[go: up one dir, main page]

JP4314781B2 - Shared calculation system and shared calculation method - Google Patents

Shared calculation system and shared calculation method Download PDF

Info

Publication number
JP4314781B2
JP4314781B2 JP2002146435A JP2002146435A JP4314781B2 JP 4314781 B2 JP4314781 B2 JP 4314781B2 JP 2002146435 A JP2002146435 A JP 2002146435A JP 2002146435 A JP2002146435 A JP 2002146435A JP 4314781 B2 JP4314781 B2 JP 4314781B2
Authority
JP
Japan
Prior art keywords
distribution board
power
management data
branch circuit
board management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002146435A
Other languages
Japanese (ja)
Other versions
JP2003337147A (en
Inventor
直紀 小須田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Epson Corp
Original Assignee
Seiko Epson Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Epson Corp filed Critical Seiko Epson Corp
Priority to JP2002146435A priority Critical patent/JP4314781B2/en
Publication of JP2003337147A publication Critical patent/JP2003337147A/en
Application granted granted Critical
Publication of JP4314781B2 publication Critical patent/JP4314781B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、設備を共同利用しながら、電力やガス等について、その費用分担の計算をする等の用途に適する、分担計算方法と分担計算システムと分担計算プログラム等に関する。
【0002】
【従来の技術】
事業部ごとの独立採算制を採用する企業では、会社全体で一括してかかる費用を、各事業部の規模に応じて一定の割合で分担させるようにしている。電力や圧力ガスや蒸気といったエネルギー資源を使用したときの費用については、それぞれ工場やビルに設けた計測器により使用量を測定して、その使用量に見合った費用分担をする管理(配賦管理)をしている。
【0003】
【発明が解決しようとする課題】
ところで、上記のような従来の技術には、次のような解決すべき課題があった。
様々な事業部の管理部門が集合しているオフィスや、全社的なプロジェクトを推進するための研究室などでは、ひとつのフロアをいくつもの部門で共用するケースも少なくない。このようなケースでは、例えば部門ごとの電力使用量の分担が問題になる。ひとつのフロアを細分化して使用しており、フロアのレイアウトを変更したり、部門の統廃合が行なわれるケースも少なくないことから、部門ごとに専用の積算電力計を設けるのは現実的でない。また、一棟の工場を異なる事業部の部門で共用するケースもある。このような場合に、例えば、工場全体に配管を通じて供給される圧搾空気や蒸気を使用したときの費用分担も必要になる。しかしながら、空気や水等の流体の流量を測定する測定器は、積算電力計よりも高価で、費用分担のために各所に取り付けるのはいっそう不経済である。
【0004】
占有面積比で費用分担を決めたり、所属従業員の数で費用分担をきめる方法もある。分電盤と積算電力計が設置されている部門が、その電力料金を負担するという方法もある。しかし、これらの方法は、各部門ごとの負担費用に対する見方が厳格になると、合理性が乏しくて受け入れられにくくなる。また、様々な計算方法で、各部門に対する電力料金の負担割合を決めても、その通知や説明業務が膨大になる。また、各事業所において比較的高い頻度で行なわれる配電設備工事や部門のレイアウト変更などで、各部門に割り当てるべき費用の計算方法の更新が間に合わなかったり、間違いが生じる等の問題もあった。
【0005】
本発明は以上の点に着目してなされたもので、電力やガス等について、少ない測定器で複数の共用者の的確な費用分担計算等をする、分担計算システムを提供することを目的とする。
また、本発明は、各事業所や部門の配電設備の変更情報を常に最新の状態に保ち、各所に設置した積算電力計の測定値に基づいて正確に費用分担計算等をする分担計算システムを提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明は次の構成により上記の課題を解決する。
〈構成1〉
複数の分岐回路を通じて負荷に供給される電力を一括して測定した結果を取得する手段と、上記電力の測定結果を、上記各分岐回路を通じて供給できる電力の許容値に基づいて案分して、上記各分岐回路を通じて電力を供給される各負荷の使用電力を算出する手段を備えたことを特徴とする分担計算システム。
【0007】
複数の分岐回路は、それぞれ電源側と負荷側とを接続して負荷に電力を供給する任意の電気回路である。全ての分岐回路に供給される電力を一括して測定する。その測定結果を、任意の手段で取得する。各分岐回路を通じて電力を供給される各負荷は、例えば、別々の利用先により利用されている。各負荷の使用電力を直接求めることができないから、各分岐回路を通じて供給できる電力の許容値に基づいて案分処理する。電力の許容値は、最大定格電流等を参考に自由に定める。最大定格電流と正確に一致する必要はない。案分処理とは、例えば、電力の許容値の比に基づいて比例配分することである。分担計算方法は任意である。案分処理により使用電力を推定して、例えば、費用分担計算の資料等に利用する。
【0008】
〈構成2〉
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、この測定された電力に応じた電力料金を演算する手段と、上記分電盤内部の各分岐回路を通じて電力を供給される各負荷の利用先が分担する電力料金を、上記各分岐回路の定格に基づいて案分処理をする電力料金算出手段とを備えたことを特徴とする分担計算システム。
【0009】
分電盤(配電盤等を含む回路分岐用の装置を、以下、分電盤と総称して説明する)は配電線を分岐する装置である。各分岐回路にはその分岐回路を通じて電力を使用する負荷が接続される。分岐回路にはそれぞれ接続される負荷の種類に応じた定格が設定されている。負荷の種類は任意であり、分岐回路に接続されていても、未だ接続されていなくても構わない。ここでいう定格とは、通常状態で分岐回路を通じて負荷に供給できる電流あるいは電力の最大値のことで、電気機器に一般的に表示されているものでよい。定格は、電流、電力のどちらで表現しても構わない。分岐回路自体の定格でもよいし、分岐回路に接続されたブレーカー等の定格のどちらを利用してもよい。積算電力計は、実際に接続された負荷に供給された電力を測定する。積算電力計の測定値は、ネットワーク等、既知の任意の手段で取得される。積算電力計により測定した電力に応じた電力料金は、電力会社の規定等で計算できる。その結果を、各分岐回路の定格に基づいて案分し、利用者毎の費用分担を計算する。電力会社の規定に従った演算処理により、積算電力計の測定値から、電力料金の演算が行なわれる。各分岐回路を通じて電力を供給される各負荷は、それぞれ所定の利用先に所属しており、電力料金は各利用先が分担する。分担金額は、各分岐回路の定格を根拠として使用して演算される。単純な比例計算でもよいし、所定の演算式に定格をパラメータとして入力しても構わない。これらの処理により、各分岐回路に積算電力計が挿入されていなくても、分電盤の積算電力計が測定した消費電力のうち、どれだけが、どの利用先により消費されているかを自動的に計算できる。
【0010】
〈構成3〉
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、上記分電盤内部の各分岐回路を通じて電力を供給される各負荷の利用先の推定電力使用量を、上記各分岐回路の定格に基づいて案分処理する電力使用量算出手段とを備えたことを特徴とする分担計算システム。
【0011】
分電盤は、複数の負荷を、例えばその配置により区分して、負荷(群)毎に別々に電力を供給する。ある利用先は、ある分岐回路を通じて単数または複数の負荷を利用する。別の利用先は、別の分岐回路を通じて残りの単数または複数の負荷を利用する。利用先の推定電力使用量は、例えば、利用する負荷が接続された分岐回路の定格値を積算して比例配分して計算する。
【0012】
〈構成4〉
構成2または3に記載の分担計算システムにおいて、案分処理のために、管理対象とされる全ての分電盤について、その中の分岐回路の定格と各分岐回路に接続される負荷を利用する利用先との関係を示す分電盤管理データを使用することを特徴とする分担計算システム。
【0013】
負荷は分岐回路に常に接続されていなくてもよい。各分岐回路に接続される負荷を利用する利用先は、電力料金や推定電力使用量の計算を必要とする対象であればなんでもよく、部門名、個人名、会社名等、任意でよい。
【0014】
〈構成5〉
構成2または3に記載の分担計算システムにおいて、案分処理のために、管理対象とされる全ての分電盤について、その中の分岐回路の定格と各分岐回路に接続される負荷の接続場所との関係を示す分電盤管理データを使用することを特徴とする分担計算システム。
【0015】
分電盤の中の分岐回路の定格値と各分岐回路の負荷の接続場所との関係を示す分電盤管理データは、その分電盤を使用したフロアの電気工事完了時に作成できる。このデータは、その後の配電工事のデータとして利用できる。負荷の接続場所と利用先との関係を別途用意すれば、利用先の推定電力使用量の計算等が可能になる。
【0016】
〈構成6〉
構成4または5に記載の分担計算システムにおいて、各分電盤の分電盤管理データは、当該分電盤の分岐回路の新設または改修時に生成され、この分電盤管理データをネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
【0017】
分電盤の分岐回路の新設または改修時には、負荷の利用先が決定する。このとき、新設や改修を担当した工事業者等が分電盤データを作成して、工事の完了時にネットワークを通じてホストコンピュータ等へ送信する。もちろん、フレキシブルディスク等の媒体を利用して収集されるものも一部に含まれて構わない。この方式によれば、分電盤管理データベースを確実に迅速に更新でき、常に正確な費用分担計算ができる。
【0018】
〈構成7〉
構成6に記載の分担計算システムにおいて、各分電盤の分電盤管理データは、それぞれ各分電盤付属の記憶装置に保持されており、この分電盤管理データを、ネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
【0019】
分電盤の分岐回路の新設または改修工事の完了時に、工事業者等が分電盤データを作成し、分電盤に付属した記憶装置に記憶させる。分電盤に付属していればよく、内蔵されていても、外付けされていても構わない。積算電力計側にあっても構わない。そのデータは、例えば、積算電力計の検針データと同様の方法でホストコンピュータに伝送されるとよい。
【0020】
〈構成8〉
【0021】
データベースプログラムは、例えば、表計算形式データ処理プログラムや、リレーショナルデータベースプログラム等である。こうしたプログラムには、定型書式データにより外部データを取り込む機能がある。定型書式データには、一単位のデータを順にカンマで区切ったいわゆるCSVデータや、スペースやタブ等で区切ったデータ、箇条書きのデータ等がある。いずれも、例えば、テキスト形式で簡単に作成でき、工事業者等に作成させてそのままデータベースに取り入れることができる。また、データサイズが小さいので、分電盤の内蔵メモリに無理なく記憶させられる。
【0022】
〈構成9〉
構成2または3に記載の分担計算システムにおいて、案分処理により求められた利用先の推定電力使用量もしくは電力料金を、ネットワークを通じて閲覧可能に保持する手段を備えたことを特徴とする分担計算システム。
【0023】
ネットワークを通じて各利用先の推定電力使用量を公表し、利用先を含む関係機関に閲覧させることで、電力消費の節約等を推進できる。ネットワークはインターネットやイントラネット等の情報公開用のネットワークである。推定電力使用量もしくは電力料金のいずれを公表しても、同様の効果がある。
【0024】
〈構成10〉
複数の分岐管を通じて負荷に供給される流体の流量を一括して測定する手段と、上記各分岐管を通じて流体を供給される各負荷の流体使用量を、単位時間に上記各分岐管を通じて供給できる流体の流量に基づいて案分処理する手段を備えたことを特徴とする分担計算システム。
【0025】
圧力ガスや蒸気、その他の各種流体を複数の利用者に供給する場合にも、電力の供給と同様の案分処理ができる。
【0026】
〈構成11〉
複数の分岐回路を通じて負荷に供給される電力を一括して測定した結果を取得し、上記電力の測定結果を、上記各分岐回路を通じて供給できる電力の許容値に基づいて案分して、上記各分岐回路を通じて電力を供給される各負荷の使用電力を算出することを特徴とする分担計算方法。
【0027】
請求項1に対応する費用分担計算方法の発明である。
【0028】
〈構成12〉
複数の分岐回路を通じて負荷に供給される電力を一括して測定した結果を取得する処理と、上記電力の測定結果を、上記各分岐回路を通じて供給できる電力の許容値に基づいて案分して、上記各分岐回路を通じて電力を供給される各負荷の使用電力を算出する処理とを、コンピュータに実行させることを特徴とする分担計算プログラム。
【0029】
請求項1に対応する費用分担計算プログラムの発明である。
【0030】
〈構成13〉
内部に設けられた分岐回路の定格と、各分岐回路に接続される負荷を利用する利用先または負荷の接続場所との対応関係を示す分電盤管理データを、内部メモリに記憶させたことを特徴とする分電盤。
【0031】
各分岐回路に接続される負荷を利用する利用先は、配電工事のつど変更になることが多い。この情報を工事竣工時に分電盤の内部メモリに記憶させて、読み出せるようにしておく。ラベル等に記録しておくのと比較して、汚れたり消えたりするおそれがない。また、ネットワークを通じてその情報を取得できるから、管理しやすい。
【0032】
〈構成14〉
分電盤の内部に設けられた分岐回路の定格と、各分岐回路に接続される負荷を利用する利用先または負荷の接続場所との対応関係を示す分電盤管理データを、内部メモリに記憶させたことを特徴とする積算電力計。
【0033】
分電盤管理データは、その分電盤への供給電力を測定する積算電力計のメモリに記憶されていてもよい。
【0034】
【発明の実施の形態】
以下、本発明の実施の形態を具体例を用いて説明する。
図1は、本発明の分担計算システムの主要部を示すブロック図である。
図において、事業所内部の電気機器に電力を供給するための配電線1は、分電盤10によって分配され、フロア20に電力を供給している。フロア20は、例えば、業務課用フロア21と総務課用フロア22と経理課用フロア23とに区分けされている。分電盤10の中に設けられた分岐回路は、それぞれブレーカー11を介して、フロア20の中の電灯やコンセントやその他の負荷に接続されている。この分電盤10に供給される電力は、一括して積算電力計12によって測定される。この事業所に存在する多数のフロアには、それぞれ、このフロア20と同じように、分電盤10とこれに供給される電力を一括測定する積算電力計12を設ける。
【0035】
事業所の内部に多数のフロアがあって、それぞれ積算電力計12が設けられていると、その電力測定値の読み取りと記録作業が膨大になる。そこで、これらの測定値を自動的に収集するために、データ収集サーバ30を設ける。各積算電力計12とデータ収集サーバ30のインタフェース31とが、ネットワークを通じて接続される。データ収集サーバ30には、測定値取得手段32とデータ転送手段34とが設けられている。測定値取得手段32とデータ転送手段34はいずれも、データ収集サーバ30において動作するコンピュータプログラムである。積算電力データベース35は、データ収集サーバ30に内蔵されるかあるいは外付けされた記憶装置に記憶されたデータである。
【0036】
全ての積算電力計12の測定値は、インタフェース31を通じて、所定のタイミングで測定値取得手段32に取得される。各積算電力計12の測定値は、例えば、1時間おきに取得されて、積算電力データベース35に順次記録される。この部分の処理には既存の技術が採用できるため、さらに詳細な説明は省略する。データ転送手段34は積算電力データベース35に蓄積された全ての積算電力計12の測定値を、例えば毎月1回、管理サーバ40に自動的に転送する処理を実行する機能を持つ。
【0037】
管理サーバ40には、電力使用料算出手段41と電力料金算出手段42とが設けられている。電力使用料算出手段41と電力料金算出手段42とは、管理サーバ40において動作するコンピュータプログラムである。また、管理サーバ40に内蔵されるかあるいは外付けされた記憶装置43には、分電盤管理データベース44と分担金額データベース45とが記憶されている。分電盤管理データベース44は、各分電盤10に関する情報を管理するための分電盤管理データ17を収集したものである。分電盤管理データ17は、例えば、分電盤10の分岐回路を通じて電力が供給される場所と、電力の供給を受ける部署と、分岐回路の定格とを対応させたデータを含む。図示した例では、Aフロアの北側の業務課に、40アンペア分の電力が供給され、Aフロアの中央の総務課に、60アンペア分の電力が供給され、Aフロアの南側の経理課に、60アンペア分の電力が供給されるというデータ構成になっている。
【0038】
なお、分電盤管理データ17には、この他に、分電盤識別番号と、分岐回路識別番号群と、対応するブレーカーの定格電流等の情報を含めておく。これは、配電工事等に必要な情報になる。電力使用料算出手段41は、データ収集サーバ30から転送される全ての分電盤10の積算電力データと分電盤管理データ17とを利用して、各部門の推定電力使用量を、後で説明する要領で算出する機能を持つ。電力料金算出手段42は、各部門に対する電力料金の分担割合を定め、実際の分担金額を算出する機能を持つ。上記の計算結果は部門別消費電力データベース45に記録される。
【0039】
この発明においては、電気料金の分担計算のために、フロアや建家ごとに設けられた分電盤10に、それぞれ積算電力計12を取り付ける。積算電力計12は、該当する分電盤10を通じて供給される電力を一括測定する。分電盤10の中には、電灯用、コンセント用、というように、用途ごとにブレーカー11が設けられている。また、フロアの壁や床面は、適当な範囲でブロック分けされており、各ブロックに電力を供給する分岐回路には、それぞれブレーカー11が挿入されている。一般には、分電盤10の蓋を開けると、どのブレーカーの配線がどの場所に通じるものか、どの部門に使用されているか等を表示するラベルが貼り付けられている。分電盤管理データ17は、この情報をデータ化したものである。
【0040】
また、分岐回路やブレーカーには、それぞれ例えば、20アンペアとか40アンペアというように定格電流が定められている。この発明では、分電盤10の内部で、使用先ごとに分岐された回路の定格電流等の表示を利用して、比例配分によって、その分電盤10を通じて電力の供給を受ける使用先ごとの電気料金の分担割合を計算する。ブレーカの表示だけでなく、定格電流あるいは定格電力を、直接あるいは間接的に表示するデータがあれば、それを利用するとよい。
【0041】
図1に示したように、分電盤10中に8つの分岐回路があって、一方の分岐回路に接続されたブレーカーの定格電流がいずれも20アンペアであるとする。定格電流が20アンペアのブレーカー2台に、業務課所有の負荷が接続され、同様のブレーカー3台に、総務課所有の負荷が接続されている。さらに、同様のブレーカー3台に、経理課所有の負荷が接続されている。ここで、ブレーカーの定格電流が20アンペアの分岐回路には、いずれもほぼ20アンペアの定格の負荷が接続されて、ほぼ同様の条件で使用されているものと仮定する。
【0042】
これにより、業務課と総務課と経理課の電力料金の分担比は、2対3対3であると算定する。こうすれば、実際に各課ごとの消費電力を測定するための積算電力計を準備しなくても、分電盤10に接続された1台の積算電力計12で一括して使用電力量を測定し、上記分担比で費用請求をすれば足りる。実際には、定格よりもずっと少ない負荷を接続している場合があるかもしれないが、それは無視する。各部門はそれぞれいくつもの分岐回路から電力の供給を受けており、分担比に基づく計算結果と実際に分担すべき金額との間の誤差は無視できる程度と考えてしまう。こうした計算によって、少ない設備で簡便に各部門の消費電力の算出が可能になる。
【0043】
図2は、本発明のシステムの利用形態を示すブロック図である。
図のように、事業所に多数の分電盤10(1)〜10(3)・・があるときに、各分電盤に接続された積算電力計12(1)〜12(3)・・の検針をする。これには、図1で説明したように、電力会社等で既に採用されている自動遠隔検針システムを利用する。即ち、例えば、積算電力計の電力測定値15を配電線や別途敷設した通信線を使用してデータ収集サーバ30に送信する。データ収集サーバ30からは、毎月月次積算電力16が管理サーバ40に転送される。
【0044】
また、各分電盤10(1)〜10(3)・・の分岐回路がどの部門の負荷に接続されているかを正確に把握しておかなければ、上記の分担比を決定できない。実際の配電工事は比較的頻繁に行なわれ、現場合わせの部分が多くて当初の設計図面どおりに実施されないことが少なくないから、各分電盤の分岐回路と接続先の情報は、配電工事の竣工後に工事担当者に報告させるのが最も正確である。そこで、各分電盤の分岐回路と接続先を対応させた分電盤管理データ17を、例えば、CSV(Comma Separated Values)データ形式で、工事担当者の端末装置38からメール等により管理サーバ40に送信する。もちろん、その他の形式でその他の方法で管理サーバ40にデータが収集されるようにしても構わない。
【0045】
なお、例えば、分電盤10の中や、積算電力計12の中の所定の記憶装置に分電盤管理データ17を記憶させておくことができれば、積算電力計12の検針データをホストコンピュータに送信するとき、この情報を同時にホストコンピュータに送信することもできる。配線の入れ替え工事をしたとき、工事担当者がこの情報を書き換えるようにすれば、常に最新の情報が分電盤10や積算電力計12に保持されていることになり、確実な管理ができる。
【0046】
管理サーバ40は、部門別の費用分担の計算を終了すると、その結果を事業部門の端末装置39等へ送信する。さらに、例えば、部門別消費電力一覧27を生成して、ウェブページ化し、ネットワーク5を通じて公開する。 ネットワーク5は、インターネットやイントラネット(LAN、WAN)、電話回線網、などの各種の任意の情報通信用ネットワークである。これは全社的に閲覧を許可するもので、有線ネットワークでも無線ネットワークでも構わない。ウェブページは、HTML(Hyper Text Mark-up Language)、SGML(Standard Generalized Mark-up Language)、XML(eXtensible Markup Language) 等の形式で作成されたもので、ネットワーク5を通じて端末6、7、8等のブラウザにより閲覧可能な形式のデータである。
【0047】
図3の(a)は、部門別の費用分担の計算結果例を示し、(b)は部門別消費電力一覧の例を示す説明図である。
図1のようにして、分電盤10で業務課用フロア21と総務課用フロア22と経理課用フロア23に電力を供給したとき、各分岐回路の定格から、電力使用料の分担比は、図3の(a)に示すように40対60対60になる。積算電力計12の測定した1カ月分の積算電力を750キロワット(KW)としたとき、これを40対60対60で案分計算する。こうして求めた分担電力使用料に、電力料金の単価を掛ければ分担電力料金が求められる。この結果を各部門に配布して、毎月の経費計算に使用させる。
【0048】
図3の(b)は、「××製造課」について、毎月の電力使用量の変化をグラフ化したものである。この図では、例えば、毎月の基礎設備関係電力使用量と、空調関係電力使用量と、電灯関係電力使用量の変化が図示されている。基礎設備関係電力使用量というのは、事業所全体として予め一定の割合で分担を要求する共有設備の電力であり、これは別システムで自動的に割り当てられる。空調関係電力使用量と電灯関係電力使用量は、それぞれ異なる系統から異なる分電盤等を介して各部門に電力供給されるため、別々に個別に計算されている。この部門は空調関係の電力使用量は季節を問わず一定で、電灯関係の使用量は時期変動がある。図3(a)や(b)に示したような情報をネットワークを通じて公開すると、各部門において電力の使用方法の見直しや改善が図られて節電等による経費の節減を図ることができる。
【0049】
図4は、本発明のシステムの各種の変形例を示し、(a)は分電盤の変形例、(b)は電力計の変形例、(c)は本発明を高圧ガスの配管等に応用した例、(d)は高圧ガスの使用料費用分担例を示す説明図である。
(a)に示す分電盤10は、ネットワークインタフェース50とメモリ51と備えている。メモリ51には、既に説明したような分電盤管理データ17が、例えば工事担当者によって書き込まれる。分電盤管理データ17のメモリ51への書き込み方法は任意である。工事業者が操作して手入力をしたり、工事業者のモバイルコンピュータにより入力したりしても構わない。ネットワークインタフェース50は、メモリ51から所定のタイミングで分電盤管理データ17を読み出して、ネットワークを通じてデータ収集サーバ30に転送するためのものである。ネットワークは有線ネットワークでも無線ネットワークでも構わない。
【0050】
(b)に示す積算電力計12は、ネットワークインタフェース53とメモリ54およびメモリ55を備えている。メモリ54には、分電盤管理データ17が例えば工事担当者によって書き込まれる。メモリ55には、積算電力の測定値が既知の方法により自動的に書き込まれる。ネットワークインタフェース53は、所定のタイミングでメモリ54およびメモリ55をアクセスして、分電盤管理データ17と積算電力の測定値とを読み出して、ネットワークを通じてデータ収集サーバ30に転送する。以上のように、(a)や(b)の例では、データ収集サーバ30が分電盤管理データ17を、ネットワークを通じて自動的に取得することができ、しかも、分電盤管理データ17を常に最新の状態に保持できる。
【0051】
上記の例では、分電盤に接続した積算電力計の検針データと、各分岐回路のブレーカーの定格電流等の情報を利用して電力量金の分担計算をした。圧力ガスや蒸気の分配費用についても同様の考え方が採用できる。(c)はその例である。圧力ガスの幹線配管60が、例えば、工場の建屋ごとに1本設けられているとする。この幹線配管60に流量計61を取り付ける。幹線配管60から分岐された分岐配管66(1)〜(3)が、それぞれ所定の部門の負荷に接続されているとき、各部門で使用する圧力ガスの使用料を分担計算する。この場合には、分岐配管66(1)〜(3)等の定格流量情報を利用する。
【0052】
例えば、図の3本の分岐配管66(1)〜(3)のバルブの定格流量が全て毎分20リッターとし、幹線配管60の末端に接続されたバルブの定格流量が毎分50リッターであるとする。この場合には、図の(d)に示すように、
分岐配管66(1)〜(3)に接続された負荷を使用する第1課から第3課はそれぞれ流量計の検針データ(1200リッター)の11分の2ずつを負担する。また、幹線配管60の末端に接続された負荷を使用する工務課
は流量計の検針データの11分の5を負担する。
【0053】
圧力ガス供給用のシステムには、集中的に圧力ガスを分配する分電盤のような設備が無いことも多い。また、安全弁等が設けられていても、分岐配管ごとに必ず設けられているとは限らない。そこで、流量計61を接続した幹線配管60があって、幹線配管下流側の任意の場所で分岐した分岐配管66を通じてガスの供給を受ける利用先がある場合に、分岐配管66等の定格流量を基準に分担金額計算をする。分担計算には、分岐配管の規格を基準に比較してもよいし、圧力調整バルブ等がある場合には、圧力調整バルブの定格流量を基準にしてもよい。
【0054】
なお、例えば、分電盤の場合に、各部門で負荷が接続されているかどうかにかかわらず、その部門用の分岐回路の定格電力等で費用分担を決めてしまうと、実際の消費電力とは若干異なる費用分担になることは否めない。定格より十分低い消費電力の負荷しか接続していないケースもある。分岐回路を引き込んでいても、負荷を接続していない場合もある。常時電源をオンにして使用している負荷もあれば、ときどきしか電源をオンにしない負荷もある。しかしながら、この方法を採用すれば、使用頻度の低い無駄な配電設備を増やすのを防止する効果も期待できる。
【0055】
図5の(a)は分電盤管理データベースの更新処理フローチャートで、(b)は分電盤管理データの取得方法の変形例説明図である。
以上のようなシステムにおける各コンピュータプログラムの動作を具体的に説明する。
事業所の各フロアのレイアウト変更や電気工事により、分担計算用のデータに変更が生じるときは、工事担当者に分電盤管理データ17の更新を要求する。図のフローチャートにおいて、ステップS1で、分電盤工事の完了報告を管理サーバ40に送信すると、ステップS2で、工事業者は管理サーバ40から旧分電盤管理データを受信する。そのフォーマットは、図1を用いて説明したとおりである。なお、旧分電盤管理データの修正プログラムは、データの入力や修正操作を容易にするために、例えば、表形式のものが好ましい。ステップS3で旧分電盤管理データの修正をしてデータを更新した後、ステップS4でそのデータの内容検査を行なう。
【0056】
データの内容検査は、自動化されていることが好ましい。旧分電盤管理データの修正プログラムに組み込まれていればよい。データに記載ミス等が発見されれば、ステップS5からステップS6に進み、データの修正が要求される。正しく入された新たな分電盤管理データは、例えば、CSV形式のデータに変換して(ステップS7)、管理サーバ40に転送する(ステップS8)。ステップS9では、このCSV形式のデータが分電盤管理データベースに取り込まれる。
【0057】
図5の(b)は、分電盤に分電盤管理データを記録しておくメモリを設けた場合の分電盤管理データ取得方法を示すものである。この処理は、例えば、管理サーバ40に分電盤管理データ取得手段を新たに設けることで実現する。まず、ステップS11で、工事業者が分電盤工事完了操作を行なうと、分電盤に内蔵された図4(a)に示したようなメモリ51にデータ入力が可能な状態になる。ここで、メモリ51に、分電盤管理データ17を記録する(ステップS12)。この作業は随時行なうことができ、管理サーバ40への報告も不要である。管理サーバ側では、例えば、毎月1度、分電盤管理データベース44の更新時に、全ての分電盤から、分電盤管理データを収集する。この作業は、分電盤管理データベース44に含まれる分電盤リストを参照して行なう(ステップS13)。ステップS14でリストにある全ての分電盤に接続をして各分電盤のメモリに記録された分電盤管理データを取得する。その後ステップS15で分電盤管理データベース44を更新する。
【0058】
図6の(a)は積算電力計検針処理動作を説明するフローチャート、(b)はデータ転送手段の動作を示すフローチャートである。
全ての積算電力計の検針データは1時間おきに収集されて、積算電力データベースに記録される。データ収集サーバ30の測定値取得手段32は、この積算電力計検針処理動作を実行する。始めに、ステップS21でプログラムタイマのタイムアップがあると、ステップS22で分電盤リストを参照する。分電盤リストは、積算電力データベース35中に含まれている。ステップS23でリスト中の1つの分電盤に接続をし、ステップS24で検針値を取得する。ステップS25で全ての分電盤をアクセスしたかを判断して、未だアクセスしていない分電盤があれば、ステップS22に戻って処理を繰り返す。全ての分電盤をアクセスし終わるとステップS26に進みデータの編集処理をした後、ステップS27で積算電力データベース35を更新する。
【0059】
データ転送手段34は、ステップS31で月始めになったことを検出すると、ステップS32で積算電力データベース35の内容をCSV形式のデータに変換する。これを、ステップS33で管理サーバ40に送信する。こうして、管理サーバ40は、分担計算用のデータベース44を利用して、部門ごとの分担金額計算を実行することが可能になる。
【0060】
図7は、管理サーバ40による分担金計算処理動作のフローチャートである。まず、電力使用料算出手段41は、データ収集サーバ30から転送された分電盤毎の積算使用電力を参照する。次に、ステップS42で、分電盤管理データベース44中の対応する分電盤管理データを参照する。ステップS43では、既に説明した要領で、部門毎の使用電力量の案分計算を実行する。ステップS44ではその計算結果から図2で示した費用分担通知26を生成する。これはステップS45で事業部門に通知される。さらにステップS46で部門別消費電力一覧27を生成する。これは、ステップS47でウェブページに変換されて、ステップS48でウェブサーバにアップロードされる。こうして、計算結果が図表化されて全社に公開される。
【0061】
なお、上記の演算処理装置にインストールされたコンピュータプログラムは、それぞれ独立したプログラムモジュールを組み合わせて構成してもよいし、全体を一体化したプログラムにより構成してもよい。コンピュータプログラムにより制御される処理の全部または一部を同等の機能を備えるハードウエアで構成しても構わない。また、上記のコンピュータプログラムは、既存のアプリケーションプログラムに組み込んで使用してもよい。上記のような本発明を実現するためのコンピュータプログラムは、例えばCD−ROMのようなコンピュータで読み取り可能な記録媒体に記録して、任意の情報処理装置にインストールして利用することができる。また、ネットワークを通じて任意のコンピュータのメモリ中にダウンロードして利用することもできる。
【図面の簡単な説明】
【図1】 本発明の分担計算システムの主要部を示すブロック図である。
【図2】 本発明のシステムの利用形態を示すブロック図である。
【図3】 (a)は、部門別の費用分担の計算結果例を示し、(b)は部門別消費電力一覧の例を示す説明図である。
【図4】 本発明のシステムの各種の変形例を示し、(a)は分電盤の変形例、(b)は電力計の変形例、(c)は本発明を高圧ガスの配管等に応用した例、(d)は高圧ガスの使用料費用分担例を示す説明図である。
【図5】 (a)は分電盤管理データベースの更新処理フローチャートで、(b)は分電盤管理データの取得方法の変形例説明図である。
【図6】 (a)は積算電力計検針処理動作を説明するフローチャート、(b)はデータ転送手段の動作を示すフローチャートである。
【図7】 管理サーバ40による分担金計算処理動作のフローチャートである。
【符号の説明】
10 分電盤
11 ブレーカー
12 積算電力計
20 フロア
17 分電盤管理データ
21 業務課用フロア
22 総務課用フロア
23 経理課用フロア
30 データ収集サーバ
31 インタフェース
32 測定値取得手段
33 積算手段
34 データ転送手段
35 積算電力データベース
40 管理サーバ
41 電力使用料算出手段
42 電力料金算出手段
43 記憶装置
44 分電盤管理データベース
45 部門別消費電力データベース
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a shared calculation method, a shared calculation system, a shared calculation program, and the like, which are suitable for uses such as calculating the cost sharing of electric power, gas, etc. while sharing facilities.
[0002]
[Prior art]
In a company that adopts an independent profit system for each business unit, the cost of the entire company is shared at a certain rate according to the scale of each business unit. Management (distribution management) for the cost of using energy resources such as electric power, pressure gas, and steam, by measuring the usage with measuring instruments installed in factories and buildings, respectively. )
[0003]
[Problems to be solved by the invention]
By the way, the conventional techniques as described above have the following problems to be solved.
In offices where administrative departments of various business units are gathered and laboratories for promoting company-wide projects, there are many cases in which a single floor is shared by several departments. In such a case, for example, the sharing of the power consumption for each department becomes a problem. Since one floor is subdivided and used, and there are many cases where the layout of the floor is changed or departments are consolidated or abolished, it is not realistic to provide a dedicated wattmeter for each department. In some cases, a single factory is shared by different divisions. In such a case, for example, cost sharing when using compressed air or steam supplied to the entire factory through piping is also required. However, a measuring instrument that measures the flow rate of a fluid such as air or water is more expensive than an integrating wattmeter, and it is even more uneconomical to install in various places for cost sharing.
[0004]
There are also methods to determine the cost sharing based on the occupied area ratio and to determine the cost sharing based on the number of employees. There is also a method in which the department where the distribution board and the integrated wattmeter are installed pays the electricity charge. However, these methods are less rational and difficult to accept if the strict view of burden costs for each department becomes strict. Moreover, even if the burden rate of the power charge for each department is determined by various calculation methods, the notification and explanation work become enormous. In addition, due to power distribution facility construction and department layout changes that are carried out at a relatively high frequency at each business office, there are problems such as inadequate updating of the calculation method of expenses to be assigned to each department, and errors.
[0005]
The present invention has been made paying attention to the above points, and it is an object of the present invention to provide a shared calculation system that performs an accurate cost sharing calculation of a plurality of shared users with a small number of measuring instruments for electric power, gas, and the like. .
In addition, the present invention provides a shared calculation system that always keeps the latest information on changes in distribution facilities at each office and department, and performs cost sharing calculation accurately based on the measured value of the integrated wattmeter installed at each location. The purpose is to provide.
[0006]
[Means for Solving the Problems]
The present invention solves the above problems by the following configuration.
<Configuration 1>
A means for obtaining a result of collectively measuring power supplied to a load through a plurality of branch circuits, and a result of measuring the power based on an allowable value of power that can be supplied through each branch circuit, A shared calculation system comprising means for calculating power used by each load to which power is supplied through each branch circuit.
[0007]
The plurality of branch circuits are arbitrary electric circuits that supply power to the load by connecting the power supply side and the load side, respectively. Measure the power supplied to all branch circuits at once. The measurement result is obtained by any means. Each load to which power is supplied through each branch circuit is used by, for example, different users. Since the power used for each load cannot be obtained directly, the appropriate processing is performed based on the allowable value of power that can be supplied through each branch circuit. The allowable power value is freely determined with reference to the maximum rated current. It is not necessary to match the maximum rated current exactly. Proportional processing is, for example, proportional distribution based on the ratio of allowable power values. The sharing calculation method is arbitrary. The power consumption is estimated by prorated processing, and is used for, for example, materials for cost sharing calculation.
[0008]
<Configuration 2>
Means for obtaining a measurement value of an integrating wattmeter for measuring the power supplied to the load through the distribution board; means for calculating a power charge according to the measured power; and each branch circuit in the distribution board A shared charge calculation system comprising: a power charge calculation means for performing a prorated process based on a rating of each branch circuit for a power charge shared by a use destination of each load to which power is supplied through.
[0009]
A distribution board (an apparatus for branching a circuit including a distribution board or the like will be hereinafter collectively referred to as a distribution board) is an apparatus for branching a distribution line. Each branch circuit is connected to a load that uses power through the branch circuit. Each branch circuit is rated according to the type of load connected. The type of load is arbitrary, and it may be connected to the branch circuit or not yet connected. The rating here refers to the maximum value of current or power that can be supplied to the load through the branch circuit in a normal state, and may be generally displayed on the electrical equipment. The rating may be expressed as either current or power. Either the rating of the branch circuit itself or the rating of a breaker or the like connected to the branch circuit may be used. The integrating wattmeter measures the power supplied to the actually connected load. The measured value of the integrating wattmeter is obtained by any known means such as a network. The electric power charge according to the electric power measured by the integrating wattmeter can be calculated according to the regulations of the electric power company. The result is prorated based on the rating of each branch circuit, and the cost sharing for each user is calculated. Power charges are calculated from the measured value of the integrating wattmeter by calculation processing according to the regulations of the electric power company. Each load to which power is supplied through each branch circuit belongs to a predetermined usage destination, and the usage fee is shared by each usage destination. The share amount is calculated using the rating of each branch circuit as a basis. A simple proportional calculation may be used, or a rating may be input as a parameter in a predetermined arithmetic expression. Through these processes, even if no integrating wattmeter is inserted in each branch circuit, it automatically determines how much of the power consumption measured by the integrating wattmeter on the distribution board is consumed by which user. Can be calculated.
[0010]
<Configuration 3>
Means for obtaining a measurement value of an integrating wattmeter that measures power supplied to the load through the distribution board, and estimated power usage of each load to be supplied through each branch circuit inside the distribution board And a power usage amount calculation means that performs prorated processing based on the rating of each branch circuit.
[0011]
The distribution board divides a plurality of loads, for example, by their arrangement, and supplies power separately for each load (group). A certain user uses one or a plurality of loads through a certain branch circuit. Another user uses the remaining load or loads through another branch circuit. The estimated power usage at the usage destination is calculated by, for example, integrating and proportionally distributing the rated values of the branch circuits to which the load to be used is connected.
[0012]
<Configuration 4>
In the shared calculation system described in the configuration 2 or 3, for all the distribution boards to be managed, the branch circuit rating and the load connected to each branch circuit are used for prorated processing. A shared calculation system characterized by using distribution board management data indicating the relationship with the user.
[0013]
The load may not always be connected to the branch circuit. The usage destination that uses the load connected to each branch circuit may be any target as long as it requires calculation of power charges and estimated power consumption, and may be any department name, individual name, company name, or the like.
[0014]
<Configuration 5>
In the shared calculation system described in configuration 2 or 3, for all distribution boards to be managed for prorated processing, the rating of the branch circuit and the connection place of the load connected to each branch circuit A shared calculation system using distribution board management data indicating the relationship between
[0015]
Distribution board management data indicating the relationship between the rated value of the branch circuit in the distribution board and the load connection location of each branch circuit can be created when the electrical work on the floor using the distribution board is completed. This data can be used as data for subsequent distribution work. If the relationship between the load connection location and the usage destination is prepared separately, it is possible to calculate the estimated power consumption of the usage destination.
[0016]
<Configuration 6>
In the shared calculation system described in Configuration 4 or 5, distribution board management data for each distribution board is generated when a branch circuit of the distribution board is newly installed or modified, and this distribution board management data is acquired through the network. A distribution calculation system characterized in that a distribution board management database is generated.
[0017]
When a distribution circuit branch circuit is newly installed or repaired, the load destination is determined. At this time, a construction contractor or the like in charge of new establishment or renovation creates distribution board data and transmits it to the host computer or the like through the network when the construction is completed. Of course, a part collected using a medium such as a flexible disk may be included. According to this method, the distribution board management database can be reliably and quickly updated, and accurate cost sharing calculation can always be performed.
[0018]
<Configuration 7>
In the shared calculation system described in Configuration 6, distribution board management data for each distribution board is held in a storage device attached to each distribution board, and the distribution board management data is obtained through a network. A shared calculation system characterized in that a distribution board management database is generated.
[0019]
When the installation or renovation of the branch circuit of the distribution board is completed, the construction contractor creates distribution board data and stores it in a storage device attached to the distribution board. It only needs to be attached to the distribution board, and it may be internal or external. It may be on the integrating wattmeter side. The data may be transmitted to the host computer in the same manner as the meter reading data of the integrating wattmeter, for example.
[0020]
<Configuration 8>
[0021]
The database program is, for example, a spreadsheet data processing program or a relational database program. Such a program has a function of importing external data using fixed format data. The fixed form data includes so-called CSV data in which one unit of data is separated by commas, data separated by spaces or tabs, bulleted data, and the like. Both can be easily created, for example, in text format, and can be created by a construction contractor and incorporated into the database as it is. Moreover, since the data size is small, it can be stored in the built-in memory of the distribution board without difficulty.
[0022]
<Configuration 9>
The shared calculation system according to Configuration 2 or 3, wherein the shared calculation system includes means for holding the estimated power consumption or power charge of the usage destination obtained by the prorated processing so as to be viewable through the network. .
[0023]
By making public the estimated power usage of each user through the network and allowing related organizations including the user to view it, it is possible to promote savings in power consumption. The network is a network for information disclosure such as the Internet or an intranet. Regardless of whether the estimated power consumption or the electricity price is announced, the same effect is obtained.
[0024]
<Configuration 10>
Means for collectively measuring the flow rate of the fluid supplied to the load through a plurality of branch pipes, and the fluid usage of each load supplied with the fluid through each of the branch pipes can be supplied through the branch pipes per unit time. A sharing calculation system comprising means for performing prorated processing based on a flow rate of fluid.
[0025]
Even when pressure gas, steam, and other various fluids are supplied to a plurality of users, it is possible to perform the same processing as that of power supply.
[0026]
<Configuration 11>
Obtaining a result of collectively measuring the power supplied to the load through a plurality of branch circuits, dividing the measurement result of the power based on an allowable value of power that can be supplied through each of the branch circuits, A shared calculation method characterized by calculating the power consumption of each load to which power is supplied through a branch circuit.
[0027]
It is an invention of a cost sharing calculation method corresponding to claim 1.
[0028]
<Configuration 12>
The process of acquiring the result of collectively measuring the power supplied to the load through a plurality of branch circuits and the measurement result of the power based on the allowable value of power that can be supplied through each branch circuit, A shared calculation program for causing a computer to execute a process of calculating power used by each load supplied with power through each branch circuit.
[0029]
It is an invention of a cost sharing calculation program corresponding to claim 1.
[0030]
<Configuration 13>
Distribution board management data indicating the correspondence between the rating of the branch circuit provided inside and the connection destination of the load or load that uses the load connected to each branch circuit is stored in the internal memory. Characteristic distribution board.
[0031]
In many cases, the usage destination that uses the load connected to each branch circuit is changed every time distribution work is performed. This information is stored in the internal memory of the distribution board at the completion of construction so that it can be read out. Compared to recording on a label or the like, there is no risk of getting dirty or disappearing. Moreover, since the information can be acquired through a network, it is easy to manage.
[0032]
<Configuration 14>
Distribution board management data indicating the relationship between the rating of the branch circuit provided in the distribution board and the user or load connection location that uses the load connected to each branch circuit is stored in the internal memory. An integrated wattmeter characterized by
[0033]
The distribution board management data may be stored in a memory of an integrating wattmeter that measures the power supplied to the distribution board.
[0034]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described using specific examples.
FIG. 1 is a block diagram showing the main part of the shared calculation system of the present invention.
In the figure, a distribution line 1 for supplying electric power to electrical equipment inside a business office is distributed by a distribution board 10 and supplies electric power to a floor 20. The floor 20 is divided into, for example, a business section floor 21, a general affairs section floor 22, and an accounting section floor 23. The branch circuits provided in the distribution board 10 are connected to electric lights, outlets, and other loads in the floor 20 through the breakers 11 respectively. The electric power supplied to the distribution board 10 is collectively measured by the integrating wattmeter 12. As with this floor 20, each of the many floors existing in this office is provided with a distribution board 10 and an integrating wattmeter 12 that collectively measures the power supplied thereto.
[0035]
If there are a large number of floors inside the office and each of them has an integrated wattmeter 12, reading and recording of the power measurement value becomes enormous. Therefore, a data collection server 30 is provided to automatically collect these measurement values. Each integrating wattmeter 12 and the interface 31 of the data collection server 30 are connected through a network. The data collection server 30 is provided with measurement value acquisition means 32 and data transfer means 34. Both the measured value acquisition unit 32 and the data transfer unit 34 are computer programs that operate on the data collection server 30. The integrated power database 35 is data stored in a storage device built in the data collection server 30 or externally attached.
[0036]
The measured values of all the integrating wattmeters 12 are acquired by the measured value acquisition means 32 through the interface 31 at a predetermined timing. The measured value of each integrated wattmeter 12 is acquired, for example, every hour and is sequentially recorded in the integrated power database 35. Since the existing technology can be adopted for the processing of this part, further detailed description is omitted. The data transfer unit 34 has a function of executing a process of automatically transferring the measurement values of all the integrated wattmeters 12 accumulated in the integrated power database 35 to the management server 40, for example, once a month.
[0037]
The management server 40 is provided with a power usage fee calculation unit 41 and a power fee calculation unit 42. The power usage fee calculation unit 41 and the power fee calculation unit 42 are computer programs that operate on the management server 40. In addition, the storage device 43 built in the management server 40 or attached externally stores a distribution board management database 44 and a shared amount database 45. The distribution board management database 44 is a collection of distribution board management data 17 for managing information related to each distribution board 10. The distribution board management data 17 includes, for example, data in which a place where power is supplied through the branch circuit of the distribution board 10, a department receiving the power supply, and the rating of the branch circuit. In the example shown, 40 amps of power is supplied to the business section on the north side of the A floor, 60 amps of power is supplied to the general affairs section on the center of the A floor, and the accounting section on the south side of the A floor is The data structure is such that power for 60 amperes is supplied.
[0038]
In addition, the distribution board management data 17 includes information such as a distribution board identification number, a branch circuit identification number group, and a rated current of a corresponding breaker. This is information necessary for power distribution work. The power usage fee calculation means 41 uses the integrated power data and distribution board management data 17 of all distribution boards 10 transferred from the data collection server 30 to calculate the estimated power usage of each department later. Has a function to calculate in the manner described. The power charge calculation means 42 has a function of determining the share of the power charge for each department and calculating the actual share of money. The calculation result is recorded in the departmental power consumption database 45.
[0039]
In the present invention, an integrated wattmeter 12 is attached to a distribution board 10 provided for each floor or building for calculation of sharing of electricity charges. The integrating wattmeter 12 collectively measures the power supplied through the corresponding distribution board 10. In the distribution board 10, a breaker 11 is provided for each use, such as an electric lamp and an outlet. Further, the floor walls and the floor surface are divided into blocks within an appropriate range, and the breakers 11 are inserted into the branch circuits that supply power to the respective blocks. In general, when the lid of the distribution board 10 is opened, a label is displayed to indicate which breaker wiring leads to which location, which department is used, and the like. The distribution board management data 17 is obtained by converting this information into data.
[0040]
In addition, for the branch circuit and breaker, for example, a rated current is set such as 20 amperes or 40 amperes. In the present invention, by using the display of the rated current of the circuit branched for each user within the distribution board 10, for each user who receives power supply through the distribution board 10 by proportional distribution. Calculate the share of electricity charges. If there is data to display not only the breaker display but also the rated current or rated power directly or indirectly, it is good to use it.
[0041]
As shown in FIG. 1, it is assumed that there are eight branch circuits in the distribution board 10, and the rated currents of the breakers connected to one branch circuit are all 20 amperes. A load owned by the business section is connected to two breakers with a rated current of 20 amps, and a load owned by the general affairs section is connected to three similar breakers. In addition, a load owned by the accounting department is connected to three similar breakers. Here, it is assumed that a branch circuit having a rated current of 20 amperes is connected to a load having a rating of approximately 20 amperes and is used under substantially the same conditions.
[0042]
As a result, the sharing ratio of the power charges of the business section, the general affairs section, and the accounting section is calculated to be 2 to 3 to 3. In this way, the amount of power used can be measured collectively with one integrated wattmeter 12 connected to the distribution board 10 without actually preparing an integrated wattmeter for measuring the power consumption of each section. However, it is sufficient to charge for expenses according to the above sharing ratio. In practice, you may be connecting a much lower load than the rating, but ignore it. Each department receives power from a number of branch circuits, and the error between the calculation result based on the sharing ratio and the amount that should actually be shared is considered negligible. Such calculation makes it possible to easily calculate the power consumption of each department with a small number of facilities.
[0043]
FIG. 2 is a block diagram showing a use form of the system of the present invention.
As shown in the figure, when there are a number of distribution boards 10 (1) to 10 (3) in the office, integrated wattmeters 12 (1) to 12 (3) connected to each distribution board・ Perform meter reading. For this purpose, as described with reference to FIG. 1, an automatic remote meter reading system that has already been adopted by an electric power company or the like is used. That is, for example, the power measurement value 15 of the integrating wattmeter is transmitted to the data collection server 30 using a distribution line or a separately installed communication line. From the data collection server 30, the monthly integrated power 16 is transferred to the management server 40 every month.
[0044]
Moreover, the above-described sharing ratio cannot be determined unless it is accurately grasped to which department's load the branch circuits of the distribution boards 10 (1) to 10 (3). Actual power distribution work is carried out relatively frequently, and there are many parts that are matched to the site, so it is not often carried out according to the original design drawings. It is most accurate to report to the person in charge of construction after completion. Therefore, the distribution board management data 17 in which the branch circuit of each distribution board is associated with the connection destination is stored in the management server 40 by e-mail or the like from the terminal device 38 of the person in charge of construction in the CSV (Comma Separated Values) data format, for example. Send to. Of course, data may be collected in the management server 40 by other methods in other formats.
[0045]
For example, if the distribution board management data 17 can be stored in a predetermined storage device in the distribution board 10 or the integrated wattmeter 12, the meter reading data of the integrated wattmeter 12 is stored in the host computer. When transmitting, this information can be transmitted to the host computer at the same time. If the person in charge of the construction rewrites this information when the wiring replacement work is performed, the latest information is always held in the distribution board 10 and the integrated wattmeter 12, so that reliable management can be performed.
[0046]
When the management server 40 finishes calculating the division of expenses by department, the management server 40 transmits the result to the terminal device 39 of the business department. Further, for example, a department-specific power consumption list 27 is generated, converted into a web page, and released through the network 5. The network 5 is an arbitrary information communication network such as the Internet, an intranet (LAN, WAN), a telephone line network, and the like. This allows the entire company to browse and can be a wired network or a wireless network. The web page is created in a format such as HTML (Hyper Text Mark-up Language), SGML (Standard Generalized Mark-up Language), XML (eXtensible Markup Language), and the like. The data is in a format that can be viewed by any browser.
[0047]
FIG. 3A shows an example of calculation results of departmental cost sharing, and FIG. 3B is an explanatory diagram showing an example of departmental power consumption list.
As shown in FIG. 1, when power is supplied to the business section floor 21, the general affairs section floor 22, and the accounting section floor 23 with the distribution board 10, the share of the power usage fee is determined from the ratings of each branch circuit. As shown in FIG. 3A, 40 to 60 to 60. When the integrated power for one month measured by the integrated wattmeter 12 is 750 kilowatts (KW), this is calculated proportionately by 40:60:60. The shared power charge can be obtained by multiplying the shared power usage charge thus obtained by the unit price of the power charge. This result is distributed to each department and used for monthly expense calculation.
[0048]
FIG. 3B is a graph showing changes in monthly power consumption for “XX Production Section”. In this figure, for example, changes in monthly basic facility-related power usage, air-conditioning-related power usage, and lamp-related power usage are illustrated. The basic facility-related power consumption is the power of a shared facility that requires a certain share in advance for the entire office, and is automatically allocated by another system. The air-conditioning-related power usage and the lamp-related power usage are separately calculated because power is supplied to each department from different systems via different distribution boards. In this department, the power consumption related to air conditioning is constant regardless of the season, and the usage related to electric light varies with time. When information such as shown in FIGS. 3A and 3B is disclosed through the network, the usage of power can be reviewed and improved in each department, and the cost can be reduced by saving power.
[0049]
FIG. 4 shows various modifications of the system of the present invention. (A) is a modification of a distribution board, (b) is a modification of a wattmeter, (c) is a pipe of high pressure gas, etc. The applied example, (d) is an explanatory view showing an example of sharing the fee for use of high-pressure gas.
The distribution board 10 shown in (a) includes a network interface 50 and a memory 51. In the memory 51, the distribution board management data 17 as described above is written, for example, by a construction worker. The method for writing the distribution board management data 17 into the memory 51 is arbitrary. It may be entered manually by the contractor or by the contractor's mobile computer. The network interface 50 reads the distribution board management data 17 from the memory 51 at a predetermined timing and transfers it to the data collection server 30 through the network. The network may be a wired network or a wireless network.
[0050]
The integrating wattmeter 12 shown in (b) includes a network interface 53, a memory 54, and a memory 55. The distribution board management data 17 is written in the memory 54 by, for example, a construction worker. The measured value of the integrated power is automatically written in the memory 55 by a known method. The network interface 53 accesses the memory 54 and the memory 55 at a predetermined timing, reads the distribution board management data 17 and the measured value of the integrated power, and transfers them to the data collection server 30 through the network. As described above, in the examples (a) and (b), the data collection server 30 can automatically acquire the distribution board management data 17 through the network, and the distribution board management data 17 is always obtained. Keep up to date.
[0051]
In the above example, the sharing calculation of the electric energy was performed using the meter reading data of the integrating wattmeter connected to the distribution board and the information such as the rated current of the breaker of each branch circuit. The same concept can be adopted for the distribution cost of pressure gas and steam. (C) is an example. For example, it is assumed that one main pipe 60 for pressure gas is provided for each factory building. A flow meter 61 is attached to the main line 60. When the branch pipes 66 (1) to (3) branched from the main line pipe 60 are respectively connected to a load of a predetermined department, the usage fee of the pressure gas used in each department is calculated. In this case, the rated flow rate information of the branch pipes 66 (1) to (3) is used.
[0052]
For example, the rated flow rates of the three branch pipes 66 (1) to (3) in the figure are all 20 liters per minute, and the rated flow rate of the valve connected to the end of the main line 60 is 50 liters per minute. And In this case, as shown in FIG.
The 1st to 3rd sections, which use loads connected to the branch pipes 66 (1) to (3), respectively bear 2/11 of the meter reading data (1200 liters) of the flowmeter. In addition, the construction section that uses the load connected to the end of the main line 60
Bears 5/11 of the meter reading data of the flow meter.
[0053]
A system for supplying pressure gas often lacks equipment such as a distribution board that distributes pressure gas in a concentrated manner. Moreover, even if a safety valve or the like is provided, it is not always provided for each branch pipe. Therefore, when there is a main pipe 60 to which a flow meter 61 is connected and there is a user to receive gas supply through a branch pipe 66 branched at an arbitrary location on the downstream side of the main pipe, the rated flow rate of the branch pipe 66 and the like is set. Calculate the share amount based on the standard. In the sharing calculation, comparison may be made based on the standard of the branch pipe, and when there is a pressure adjustment valve or the like, the rated flow rate of the pressure adjustment valve may be used as a reference.
[0054]
For example, in the case of a distribution board, regardless of whether a load is connected in each department, if the cost sharing is determined by the rated power of the branch circuit for that department, the actual power consumption is There is no denying that the costs will be slightly different. In some cases, only loads with power consumption sufficiently lower than the rating are connected. Even if the branch circuit is drawn in, the load may not be connected. Some loads are always on with the power on, while others are only occasionally turned on. However, if this method is adopted, an effect of preventing an increase in useless power distribution equipment with low use frequency can be expected.
[0055]
FIG. 5A is a flowchart for updating the distribution board management database, and FIG. 5B is an explanatory diagram of a modification of the method for acquiring distribution board management data.
The operation of each computer program in the system as described above will be specifically described.
When the share calculation data is changed due to the layout change or electric work of each floor of the office, the construction staff is requested to update the distribution board management data 17. In the flowchart shown in the figure, when a distribution board construction completion report is transmitted to the management server 40 in step S1, the construction contractor receives old distribution board management data from the management server 40 in step S2. The format is as described with reference to FIG. The old distribution board management data correction program is preferably in the form of a table, for example, in order to facilitate data input and correction operations. In step S3, the old distribution board management data is corrected and the data is updated. Then, in step S4, the contents of the data are inspected.
[0056]
The data content inspection is preferably automated. It only needs to be incorporated in the old distribution board management data correction program. If a description mistake or the like is found in the data, the process proceeds from step S5 to step S6, and data correction is requested. New distribution board management data correctly entered is converted into, for example, CSV format data (step S7) and transferred to the management server 40 (step S8). In step S9, the CSV format data is taken into the distribution board management database.
[0057]
FIG. 5B shows a distribution board management data acquisition method when the distribution board is provided with a memory for recording distribution board management data. This process is realized, for example, by newly providing distribution board management data acquisition means in the management server 40. First, in step S11, when the construction contractor performs a distribution board construction completion operation, data can be input to the memory 51 as shown in FIG. 4A built in the distribution board. Here, the distribution board management data 17 is recorded in the memory 51 (step S12). This operation can be performed at any time, and no report to the management server 40 is required. On the management server side, for example, when the distribution board management database 44 is updated once a month, distribution board management data is collected from all distribution boards. This operation is performed with reference to the distribution board list included in the distribution board management database 44 (step S13). In step S14, connection to all distribution boards in the list is made, and distribution board management data recorded in the memory of each distribution board is acquired. Thereafter, the distribution board management database 44 is updated in step S15.
[0058]
6A is a flowchart for explaining the integrated wattmeter meter reading processing operation, and FIG. 6B is a flowchart showing the operation of the data transfer means.
The meter reading data of all integrated wattmeters is collected every hour and recorded in the integrated power database. The measured value acquisition means 32 of the data collection server 30 executes this integrated wattmeter meter reading processing operation. First, when the program timer expires in step S21, the distribution board list is referred to in step S22. The distribution board list is included in the integrated power database 35. In step S23, connection is made to one distribution board in the list, and the meter reading value is acquired in step S24. In step S25, it is determined whether all distribution boards have been accessed. If there is a distribution board that has not been accessed, the process returns to step S22 and the process is repeated. When all the distribution boards have been accessed, the process proceeds to step S26, where data editing processing is performed, and then the integrated power database 35 is updated in step S27.
[0059]
When the data transfer means 34 detects that it is the beginning of the month in step S31, the content of the integrated power database 35 is converted into CSV format data in step S32. This is transmitted to the management server 40 in step S33. In this way, the management server 40 can execute the shared amount calculation for each department using the shared calculation database 44.
[0060]
FIG. 7 is a flowchart of the share calculation processing operation by the management server 40. First, the power usage fee calculation means 41 refers to the integrated power usage for each distribution board transferred from the data collection server 30. Next, in step S42, the corresponding distribution board management data in the distribution board management database 44 is referred to. In step S43, a prorated calculation of the power consumption for each department is executed in the manner already described. In step S44, the expense sharing notification 26 shown in FIG. 2 is generated from the calculation result. This is notified to the business department in step S45. In step S46, the department-specific power consumption list 27 is generated. This is converted into a web page in step S47 and uploaded to the web server in step S48. In this way, the calculation results are graphed and disclosed to the entire company.
[0061]
In addition, the computer program installed in said arithmetic processing apparatus may be comprised combining each independent program module, and may be comprised by the program which integrated the whole. All or part of the processing controlled by the computer program may be configured by hardware having equivalent functions. Further, the above computer program may be used by being incorporated into an existing application program. The computer program for realizing the present invention as described above can be recorded on a computer-readable recording medium such as a CD-ROM and installed in any information processing apparatus for use. It can also be downloaded and used in the memory of any computer through the network.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a main part of a shared calculation system of the present invention.
FIG. 2 is a block diagram showing a use form of the system of the present invention.
FIG. 3A is a diagram illustrating an example of calculation results of division of expenses by department, and FIG. 3B is an explanatory diagram illustrating an example of a list of power consumption by department.
FIGS. 4A and 4B show various modifications of the system of the present invention, where FIG. 4A shows a modification of a distribution board, FIG. 4B shows a modification of a wattmeter, and FIG. The applied example, (d) is an explanatory view showing an example of sharing the fee for use of high-pressure gas.
5A is a flowchart of a distribution board management database update process, and FIG. 5B is an explanatory diagram of a modification of a method for acquiring distribution board management data.
6A is a flowchart for explaining an integrated wattmeter meter reading processing operation, and FIG. 6B is a flowchart for showing an operation of a data transfer means.
FIG. 7 is a flowchart of share calculation processing operation by the management server 40;
[Explanation of symbols]
10 Distribution board
11 Breaker
12 watt-hour meter
20 floors
17 Distribution board management data
21 Business Section Floor
22 General Affairs Division floor
23 Accounting Section Floor
30 Data collection server
31 interface
32 Measurement value acquisition means
33 Accumulation means
34 Data transfer means
35 Integrated power database
40 Management server
41 Electricity usage fee calculation means
42 Electricity rate calculation means
43 storage devices
44 Distribution board management database
45 Departmental Power Consumption Database

Claims (14)

分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、
この測定された電力に応じた電力料金を演算する手段と、
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷を利用する利用先との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の利用先が分担する電力料金を案分処理する電力料金算出手段とを備え、
各分電盤の分電盤管理データは、当該分電盤の分岐回路の新設または改修時に生成され、
この分電盤管理データをネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
Means for obtaining a measurement value of an integrating wattmeter for measuring the power supplied to the load through the distribution board;
Means for calculating a power charge according to the measured power;
For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the user using the load connected to each branch circuit, A power rate calculation means for appropriately processing the power rate shared by the usage destination of each load supplied with power through each branch circuit ;
Distribution board management data for each distribution board is generated when a branch circuit of the distribution board is newly installed or modified,
A shared calculation system characterized in that a distribution board management database is generated by acquiring the distribution board management data through a network .
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、
この測定された電力に応じた電力料金を演算する手段と、
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷の接続場所との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の接続場所が分担する電力料金を案分処理する電力料金算出手段とを備え、
各分電盤の分電盤管理データは、当該分電盤の分岐回路の新設または改修時に生成され、
この分電盤管理データをネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
Means for obtaining a measurement value of an integrating wattmeter for measuring the power supplied to the load through the distribution board;
Means for calculating a power charge according to the measured power;
For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the connection location of the load connected to each of the branch circuits is used. Power charge calculation means for appropriately processing the power charge shared by the connection place of each load supplied with power through the circuit ,
Distribution board management data for each distribution board is generated when a branch circuit of the distribution board is newly installed or modified,
A shared calculation system characterized in that a distribution board management database is generated by acquiring the distribution board management data through a network .
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷を利用する利用先との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の利用先の推定電力使用量を案分処理する電力使用量算出手段とを備え、
各分電盤の分電盤管理データは、当該分電盤の分岐回路の新設または改修時に生成され、
この分電盤管理データをネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
Means for obtaining a measurement value of an integrating wattmeter for measuring the power supplied to the load through the distribution board;
For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the user using the load connected to each branch circuit, Power usage calculation means for appropriately processing the estimated power usage of each load to be supplied with power through each branch circuit ,
Distribution board management data for each distribution board is generated when a branch circuit of the distribution board is newly installed or modified,
A shared calculation system characterized in that a distribution board management database is generated by acquiring the distribution board management data through a network .
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得する手段と、
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷の接続場所との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の接続場所の推定電力使用量を案分処理する電力使用量算出手段とを備え、
各分電盤の分電盤管理データは、当該分電盤の分岐回路の新設または改修時に生成され、
この分電盤管理データをネットワークを通じて取得して、分電盤管理データベースが生成されることを特徴とする分担計算システム。
Means for obtaining a measurement value of an integrating wattmeter for measuring the power supplied to the load through the distribution board;
For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the connection location of the load connected to each of the branch circuits is used. Power usage calculating means for appropriately processing the estimated power usage at the connection location of each load supplied with power through the circuit ,
Distribution board management data for each distribution board is generated when a branch circuit of the distribution board is newly installed or modified,
A shared calculation system characterized in that a distribution board management database is generated by acquiring the distribution board management data through a network .
請求項1乃至4のいずれかに記載の分担計算システムにおいて、
各分電盤の分電盤管理データは、それぞれ各分電盤付属の記憶装置に保持されることを特徴とする分担計算システム。
In the shared calculation system in any one of Claims 1 thru | or 4 ,
A shared calculation system characterized in that distribution board management data of each distribution board is held in a storage device attached to each distribution board.
請求項1乃至4のいずれかに記載の分担計算システムにおいて、
分電盤管理データは、データベースプログラムで読み取り可能な定型書式データからなることを特徴とする分担計算システム。
In the shared calculation system in any one of Claims 1 thru | or 4 ,
Distribution board management data consists of fixed format data that can be read by a database program.
請求項1乃至4のいずれかに記載の分担計算システムにおいて、
案分処理により求められた利用先の推定電力使用量もしくは電力料金を、ネットワークを通じて閲覧可能に保持する手段を備えたことを特徴とする分担計算システム。
In the shared calculation system in any one of Claims 1 thru | or 4 ,
A shared calculation system comprising means for holding an estimated power usage amount or a power charge of a usage destination obtained by prorated processing so as to be browseable through a network.
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得し、Acquire the measured value of the integrating wattmeter that measures the power supplied to the load through the distribution board,
この測定された電力に応じた電力料金を演算し、Calculate the electricity charge according to this measured power,
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷を利用する利用先との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の利用先が分担する電力料金を案分処理し、For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the user using the load connected to each branch circuit, Properly process the electricity charges shared by the users of each load supplied with power through each branch circuit,
各分電盤の分電盤管理データを当該分電盤の分岐回路の新設または改修時に生成させ、Generate distribution board management data for each distribution board at the time of new installation or refurbishment of the branch circuit of the distribution board,
この分電盤管理データをネットワークを通じて取得し、Obtain this distribution board management data through the network,
前記ネットワークを通じて取得された前記分電盤管理データから分電盤管理データベースを生成する分担計算方法。A shared calculation method for generating a distribution board management database from the distribution board management data acquired through the network.
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得し、Acquire the measured value of the integrating wattmeter that measures the power supplied to the load through the distribution board,
この測定された電力に応じた電力料金を演算し、Calculate the electricity charge according to this measured power,
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷の接続場所との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の接続場所が分担する電力料金を案分処理し、For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the connection location of the load connected to each of the branch circuits is used. Properly process the electricity charge shared by the connection place of each load supplied with power through the circuit,
各分電盤の分電盤管理データを当該分電盤の分岐回路の新設または改修時に生成させ、Generate distribution board management data for each distribution board at the time of new installation or refurbishment of the branch circuit of the distribution board,
この分電盤管理データをネットワークを通じて取得し、Obtain this distribution board management data through the network,
前記ネットワークを通じて取得された前記分電盤管理データから分電盤管理データベースを生成する分担計算方法。A shared calculation method for generating a distribution board management database from the distribution board management data acquired through the network.
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得し、Acquire the measured value of the integrating wattmeter that measures the power supplied to the load through the distribution board,
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷を利用する利用先との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の利用先の推定電力使用量を案分処理し、For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the user using the load connected to each branch circuit, Properly process the estimated power usage of each load that is supplied through each branch circuit,
各分電盤の分電盤管理データを当該分電盤の分岐回路の新設または改修時に生成させ、Generate distribution board management data for each distribution board at the time of new installation or refurbishment of the branch circuit of the distribution board,
この分電盤管理データをネットワークを通じて取得し、Obtain this distribution board management data through the network,
前記ネットワークを通じて取得された前記分電盤管理データから分電盤管理データベースを生成する分担計算方法。A shared calculation method for generating a distribution board management database from the distribution board management data acquired through the network.
分電盤を通じて負荷に供給される電力を測定する積算電力計の測定値を取得し、Acquire the measured value of the integrating wattmeter that measures the power supplied to the load through the distribution board,
管理対象とされる全ての分電盤について、その内部の分岐回路の定格と前記各分岐回路に接続される負荷の接続場所との関係を示す分電盤管理データを使用して、前記各分岐回路を通じて電力を供給される各負荷の接続場所の推定電力使用量を案分処理し、For all distribution boards to be managed, the distribution board management data indicating the relationship between the rating of the internal branch circuit and the connection location of the load connected to each of the branch circuits is used. Properly process the estimated power usage at the connection location of each load supplied with power through the circuit,
各分電盤の分電盤管理データを当該分電盤の分岐回路の新設または改修時に生成させ、Generate distribution board management data for each distribution board at the time of new installation or refurbishment of the branch circuit of the distribution board,
この分電盤管理データをネットワークを通じて取得し、Obtain this distribution board management data through the network,
前記ネットワークを通じて取得された前記分電盤管理データから分電盤管理データベースを生成する分担計算方法。A shared calculation method for generating a distribution board management database from the distribution board management data acquired through the network.
請求項8乃至11のいずれかに記載の分担計算方法において、The sharing calculation method according to any one of claims 8 to 11,
各分電盤の分電盤管理データは、それぞれ各分電盤付属の記憶装置に保持されることを特徴とする分担計算方法。A sharing calculation method, wherein distribution board management data of each distribution board is held in a storage device attached to each distribution board.
請求項8乃至11のいずれかに記載の分担計算方法において、The sharing calculation method according to any one of claims 8 to 11,
分電盤管理データは、データベースプログラムで読み取り可能な定型書式データからなることを特徴とする分担計算方法。The distribution panel management data comprises fixed format data that can be read by a database program.
請求項8乃至11のいずれかに記載の分担計算方法において、The sharing calculation method according to any one of claims 8 to 11,
案分処理により求められた利用先の推定電力使用量もしくは電力料金を、ネットワークを通じて閲覧可能に保持することを特徴とする分担計算方法。A shared calculation method characterized in that the estimated power consumption or power charge of a usage destination obtained by proration processing is held so as to be browseable through a network.
JP2002146435A 2002-05-21 2002-05-21 Shared calculation system and shared calculation method Expired - Fee Related JP4314781B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002146435A JP4314781B2 (en) 2002-05-21 2002-05-21 Shared calculation system and shared calculation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002146435A JP4314781B2 (en) 2002-05-21 2002-05-21 Shared calculation system and shared calculation method

Publications (2)

Publication Number Publication Date
JP2003337147A JP2003337147A (en) 2003-11-28
JP4314781B2 true JP4314781B2 (en) 2009-08-19

Family

ID=29705422

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002146435A Expired - Fee Related JP4314781B2 (en) 2002-05-21 2002-05-21 Shared calculation system and shared calculation method

Country Status (1)

Country Link
JP (1) JP4314781B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011065424A (en) * 2009-09-17 2011-03-31 Fujitsu Ltd Electric power data management system
JP5878141B2 (en) * 2013-03-26 2016-03-08 エイシアパワー株式会社 Power charge calculation device and power charge calculation program
JP6023022B2 (en) * 2013-08-05 2016-11-09 日本電信電話株式会社 Power consumption calculation system and method
KR101510138B1 (en) * 2014-08-12 2015-04-09 (특수법인)한국전파진흥협회 Power Sharing System of Mobile Station

Also Published As

Publication number Publication date
JP2003337147A (en) 2003-11-28

Similar Documents

Publication Publication Date Title
US7069161B2 (en) System for managing resource infrastructure and resource consumption in real time
US20120078680A1 (en) Electrical Engineering And Capacity Management System And Method
JP4841657B2 (en) Device management system and device management method
CN107563740B (en) Electric power transaction electricity purchasing management platform system and meter data acquisition method
JP2003061263A (en) Predictive power rate computing server
JP5814956B2 (en) Gas management system
CN113570076B (en) An online operation and maintenance management platform for gate metering devices in unified power plants
JP2006185318A (en) Energy information management device
JP4314781B2 (en) Shared calculation system and shared calculation method
CN213211022U (en) Processing system of power grid data
WO2012040515A1 (en) Electrical engineering and capacity management system and method
Cochenour et al. Distribution network model readiness for advanced distribution management systems
JP2002092735A (en) Energy management system
JP6884115B2 (en) Electricity rate management device for power generation system
JP2002163261A (en) Distribution equipment database maintenance management device and maintenance management method
JP3859632B2 (en) Water supply system and water charge calculation program
KR102688717B1 (en) Apparatus and method for determining energy price for energy share trading system
Moseley et al. Lessons and experiences in the implementation of a consolidated transmission modeling data system at ERCOT
JP2007299180A (en) Consignment fee calculation device
CN106686107A (en) Monitoring method and device for automatic meter reading rate index based on metering automation system
Genjeyev et al. Energy Management Subsystem for Electricity Metering System
Gray et al. Exploiting granular electrical energy data and the challenges a utility company faces with an ageing asset base
Coetzee et al. Basic measurement and verification approach for roll-out programmes
CN117474395A (en) Monitoring methods and systems for measuring business indicators
CN114169743A (en) Calculation management method, device and system for underground comprehensive pipe gallery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050511

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20070402

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070813

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070821

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071018

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090428

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090511

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120529

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130529

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140529

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees