[go: up one dir, main page]

JP2019108715A - Beam material of vehicle guard fence and beam material installation method - Google Patents

Beam material of vehicle guard fence and beam material installation method Download PDF

Info

Publication number
JP2019108715A
JP2019108715A JP2017241802A JP2017241802A JP2019108715A JP 2019108715 A JP2019108715 A JP 2019108715A JP 2017241802 A JP2017241802 A JP 2017241802A JP 2017241802 A JP2017241802 A JP 2017241802A JP 2019108715 A JP2019108715 A JP 2019108715A
Authority
JP
Japan
Prior art keywords
plate
bracket
opening
beam material
engaging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017241802A
Other languages
Japanese (ja)
Other versions
JP7023101B2 (en
Inventor
祥敬 嶋田
Yoshitaka Shimada
祥敬 嶋田
昌克 石川
Masakatsu Ishikawa
昌克 石川
智 吉田
Satoshi Yoshida
吉田  智
弘 松藤
Hiroshi Matsufuji
弘 松藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2017241802A priority Critical patent/JP7023101B2/en
Publication of JP2019108715A publication Critical patent/JP2019108715A/en
Application granted granted Critical
Publication of JP7023101B2 publication Critical patent/JP7023101B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

【課題】車両用防護柵設置の際の作業者の負担が軽減し、重機等を使用する場合には重機の使用時間を低減させることができる車両用防護柵のビーム材及びビーム材設置方法を提供する。【解決手段】本発明に係る車両用防護柵のビーム材は、板材により形成され、所定の間隔をおいて立設される支柱に取り付けられる、車両用防護柵のビーム材であって、板材は、当該板材を貫通する開口部と、開口部の当該板材の長手方向の一端部から支柱側に突出する係合爪と、を備える。係合爪の先端部の幅寸法は、根元部の幅寸法に対し長く形成され、開口部の板材の長手方向に垂直方向の幅寸法は、係合爪の先端部の幅寸法よりも長い。【選択図】図1PROBLEM TO BE SOLVED: To provide a beam material and a beam material installation method for a vehicle guard fence, which can reduce the burden on a worker when installing a vehicle guard fence and reduce the usage time of the heavy machine when using a heavy machine or the like. offer. SOLUTION: The beam material of a vehicle guard rail according to the present invention is a beam material of a vehicle guard fence formed of a plate material and attached to columns erected at predetermined intervals, and the plate material is The plate is provided with an opening that penetrates the plate and an engaging claw that protrudes from one end of the opening in the longitudinal direction toward the support column. The width dimension of the tip portion of the engaging claw is formed longer than the width dimension of the root portion, and the width dimension in the direction perpendicular to the longitudinal direction of the plate material of the opening is longer than the width dimension of the tip portion of the engaging claw. [Selection diagram] Fig. 1

Description

本発明は、車両用防護柵のビーム材に関し、特にビーム材の構造及びそのビーム材の設置方法に関する。   The present invention relates to a beam material of a protective fence for a vehicle, and more particularly to a structure of the beam material and a method of installing the beam material.

一般道路や高速道路に設けられる車両用防護柵として、ガードレールが設置されている。これらの車両用防護柵は、進行方向を誤った車両が路外に逸脱するのを防ぐとともに、路肩側の歩道を通行する歩行者等を保護する。特許文献1に開示されているように、車両用防護柵として、所定の間隔に立設された支柱に金属製の板材を波状に成形したビーム材を固定したものが用いられている。   Guard rails are installed as protective fences for vehicles provided on general roads and expressways. These vehicle protective fences prevent a vehicle whose direction of travel is wrong from deviating out of the road, and protect pedestrians and the like who pass along the sidewalk on the shoulder side. As disclosed in Patent Document 1, as a vehicle protection fence, one in which a beam material obtained by forming a plate material made of metal into a wave shape is fixed to a support erected at a predetermined interval.

特開2007−211448号公報Unexamined-Japanese-Patent No. 2007-211448

特許文献1に開示されている車両用防護柵は、金属製の板材を波状に成形したビーム材を使用している。ビーム材は、立設された複数の支柱に取り付けられたブラケットに取り付けられるが、取り付ける際に吊り帯又は作業者の手などにより支持され、ブラケットに設けられた孔とビーム材に設けられた孔とを合わせながら取り付けられる。近年、作業者は高齢化が進んでおり、車両用防護柵においても作業負荷の少ないものが望まれている。特許文献1に開示されている車両用防護柵は、ビーム材の重量が重く、設置する作業者に負担がかかるという課題があった。また、吊り帯などにより支持される場合は、重機などを用いてビーム材を支持しながらビーム材をブラケットに固定する必要がある。そのため、1つのビーム材を固定する際の、重機を使用する時間が長くなり、作業の効率が下がるという課題があった。   The vehicle protective fence disclosed in Patent Document 1 uses a beam material in which a metal plate material is formed in a wave shape. Although the beam material is attached to a bracket attached to a plurality of erected columns, it is supported by a suspension band or a worker's hand at the time of attachment, and holes provided in the bracket and holes provided in the beam material It is attached while aligning with. In recent years, workers are aging and it is desired that the protective fences for vehicles have a small workload. In the protective fence for a vehicle disclosed in Patent Document 1, there is a problem that the weight of the beam material is heavy and a burden is placed on an operator to be installed. In addition, when supported by a suspension band or the like, the beam material needs to be fixed to the bracket while supporting the beam material using a heavy machine or the like. Therefore, the time to use heavy machinery when fixing one beam material becomes long, and there existed a subject that the efficiency of operation fell.

本発明は、上記の課題を解決するものであり、車両用防護柵の設置において、ビーム材をブラケットに固定する際の作業負担を軽減し、作業効率を向上させる車両用防護柵のビーム材及びビーム材設置方法を提供することを目的とする。   The present invention solves the above-mentioned problems, and in the installation of a protective fence for a vehicle, a beam material of a protective fence for a vehicle which reduces the work load when fixing a beam material to a bracket and improves work efficiency It aims at providing a beam material installation method.

本発明に係る車両用防護柵のビーム材は、板材により形成され、所定の間隔をおいて立設される支柱に取り付けられる、車両用防護柵のビーム材であって、前記板材は、当該板材を貫通する開口部と、該開口部の当該板材の長手方向の一端部から前記支柱側に突出する係合爪と、を備え、前記係合爪の先端部の幅寸法は、根元部の幅寸法に対し長く形成され、前記開口部の前記板材の長手方向に垂直方向の幅寸法は、前記係合爪の前記先端部の幅寸法よりも長い。   The beam material of the protective fence for a vehicle according to the present invention is a beam material of a protective fence for a vehicle, which is formed of a plate material and attached to a column erected at a predetermined distance, and the plate material is the plate material And an engaging claw which protrudes toward the support from the one end of the plate in the longitudinal direction of the opening, and the width dimension of the tip of the engaging claw is the width of the root The width of the opening in the direction perpendicular to the longitudinal direction of the plate is longer than the width of the tip of the engaging claw.

本発明に係る車両用防護柵のビーム材設置方法は、支柱に取り付けられたブラケットの端部に設けられた切り欠きに、板材から突出した係合爪を挿入する係合工程と、前記板材を前記ブラケットに締結部材により固定する固定工程と、を備える。   In the method of installing a beam material of a protective fence for a vehicle according to the present invention, an engaging step of inserting an engaging claw projecting from a plate material into a notch provided at an end of a bracket attached to a support; And a fixing step of fixing to the bracket by a fastening member.

本発明に係る車両用防護柵のビーム材設置方法は、第1支柱に取り付けられた第1ブラケットの端部に設けられた第1切り欠き及び第2支柱に取り付けられた第2ブラケットの端部に設けられた第2切り欠きのうち少なくとも一方に第1板材を係合させる第1板材係合工程と、締結部材により前記第1ブラケットに前記第1板材を固定する第1板材固定工程と、を備える。   The beam material installation method for a vehicle protection fence according to the present invention includes the first notch provided at the end of the first bracket attached to the first support and the end of the second bracket attached to the second support. A first plate engaging step in which the first plate is engaged with at least one of the second notches provided in the second plate, and a first plate fixing step in which the first plate is fixed to the first bracket by a fastening member; Equipped with

上記の構成により、車両用防護柵のビーム材及びビーム材設置方法は、車両用防護柵にビーム材を固定する際に仮止めができる係合爪と開口部とを備えるため、車両用防護柵設置の際の作業者の負担が軽減し、重機等を使用する場合には重機の使用時間を低減させることができるため、作業効率を向上させることができる。   According to the above configuration, the beam material and the beam material installation method of the vehicle protection fence are provided with the engagement claw and the opening portion that can be temporarily fixed when fixing the beam material to the vehicle protection fence. Since the burden on the operator at the time of installation is reduced and the usage time of the heavy machine can be reduced when using the heavy machine etc., the working efficiency can be improved.

本発明の実施の形態1に係る車両用防護柵の正面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a front view of the protective fence for vehicles which concerns on Embodiment 1 of this invention. 図1のブラケットの構造を説明する正面図及び天面図である。It is the front view and top view explaining the structure of the bracket of FIG. 図1のビーム材とブラケットとの固定部分の断面を示す図である。It is a figure which shows the cross section of the fixing | fixed part of the beam material of FIG. 1, and a bracket. 図1のビーム材の断面図である。It is sectional drawing of the beam material of FIG. 図1のビーム材の長手方向に垂直な方向の断面を示す図である。It is a figure which shows the cross section of the direction perpendicular | vertical to the longitudinal direction of the beam material of FIG. 図1の車両用防護柵のビーム材の設置前の状態を示す図である。It is a figure which shows the state before installation of the beam material of the guard fence for vehicles of FIG. 図1の車両用防護柵のビーム材の設置中の図である。It is a figure in installation of the beam material of the guard fence for vehicles of FIG. 図7のブラケット周辺の拡大図である。It is an enlarged view of the bracket periphery of FIG. 図1の車両用防護柵のビーム材の設置中の図である。It is a figure in installation of the beam material of the guard fence for vehicles of FIG. 図9の係合部の拡大図である。It is an enlarged view of the engaging part of FIG.

実施の形態1.
図1は、本発明の実施の形態1に係る車両用防護柵100の正面図である。図1は、車両が通行する道路側から見た図である。車両用防護柵100は、道路の路肩に設置されている。車両用防護柵100は、道路を通行する車両が進行方向を誤った場合に、道路外、すなわち対向車線又は歩道等に逸脱するのを防ぐ。また、歩行者等が道路外の歩道等から道路内にみだりに出てくるのを抑制する。
Embodiment 1
FIG. 1 is a front view of a vehicle protection fence 100 according to a first embodiment of the present invention. FIG. 1 is a view from the side of a road through which a vehicle passes. The vehicle protection fence 100 is installed on the road shoulder of the road. The vehicle protection fence 100 prevents the vehicle traveling on the road from deviating off the road, that is, to an opposite lane, a sidewalk, or the like when the traveling direction is incorrect. In addition, we control that pedestrians come out to the road from sidewalks out of the road alone.

車両用防護柵100は、地面に立設された支柱20と、支柱20に固定されたビーム材10とから構成される。支柱20は、地面に所定の間隔を持って立設されている。支柱20には、ビーム材10のブラケット30が固定されている。ビーム材10は、金属製の板材を成形してつくられるものである。1つのビーム材10は、少なくとも2本の支柱20に固定される。ただし、1つのビーム材10は、更に多くの支柱20に固定されていてもよい。実施の形態1においては、図1に示される様に、ビーム材10Aの一方の端部がブラケット30Aに、他方の端部はブラケット30Bに固定されている。ブラケット30Aは、支柱20Aに、ブラケット30Bは支柱20Bに固定されている。ビーム材10Bは、一方の端部が、ビーム材10Aが取り付けられたブラケット30Bに、ビーム材10Aの上から重ねられて固定されている。ビーム材10Bの他方の端部は、ブラケット30Cに固定されている。ブラケット30Cは、支柱20Cに固定されている。   The vehicle protection fence 100 is composed of a support 20 erected on the ground and a beam 10 fixed to the support 20. The columns 20 are erected on the ground with a predetermined distance. The bracket 30 of the beam material 10 is fixed to the support 20. The beam material 10 is formed by molding a metal plate. One beam 10 is fixed to at least two columns 20. However, one beam material 10 may be fixed to more columns 20. In the first embodiment, as shown in FIG. 1, one end of the beam material 10A is fixed to the bracket 30A and the other end is fixed to the bracket 30B. The bracket 30A is fixed to the support 20A, and the bracket 30B is fixed to the support 20B. One end of the beam material 10B is fixed to a bracket 30B on which the beam material 10A is attached from the top of the beam material 10A. The other end of the beam member 10B is fixed to the bracket 30C. The bracket 30C is fixed to the support 20C.

(ブラケット30)
車両用防護柵100は、道路に沿って複数枚のビーム材10を接続させて構成される。互いに隣合ったビーム材10Aとビーム材10Bとは、長手方向の端部同士を重ね合わせて、支柱20Bに取り付けられたブラケット30Bに固定されている。図1においては、2つのビーム材10Aとビーム材10Bとが3本の支柱20A〜20Cに接続されているが、車両用防護柵100は、更に多くのビーム材10を接続して構成されていてもよい。なお、ビーム材10A、10Bをまとめてビーム材10と呼ぶ場合がある。また、支柱20A、20B、20Cをまとめて支柱20、支柱20に設けられたブラケット30A、30B、30Cをまとめてブラケット30と呼ぶ場合がある。
(Bracket 30)
The vehicle protection fence 100 is configured by connecting a plurality of beam members 10 along a road. The beam members 10A and the beam members 10B adjacent to each other are fixed to a bracket 30B attached to a support 20B by overlapping end portions in the longitudinal direction. In FIG. 1, two beam members 10A and 10B are connected to three columns 20A to 20C, but the vehicle protection fence 100 is configured by connecting more beam members 10 May be The beam members 10A and 10B may be collectively referred to as a beam member 10. In addition, the columns 20A, 20B, and 20C may be collectively referred to as the column 20, and the brackets 30A, 30B, and 30C provided on the column 20 may be collectively referred to as the bracket 30.

図2は、図1のブラケット30の構造を説明する正面図及び天面図である。図3は、図1のビーム材10とブラケット30との固定部分の断面を示す図である。図2(a)は、ブラケット30の天面図、すなわち図1の上方から見た状態の図であり、図2(b)は、ブラケット30の正面図、すなわち図1の正面から見た状態の図である。ビーム材10は、ブラケット30を介して支柱20に固定されるものである。ビーム材10の端部には、固定用ボルト31が挿通できる固定用ボルト孔11が設けられている。ブラケット30は、中央部に支柱20に固定される支柱固定部33を有し、支柱固定部33を挟んでビーム材固定部34を有する。2つのビーム材固定部34は、支柱固定部33に対しビーム材10側に突出しており、略同一面を形成するように平行に配置されている。ビーム材固定部34は、固定用ボルト31が挿通できる固定用ボルト挿通孔35を有する。ビーム材10は、固定用ボルト孔11に固定用ボルト31が挿通され、固定用ボルト31と固定用ナット32とを締結することによりブラケット30に固定される。ブラケット30は、ブラケット固定用ボルト孔38にブラケット固定ボルト21を通し、ブラケット固定ボルト21とブラケット固定ナット22とを締結することにより、支柱固定部33が支柱20に固定される。支柱固定部33は、支柱20の形状に沿った形状であるため、ブラケット固定ボルト21及びブラケット固定ナット22により安定して支柱20に固定される。   FIG. 2 is a front view and a top view illustrating the structure of the bracket 30 of FIG. FIG. 3 is a view showing a cross section of a fixing portion of the beam material 10 and the bracket 30 of FIG. 2 (a) is a top view of the bracket 30, ie, a view from the upper side of FIG. 1, and FIG. 2 (b) is a front view of the bracket 30, ie, a view from the front of FIG. Of the The beam 10 is fixed to the support 20 via the bracket 30. At the end of the beam member 10, a fixing bolt hole 11 through which the fixing bolt 31 can be inserted is provided. The bracket 30 has a support fixing portion 33 fixed to the support 20 at a central portion, and has a beam material fixing portion 34 with the support fixing portion 33 interposed therebetween. The two beam material fixing portions 34 project toward the beam material 10 with respect to the column fixing portion 33, and are arranged in parallel so as to form substantially the same plane. The beam material fixing portion 34 has a fixing bolt insertion hole 35 through which the fixing bolt 31 can be inserted. The beam member 10 is fixed to the bracket 30 by inserting the fixing bolt 31 into the fixing bolt hole 11 and fastening the fixing bolt 31 and the fixing nut 32. The bracket fixing bolt 21 is passed through the bracket fixing bolt hole 38 and the bracket fixing bolt 21 and the bracket fixing nut 22 are fastened to fix the column fixing portion 33 to the column 20. The support fixing portion 33 has a shape that conforms to the shape of the support 20, and is thus stably fixed to the support 20 by the bracket fixing bolt 21 and the bracket fixing nut 22.

ブラケット30は、ビーム材固定部34に切り欠きを備える。ビーム材固定部34の端部37は、中央に切り欠き36が形成されており、端部37から矩形に凹みが切り込まれている。切り欠き36のビーム材10の長手方向に垂直な方向の幅は、後述する係合爪50の根元部52の幅寸法wよりも大きく形成されている。   The bracket 30 has a notch in the beam material fixing portion 34. A notch 36 is formed at the center of the end 37 of the beam fixing portion 34, and a recess is cut into the rectangle from the end 37. The width of the notch 36 in the direction perpendicular to the longitudinal direction of the beam material 10 is formed larger than the width dimension w of the root portion 52 of the engaging claw 50 described later.

(ビーム材10の固定用ボルト孔11)
図1において、ビーム材10Aの固定用ボルト孔11a、11bは、ブラケット30Aのビーム材固定部34にそれぞれ設けられた固定用ボルト挿通孔35に対応するように、間隔が設定されている。ビーム材10Aは、一方の端部に対しビーム材10Aの長手方向の他方の端部にも固定用ボルト孔11c、11dが設けられており、ブラケット30Bのビーム材固定部34にそれぞれ設けられた固定用ボルト挿通孔35に対応するように、間隔が設定されている。なお、ビーム材10には、さらに多くの固定用ボルト孔11が設けられていても良い。
(Bolt hole 11 for fixing beam 10)
In FIG. 1, the fixing bolt holes 11a and 11b of the beam 10A are set at intervals so as to correspond to the fixing bolt insertion holes 35 provided in the beam material fixing portion 34 of the bracket 30A. The beam material 10A has fixing bolt holes 11c and 11d at one end and the other end of the beam material 10A in the longitudinal direction, and is provided at the beam material fixing portion 34 of the bracket 30B. An interval is set to correspond to the fixing bolt insertion hole 35. The beam material 10 may be provided with more fixing bolt holes 11.

ビーム材10は、長手方向に垂直な方向の断面が波形になっている。言い換えると、凹凸形状が形成されている。ビーム材10は、長手方向に垂直な断面において2つの山部と、2つの山部の間に谷部が形成されている。固定用ボルト孔11は、谷部の底部16に設けられている(後述の図5参照)。固定用ボルト孔11が、谷部の底部16に設置されていることにより、支柱20からビーム材10の距離であるブロックアウト量を大きくとることができる。   The beam material 10 has a corrugated cross section in the direction perpendicular to the longitudinal direction. In other words, the uneven shape is formed. The beam material 10 has a valley formed between two peaks and two peaks in a cross section perpendicular to the longitudinal direction. The fixing bolt holes 11 are provided in the bottom portion 16 of the valley (see FIG. 5 described later). Since the fixing bolt holes 11 are installed in the bottom portion 16 of the valley, the block-out amount, which is the distance from the support 20 to the beam material 10, can be increased.

(ビーム材10の接続用ボルト孔12)
図1に示される様に、ビーム材10Bは、一方の端部において、隣合うビーム材10Aと接続されている。ビーム材10Aとビーム材10Bとは、長手方向に垂直な断面形状が同一に形成されているため、凹凸形状を合わせて重ねられている。ビーム材10Aとビーム材10Bとは、長手方向に垂直な断面において、2つの山部の頂部に接続用ボルト孔12が設けられており、それぞれに設けられた接続用ボルト孔12の位置が合うように重ねられている。ビーム材10Aとビーム材10Bとの接続用ボルト孔12には、接続用ボルト60が挿通される。挿通された接続用ボルト60に接続用ナット61が締結され、ビーム材10Aとビーム材10Bとは、重ねられている部分が離れないように結合されている。実施の形態1においては、ビーム材10Aとビーム材10Bとは、ビーム材10Bが道路側に位置する様に重ねられており、4箇所の接続用ボルト孔12において接続用ボルト60が締結されている。
(Bolt hole 12 for connecting beam 10)
As shown in FIG. 1, the beam material 10B is connected to the adjacent beam material 10A at one end. Since the beam members 10A and 10B have the same cross-sectional shape in the direction perpendicular to the longitudinal direction, they are overlapped with each other. In the beam member 10A and the beam member 10B, in the cross section perpendicular to the longitudinal direction, the connecting bolt holes 12 are provided at the tops of the two peak parts, and the positions of the connecting bolt holes 12 provided in each are aligned. It is piled up like that. The connection bolt 60 is inserted into the connection bolt hole 12 between the beam material 10A and the beam material 10B. The connection nut 61 is fastened to the inserted connection bolt 60, and the beam 10A and the beam 10B are coupled such that the overlapping portions are not separated. In the first embodiment, the beam material 10A and the beam material 10B are stacked such that the beam material 10B is located on the road side, and the connection bolts 60 are fastened in the four connection bolt holes 12 There is.

接続用ボルト孔12は、ビーム材10の長手方向に複数設けられており、ビーム材10の両端部の凹凸形状の山部の頂部に2箇所ずつ設けられている。つまり、ビーム材10の1つあたりに接続用ボルト孔12が8つ設けられている。実施の形態1においては、接続用ボルト孔12a、12bにおいて接続用ボルト60が挿通されている。ビーム材10Bに隣合っているビーム材10Aも同様に形成されている。   A plurality of connecting bolt holes 12 are provided in the longitudinal direction of the beam member 10, and two connection bolt holes 12 are provided at the tops of the ridges of the uneven shape at both ends of the beam member 10. That is, eight connection bolt holes 12 are provided per one of the beam members 10. In the first embodiment, the connection bolt 60 is inserted through the connection bolt holes 12a and 12b. The beam material 10A adjacent to the beam material 10B is similarly formed.

(ビーム材10の開口部40及び係合爪50)
図4は、図1のビーム材10の断面図である。図5は、図1のビーム材10の長手方向に垂直な方向の断面を示す図である。ビーム材10は、固定用ボルト孔11が設けられている谷部の底部16に開口部40と係合爪50とを備える。また、ビーム材10は、接続用ボルト孔12が設けられている山部の頂部18に開口部40と係合爪50とを備える。図4においては、谷部の底部16に設けられた開口部40及び係合爪50の構造を示している。開口部40と係合爪50とを合わせて係合部90と呼ぶ。開口部40は、板材から成形されるビーム材10を貫通する孔である。ビーム材10の長手方向において、周縁41の一端部42には、係合爪50が接続している。係合爪50は、周縁41の一端部42から周縁41の他端部43に向かって形成されており、ビーム材10の裏面側に突出している。すなわち、係合爪50は、ビーム材10から支柱20及びブラケット30が位置する側に向かって突出している。また、図4(b)に示されている様に、開口部40が設けられている面の法線方向から見た時に、係合爪50は周縁41の内側に収まって見えるように形成されている。つまり、開口部40が設けられている面の法線方向から係合爪50を開口部40が設けられている面に投影すると、その投影された係合爪50は、周縁41の内部に収まる。
(The opening 40 of the beam 10 and the engagement claw 50)
FIG. 4 is a cross-sectional view of the beam 10 of FIG. FIG. 5 is a view showing a cross section in a direction perpendicular to the longitudinal direction of the beam material 10 of FIG. The beam member 10 is provided with an opening 40 and an engaging claw 50 at the bottom 16 of the valley where the fixing bolt hole 11 is provided. Further, the beam member 10 is provided with an opening 40 and an engaging claw 50 at the top 18 of the peak portion where the connecting bolt hole 12 is provided. In FIG. 4, the structure of the opening 40 and the engagement claw 50 provided in the bottom 16 of the valley is shown. The opening 40 and the engagement claw 50 are collectively referred to as an engagement portion 90. The opening 40 is a hole that penetrates the beam material 10 formed of a plate material. An engaging claw 50 is connected to one end 42 of the peripheral edge 41 in the longitudinal direction of the beam member 10. The engagement claw 50 is formed from one end 42 of the peripheral edge 41 toward the other end 43 of the peripheral edge 41 and protrudes toward the back surface of the beam material 10. That is, the engagement claws 50 project from the beam 10 toward the side where the support 20 and the bracket 30 are located. Further, as shown in FIG. 4B, when viewed in the normal direction of the surface on which the opening 40 is provided, the engaging claw 50 is formed so as to be contained inside the peripheral edge 41 and be viewed. ing. That is, when the engaging claw 50 is projected on the surface on which the opening 40 is provided from the normal direction of the surface on which the opening 40 is provided, the projected engaging claw 50 fits inside the peripheral edge 41. .

係合爪50が接続されている周縁41の一端部42と対向している他端部43は、ビーム材10の長手方向に向かって幅が狭まるように形成されている。つまり、周縁41のビーム材10の長手方向に沿った辺45から開口部40の中央部に向かって斜辺46が伸びている。他端部43の中央部は、平坦部44になっており、平坦部44はビーム材10の長手方向と垂直な方向に伸びる。なお、平坦部44の幅寸法hは、係合爪50の根元部52の幅寸法w以下になるように設定されるのが望ましい。   The other end 43 opposite to the one end 42 of the peripheral edge 41 to which the engagement claw 50 is connected is formed so as to narrow in width in the longitudinal direction of the beam material 10. That is, the oblique side 46 extends from the side 45 along the longitudinal direction of the beam material 10 of the peripheral edge 41 toward the central portion of the opening 40. The central portion of the other end portion 43 is a flat portion 44, and the flat portion 44 extends in a direction perpendicular to the longitudinal direction of the beam material 10. The width dimension h of the flat portion 44 is desirably set to be equal to or less than the width dimension w of the root portion 52 of the engagement claw 50.

係合爪50は、開口部40の一端部42から根元部52が伸び、根元部52の先端に根元部52に対して幅広に形成されている先端部51が形成されている。つまり、先端部51は、ビーム材10の長手方向に垂直な方向に張り出している。また、先端部51の先端側、つまり開口部40の他端部43側に位置する側の縁部53は、開口部40の周縁の他端部43と相似形状に形成されている。係合爪50は、ビーム材10を構成する板材に係合爪50の外形及び開口部40の周縁41の形状に切り込みを入れて、折り曲げることにより形成することができる。こうすることにより、開口部40を極力小さく形成しながら係合爪50を大きくすることができる。よって、開口部40をビーム材10の外観上に極力目立たないように配置することができる。   The engagement claw 50 has a root 52 extending from one end 42 of the opening 40, and a tip 51 formed wide at the tip of the root 52 with respect to the root 52 is formed. That is, the tip 51 protrudes in the direction perpendicular to the longitudinal direction of the beam material 10. The edge 53 of the tip end of the tip 51, that is, the edge 53 located on the other end 43 side of the opening 40 is formed in a similar shape to the other end 43 of the peripheral edge of the opening 40. The engagement claws 50 can be formed by cutting the plate material of the beam member 10 into the outer shape of the engagement claws 50 and the shape of the peripheral edge 41 of the opening 40 and bending the same. By doing this, the engaging claw 50 can be enlarged while the opening 40 is formed as small as possible. Therefore, the opening 40 can be arranged as inconspicuous as possible on the appearance of the beam material 10.

ビーム材10は、長手方向に垂直方向な断面において、板材を波形に形成したものである。ビーム材10Aは、係合部90を6箇所備えている。係合部90は、支柱20Aに取り付けられる側のビーム材10Aの端部に3箇所形成されている。支柱20Aに取り付けられる側のビーム材10Aの端部においては、ビーム材10の波形の凹凸形状の2つの山部に係合部90c、90dが、1つの谷部に90aが形成されている。ビーム材10Aの山部の頂部18に設けられた係合部90c、90dは、支柱20Aに取り付けられる側のビーム材10Aの端部の山部の頂部18に2箇所ずつ設けられた接続用ボルト孔12a、12bの間に位置するように設けられている。ビーム材10Aの谷部の底部16に設けられた係合部90aは、支柱20Aに取り付けられる側のビーム材10Aの端部に設けられた2箇所の固定用ボルト孔11a、11bよりも端に位置している。ビーム材10Aの谷部の底部16に設けられた2箇所の固定用ボルト孔11a、11bがブラケット30Aの2箇所の固定用ボルト挿通孔35に重なる様に位置した時に、係合部90aの係合爪50は、ブラケット30Aの端部の切り欠き36に挿入されるように位置する。   The beam material 10 is formed by forming a plate material in a corrugated shape in a cross section perpendicular to the longitudinal direction. Beam material 10A is provided with six engaging parts 90. The engaging portions 90 are formed at three positions at the end of the beam 10A on the side attached to the support 20A. At the end of the beam member 10A attached to the support column 20A, engaging portions 90c and 90d are formed in two peak portions of the corrugated shape of the beam member 10, and 90a is formed in one valley. The engaging portions 90c and 90d provided at the top 18 of the peak of the beam 10A are connection bolts provided at two points at the top 18 of the peak of the end of the beam 10A attached to the support column 20A. It is provided so as to be located between the holes 12a and 12b. The engaging portion 90a provided at the bottom portion 16 of the valley portion of the beam 10A is located at the end of the two fixing bolt holes 11a and 11b provided at the end of the beam 10A on the side attached to the column 20A. positioned. When the two fixing bolt holes 11a and 11b provided at the bottom portion 16 of the valley portion of the beam member 10A are positioned to overlap the two fixing bolt insertion holes 35 of the bracket 30A, engagement of the engaging portion 90a The joint claw 50 is positioned to be inserted into the notch 36 at the end of the bracket 30A.

ビーム材10Aの係合部90は、支柱20Bに取り付けられる側のビーム材10Aの端部に3箇所形成されている。支柱20Bに取り付けられる側のビーム材10Aの端部においては、ビーム材10Aの波形の凹凸形状の2つの山部に係合部90e、90fが、1つの谷部に係合部90bが形成されている。ビーム材10Aの山部の頂部18に設けられた係合部90e、90fは、支柱20Aに取り付けられる側のビーム材10Aの端部に2箇所設けられた接続用ボルト孔12c、12dの間に位置するように設けられている。ビーム材10Aの谷部の底部16に設けられた係合部90bは、支柱20Aに取り付けられる側のビーム材10Aの端部に設けられた2箇所の固定用ボルト孔11c、11dよりもビーム材10Aの長手方向の中央側に位置している。ビーム材10Aの谷部の底部16に設けられた2箇所の固定用ボルト孔11c、11dがブラケット30Bの2箇所の固定用ボルト挿通孔35に重なる様に位置した時に、係合部90bの係合爪50は、根元部52がブラケット30Bの端部の切り欠き36に挿入されるように位置する。なお、ビーム材10に設けられた係合部90は、全て同じ形状で同じ方向を向けて設置されている。   Three engaging portions 90 of the beam 10A are formed at the end of the beam 10A on the side to be attached to the support 20B. At the end of the beam member 10A on the side attached to the support column 20B, engaging portions 90e and 90f are formed in two peak portions of the corrugated shape of the beam member 10A, and an engaging portion 90b is formed in one valley portion. ing. The engaging portions 90e and 90f provided at the top 18 of the peak of the beam 10A are provided between the connecting bolt holes 12c and 12d provided at two ends of the beam 10A on the side attached to the support 20A. It is provided to be located. The engagement portion 90b provided at the bottom portion 16 of the valley portion of the beam 10A is more beam material than the two fixing bolt holes 11c and 11d provided at the end of the beam 10A on the side attached to the support 20A. It is located on the center side in the longitudinal direction of 10A. When the two fixing bolt holes 11c and 11d provided at the bottom portion 16 of the valley portion of the beam 10A are positioned to overlap the two fixing bolt insertion holes 35 of the bracket 30B, engagement of the engaging portion 90b The joint claw 50 is positioned such that the root 52 is inserted into the notch 36 at the end of the bracket 30B. In addition, the engaging part 90 provided in the beam material 10 is installed with the same shape and the same direction.

図1に示される様に、ビーム材10Bは、係合部90を5箇所備えている。係合部90は、支柱20Bに取り付けられる側のビーム材10Bの端部に2箇所形成されている。支柱20Bに取り付けられる側のビーム材10Bの端部においては、ビーム材10の波形の凹凸形状の2つの山部の頂部18のそれぞれに、係合部90c、90dが形成されている。ビーム材10Bの山部の頂部18に設けられた係合部90c、90dは、支柱20Bに取り付けられる側のビーム材10Bの端部の山部の頂部18に2箇所ずつ設けられた接続用ボルト孔12a、12bの間に位置するように設けられている。   As shown in FIG. 1, the beam material 10 </ b> B includes five engaging portions 90. The engaging portions 90 are formed at two ends of the end of the beam member 10B on the side to be attached to the support 20B. At the end of the beam 10B attached to the support 20B, engaging portions 90c and 90d are formed on the tops 18 of the two peaks of the corrugated shape of the beam 10, respectively. The engaging portions 90c and 90d provided at the top 18 of the peak of the beam 10B are connection bolts provided at two points at the top 18 of the peak of the end of the beam 10B on the side attached to the column 20B. It is provided so as to be located between the holes 12a and 12b.

支柱20Bに取り付けられたビーム材10Aの端部と支柱20Bに取り付けられるビーム材10Bの端部とを重ねて、それぞれの接続用ボルト孔12の位置を合わせると、ビーム材10Aの係合部90eとビーム材10Bの係合部90cとが、またビーム材10Aの係合部90fとビーム材10Bの係合部90dとが、重なる様になっている。この状態において、ビーム材10B側の係合部90c、90dの係合爪50は、ビーム材10A側の係合部90e、90fの開口部40に挿入されている。そして、ビーム材10Bの係合部90c、90dの係合爪50は、ビーム材10Aの係合部90e、90fの係合爪50よりも支柱10C寄りに位置している。そのため、幅広に形成されている係合爪50の先端部51は、ビーム材10B側の開口部40の他端部43に形成された斜辺46に引っ掛かるようになっている。これにより、ビーム材10Aに重ねられたビーム材10Bは、ビーム材10Aから離れる方向に移動するのが抑制される。   When the end of the beam 10A attached to the support 20B and the end of the beam 10B attached to the support 20B are overlapped and the positions of the connecting bolt holes 12 are aligned, the engaging portion 90e of the beam 10A is engaged. And the engaging portion 90c of the beam member 10B, and the engaging portion 90f of the beam member 10A and the engaging portion 90d of the beam member 10B overlap each other. In this state, the engaging claws 50 of the engaging portions 90c and 90d on the beam material 10B side are inserted into the openings 40 of the engaging portions 90e and 90f on the beam material 10A side. The engaging claws 50 of the engaging portions 90c and 90d of the beam 10B are positioned closer to the support 10C than the engaging claws 50 of the engaging portions 90e and 90f of the beam 10A. Therefore, the distal end 51 of the engaging claw 50 formed wide is hooked on the oblique side 46 formed at the other end 43 of the opening 40 on the beam material 10B side. Thus, the beam material 10B superimposed on the beam material 10A is suppressed from moving away from the beam material 10A.

支柱20Cに取り付けられる側のビーム材10Bの端部には、ビーム材10Bの波形の凹凸形状の2つの山部の頂部18と1つの谷部の底部16とのそれぞれに、係合部90が1箇所ずつ形成されている。谷部の底部16に設けられた係合部90bは、支柱20Cに取り付けられる側のビーム材10Bの端部に設けられた2箇所の固定用ボルト孔11よりもビーム材10Bの長手方向の中央側に位置している。ビーム材10Bの谷部の底部16に設けられた2箇所の固定用ボルト孔11がブラケット30Cの2箇所の固定用ボルト挿通孔35に重なる様に位置した時に、係合部90bの係合爪50は、根元部52がブラケット30Bの端部の切り欠き36に挿入されるように位置する。   At the end of the beam member 10B on the side attached to the support column 20C, engaging portions 90 are respectively provided on the top 18 of the two ridges and the bottom 16 of one valley of the corrugated shape of the beam 10B. It is formed one by one. The engaging portion 90b provided at the bottom portion 16 of the valley is at the longitudinal center of the beam 10B than the two fixing bolt holes 11 provided at the end of the beam 10B on the side attached to the column 20C. Located on the side. When the two fixing bolt holes 11 provided at the bottom portion 16 of the valley portion of the beam member 10B are positioned to overlap the two fixing bolt insertion holes 35 of the bracket 30C, the engaging claws of the engaging portion 90b 50 are positioned so that the root 52 is inserted into the notch 36 at the end of the bracket 30B.

(ビーム材10設置方法)
図6は、図1の車両用防護柵100のビーム材10の設置前の状態を示す図である。
図6に示される様に、まず支柱20を所定の間隔に立設する。支柱20同士の間隔は、ビーム材10の使用に応じ適宜設定することができる。支柱20にはそれぞれビーム材10を固定するためのブラケット30が取り付けられている。
(Beam material 10 installation method)
FIG. 6 is a view showing the state of the beam guard 10 of the vehicle protection fence 100 of FIG. 1 before installation.
As shown in FIG. 6, first, the columns 20 are erected at predetermined intervals. The distance between the columns 20 can be appropriately set according to the use of the beam material 10. Brackets 30 for fixing the beam members 10 are attached to the columns 20 respectively.

(ビーム材10Aの係合工程)
図7は、図1の車両用防護柵100のビーム材10Aの設置中の図である。図7に示される様に、まず、支柱20A及び支柱20Bの間に渡すようにビーム材10Aを配置する。ビーム材10は、例えば吊り帯により支持されながら、ビーム材10Aの固定用ボルト孔11a、11bとブラケット30Aの固定用ボルト挿通孔35との位置が合うように配置される。このとき、ビーム材10Aの裏面、すなわち支柱20A側の面に突出している係合部90aの係合爪50は、ブラケット30Aの切り欠き36に挿入される。また、係合部90bの係合爪50は、ブラケット30Bの切り欠き36に挿入される。なお、固定用ボルト孔11a、11bは、本発明の「固定孔」に相当する。また、係合部90aの係合爪50は、本発明の「第1係合爪」に相当し、ブラケット30Aの切り欠き36は、本発明の「第1切り欠き」に相当する。
(The engagement process of beam material 10A)
FIG. 7 is a view during installation of the beam material 10A of the vehicle protection fence 100 of FIG. As shown in FIG. 7, first, the beam material 10A is disposed to pass between the support 20A and the support 20B. The beam material 10 is disposed so that the positions of the fixing bolt holes 11a and 11b of the beam material 10A and the fixing bolt insertion hole 35 of the bracket 30A are aligned while being supported by, for example, a suspension band. At this time, the engaging claws 50 of the engaging portion 90a protruding from the back surface of the beam member 10A, that is, the surface on the side of the column 20A, are inserted into the notch 36 of the bracket 30A. Further, the engaging claws 50 of the engaging portion 90b are inserted into the notches 36 of the bracket 30B. The fixing bolt holes 11a and 11b correspond to the "fixing holes" in the present invention. Further, the engagement claw 50 of the engagement portion 90a corresponds to the "first engagement claw" of the present invention, and the notch 36 of the bracket 30A corresponds to the "first notch" of the present invention.

図8は、図7のブラケット30A周辺の拡大図である。この状態において、係合部90aの係合爪50の根元部52は、切り欠き36の内側に挿入されている。係合爪50の先端部51は、ブラケット30Aの裏側、すなわち支柱20A側に位置する。係合爪50の先端部51の幅は、切り欠き36の幅よりも大きく形成されている。そのため、係合爪50の先端部51がブラケット30Aに引っ掛かり、ビーム材10Aが図7における手前側、つまりビーム材10Aがブラケット30Aから脱落するのを抑える。   FIG. 8 is an enlarged view of the vicinity of the bracket 30A of FIG. In this state, the root portion 52 of the engagement claw 50 of the engagement portion 90 a is inserted inside the notch 36. The tip end portion 51 of the engaging claw 50 is located on the back side of the bracket 30A, that is, on the side of the support 20A. The width of the distal end portion 51 of the engagement claw 50 is formed larger than the width of the notch 36. Therefore, the front end 51 of the engagement claw 50 is caught on the bracket 30A, and the beam 10A is prevented from coming off the near side in FIG. 7, that is, the beam 10A from the bracket 30A.

図7に示される様に、ビーム材10Aのブラケット30Bに取り付けられる側の端部において、ビーム材10Aは、ビーム材10Aの固定用ボルト孔11とブラケット30Bの固定用ボルト挿通孔35との位置が合うように配置される。支柱20B側の面に突出している係合部90bの係合爪50は、ブラケット30Bの切り欠き36に挿入される。係合部90bの係合爪50も、係合部90aと同様に、係合爪50の先端部51がブラケット30Bに引っ掛かり、ビーム材10Aがブラケット30Aから離れる側に移動するのを抑える。つまり、係合部90bとブラケット30Bの切り欠き36も、図8と同様な状態で係合している。   As shown in FIG. 7, at the end of the beam 10A attached to the bracket 30B, the beam 10A is located at the fixing bolt hole 11 of the beam 10A and the fixing bolt insertion hole 35 of the bracket 30B. Are arranged to fit. The engagement claws 50 of the engagement portion 90b protruding from the surface on the side of the column 20B are inserted into the notches 36 of the bracket 30B. Similarly to the engaging portion 90a, the engaging claw 50 of the engaging portion 90b prevents the distal end portion 51 of the engaging claw 50 from being caught by the bracket 30B and moving the beam 10A away from the bracket 30A. That is, the engaging portion 90b and the notch 36 of the bracket 30B are also engaged in the same state as in FIG.

上記のように、ビーム材10Aの係合部90a、90bのそれぞれの係合爪50をブラケット30A、30Bのそれぞれの切り欠き36に挿入し、係合させる工程を、「係合工程」と呼ぶ。又は、ビーム材10Aを「第1板材」としたときに、この「第1板材」を係合させる工程を「第1板材係合工程」と呼ぶ。なお、本発明において、ビーム材10Aは「第1板材」、ブラケット30Aは「第1ブラケット」、ブラケット30Bは「第2ブラケット」、ブラケット30Bの切り欠き36は「第2切り欠き」、支柱20Aは「第1支柱」、支柱20Bは「第2支柱」に相当するものである。   As described above, the process of inserting and engaging the engagement claws 50 of the engagement portions 90a and 90b of the beam 10A into the notches 36 of the brackets 30A and 30B is referred to as "engagement process". . Alternatively, when the beam material 10A is a "first plate material", a process of engaging the "first plate material" is referred to as a "first plate material engaging process". In the present invention, the beam material 10A is "first plate material", the bracket 30A is "first bracket", the bracket 30B is "second bracket", the notch 36 of the bracket 30B is "second notch", the support 20A Is the “first support”, and the support 20B is equivalent to the “second support”.

なお、ビーム材10Aの支柱20A側に配置されている係合部90aは、設けられていなくとも良い。ビーム材10Aが係合部90aを有していない場合、ブラケット30Aに係合させることができない。しかし、ブラケット30Bに係合部90bのみを係合させた状態で、ビーム材10Aの支柱20A側の端部を支持しながら固定用ボルト孔11a、11bに固定用ボルト31及び固定用ナット32を締結させることができる。そのため、ビーム材10Aを支柱20A、20Bに取り付けるための作業負担は、従来よりも低減させることができる。また、ビーム材10Aに係合部90aを設けないことにより、ビーム材10Bと形状が同一になるため、車両用防護柵100の全てのビーム材10を共通化できるという利点がある。   In addition, the engaging part 90a arrange | positioned at the support | pillar 20A side of 10 A of beam materials does not need to be provided. If the beam 10A does not have the engaging portion 90a, it can not be engaged with the bracket 30A. However, in a state where only the engaging portion 90b is engaged with the bracket 30B, the fixing bolt 31 and the fixing nut 32 are fixed to the fixing bolt holes 11a and 11b while supporting the end of the beam member 10A on the support 20A side. It can be concluded. Therefore, the work load for attaching the beam material 10A to the columns 20A and 20B can be reduced as compared with the conventional case. Further, by not providing the engaging portion 90a in the beam member 10A, the beam member 10B has the same shape as the beam member 10B, so that all the beam members 10 of the vehicle protection fence 100 can be made common.

(ビーム材10Aの固定工程)
図7に示される様に、ビーム材10Aは、ブラケット30A及びブラケット30Bに係合爪50が係合している。そのため、吊り帯を使って重機等でビーム材10Aを支持する必要がなく、ビーム材10Aをブラケット30A及びブラケット30Bに仮止めした状態にすることができる。この状態で、ビーム材10Aの固定用ボルト孔11a、11bとブラケット30Aの固定用ボルト挿通孔35とに固定用ボルト31を通して、固定用ナット32を締結することにより、ビーム材10Aをブラケット30Aに固定することができる。この工程を、「固定工程」と呼ぶ。又は、ビーム材10Aを「第1板材」としたときに、この「第1板材」を固定する工程を「第1板材固定工程」と呼ぶ。なお、固定用ボルト31及び固定用ナット32は、本発明の「締結部材」に相当する。
(Fixing process of beam material 10A)
As shown in FIG. 7, in the beam member 10A, the engagement claw 50 is engaged with the bracket 30A and the bracket 30B. Therefore, it is not necessary to support the beam material 10A with a heavy machine or the like using a suspension band, and the beam material 10A can be temporarily fixed to the bracket 30A and the bracket 30B. In this state, the fixing bolt 32 is passed through the fixing bolt 31 through the fixing bolt holes 11a and 11b of the beam material 10A and the fixing bolt insertion hole 35 of the bracket 30A, and the beam material 10A is fixed to the bracket 30A. It can be fixed. This process is called "fixing process". Alternatively, when the beam material 10A is a "first plate material", a process of fixing the "first plate material" is referred to as a "first plate material fixing process". The fixing bolt 31 and the fixing nut 32 correspond to the “fastening member” in the present invention.

(ビーム材10Bの係合工程)
図9は、図1の車両用防護柵100のビーム材10Bの設置中の図である。図9に示される様に、ビーム材10Bを支柱20Bと支柱20Cとの間に渡すように配置する。ビーム材10Bは、例えば吊り帯により支持されながら、ビーム材10Bの接続用ボルト孔12a、12bとビーム材10Aの接続用ボルト孔12c、12dとの位置が合うように配置される。このとき、ビーム材10Bの裏面、すなわち支柱20B側の面に突出している係合部90cの係合爪50は、ビーム材10Aの係合部90eの開口部40に挿入されている。また、ビーム材10Bの裏面に突出している係合部90dの係合爪50は、ビーム材10Aの係合部90fの開口部40に挿入されている。
(Beam material 10B engagement process)
FIG. 9 is a view during installation of the beam material 10B of the vehicle protection fence 100 of FIG. As shown in FIG. 9, the beam material 10B is disposed to be passed between the support 20B and the support 20C. The beam material 10B is arranged such that the connection bolt holes 12a and 12b of the beam material 10B and the connection bolt holes 12c and 12d of the beam material 10A are aligned while being supported by, for example, a suspension band. At this time, the engaging claws 50 of the engaging portion 90c projecting on the back surface of the beam 10B, that is, the surface on the side of the column 20B, are inserted into the opening 40 of the engaging portion 90e of the beam 10A. In addition, the engagement claws 50 of the engagement portion 90d protruding from the back surface of the beam member 10B are inserted into the opening 40 of the engagement portion 90f of the beam member 10A.

図10は、図9の係合部90c、90d、90e、90fの拡大図である。ビーム材10Bの接続用ボルト孔12a、12bとビーム材10Aの接続用ボルト孔12c、12dとの位置が合ったときに、ビーム材10Bの係合部90c、90dとビーム材10Aの係合部90e、90fとは、図10に示される様に係合している。つまり、ビーム材10Bの係合部90cの係合爪50は、ビーム材10Aの係合部90eの開口部40に挿入されている。そして、ビーム材10Bの係合部90cの係合爪50の根元部52は、ビーム材10Aの係合部90eの開口部40の他端部43の平坦部44に重なる様に位置している。従って、ビーム材10Bの係合部90cの係合爪50は、ビーム材10Aの係合部90eの開口部40の他端部43に引っ掛かる。また、ビーム材10Bの係合部90d及びビーム材10Aの係合部90eも同様である。そのため、ビーム材10Bは、ビーム材10Aと重ねられた状態でビーム材10Aから脱落しないように係合される。   FIG. 10 is an enlarged view of the engaging portions 90c, 90d, 90e, and 90f of FIG. When the connecting bolt holes 12a and 12b of the beam 10B are aligned with the connecting bolt holes 12c and 12d of the beam 10A, the engaging portions 90c and 90d of the beam 10B and the engaging portion of the beam 10A are aligned. 90e and 90f are engaged as shown in FIG. That is, the engagement claw 50 of the engagement portion 90c of the beam 10B is inserted into the opening 40 of the engagement portion 90e of the beam 10A. The root 52 of the engaging claw 50 of the engaging portion 90c of the beam 10B is positioned to overlap the flat portion 44 of the other end 43 of the opening 40 of the engaging portion 90e of the beam 10A. . Therefore, the engaging claw 50 of the engaging portion 90c of the beam 10B is caught on the other end 43 of the opening 40 of the engaging portion 90e of the beam 10A. The same applies to the engaging portion 90d of the beam 10B and the engaging portion 90e of the beam 10A. Therefore, the beam material 10B is engaged so as not to drop out of the beam material 10A in a state of being overlapped with the beam material 10A.

さらに、図9の支柱20Cと固定される側のビーム材10Bの端部においては、ビーム材10Bの係合部90bと、ブラケット30Cの切り欠き36とが図8と同様な状態で係合している。このように、ビーム材10Bは、支柱20B側の端部においてはビーム材10Aと係合し、支柱20C側の端部においてブラケット30Cと係合しており、ビーム材10A及びブラケット30Cから脱落しないように仮止めされる。上記のように、ビーム材10Bを、ビーム材10A及びブラケット30Cに係合させる工程を、「係合工程」と呼ぶ。又は、ビーム材10Bを「第2板材」としたときに、この「第2板材」を係合させる工程を「第2板材係合工程」と呼ぶ。なお、本発明において、ビーム材10Bは「第2板材」、ビーム材10Bの係合部90c、90dの係合爪50は「第2係合爪」、ブラケット30Cは「第3ブラケット」、ブラケット30Cの切り欠き36は「第3切り欠き」、支柱20Cは「第3支柱」に相当するものである。   Furthermore, at the end of the beam member 10B on the side fixed to the column 20C in FIG. 9, the engaging portion 90b of the beam member 10B and the notch 36 of the bracket 30C engage in the same state as FIG. ing. Thus, the beam member 10B engages with the beam member 10A at the end on the column 20B side, engages with the bracket 30C at the end on the column 20C side, and does not come off from the beam member 10A and the bracket 30C It is temporarily fixed. As described above, the process of engaging the beam material 10B with the beam material 10A and the bracket 30C is referred to as an "engagement process". Or when the beam material 10B is made into a "2nd board | plate material", the process which makes this "2nd board | plate material" engage is called a "2nd board | plate material engagement process." In the present invention, the beam member 10B is a "second plate material", the engaging claws 50 of the engaging portions 90c and 90d of the beam member 10B are a "second engaging claw", the bracket 30C is a "third bracket", a bracket The notch 36 of 30 C corresponds to the “third notch”, and the column 20 C corresponds to the “third column”.

(ビーム材10Bの固定工程)
図9に示される様に、ビーム材10Bは、ビーム材10A及びブラケット30Cに係合爪50が係合している。そのため、吊り帯を使って重機等でビーム材10Aを支持する必要がなく、ビーム材10Bは、ビーム材10A及びブラケット30Bに仮止めされた状態にすることができる。この状態で、ビーム材10Bの固定用ボルト孔11a、11bとブラケット30Bの固定用ボルト挿通孔35とに固定用ボルト31を通して、ビーム材10Bをブラケット30Aに固定することができる。また、ブラケット30Bとビーム材10Bとの間には、ビーム材10Aが挟まれている状態であるため、ビーム材10Bがブラケット30Bに固定されることにより、ビーム材10Aもブラケット30Bに固定されることになる。ビーム材10Aとビーム材10Bとがブラケット30Bに固定されるこの工程を、「固定工程」と呼ぶ。又は、ビーム材10Bを「第2板材」としたときに、この「第2板材」を固定する工程を「第2板材固定工程」と呼ぶ。「第2板材固定工程」により「第1板材」も「第2ブラケット」に固定される。
(Fixing process of beam material 10B)
As shown in FIG. 9, in the beam material 10B, the engagement claw 50 is engaged with the beam material 10A and the bracket 30C. Therefore, it is not necessary to support the beam material 10A with a heavy machine or the like using a suspension band, and the beam material 10B can be temporarily fixed to the beam material 10A and the bracket 30B. In this state, the beam material 10B can be fixed to the bracket 30A by passing the fixing bolt 31 through the fixing bolt holes 11a and 11b of the beam material 10B and the fixing bolt insertion hole 35 of the bracket 30B. Further, since the beam material 10A is sandwiched between the bracket 30B and the beam material 10B, the beam material 10A is also fixed to the bracket 30B by fixing the beam material 10B to the bracket 30B. It will be. This process of fixing the beam material 10A and the beam material 10B to the bracket 30B is referred to as a "fixing process". Alternatively, when the beam material 10B is a "second plate material", a process of fixing the "second plate material" is referred to as a "second plate material fixing process". The "first plate material" is also fixed to the "second bracket" by the "second plate material fixing step".

また、ビーム材10Bをブラケット30Bに固定したときに、ビーム材10Aとビーム材10Bとを互いに固定する。つまり、ビーム材10Bの接続用ボルト孔12aとビーム材10Aの接続用ボルト孔12cとに接続用ボルト60を通し、接続用ナット(図示なし)により締結することによりビーム材10Aとビーム材10Bとを離れないように固定することができる。また、ビーム材10Bの接続用ボルト孔12b及びビーム材10Aの接続用ボルト孔12dも同様に接続用ボルト60により固定する。「第2板材固定工程」は、上記の接続用ボルト60を締結する工程を含んでも良い。なお、接続用ボルト60及び接続用ナットは、本発明の「締結部材」に相当する。   When the beam 10B is fixed to the bracket 30B, the beam 10A and the beam 10B are fixed to each other. That is, the connection bolt 60 is passed through the connection bolt hole 12a of the beam member 10B and the connection bolt hole 12c of the beam member 10A and fastened by the connection nut (not shown), so that the beam member 10A and the beam member 10B Can be fixed so as not to leave. Further, the connecting bolt holes 12b of the beam 10B and the connecting bolt holes 12d of the beam 10A are similarly fixed by the connecting bolts 60. The “second plate fixing step” may include a step of fastening the connection bolt 60 described above. The connection bolt 60 and the connection nut correspond to the “fastening member” in the present invention.

ビーム材10Bの固定工程が完了したあとは、更に他のビーム材10をビーム材10B及び他の支柱20のブラケット30に係合させ、固定させることができる。つまり、上記の第2板材係合工程及び第2板材固定工程を他のビーム材10に適用し、繰り返し行うことにより車両用防護柵100をさらに長く設置することができる。   After the fixing process of the beam material 10B is completed, another beam material 10 can be engaged with and fixed to the beam material 10B and the bracket 30 of the other support column 20. That is, the protection fence 100 for vehicles can be installed still longer by applying the said 2nd board | plate material engagement process and a 2nd board | plate material fixation process to the other beam material 10, and performing repeatedly.

以上の様なビーム材設置方法を行うことにより、既設の支柱20又は新設の支柱20にビーム材10を設置するにあたり、作業者の負担が軽減し、または重機等を使用する場合には重機の使用時間を低減させることができる。これにより、車両用防護柵100の設置が容易になり、設置にかかる工数も低減させることができる。また、支柱20からビーム材10を取り外す作業においても、接続用ボルト60及び固定用ボルト31を外してもビーム材10が取り付けられていた位置から脱落しにくい。そのため、ビーム材10の取り外し作業においてもビーム材10を支持する作業が軽減するという利点がある。   By performing the beam material installation method as described above, when installing the beam material 10 on the existing support 20 or the new support 20, the burden on the operator is reduced, or when using a heavy equipment etc. The use time can be reduced. Thus, installation of the vehicle protection fence 100 is facilitated, and the number of installation steps can also be reduced. Further, also in the operation of removing the beam 10 from the support column 20, even if the connecting bolt 60 and the fixing bolt 31 are removed, it is difficult for the beam 10 to be detached from the position where the beam 10 is attached. Therefore, there is an advantage that the work of supporting the beam material 10 is reduced also in the work of removing the beam material 10.

10 ビーム材、10A ビーム材、10B ビーム材、11 固定用ボルト孔、11a 固定用ボルト孔、11b 固定用ボルト孔、11c 固定用ボルト孔、11d 固定用ボルト孔、12 接続用ボルト孔、12a 接続用ボルト孔、12b 接続用ボルト孔、12c 接続用ボルト孔、12d 接続用ボルト孔、16 底部、18 頂部、20 支柱、20A 支柱、20B 支柱、20C 支柱、21 ブラケット固定ボルト、22 ブラケット固定ナット、30 ブラケット、30A ブラケット、30B ブラケット、30C ブラケット、31 固定用ボルト、32 固定用ナット、33 支柱固定部、34 ビーム材固定部、35 固定用ボルト挿通孔、36 切り欠き、37 端部、38 ブラケット固定用ボルト孔、40 開口部、41 周縁、42 一端部、43 他端部、44 平坦部、45 辺、46 斜辺、50 係合爪、51 先端部、52 根元部、53 縁部、60 接続用ボルト、61 接続用ナット、90 係合部、90a 係合部、90b 係合部、90c 係合部、90d 係合部、90e 係合部、90f 係合部、100 車両用防護柵。   10 beam material, 10A beam material, 10B beam material, 11 fixing bolt hole, 11a fixing bolt hole, 11b fixing bolt hole, 11c fixing bolt hole, 11d fixing bolt hole, 12 connection bolt hole, 12a connection Bolt holes 12b connection bolt holes 12c connection bolt holes 12d connection bolt holes 16 bottom 18 top 20 columns 20A columns 20B columns 20C columns 21 bracket fixing bolts 22 bracket fixing nuts Reference Signs List 30 bracket, 30A bracket, 30B bracket, 30C bracket, 31 fixing bolt, 32 fixing nut, 33 post fixing portion, 34 beam fixing portion, 35 fixing bolt insertion hole, 36 notch, 37 end, 38 bracket Fixing bolt holes, 40 openings, 41 rims , 42 one end portion, 43 other end portion, 44 flat portion, 45 side, 46 oblique side, 50 engagement claw, 51 tip portion, 52 root portion, 53 edge portion, 60 connection bolt, 61 connection nut, 90 engagement Part, 90a engaging part, 90b engaging part, 90c engaging part, 90d engaging part, 90e engaging part, 90f engaging part, 100 vehicle protection fence.

Claims (12)

板材により形成され、所定の間隔をおいて立設される支柱に取り付けられる、車両用防護柵のビーム材であって、
前記板材は、
当該板材を貫通する開口部と、
該開口部の当該板材の長手方向の一端部から前記支柱側に突出する係合爪と、を備え、
前記係合爪の先端部の幅寸法は、
根元部の幅寸法に対し長く形成され、
前記開口部の前記板材の長手方向に垂直方向の幅寸法は、
前記係合爪の前記先端部の幅寸法よりも長い、車両用防護柵のビーム材。
A beam material of a vehicle protection fence which is formed of a plate material and attached to a column erected at a predetermined interval,
The plate material is
An opening through the plate;
And an engaging claw protruding toward the support from the one end of the plate in the opening in the longitudinal direction,
The width dimension of the tip of the engagement claw is
Longer than the width of the root,
The width dimension of the opening in the direction perpendicular to the longitudinal direction of the plate material is
The beam material of the guard fence for vehicles longer than the width dimension of the tip part of the engagement claw.
前記開口部の周縁は、
前記係合爪が設けられている前記一端部と、
前記一端部と対向する他端部と、を備え、
前記他端部は、
前記板材の長手方向に向かって幅が狭くなるように形成されている、請求項1に記載の車両用防護柵のビーム材。
The periphery of the opening is
The one end at which the engagement claw is provided;
The other end opposite to the one end;
The other end is
The beam material of the guard fence for vehicles according to claim 1 formed so that width may become narrow toward the longitudinal direction of said board material.
前記係合爪は、
前記開口部が設けられている前記板材の表面の法線方向から見て、前記開口部の前記周縁の内側に位置するように形成されている、請求項2に記載の車両用防護柵のビーム材。
The engagement claw is
The beam for a vehicle protection fence according to claim 2, wherein the beam is formed so as to be located inside the peripheral edge of the opening when viewed from the normal direction of the surface of the plate on which the opening is provided. Material.
前記開口部は、
前記他端部の中央部に平坦部が形成され、
前記平坦部の長さは、
前記係合爪の前記根元部の幅寸法以下の長さに形成されている、請求項2又は3に記載の車両用防護柵のビーム材。
The opening is
A flat portion is formed at the central portion of the other end portion,
The length of the flat portion is
The beam material of the guard fence for vehicles according to claim 2 or 3 formed in the length below the width dimension of said root part of said engaging claw.
前記板材の長手方向の一方の端部と他方の端部とは、
それぞれに、締結部材を通す固定孔、前記開口部、及び前記係合爪が形成され、
前記開口部と前記係合爪とは、
前記一方の端部の固定孔と前記他方の端部の固定孔とを重ねたときに、
前記一方の端部に形成された前記開口部の前記平坦部が、前記他方の端部に形成された前記係合爪の前記根元部に重なるように配置されている、請求項4に記載の車両用防護柵のビーム材。
One end and the other end of the plate in the longitudinal direction are
In each of the holes, a fixing hole for passing a fastening member, the opening, and the engagement claw are formed.
The opening and the engagement claw are
When the fixing hole at the one end and the fixing hole at the other end are overlapped,
The flat portion of the opening formed at the one end is arranged to overlap the root of the engaging claw formed at the other end. Beam material of guard fences for vehicles.
前記板材は、
長手方向に垂直な断面が凹凸形状に形成され、
前記凹凸形状は、
2つの山部と、前記山部の間に形成された谷部と、を備え、
前記開口部と前記係合爪とは、
2つの前記山部の頂部のそれぞれに2箇所ずつ形成される、請求項1〜5の何れか1項に記載の車両用防護柵のビーム材。
The plate material is
The cross section perpendicular to the longitudinal direction is formed in a concavo-convex shape,
The uneven shape is
Comprising two peaks and a valley formed between the peaks,
The opening and the engagement claw are
The beam material of the guard fence for vehicles according to any one of claims 1 to 5 formed in two places at each of the peak part of two said peak parts.
前記開口部と前記係合爪とは、
前記谷部の底部に形成される、請求項6に記載の車両用防護柵のビーム材。
The opening and the engagement claw are
The beam material of the guard fence for vehicles according to claim 6 formed in the bottom of said valley.
支柱に取り付けられたブラケットの端部に設けられた切り欠きに、板材から突出した係合爪を挿入する係合工程と、
前記板材を前記ブラケットに締結部材により固定する固定工程と、を備える、車両用防護柵のビーム材設置方法。
An engagement step of inserting an engagement claw projecting from the plate material into a notch provided at an end of the bracket attached to the support;
And a fixing step of fixing the plate member to the bracket by a fastening member.
第1支柱に取り付けられた第1ブラケットの端部に設けられた第1切り欠き及び第2支柱に取り付けられた第2ブラケットの端部に設けられた第2切り欠きのうち少なくとも一方に第1板材を係合させる第1板材係合工程と、締結部材により前記第1ブラケットに前記第1板材を固定する第1板材固定工程と、を備える、車両用防護柵のビーム材設置方法。   At least one of a first notch provided at the end of the first bracket attached to the first support and a second notch provided at the end of the second bracket attached to the second support A beam material installation method for a vehicle protection fence, comprising: a first plate engaging step of engaging a plate; and a first plate fixing step of fixing the first plate to the first bracket by a fastening member. 前記第1板材に設けられた開口部に、第2板材から突出した第2係合爪を挿入し前記第1板材の前記開口部と前記第2板材の前記第2係合爪とを係合させ、
前記第2板材のうち前記第1板材と係合している一方の端部の反対側に位置する他方の端部において、前記第2板材から突出した第1係合爪を第3支柱に取り付けられた第3ブラケットの端部に設けられた第3切り欠きに挿入する第2板材係合工程を備える、請求項9に記載の車両用防護柵のビーム材設置方法。
The second engaging claws protruding from the second plate are inserted into the opening provided in the first plate, and the opening of the first plate and the second engaging claws of the second plate are engaged. Let
At the other end portion of the second plate member positioned opposite to the one end portion engaged with the first plate member, the first engagement claw protruding from the second plate member is attached to the third support post The method according to claim 9, further comprising: a second plate engaging step of inserting the third plate into the third notch provided at the end of the third bracket.
前記第2ブラケットに締結部材により前記第1板材及び前記第2板材を固定する第2板材固定工程を備える、請求項10に記載の車両用防護柵のビーム材設置方法。   The method according to claim 10, further comprising: a second plate fixing step of fixing the first plate and the second plate to the second bracket by a fastening member. 前記第2板材固定工程の後に、
前記第2板材を前記第1板材とし、他の板材を前記第2板材として、前記第2板材係合工程と、前記第2板材固定工程と、繰り返し行う、請求項11に記載の車両用防護柵のビーム材設置方法。
After the second plate fixing step,
The vehicle protection according to claim 11, wherein the second plate material is used as the first plate material, and another plate material is used as the second plate material, wherein the second plate material engaging step and the second plate member fixing step are repeatedly performed. Beam installation method of fence.
JP2017241802A 2017-12-18 2017-12-18 Beam material for vehicle guard fence and beam material installation method Active JP7023101B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017241802A JP7023101B2 (en) 2017-12-18 2017-12-18 Beam material for vehicle guard fence and beam material installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017241802A JP7023101B2 (en) 2017-12-18 2017-12-18 Beam material for vehicle guard fence and beam material installation method

Publications (2)

Publication Number Publication Date
JP2019108715A true JP2019108715A (en) 2019-07-04
JP7023101B2 JP7023101B2 (en) 2022-02-21

Family

ID=67179243

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017241802A Active JP7023101B2 (en) 2017-12-18 2017-12-18 Beam material for vehicle guard fence and beam material installation method

Country Status (1)

Country Link
JP (1) JP7023101B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5481640U (en) * 1977-11-21 1979-06-09
JPH09250115A (en) * 1996-03-14 1997-09-22 Nippon Kokan Light Steel Kk Beam for guard rail and production method and device thereof
JP3057762U (en) * 1998-09-16 1999-06-02 神鋼建材工業株式会社 Guardrail
US6036399A (en) * 1996-03-15 2000-03-14 Les Profiles Du Centre S.A. Crash barrier and method of erecting
JP2007016410A (en) * 2005-07-05 2007-01-25 Shinko Kenzai Ltd Guardrail
JP2007211448A (en) * 2006-02-08 2007-08-23 Nippon Steel & Sumikin Metal Products Co Ltd Road guard fence connection structure and road guard beam material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5481640U (en) * 1977-11-21 1979-06-09
JPH09250115A (en) * 1996-03-14 1997-09-22 Nippon Kokan Light Steel Kk Beam for guard rail and production method and device thereof
US6036399A (en) * 1996-03-15 2000-03-14 Les Profiles Du Centre S.A. Crash barrier and method of erecting
JP3057762U (en) * 1998-09-16 1999-06-02 神鋼建材工業株式会社 Guardrail
JP2007016410A (en) * 2005-07-05 2007-01-25 Shinko Kenzai Ltd Guardrail
JP2007211448A (en) * 2006-02-08 2007-08-23 Nippon Steel & Sumikin Metal Products Co Ltd Road guard fence connection structure and road guard beam material

Also Published As

Publication number Publication date
JP7023101B2 (en) 2022-02-21

Similar Documents

Publication Publication Date Title
US9574365B2 (en) Clamps for repairing posts and methods and/or arrangements for repairing such posts with said clamps
EP2007603B1 (en) Mudguard for mobile working machines
KR102115266B1 (en) connecting ports for fence and using fence
KR20110112101A (en) Composite Wood Fence Coupling Structure
KR102057202B1 (en) Device for connecting road barrier block
JP2019108715A (en) Beam material of vehicle guard fence and beam material installation method
KR102085920B1 (en) Temporary bridge with end corner member and construction method therefor
JP6463284B2 (en) Steel ground cover mounting structure
KR100846149B1 (en) Handrail Pipe Joint
KR101987718B1 (en) Shading board for median strip and constructing method of the same
KR101249007B1 (en) Wire type safety fence
JP6389405B2 (en) Guard fence construction method and construction jig
KR101258044B1 (en) Safety fence for road with artificial turf and road kill prevention fence
KR101097056B1 (en) Road Firewall
KR20180012589A (en) Fence, wall structure using fence and construction method thereof
JP6799119B1 (en) Support members that support the tread members, passages, landings, passage installation methods, landing installation methods
JP2564772B2 (en) Overhang bracket for guardrail
JP5831983B2 (en) Protective fence
KR101786030B1 (en) Guide structure of container ship
CN210113165U (en) Crawler belt shield and crawler belt excavator
JP2019108716A (en) Beam material of vehicle guard fence
JP6991847B2 (en) Beam material for vehicle guard rails
CN216380854U (en) A rail guard for construction
KR102354679B1 (en) Grating
KR20000061713A (en) clamp for iron fence-support

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201001

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210831

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211025

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220119

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220208

R150 Certificate of patent or registration of utility model

Ref document number: 7023101

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250