべき負荷205である抹消対象負荷205、に関する負荷情報であればよい。また、更新部48は、たとえば、抹消対象負荷情報を一時的に保持しておく。 Upon receiving the input information from the load information receiving unit 49, the updating unit 48 acquires the deletion target load ID from the received input information as the deletion target load information. The deletion target load information is not limited to the deletion target load ID, and may be the load information regarding the deletion target load 205 that is the load 205 whose registration should be deleted in the power demand facility. Further, the updating unit 48 temporarily holds the deletion target load information, for example.

更新部48は、たとえば、自己の需要家装置202のアドレス、抹消対象負荷情報および電力消費管理装置101のアドレスを送信部43へ出力する。 The updating unit 48 outputs, for example, the address of its own customer device 202, the deletion target load information, and the address of the power consumption management device 101 to the transmitting unit 43.

たとえば、送信部43は、更新部48から需要家装置202のアドレス、抹消対象負荷情報および電力消費管理装置101のアドレスを受けると、電力消費管理装置101のアドレスを宛先として、需要家装置202のアドレスおよび抹消対象負荷情報を含む登録信号を電力消費管理装置101へインターネット10経由で送信する。 For example, when the transmitting unit 43 receives the address of the consumer device 202, the load information to be erased, and the address of the power consumption management device 101 from the updating unit 48, the transmission unit 43 sets the address of the power consumption management device 101 as the destination, A registration signal including the address and the deletion target load information is transmitted to the power consumption management apparatus 101 via the Internet 10.

再び図17を参照して、電力消費管理装置101における受信部22は、需要家装置202から登録信号をインターネット10経由で受信すると、受信した登録信号を更新部28へ出力する。 Referring to FIG. 17 again, when receiving unit 22 in power consumption management device 101 receives a registration signal from consumer device 202 via Internet 10, it outputs the received registration signal to updating unit 28.

更新部28は、受信部22から登録信号を受けると、受けた登録信号から送信元の需要家装置202のアドレスおよび抹消対象負荷情報を取得する。 Upon receiving the registration signal from the reception unit 22, the update unit 28 acquires the address of the transmission-source consumer device 202 and the deletion target load information from the received registration signal.

そして、更新部28は、取得した抹消対象負荷情報すなわち抹消対象負荷IDを用いて、当該抹消対象負荷IDに対応する抑制可能量および制御内容を記憶部26におけるDLCマッピングテーブルTbl1から削除する。 Then, the updating unit 28 deletes the controllable amount and control content corresponding to the deletion target load ID from the DLC mapping table Tbl1 in the storage unit 26 by using the acquired deletion target load information, that is, the deletion target load ID.

そして、更新部28は、抹消対象負荷205の登録が抹消された旨を示す応答情報、および送信元の需要家装置202のアドレスを送信部23へ出力する。 Then, the updating unit 28 outputs the response information indicating that the registration of the deletion target load 205 has been deleted and the address of the consumer device 202 that is the transmission source to the transmission unit 23.

たとえば、送信部23は、更新部28から応答情報および送信元の需要家装置202のアドレスを受けると、受けたアドレスを宛先として、応答情報を含む応答信号を抹消対象負荷情報の送信元の需要家装置202へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the response information and the address of the sender's consumer device 202 from the update unit 28, the transmission unit 23 sends a response signal including the response information to the demand of the transmission source of the deletion target load information with the received address as the destination. It is transmitted to the home device 202 via the Internet 10.

再び図16を参照して、需要家装置202における受信部42は、たとえば、電力消費管理装置101から応答信号をインターネット10経由で受信すると、受信した応答信号から応答情報を取得し、取得した応答情報を更新部48へ出力する。 Referring again to FIG. 16, when the reception unit 42 in the consumer device 202 receives a response signal from the power consumption management device 101 via the Internet 10, for example, the reception unit 42 acquires response information from the received response signal, and acquires the response. The information is output to the updating unit 48.

更新部48は、受信部42から応答情報を受けると、受けた応答情報に対応する抹消対象負荷205との通信方法を記憶部45から削除する。 Upon receiving the response information from the receiving unit 42, the updating unit 48 deletes the communication method with the deletion target load 205 corresponding to the received response information from the storage unit 45.

具体的には、更新部48は、たとえば、一時的に保持しておいた抹消対象負荷情報すなわち抹消対象負荷IDを用いて、当該抹消対象負荷IDに対応する制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2から削除する。 Specifically, the updating unit 48 stores the control I/F and the control method corresponding to the deletion target load ID by using, for example, the deletion target load information temporarily stored, that is, the deletion target load ID. It is deleted from the load control table Tbl2 in the unit 45.

[負荷205を抹消する際の動作]
図19は、本発明の第2の実施の形態に係る電力消費管理システムにおける負荷抹消処理のシーケンスの一例を示す図である。
[Operation when deleting the load 205]
FIG. 19 is a diagram showing an example of a sequence of load erasing processing in the power consumption management system according to the second embodiment of the present invention.

図19を参照して、まず、需要家装置202は、電力需要施設において節電制御の対象から除外したい負荷205の抹消対象負荷IDを需要家から受け付ける(ステップS252)。 With reference to FIG. 19, first, the consumer device 202 receives, from the consumer, a deletion target load ID of the load 205 to be excluded from the power saving control targets in the power demanding facility (step S252).

次に、需要家装置202は、抹消対象負荷IDを受け付けて、受け付けた抹消対象負荷IDを示す抹消対象負荷情報、および自己の需要家装置202のアドレスを含む登録信号を電力消費管理装置101へ送信する。また、需要家装置202は、抹消対象負荷情報を一時的に保持しておく(ステップS254)。 Next, the consumer device 202 receives the deletion target load ID, and sends to the power consumption management device 101 a registration signal including the deletion target load information indicating the received deletion target load ID and the address of its own consumer device 202. Send. Further, the consumer device 202 temporarily holds the deletion target load information (step S254).

次に、電力消費管理装置101は、需要家装置202から登録信号を受信すると、受信した登録信号から抹消対象負荷情報の示す抹消対象負荷ID、および送信元の需要家装置202のアドレスを取得する。そして、電力消費管理装置101は、取得した抹消対象負荷IDを用いて、当該抹消対象負荷IDに対応する抑制可能量および制御内容を記憶部26におけるDLCマッピングテーブルTbl1から削除する(ステップS256)。 Next, when the power consumption management apparatus 101 receives the registration signal from the customer apparatus 202, the power consumption management apparatus 101 acquires the deletion target load ID indicated by the deletion target load information and the address of the transmission source customer apparatus 202 from the received registration signal. .. Then, the power consumption management apparatus 101 uses the acquired deletion target load ID to delete the suppressible amount and control content corresponding to the deletion target load ID from the DLC mapping table Tbl1 in the storage unit 26 (step S256).

次に、電力消費管理装置101は、応答情報を含む応答信号を送信元の需要家装置202へインターネット10経由で送信する(ステップS258)。 Next, the power consumption management apparatus 101 transmits a response signal including response information to the consumer device 202 that is the transmission source via the Internet 10 (step S258).

次に、需要家装置202は、電力消費管理装置101から応答情報を含む応答信号を受信すると、一時的に保持しておいた抹消対象負荷情報の示す抹消対象負荷IDを用いて、当該抹消対象負荷IDに対応する制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2から削除する(ステップS260)。 Next, when the consumer device 202 receives the response signal including the response information from the power consumption management device 101, the consumer device 202 uses the deletion target load ID indicated by the deletion target load information that is temporarily stored, and deletes the corresponding deletion target. The control I/F and control method corresponding to the load ID are deleted from the load control table Tbl2 in the storage unit 45 (step S260).

以上のように、本発明の第2の実施の形態に係る需要家装置では、送信部43は、電力需要施設において新たに登録すべき負荷205である新規負荷205、に関する新規負荷情報を送信する。受信部42は、新規負荷205が登録された旨を示す応答情報を受信する。 As described above, in the consumer device according to the second embodiment of the present invention, the transmission unit 43 transmits the new load information regarding the new load 205, which is the load 205 to be newly registered in the power demanding facility. .. The receiving unit 42 receives the response information indicating that the new load 205 has been registered.

このような構成により、需要家装置202における処理によってたとえばアグリゲータ側の装置に新規負荷205を登録することができるので、アグリゲータ側の装置を操作して新規負荷205を登録するというオペレータの負担を軽減し、かつ新規負荷205の登録を迅速に行うことができる。また、登録情報を含むテーブルのメンテナンス処理の負荷を軽減することができる。 With such a configuration, the new load 205 can be registered in the device on the aggregator side, for example, by the process in the consumer device 202, so that the operator's burden of operating the device on the aggregator side and registering the new load 205 is reduced. In addition, the new load 205 can be registered quickly. Further, it is possible to reduce the load of maintenance processing of the table including the registration information.

また、本発明の第2の実施の形態に係る需要家装置では、記憶部45は、1または複数の負荷205との通信方法に関する情報を記憶する。更新部48は、受信部42によって受信された応答情報に対応する新規負荷205との通信方法に関する情報を記憶部45に保存する。 Further, in the consumer device according to the second embodiment of the present invention, the storage unit 45 stores information regarding a communication method with one or a plurality of loads 205. The updating unit 48 saves the information about the communication method with the new load 205 corresponding to the response information received by the receiving unit 42 in the storage unit 45.

このように、たとえば、アグリゲータ側の装置に新規負荷205が登録されたことに応答して新規負荷205との通信方法に関する情報を記憶部45に保存する構成により、アグリゲータ側の装置における登録内容と記憶部45における保存内容との同期をとることができる。 In this way, for example, by the configuration in which the information on the communication method with the new load 205 is stored in the storage unit 45 in response to the registration of the new load 205 in the aggregator side device, the registered contents in the aggregator side device The contents stored in the storage unit 45 can be synchronized.

また、本発明の第2の実施の形態に係る需要家装置では、送信部43は、電力需要施設において登録を抹消すべき負荷205である抹消対象負荷205、に関する抹消対象負荷情報を送信する。受信部42は、抹消対象負荷205の登録が抹消された旨を示す応答情報を受信する。 Further, in the consumer device according to the second embodiment of the present invention, the transmission unit 43 transmits the deletion target load information regarding the deletion target load 205, which is the load 205 whose registration should be deleted in the power demanding facility. The receiving unit 42 receives the response information indicating that the registration of the deletion target load 205 has been deleted.

このような構成により、需要家装置202における処理によってたとえばアグリゲータ側の装置から抹消対象負荷205を抹消することができるので、アグリゲータ側の装置を操作して抹消対象負荷205を抹消するというオペレータの負担を軽減し、かつ抹消対象負荷205の抹消を迅速に行うことができる。また、登録情報を含むテーブルのメンテナンス処理の負荷を軽減することができる。 With such a configuration, the load to be deleted 205 can be deleted from the device on the aggregator side by the process in the consumer device 202. Therefore, the operator's burden of operating the device on the aggregator side to delete the load 205 to be deleted The load 205 can be reduced and the load 205 to be deleted can be deleted quickly. Further, it is possible to reduce the load of maintenance processing of the table including the registration information.

また、本発明の第2の実施の形態に係る需要家装置では、記憶部45は、1または複数の負荷との通信方法に関する情報を記憶する。更新部48は、受信部42によって受信された応答情報に対応する抹消対象負荷205との通信方法に関する情報を記憶部45から削除する。 Further, in the consumer device according to the second embodiment of the present invention, the storage unit 45 stores information regarding a communication method with one or a plurality of loads. The updating unit 48 deletes the information about the communication method with the deletion target load 205 corresponding to the response information received by the receiving unit 42 from the storage unit 45.

このように、たとえば、アグリゲータ側の装置から抹消対象負荷205が抹消されたことに応答して抹消対象負荷205との通信方法に関する情報を記憶部45から削除する構成により、アグリゲータ側の装置における登録内容と記憶部45における保存内容との同期をとることができる。 In this way, for example, by the configuration in which the information regarding the communication method with the deletion target load 205 is deleted from the storage unit 45 in response to the deletion target load 205 being deleted from the aggregator side device, the registration in the aggregator side device is performed. The contents and the contents stored in the storage unit 45 can be synchronized.

その他の構成および動作は第1の実施の形態に係る電力消費管理システムと同様であるため、ここでは詳細な説明を繰り返さない。 Other configurations and operations are similar to those of the power consumption management system according to the first embodiment, and therefore detailed description will not be repeated here.

次に、本発明の他の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。 Next, another embodiment of the present invention will be described with reference to the drawings. It should be noted that the same or corresponding parts in the drawings are designated by the same reference numerals and the description thereof will not be repeated.

<第3の実施の形態>
本実施の形態は、第1の実施の形態に係る電力消費管理システムと比べて負荷の状態に基づく制御を行う電力消費管理システムに関する。以下で説明する内容以外は第1の実施の形態に係る電力消費管理システムと同様である。
<Third Embodiment>
The present embodiment relates to a power consumption management system that performs control based on a load state as compared with the power consumption management system according to the first embodiment. The power consumption management system according to the first embodiment is the same as the power consumption management system according to the first embodiment except for the contents described below.

図20は、本発明の第3の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。 FIG. 20: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 3rd Embodiment of this invention.

図20を参照して、需要家装置202は、本発明の第1の実施の形態に係る需要家装置と比べて、さらに、状態情報取得部50と、削除部51とを備える。 Referring to FIG. 20, consumer device 202 further includes a state information acquisition unit 50 and a deletion unit 51, as compared with the consumer device according to the first embodiment of the present invention.

図21は、本発明の第3の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。 FIG. 21: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 3rd Embodiment of this invention.

図21を参照して、電力消費管理装置101は、本発明の第1の実施の形態に係る電力消費管理装置と比べて、さらに、削除部30と、評価部31とを備える。 Referring to FIG. 21, power consumption management device 101 further includes a deletion unit 30 and an evaluation unit 31 as compared with the power consumption management device according to the first embodiment of the present invention.

[制御状態の取得]
再び図20を参照して、需要家装置202における状態情報取得部50は、対象負荷205の動作状態を示す状態情報をたとえば定期的に取得する。
[Getting control status]
Referring again to FIG. 20, the state information acquisition unit 50 in the consumer device 202 acquires the state information indicating the operation state of the target load 205, for example, periodically.

具体的には、状態情報取得部50は、たとえば、制御部44による接点信号制御を受ける対象負荷205のスイッチの状態を動作状態として取得する。状態情報取得部50は、当該スイッチの状態を対象負荷205から直接取得してもよいし、接点信号制御の制御結果を制御部44から受けることにより取得してもよい。 Specifically, the state information acquisition unit 50 acquires, for example, the state of the switch of the target load 205 that receives the contact signal control by the control unit 44 as the operating state. The status information acquisition unit 50 may directly acquire the status of the switch from the target load 205, or may receive the control result of the contact signal control from the control unit 44.

また、状態情報取得部50は、たとえば、制御部44によるネットワーク制御を受ける対象負荷205のスイッチの状態および設定値を動作状態として取得する。状態情報取得部50は、当該スイッチの状態および当該設定値を対象負荷205からLAN11経由で取得してもよいし、ネットワーク制御の制御結果を制御部44から受けることにより取得してもよい。 Further, the state information acquisition unit 50 acquires, for example, the state and the set value of the switch of the target load 205 that is subjected to network control by the control unit 44 as the operating state. The status information acquisition unit 50 may acquire the status of the switch and the setting value from the target load 205 via the LAN 11, or may acquire the control result of network control from the control unit 44.

状態情報取得部50は、対象負荷205のスイッチの状態および設定値と対応の対象負荷ID(以下、評価対象負荷IDとも称する。)とを含む状態情報を生成し、生成した状態情報、自己の需要家装置202のアドレスおよび電力消費管理装置101のアドレスを送信部43へ出力する。 The status information acquisition unit 50 generates status information including the status and setting value of the switch of the target load 205 and the corresponding target load ID (hereinafter, also referred to as evaluation target load ID), and the generated status information and its own. The address of the consumer device 202 and the address of the power consumption management device 101 are output to the transmission unit 43.

たとえば、送信部43は、状態情報取得部50から状態情報、需要家装置202のアドレスおよび電力消費管理装置101のアドレスを受けると、電力消費管理装置101のアドレスを宛先として、状態情報および需要家装置202のアドレスを含む状態信号を電力消費管理装置101へインターネット10経由で送信する。 For example, when the transmission unit 43 receives the state information, the address of the consumer device 202 and the address of the power consumption management device 101 from the state information acquisition unit 50, the state information and the consumer are addressed to the address of the power consumption management device 101. A status signal including the address of the device 202 is transmitted to the power consumption management device 101 via the Internet 10.

[制御状態の評価]
再び図21を参照して、電力消費管理装置101における受信部22は、需要家装置202から状態信号をインターネット10経由で受信すると、受信した状態信号を評価部31へ出力する。
[Evaluation of control status]
Referring to FIG. 21 again, when receiving unit 22 in power consumption management device 101 receives a status signal from consumer device 202 via Internet 10, it outputs the received status signal to evaluation unit 31.

評価部31は、受信部22から状態信号を受けると、受けた状態信号から状態情報および送信元の需要家装置202のアドレスを取得する。評価部31は、状態情報から対象負荷205のスイッチの状態および設定値と評価対象負荷IDとを取得する。 When the evaluation unit 31 receives the status signal from the reception unit 22, the evaluation unit 31 acquires the status information and the address of the consumer device 202 of the transmission source from the received status signal. The evaluation unit 31 acquires the state and set value of the switch of the target load 205 and the evaluation target load ID from the state information.

評価部31は、取得した状態情報に基づいて、対象負荷205に対する需要家装置202の制御を評価する。 The evaluation unit 31 evaluates the control of the consumer device 202 with respect to the target load 205 based on the acquired state information.

具体的には、評価部31は、たとえば、評価対象負荷IDに対応する対象負荷205に対して負荷決定部25が与えた制御内容を負荷決定部25から取得し、取得した制御内容と対象負荷205のスイッチの状態および設定値とを比較することにより、対象負荷205に対する需要家装置202の制御を評価する。 Specifically, for example, the evaluation unit 31 acquires the control content given by the load determination unit 25 for the target load 205 corresponding to the evaluation target load ID from the load determination unit 25, and acquires the acquired control content and target load. The control of the consumer device 202 with respect to the target load 205 is evaluated by comparing the state of the switch of 205 and the set value.

評価部31は、たとえば、上記比較を行う際に、DR開始タイミング前の状態情報とDR開始タイミング後の状態情報とを参考に用いる。 For example, the evaluation unit 31 uses the state information before the DR start timing and the state information after the DR start timing as a reference when performing the above comparison.

たとえば、評価部31は、制御内容と対象負荷205のスイッチの状態および設定値とが一致している場合、対象負荷205に対する需要家装置202の制御を「良好」と評価する。 For example, the evaluation unit 31 evaluates the control of the consumer device 202 for the target load 205 as “good” when the control content matches the switch state and the set value of the target load 205.

一方、たとえば、評価部31は、制御内容と対象負荷205のスイッチの状態および設定値とが一致していない場合、対象負荷205に対する需要家装置202の制御を「不良」と評価する。 On the other hand, for example, when the control content does not match the switch state and the set value of the target load 205, the evaluation unit 31 evaluates the control of the consumer device 202 for the target load 205 as “defective”.

評価部31は、たとえば、対象負荷205に対する需要家装置202の制御を「不良」と評価した場合、評価結果を負荷決定部25へ通知し、また、評価対象負荷IDおよび送信元の需要家装置202のアドレスを削除部30へ出力する。 For example, when the control of the consumer device 202 for the target load 205 is evaluated as “defective”, the evaluation unit 31 notifies the load determination unit 25 of the evaluation result, and also evaluates the target load ID and the consumer device of the transmission source. The address of 202 is output to the deletion unit 30.

なお、評価部31は、対象負荷205に対する需要家装置202の制御を「不良」であると複数回評価した場合に、評価結果を負荷決定部25へ通知し、また、評価対象負荷IDおよび送信元の需要家装置202のアドレスを削除部30へ出力してもよい。 Note that the evaluation unit 31 notifies the load determination unit 25 of the evaluation result when the control of the consumer device 202 with respect to the target load 205 is evaluated as “defective” multiple times, and also the evaluation target load ID and the transmission result. The address of the original consumer device 202 may be output to the deletion unit 30.

[対象負荷205の追加]
負荷決定部25は、評価部31から評価結果の通知を受けると、以下の処理を行う。すなわち、負荷決定部25は、たとえば、図4に示すDLCマッピングテーブルTbl1に含まれる節電パターンのうち、現在節電制御の対象となっている対象節電パターンを除いた節電パターンの中から新たに節電の対象とすべき1または複数の対象節電パターンを決定する。
[Addition of target load 205]
Upon receiving the notification of the evaluation result from the evaluation unit 31, the load determination unit 25 performs the following processing. That is, for example, the load determination unit 25 newly saves power from the power-saving patterns included in the DLC mapping table Tbl1 illustrated in FIG. 4 excluding the target power-saving pattern that is currently the target of power-saving control. Determine one or more target power saving patterns to be targeted.

負荷決定部25は、決定した対象節電パターンに基づいて対象負荷制御情報を生成し、生成した対象負荷制御情報を送信部23経由で需要家装置202へ送信する。 The load determination unit 25 generates target load control information based on the determined target power saving pattern, and transmits the generated target load control information to the consumer device 202 via the transmission unit 23.

[評価不良の対象負荷205の削除]
削除部30は、評価部31による制御の評価結果に基づいて、記憶部26が記憶する対象負荷205の候補の中から抹消すべき対象負荷205を決定し、決定した対象負荷205に関する情報を記憶部26から削除する。
[Delete Target Load 205 with Poor Evaluation]
The deletion unit 30 determines the target load 205 to be deleted from the candidates of the target load 205 stored in the storage unit 26 based on the evaluation result of the control by the evaluation unit 31, and stores information on the determined target load 205. Delete from section 26.

具体的には、削除部30は、たとえば、評価部31から評価対象負荷IDおよび送信元の需要家装置202のアドレスを受けると、評価対象負荷IDに対応する対象負荷205を抹消すべき対象負荷205であると認識する。 Specifically, for example, when the deletion unit 30 receives the evaluation target load ID and the address of the consumer device 202 of the transmission source from the evaluation unit 31, the target load 205 corresponding to the evaluation target load ID should be deleted. It is recognized as 205.

そして、削除部30は、たとえば、記憶部26におけるDLCマッピングテーブルTbl1において、評価対象負荷IDに対応する抑制可能量および制御内容を削除する。 Then, the deletion unit 30 deletes the controllable amount and control content corresponding to the evaluation target load ID in the DLC mapping table Tbl1 in the storage unit 26, for example.

そして、削除部30は、評価対象負荷IDに対応する対象負荷205の登録が抹消された旨を示す応答情報、および送信元の需要家装置202のアドレスを送信部23へ出力する。 Then, the deletion unit 30 outputs, to the transmission unit 23, response information indicating that the registration of the target load 205 corresponding to the evaluation target load ID has been deleted, and the address of the consumer device 202 that is the transmission source.

たとえば、送信部23は、削除部30から応答情報および送信元の需要家装置202のアドレスを受けると、受けたアドレスを宛先として、応答情報を含む応答信号を状態情報の送信元の需要家装置202へインターネット10経由で送信する。 For example, when the transmission unit 23 receives the response information and the address of the transmission source consumer device 202 from the deletion unit 30, the transmission unit 23 addresses the received address as a destination and transmits a response signal including the response information to the transmission source consumer device of the state information. It transmits to 202 via the internet 10.

再び図20を参照して、需要家装置202における受信部42は、たとえば、電力消費管理装置101から応答信号をインターネット10経由で受信すると、受信した応答信号から応答情報を取得し、取得した応答情報を削除部51へ出力する。 Referring again to FIG. 20, when the reception unit 42 in the consumer device 202 receives a response signal from the power consumption management device 101 via the Internet 10, the reception unit 42 acquires response information from the received response signal and acquires the response. The information is output to the deletion unit 51.

削除部51は、受信部42から応答情報を受けると、受けた応答情報に基づいて、評価対象負荷IDに対応する対象負荷205の登録が抹消されたことを認識する。そして、削除部51は、評価対象負荷IDに対応する制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2から削除する。 Upon receiving the response information from the receiving unit 42, the deleting unit 51 recognizes that the registration of the target load 205 corresponding to the evaluation target load ID has been deleted based on the received response information. Then, the deletion unit 51 deletes the control I/F and the control method corresponding to the evaluation target load ID from the load control table Tbl2 in the storage unit 45.

なお、削除部30は、評価部31から評価対象負荷IDを受けると、受けた評価対象負荷IDに対応する抑制可能量および制御内容をDLCマッピングテーブルTbl1から削除する構成であるとしたが、これに限定するものではない。 When the deletion unit 30 receives the evaluation target load ID from the evaluation unit 31, the deletion unit 30 deletes the controllable amount and control content corresponding to the received evaluation target load ID from the DLC mapping table Tbl1. It is not limited to.

削除部30は、たとえば、エコネットプロトコルを用いて評価対象負荷IDに対応する対象負荷205と通信を行うことが可能である場合、当該対象負荷205の動作状態を自ら取得し、取得した動作状態を自ら確認した後、確認結果に基づいて、対応の情報をDLCマッピングテーブルTbl1から削除する構成であってもよい。 For example, when the deleting unit 30 can communicate with the target load 205 corresponding to the evaluation target load ID using the ECONET protocol, the deleting unit 30 acquires the operation state of the target load 205 and acquires the acquired operation state. May be configured to be self-checked and then the corresponding information is deleted from the DLC mapping table Tbl1 based on the check result.

[制御状態を評価する際の動作]
図22は、本発明の第3の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。
[Operation when evaluating control status]
FIG. 22: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 3rd Embodiment of this invention.

図22を参照して、ステップS302〜S310の動作は、図8に示すステップS102〜S110の動作と同様である。 22, the operations of steps S302 to S310 are similar to the operations of steps S102 to S110 shown in FIG.

次に、需要家装置202は、たとえば、負荷205A,205B,205Dにおけるスイッチの状態および設定値を示す動作状態を、負荷205A、LAN接点変換器207および負荷205Dからそれぞれ定期的に取得する(ステップS312、S314およびS316)。 Next, the consumer device 202, for example, periodically acquires the operating states indicating the states of the switches and the set values in the loads 205A, 205B, and 205D from the load 205A, the LAN contact converter 207, and the load 205D, respectively (step). S312, S314 and S316).

次に、需要家装置202は、取得した動作状態を示す状態情報、および自己の需要家装置202のアドレスを含む状態信号を電力消費管理装置101へ送信する(ステップS318)。 Next, the consumer device 202 transmits, to the power consumption management device 101, a state signal including the acquired state information indicating the operating state and the address of the consumer device 202 of itself (step S318).

次に、需要家装置202は、カウンタ46のカウント値からDR開始タイミングが到来したことを認識する(ステップS320)。 Next, the consumer device 202 recognizes that the DR start timing has arrived from the count value of the counter 46 (step S320).

次に、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS322)。 Next, the consumer device 202 transmits a contact signal for turning off the switch to the load 205A corresponding to the target load ID based on the acquired target load control information, the connection I/F, and the control method (step). S322).

また、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフすることを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Bに対して接点信号制御を行うLAN接点変換器207へ送信する(ステップS324)。 In addition, the consumer device 202 sends a control command indicating that the switch is turned off based on the acquired target load control information and the connection I/F and control method to the load 205B corresponding to the target load ID according to the Ethernet standard. Is transmitted to the LAN contact converter 207 which performs contact signal control (step S324).

次に、LAN接点変換器207は、需要家装置202から制御命令を受信すると、受信した制御命令に基づいて、スイッチをオフするための接点信号を負荷205Bへ送信する(ステップS325)。 Next, when the LAN contact converter 207 receives a control command from the consumer device 202, the LAN contact converter 207 transmits a contact signal for turning off the switch to the load 205B based on the received control command (step S325).

次に、需要家装置202は、たとえば、負荷205A,205B,205Dにおけるスイッチの状態および設定値を示す動作状態を、負荷205A、LAN接点変換器207および負荷205Dからそれぞれ定期的に取得する(ステップS326、S328およびS330)。 Next, the consumer device 202, for example, periodically acquires the operating states indicating the states of the switches and the set values in the loads 205A, 205B, and 205D from the load 205A, the LAN contact converter 207, and the load 205D, respectively (step). S326, S328 and S330).

次に、需要家装置202は、取得した動作状態を示す状態情報、および自己の需要家装置202のアドレスを含む状態信号を電力消費管理装置101へ送信する(ステップS332)。 Next, the consumer device 202 transmits, to the power consumption management device 101, a state signal including the acquired state information indicating the operating state and the address of the consumer device 202 of itself (step S332).

次に、電力消費管理装置101は、需要家装置202から状態信号を受信すると、受信した状態信号から状態情報および送信元の需要家装置202のアドレスを取得する。そして、電力消費管理装置101は、取得した状態情報に基づいて、対象負荷205に対する需要家装置202の制御を評価する(ステップS334)。 Next, when the power consumption management apparatus 101 receives the status signal from the customer apparatus 202, the power consumption management apparatus 101 acquires the status information and the address of the sender customer apparatus 202 from the received status signal. Then, the power consumption management apparatus 101 evaluates the control of the consumer device 202 with respect to the target load 205 based on the acquired state information (step S334).

電力消費管理装置101は、たとえば対象負荷205Bの評価結果が「不良」であった場合、DLCマッピングテーブルTbl1に含まれる節電パターンのうち、現在節電の対象となっている対象節電パターンを除いた節電パターンの中から対象負荷205Dに対応する節電パターンを新たな対象節電パターンとして決定する(ステップS336)。 For example, when the evaluation result of the target load 205B is “defective”, the power consumption management apparatus 101 saves power in the power saving patterns included in the DLC mapping table Tbl1 excluding the target power saving pattern that is currently the target of power saving. From the patterns, the power saving pattern corresponding to the target load 205D is determined as a new target power saving pattern (step S336).

次に、電力消費管理装置101は、決定した対象節電パターンに含まれる対象負荷候補IDおよび対応の制御内容を含む対象負荷制御情報を生成し、生成した対象負荷制御情報を含むDLC信号を需要家装置202へ送信する(ステップS338)。 Next, the power consumption management apparatus 101 generates target load control information including the target load candidate ID included in the determined target power saving pattern and the corresponding control content, and the DLC signal including the generated target load control information is consumed by the consumer. The data is transmitted to the device 202 (step S338).

次に、需要家装置202は、電力消費管理装置101からDLC信号を受信すると、受信したDLC信号から対象負荷制御情報を取得し、取得した対象負荷制御情報、および負荷制御テーブルTbl2の内容に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する(ステップS340)。 Next, when the consumer device 202 receives the DLC signal from the power consumption management device 101, the consumer device 202 acquires the target load control information from the received DLC signal, and based on the acquired target load control information and the content of the load control table Tbl2. Then, the connection I/F and the control method corresponding to the target load ID are acquired (step S340).

次に、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、「設定値を3℃上げる」ことを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Dへ送信する(ステップS342)。 Next, the consumer device 202 sends a control instruction indicating “increase the set value by 3° C.” based on the acquired target load control information, the connection I/F, and the control method according to the target load ID according to the Ethernet standard. Is transmitted to the load 205D corresponding to (step S342).

次に、電力消費管理装置101は、取得した状態情報に含まれる評価対象負荷IDを用いて、当該評価対象負荷IDに対応する抑制可能量および制御内容を記憶部26におけるDLCマッピングテーブルTbl1から削除する(ステップS344)。 Next, the power consumption management apparatus 101 deletes the controllable amount and control content corresponding to the evaluation target load ID from the DLC mapping table Tbl1 in the storage unit 26 using the evaluation target load ID included in the acquired state information. Yes (step S344).

次に、電力消費管理装置101は、応答情報を含む応答信号を送信元の需要家装置202へインターネット10経由で送信する(ステップS346)。 Next, the power consumption management apparatus 101 transmits a response signal including response information to the consumer device 202 that is the transmission source via the Internet 10 (step S346).

次に、需要家装置202は、電力消費管理装置101から応答情報を含む応答信号を受信すると、受信した応答情報に基づいて、評価対象負荷IDに対応する対象負荷205の登録が抹消されたことを認識する。そして、需要家装置202は、評価対象負荷IDに対応する制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2から削除する(ステップS348)。 Next, when the consumer device 202 receives the response signal including the response information from the power consumption management device 101, the registration of the target load 205 corresponding to the evaluation target load ID is deleted based on the received response information. Recognize. Then, the consumer device 202 deletes the control I/F and the control method corresponding to the evaluation target load ID from the load control table Tbl2 in the storage unit 45 (step S348).

以上のように、本発明の第3の実施の形態に係る需要家装置では、状態情報取得部50は、対象負荷205の動作状態を示す状態情報を取得する。送信部43は、状態情報取得部50によって取得された状態情報を送信する。 As described above, in the consumer device according to the third embodiment of the present invention, the state information acquisition unit 50 acquires the state information indicating the operating state of the target load 205. The transmission unit 43 transmits the state information acquired by the state information acquisition unit 50.

このような構成により、需要家装置202の動作状態をたとえばアグリゲータ側の装置へ通知することができるので、アグリゲータ側の装置は、需要家装置202の動作状態に基づいて、たとえば対象負荷205の電力消費を抑制する制御に対してフィードバックをかけることができる。 With such a configuration, the operating state of the consumer device 202 can be notified to, for example, the device on the aggregator side. Therefore, the device on the aggregator side, based on the operating state of the consumer device 202, for example, the power of the target load 205. Feedback can be applied to the control for suppressing the consumption.

また、本発明の第3の実施の形態に係る電力消費管理装置では、受信部22は、対象負荷205の動作状態を示す状態情報を需要家装置202から受信する。評価部31は、受信部22によって受信された状態情報に基づいて、対象負荷205に対する需要家装置202の制御を評価する。 Further, in the power consumption management device according to the third embodiment of the present invention, the receiving unit 22 receives the state information indicating the operating state of the target load 205 from the consumer device 202. The evaluation unit 31 evaluates the control of the consumer device 202 with respect to the target load 205 based on the state information received by the reception unit 22.

このような構成により、対象負荷205に対する需要家装置202の制御の評価結果に基づいて、たとえば現在の需要家装置202の動作状態に応じた内容の制御へ変更することができる。 With such a configuration, based on the evaluation result of the control of the consumer device 202 with respect to the target load 205, for example, the control can be changed to the content according to the current operation state of the consumer device 202.

また、本発明の第3の実施の形態に係る電力消費管理装置では、記憶部26は、対象負荷の候補に関する情報を記憶する。削除部30は、評価部31による制御の評価結果に基づいて、記憶部26における対象負荷205の候補の中から抹消すべき対象負荷205を決定し、決定した対象負荷205に関する情報を記憶部26から削除する。 In addition, in the power consumption management device according to the third embodiment of the present invention, the storage unit 26 stores information regarding candidates for the target load. The deletion unit 30 determines the target load 205 to be deleted from the candidates for the target load 205 in the storage unit 26 based on the evaluation result of the control by the evaluation unit 31, and stores information regarding the determined target load 205 in the storage unit 26. Remove from.

このような構成により、たとえば制御性が悪い対象負荷205の候補を記憶部26から削除することができるので、記憶部26における対象負荷205の候補において制御性が良い対象負荷205の候補の割合を増やすことができる。 With such a configuration, for example, a candidate for the target load 205 having poor controllability can be deleted from the storage unit 26. Therefore, among the candidates for the target load 205 in the storage unit 26, the ratio of candidates for the target load 205 having good controllability can be determined. You can increase.

その他の構成および動作は第1の実施の形態に係る電力消費管理システムと同様であるため、ここでは詳細な説明を繰り返さない。 Other configurations and operations are similar to those of the power consumption management system according to the first embodiment, and therefore detailed description will not be repeated here.

次に、本発明の他の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。 Next, another embodiment of the present invention will be described with reference to the drawings. It should be noted that the same or corresponding parts in the drawings are designated by the same reference numerals and the description thereof will not be repeated.

<第4の実施の形態>
本実施の形態は、第1の実施の形態に係る電力消費管理システムと比べて電力消費量に基づく制御を行う電力消費管理システムに関する。以下で説明する内容以外は第1の実施の形態に係る電力消費管理システムと同様である。
<Fourth Embodiment>
The present embodiment relates to a power consumption management system that performs control based on power consumption as compared with the power consumption management system according to the first embodiment. The power consumption management system according to the first embodiment is the same as the power consumption management system according to the first embodiment except for the contents described below.

図23は、本発明の第4の実施の形態に係る電力消費管理システムの適用例を示す図である。 FIG. 23 is a diagram showing an application example of the power consumption management system according to the fourth embodiment of the present invention.

図23を参照して、電力消費管理システム301は、本発明の第1の実施の形態に係る電力消費管理システムと比べて、さらに、電力メータ206を備える。 Referring to FIG. 23, power consumption management system 301 further includes a power meter 206 as compared with the power consumption management system according to the first embodiment of the present invention.

電力メータ206は、たとえば、需要家AAAの電力需要施設における電力消費量を測定し、測定した電力消費量を需要家装置202へ定期的に出力する。 The electric power meter 206 measures, for example, the amount of electric power consumed in the electric power demanding facility of the consumer AAA, and periodically outputs the measured amount of electric power consumption to the consumer device 202.

図24は、本発明の第4の実施の形態に係る電力消費管理システムにおける需要家装置の構成を示す図である。 FIG. 24: is a figure which shows the structure of the customer apparatus in the power consumption management system which concerns on the 4th Embodiment of this invention.

図24を参照して、需要家装置202は、本発明の第1の実施の形態に係る需要家装置と比べて、さらに、削除部51と、消費情報取得部52とを備える。需要家装置202における削除部51の動作は、図20に示す需要家装置202における削除部51と同様である。 Referring to FIG. 24, consumer device 202 further includes a deletion unit 51 and a consumption information acquisition unit 52, as compared with the consumer device according to the first embodiment of the present invention. The operation of the deleting unit 51 in the consumer device 202 is the same as that of the deleting unit 51 in the consumer device 202 shown in FIG.

図25は、本発明の第4の実施の形態に係る電力消費管理システムにおける電力消費管理装置の構成を示す図である。 FIG. 25: is a figure which shows the structure of the power consumption management apparatus in the power consumption management system which concerns on the 4th Embodiment of this invention.

図25を参照して、電力消費管理装置101は、本発明の第1の実施の形態に係る電力消費管理装置と比べて、さらに、削除部30と、評価部32とを備える。電力消費管理装置101における削除部30の動作は、図21に示す電力消費管理装置101における削除部30と同様である。 With reference to FIG. 25, the power consumption management apparatus 101 further includes a deletion unit 30 and an evaluation unit 32, as compared with the power consumption management apparatus according to the first embodiment of the present invention. The operation of the deletion unit 30 in the power consumption management apparatus 101 is similar to that of the deletion unit 30 in the power consumption management apparatus 101 illustrated in FIG.

[電力消費量の取得]
再び図24を参照して、需要家装置202における消費情報取得部52は、電力需要施設における電力消費量を示す電力消費情報をたとえば定期的に取得する。具体的には、消費情報取得部52は、電力メータ206から電力消費量を定期的に受信する。消費情報取得部52は、受信した電力消費量を含む電力消費情報を生成し、生成した電力消費情報、自己の需要家装置202のアドレスおよび電力消費管理装置101のアドレスを送信部43へ出力する。
[Getting power consumption]
Referring again to FIG. 24, the consumption information acquisition unit 52 in the consumer device 202 acquires power consumption information indicating the power consumption in the power demanding facility, for example, periodically. Specifically, the consumption information acquisition unit 52 regularly receives the power consumption amount from the power meter 206. The consumption information acquisition unit 52 generates power consumption information including the received power consumption amount, and outputs the generated power consumption information, the address of its own customer device 202 and the address of the power consumption management device 101 to the transmission unit 43. ..

たとえば、送信部43は、消費情報取得部52から電力消費情報、需要家装置202のアドレスおよび電力消費管理装置101のアドレスを受けると、電力消費管理装置101のアドレスを宛先として、電力消費情報および需要家装置202のアドレスを含む電力消費信号を電力消費管理装置101へインターネット10経由で送信する。 For example, when the transmission unit 43 receives the power consumption information, the address of the consumer device 202 and the address of the power consumption management device 101 from the consumption information acquisition unit 52, the power consumption information and the address of the power consumption management device 101 are set as the destination. A power consumption signal including the address of the consumer device 202 is transmitted to the power consumption management device 101 via the Internet 10.

[制御状態の評価]
再び図25を参照して、電力消費管理装置101における受信部22は、需要家装置202から電力消費信号をインターネット10経由で受信すると、受信した電力消費信号を負荷決定部25および評価部32へ出力する。
[Evaluation of control status]
Referring again to FIG. 25, when the reception unit 22 in the power consumption management device 101 receives the power consumption signal from the consumer device 202 via the Internet 10, the received power consumption signal is sent to the load determination unit 25 and the evaluation unit 32. Output.

負荷決定部25は、受信部22から電力消費信号を受けると、受けた電力消費信号から電力消費情報および送信元の需要家装置202のアドレスを取得する。 Upon receiving the power consumption signal from the reception unit 22, the load determination unit 25 acquires the power consumption information and the address of the consumer device 202 of the transmission source from the received power consumption signal.

負荷決定部25は、たとえば、取得した電力消費情報が示す電力需要施設における電力消費量に基づいて、本発明の第1の実施の形態において説明した過去の抑制量の実績値を算出する。 The load determination unit 25 calculates, for example, the actual value of the past suppression amount described in the first embodiment of the present invention based on the power consumption amount in the power demanding facility indicated by the acquired power consumption information.

また、負荷決定部25は、たとえば、電力管理情報の示す電力消費の目標である電力消費目標を算出する。 In addition, the load determination unit 25 calculates, for example, a power consumption target which is a target of power consumption indicated by the power management information.

具体的には、負荷決定部25は、たとえば、各電力需要施設における消費電力量の想定値を系統側管理装置151から受信部22および管理情報取得部24経由で受信するか、または保持している。消費電力量の想定値は、たとえば電力消費を抑制しなかった場合の電力消費量であり、過去の電力消費データ等に基づいて算出される。 Specifically, the load determination unit 25 receives, for example, the estimated value of the power consumption at each power demand facility from the system-side management device 151 via the reception unit 22 and the management information acquisition unit 24, or holds it. There is. The assumed value of power consumption is, for example, the power consumption when the power consumption is not suppressed, and is calculated based on past power consumption data and the like.

負荷決定部25は、たとえば、消費電力量の想定値から上述の方法(A1)により算出される平均総和を差し引いた値を電力消費目標として算出する。負荷決定部25は、算出した電力消費目標を評価部32へ出力する。 The load determining unit 25 calculates, for example, a value obtained by subtracting the average sum calculated by the above method (A1) from the assumed value of the power consumption as the power consumption target. The load determination unit 25 outputs the calculated power consumption target to the evaluation unit 32.

なお、負荷決定部25は、たとえば、上述の方法(B)により算出される想定電力量Mから想定抑制量Kを差し引いた値を電力消費目標として算出してもよい。 The load determining unit 25 may calculate, for example, a value obtained by subtracting the estimated suppression amount K from the estimated power amount M calculated by the method (B) described above as the power consumption target.

評価部32は、受信部22によって受信された電力消費情報の示す電力消費量、および電力管理情報の示す電力消費の目標を比較し、比較した結果に基づいて対象負荷205に対する需要家装置202の制御を評価する。 The evaluation unit 32 compares the power consumption amount indicated by the power consumption information received by the reception unit 22 with the power consumption target indicated by the power management information, and based on the comparison result, the consumer device 202 for the target load 205. Evaluate control.

具体的には、評価部32は、受信部22から電力消費信号を受けると、受けた電力消費信号から電力消費情報を取得する。 Specifically, when the evaluation unit 32 receives the power consumption signal from the reception unit 22, the evaluation unit 32 acquires the power consumption information from the received power consumption signal.

評価部32は、取得した電力消費情報の示す電力消費量、および負荷決定部25から受ける電力消費目標を比較する。 The evaluation unit 32 compares the power consumption amount indicated by the acquired power consumption information with the power consumption target received from the load determination unit 25.

評価部32は、たとえば、電力消費量が電力消費目標以下である場合、対象負荷205に対する需要家装置202の制御を「良好」と評価する。 For example, when the power consumption is less than or equal to the power consumption target, the evaluation unit 32 evaluates the control of the consumer device 202 with respect to the target load 205 as “good”.

一方、評価部32は、たとえば、電力消費量が電力消費目標を超える場合、対象負荷205に対する需要家装置202の制御を「不良」と評価する。 On the other hand, for example, when the power consumption exceeds the power consumption target, the evaluation unit 32 evaluates the control of the consumer device 202 with respect to the target load 205 as “defective”.

評価部31は、たとえば、対象負荷205に対する需要家装置202の制御を「不良」と評価した場合、制御不良通知を負荷決定部25へ出力する。 For example, when the evaluation unit 31 evaluates the control of the consumer device 202 for the target load 205 as “defective”, the evaluation unit 31 outputs a control failure notification to the load determination unit 25.

なお、評価部31は、対象負荷205に対する需要家装置202の制御を「不良」であると複数回評価した場合に、制御不良通知を負荷決定部25へ出力してもよい。 The evaluation unit 31 may output the control failure notification to the load determination unit 25 when the control of the consumer device 202 with respect to the target load 205 is evaluated as “defective” multiple times.

[対象負荷205の削除]
負荷決定部25は、評価部31から制御不良通知を受けると、たとえば、以下のいずれかの方法を用いて、現在制御を行っている対象負荷205の中から削除対象の対象負荷205を決定する。
[Delete target load 205]
When the load determination unit 25 receives the control failure notification from the evaluation unit 31, the load determination unit 25 determines the target load 205 to be deleted from the target loads 205 currently being controlled, for example, using one of the following methods. ..

すなわち、負荷決定部25は、現在制御を行っている対象負荷205の中からすべての対象負荷205を削除対象の対象負荷205として決定する。 That is, the load determining unit 25 determines all the target loads 205 among the target loads 205 currently being controlled as the target loads 205 to be deleted.

また、たとえば、各節電パターンに予め優先度が付与されている場合、負荷決定部25は、当該優先度に応じて削除対象の対象負荷205を決定する。 Further, for example, when a priority is given to each power saving pattern in advance, the load determining unit 25 determines the target load 205 to be deleted according to the priority.

また、たとえば、負荷決定部25は、抑制可能量の大きさに応じて削除対象の対象負荷205を決定する。 Further, for example, the load determining unit 25 determines the target load 205 to be deleted according to the size of the restrainable amount.

また、負荷決定部25は、たとえば現在制御を行っている対象負荷205の中から輪番で対象負荷205を選択し、選択した対象負荷205を削除対象の対象負荷205として決定する。 In addition, the load determining unit 25 selects the target load 205 by a wheel number from the target loads 205 currently being controlled, and determines the selected target load 205 as the target load 205 to be deleted.

また、負荷決定部25は、たとえば現在制御を行っている対象負荷205の中からランダムに対象負荷205を選択し、選択した対象負荷205を削除対象の対象負荷205として決定する。 Further, the load determining unit 25 randomly selects the target load 205 from the target loads 205 currently being controlled, and determines the selected target load 205 as the target load 205 to be deleted.

また、負荷決定部25は、たとえば、現在制御を行っている対象負荷205の個別の電力削減量を取得し、取得した電力削減量に基づいて削除対象の対象負荷205を決定する。 Further, the load determining unit 25 acquires, for example, the individual power reduction amount of the target load 205 currently being controlled, and determines the target load 205 to be deleted based on the acquired power reduction amount.

より詳細には、負荷決定部25は、たとえば、現在制御を行っている対象負荷205のうちの1つの対象負荷205に対する制御内容をDR開始タイミングより前の制御内容に一時的に戻す。 More specifically, for example, the load determination unit 25 temporarily returns the control content for one target load 205 of the target loads 205 currently being controlled to the control content before the DR start timing.

そして、負荷決定部25は、たとえば、制御内容を戻した後における電力需要施設における電力消費量から制御内容を戻す前における電力需要施設における電力消費量を差し引くことにより個別の電力削減量を取得する。 Then, the load determination unit 25 acquires the individual power reduction amount by subtracting the power consumption amount in the power demand facility before returning the control content from the power consumption amount in the power demand facility after returning the control content, for example. ..

そして、負荷決定部25は、現在制御を行っている対象負荷205のすべてについての個別の電力削減量を取得する。 Then, the load determination unit 25 acquires the individual power reduction amount for all the target loads 205 that are currently controlled.

負荷決定部25は、たとえば、電力削減量が小さい対象負荷205を削除対象の対象負荷205として決定する。 The load determining unit 25 determines, for example, the target load 205 having a small power reduction amount as the target load 205 to be deleted.

負荷決定部25は、削除対象の対象負荷205を決定すると、決定した対象負荷205のID(以下、削除対象負荷IDとも称する。)を記憶部26におけるDLCマッピングテーブルTbl1から取得し、取得した削除対象負荷IDおよび送信元の需要家装置202のアドレスを削除部30へ出力する。 When the load determining unit 25 determines the target load 205 to be deleted, the load determining unit 25 acquires the ID of the determined target load 205 (hereinafter, also referred to as deletion target load ID) from the DLC mapping table Tbl1 in the storage unit 26, and acquires the acquired deletion. The target load ID and the address of the consumer device 202 of the transmission source are output to the deletion unit 30.

削除部30は、評価部32による制御の評価結果に基づいて、記憶部26が記憶する対象負荷205の候補の中から抹消すべき対象負荷205を決定し、決定した対象負荷205に関する情報を記憶部26から削除する。 The deletion unit 30 determines the target load 205 to be deleted from the candidates of the target load 205 stored in the storage unit 26 based on the evaluation result of the control by the evaluation unit 32, and stores information on the determined target load 205. Delete from section 26.

具体的には、削除部30は、たとえば、負荷決定部25から削除対象負荷IDおよび送信元の需要家装置202のアドレスを受けると、記憶部26におけるDLCマッピングテーブルTbl1において、削除対象負荷IDに対応する抑制可能量および制御内容を削除する。 Specifically, for example, when the deletion unit 30 receives the deletion target load ID and the address of the transmission source consumer device 202 from the load determination unit 25, the deletion unit 30 sets the deletion target load ID in the DLC mapping table Tbl1 in the storage unit 26. Delete the corresponding suppressible amount and control contents.

そして、削除部30は、評価対象負荷IDに対応する対象負荷205の登録が抹消された旨を示す応答情報を、送信元の需要家装置202へ送信部23経由で送信する。 Then, the deletion unit 30 transmits response information indicating that the registration of the target load 205 corresponding to the evaluation target load ID has been deleted to the consumer device 202 that is the transmission source via the transmission unit 23.

[対象負荷205の追加]
また、負荷決定部25は、評価部31から制御不良通知を受けると、以下の処理を行う。すなわち、負荷決定部25は、たとえば、図4に示すDLCマッピングテーブルTbl1に含まれる節電パターンのうち、現在節電の対象となっている対象節電パターンを除いた節電パターンの中から新たに節電の対象とすべき1または複数の対象節電パターンを決定する。
[Addition of target load 205]
Further, when the load determination unit 25 receives the control failure notification from the evaluation unit 31, the load determination unit 25 performs the following processing. That is, for example, the load determination unit 25 newly selects a power saving pattern from the power saving patterns included in the DLC mapping table Tbl1 illustrated in FIG. 4 excluding the current power saving target power saving pattern. One or more target power saving patterns to be determined are determined.

負荷決定部25は、決定した対象節電パターンに基づいて対象負荷制御情報を生成し、生成した対象負荷制御情報を送信部23経由で需要家装置202へ送信する。 The load determination unit 25 generates target load control information based on the determined target power saving pattern, and transmits the generated target load control information to the consumer device 202 via the transmission unit 23.

[制御状態を評価する際の動作]
図26は、本発明の第4の実施の形態に係る電力消費管理システムにおける電力消費抑制処理のシーケンスの一例を示す図である。
[Operation when evaluating control status]
FIG. 26: is a figure which shows an example of the sequence of the power consumption suppression process in the power consumption management system which concerns on the 4th Embodiment of this invention.

図26を参照して、ステップS402〜S410の動作は、図8に示すステップS102〜S110の動作と同様である。 Referring to FIG. 26, the operations of steps S402 to S410 are similar to the operations of steps S102 to S110 shown in FIG.

次に、需要家装置202は、電力需要施設における電力消費量をたとえば定期的に電力メータ206から取得する(ステップS412)。 Next, the consumer device 202 acquires the power consumption in the power demanding facility, for example, periodically from the power meter 206 (step S412).

次に、需要家装置202は、取得した電力消費量を含む電力消費情報を生成し、生成した電力消費情報、および自己の需要家装置202のアドレスを含む電力消費信号をたとえば定期的に電力消費管理装置101へ送信する(ステップS414)。 Next, the consumer device 202 generates power consumption information including the acquired power consumption amount, and periodically generates the power consumption signal including the generated power consumption information and the address of the consumer device 202 of itself. It transmits to the management apparatus 101 (step S414).

次に、需要家装置202は、カウンタ46のカウント値からDR開始タイミングが到来したことを認識する(ステップS416)。 Next, the consumer device 202 recognizes that the DR start timing has arrived from the count value of the counter 46 (step S416).

次に、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフすることを示す制御命令を、イーサネット規格に従って、対象負荷IDに対応する負荷205Bに対して接点信号制御を行うLAN接点変換器207へ送信する(ステップS418)。 Next, the consumer device 202 sends a control command indicating that the switch is turned off based on the acquired target load control information and the connection I/F and the control method to the load corresponding to the target load ID according to the Ethernet standard. It transmits to the LAN contact converter 207 which performs contact signal control with respect to 205B (step S418).

次に、LAN接点変換器207は、需要家装置202から制御命令を受信すると、受信した制御命令に基づいて、スイッチをオフするための接点信号を負荷205Bへ送信する(ステップS419)。 Next, when the LAN contact converter 207 receives the control command from the consumer device 202, the LAN contact converter 207 transmits a contact signal for turning off the switch to the load 205B based on the received control command (step S419).

次に、需要家装置202は、電力需要施設における電力消費量をたとえば定期的に電力メータ206から取得する(ステップS420)。 Next, the consumer device 202 acquires the power consumption amount in the power demanding facility, for example, periodically from the power meter 206 (step S420).

次に、需要家装置202は、取得した電力消費量を含む電力消費情報を生成し、生成した電力消費情報、および自己の需要家装置202のアドレスを含む電力消費信号をたとえば定期的に電力消費管理装置101へ送信する(ステップS422)。 Next, the consumer device 202 generates power consumption information including the acquired power consumption amount, and periodically generates the power consumption signal including the generated power consumption information and the address of the consumer device 202 of itself. It transmits to the management apparatus 101 (step S422).

次に、電力消費管理装置101は、需要家装置202から電力消費信号を受信すると、受信した電力消費信号から電力消費情報および送信元の需要家装置202のアドレスを取得する。そして、電力消費管理装置101は、取得した電力消費情報の示す電力消費量、および電力消費目標を比較し、比較した結果に基づいて対象負荷205に対する需要家装置202の制御を評価する(ステップS424)。 Next, when the power consumption management device 101 receives the power consumption signal from the consumer device 202, the power consumption management device 101 acquires the power consumption information and the address of the sender's consumer device 202 from the received power consumption signal. Then, the power consumption management apparatus 101 compares the power consumption amount indicated by the acquired power consumption information and the power consumption target, and evaluates the control of the consumer device 202 with respect to the target load 205 based on the comparison result (step S424). ).

電力消費管理装置101は、たとえば評価結果が「不良」であった場合、DLCマッピングテーブルTbl1に含まれる節電パターンのうち、現在節電の対象となっている対象節電パターンを除いた節電パターンの中から対象負荷205Aに対応する節電パターンを新たな対象節電パターンとして決定する(ステップS426)。 For example, when the evaluation result is “defective”, the power consumption management apparatus 101 selects from among the power saving patterns included in the DLC mapping table Tbl1 the power saving patterns excluding the current power saving target target power saving pattern. The power saving pattern corresponding to the target load 205A is determined as a new target power saving pattern (step S426).

次に、電力消費管理装置101は、決定した対象節電パターンに含まれる対象負荷候補IDおよび対応の制御内容を含む対象負荷制御情報を生成し、生成した対象負荷制御情報を含むDLC信号を需要家装置202へ送信する(ステップS428)。 Next, the power consumption management apparatus 101 generates target load control information including the target load candidate ID included in the determined target power saving pattern and the corresponding control content, and the DLC signal including the generated target load control information is consumed by the consumer. The data is transmitted to the device 202 (step S428).

次に、需要家装置202は、電力消費管理装置101からDLC信号を受信すると、受信したDLC信号から対象負荷制御情報を取得し、取得した対象負荷制御情報、および負荷制御テーブルTbl2の内容に基づいて、対象負荷IDに対応する接続I/Fおよび制御方法を取得する(ステップS430)。 Next, when the consumer device 202 receives the DLC signal from the power consumption management device 101, the consumer device 202 acquires the target load control information from the received DLC signal, and based on the acquired target load control information and the content of the load control table Tbl2. Then, the connection I/F and the control method corresponding to the target load ID are acquired (step S430).

次に、需要家装置202は、取得した対象負荷制御情報、ならびに接続I/Fおよび制御方法に基づいて、スイッチをオフするための接点信号を対象負荷IDに対応する負荷205Aへ送信する(ステップS432)。 Next, the consumer device 202 transmits a contact signal for turning off the switch to the load 205A corresponding to the target load ID based on the acquired target load control information, the connection I/F, and the control method (step). S432).

次に、電力消費管理装置101は、現在制御を行っている対象負荷205の中から削除対象の対象負荷205を決定し、決定した対象負荷205の対象負荷IDを用いて、当該対象負荷IDに対応する抑制可能量および制御内容を記憶部26におけるDLCマッピングテーブルTbl1から削除する(ステップS434)。 Next, the power consumption management apparatus 101 determines the target load 205 to be deleted from the target loads 205 currently being controlled, and uses the target load ID of the determined target load 205 as the target load ID. The corresponding suppressible amount and control content are deleted from the DLC mapping table Tbl1 in the storage unit 26 (step S434).

次に、電力消費管理装置101は、応答情報を含む応答信号を送信元の需要家装置202へインターネット10経由で送信する(ステップS436)。 Next, the power consumption management apparatus 101 transmits a response signal including response information to the consumer device 202 that is the transmission source via the Internet 10 (step S436).

次に、需要家装置202は、電力消費管理装置101から応答情報を含む応答信号を受信すると、受信した応答情報に基づいて、上記対象負荷IDに対応する対象負荷205の登録が抹消されたことを認識する。そして、需要家装置202は、対応の制御I/Fおよび制御方法を記憶部45における負荷制御テーブルTbl2から削除する(ステップS438)。 Next, when the consumer device 202 receives the response signal including the response information from the power consumption management device 101, the registration of the target load 205 corresponding to the target load ID is deleted based on the received response information. Recognize. Then, the consumer device 202 deletes the corresponding control I/F and control method from the load control table Tbl2 in the storage unit 45 (step S438).

以上のように、本発明の第4の実施の形態に係る需要家装置では、消費情報取得部52は、電力需要施設における電力消費量を示す電力消費情報を取得する。送信部43は、消費情報取得部52によって取得された電力消費情報を送信する。 As described above, in the consumer device according to the fourth embodiment of the present invention, the consumption information acquisition unit 52 acquires the power consumption information indicating the power consumption amount in the power demanding facility. The transmission unit 43 transmits the power consumption information acquired by the consumption information acquisition unit 52.

このような構成により、需要家装置202の電力消費量をたとえばアグリゲータ側の装置へ通知することができるので、アグリゲータ側の装置は、電力消費量に基づいて、対象負荷205の電力消費を抑制する制御に対してフィードバックをかけることができる。 With such a configuration, the power consumption of the consumer device 202 can be notified to, for example, the device on the aggregator side, and thus the device on the aggregator side suppresses the power consumption of the target load 205 based on the power consumption. Feedback can be applied to the control.

また、本発明の第4の実施の形態に係る電力消費管理装置では、受信部22は、電力需要施設における電力消費量を示す電力消費情報を需要家装置202から受信する。評価部32は、受信部22によって受信された電力消費情報の示す電力消費量、および電力管理情報の示す電力消費の目標を比較し、比較した結果に基づいて対象負荷205に対する需要家装置202の制御を評価する。 Further, in the power consumption management device according to the fourth embodiment of the present invention, the reception unit 22 receives power consumption information indicating the power consumption amount in the power demanding facility from the consumer device 202. The evaluation unit 32 compares the power consumption amount indicated by the power consumption information received by the reception unit 22 with the power consumption target indicated by the power management information, and based on the comparison result, the consumer device 202 for the target load 205. Evaluate control.

このような構成により、対象負荷205に対する需要家装置202の制御の、需要家装置202の電力消費量に基づく適切な評価結果を用いて、たとえば需要家装置202の電力消費量を電力管理情報の示す電力消費の目標により近づける制御を行うことができる。 With such a configuration, by using an appropriate evaluation result of the control of the consumer device 202 with respect to the target load 205 based on the power consumption amount of the consumer device 202, for example, the power consumption amount of the consumer device 202 is calculated in the power management information. It is possible to perform control to bring the target closer to the indicated power consumption target.

また、本発明の第4の実施の形態に係る電力消費管理装置では、記憶部26は、対象負荷の候補に関する情報を記憶する。削除部30は、評価部32による制御の評価結果に基づいて、記憶部26における対象負荷205の候補の中から抹消すべき対象負荷205を決定し、決定した対象負荷205に関する情報を記憶部26から削除する。 Further, in the power consumption management device according to the fourth embodiment of the present invention, the storage unit 26 stores information regarding candidates for the target load. The deletion unit 30 determines the target load 205 to be deleted from the candidates for the target load 205 in the storage unit 26 based on the evaluation result of the control performed by the evaluation unit 32, and stores information regarding the determined target load 205 in the storage unit 26. Remove from.

このような構成により、たとえば電力消費の抑制能力が低い対象負荷205の候補を記憶部26から削除することができるので、記憶部26における対象負荷205の候補において電力消費の抑制能力が高い対象負荷205の候補の割合を増やすことができる。 With such a configuration, for example, a candidate for the target load 205 having a low power consumption suppressing ability can be deleted from the storage unit 26, and thus a target load having a high power consumption suppressing ability for the candidate target load 205 in the storage unit 26 can be deleted. The proportion of 205 candidates can be increased.

その他の構成および動作は第1の実施の形態に係る電力消費管理システムと同様であるため、ここでは詳細な説明を繰り返さない。 Other configurations and operations are similar to those of the power consumption management system according to the first embodiment, and therefore detailed description will not be repeated here.

なお、本発明の第1の実施の形態〜第4の実施の形態に係る各装置の構成要素および動作のうち、一部または全部を適宜組み合わせることも可能である。 In addition, it is also possible to combine some or all of the components and operations of the respective devices according to the first to fourth embodiments of the present invention as appropriate.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 It should be considered that the above-described embodiments are illustrative in all points and not restrictive. The scope of the present invention is shown not by the above description but by the claims, and is intended to include meanings equivalent to the claims and all modifications within the scope.

以上の説明は、以下に付記する特徴を含む。 The above description includes the features described below.

[付記1]
電力需要施設における1または複数の負荷を制御可能な需要家装置であって、
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信する受信部と、
前記受信部によって受信された前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制する制御部とを備え、
前記電力需要施設は、ビル、工場または一般家庭であり、
前記需要家装置は、計測装置および制御装置の機能を有し、
前記負荷は、二次電池式電気自動車、プラグインハイブリッドカー、照明、テレビおよび空調装置の少なくともいずれか1つであり、
前記対象負荷情報は、前記対象負荷のIDであり、
前記制御部は、前記対象負荷のスイッチのオフおよび設定値の変更の少なくともいずれか一方を行う、需要家装置。
[Appendix 1]
A consumer device capable of controlling one or more loads in a power demand facility,
A receiving unit that receives target load information indicating a target load that is the load that should be the target of power consumption suppression,
By controlling the target load indicated by the target load information received by the receiving unit, a control unit for suppressing power consumption of the target load,
The power demand facility is a building, a factory or a household,
The consumer device has the functions of a measuring device and a control device,
The load is at least one of a secondary battery electric vehicle, a plug-in hybrid car, lighting, a television, and an air conditioner,
The target load information is the ID of the target load,
The consumer device, wherein the control unit turns off the switch of the target load and/or changes the set value.

[付記2]
電力需要施設における電力消費を管理する電力消費管理装置であって、
電力系統側から電力消費に関する電力管理情報を取得する管理情報取得部と、
前記管理情報取得部によって取得された前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定する負荷決定部と、
前記負荷決定部によって決定された前記対象負荷を示す対象負荷情報を需要家装置へ送信する送信部とを備え、
前記電力需要施設は、ビル、工場または一般家庭であり、
前記電力消費管理装置は、DRAS(Demand Response Automation Server)であり、
前記電力管理情報は、電力消費の抑制の対象期間の開始タイミングおよび前記対象期間の長さ、ならびに依頼電力量、電力消費の削減依頼量または削減レベルの少なくともいずれか一つを含み、
前記負荷は、二次電池式電気自動車、プラグインハイブリッドカー、照明、テレビおよび空調装置の少なくともいずれか1つであり、
前記対象負荷情報は、前記対象負荷のIDであり、
前記需要家装置は、計測装置および制御装置の機能を有する、電力消費管理装置。
[Appendix 2]
A power consumption management device for managing power consumption in a power demand facility,
A management information acquisition unit that acquires power management information regarding power consumption from the power system side,
A load determination unit that determines a target load that is a load that should be a target of power consumption suppression, based on the power management information acquired by the management information acquisition unit;
A load unit that transmits target load information indicating the target load determined by the load determination unit to a consumer device,
The power demand facility is a building, a factory or a household,
The power consumption management device is a DRAS (Demand Response Automation Server),
The power management information includes at least one of a start timing of a target period of power consumption suppression and a length of the target period, and a requested power amount, a power consumption reduction request amount, or a reduction level,
The load is at least one of a secondary battery electric vehicle, a plug-in hybrid car, lighting, a television, and an air conditioner,
The target load information is an ID of the target load,
The consumer device is a power consumption management device having the functions of a measurement device and a control device.

[付記3]
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設における1または複数の負荷を制御可能な需要家装置とを備え、
前記電力消費管理装置は、電力消費の抑制対象とすべき負荷である対象負荷を示す対象負荷情報を前記需要家装置へ送信し、
前記需要家装置は、前記対象負荷情報を前記電力消費管理装置から受信し、受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制し、
前記電力需要施設は、ビル、工場または一般家庭であり、
前記電力消費管理装置は、DRAS(Demand Response Automation Server)であり、
前記負荷は、二次電池式電気自動車、プラグインハイブリッドカー、照明、テレビおよび空調装置の少なくともいずれか1つであり、
前記需要家装置は、計測装置および制御装置の機能を有し、
前記対象負荷情報は、前記対象負荷のIDであり、
前記需要家装置は、前記対象負荷のスイッチのオフおよび設定値の変更の少なくともいずれか一方を行う、電力消費管理システム。
[Appendix 3]
A power consumption management device for managing power consumption in a power demand facility,
A consumer device capable of controlling one or more loads in the power demand facility,
The power consumption management device transmits target load information indicating a target load that is a load to be suppressed of power consumption to the consumer device,
The consumer device receives the target load information from the power consumption management device and controls the target load indicated by the received target load information to suppress power consumption of the target load,
The power demand facility is a building, a factory or a household,
The power consumption management device is a DRAS (Demand Response Automation Server),
The load is at least one of a secondary battery electric vehicle, a plug-in hybrid car, lighting, a television, and an air conditioner,
The consumer device has the functions of a measuring device and a control device,
The target load information is an ID of the target load,
The consumer device is a power consumption management system for turning off a switch of the target load and/or changing a set value.

22 受信部
23 送信部
24 管理情報取得部
25 負荷決定部
26 記憶部
27 カウンタ
28 更新部
30 削除部
31 評価部
32 評価部
42 受信部
43 送信部
44 制御部
45 記憶部
46 カウンタ
47 表示部
48 更新部
49 負荷情報受け付け部
50 状態情報取得部
51 削除部
52 消費情報取得部
101,111 電力消費管理装置
151 系統側管理装置
202,212 需要家装置
203 高負荷
204 低負荷
205 負荷
206 電力メータ
207 LAN接点変換器
301 電力消費管理システム
22 receiving section 23 transmitting section 24 management information acquiring section 25 load determining section 26 storage section 27 counter 28 updating section 30 deleting section 31 evaluation section 32 evaluation section 42 reception section 43 transmission section 44 control section 45 storage section 46 counter 47 display section 48 Update unit 49 Load information acceptance unit 50 State information acquisition unit 51 Delete unit 52 Consumption information acquisition unit 101,111 Power consumption management device 151 System side management device 202,212 Customer device 203 High load 204 Low load 205 Load 206 Electric power meter 207 LAN contact converter 301 Power consumption management system

Claims (23)

電力需要施設における1または複数の負荷を制御可能な需要家装置であって、
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信する受信部と、
前記受信部によって受信された前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制する制御部とを備え、
前記需要家装置は、さらに、
前記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を送信する送信部を備え、
前記受信部は、さらに、前記新規負荷が登録された旨を示す応答情報を受信し、
前記需要家装置は、さらに、
1または複数の前記負荷との通信方法に関する情報を記憶する記憶部と、
前記受信部によって受信された前記応答情報に対応する前記新規負荷との通信方法に関する情報を前記記憶部に保存する更新部とを備える、需要家装置。
A consumer device capable of controlling one or more loads in a power demand facility,
A receiving unit that receives target load information indicating a target load that is the load that should be the target of power consumption suppression,
By controlling the target load indicated by the target load information received by the receiving unit, Bei example and the control for suppressing unit the power consumption of the target load,
The consumer device further includes
A load unit that transmits load information regarding a new load that is a load that should be newly registered in the power demand facility,
The receiving unit further receives response information indicating that the new load is registered,
The consumer device further includes
A storage unit that stores information about a method of communicating with one or more of the loads;
A consumer device , comprising: an updating unit that stores information regarding a communication method with the new load, which corresponds to the response information received by the receiving unit, in the storage unit .
前記受信部は、さらに、前記対象負荷の制御内容を示す制御情報を受信し、The receiving unit further receives control information indicating the control content of the target load,
前記制御部は、前記制御情報の示す前記制御内容に従って前記対象負荷を制御する、請求項1に記載の需要家装置。 The consumer device according to claim 1, wherein the control unit controls the target load according to the control content indicated by the control information.
記制御部は、前記対象負荷との通信方法に関する情報を前記記憶部から取得し、取得した前記通信方法を用いて前記対象負荷を制御する、請求項1または請求項2に記載の需要家装置。 Before SL control unit obtains information on how to communicate with the target load from the storage unit, controls the target load using the acquired communication method, customers according to claim 1 or claim 2 apparatus. 前記送信部は、さらに、前記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信し、
前記受信部は、さらに、前記抹消対象負荷の登録が抹消された旨を示す応答情報を受信する、請求項1から請求項3のいずれか1項に記載の需要家装置。
The transmission unit further transmits load information regarding a deletion target load that is a load whose registration should be deleted in the power demand facility ,
The consumer device according to any one of claims 1 to 3, wherein the receiving unit further receives response information indicating that the registration of the load to be deleted has been deleted.
電力需要施設における1または複数の負荷を制御可能な需要家装置であって、
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信する受信部と、
前記受信部によって受信された前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制する制御部とを備え、
前記需要家装置は、さらに、
前記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信する送信部を備え、
前記受信部は、さらに、前記抹消対象負荷の登録が抹消された旨を示す応答情報を受信し、
前記需要家装置は、さらに、
1または複数の前記負荷との通信方法に関する情報を記憶する記憶部と、
前記受信部によって受信された前記応答情報に対応する前記抹消対象負荷との通信方法に関する情報を前記記憶部から削除する更新部とを備える、需要家装置。
A consumer device capable of controlling one or more loads in a power demand facility,
A receiving unit that receives target load information indicating a target load that is the load that should be the target of power consumption suppression,
By controlling the target load indicated by the target load information received by the receiving unit, a control unit for suppressing power consumption of the target load,
The consumer device further includes
The power demanding facility includes a transmission unit that transmits load information regarding a deletion target load that is a load whose registration should be deleted,
The receiving unit further receives response information indicating that the registration of the deletion target load has been deleted,
The consumer device further includes
A storage unit that stores information about a method of communicating with one or more of the loads;
And a renewal unit for deleting information about how to communicate with the peripheral target load corresponding to the response information received by the receiving unit from the storage unit, demand Yoie device.
前記需要家装置は、さらに、
前記対象負荷の動作状態を示す状態情報を取得する状態情報取得部を備え、
前記送信部は、さらに、前記状態情報取得部によって取得された前記状態情報を送信する、請求項1から請求項のいずれか1項に記載の需要家装置。
The consumer device further includes
A state information acquisition unit for acquiring state information indicating the operation state of the target load ,
The transmitting unit is further that sends the status information acquired by the status information acquisition unit, consumer apparatus according to any one of claims 1 to 5.
前記需要家装置は、さらに、
前記電力需要施設における電力消費量を示す電力消費情報を取得する消費情報取得部を備え、
前記送信部は、さらに、前記消費情報取得部によって取得された前記電力消費情報を送信する、請求項1から請求項のいずれか1項に記載の需要家装置。
The consumer device further includes
A power consumption information acquisition unit that acquires power consumption information indicating power consumption in the power demand facility ,
The transmitting unit is further that sends the power consumption information acquired by the consumption information acquiring unit, the consumer device according to any one of claims 1 to 6.
前記制御部は、電力消費の抑制の対象期間の開始タイミングにおいて前記対象負荷の制御を開始し、
前記制御部は、前記対象期間の終了タイミングにおいて前記対象負荷の制御を終了するか、または前記対象期間の終了に関する情報を出力する、請求項1から請求項のいずれか1項に記載の需要家装置。
The control unit starts control of the target load at a start timing of a target period of suppression of power consumption,
The demand according to any one of claims 1 to 7 , wherein the control unit ends control of the target load at the end timing of the target period or outputs information regarding the end of the target period. Home equipment.
電力需要施設における電力消費を管理する電力消費管理装置であって、
電力系統側から電力消費に関する電力管理情報を取得する管理情報取得部と、
前記管理情報取得部によって取得された前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定する負荷決定部と、
前記負荷決定部によって決定された前記対象負荷を示す対象負荷情報を需要家装置へ送信する送信部と、
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信する受信部と、
前記受信部によって受信された前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価する評価部と、
前記対象負荷の候補に関する情報を記憶する記憶部と、
前記評価部による前記制御の評価結果に基づいて、前記記憶部における前記対象負荷の候補の中から抹消すべき前記対象負荷を決定し、決定した前記対象負荷に関する情報を前記記憶部から削除する削除部とを備える、電力消費管理装置。
A power consumption management device for managing power consumption in a power demand facility,
A management information acquisition unit that acquires power management information regarding power consumption from the power system side,
A load determination unit that determines a target load that is a load that should be a target of power consumption suppression, based on the power management information acquired by the management information acquisition unit;
A transmission unit that transmits target load information indicating the target load determined by the load determination unit to a consumer device ,
A receiving unit that receives state information indicating the operating state of the target load from the consumer device,
Based on the state information received by the receiving unit, an evaluation unit that evaluates control of the consumer device for the target load,
A storage unit that stores information about the target load candidates;
Based on the evaluation result of the control by the evaluation unit, the target load to be deleted is determined from the candidates of the target load in the storage unit, and information regarding the determined target load is deleted from the storage unit. And a power consumption management device.
記負荷決定部は、前記電力管理情報に基づいて前記記憶部における前記対象負荷の候補の中から前記対象負荷を決定する、請求項に記載の電力消費管理装置。 Before SL load determination unit determines the target load from the candidates of the target load in the storage unit based on the power management information, power consumption management device according to claim 9. 前記負荷決定部は、さらに、前記電力管理情報に基づいて、前記対象負荷の制御内容を決定し、The load determination unit further determines the control content of the target load based on the power management information,
前記送信部は、さらに、前記負荷決定部によって決定された前記制御内容を示す制御情報を前記需要家装置へ送信する、請求項9または請求項10に記載の電力消費管理装置。The power consumption management device according to claim 9 or 10, wherein the transmission unit further transmits, to the consumer device, control information indicating the control content determined by the load determination unit.
前記受信部は、さらに、前記電力需要施設における電力消費量を示す電力消費情報を前記需要家装置から受信し、
前記電力消費管理装置は、さらに、
前記受信部によって受信された電力消費情報の示す前記電力消費量、および前記電力管理情報の示す電力消費の目標を比較し、比較した結果に基づいて前記対象負荷に対する前記需要家装置の制御を評価する評価部を備える、請求項から請求項11のいずれか1項に記載の電力消費管理装置。
The receiving unit further receives power consumption information indicating power consumption in the power demanding facility from the consumer device ,
The power consumption management device further comprises
The control of the consumer device with respect to the target load is evaluated based on the comparison result by comparing the power consumption amount indicated by the power consumption information received by the receiving unit and the power consumption target indicated by the power management information. comprising an evaluation unit for the power consumption management device according to any one of claims 11 claim 9.
電力需要施設における電力消費を管理する電力消費管理装置であって、
電力系統側から電力消費に関する電力管理情報を取得する管理情報取得部と、
前記管理情報取得部によって取得された前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定する負荷決定部と、
前記負荷決定部によって決定された前記対象負荷を示す対象負荷情報を需要家装置へ送信する送信部とを備え、
前記負荷決定部は、さらに、前記電力管理情報に基づいて、前記対象負荷の制御内容を決定し、
前記送信部は、さらに、前記負荷決定部によって決定された前記制御内容を示す制御情報を前記需要家装置へ送信し、
前記電力消費管理装置は、さらに、
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信する受信部と、
前記受信部によって受信された前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価する評価部とを備え、
前記負荷決定部は、前記評価部による前記制御の評価結果に基づいて、前回決定した前記対象負荷および前記制御内容の組み合わせとは異なる内容の組み合わせを決定し、
前記送信部は、さらに、前記負荷決定部によって決定された前記異なる内容の組み合わせを示す情報を前記需要家装置へ送信する、電力消費管理装置。
A power consumption management device for managing power consumption in a power demand facility,
A management information acquisition unit that acquires power management information regarding power consumption from the power system side,
A load determination unit that determines a target load that is a load that should be a target of power consumption suppression, based on the power management information acquired by the management information acquisition unit;
A load unit that transmits target load information indicating the target load determined by the load determination unit to a consumer device,
The load determination unit further determines the control content of the target load based on the power management information,
The transmission unit further transmits control information indicating the control content determined by the load determination unit to the consumer device,
The power consumption management device further includes
A receiving unit that receives state information indicating the operating state of the target load from the consumer device,
Based on the status information received by the receiving unit, e Bei an evaluation unit for evaluating the control of the customer device to said target load,
The load determination unit, based on the evaluation result of the control by the evaluation unit, determines a combination of contents different from the combination of the target load and the control content previously determined,
The power consumption management device , wherein the transmission unit further transmits information indicating the combination of the different contents determined by the load determination unit, to the consumer device.
電力需要施設における電力消費を管理する電力消費管理装置と、
前記電力需要施設における1または複数の負荷を制御可能な需要家装置とを備え、
前記電力消費管理装置は、電力消費の抑制対象とすべき負荷である対象負荷を示す対象負荷情報を前記需要家装置へ送信し、
前記需要家装置は、前記対象負荷情報を前記電力消費管理装置から受信し、受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制し、
前記需要家装置は、前記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を前記電力消費管理装置へ送信し、
前記需要家装置は、前記新規負荷が登録された旨を示す応答情報を前記電力消費管理装置から受信し、
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、受信した前記応答情報に対応する前記新規負荷との通信方法に関する情報を前記記憶部に保存する、電力消費管理システム。
A power consumption management device for managing power consumption in a power demand facility,
A consumer device capable of controlling one or more loads in the power demand facility,
The power consumption management device transmits target load information indicating a target load that is a load to be suppressed of power consumption to the consumer device,
The consumer device receives the target load information from the power consumption management device and controls the target load indicated by the received target load information to suppress power consumption of the target load ,
The consumer device transmits load information regarding a new load, which is a load to be newly registered in the power demand facility, to the power consumption management device,
The consumer device receives response information indicating that the new load has been registered from the power consumption management device,
The consumer device includes a storage unit that stores information about a communication method with one or a plurality of the loads, and stores information about a communication method with the new load corresponding to the received response information in the storage unit. , Power consumption management system.
電力需要施設における電力消費を管理する電力消費管理装置と、A power consumption management device for managing power consumption in a power demand facility,
前記電力需要施設における1または複数の負荷を制御可能な需要家装置とを備え、A consumer device capable of controlling one or more loads in the power demand facility,
前記電力消費管理装置は、電力消費の抑制対象とすべき負荷である対象負荷を示す対象負荷情報を前記需要家装置へ送信し、The power consumption management device transmits target load information indicating a target load that is a load to be suppressed of power consumption to the consumer device,
前記需要家装置は、前記対象負荷情報を前記電力消費管理装置から受信し、受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制し、The consumer device receives the target load information from the power consumption management device and controls the target load indicated by the received target load information to suppress power consumption of the target load,
前記需要家装置は、前記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を前記電力消費管理装置へ送信し、The consumer device transmits load information regarding a deletion target load, which is a load whose registration should be deleted in the power demand facility, to the power consumption management device,
前記需要家装置は、前記抹消対象負荷の登録が抹消された旨を示す応答情報を前記電力消費管理装置から受信し、The consumer device receives, from the power consumption management device, response information indicating that the registration of the deletion target load has been deleted,
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、受信した前記応答情報に対応する前記抹消対象負荷との通信方法に関する情報を前記記憶部から削除する、電力消費管理システム。The consumer device includes a storage unit that stores information about a communication method with one or more of the loads, and deletes information about a communication method with the deletion target load corresponding to the received response information from the storage unit. Power consumption management system.
電力需要施設における1または複数の負荷を制御可能な需要家装置における電力消費管理方法であって、
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信するステップと、
受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制するステップと、
前記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を送信するステップと、
前記新規負荷が登録された旨を示す応答情報を受信するステップとを含み、
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、
前記電力消費管理方法は、さらに、
受信した前記応答情報に対応する前記新規負荷との通信方法に関する情報を前記記憶部に保存するステップを含む、電力消費管理方法。
A power consumption management method in a consumer device capable of controlling one or more loads in a power demand facility,
A step of receiving target load information indicating a target load that is the load to be the target of power consumption suppression;
By controlling the target load indicated by the received target load information, suppressing the power consumption of the target load ,
A step of transmitting load information regarding a new load, which is a load to be newly registered in the power demand facility,
Receiving response information indicating that the new load has been registered,
The consumer device includes a storage unit that stores information regarding a communication method with one or more of the loads,
The power consumption management method further comprises
A power consumption management method , comprising the step of storing in the storage unit information related to a method of communicating with the new load corresponding to the received response information .
電力需要施設における1または複数の負荷を制御可能な需要家装置における電力消費管理方法であって、A power consumption management method in a consumer device capable of controlling one or more loads in a power demand facility,
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信するステップと、A step of receiving target load information indicating a target load that is the load to be the target of power consumption suppression;
受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制するステップと、By controlling the target load indicated by the received target load information, suppressing the power consumption of the target load,
前記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信するステップと、A step of transmitting load information regarding a deletion target load, which is a load whose registration should be deleted in the power demand facility,
前記抹消対象負荷の登録が抹消された旨を示す応答情報を受信するステップとを含み、Receiving response information indicating that the registration of the load to be deleted has been deleted,
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、The consumer device includes a storage unit that stores information about a communication method with one or more of the loads,
前記電力消費管理方法は、さらに、The power consumption management method further comprises
受信した前記応答情報に対応する前記抹消対象負荷との通信方法に関する情報を前記記憶部から削除するステップを含む、電力消費管理方法。A power consumption management method, comprising the step of deleting from the storage unit information related to the communication method with the load to be deleted corresponding to the received response information.
電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、
電力系統側から電力消費に関する電力管理情報を取得するステップと、
取得した前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、
決定した前記対象負荷を示す対象負荷情報を需要家装置へ送信するステップと
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信するステップと、
受信した前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価するステップとを含み、
前記電力消費管理装置は、前記対象負荷の候補に関する情報を記憶する記憶部を含み、
前記電力消費管理方法は、さらに、
前記制御の評価結果に基づいて、前記記憶部における前記対象負荷の候補の中から抹消すべき前記対象負荷を決定し、決定した前記対象負荷に関する情報を前記記憶部から削除するステップを含む、電力消費管理方法。
A power consumption management method in a power consumption management device for managing power consumption in a power demand facility,
Acquiring power management information about power consumption from the grid side,
Based on the acquired power management information, determining a target load that is a load that should be the target of power consumption suppression,
Transmitting target load information indicating the determined target load to the consumer device ,
Receiving state information indicating the operating state of the target load from the consumer device,
Evaluating the control of the consumer device for the target load based on the received state information,
The power consumption management device includes a storage unit that stores information about the target load candidates,
The power consumption management method further comprises
Based on the evaluation result of the control, including the step of determining the target load to be deleted from the candidates of the target load in the storage unit, and deleting information about the determined target load from the storage unit, Consumption management method.
電力需要施設における電力消費を管理する電力消費管理装置における電力消費管理方法であって、A power consumption management method in a power consumption management device for managing power consumption in a power demand facility,
電力系統側から電力消費に関する電力管理情報を取得するステップと、Acquiring power management information about power consumption from the power grid side,
取得した前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、 Based on the acquired power management information, determining a target load that is a load that should be the target of power consumption suppression,
決定した前記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを含み、Including a step of transmitting target load information indicating the determined target load to a consumer device,
前記対象負荷を決定するステップにおいては、さらに、前記電力管理情報に基づいて、前記対象負荷の制御内容を決定し、In the step of determining the target load, further, based on the power management information, determine the control content of the target load,
前記対象負荷情報を送信するステップにおいては、さらに、決定した前記制御内容を示す制御情報を前記需要家装置へ送信し、In the step of transmitting the target load information, further, control information indicating the determined control content is transmitted to the consumer device,
前記電力消費管理方法は、さらに、The power consumption management method further comprises
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信するステップと、Receiving state information indicating the operating state of the target load from the consumer device,
受信した前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価するステップと、Evaluating the control of the consumer device for the target load based on the received status information;
前記制御の評価結果に基づいて、前回決定した前記対象負荷および前記制御内容の組み合わせとは異なる内容の組み合わせを決定するステップと、A step of deciding a combination of contents different from the previously decided combination of the target load and the control contents based on the evaluation result of the control;
決定した前記異なる内容の組み合わせを示す情報を前記需要家装置へ送信するステップとを含む、電力消費管理方法。Transmitting the information indicating the determined combination of the different contents to the consumer device.
電力需要施設における1または複数の負荷を制御可能な需要家装置において用いられる電力消費管理プログラムであって、
コンピュータに、
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信するステップと、
受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制するステップと、
前記電力需要施設において新たに登録すべき負荷である新規負荷、に関する負荷情報を送信するステップと、
前記新規負荷が登録された旨を示す応答情報を受信するステップとを実行させるためのプログラムであり、
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、
さらに、コンピュータに、
受信した前記応答情報に対応する前記新規負荷との通信方法に関する情報を前記記憶部に保存するステップを実行させるための、電力消費管理プログラム。
A power consumption management program used in a consumer device capable of controlling one or more loads in a power demand facility,
On the computer,
A step of receiving target load information indicating a target load that is the load to be the target of power consumption suppression;
By controlling the target load indicated by the received target load information, suppressing the power consumption of the target load ,
A step of transmitting load information regarding a new load, which is a load to be newly registered in the power demand facility,
A program for executing a step of receiving response information indicating that the new load is registered,
The consumer device includes a storage unit that stores information regarding a communication method with one or more of the loads,
In addition, on the computer,
A power consumption management program for executing the step of storing in the storage unit the information on the communication method with the new load corresponding to the received response information .
電力需要施設における1または複数の負荷を制御可能な需要家装置において用いられる電力消費管理プログラムであって、A power consumption management program used in a consumer device capable of controlling one or more loads in a power demand facility,
コンピュータに、On the computer,
電力消費の抑制対象とすべき前記負荷である対象負荷を示す対象負荷情報を受信するステップと、A step of receiving target load information indicating a target load that is the load to be the target of power consumption suppression;
受信した前記対象負荷情報の示す前記対象負荷を制御することにより、前記対象負荷の電力消費を抑制するステップと、By controlling the target load indicated by the received target load information, suppressing the power consumption of the target load,
前記電力需要施設において登録を抹消すべき負荷である抹消対象負荷、に関する負荷情報を送信するステップと、A step of transmitting load information regarding a deletion target load, which is a load whose registration should be deleted in the power demand facility,
前記抹消対象負荷の登録が抹消された旨を示す応答情報を受信するステップとを実行させるためのプログラムであり、A program for executing a step of receiving response information indicating that the registration of the load to be deleted has been deleted,
前記需要家装置は、1または複数の前記負荷との通信方法に関する情報を記憶する記憶部を含み、The consumer device includes a storage unit that stores information about a communication method with one or more of the loads,
さらに、コンピュータに、In addition, on the computer,
受信した前記応答情報に対応する前記抹消対象負荷との通信方法に関する情報を前記記憶部から削除するステップを実行させるための、電力消費管理プログラム。A power consumption management program for executing a step of deleting, from the storage unit, information related to a communication method with the deletion target load corresponding to the received response information.
電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、
コンピュータに、
電力系統側から電力消費に関する電力管理情報を取得するステップと、
取得した前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、
決定した前記対象負荷を示す対象負荷情報を需要家装置へ送信するステップと
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信するステップと、
受信した前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価するステップとを実行させるためのプログラムであり、
前記電力消費管理装置は、前記対象負荷の候補に関する情報を記憶する記憶部を含み、
さらに、コンピュータに、
前記制御の評価結果に基づいて、前記記憶部における前記対象負荷の候補の中から抹消すべき前記対象負荷を決定し、決定した前記対象負荷に関する情報を前記記憶部から削除するステップを実行させるための、電力消費管理プログラム。
A power consumption management program used in a power consumption management device for managing power consumption in a power demand facility,
On the computer,
Acquiring power management information about power consumption from the grid side,
Based on the acquired power management information, determining a target load that is a load that should be the target of power consumption suppression,
Transmitting target load information indicating the determined target load to the consumer device ,
Receiving state information indicating the operating state of the target load from the consumer device,
A program for executing a step of evaluating control of the consumer device for the target load based on the received state information,
The power consumption management device includes a storage unit that stores information about the target load candidates,
In addition, on the computer,
In order to execute the step of determining the target load to be deleted from the candidates of the target load in the storage unit based on the evaluation result of the control, and deleting the information regarding the determined target load from the storage unit. , A power consumption management program.
電力需要施設における電力消費を管理する電力消費管理装置において用いられる電力消費管理プログラムであって、A power consumption management program used in a power consumption management device for managing power consumption in a power demand facility,
コンピュータに、On the computer,
電力系統側から電力消費に関する電力管理情報を取得するステップと、Acquiring power management information about power consumption from the power grid side,
取得した前記電力管理情報に基づいて、電力消費の抑制対象とすべき負荷である対象負荷を決定するステップと、Based on the acquired power management information, determining a target load that is a load that should be the target of power consumption suppression,
決定した前記対象負荷を示す対象負荷情報を需要家装置へ送信するステップとを実行させるためのプログラムであり、A program for executing a step of transmitting target load information indicating the determined target load to a consumer device,
前記対象負荷を決定するステップにおいては、さらに、前記電力管理情報に基づいて、前記対象負荷の制御内容を決定し、In the step of determining the target load, further, based on the power management information, determine the control content of the target load,
前記対象負荷情報を送信するステップにおいては、さらに、決定した前記制御内容を示す制御情報を前記需要家装置へ送信し、In the step of transmitting the target load information, further, control information indicating the determined control content is transmitted to the consumer device,
さらに、コンピュータに、In addition, on the computer,
前記対象負荷の動作状態を示す状態情報を前記需要家装置から受信するステップと、Receiving state information indicating the operating state of the target load from the consumer device,
受信した前記状態情報に基づいて、前記対象負荷に対する前記需要家装置の制御を評価するステップと、Evaluating the control of the consumer device for the target load based on the received status information;
前記制御の評価結果に基づいて、前回決定した前記対象負荷および前記制御内容の組み合わせとは異なる内容の組み合わせを決定するステップと、A step of deciding a combination of contents different from the previously decided combination of the target load and the control contents based on the evaluation result of the control;
決定した前記異なる内容の組み合わせを示す情報を前記需要家装置へ送信するステップとを実行させるための、電力消費管理プログラム。And a step of transmitting information indicating the determined combination of different contents to the consumer device, the power consumption management program.
JP2014261451A 2014-12-25 2014-12-25 Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program Active JP6744071B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014261451A JP6744071B2 (en) 2014-12-25 2014-12-25 Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014261451A JP6744071B2 (en) 2014-12-25 2014-12-25 Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program

Publications (2)

Publication Number Publication Date
JP2016123189A JP2016123189A (en) 2016-07-07
JP6744071B2 true JP6744071B2 (en) 2020-08-19

Family

ID=56329268

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014261451A Active JP6744071B2 (en) 2014-12-25 2014-12-25 Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program

Country Status (1)

Country Link
JP (1) JP6744071B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6482504B2 (en) * 2016-07-22 2019-03-13 三菱電機ビルテクノサービス株式会社 Power control apparatus and program
JP6410857B2 (en) * 2017-02-06 2018-10-24 三菱電機株式会社 Power saving request device and power saving request program
JP6825968B2 (en) * 2017-04-11 2021-02-03 京セラ株式会社 Power management method and power management device
JP6975125B2 (en) * 2018-11-28 2021-12-01 京セラ株式会社 Power management server and power management method
JP7048097B2 (en) * 2018-12-03 2022-04-05 株式会社アイ・グリッド・ソリューションズ Server and energy saving contribution system
JP7093033B2 (en) * 2020-09-30 2022-06-29 ダイキン工業株式会社 Power control system
JP7417868B2 (en) * 2021-01-15 2024-01-19 パナソニックIpマネジメント株式会社 Demand adjustment control system, demand adjustment control method, and program

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2685942B2 (en) * 1989-12-21 1997-12-08 株式会社東芝 How to limit the peak value of power consumption
JPH07143670A (en) * 1993-11-19 1995-06-02 Mitsubishi Electric Corp Demand control device
JP5123039B2 (en) * 2008-04-18 2013-01-16 パナソニック株式会社 Power management system
JP2012048409A (en) * 2010-08-25 2012-03-08 Panasonic Electric Works Co Ltd Power management system and administrative server
JP2012178935A (en) * 2011-02-28 2012-09-13 Mitsubishi Electric Corp System power management system
JP5605656B2 (en) * 2011-03-24 2014-10-15 住友電気工業株式会社 Power management system, server device, and program
JP2013099182A (en) * 2011-11-04 2013-05-20 Hitachi Ltd Local energy management system, and correction method of amount of supply/demand adjustment
JP6036510B2 (en) * 2013-04-18 2016-11-30 株式会社バッファロー COMMUNICATION SYSTEM, COMMUNICATION DEVICE, CONTROL METHOD, AND COMPUTER PROGRAM

Also Published As

Publication number Publication date
JP2016123189A (en) 2016-07-07

Similar Documents

Publication Publication Date Title
JP6744071B2 (en) Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program
JP5016704B2 (en) Power demand management apparatus and power demand management system
KR102511006B1 (en) Method and apparatus for controlling power supply
US20120221164A1 (en) Power controller for electric devices, and telephone
JP6234264B2 (en) Electric power demand adjustment system, electric power demand adjustment method, and electric power demand adjustment device
JPWO2012144629A1 (en) Power control apparatus, control system, and control method
JP6129280B2 (en) System controller, remote control method and program
JP5850240B2 (en) Power management equipment
JP2015010803A (en) Energy-saving operation control method and energy-saving operation control system
WO2015046320A1 (en) Home energy management system and hone energy management method
JP2018048774A (en) Information providing system, information providing method and control program
JP6391788B2 (en) Power measurement apparatus, suppression level notification method, and program
JP6701761B2 (en) Power consumption management device, power consumption management system, and power consumption management program
JP6289759B2 (en) Control device, control system, control method, and program
JP6289502B2 (en) Energy management system, system controller, and energy management method
JPWO2014141354A1 (en) Electric equipment control device and electric equipment control system
JP2017191521A (en) Display method, program, and display system
WO2014188979A1 (en) Controller, method for controlling electrical device, device control system, and program
JP2015118525A (en) Energy management system, energy management apparatus, and energy management method
JP6513231B2 (en) Power consumption prediction device, power consumption prediction system, power consumption prediction method, and program
JP6385599B2 (en) Energy management apparatus, power information display method and program
JP6405996B2 (en) Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program
JPWO2017090173A1 (en) Control device, charging information display method and program
WO2017018530A1 (en) Information processing system, information processing method, and program
JP6433593B2 (en) Display device, control device, status display method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170721

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180515

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180529

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180725

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20180918

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181130

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20181211

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20190111

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200730

R150 Certificate of patent or registration of utility model

Ref document number: 6744071

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250