JP6379045B2 - Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method - Google Patents
Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method Download PDFInfo
- Publication number
- JP6379045B2 JP6379045B2 JP2015000844A JP2015000844A JP6379045B2 JP 6379045 B2 JP6379045 B2 JP 6379045B2 JP 2015000844 A JP2015000844 A JP 2015000844A JP 2015000844 A JP2015000844 A JP 2015000844A JP 6379045 B2 JP6379045 B2 JP 6379045B2
- Authority
- JP
- Japan
- Prior art keywords
- mold
- support bracket
- formwork
- beam bottom
- pca
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
本発明は、プレキャストコンクリート(PCaと略記する、以下同じ)梁のセンタージョイント部における、梁底型枠用支持金具とPCa梁ジョイント部の構造とその構築方法に関するものである。 The present invention relates to a structure of a beam-bottom formwork support metal fitting and a PCa beam joint portion in a center joint portion of a precast concrete (abbreviated as PCa, hereinafter the same) beam and a construction method thereof.
従来、図4に示すように、PCa工法におけるPCa梁13,13のセンタージョイント部の形成には、図4に示すように、梁主筋等を機械式継手で接続した後、梁底および梁の左右側に型枠14と、前記梁底の型枠を支持させるためスラブ16から立設される支保工15とを設置して、前記型枠14内にコンクリートを打設して形成している。この従来例の先願として、特許文献1の図5,図6に示すPCa工法が知られている。
Conventionally, as shown in FIG. 4, in the formation of the center joint portion of the
しかし、従来の梁底型枠を支保工15に支持させて、梁底・左右側の型枠内にコンクリートを打設しPCa梁のセンタージョイント部を形成する工法では、支保工15の設置と、打設コンクリートの硬化後に、前記型枠撤去のために支保工15を撤去するという作業工程が発生する。また、センタージョイント部の下に前記支保工15が存在することで、作業員の移動や資材搬入出作業などにおいて他の作業の邪魔になるばかりで無く、近年の型枠大工の労務不足によって、型枠工事の作業工程が増えると全体工程の遅延の要因となるという課題がある。
However, in the construction method in which the conventional beam bottom formwork is supported by the
本発明に係る梁底型枠用支持金具と、PCa梁ジョイント部の構造とその構築方法は、このような課題を解決するために提案されたものである。 The beam-bottom formwork support metal fitting, the structure of the PCa beam joint portion and the construction method thereof according to the present invention have been proposed in order to solve such problems.
本発明に係る梁底型枠用支持金具の上記課題を解決して目的を達成するための要旨は、 プレキャストコンクリート梁のジョイント部における、間隙を置いて並設された梁下端筋に跨がって吊持されるように形成されたコ字形のセパレーター筋と、前記セパレーター筋の端部に螺着された型枠受け用のナットとからなることである。 The gist of the present invention for solving the above-mentioned problems of the beam bottom formwork support bracket according to the present invention is to straddle the beam bottom bars arranged in parallel with a gap in the joint portion of the precast concrete beam. A U-shaped separator bar formed so as to be suspended, and a mold receiving nut screwed to the end of the separator bar.
本発明に係るPCa梁ジョイント部の構造の要旨は、プレキャストコンクリート梁のジョイント部において、接続手段で接続された梁下端筋に、前記梁底型枠用支持金具が適宜間隔を置いて接続方向に配置されて吊持され、前記梁底型枠用支持金具によるナットの撤去部分に充填材が充填されていることである。 The gist of the structure of the PCa beam joint according to the present invention is that, in the joint portion of the precast concrete beam, the beam bottom formwork support fitting is appropriately spaced in the connection direction at the beam lower end bar connected by the connecting means. It is arrange | positioned and suspended and the filler is filled into the removal part of the nut by the said support member for beam bottom formwork.
本発明に係るPCa梁ジョイント部の構築方法の要旨は、前記本発明に係る梁底型枠用支持金具を形成し、プレキャストコンクリート梁を対向させて配設した後に、該対向したプレキャストコンクリート梁のジョイント部における梁下端筋を少なくとも接続し、間隔を置いて並設された前記梁下端筋に跨がって載置させて前記梁底型枠用支持金具を吊持させ、前記梁底型枠用支持金具に梁底型枠を取り付けるとともに該梁底型枠用支持金具を介して前記梁下端筋に梁底型枠を支持させ、前記ジョイント部の左右側方に梁側型枠を取り付けて支持させ、前記ジョイント部の梁底型枠および梁側型枠で形成される型枠内にコンクリートを打設することである。 The gist of the construction method of the PCa beam joint portion according to the present invention is to form the beam-bottom formwork support bracket according to the present invention, arrange the precast concrete beams facing each other, and then arrange the facing precast concrete beams. The beam bottom formwork is formed by connecting at least the beam bottom reinforcement in the joint portion and placing the beam bottom formwork support brackets on the beam bottom reinforcement arranged in parallel with a gap therebetween. A beam bottom mold is attached to the support bracket for the beam, and the beam bottom mold is supported by the beam bottom reinforcement via the beam bottom mold support bracket, and the beam side mold is attached to the left and right sides of the joint portion. It is made to support, and concrete is cast in the form formed by the beam bottom formwork and the beam side formwork of the joint part.
本発明の梁底型枠用支持金具と、PCa梁ジョイント部の構造とその構築方法によれば、梁底型枠を梁底型枠用支持金具を介して梁下端筋で支持して、従来の支保工が不要となるので、型枠工事の作業工程を短縮して労務不足への対応が可能となり、結果的に全体工程の短縮に貢献すると言う優れた効果を奏するものである。 According to the beam-bottom formwork support bracket, the structure of the PCa beam joint and the construction method thereof according to the present invention, the beam-bottom formwork is supported by the beam lower end bar via the beam-bottom formwork support bracket. Therefore, the work process of the formwork can be shortened to cope with labor shortage, resulting in an excellent effect of contributing to the shortening of the entire process.
図1に示すように、本発明に係る梁底型枠用支持金具1を梁下端筋4に吊持させて、梁底型枠6を支持させるようにしたものである。
As shown in FIG. 1, a beam bottom mold support 1 according to the present invention is suspended from a beam
前記梁底型枠用支持金具1は、図2(A),(B)に示すように、PCa梁(図4参照)13,13のセンタージョイント部における、間隙を置いて並設された梁下端筋4,4に跨がって吊持されるように形成されたコ字形のセパレーター筋2と、該セパレーター筋2の端部に螺着された型枠受け用の型枠受用ナット3とからなる。
As shown in FIGS. 2 (A) and 2 (B), the beam bottom mold support bracket 1 is a beam arranged in parallel with a gap in the center joint portion of the PCa beams (see FIG. 4) 13 and 13. A U-shaped
前記セパレーター筋2は、コ字形に形成されて、隣接する前記梁下端筋4,4に跨がって載置されるが、図1に示すように、隣接する2本の梁下端筋ばかりで無く、間に1本若しくは複数本の梁下端筋を置いて、その両側の梁下端筋4,4に跨がって掛けるような大きさのコ字形に形成しても良い。
The
前記型枠受用ナット3は、例えば、Pコーンや六角座金などである。これは、コンクリート体表面の仕上げの相違により選択されるものである。
The
上記梁底型枠用支持金具1を使用したセンタージョイント部の構造は、図1乃至図2(A),(B)に示すように、機械式継手(図示せず)などの接続手段で接続された梁下端筋4,4に跨がって吊持され、前記梁底型枠用支持金具1が前記梁下端筋4の接続方向(長手方向)に適宜間隔を置いて配置される。図3に示すように、前記梁底型枠用支持金具1による型枠受用ナット3の撤去跡11aには、充填材12が充填されている。
As shown in FIGS. 1 to 2A and 2B, the structure of the center joint portion using the beam bottom mold support 1 is connected by a connecting means such as a mechanical joint (not shown). The beam bottom formwork support bracket 1 is hung across the beam
また、このセンタージョイント部の形成方法としては、例えば、図2に示す前記梁底型枠用支持金具1を形成する。PCa梁13,13を対向させて柱等に架設し支保工で支持させた後に、該対向したPCa梁13,13のセンタージョイント部における梁上端筋、梁下端筋4を機械式継手などで接続して配筋する。
Moreover, as a formation method of this center joint part, for example, the beam-bottom mold support bracket 1 shown in FIG. 2 is formed. After the
間隔を置いて並設された前記梁下端筋4,4に跨がって載置させて前記梁底型枠用支持金具1を、例えば2箇所から3箇所に吊持させる。型枠受用ナット3が、Pコーンであれば該Pコーンに、フォームタイ(登録商標)3bにおけるねじ棒3aを螺着させて、該ねじ棒3aとPコーンの型枠受用ナット3とを、セパレーター筋2の端部のネジ部に螺着させる。
The beam-bottom form support bracket 1 is suspended from, for example, two to three by placing the
前記梁底型枠用支持金具1に梁底型枠6を取り付けて、端太材7を互いに直交させて支持させて、フォームタイ(登録商標)3bにおける締付金具8とナット9とで固定する。
The beam-bottom mold 6 is attached to the beam-bottom mold support bracket 1, and the end
次に、図1に示すように、前記センタージョイント部の左右側方に梁側型枠10を取り付けて支持させる。なお、前記梁底型枠6と梁側型枠10とは、いずれが先に構築されても良く、特にその順番を限定するものではない。そして、PCa梁13の対向した端面と、前記センタージョイント部の梁底型枠6および梁側型枠10,10で形成される型枠内にコンクリートを打設する。
Next, as shown in FIG. 1, a beam-
図3に示すように、前記打設したコンクリート11が所要の強度を発現したら、梁底・梁側の型枠6,10をそれぞれ撤去する。そして、前記梁底型枠用支持金具1の型枠受用ナット3であるPコーンの凹部状の撤去跡11aに、モルタル等の充填材12を充填する。
As shown in FIG. 3, when the
このように、PCa梁ジョイント部の構築方法によってセンタージョイント部が構築される。このセンタージョイント部においては、その下に支保工15が設置されないので、作業員の移動・通過および資材搬入出作業が容易となり、前記支保工15の設置作業、撤去作業も不要となる。
Thus, the center joint part is constructed by the construction method of the PCa beam joint part. In the center joint portion, the
1 梁底型枠用支持金具、
2 セパレーター筋、
3 型枠受用ナット、 3a ねじ棒、
3b フォームタイ(登録商標)、
4 梁下端筋、
5 あばら筋(スターラップ)、
6 梁底型枠、
7 端太材、
8 締付金具、
9 ナット、
10 梁側型枠、
11 コンクリート、
11a 撤去跡、
12 充填材、
13 PCa梁、
14 型枠、
15 支保工(サポート)、
16 スラブ。
1 Support bracket for beam bottom formwork,
2 Separator streaks,
3 Formwork receiving nut, 3a Screw rod,
3b Form tie (registered trademark),
4 Beam bottom reinforcement,
5 Stirrup, stirrup
6 Beam bottom formwork,
7 End thick wood,
8 Fastening bracket,
9 nuts,
10 Beam side formwork,
11 Concrete,
11a Removal trace,
12 Filler,
13 PCa beams,
14 formwork,
15 Support work (support),
16 Slab.
Claims (3)
前記セパレーター筋の端部に螺着された型枠受け用のナットとからなること、
を特徴とする梁底型枠用支持金具。 In the joint part of the precast concrete beam, a U-shaped separator bar formed so as to be suspended across the beam lower bar lined in parallel with a gap,
A nut for receiving a mold screwed to an end of the separator line,
Supporting bracket for beam bottom formwork characterized by
を特徴とするPCa梁ジョイント部の構造。 In the joint part of the precast concrete beam, the beam bottom formwork support metal fitting according to claim 1 is arranged in the connection direction at an appropriate interval and suspended from the beam lower end bars connected by the connection means, and the beam Filler is filled in the removed part of the nut by the support bracket for the bottom mold,
PCa beam joint structure characterized by
プレキャストコンクリート梁を対向させて配設した後に、
該対向したプレキャストコンクリート梁のジョイント部における梁下端筋を少なくとも接続し、
間隔を置いて並設された前記梁下端筋に跨がって載置させて前記梁底型枠用支持金具を吊持させ、
前記梁底型枠用支持金具に梁底型枠を取り付け該梁底型枠用支持金具を介して前記梁下端筋に梁底型枠を支持させ、
前記ジョイント部の左右側方に梁側型枠を取り付けて支持させ、
前記ジョイント部の梁底型枠および梁側型枠で形成される型枠内にコンクリートを打設すること、
を特徴とするPCa梁ジョイント部の構築方法。 Forming the beam bottom formwork support bracket according to claim 1,
After placing precast concrete beams facing each other,
Connecting at least the beam bottom bars in the joints of the opposed precast concrete beams;
The beam bottom mold support bracket is suspended by being placed across the beam lower end bars arranged in parallel at intervals,
The beam bottom mold is attached to the beam bottom mold support bracket, and the beam bottom mold is supported by the beam bottom line via the beam bottom mold support bracket.
Attach and support the beam-side formwork on the left and right sides of the joint part,
Placing concrete in a mold formed by a beam bottom mold and a beam side mold of the joint part;
The construction method of the PCa beam joint part characterized by these.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015000844A JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015000844A JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016125287A JP2016125287A (en) | 2016-07-11 |
| JP6379045B2 true JP6379045B2 (en) | 2018-08-22 |
Family
ID=56359060
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015000844A Active JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6379045B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6856641B2 (en) | 2016-06-24 | 2021-04-07 | 矢崎総業株式会社 | Vehicle circuit |
| DE112017003126B4 (en) | 2016-06-24 | 2023-03-09 | Yazaki Corporation | VEHICLE CIRCUITS |
| DE112017003140B4 (en) | 2016-06-24 | 2023-03-16 | Yazaki Corporation | VEHICLE CIRCUITS |
| DE112017003155B4 (en) | 2016-06-24 | 2023-01-19 | Yazaki Corporation | CIRCUIT BODY FOR VEHICLE |
| CN108222266A (en) * | 2018-01-23 | 2018-06-29 | 宁波建工工程集团有限公司 | Steel Reinforced Concrete Composite Beams hang mould pouring construction structure and its construction method |
| JP7195175B2 (en) * | 2019-02-21 | 2022-12-23 | 三井ホームコンポーネント株式会社 | Anchor installation frame, anchor assembly and beam construction method |
| CN114135038B (en) * | 2021-11-26 | 2023-04-25 | 建邦技术集团有限公司 | Steel bar truss floor carrier plate with supporting seat |
| CN115749268A (en) * | 2022-12-02 | 2023-03-07 | 中国建筑一局(集团)有限公司 | A construction method of suspended formwork for cantilevered stiffened concrete beams |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5153715U (en) * | 1974-10-21 | 1976-04-24 | ||
| JPS5940U (en) * | 1982-06-21 | 1984-01-05 | 日綜産業株式会社 | Installation device for large pull members in shoring |
| JPH06317015A (en) * | 1993-05-10 | 1994-11-15 | Fujita Corp | Method of assembling beam formwork |
| JPH07292855A (en) * | 1994-04-25 | 1995-11-07 | Maeda Corp | Steel encased reinforcing concrete girder |
| JPH10325173A (en) * | 1997-05-27 | 1998-12-08 | Kobayashi Jun | Construction method of beam, beam formwork device, and cap for side plate |
-
2015
- 2015-01-06 JP JP2015000844A patent/JP6379045B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016125287A (en) | 2016-07-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6379045B2 (en) | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method | |
| CN105888108B (en) | Built-in positioning prefabricated component reinforced concrete shear wall and construction method | |
| KR101327781B1 (en) | Expansion joint having length-adjustable anchors and method for installing the same | |
| JP2013530322A (en) | REINFORCING METHOD AND REINFORCING DEVICE FOR REINFORCING AND WEIGHTING FLOOR AND ROOF FRAME STRUCTURE | |
| KR20180045140A (en) | The structure of non-binding dismantling formwork beams and deck plates without the need to secure jobs | |
| CN108678193B (en) | Post-cast strip and construction method thereof | |
| JP2001193015A (en) | Bridge handrail | |
| CN103603491A (en) | Beam plate post-cast strip template support frame and erection method thereof | |
| CN106285002A (en) | Cast-in-place walls difference of height tool-type hoisting die construction method | |
| CN204983647U (en) | Design instrument formula aluminum alloy template | |
| CN106906996A (en) | Reusable pre-buried ring | |
| KR101436845B1 (en) | Form supporting structure for the cantilever part of the steel pipe girder bridge | |
| JP6310362B2 (en) | A hanging bracket that fixes the floor slab formwork to the main girder. | |
| JP2008127873A (en) | Block out flask, and recess forming method using the same | |
| KR101908811B1 (en) | Concrete form for bridge | |
| CN105133854A (en) | Replacement unloading structure and construction method for vertical component | |
| CN103291000A (en) | Tool type steel bar support and construction method for suspending floor slab hogging-moment steel bars | |
| JP6529379B2 (en) | Invert formwork | |
| JP6473670B2 (en) | Structural restoration method | |
| JP4949438B2 (en) | Concrete foundation formation method | |
| JP2001140221A (en) | Repair method of overhang floor slab and support structure of formwork | |
| KR20160000005A (en) | reinforcing expansion joint for wide concrete slab by using steel plate and reinforcing method of construction using the same for wide concrete slab | |
| KR200466393Y1 (en) | Pre-setting apparatus for expansion joint | |
| JP6471056B2 (en) | Structural restoration method | |
| KR100840279B1 (en) | Hanger device for slab formwork |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170830 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180627 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180703 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180730 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6379045 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |