JP5571475B2 - 新エネルギー発電所群の制御システム、およびその制御方法 - Google Patents
新エネルギー発電所群の制御システム、およびその制御方法 Download PDFInfo
- Publication number
- JP5571475B2 JP5571475B2 JP2010140267A JP2010140267A JP5571475B2 JP 5571475 B2 JP5571475 B2 JP 5571475B2 JP 2010140267 A JP2010140267 A JP 2010140267A JP 2010140267 A JP2010140267 A JP 2010140267A JP 5571475 B2 JP5571475 B2 JP 5571475B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- output
- new energy
- power generation
- energy power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J3/1885—Arrangements for adjusting, eliminating or compensating reactive power in networks using rotating means, e.g. synchronous generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- H02J2101/24—
-
- H02J2101/28—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
ここで、Pは発電出力(W)、ρは空気密度(kg/m3)、Aは受風面積(m2)、
vは風速(m/s)、ηは発電効率(%)である。
n=T/δT (2)
ただし、Tは過去時刻Toと現在時刻Tpとの間の時間、δTは刻み時間である。
また、図8は、2つの風力発電所の相互間の相関係数を示す特性図であり、横軸にシフト時間、縦軸に相関係数を表わしている。
なお、風力発電所5A〜5Cを図8においてはそれぞれ風力発電所A、B、Cと表記している。
但し、iは新エネルギー発電所5A〜6Bのうち出力急変の可能性ありと予測された発電所の番号、tsは出力急変発生予測時刻、tpは現在時刻、Pi(t)は任意の時刻tにおいて出力急変が予測されるi番目の発電所の発電出力、Pi(tp)は現在時刻におけるi番目の発電所の発電出力である。
P(t)=ΣPi(t) (4)
但し、Pは新エネルギー発電所の発電出力、Qは新エネルギー発電所の発電出力の無効電力、QAは新エネルギー発電所の発電出力の無効電力の平均レベル、aは有効電力と無効電力の比例定数(=r/x)、rは系統インピーダンスの抵抗分、xは系統インピーダンスのリアクタンス分である。
なお、ここでは、無効電力の位相は電力系統から見て遅れ方向を正(プラス)とする。
VQsc=ΔVF/ΔQF (7)
このような式(7)の計算を全ての新エネルギー発電所5A〜6Bを対象にして行い、電圧調整感度VQscを求める。
QL=(Vave−Vo)/VQsc (8)
1 電力系統
2 送電線
3(31〜34) 変電所
4 給電指令所
5(5A、5B、5C) 風力発電所、新エネルギー発電所
51A、51B、51C 風力発電システム
52A、52B、52C 計測制御端末
53A、53B、53C、63A、63B、73 受電設備
6(6A、6B) 太陽光発電所、新エネルギー発電所
61A,61B 太陽光発電システム
62A、62B 計測制御端末
7 出力調整センタ
71 出力調整装置
72 計測制御端末
8 制御システム
81 制御演算装置
811 出力調整機能
8111 出力急変予測部(出力急変予測手段)
8112 出力制御演算部(発電出力調整手段)
812 電圧調整機能
8121 相関係数演算部(相関係数演算手段)
8122 電圧調整感度演算部(電圧調整感度演算手段)
8123 無効電力指令演算部(無効電力指令演算手段)
82 入力装置
83 表示装置
84 通信装置
85 データ格納装置
9(91、92) 通信線、通信網
10 気象情報サーバ
Claims (4)
- 電力系統に接続され、気象条件に応じて発電出力が変動する複数の風力発電所および太陽光発電所からなる新エネルギー発電所群と、発電出力が制御可能な出力調整装置と、前記電力系統の需給バランスを制御するための給電指令所と、前記電力系統の電圧および無効電力を調整する変電所とに、通信線を介して接続され、前記新エネルギー発電所群および前記出力調整装置の発電出力の調整を行う新エネルギー発電所群の制御システムであって、
前記新エネルギー発電所群で計測された電気特性および気象特性を用いて、該新エネルギー発電所群の発電出力の急変を予測する出力急変予測手段と、
前記出力急変予測手段が予測した予測結果に基づいて、前記新エネルギー発電所群と前記出力調整装置の発電出力を調整する発電出力調整手段と
を備え、
前記出力急変予測手段は、前記新エネルギー発電所群の運転/停止状態の情報と、複数の新エネルギー発電所間の発電出力の相関関係とを用いて、発電出力が急変する新エネルギー発電所とその発生時刻を予測することを特徴とする新エネルギー発電所群の制御システム。 - 電力系統に接続され、気象条件に応じて発電出力が変動する複数の風力発電所および太陽光発電所からなる新エネルギー発電所群と、発電出力が制御可能な出力調整装置と、前記電力系統の需給バランスを制御するための給電指令所と、前記電力系統の電圧および無効電力を調整する変電所とに、通信線を介して接続され、前記新エネルギー発電所群および前記出力調整装置の発電出力の調整を行う新エネルギー発電所群の制御システムであって、
前記新エネルギー発電所群で計測された電気特性および気象特性を用いて、該新エネルギー発電所群の発電出力の急変を予測する出力急変予測手段と、
前記出力急変予測手段が予測した予測結果に基づいて、前記新エネルギー発電所群と前記出力調整装置の発電出力を調整する発電出力調整手段と
を備え、
前記発電出力調整手段は、前記新エネルギー発電所の発電出力の情報と前記出力急変予測手段が予測した出力急変予測結果とを用いて、前記新エネルギー発電所群の発電出力を所定の目標値に保つように、出力調整が可能な新エネルギー発電所および前記出力調整装置の発電出力を調整することを特徴とする新エネルギー発電所群の制御システム。 - 電力系統に接続され、気象条件に応じて発電出力が変動する複数の風力発電所および太陽光発電所からなる新エネルギー発電所群と、発電出力が制御可能な出力調整装置と、前記電力系統の需給バランスを制御するための給電指令所と、前記電力系統の電圧および無効電力を調整する変電所とに、通信線を介して接続され、前記新エネルギー発電所群および前記出力調整装置の発電出力の調整を行う新エネルギー発電所群の制御方法であって、
前記新エネルギー発電所群で計測された電気特性および気象特性を用いて、該新エネルギー発電所群の発電出力の急変を予測する第1のステップと、
前記第1のステップで予測された予測結果に基づいて、前記新エネルギー発電所群と前記出力調整装置の発電出力を調整する第2のステップと
を含み、
前記第1のステップにおいて、前記新エネルギー発電所群の運転/停止状態の情報と、複数の新エネルギー発電所間の発電出力の相関関係とを用いて、発電出力が急変する新エネルギー発電所とその発生時刻を予測することを特徴とする新エネルギー発電所群の制御方法。 - 電力系統に接続され、気象条件に応じて発電出力が変動する複数の風力発電所および太陽光発電所からなる新エネルギー発電所群と、発電出力が制御可能な出力調整装置と、前記電力系統の需給バランスを制御するための給電指令所と、前記電力系統の電圧および無効電力を調整する変電所とに、通信線を介して接続され、前記新エネルギー発電所群および前記出力調整装置の発電出力の調整を行う新エネルギー発電所群の制御方法であって、
前記新エネルギー発電所群で計測された電気特性および気象特性を用いて、該新エネルギー発電所群の発電出力の急変を予測する第1のステップと、
前記第1のステップで予測された予測結果に基づいて、前記新エネルギー発電所群と前記出力調整装置の発電出力を調整する第2のステップと
を含み、
前記第2のステップにおいて、前記新エネルギー発電所の出力情報と前記第1のステップで予測された出力急変予測結果とを用いて、前記新エネルギー発電所群の発電出力を所定の目標値に保つように、出力調整が可能な新エネルギー発電所および前記出力調整装置の発電出力を調整することを特徴とする新エネルギー発電所群の制御方法。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010140267A JP5571475B2 (ja) | 2010-06-21 | 2010-06-21 | 新エネルギー発電所群の制御システム、およびその制御方法 |
| PCT/JP2011/064133 WO2011162238A1 (ja) | 2010-06-21 | 2011-06-21 | 新エネルギー発電所群の制御システム、およびその制御方法 |
| JP2013267049A JP5647329B2 (ja) | 2010-06-21 | 2013-12-25 | 新エネルギー発電所群の制御システム、およびその制御方法 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010140267A JP5571475B2 (ja) | 2010-06-21 | 2010-06-21 | 新エネルギー発電所群の制御システム、およびその制御方法 |
| JP2013267049A JP5647329B2 (ja) | 2010-06-21 | 2013-12-25 | 新エネルギー発電所群の制御システム、およびその制御方法 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2013267049A Division JP5647329B2 (ja) | 2010-06-21 | 2013-12-25 | 新エネルギー発電所群の制御システム、およびその制御方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2012005310A JP2012005310A (ja) | 2012-01-05 |
| JP5571475B2 true JP5571475B2 (ja) | 2014-08-13 |
Family
ID=59297964
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2010140267A Expired - Fee Related JP5571475B2 (ja) | 2010-06-21 | 2010-06-21 | 新エネルギー発電所群の制御システム、およびその制御方法 |
| JP2013267049A Expired - Fee Related JP5647329B2 (ja) | 2010-06-21 | 2013-12-25 | 新エネルギー発電所群の制御システム、およびその制御方法 |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2013267049A Expired - Fee Related JP5647329B2 (ja) | 2010-06-21 | 2013-12-25 | 新エネルギー発電所群の制御システム、およびその制御方法 |
Country Status (2)
| Country | Link |
|---|---|
| JP (2) | JP5571475B2 (ja) |
| WO (1) | WO2011162238A1 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110808583A (zh) * | 2019-11-06 | 2020-02-18 | 国网北京市电力公司 | 一种面向多目标的变电站优化控制方法 |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9373958B2 (en) * | 2012-03-22 | 2016-06-21 | Sunpower Corporation | Control techniques for photovoltaic power plants |
| DE102013208474A1 (de) * | 2013-05-08 | 2014-11-13 | Wobben Properties Gmbh | Verfahren zum Einspeisen elektrischer Leistung in ein elektrisches Versorgungsnetz |
| DE102013215396A1 (de) * | 2013-08-06 | 2015-02-12 | Wobben Properties Gmbh | Verfahren zum Steuern von Windenergieanlagen |
| JP6512745B2 (ja) * | 2014-04-02 | 2019-05-15 | 三菱電機株式会社 | 太陽光発電システム、端末、解析処理方法、及び、プログラム |
| KR101556229B1 (ko) * | 2014-07-23 | 2015-09-30 | 전북대학교산학협력단 | 풍력발전단지 출력 제어 방법 |
| JP5941115B2 (ja) * | 2014-10-01 | 2016-06-29 | 中国電力株式会社 | 予測装置 |
| JP6384439B2 (ja) * | 2015-09-24 | 2018-09-05 | 東芝三菱電機産業システム株式会社 | 分散型電源システムの制御装置および制御方法 |
| US11416951B2 (en) | 2015-10-28 | 2022-08-16 | Kyocera Corporation | Equipment management system and equipment management method |
| EP3446133B1 (en) | 2016-04-22 | 2020-05-13 | DEPsys SA | Method of determining mutual voltage sensitivity coefficients between a plurality of measuring nodes of an electric power network |
| JP7075788B2 (ja) * | 2018-03-13 | 2022-05-26 | 株式会社日立製作所 | 再生可能エネルギ発電装置の急変動の予見検知方法、および、再生可能エネルギ発電システム |
| JP6917407B2 (ja) * | 2019-04-18 | 2021-08-11 | シャープ株式会社 | 出力制御装置、発電システム、および、出力制御方法 |
| CN113162053B (zh) * | 2021-03-18 | 2022-06-07 | 南京邮电大学 | 基于负荷转供和储能调节的配电网电压控制方法及系统 |
| CN114285035B (zh) * | 2021-12-30 | 2023-06-20 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种防止发电厂厂用电系统电源串网的装置及方法 |
| CN114629165B (zh) * | 2022-03-14 | 2024-11-22 | 新疆大学 | 一种光储电站群参与电网稳定控制的功率分配方法 |
| CN114726009B (zh) * | 2022-06-09 | 2022-09-02 | 东南大学溧阳研究院 | 考虑功率预测的风电场群无功分层优化控制方法及其系统 |
| US12040616B2 (en) | 2022-11-03 | 2024-07-16 | Zhejiang University | Distributed voltage clamping method for 100% renewable-energy sending-end grid |
| CN115693695B (zh) * | 2022-11-03 | 2024-03-15 | 浙江大学 | 一种100%新能源送端电网的分布式电压钳位方法 |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3317833B2 (ja) * | 1995-01-17 | 2002-08-26 | 株式会社日立製作所 | 送配電系統の制御システムおよび制御方法 |
| JP4102278B2 (ja) * | 2003-03-19 | 2008-06-18 | 三菱電機株式会社 | 風力発電システム |
| JP2004312797A (ja) * | 2003-04-02 | 2004-11-04 | Tokyo Gas Co Ltd | 出力電力補償システム |
| JP4085045B2 (ja) * | 2003-11-28 | 2008-04-30 | 三菱電機株式会社 | 分散型電源制御システム |
| JP4575272B2 (ja) * | 2005-10-27 | 2010-11-04 | 株式会社日立製作所 | 分散型電源システム及び系統安定化方法 |
| JP2009153333A (ja) * | 2007-12-21 | 2009-07-09 | Tokyo Gas Co Ltd | 分散型電源システム及びその制御方法 |
| JP5076157B2 (ja) * | 2008-09-19 | 2012-11-21 | 東京瓦斯株式会社 | 分散型電源システム及びこのシステムを用いた系統電圧安定化方法 |
-
2010
- 2010-06-21 JP JP2010140267A patent/JP5571475B2/ja not_active Expired - Fee Related
-
2011
- 2011-06-21 WO PCT/JP2011/064133 patent/WO2011162238A1/ja not_active Ceased
-
2013
- 2013-12-25 JP JP2013267049A patent/JP5647329B2/ja not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110808583A (zh) * | 2019-11-06 | 2020-02-18 | 国网北京市电力公司 | 一种面向多目标的变电站优化控制方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5647329B2 (ja) | 2014-12-24 |
| JP2014057518A (ja) | 2014-03-27 |
| JP2012005310A (ja) | 2012-01-05 |
| WO2011162238A1 (ja) | 2011-12-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5571475B2 (ja) | 新エネルギー発電所群の制御システム、およびその制御方法 | |
| Bevrani et al. | Renewable energy sources and frequency regulation: survey and new perspectives | |
| Ketabi et al. | An underfrequency load shedding scheme for hybrid and multiarea power systems | |
| US7908036B2 (en) | Power production control system and method | |
| EP2721710B1 (en) | Hybrid electric generating power plant that uses a combination of real-time generation facilities and energy storage system | |
| Abo-Khalil | Impacts of wind farms on power system stability | |
| Singarao et al. | Frequency responsive services by wind generation resources in United States | |
| US10320196B2 (en) | Wind power plant, and a method for increasing the reactive power capability of a wind power plant | |
| CN104620458A (zh) | 确定发电站控制器中的各个设定点的方法和发电站控制器 | |
| JPWO2017150376A1 (ja) | 電力システム | |
| JP2013219941A (ja) | 再生可能エネルギー利用発電システムの制御方法及び制御装置 | |
| Hung et al. | Technical challenges, security and risk in grid integration of renewable energy | |
| WO2014203388A1 (ja) | 再生可能エネルギー発電設備の制御システム及びその制御方法並びに再生可能エネルギー発電システム | |
| JP2018160964A (ja) | 電力システム | |
| Hosseini et al. | Coordinating demand response and wind turbine controls for alleviating the first and second frequency dips in wind-integrated power grids | |
| Ogimoto et al. | Making renewables work: Operational practices and future challenges for renewable energy as a major power source in Japan | |
| JP5576826B2 (ja) | 風力発電装置群の制御システム及び制御方法 | |
| JP2018182847A (ja) | 系統連系システムおよび電力システム | |
| JP7180993B2 (ja) | 発電システム | |
| JP6375161B2 (ja) | 再生可能エネルギー発電施設の制御システム | |
| JP2006042458A (ja) | 周波数制御装置及び系統周波数制御方法 | |
| JP2018148627A (ja) | 電力システム | |
| Wu et al. | Effect of system inertia on frequency response in power systems with renewable energy integration | |
| Nanou et al. | Evaluation of DC voltage control strategies for multi-terminal HVDC grids comprising island systems with high RES penetration | |
| Holttinen et al. | Power system impacts of wind power |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120703 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20131029 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20131225 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140527 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140626 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5571475 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |