JP4283856B2 - リングギア用平線の製造方法 - Google Patents
リングギア用平線の製造方法 Download PDFInfo
- Publication number
- JP4283856B2 JP4283856B2 JP2007051758A JP2007051758A JP4283856B2 JP 4283856 B2 JP4283856 B2 JP 4283856B2 JP 2007051758 A JP2007051758 A JP 2007051758A JP 2007051758 A JP2007051758 A JP 2007051758A JP 4283856 B2 JP4283856 B2 JP 4283856B2
- Authority
- JP
- Japan
- Prior art keywords
- mass
- flat wire
- cold
- less
- working process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES, PROFILES OR LIKE SEMI-MANUFACTURED PRODUCTS OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C1/00—Manufacture of metal sheets, wire, rods, tubes or like semi-manufactured products by drawing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/16—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling wire rods, bars, merchant bars, rounds wire or material of like small cross-section
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Extraction Processes (AREA)
- Metal Rolling (AREA)
Description
た場合には、製品表面肌がとくに良好であった。しかし、No.4〜No.7、No.8〜No.11、No.12〜No.15のいずれの冷間加工工程の場合でも、総断面減少率が60%を超えると、製品
硬さとそのバラツキは許容値に収まらなくなる。なお、前記総断面減少率は、丸鋼素材の炭素含有量によって若干の差はあるものの、40%程度確保しておくことが望ましい(No.4、No.8、No.12)。これらの結果により、本発明の有効性が確認された。なお、平線の
製品形状を、片側または両側の側面にRが形成されたものとする必要がある場合には、幅方向の圧延を行なうロール3、3およびロール4c、4dのいずれか一方または両方に孔型ロールを用いることができる。
3:側方ロール 4a、4b:上下ロール 4c、4d:側方ロール
5:引抜きダイス
Claims (2)
- 炭素含有量が0.30〜0.60質量%の丸鋼素材から冷間加工工程によりリングギア用平線を製造する方法であって、前記冷間加工工程が少なくとも1回の、冷間圧延または冷間ローラ引抜きを行なった後、この冷間加工工程の最終段階で、穴ダイスにより平線の全周面の加工する仕上げ引抜きを行う工程を備え、かつ前記冷間圧延または冷間ローラ引抜きと仕上げ引抜きとの間に、平線の上下面および側面を少なくとも1回4方向から圧下し、前記冷間加工工程における総断面減少率を、上記炭素含有量に対応して、炭素含有量が0.30質量%〜0.40質量%未満の場合には65%以下に、0.40質量%〜0.50質量%未満の場合には60%以下に、0.50質量%〜0.60質量%の場合には55%以下としたことを特徴とするリングギア用平線の製造方法。
- 炭素含有量が0.30〜0.60質量%の丸鋼素材から冷間加工工程によりリングギア用平線を製造する方法であって、前記冷間加工工程が少なくとも1回の、冷間圧延または冷間ローラ引抜きを行なった素材を、該冷間加工工程の最終段階で、穴ダイスにより平線の全周面の加工する仕上げ引抜きを行う工程を備え、かつ前記冷間圧延または冷間ローラ引抜きを行なった素材を、仕上げ引抜き工程の前に、平線の上下面および側面を少なくとも1回4方向から圧下し、前記冷間加工工程における総断面減少率を、上記炭素含有量に対応して、炭素含有量が0.30質量%〜0.40質量%未満の場合には65%以下に、0.40質量%〜0.50質量%未満の場合には60%以下に、0.50質量%〜0.60質量%の場合には55%以下としたことを特徴とするリングギア用平線の製造方法。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007051758A JP4283856B2 (ja) | 2006-06-12 | 2007-03-01 | リングギア用平線の製造方法 |
| US11/755,520 US8448488B2 (en) | 2006-06-12 | 2007-05-30 | Flat wire manufacturing method of manufacturing flat wire for ring gear |
| KR1020070056638A KR100912152B1 (ko) | 2006-06-12 | 2007-06-11 | 링 기어용 평선의 제조 방법 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006162623 | 2006-06-12 | ||
| JP2007051758A JP4283856B2 (ja) | 2006-06-12 | 2007-03-01 | リングギア用平線の製造方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2008018468A JP2008018468A (ja) | 2008-01-31 |
| JP4283856B2 true JP4283856B2 (ja) | 2009-06-24 |
Family
ID=38860269
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2007051758A Active JP4283856B2 (ja) | 2006-06-12 | 2007-03-01 | リングギア用平線の製造方法 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US8448488B2 (ja) |
| JP (1) | JP4283856B2 (ja) |
| KR (1) | KR100912152B1 (ja) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102009039710B4 (de) * | 2009-08-28 | 2014-03-20 | V&M Deutschland Gmbh | Verfahren zur Herstellung warmgewalzter Hohlprofile mit kleinen Kantenradien, Hohlprofil und Verwendung des Hohlprofils |
| CN103406377A (zh) * | 2013-08-23 | 2013-11-27 | 江苏句容联合铜材有限公司 | 一种铜扁线生产方法 |
| CN105383227B (zh) * | 2015-12-01 | 2018-05-25 | 江苏兴达钢帘线股份有限公司 | 子午线轮胎用矩形断面钢丝及其制作钢丝圈的方法 |
| JP2017196628A (ja) * | 2016-04-25 | 2017-11-02 | 住友電工スチールワイヤー株式会社 | 異形金属線の製造方法 |
| CN108097738A (zh) * | 2017-12-12 | 2018-06-01 | 无锡广兴东茂科技有限公司 | 一种汽车发动机齿圈用型钢的生产工艺 |
| KR102022088B1 (ko) * | 2018-02-20 | 2019-09-18 | 주식회사 삼원강재 | 강선의 제조 방법 및 장치 |
| CN118321340B (zh) * | 2024-06-07 | 2024-08-27 | 中北大学 | 一种异型金属丝的加工方法 |
| CN118950728A (zh) * | 2024-08-30 | 2024-11-15 | 湖州长城异形线材有限公司 | 铜扁线拉拔工艺及装置 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH072242B2 (ja) | 1987-07-22 | 1995-01-18 | 金井 宏之 | うず巻ばね用平線の製造方法 |
| JP2932943B2 (ja) * | 1993-11-04 | 1999-08-09 | 株式会社神戸製鋼所 | 高耐食性高強度ばね用鋼材 |
| JP3173756B2 (ja) * | 1994-07-28 | 2001-06-04 | 株式会社東郷製作所 | コイルばねの製造方法 |
| JPWO2003008121A1 (ja) * | 2001-07-17 | 2004-11-04 | 株式会社ハルナ | 冷間圧延構成体及び冷間圧延方法 |
| KR100469671B1 (ko) * | 2002-07-11 | 2005-02-02 | 삼화강봉주식회사 | 냉간압조 특성이 우수한 소입소려 열처리강선 |
| EP1674588B1 (en) * | 2004-12-22 | 2010-02-10 | Kabushiki Kaisha Kobe Seiko Sho | High carbon steel wire material having excellent wire drawability and manufacturing process thereof |
-
2007
- 2007-03-01 JP JP2007051758A patent/JP4283856B2/ja active Active
- 2007-05-30 US US11/755,520 patent/US8448488B2/en not_active Expired - Fee Related
- 2007-06-11 KR KR1020070056638A patent/KR100912152B1/ko not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2008018468A (ja) | 2008-01-31 |
| US20070289350A1 (en) | 2007-12-20 |
| KR20070118544A (ko) | 2007-12-17 |
| KR100912152B1 (ko) | 2009-08-14 |
| US8448488B2 (en) | 2013-05-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4283856B2 (ja) | リングギア用平線の製造方法 | |
| EP2394752B1 (en) | Titanium material for hot rolling and manufacturing method thereof | |
| CN100581716C (zh) | 制造环形齿轮用扁钢丝的扁钢丝制造方法 | |
| CN111957752A (zh) | 消除热轧低碳软钢表面的亮带及附加浪形缺陷的生产方法 | |
| CN114888076A (zh) | 一种单面双槽弹簧扁钢的轧制方法 | |
| JP4543980B2 (ja) | 内質特性に極めて優れた極厚鋼板の製造方法 | |
| CN113543901B (zh) | 无缝方形钢管的制造方法 | |
| CN116673337B (zh) | 一种不锈钢复合螺纹钢筋的精轧孔型系统以及轧制方法和不锈钢复合螺纹钢筋 | |
| JP6540631B2 (ja) | 冷間タンデム圧延機及び冷延鋼板の製造方法 | |
| CN111479638A (zh) | H型钢的制造方法 | |
| JP4284918B2 (ja) | 引き抜き加工用母材の製造方法 | |
| JP7295397B2 (ja) | 形鋼の製造方法 | |
| CN103831303B (zh) | 减少宽厚板表面麻坑的方法 | |
| JP4456599B2 (ja) | 平鋼の製造方法 | |
| JP4130924B2 (ja) | 条材の熱間圧延方法 | |
| JP2970504B2 (ja) | 外法一定平行フランジ溝形鋼の圧延方法 | |
| CN112605132B (zh) | 控制不锈钢带钢边直裂的轧制方法 | |
| JP5884162B2 (ja) | T形鋼の製造方法 | |
| EP3593915A1 (en) | H-section steel manufacturing method | |
| CN114951276B (zh) | 一种消除棒材表面褶皱的方法 | |
| JP4649987B2 (ja) | 表面性状に優れた酸洗鋼板の製造方法 | |
| JPH10156408A (ja) | 熱間圧延用スラブの幅圧下プレス用金型及び幅圧下方法 | |
| CN119702688A (zh) | 一种适用于控制奥氏体冷轧不锈钢表面的生产工艺 | |
| CN119566074A (zh) | 一种高速线材轧机设定新规格辊缝方法及应用 | |
| JPS586704A (ja) | 極厚鋼材用鋼塊の分塊圧延方法およびその装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080724 |
|
| A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20080724 |
|
| A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20080818 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20081201 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081216 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090216 |
|
| TRDD | Decision of grant or rejection written | ||
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20090217 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090317 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090319 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4283856 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120327 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120327 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130327 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140327 Year of fee payment: 5 |