JP4079365B2 - Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence - Google Patents
Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence Download PDFInfo
- Publication number
- JP4079365B2 JP4079365B2 JP2003150478A JP2003150478A JP4079365B2 JP 4079365 B2 JP4079365 B2 JP 4079365B2 JP 2003150478 A JP2003150478 A JP 2003150478A JP 2003150478 A JP2003150478 A JP 2003150478A JP 4079365 B2 JP4079365 B2 JP 4079365B2
- Authority
- JP
- Japan
- Prior art keywords
- fence
- suspension fence
- prevention suspension
- avalanche
- existing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 title claims description 141
- 230000002265 prevention Effects 0.000 title claims description 120
- 238000000034 method Methods 0.000 title claims description 10
- 230000003449 preventive effect Effects 0.000 claims description 33
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は一般に、雪崩予防吊り柵および雪崩予防吊り柵の嵩上げ方法に関する。より詳細には、本発明は、設計積雪深さの見直し等により既設予防吊り柵の高さが不足するようになった場合であっても、既設予防吊り柵を取り換えずに既設予防吊り柵の高さを嵩上げするための雪崩予防吊り柵、及び雪崩予防吊り柵の嵩上げ方法に関する。
【0002】
【従来の技術】
積雪地においては、冬期間に雪崩が発生するおそれがある。したがって、道路脇の斜面に雪崩予防吊り柵を設置して、雪崩から道路を防護している。雪崩予防吊り柵は、一般的には、図8に示されるように、道路脇の斜面に鋼製の柵を配置し、斜面上方からワイヤで吊るすことによって固定されている。このような雪崩予防吊り柵の高さは、設置個所における設計積雪深さに応じて設定されている。
【0003】
【発明が解決しようとする課題】
しかしながら、設計積雪深さの見直し等により既設予防吊り柵の高さが不足するようになると、当該既設予防吊り柵では雪崩に対して効果的に対処することができないため、既設予防吊り柵を取り換えなければならないという課題があった。
【0004】
したがって、本発明は、設計積雪深さの見直し等により既設予防吊り柵の高さが不足するようになった場合であっても、既設の雪崩予防吊り柵を取り換えることなく、予防吊り柵の高さを嵩上げするための雪崩予防吊り柵および雪崩予防吊り柵の嵩上げ方法を提供することを目的としている。
【0005】
【課題を解決するための手段】
本願請求項1に記載の1スパン用の雪崩予防吊り柵は、互いに平行に配置された2本の柱部材と、前記柱部材の下端を基点として高さHの個所から前記柱部材の上端まで所定間隔隔てて前記柱部材間に配置された複数本の水平部材と、前記柱部材の各々の下端に配置された回転支承部分と、雪崩予防吊り柵を既設予防吊り柵と一体化させるためのロープとを備え、前記柱部材の間隔が、雪崩予防吊り柵を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵の柱部材が既設予防吊り柵の柱部材の外側又は内側に位置するように選定されており、雪崩予防吊り柵の適所に一端を結び付けた前記ロープを、既設予防吊り柵の柱部材の上端に取り付けられたガイドローラに掛けて他端を引っ張ることにより、雪崩予防吊り柵を回転支承部分を中心として引き上げ、雪崩予防吊り柵を既設予防吊り柵と一体化させるように構成されていることを特徴とするものである。
【0006】
本願請求項2に記載の2スパン用の雪崩予防吊り柵は、互いに平行に配置された3本の柱部材と、前記柱部材の下端を基点として高さHの個所から前記柱部材の上端まで所定間隔隔てて前記柱部材間に配置された複数本の水平部材と、前記柱部材の各々の下端に配置された回転支承部分と、雪崩予防吊り柵を既設予防吊り柵と一体化させるためのロープとを備え、前記柱部材の間隔が、雪崩予防吊り柵を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵の左右の柱部材が既設予防吊り柵の左右の柱部材の外側又は内側に位置し、雪崩予防吊り柵の中央の柱部材が既設予防吊り柵の中央の柱部材の左側又は右側に位置するように選定されており、雪崩予防吊り柵の適所に一端を結び付けた前記ロープを、既設予防吊り柵の柱部材の上端に取り付けられたガイドローラに掛けて他端を引っ張ることにより、雪崩予防吊り柵を回転支承部分を中心として引き上げ、雪崩予防吊り柵を既設予防吊り柵と一体化させるように構成されていることを特徴とするものである。
【0008】
本願請求項3に記載の既設予防吊り柵の高さを嵩上げするための方法は、前記請求項1又は2に記載の雪崩予防吊り柵を準備する段階と、前記雪崩予防吊り柵の各柱部材の下端に設けられた前記回転支承部分の内壁面を前記既設予防吊り柵の最下段の水平部材に引っ掛ける段階と、前記雪崩予防吊り柵の適所に一端が結び付けられたロープを、前記既設予防吊り柵の柱部材と前記雪崩予防吊り柵の柱部材が側面から見て一致するまで、前記既設予防吊り柵の柱部材の上端に取付けられたガイドローラに掛けて引っ張る段階と、前記雪崩予防吊り柵にブレースを取付けるとともに、前記既設予防吊り柵の水平部材と前記雪崩予防吊り柵の柱部材とをUボルトで連結する段階とを含むことを特徴とするものである。
【0009】
【発明の実施の形態】
次に図面を参照して、本発明の好ましい実施の形態に係る雪崩予防吊り柵について詳細に説明する。図1は本発明の第1の実施の形態に係る雪崩予防吊り柵の正面図、図2は側面図である。
【0010】
図1及び図2において全体として参照符号10で示される本発明の第1の実施の形態に係る雪崩予防吊り柵は、互いに平行に配置された2本の柱部材12と、柱部材12の下端を基点として高さHの個所から柱部材12の上端まで所定間隔隔てて柱部材12間に配置された複数本の水平部材14とを備えている。水平部材14は好ましくは、円形鋼管で形成されている。なお、柱部材12間の内幅Wは、後述する既設予防吊り柵の柱部材間の外幅W0 よりも広くなるように選定されており、高さHは、既設予防吊り柵の全体高さとほぼ等しい高さとなるように選定されている。ここで、外幅とは、左側の柱部材12の外縁と右側の柱部材12の外縁との間の距離のことを意味し、内幅とは、左側の柱部材12の内縁と右側の柱部材12の内縁との間の距離のことを意味する(図5(d)参照)。
【0011】
各柱部材12の下端には、内壁面16aが円弧状になった回転支承部分16が設けられている。なお、内壁面16aの径は、後述する既設予防吊り柵の水平部材(図3において破線で図示)を構成する円形鋼管の外径とほぼ等しくなるように選定されている。
【0012】
次に、図5を参照して、以上のように構成された本発明の第1の実施の形態に係る雪崩予防吊り柵10を用いて、既設の雪崩予防吊り柵を嵩上げする方法について説明する。
【0013】
まず、嵩上げしようとする既設予防吊り柵の柱部材の上端に、図4に示されるようなガイドローラ20を取付ける。次いで、図5(a)に示されるように、既設予防吊り柵が設置されている個所の下方の斜面に、雪崩予防吊り柵10を置き、雪崩予防吊り柵10の各柱部材12の下端に設けられた回転支承部分16の内壁面16aを既設予防吊り柵の最下段の水平部材に引っ掛ける。
【0014】
次いで、ロープの一端を雪崩予防吊り柵10の適所に結び付けた後、ロープをガイドローラ20に掛けて、ロープの他端を人力又は(ウィンチ等の)機械力で引っ張る。すると、雪崩予防吊り柵10は、回転支承部分16を中心として回転して引き上げられ(図5(b)参照)、ついには既設予防吊り柵の柱部材と雪崩予防吊り柵10の柱部材10が側面から見て一致するようになる(図5(c)参照)。
【0015】
最後に、図5(d)に示されるように、既設予防吊り柵の水平部材と雪崩予防吊り柵10の柱部材12とをUボルト等で連結することによって、既設予防吊り柵と雪崩予防吊り柵10とを強固に一体化させるとともに、雪崩予防吊り柵10にブレースを取付け、更にワイヤで斜面に固定する。
【0016】
図6は、本発明の第2の実施の形態に係る雪崩予防吊り柵を示した正面図である。図6において全体として参照符号20で示される本発明の第2の実施の形態に係る雪崩予防吊り柵は、柱部材が3本ある2スパンの既設予防吊り柵の嵩上げに用いられる点を除いて、第1の実施の形態に係る雪崩予防吊り柵10と実質的に同一の構成を有している。
【0017】
すなわち、雪崩予防吊り柵20は、互いに平行に配置された3本の柱部材22と、柱部材22の下端を基点として高さHの個所から柱部材22の上端まで所定間隔隔てて各柱部材22間に配置された複数本の水平部材24とを備え、各柱部材22の下端には、内壁面が円弧状になった回転支承部分26が設けられている。左側の柱部材22の内縁と中央の柱部材22の左縁との間の距離W1 は、既設予防吊り柵の左側の柱部材と中央の柱部材の間の外幅W1 ′よりも広くなるように選定されており、中央の柱部材22の右縁と右側の柱部材22の内縁との間の距離W2 は、既設予防吊り柵の中央の柱部材と右側の柱部材の間の内幅W2 ′よりも広くなるように選定されている(図7参照)。これにより、雪崩予防吊り柵20を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵20の左右の柱部材22が既設予防吊り柵の左右の柱部材の外側に位置し、雪崩予防吊り柵20の中央の柱部材22が既設予防吊り柵の中央の柱部材の左側又は右側に位置することになる。
【0018】
本発明は、以上の発明の実施の形態に限定されることなく、特許請求の範囲に記載された発明の範囲内で、種々の変更が可能であり、それらも本発明の範囲内に包含されるものであることはいうまでもない。
【0019】
なお、前記第1の実施の形態では、雪崩予防吊り柵10を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵10の柱部材12が既設予防吊り柵の柱部材の外側に位置するように、柱部材12の間隔が選定されているが、既設予防吊り柵の柱部材の内側に位置するように、柱部材12の間隔を選定してもよい。
【0020】
また、前記第2の実施の形態でも、雪崩予防吊り柵20を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵20の左右の柱部材22が既設予防吊り柵の左右の柱部材の外側に位置するように、左右の柱部材22の間隔が選定されているが、既設予防吊り柵の左右の柱部材の内側に位置するように、左右の柱部材22の間隔を選定してもよい。
【0021】
【発明の効果】
本発明により、設計積雪深さの見直し等により既設予防吊り柵の高さが不足するようになった場合であっても、既設予防吊り柵を取り換えることなく、予防吊り柵の高さを容易に嵩上げすることができるので、工事コスト及び労力の低減を図ることが可能となる。
【図面の簡単な説明】
【図1】 本発明の第1の実施の形態に係る雪崩予防吊り柵を示した正面図である。
【図2】 図1の雪崩予防吊り柵の側面図である。
【図3】 図1の雪崩予防吊り柵の柱部材の下端に取付けられる回転支承部分を示した図である。
【図4】 (a)は既設予防吊り柵の柱部材の上端に取付けられるガイドローラを示した図、(b)は(a)の線4b−4bに沿った側面図である。
【図5】 図1の雪崩予防吊り柵を用いて、既設の雪崩予防吊り柵を嵩上げする方法の手順を示した一連の図である。
【図6】 本発明の第2の実施の形態に係る雪崩予防吊り柵を示した正面図である。
【図7】 図6の雪崩予防吊り柵を用いて、既設の雪崩予防吊り柵を嵩上げする状態を示した図である。
【図8】 従来の雪崩予防吊り柵を示した図である。
【符号の説明】
10、20 雪崩予防吊り柵
12、22 柱部材
14、24 水平部材
16、26 回転支承部分
20 ガイドローラ[0001]
BACKGROUND OF THE INVENTION
The present invention generally relates to an avalanche prevention suspension fence and a method for raising an avalanche prevention suspension fence. More specifically, the present invention relates to the construction of the existing preventive suspension fence without replacing the existing preventive suspension fence even when the height of the existing preventive suspension fence becomes insufficient due to a review of the design snow depth, etc. The present invention relates to an avalanche prevention suspension fence for raising the height and a method for raising an avalanche prevention suspension fence.
[0002]
[Prior art]
In snowy areas, avalanches may occur during the winter. Therefore, an avalanche prevention suspension fence is installed on the slope beside the road to protect the road from the avalanche. As shown in FIG. 8, the avalanche prevention suspension fence is generally fixed by placing a steel fence on a slope beside a road and suspending it with a wire from above the slope. The height of such an avalanche prevention suspension fence is set according to the designed snow depth at the installation location.
[0003]
[Problems to be solved by the invention]
However, if the height of the existing preventive suspension fence becomes insufficient due to revision of the design snow depth, etc., the existing preventive suspension fence cannot effectively cope with avalanches, so the existing preventive suspension fence is replaced. There was a problem that had to be done.
[0004]
Therefore, even if the height of the existing preventive suspension fence becomes insufficient due to a review of the design snow depth, the present invention increases the height of the preventive suspension fence without replacing the existing avalanche prevention suspension fence. An object of the present invention is to provide an avalanche prevention suspension fence for raising the height and a method for raising an avalanche prevention suspension fence.
[0005]
[Means for Solving the Problems]
The 1-span avalanche prevention suspended fence according to claim 1 of the present invention is composed of two pillar members arranged in parallel to each other, and a position of height H from the lower end of the pillar member as a base point to the upper end of the pillar member. For integrating a plurality of horizontal members disposed between the pillar members at a predetermined interval, a rotating support portion disposed at a lower end of each of the pillar members, and an avalanche prevention suspension fence with an existing prevention suspension fence. The avalanche prevention suspension fence is located outside or inside the pillar member of the existing prevention suspension fence when the avalanche prevention suspension fence is integrated with the existing prevention suspension fence. The avalanche prevention suspension fence is hung on the guide roller attached to the upper end of the pillar member of the existing prevention suspension fence, and the other end is pulled. Rotating the fence around the center Pulling Te, and is characterized in that it is configured to avalanche prevention hanging fences so as to be integrated with existing prevention hanging fence.
[0006]
The two-span avalanche prevention suspended fence according to
[0008]
The method for raising the height of the existing preventive suspension fence according to claim 3 of the present application includes the steps of preparing the avalanche prevention suspension fence according to
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Next, an avalanche prevention suspension fence according to a preferred embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a front view of an avalanche prevention suspension fence according to the first embodiment of the present invention, and FIG. 2 is a side view thereof.
[0010]
1 and 2, the avalanche prevention suspension fence according to the first embodiment of the present invention generally indicated by
[0011]
At the lower end of each
[0012]
Next, a method of raising an existing avalanche prevention suspension fence using the avalanche
[0013]
First, the
[0014]
Next, after one end of the rope is tied to an appropriate position of the avalanche
[0015]
Finally, as shown in FIG. 5 (d), the existing preventive suspension fence and the avalanche prevention suspension are connected by connecting the horizontal member of the existing prevention suspension fence and the
[0016]
FIG. 6: is the front view which showed the avalanche prevention suspension fence which concerns on the 2nd Embodiment of this invention. The avalanche prevention suspension fence according to the second embodiment of the present invention indicated by
[0017]
That is, the avalanche
[0018]
The present invention is not limited to the above-described embodiments, and various modifications can be made within the scope of the invention described in the claims, and these are also included in the scope of the present invention. Needless to say, it is something.
[0019]
In the first embodiment, when the avalanche
[0020]
Also in the second embodiment, when the avalanche
[0021]
【The invention's effect】
According to the present invention, even if the height of the existing preventive suspension fence becomes insufficient due to a review of the design snow depth, etc., the height of the preventive suspension fence can be easily increased without replacing the existing preventive suspension fence. Since it can be raised, construction costs and labor can be reduced.
[Brief description of the drawings]
FIG. 1 is a front view showing an avalanche prevention suspension fence according to a first embodiment of the present invention.
FIG. 2 is a side view of the avalanche prevention suspension fence of FIG.
3 is a view showing a rotation support portion attached to a lower end of a pillar member of the avalanche prevention suspension fence of FIG. 1. FIG.
4A is a view showing a guide roller attached to the upper end of a pillar member of an existing preventive suspension fence, and FIG. 4B is a side view taken along
FIG. 5 is a series of diagrams showing a procedure of a method of raising an existing avalanche prevention suspension fence using the avalanche prevention suspension fence of FIG. 1;
FIG. 6 is a front view showing an avalanche prevention suspension fence according to a second embodiment of the present invention.
7 is a view showing a state in which an existing avalanche prevention suspension fence is raised using the avalanche prevention suspension fence of FIG. 6. FIG.
FIG. 8 is a view showing a conventional avalanche prevention suspension fence.
[Explanation of symbols]
10, 20 Avalanche
Claims (3)
互いに平行に配置された2本の柱部材と、
前記柱部材の下端を基点として高さHの個所から前記柱部材の上端まで所定間隔隔てて前記柱部材間に配置された複数本の水平部材と、
前記柱部材の各々の下端に配置された回転支承部分と、
雪崩予防吊り柵を既設予防吊り柵と一体化させるためのロープとを備え、
前記柱部材の間隔が、雪崩予防吊り柵を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵の柱部材が既設予防吊り柵の柱部材の外側又は内側に位置するように選定されており、
雪崩予防吊り柵の適所に一端を結び付けた前記ロープを、既設予防吊り柵の柱部材の上端に取り付けられたガイドローラに掛けて他端を引っ張ることにより、雪崩予防吊り柵を回転支承部分を中心として引き上げ、雪崩予防吊り柵を既設予防吊り柵と一体化させるように構成されていることを特徴とする雪崩予防吊り柵。An avalanche prevention suspended fence used for raising the height of an existing preventive suspension fence with a height of 1 span having a horizontal member made of a circular steel pipe,
Two column members arranged parallel to each other;
A plurality of horizontal members disposed between the column members at a predetermined interval from a position of height H from the lower end of the column member to the upper end of the column member;
A rotation support portion disposed at the lower end of each of the column members ;
A rope for integrating the avalanche prevention suspension fence with the existing prevention suspension fence ,
The interval between the pillar members is selected such that when the avalanche prevention suspension fence is integrated with the existing prevention suspension fence, the pillar member of the avalanche prevention suspension fence is located outside or inside the pillar member of the existing prevention suspension fence. And
The rope with one end tied to the appropriate position of the avalanche prevention suspension fence is hung on the guide roller attached to the upper end of the pillar member of the existing prevention suspension fence, and the other end is pulled, so that the avalanche prevention suspension fence is centered on the rotating support part. An avalanche prevention suspension fence characterized by being configured to pull up and integrate the avalanche prevention suspension fence with the existing prevention suspension fence.
互いに平行に配置された3本の柱部材と、
前記柱部材の下端を基点として高さHの個所から前記柱部材の上端まで所定間隔隔てて前記柱部材間に配置された複数本の水平部材と、
前記柱部材の各々の下端に配置された回転支承部分と、
雪崩予防吊り柵を既設予防吊り柵と一体化させるためのロープとを備え、
前記柱部材の間隔が、雪崩予防吊り柵を既設予防吊り柵と一体化させたとき、雪崩予防吊り柵の左右の柱部材が既設予防吊り柵の左右の柱部材の外側又は内側に位置し、雪崩予防吊り柵の中央の柱部材が既設予防吊り柵の中央の柱部材の左側又は右側に位置するように選定されており、
雪崩予防吊り柵の適所に一端を結び付けた前記ロープを、既設予防吊り柵の柱部材の上端に取り付けられたガイドローラに掛けて他端を引っ張ることにより、雪崩予防吊り柵を回転支承部分を中心として引き上げ、雪崩予防吊り柵を既設予防吊り柵と一体化させるように構成されていることを特徴とする雪崩予防吊り柵。An avalanche prevention suspended fence used for raising the height of an existing preventive suspension fence with a height of 2 span having a horizontal member made of a circular steel pipe,
Three column members arranged parallel to each other;
A plurality of horizontal members disposed between the column members at a predetermined interval from a position of height H from the lower end of the column member to the upper end of the column member;
A rotation support portion disposed at the lower end of each of the column members ;
A rope for integrating the avalanche prevention suspension fence with the existing prevention suspension fence ,
When the avalanche prevention suspension fence is integrated with the existing prevention suspension fence, the left and right pillar members of the avalanche prevention suspension fence are located outside or inside the left and right pillar members of the existing prevention suspension fence. The central pillar member of the avalanche prevention suspension fence is selected to be located on the left or right side of the central pillar member of the existing prevention suspension fence,
The rope with one end tied to the appropriate position of the avalanche prevention suspension fence is hung on the guide roller attached to the upper end of the pillar member of the existing prevention suspension fence, and the other end is pulled, so that the avalanche prevention suspension fence is centered on the rotating support part. An avalanche prevention suspension fence characterized by being configured to pull up and integrate the avalanche prevention suspension fence with the existing prevention suspension fence.
前記請求項1又は2に記載の雪崩予防吊り柵を準備する段階と、
前記雪崩予防吊り柵の各柱部材の下端に設けられた前記回転支承部分の内壁面を前記既設予防吊り柵の最下段の水平部材に引っ掛ける段階と、
前記雪崩予防吊り柵の適所に一端が結び付けられたロープを、前記既設予防吊り柵の柱部材と前記雪崩予防吊り柵の柱部材が側面から見て一致するまで、前記既設予防吊り柵の柱部材の上端に取付けられたガイドローラに掛けて引っ張る段階と、
前記雪崩予防吊り柵にブレースを取付けるとともに、前記既設予防吊り柵の水平部材と前記雪崩予防吊り柵の柱部材とをUボルトで連結する段階と、
を含むことを特徴とする方法。A method for raising the height of an existing preventive suspension fence with a height H having a column member made of a circular steel pipe,
Preparing an avalanche preventing suspension fence according to claim 1 or 2,
Hooking the inner wall surface of the rotating support portion provided at the lower end of each pillar member of the avalanche prevention suspension fence to the horizontal member at the bottom of the existing prevention suspension fence;
A rope member having one end tied to a proper position of the avalanche prevention suspension fence until the pillar member of the existing prevention suspension fence and the pillar member of the avalanche prevention suspension fence coincide with each other when viewed from the side. And pulling on a guide roller attached to the upper end of the
Attaching a brace to the avalanche prevention suspension fence and connecting a horizontal member of the existing prevention avalanche fence and a pillar member of the avalanche prevention suspension fence with a U bolt;
A method comprising the steps of:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003150478A JP4079365B2 (en) | 2003-05-28 | 2003-05-28 | Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003150478A JP4079365B2 (en) | 2003-05-28 | 2003-05-28 | Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004353229A JP2004353229A (en) | 2004-12-16 |
| JP4079365B2 true JP4079365B2 (en) | 2008-04-23 |
Family
ID=34046264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003150478A Expired - Fee Related JP4079365B2 (en) | 2003-05-28 | 2003-05-28 | Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4079365B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4629806B1 (en) * | 2010-07-16 | 2011-02-09 | 有限会社吉田構造デザイン | Protective fence and its raising method |
| JP5525649B1 (en) * | 2013-11-28 | 2014-06-18 | 株式会社プロテックエンジニアリング | Avalanche prevention facility |
-
2003
- 2003-05-28 JP JP2003150478A patent/JP4079365B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004353229A (en) | 2004-12-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2236651C (en) | Railroad crossing signal foundation and spider and method of producing the same | |
| EP1158102A2 (en) | Roadside guard cable fence | |
| JPS63501229A (en) | Improved elastic guard fence structure | |
| JP5357844B2 (en) | Rock fall protection net structure | |
| JP2018204341A (en) | Erection and removal structure of continuous fence, and erection and removal method of continuous fence | |
| JP4079365B2 (en) | Avalanche prevention suspension fence and method of raising avalanche prevention suspension fence | |
| JP3753170B2 (en) | How to build structures useful as roads and construction scaffolds on slopes | |
| US7438243B1 (en) | Tie-down anchor for a self-propelled irrigation system | |
| JP5032255B2 (en) | Rockfall protection and avalanche prevention facility | |
| KR101212009B1 (en) | Lifting-Type Median Strip in Road for Quick Opening | |
| JP2004232366A (en) | Hanging scaffold | |
| US20050144888A1 (en) | Ground mounting fixture | |
| JP3069850B2 (en) | Tide gate with protective fence | |
| US10030351B2 (en) | Manhole frame with one or more handholds | |
| JPH0452255Y2 (en) | ||
| JPH073783A (en) | Expansion reinforcement for bottom-enlarged foundation | |
| AU734274B2 (en) | A support | |
| JP2001069861A (en) | Wind-breaking net device | |
| KR102807783B1 (en) | Lifting device for concrete piles | |
| JP3723541B2 (en) | How to prevent the collapse of Mt. Fuji | |
| KR102818144B1 (en) | Standing Device for Rainwater Drain Grating | |
| KR200234853Y1 (en) | roll type safety fence | |
| JP3704110B2 (en) | How to prevent the collapse of Mt. Fuji | |
| CN214530313U (en) | Foldable road signboard for highway | |
| JP3171689U (en) | Law shoulder protection plate of avalanche prevention fence |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060509 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070904 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071019 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080131 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080201 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110215 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |