[go: up one dir, main page]

JP2019036068A - Power re-transmission system - Google Patents

Power re-transmission system Download PDF

Info

Publication number
JP2019036068A
JP2019036068A JP2017156051A JP2017156051A JP2019036068A JP 2019036068 A JP2019036068 A JP 2019036068A JP 2017156051 A JP2017156051 A JP 2017156051A JP 2017156051 A JP2017156051 A JP 2017156051A JP 2019036068 A JP2019036068 A JP 2019036068A
Authority
JP
Japan
Prior art keywords
power
power transmission
customer
management terminal
home
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2017156051A
Other languages
Japanese (ja)
Inventor
上野 仁士
Hitoshi Ueno
仁士 上野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2017156051A priority Critical patent/JP2019036068A/en
Publication of JP2019036068A publication Critical patent/JP2019036068A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

To provide a power re-transmission system capable of improve safety when the power transmission is resumed.SOLUTION: A power re-transmission system 1 comprises: a management terminal 6 transmitting a power transmission stop command and a power transmission resumption command to a customer house 102; a watt-hour meter 2 communicatively connected to the management terminal 6 so as to calculate a power consumption amount at the customer house 102, and stopping power transmission to the customer house 102 on the basis of the power transmission stop command received from the management terminal 6, and resuming power transmission to the customer house 102 on the basis of the power transmission resumption command received from the management terminal 6; and a monitor device 5 communicatively connected to the watt-hour meter 2 so as to display information transmitted from the management terminal 6 and the watt-hour meter 2, comparing a first power consumption amount W1 before stoppage of power transmission with a second power consumption amount W2 after resumption of power transmission transmitted from the watt-hour meter 2, and transmitting a power transmission stop request to the management terminal 6 when the second power consumption amount W2 is equal to or larger than the first power consumption amount W1. The management terminal 6 transmits the power transmission stop command to the watt-hour meter on the basis of the power transmission stop request.SELECTED DRAWING: Figure 1

Description

本発明は、電力再送電システムに関する。   The present invention relates to a power re-transmission system.

従来、電力会社が顧客宅に設けた電気メータの検針を月毎に行って電気料金を算定し、算定した電気料金を顧客に請求している。顧客は、顧客の銀行口座やクレジットカードからの引き落とし、又は、電力会社から郵送される振込用紙によって金融機関やコンビニエンスストア等で電気料金の支払いを行う。銀行口座の残高不足やクレジットカードの利用上限額超過、又は、振込用紙による電気料金の支払い遅れ等によって、支払期日までに電気料金の入金を確認できなかった場合に、電力会社は、電気料金滞納用の支払票を顧客に郵送して再度料金支払いの督促を行うが、指定期日を超過しても電気料金の入金を確認できなかった場合には、該当する顧客宅への送電を停止する措置を行っている。   Conventionally, an electric power company performs a meter reading of an electric meter provided at a customer's house every month to calculate an electricity bill, and bills the customer for the calculated electricity bill. The customer pays the electricity bill at a financial institution, a convenience store, etc. by debiting from the customer's bank account or credit card, or by a transfer form mailed from the power company. If the payment of the electricity bill could not be confirmed by the due date due to insufficient balance of the bank account, excess credit card usage limit, or delay in payment of the electricity bill by transfer form, Measures to stop power transmission to the customer's home if the payment of the electricity bill is not confirmed even if the specified date is exceeded, even if the payment date is mailed to the customer and the fee is paid again. It is carried out.

送電停止措置を解除するためには、顧客が金融機関やコンビニエンスストア等に赴き、電気料金滞納用の支払票によって延滞料を含めた料金の支払いを行う必要がある。また、電気料金の入金を確認した後、電力会社が再送電を行う際には、アイロンやドライヤー等の電熱機器がコンセントに接続されていないか等の火災防止確認が行われる(例えば、特許文献1)。   In order to cancel the power transmission suspension measure, the customer needs to go to a financial institution or a convenience store and pay the fee including the late fee by using the payment slip for delinquent electricity charges. In addition, after confirming the payment of the electricity bill, when the electric power company re-transmits power, a fire prevention confirmation is made such as whether or not an electric heating device such as an iron or a dryer is connected to the outlet (for example, patent document) 1).

特開2016−128974号公報Japanese Patent Laid-Open No. 2006-128974

しかしながら、火災防止確認の実施は、顧客に委ねられているため、本来必要な火災防止確認が完了していない状態で、送電が再開される可能性がある。   However, since implementation of fire prevention confirmation is left to the customer, there is a possibility that power transmission may be resumed in a state where the necessary fire prevention confirmation has not been completed.

本発明は、上記を鑑みてなされたものであって、送電再開の際の安全性を高めることが可能な電力再送電システムを提供する。   This invention is made | formed in view of the above, Comprising: The power re-transmission system which can improve the safety | security at the time of power transmission restart is provided.

上述した課題を解決し、目的を達成するために、本発明の電力再送電システムは、顧客宅への送電を停止させるための送電停止指令、及び、前記顧客宅への送電を再開させるための送電再開指令を送信する管理端末と、前記管理端末と通信可能に接続され、前記顧客宅における消費電力量を算出すると共に、前記管理端末から受信した送電停止指令に基づき、前記顧客宅への送電を停止し、前記管理端末から受信した送電再開指令に基づき、前記顧客宅への送電を再開する電力量計と、前記電力量計と通信可能に接続され、前記管理端末及び前記電力量計から送信される情報を表示すると共に、前記電力量計から送信された、送電停止前の前記消費電力量である第1消費電力量と、送電再開後の前記消費電力量である第2消費電力量とを比較し、前記第2消費電力量が前記第1消費電力量以上である場合に、前記管理端末に対し、前記電力量計に前記顧客宅への送電を停止させることを要求する送電停止要求を送信するモニタ装置と、を備え、前記管理端末は、前記送電停止要求に基づき、前記電力量計に対して前記送電停止指令を送信する。   In order to solve the above-described problems and achieve the object, the power re-transmission system according to the present invention includes a power transmission stop command for stopping power transmission to a customer's home, and a power transmission stop command for resuming power transmission to the customer's home. A management terminal that transmits a power transmission restart command and a communication terminal that is communicably connected to the management terminal, calculates power consumption at the customer home, and transmits power to the customer home based on a power transmission stop command received from the management terminal And based on the power transmission restart command received from the management terminal, the watt-hour meter that resumes power transmission to the customer's home, and the watt-hour meter are communicably connected, from the management terminal and the watt-hour meter While displaying the information transmitted, the 1st power consumption amount which is the said power consumption amount before transmission stop transmitted from the said watt-hour meter, and the 2nd power consumption amount which is the said power consumption amount after transmission restart Compare with When the second power consumption is equal to or greater than the first power consumption, the management terminal transmits a power transmission stop request for requesting the power meter to stop power transmission to the customer's home. A monitoring device, and the management terminal transmits the power transmission stop command to the watt-hour meter based on the power transmission stop request.

本発明の望ましい態様として、前記電力量計は、配電線から引込線を介して供給される電力を、屋内線を介して顧客宅に供給し、前記モニタ装置は、前記屋内線から供給される電力、又は、前記配電線から前記引込線を介して供給される電力の何れか一方が供給され、前記電力量計によって屋内線を介した電力供給が停止している場合に、前記配電線から前記引込線を介して電力が供給される。   As a desirable aspect of the present invention, the watt-hour meter supplies power supplied from a distribution line via a service line to a customer's house via an indoor line, and the monitor device supplies power supplied from the indoor line. Or, when any one of the electric power supplied from the distribution line via the service line is supplied and the power supply via the indoor line is stopped by the watt-hour meter, the service line is connected to the service line from the distribution line. Power is supplied via

本発明の望ましい態様として、前記モニタ装置は、電子マネーの情報を読み取り、前記管理端末に対して前記電子マネーの情報を送信し、前記管理端末は、前記電子マネーの情報に基づき、前記顧客宅において使用された電気使用量に応じた電気料金を徴収する。   As a preferred aspect of the present invention, the monitor device reads electronic money information and transmits the electronic money information to the management terminal, and the management terminal is configured to send the customer home based on the electronic money information. Collect electricity charges according to the amount of electricity used in

本発明の望ましい態様として、前記管理端末は、前記電気料金の徴収状況に応じて、前記モニタ装置に対して前記顧客宅への送電再開に伴う火災を防止するための火災防止確認指令を送信し、前記モニタ装置は、前記火災防止確認指令に基づき、所定の火災防止確認処理を行う。   As a desirable aspect of the present invention, the management terminal transmits a fire prevention confirmation command for preventing a fire due to resumption of power transmission to the customer's house to the monitor device according to the collection status of the electricity bill. The monitor device performs predetermined fire prevention confirmation processing based on the fire prevention confirmation command.

本発明の望ましい態様として、前記管理端末は、前記火災防止確認処理の結果に応じて、前記電力量計に対して前記送電再開指令を送信し、前記電力量計は、前記送電再開指令に基づき、前記顧客宅への送電を再開する。   As a desirable mode of the present invention, the management terminal transmits the power transmission restart command to the watt hour meter according to the result of the fire prevention confirmation process, and the watt hour meter is based on the power transmission restart command. The power transmission to the customer's home is resumed.

本発明によれば、送電再開の際の安全性を高めることが可能な電力再送電システムを提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the electric power re-transmission system which can improve the safety | security at the time of power transmission restart can be provided.

図1は、実施形態に係る電力再送電システムの概略構成図である。FIG. 1 is a schematic configuration diagram of a power re-transmission system according to the embodiment. 図2は、顧客別データの一例を示す図である。FIG. 2 is a diagram illustrating an example of customer-specific data. 図3は、料金徴収状況の一例を示す図である。FIG. 3 is a diagram illustrating an example of a charge collection status. 図4は、宅内モニタのブロック構成の一例を示す図である。FIG. 4 is a diagram illustrating an example of a block configuration of the home monitor. 図5は、実施形態に係る電力再送電システムにおける電力再送電処理の一例を示すフローチャートである。FIG. 5 is a flowchart illustrating an example of a power re-transmission process in the power re-transmission system according to the embodiment. 図6は、火災防止確認画面の一例を示す図である。FIG. 6 is a diagram illustrating an example of a fire prevention confirmation screen.

以下、本発明につき図面を参照しつつ詳細に説明する。なお、下記の発明を実施するための形態(以下、実施形態という)により本発明が限定されるものではない。また、下記実施形態における構成要素には、当業者が容易に想定できるもの、実質的に同一のもの、いわゆる均等の範囲のものが含まれる。さらに、下記実施形態で開示した構成要素は適宜組み合わせることが可能である。   Hereinafter, the present invention will be described in detail with reference to the drawings. The present invention is not limited by the following modes for carrying out the invention (hereinafter referred to as embodiments). In addition, constituent elements in the following embodiments include those that can be easily assumed by those skilled in the art, those that are substantially the same, and those in a so-called equivalent range. Furthermore, the constituent elements disclosed in the following embodiments can be appropriately combined.

図1は、実施形態に係る電力再送電システムの概略構成図である。実施形態に係る電力再送電システム1は、主な構成要素として、スマートメータ(電力量計)2と、引込線3と、屋内線4と、宅内モニタ(モニタ装置)5と、管理サーバ(管理端末)6と、を含む。   FIG. 1 is a schematic configuration diagram of a power re-transmission system according to the embodiment. The power re-transmission system 1 according to the embodiment includes, as main components, a smart meter (electric energy meter) 2, a service line 3, an indoor line 4, a home monitor (monitor device) 5, and a management server (management terminal) 6).

管理サーバ6とスマートメータ2との間は、例えば、配電線101を介した電力線搬送通信(Power Line Communication:PLC)等を用いたFAN(Field Area Network)によりデータ通信を行う。管理サーバ6とスマートメータ2との間の通信手段は、上述した配電線101を介したFANに限るものではなく、例えば、WAN(Wide Area Network)等の移動体無線通信網や光通信網であっても良い。   For example, data communication is performed between the management server 6 and the smart meter 2 by FAN (Field Area Network) using, for example, power line communication (PLC) via the distribution line 101. The communication means between the management server 6 and the smart meter 2 is not limited to the FAN via the above-described distribution line 101, and may be, for example, a mobile wireless communication network such as a WAN (Wide Area Network) or an optical communication network. There may be.

スマートメータ2と宅内モニタ5との間は、例えば、屋内線4を介したPLC等を用いたHAN(Home Area Network)等によりデータ通信を行う。スマートメータ2と宅内モニタ5との間の通信手段は、上述した屋内線4を介したHANに限るものではなく、例えば、LANケーブルでスマートメータ2とモニタ装置3とが接続される有線LANの態様であっても良いし、無線LANの態様であっても良い。   For example, data communication is performed between the smart meter 2 and the home monitor 5 by HAN (Home Area Network) using a PLC or the like via the indoor line 4. The communication means between the smart meter 2 and the home monitor 5 is not limited to the HAN via the indoor line 4 described above. For example, a wired LAN in which the smart meter 2 and the monitor device 3 are connected by a LAN cable. An aspect may be sufficient and the aspect of wireless LAN may be sufficient.

スマートメータ2は、例えば顧客宅102の屋外に設置され、所定期間毎(例えば月毎)に自動検針して顧客宅102において使用された電気使用量を計測する装置である。スマートメータ2は、引込線3を介して配電線101に接続され、屋内線4を介して顧客宅102内の電気機器103及び宅内モニタ5に電力を供給する。   The smart meter 2 is a device that is installed, for example, outside the customer's home 102 and measures the amount of electricity used at the customer's home 102 by automatically reading the meter every predetermined period (for example, every month). The smart meter 2 is connected to the distribution line 101 via the lead-in wire 3 and supplies power to the electrical device 103 and the home monitor 5 in the customer home 102 via the indoor wire 4.

また、スマートメータ2は、管理サーバ6からの制御指令に基づき、引込線3と屋内線4とを接続又は切断する機能を有している。   The smart meter 2 has a function of connecting or disconnecting the lead-in line 3 and the indoor line 4 based on a control command from the management server 6.

例えば、顧客が電気料金の支払いを延滞している場合、管理サーバ6から送電停止指令(第1送電停止指令)を送信してスマートメータ2を遠隔操作することにより、引込線3と屋内線4とを切断して顧客宅102への電力の供給を停止し(送電停止ともいう)、顧客が電気料金を支払った場合、管理サーバ6から送電再開指令を送信してスマートメータ2を遠隔操作することにより、引込線3と屋内線4とを接続して顧客宅102への電力の供給を再開する(送電再開ともいう)。   For example, when the customer is overdue to pay the electricity bill, by sending a power transmission stop command (first power transmission stop command) from the management server 6 and remotely operating the smart meter 2, the service line 3 and the indoor line 4 To stop the power supply to the customer's home 102 (also referred to as power transmission stop), and when the customer pays the electricity bill, send the power transmission restart command from the management server 6 to remotely operate the smart meter 2 Thus, the service line 3 and the indoor line 4 are connected to resume the supply of power to the customer's home 102 (also referred to as power transmission restart).

また、スマートメータ2は、引込線3と屋内線4とが接続されているとき、顧客宅102内の電気機器103及び宅内モニタ5において消費される消費電力量を算出し、宅内モニタ5に送信する機能を有している。   In addition, the smart meter 2 calculates the power consumption consumed in the electrical equipment 103 in the customer's home 102 and the home monitor 5 when the service line 3 and the indoor line 4 are connected, and transmits the power consumption to the home monitor 5. It has a function.

宅内モニタ5は、例えば顧客宅102の屋内に設置され、スマートメータ2に接続された屋内線4から供給される電力、又は、配電線101から引込線3を介して供給される電力の何れか一方が供給される。   The in-home monitor 5 is installed, for example, indoors in the customer's home 102 and either one of power supplied from the indoor line 4 connected to the smart meter 2 or power supplied from the distribution line 101 via the lead-in line 3. Is supplied.

管理サーバ6は、例えば電力会社100等に設置されたコンピュータであり、スマートメータ2及び宅内モニタ5との間でデータの送受信を行う通信機能を有している。   The management server 6 is a computer installed in, for example, the electric power company 100 and has a communication function for transmitting and receiving data between the smart meter 2 and the home monitor 5.

管理サーバ6は、顧客毎のデータを格納するデータベース63を備えている。管理サーバ6は、顧客宅102において使用された電気使用量に基づいて算出した電気料金と、電気料金の料金徴収状況に基づいて、顧客への請求金額、送電停止の事前通知、送電停止の施工通知等を含む各種情報を送信する。   The management server 6 includes a database 63 that stores data for each customer. The management server 6 determines the amount charged to the customer, prior notice of power transmission suspension, construction of power transmission suspension based on the electricity bill calculated based on the amount of electricity used at the customer's home 102 and the charge collection status of the electricity bill. Various information including notifications is transmitted.

図2は、顧客別データの一例を示す図である。図2に示すように、管理サーバ6のデータベース63には、顧客別データD1として、顧客ID631毎に、当月の検針値632、前月の検針値633、電気使用量634、電気料金635、入金予定日636、支払期限日637、料金徴収状況638等が保持されている。   FIG. 2 is a diagram illustrating an example of customer-specific data. As shown in FIG. 2, in the database 63 of the management server 6, as the customer-specific data D1, for each customer ID 631, the meter reading value 632 for the current month, the meter reading value 633 for the previous month, the amount of electricity used 634, the electricity bill 635, and the payment schedule A date 636, a due date 637, a fee collection status 638, and the like are held.

当月の検針値632は、第1通信手段を介してスマートメータ2から送信された当月のスマートメータ2の指示値である。   The current meter reading value 632 is an indication value of the current smart meter 2 transmitted from the smart meter 2 via the first communication means.

前月の検針値633は、第1通信手段を介してスマートメータ2から送信された前月のスマートメータ2の指示値である。   The meter reading value 633 of the previous month is an indication value of the smart meter 2 of the previous month transmitted from the smart meter 2 via the first communication means.

電気使用量634は、当月の検針値632及び前月の検針値633に基づいて算出された当月の電気使用量である。   The electricity usage amount 634 is the electricity usage amount for the current month calculated based on the meter reading value 632 for the current month and the meter reading value 633 for the previous month.

電気料金635は、電気使用量634に基づいて算出された当月の電気料金である。   The electricity bill 635 is the electricity bill for the current month calculated based on the amount of electricity used 634.

入金予定日636は、当月の電気料金635の入金予定日である。この入金予定日636としては、例えばクレジットカードや銀行口座からの引き落とし期日が設定される。   The scheduled deposit date 636 is a scheduled deposit date for the electricity bill 635 of the current month. As this scheduled payment date 636, for example, a withdrawal date from a credit card or a bank account is set.

支払期限日637は、当月の検針日からN1日後(例えば当月の検針日の翌日から30日目)に設定される。   The payment due date 637 is set N1 days after the meter reading date of the current month (for example, the 30th day from the day after the meter reading date of the current month).

図3は、料金徴収状況の一例を示す図である。料金徴収状況638としては、図3に示すように、延滞日数6381、延滞利息6382、送電停止予定日6383、入金日6384、入金額6385等を含む。   FIG. 3 is a diagram illustrating an example of a charge collection status. As shown in FIG. 3, the fee collection status 638 includes the number of days arrears 6381, the arrears interest 6382, the scheduled power transmission stop date 6383, the deposit date 6384, the deposit amount 6385, and the like.

延滞日数6381は、支払期限日637の翌日以降の経過日数である。   The number of days arrears 6381 is the number of days that have passed since the day after the due date 637.

延滞利息6382は、電気料金635及び延滞日数6381に応じた利息である。   The arrears interest 6382 is interest according to the electricity bill 635 and the arrears days 6381.

送電停止予定日6383は、支払期限日637からN2日後(例えば支払期限日637から20日後)に設定される。   The scheduled power transmission stop date 6383 is set N2 days after the due date 637 (for example, 20 days after the due date 637).

入金日6384は、電気料金635に延滞利息6382を加算した請求金額が顧客から支払われた日付であり、入金額6385は、入金日6384において顧客から入金された徴収金額である。   The payment date 6384 is the date when the billing amount obtained by adding the arrears interest 6382 to the electricity bill 635 is paid by the customer, and the payment amount 6385 is the amount collected from the customer on the payment date 6384.

また、管理サーバ6は、送電停止後の送電復旧時に火災が起きることがないように対応しているか否かの火災防止確認を行う。即ち、管理サーバ6は、火災につながる可能性がある電気製品(例えば、アイロン等の電熱機器)のスイッチが入り状態になっていないことを、顧客が確認済みであるか否かを確認するための火災防止確認指令を宅内モニタ5に送信する。   In addition, the management server 6 performs a fire prevention check as to whether or not a countermeasure is taken so that a fire does not occur when power transmission is restored after power transmission is stopped. That is, the management server 6 confirms whether or not the customer has confirmed that the electrical product (for example, an electric heating device such as an iron) that may cause a fire is not switched on. The fire prevention confirmation command is sent to the home monitor 5.

図4は、宅内モニタのブロック構成の一例を示す図である。図4に示すように、宅内モニタ5は、切換部51と、電源部52と、通信部53と、操作部54と、表示部55と、読取部56と、記憶部57と、これらを制御する制御部58と、を備える。   FIG. 4 is a diagram illustrating an example of a block configuration of the home monitor. As shown in FIG. 4, the home monitor 5 controls the switching unit 51, the power supply unit 52, the communication unit 53, the operation unit 54, the display unit 55, the reading unit 56, the storage unit 57, and these. And a control unit 58.

切換部51は、引込線3及び屋内線4に接続され、屋内線4に電流が流れているか否か
を検知する図示しない電流検知機能を有する。また、切換部51は、屋内線4に流れる電流を検知した場合には、屋内線4から電力の供給を受けて引込線3とは接続を遮断し、屋内線4に流れる電流を検知しない場合には、引込線3から電力の供給を受けて屋内線4とは接続を遮断するスイッチ機能を有している。
The switching unit 51 is connected to the lead-in line 3 and the indoor line 4 and has a current detection function (not shown) that detects whether or not a current flows through the indoor line 4. When the switching unit 51 detects the current flowing through the indoor line 4, the switching unit 51 receives power from the indoor line 4, disconnects from the lead-in line 3, and does not detect the current flowing through the indoor line 4. Has a switch function for receiving a supply of electric power from the lead-in line 3 and cutting off the connection with the indoor line 4.

電源部52は、切換部51から出力された電力を、宅内モニタ5の各構成部において使用される直流電圧値に変換して各構成部に供給する。   The power supply unit 52 converts the power output from the switching unit 51 into a DC voltage value used in each component of the home monitor 5 and supplies it to each component.

通信部53は、上述したスマートメータ2と宅内モニタ5との間の通信手段を構成する通信インターフェースである。   The communication unit 53 is a communication interface constituting communication means between the smart meter 2 and the home monitor 5 described above.

操作部54は、例えば宅内モニタ5に設けられた操作ボタンである。表示部55は、例えば液晶表示装置である。操作部54は、例えば表示部55に設けられたタッチセンサでも良いし、表示部55は、タッチセンサと一体化されたタッチセンサ付きの液晶表示装置であっても良い。操作部54及び表示部55の態様により、実施形態が限定されるものではない。   The operation unit 54 is an operation button provided on the home monitor 5, for example. The display unit 55 is a liquid crystal display device, for example. For example, the operation unit 54 may be a touch sensor provided in the display unit 55, or the display unit 55 may be a liquid crystal display device with a touch sensor integrated with the touch sensor. The embodiment is not limited by the mode of the operation unit 54 and the display unit 55.

読取部56は、例えばプリペイド(前払い)式の電子マネーカード(ICカード)200から、事前にチャージされた電子マネーの残高(情報)を読み取る構成部である。なお、電子マネーカード200の残高を読み取る手法としては、読取部56に電子マネーカード200を翳す態様であっても良いし、差込口(不図示)に電子マネーカード200を差し込む態様であっても良い。また、読取部56は、事前に電子マネーがチャージされた際に発行されたプリペイド番号によって、電子マネーの残高を読み取る構成であっても良い。電子マネーカード200は、コンビニエンスストアや電力会社等の窓口でチャージすることができる。   The reading unit 56 is a component that reads a balance (information) of pre-charged electronic money from, for example, a prepaid electronic money card (IC card) 200. The method of reading the balance of the electronic money card 200 may be a mode in which the electronic money card 200 is placed in the reading unit 56 or a mode in which the electronic money card 200 is inserted into a slot (not shown). May be. The reading unit 56 may be configured to read the balance of electronic money using a prepaid number issued when the electronic money is charged in advance. The electronic money card 200 can be charged at a convenience store, a power company or the like.

記憶部57は、スマートメータ2において算出された消費電力量を記憶する機能を有している。   The storage unit 57 has a function of storing the power consumption calculated in the smart meter 2.

また、記憶部57は、管理サーバ6から送信された火災防止確認指令の受信回数をカウンタ値Xとして記憶する機能を有している。カウンタ値Xは、初期値を「0」とし、0からn(nは1以上の整数)までの正数値を取り得る。   In addition, the storage unit 57 has a function of storing the number of receptions of the fire prevention confirmation command transmitted from the management server 6 as the counter value X. The counter value X has an initial value “0” and can take a positive value from 0 to n (n is an integer of 1 or more).

また、記憶部57は、カウンタ値Xに応じた火災防止確認画面を記憶する機能を有している。火災防止確認画面については後述する。   The storage unit 57 has a function of storing a fire prevention confirmation screen corresponding to the counter value X. The fire prevention confirmation screen will be described later.

制御部58は、例えば、CPU(Central Processing Unit)により構成され、上述した通信手段を介してスマートメータ2から送信された消費電力量を記憶部55に格納する機能を有している。   The control part 58 is comprised by CPU (Central Processing Unit), for example, and has the function to store the power consumption transmitted from the smart meter 2 via the communication means mentioned above in the memory | storage part 55. FIG.

また、制御部58は、上述した通信手段を介して管理サーバ6から送信された各種情報を表示部55に表示する機能を有している。   Further, the control unit 58 has a function of displaying various information transmitted from the management server 6 via the communication means described above on the display unit 55.

また、制御部58は、操作部54から入力された情報を、上述した通信手段を介して管理サーバ6に送信する機能を有している。   Further, the control unit 58 has a function of transmitting information input from the operation unit 54 to the management server 6 via the communication means described above.

一例として、制御部58は、管理サーバ6から送信された火災防止確認指令を受信し、表示部55に所定の火災防止確認画面を表示する。顧客が表示部55に表示された火災防止確認画面を参照して操作部54を操作すると、制御部58は、火災につながる可能性がある電気製品(例えば、アイロン等の電熱機器)のスイッチが入り状態になっていないことを、顧客が確認済みであることを示す火災防止確認通知を管理サーバ6に送信する。   As an example, the control unit 58 receives the fire prevention confirmation command transmitted from the management server 6 and displays a predetermined fire prevention confirmation screen on the display unit 55. When the customer operates the operation unit 54 with reference to the fire prevention confirmation screen displayed on the display unit 55, the control unit 58 switches on a switch of an electrical product (for example, an electric heating device such as an iron) that may cause a fire. A fire prevention confirmation notification is sent to the management server 6 indicating that the customer has been confirmed that it is not in the on state.

また、制御部58は、読取部56によって読み取られた電子マネーの残高(情報)を、上述した通信手段を介して管理サーバ6に送信する機能を有している。   In addition, the control unit 58 has a function of transmitting the balance (information) of electronic money read by the reading unit 56 to the management server 6 via the communication means described above.

次に、上記のように構成された電力再送電システム1の処理について説明する。図5は、実施形態に係る電力再送電システムにおける電力再送電処理の一例を示すフローチャートである。なお、本実施形態では、既に顧客と電力会社との間で電気供給契約が締結され、当月の検針値632、前月の検針値633、電気使用量634、電気料金635、入金予定日636、支払期限日637、及び料金徴収状況638の送電停止予定日6383が決定し、顧客データD1として管理サーバ6に保持されているものとする。また、図5に示すフローチャートは、支払期限日637を越えて電気料金635に延滞利息6382を加算した請求金額が入金されていない顧客を想定している。また、管理サーバ6から送信された火災防止確認指令の受信回数であるカウンタ値Xは初期値「0」にリセット(X=0)されているものとする。また、電子マネーカード200は、予めコンビニエンスストアや電力会社等の窓口で請求金額以上の金額がチャージされているものとする。   Next, processing of the power re-transmission system 1 configured as described above will be described. FIG. 5 is a flowchart illustrating an example of a power re-transmission process in the power re-transmission system according to the embodiment. In this embodiment, an electricity supply contract has already been concluded between the customer and the electric power company, and the meter reading value 632 of the current month, the meter reading value 633 of the previous month, the amount of electricity used 634, the electricity charge 635, the scheduled payment date 636, and the payment It is assumed that the due date 637 and the scheduled power transmission stop date 6383 of the charge collection status 638 are determined and held in the management server 6 as customer data D1. Further, the flowchart shown in FIG. 5 assumes a customer who has not received a billing amount obtained by adding arrearage interest 6382 to the electricity bill 635 beyond the payment due date 637. Further, it is assumed that the counter value X, which is the number of times of receiving the fire prevention confirmation command transmitted from the management server 6, has been reset to the initial value “0” (X = 0). In addition, it is assumed that the electronic money card 200 has been charged in advance at a counter of a convenience store, a power company, or the like at an amount greater than or equal to the amount charged.

スマートメータ2は、常時消費電力量を算出して宅内モニタ5に送信する。宅内モニタ5の制御部58は、スマートメータ2から送信された消費電力量の最新値を、第1消費電力量W1として記憶部57に記憶する(ステップS101)。このとき、宅内モニタ5は、屋内線4から電力を供給されている。   The smart meter 2 always calculates the power consumption and transmits it to the home monitor 5. The control unit 58 of the home monitor 5 stores the latest value of the power consumption amount transmitted from the smart meter 2 in the storage unit 57 as the first power consumption amount W1 (step S101). At this time, the home monitor 5 is supplied with power from the indoor line 4.

管理サーバ6は、顧客データD1を参照し、当該顧客の料金徴収状況638から、当該顧客の送電停止予定日6383であるか否かを判定する(ステップS102)。   The management server 6 refers to the customer data D1, and determines from the charge collection status 638 of the customer whether or not it is the scheduled power transmission stop date 6383 of the customer (step S102).

送電停止予定日6383でない場合には(ステップS102;No)、ステップS101に戻る。   If it is not the scheduled power transmission stop date 6383 (step S102; No), the process returns to step S101.

送電停止予定日6383である場合には(ステップS102;Yes)、管理サーバ6は、送電停止指令(第1送電停止指令)をスマートメータ2及び宅内モニタ5に送信する(ステップS103)。すなわち、管理サーバ6は、送電停止予定日6383の前日までに電気料金635に延滞利息6382を加算した請求金額の入金が確認できなかった場合に、送電停止指令(第1送電停止指令)をスマートメータ2及び宅内モニタ5に送信する。また、管理サーバ6は、送電停止予定日6383までに電気料金635に延滞利息6382を加算した請求金額の支払いが完了していないために電力供給を停止したこと、及び請求金額を含む送電停止施工通知を宅内モニタ5に送信する。   If it is the scheduled power transmission stop date 6383 (step S102; Yes), the management server 6 transmits a power transmission stop command (first power transmission stop command) to the smart meter 2 and the home monitor 5 (step S103). That is, the management server 6 smartly issues a power transmission stop command (first power transmission stop command) when payment of the billed amount obtained by adding the arrears interest 6382 to the electricity bill 635 is not confirmed by the day before the scheduled power transmission stop date 6383. It transmits to the meter 2 and the home monitor 5. In addition, the management server 6 stops the power supply because the payment of the billed amount obtained by adding the arrears interest 6382 to the electricity bill 635 is not completed by the scheduled power transmission stop date 6383, and the power transmission suspension construction including the billed amount A notification is transmitted to the home monitor 5.

スマートメータ2は、管理サーバ6から送信された送電停止指令(第1送電停止指令)に基づき、引込線3と屋内線4とを切断して顧客宅102への送電を停止する。このとき、宅内モニタ5の切換部51は、制御部58により切り換えられ、宅内モニタ5は、引込線3から電力を供給される。また、宅内モニタ5の記憶部57には、送電停止の直前の消費電力量(第1消費電力量W1)が保持される。   Based on the power transmission stop command (first power transmission stop command) transmitted from the management server 6, the smart meter 2 disconnects the lead-in line 3 and the indoor line 4 and stops power transmission to the customer home 102. At this time, the switching unit 51 of the home monitor 5 is switched by the control unit 58, and the home monitor 5 is supplied with power from the service line 3. In addition, the storage unit 57 of the home monitor 5 holds the power consumption immediately before the power transmission is stopped (first power consumption W1).

管理サーバ6は、請求金額の入金待ちを行う(ステップS104)。具体的に、宅内モニタ5の制御部58は、上述した送電停止施工通知を表示部55に表示し、顧客に対して請求金額の入金を促す。顧客が宅内モニタ5の読取部56から電子マネーカード200の残高(情報)を読み取らせることで、請求金額の入金確認が行われる。請求金額の入金が確認できない場合には(ステップS104;No)、ステップS104の処理を繰り返す。請求金額の入金確認が完了すると(ステップS104;Yes)、宅内モニタ5の制御部58は、入金確認通知を管理サーバ6に送信する(ステップS105)。   The management server 6 waits for the deposit amount (step S104). Specifically, the control unit 58 of the home monitor 5 displays the above-mentioned power transmission stop construction notice on the display unit 55 and prompts the customer to deposit the billed amount. When the customer reads the balance (information) of the electronic money card 200 from the reading unit 56 of the home monitor 5, the payment confirmation of the billed amount is performed. If the deposit amount cannot be confirmed (step S104; No), the process of step S104 is repeated. When the payment confirmation of the charged amount is completed (step S104; Yes), the control unit 58 of the home monitor 5 transmits a payment confirmation notification to the management server 6 (step S105).

管理サーバ6は、入金確認通知を受信すると、電子マネーカード200の残高(情報)から、請求金額を徴収し、宅内モニタ5に火災防止確認指令を送信する(ステップS106)。   When receiving the payment confirmation notification, the management server 6 collects the billed amount from the balance (information) of the electronic money card 200 and transmits a fire prevention confirmation command to the home monitor 5 (step S106).

宅内モニタ5の制御部58は、受信した火災防止確認指令に基づき、カウンタ値Xをインクリメントして記憶部57に記憶すると共に(X=X+1)、表示部55にカウンタ値Xに応じた所定の火災防止確認画面を表示する(ステップS107)。   Based on the received fire prevention confirmation command, the control unit 58 of the home monitor 5 increments the counter value X and stores it in the storage unit 57 (X = X + 1), and displays a predetermined value corresponding to the counter value X on the display unit 55. A fire prevention confirmation screen is displayed (step S107).

図6は、火災防止確認画面の一例を示す図である。図6では、カウンタ値Xの最大数nの火災防止確認画面G1,G2,・・・,Gnを例示している。   FIG. 6 is a diagram illustrating an example of a fire prevention confirmation screen. FIG. 6 illustrates fire prevention confirmation screens G1, G2,..., Gn having the maximum number n of counter values X.

図6に示すように、火災防止確認画面G1,G2,・・・,Gnは、それぞれ表示部55に確認項目(項目1,2,・・・)が表示され、操作部54として、各確認項目毎に確認ボタン541,542,・・・が表示された例を示している。火災防止確認画面G1,G2,・・・,Gnにおいて表示される確認項目は、各火災防止確認画面G1,G2,・・・,Gnで重複した項目があっても良いし、それぞれ異なる項目であっても良い。また、各火災防止確認画面G1,G2,・・・,Gnで表示される確認項目の数は、1つであっても良いし、複数であっても良い。   As shown in FIG. 6, on the fire prevention confirmation screens G1, G2,..., Gn, confirmation items (items 1, 2,...) Are displayed on the display unit 55, respectively. In this example, confirmation buttons 541, 542,... Are displayed for each item. The confirmation items displayed on the fire prevention confirmation screens G1, G2,..., Gn may be duplicated on each fire prevention confirmation screen G1, G2,. There may be. Further, the number of confirmation items displayed on each fire prevention confirmation screen G1, G2,..., Gn may be one or plural.

宅内モニタ5の制御部58は、火災防止確認指令に基づき、所定の火災防止確認処理を行う。まず、宅内モニタ5の制御部58は、火災防止確認の完了待ちを行う(ステップS108)。具体的に、宅内モニタ5の制御部58は、火災防止確認指令の受信回数であるカウンタ値Xに応じた火災防止確認画面G1,G2,・・・,Gnを表示部55に表示し、顧客に対して火災防止確認を促す。顧客が表示部55に表示された火災防止確認画面G1,G2,・・・,Gnを参照して操作部54(確認ボタン541,542,・・・)を操作することで、火災防止確認が行われる。火災防止確認が完了していない場合には(ステップS108;No)、ステップS108の処理を繰り返す。火災防止確認が完了すると(ステップS108;Yes)、宅内モニタ5の制御部58は、顧客が火災防止確認済みであることを示す火災防止確認通知を、管理サーバ6に送信する(ステップS109)。   The control unit 58 of the home monitor 5 performs predetermined fire prevention confirmation processing based on the fire prevention confirmation instruction. First, the control unit 58 of the home monitor 5 waits for completion of the fire prevention confirmation (step S108). Specifically, the control unit 58 of the home monitor 5 displays on the display unit 55 fire prevention confirmation screens G1, G2,..., Gn corresponding to the counter value X that is the number of times of reception of the fire prevention confirmation command. Encourage confirmation of fire prevention. The fire prevention confirmation is made when the customer operates the operation unit 54 (confirmation buttons 541, 542,...) With reference to the fire prevention confirmation screens G1, G2,..., Gn displayed on the display unit 55. Done. When the fire prevention confirmation is not completed (step S108; No), the process of step S108 is repeated. When the fire prevention confirmation is completed (step S108; Yes), the control unit 58 of the home monitor 5 transmits a fire prevention confirmation notification indicating that the customer has confirmed the fire prevention to the management server 6 (step S109).

管理サーバ6は、火災防止確認通知を受信すると、すなわち、宅内モニタ5によって火災防止確認処理が完了すると、送電再開指令をスマートメータ2に送信する(ステップS110)。スマートメータ2は、管理サーバ6から送信された送電再開指令に基づき、引込線3と屋内線4とを接続して顧客宅102への送電を再開する。このとき、宅内モニタ5の切換部51は、制御部58により切り換えられ、宅内モニタ5には、屋内線4から電力が供給される。   When receiving the fire prevention confirmation notification, that is, when the fire prevention confirmation processing is completed by the home monitor 5, the management server 6 transmits a power transmission restart instruction to the smart meter 2 (step S110). The smart meter 2 connects the lead-in line 3 and the indoor line 4 based on the power transmission restart command transmitted from the management server 6 and restarts power transmission to the customer's home 102. At this time, the switching unit 51 of the home monitor 5 is switched by the control unit 58, and power is supplied to the home monitor 5 from the indoor line 4.

このとき、スマートメータ2は、消費電力量の算出を再開し、算出した消費電力量を宅内モニタ5に送信する。宅内モニタ5の制御部58は、火災防止確認通知の送信後にスマートメータ2から送信された消費電力量を、第2消費電力量W2として記憶部57に記憶する(ステップS111)。   At this time, the smart meter 2 restarts the calculation of the power consumption, and transmits the calculated power consumption to the home monitor 5. The control unit 58 of the home monitor 5 stores the power consumption amount transmitted from the smart meter 2 after the transmission of the fire prevention confirmation notification as the second power consumption amount W2 in the storage unit 57 (step S111).

宅内モニタ5の制御部58は、送電再開後の消費電力量である第2消費電力量W2が、送電停止の直前の消費電力量である第1消費電力量W1よりも小さいか否か(W1>W2)を判定する(ステップS112)。   The control unit 58 of the home monitor 5 determines whether or not the second power consumption amount W2 that is the power consumption amount after restarting the power transmission is smaller than the first power consumption amount W1 that is the power consumption amount immediately before the power transmission is stopped (W1). > W2) is determined (step S112).

第2消費電力量W2が第1消費電力量W1よりも小さい(W1>W2)場合には(ステップS112;Yes)、宅内モニタ5の制御部58は、正常に送電が再開されたことを示す送電再開画面を表示部55に表示し(ステップS113)、送電再開画面の表示後にスマートメータ2から送信された消費電力量を、第2消費電力量W1として記憶部57に記憶するようにすると共に、火災防止確認指令の受信回数であるカウンタ値Xを初期値「0」にリセットして(X=0)記憶部57に記憶し(ステップS114)、電力再送電処理を終了する。   When the second power consumption amount W2 is smaller than the first power consumption amount W1 (W1> W2) (step S112; Yes), the control unit 58 of the home monitor 5 indicates that power transmission has been resumed normally. The power transmission restart screen is displayed on the display unit 55 (step S113), and the power consumption amount transmitted from the smart meter 2 after the power transmission restart screen is displayed is stored in the storage unit 57 as the second power consumption amount W1. Then, the counter value X, which is the number of receptions of the fire prevention confirmation command, is reset to the initial value “0” (X = 0) and stored in the storage unit 57 (step S114), and the power re-transmission process is terminated.

第2消費電力量W2が第1消費電力量W1以上である(W1≦W2)場合には(ステップS112;No)、宅内モニタ5の制御部58は、記憶部57に記憶されたカウンタ値Xが最大値nよりも大きいか否かを判定する(ステップS115)。   When the second power consumption amount W2 is equal to or greater than the first power consumption amount W1 (W1 ≦ W2) (step S112; No), the control unit 58 of the home monitor 5 stores the counter value X stored in the storage unit 57. Is larger than the maximum value n (step S115).

カウンタ値Xが最大値n以下である(X≦n)場合には(ステップS115;No)、再度火災防止確認が必要であることを表示部55に表示し、第1送電停止要求を管理サーバ6に送信する(ステップS116)。   When the counter value X is less than or equal to the maximum value n (X ≦ n) (step S115; No), it is displayed on the display unit 55 that the fire prevention confirmation is necessary again, and the first power transmission stop request is sent to the management server 6 (step S116).

管理サーバ6は、第1送電停止要求を受信すると、ステップS103以降の処理を繰り返し行う。   When the management server 6 receives the first power transmission stop request, the management server 6 repeatedly performs the processing from step S103.

カウンタ値Xが最大値nよりも大きい(X>n)場合には(ステップS115;Yes)、宅内モニタ5の制御部58は、送電を再開するためには顧客が電力会社に連絡して火災防止確認を行う必要があること、及び、電力会社の電話番号等の連絡先を含む火災防止連絡確認画面を表示部55に表示し(ステップS117)、管理サーバ6に第2送電停止要求を送信する(ステップS118)。   When the counter value X is larger than the maximum value n (X> n) (step S115; Yes), the control unit 58 of the home monitor 5 causes the customer to contact the power company and fire to resume power transmission. A fire prevention contact confirmation screen including a contact information such as a power company telephone number and the like is displayed on the display unit 55 (step S117), and a second power transmission stop request is transmitted to the management server 6 (Step S118).

管理サーバ6は、第2送電停止要求を受信すると、送電停止指令(第2送電停止指令)をスマートメータ2及び宅内モニタ5に送信する(ステップS119)。   When receiving the second power transmission stop request, the management server 6 transmits a power transmission stop command (second power transmission stop command) to the smart meter 2 and the home monitor 5 (step S119).

スマートメータ2は、管理サーバ6から送信された送電停止指令(第2送電停止指令)に基づき、引込線3と屋内線4とを切断して顧客宅102への送電を停止する。このとき、宅内モニタ5の切換部51は、制御部58により切り換えられ、宅内モニタ5は、引込線3から電力を供給される。   Based on the power transmission stop command (second power transmission stop command) transmitted from the management server 6, the smart meter 2 disconnects the lead-in line 3 and the indoor line 4 and stops power transmission to the customer home 102. At this time, the switching unit 51 of the home monitor 5 is switched by the control unit 58, and the home monitor 5 is supplied with power from the service line 3.

宅内モニタ5の制御部58は、送電停止指令(第2送電停止指令)を受信すると、送電停止指令(第2送電停止指令)の受信後にスマートメータ2から送信された消費電力量を、第1消費電力量W1として記憶部57に記憶するようにすると共に、火災防止確認指令の受信回数であるカウンタ値Xを初期値「0」にリセットして(X=0)記憶部57に記憶し(ステップS114)、電力再送電処理を終了する。   When receiving the power transmission stop command (second power transmission stop command), the control unit 58 of the home monitor 5 uses the first power consumption amount transmitted from the smart meter 2 after receiving the power transmission stop command (second power transmission stop command). The power consumption amount W1 is stored in the storage unit 57, and the counter value X, which is the number of receptions of the fire prevention confirmation command, is reset to the initial value “0” (X = 0) and stored in the storage unit 57 ( Step S114), the power re-transmission process is terminated.

上述した電力再送電処理により、送電再開後の消費電力量である第2消費電力量W2が、送電停止の直前の消費電力量である消費電力量W1以上である場合には送電が停止されるので、顧客の火災防止確認が不十分であることに起因する火災を未然に防ぐことができる。   By the power re-transmission process described above, power transmission is stopped when the second power consumption W2 that is the power consumption after restarting power transmission is equal to or greater than the power consumption W1 that is the power consumption immediately before the power transmission is stopped. Therefore, it is possible to prevent a fire caused by the customer's fire prevention confirmation being insufficient.

また、本実施形態では、上述したように、宅内モニタ5に電気料金の決済が可能な電子マネーカード200の読取部56を設けることで、例えば、顧客がやむを得ず支払期限日637を越えて電気料金635に延滞利息6382を加算した請求金額が入金出来ず、送電停止予定日6383を迎えて送電停止され、顧客の帰宅が夜間に及んだ場合等、早急に送電を復旧したい場合でも、コンビニエンスストアや金融機関に出向くことなく、顧客宅102で予めコンビニエンスストアや電力会社等の窓口でチャージされている電子マネーカード200から請求金額の決済が可能である。   Further, in the present embodiment, as described above, the reading unit 56 of the electronic money card 200 that can settle the electricity bill is provided in the home monitor 5, so that, for example, the customer is unavoidable and the electricity bill exceeds the payment due date 637. Even if you want to restore power transmission as soon as possible, such as when you cannot receive the charged amount of 635 plus arrears interest 6382, the power transmission is stopped at the scheduled power transmission stop date 6383, and the customer returns home at night, etc. It is possible to settle the billed amount from the electronic money card 200 that has been charged in advance at a convenience store, a power company or the like at the customer's house 102 without going to a financial institution.

以上説明したように、実施形態に係る電力再送電システム1は、顧客宅102への送電を停止させるための送電停止指令(第1送電停止指令)、及び、顧客宅102への送電を再開させるための送電再開指令を送信する管理サーバ(管理端末)6と、管理サーバ(管理端末)6と通信可能に接続され、顧客宅102における消費電力量を算出すると共に、管理サーバ6から受信した送電停止指令(第1送電停止指令)に基づき、顧客宅102への送電を停止し、管理サーバ6から受信した送電再開指令に基づき、顧客宅102への送電を再開するスマートメータ(電力量計)2と、スマートメータ(電力量計)2と通信可能に接続され、管理サーバ(管理端末)6及びスマートメータ(電力量計)2から送信される情報を表示すると共に、スマートメータ(電力量計)2から送信された、送電停止前の消費電力量である第1消費電力量W1と、送電再開後の消費電力量である第2消費電力量W2とを比較し、第2消費電力量W2が第1消費電力量W1以上である場合に、管理サーバ(管理端末)6に対し、スマートメータ(電力量計)2に顧客宅102への送電を停止させることを要求する送電停止要求(第1送電停止要求)を送信する宅内モニタ(モニタ装置)5と、を備える。管理サーバ(管理端末)6は、送電停止要求(第1送電停止要求)に基づき、スマートメータ(電力量計)2に対して送電停止指令(第1送電停止指令)を送信する。   As described above, the power re-transmission system 1 according to the embodiment restarts power transmission stop command (first power transmission stop command) for stopping power transmission to the customer home 102 and power transmission to the customer home 102. The management server (management terminal) 6 that transmits a power transmission restart command for communication and the management server (management terminal) 6 are communicably connected to each other, calculate the power consumption at the customer's home 102, and receive the power transmission received from the management server 6 A smart meter (watt hour meter) that stops power transmission to the customer's home 102 based on the stop command (first power transmission stop command) and restarts power transmission to the customer's home 102 based on the power transmission restart command received from the management server 6 2 and a smart meter (power meter) 2 that are communicably connected to each other, display information transmitted from the management server (management terminal) 6 and the smart meter (power meter) 2, and The first power consumption W1 transmitted from the meter 2 (power meter) before power transmission is compared with the second power consumption W2 that is power consumption after power transmission is resumed, 2 When the power consumption amount W2 is equal to or greater than the first power consumption amount W1, the management server (management terminal) 6 is requested to cause the smart meter (power meter) 2 to stop power transmission to the customer home 102. And a home monitor (monitor device) 5 for transmitting a power transmission stop request (first power transmission stop request). The management server (management terminal) 6 transmits a power transmission stop command (first power transmission stop command) to the smart meter (power meter) 2 based on a power transmission stop request (first power transmission stop request).

これにより、送電再開後の消費電力量である第2消費電力量W2が、送電停止の直前の消費電力量である消費電力量W1以上である場合には送電が停止されるので、送電再開の際の安全性を高めることができる。   Accordingly, when the second power consumption W2 that is the power consumption after the power transmission is resumed is equal to or greater than the power consumption W1 that is the power consumption immediately before the power transmission is stopped, the power transmission is stopped. Safety can be improved.

また、スマートメータ(電力量計)2は、配電線101から引込線3を介して供給される電力を、屋内線4を介して顧客宅102に供給し、宅内モニタ(モニタ装置)5は、屋内線4から供給される電力、又は、配電線101から引込線3を介して供給される電力の何れか一方が供給される。   The smart meter (watt-hour meter) 2 supplies the power supplied from the distribution line 101 via the lead-in line 3 to the customer's house 102 via the indoor line 4, and the home monitor (monitor device) 5 is used indoors. Either the electric power supplied from the line 4 or the electric power supplied from the distribution line 101 via the lead-in line 3 is supplied.

このような構成において、宅内モニタ(モニタ装置)5は、スマートメータ(電力量計)2によって屋内線4を介した電力供給が停止している場合に、配電線101から引込線3を介して電力が供給される。   In such a configuration, the home monitor (monitor device) 5 is configured to supply power from the distribution line 101 via the lead-in line 3 when power supply via the indoor line 4 is stopped by the smart meter (watt-hour meter) 2. Is supplied.

また、宅内モニタ(モニタ装置)5は、事前にチャージされた電子マネーの残高(情報)を読み取り、管理サーバ(管理端末)6に対して電子マネーの残高(情報)を送信する。管理サーバ(管理端末)6は、電子マネーの情報に基づき、顧客宅102において使用された電気使用量に応じた電気料金を徴収する。   The home monitor (monitor device) 5 reads the balance (information) of the electronic money charged in advance and transmits the balance (information) of the electronic money to the management server (management terminal) 6. The management server (management terminal) 6 collects an electricity bill corresponding to the amount of electricity used at the customer's home 102 based on the information of electronic money.

これにより、例えば、顧客がやむを得ず支払期限日637を越えて電気料金が入金出来ず、送電停止予定日を迎えて送電停止され、顧客の帰宅が夜間に及んだ場合等、早急に送電を復旧したい場合でも、コンビニエンスストアや金融機関に出向くことなく、顧客宅で予めコンビニエンスストアや電力会社等の窓口でチャージされている電子マネーカード200から電気料金の決済が可能である。   As a result, for example, if the customer is forced to pay the electricity fee beyond the due date 637, the power transmission is stopped at the scheduled power transmission stop date, and the customer returns home at night. Even if it is desired to do so, it is possible to settle the electricity bill from the electronic money card 200 that has been charged in advance at the customer's house at a convenience store, a power company, or the like without going to a convenience store or a financial institution.

また、管理サーバ(管理端末)6は、電気料金の徴収状況に応じて、宅内モニタ(モニタ装置)5に対して顧客宅102への送電再開に伴う火災を防止するための火災防止確認指令を送信する。宅内モニタ(モニタ装置)5は、火災防止確認指令に基づき、所定の火災防止確認処理を行う。   In addition, the management server (management terminal) 6 issues a fire prevention confirmation command to prevent a fire associated with resumption of power transmission to the customer home 102 to the home monitor (monitor device) 5 according to the collection status of the electricity bill. Send. The home monitor (monitor device) 5 performs predetermined fire prevention confirmation processing based on the fire prevention confirmation instruction.

また、管理サーバ(管理端末)6は、火災防止確認処理の結果に応じて、スマートメータ(電力量計)2に対して送電再開指令を送信する。スマートメータ(電力量計)2は、送電再開指令に基づき、顧客宅102への送電を再開する。   Further, the management server (management terminal) 6 transmits a power transmission restart command to the smart meter (electricity meter) 2 according to the result of the fire prevention confirmation process. The smart meter (electric energy meter) 2 restarts power transmission to the customer's home 102 based on a power transmission restart command.

このような構成において、送電再開後の消費電力量である第2消費電力量W2が、送電停止の直前の消費電力量である消費電力量W1以上である場合には送電が停止されるので、顧客の火災防止確認が不十分であることに起因する火災を未然に防ぐことができ、送電再開の際の安全性を高めることできる。   In such a configuration, when the second power consumption amount W2 that is the power consumption amount after restarting the power transmission is equal to or greater than the power consumption amount W1 that is the power consumption amount immediately before the power transmission is stopped, the power transmission is stopped. It is possible to prevent a fire caused by the customer's fire prevention confirmation being inadequate and improve safety when resuming power transmission.

1 電力再送電システム
2 スマートメータ(電力量計)
3 引込線
4 屋内線
5 宅内モニタ(モニタ装置)
6 管理サーバ(管理端末)
51 切換部
52 電源部
53 通信部
54 操作部
55 表示部
56 読取部
57 記憶部
58 制御部
63 データベース
100 電力会社
101 配電線
102 顧客宅
103 電気機器
200 電子マネーカード(ICカード)
1 Electric power re-transmission system 2 Smart meter (electric energy meter)
3 Service line 4 Indoor line 5 Home monitor (monitor device)
6 management server (management terminal)
DESCRIPTION OF SYMBOLS 51 Switching part 52 Power supply part 53 Communication part 54 Operation part 55 Display part 56 Reading part 57 Storage part 58 Control part 63 Database 100 Electric power company 101 Distribution line 102 Customer house 103 Electric equipment 200 Electronic money card (IC card)

Claims (5)

顧客宅への送電を停止させるための送電停止指令、及び、前記顧客宅への送電を再開させるための送電再開指令を送信する管理端末と、
前記管理端末と通信可能に接続され、前記顧客宅における消費電力量を算出すると共に、前記管理端末から受信した送電停止指令に基づき、前記顧客宅への送電を停止し、前記管理端末から受信した送電再開指令に基づき、前記顧客宅への送電を再開する電力量計と、
前記電力量計と通信可能に接続され、前記管理端末及び前記電力量計から送信される情報を表示すると共に、前記電力量計から送信された、送電停止前の前記消費電力量である第1消費電力量と、送電再開後の前記消費電力量である第2消費電力量とを比較し、前記第2消費電力量が前記第1消費電力量以上である場合に、前記管理端末に対し、前記電力量計に前記顧客宅への送電を停止させることを要求する送電停止要求を送信するモニタ装置と、
を備え、
前記管理端末は、前記送電停止要求に基づき、前記電力量計に対して前記送電停止指令を送信する
電力再送電システム。
A power transmission stop command for stopping power transmission to the customer's home, and a management terminal that transmits a power transmission restart command for restarting power transmission to the customer's home;
Connected to the management terminal so as to be communicable, calculates power consumption at the customer's home, and stops power transmission to the customer's home based on the power transmission stop command received from the management terminal. Based on a power transmission restart command, a watt-hour meter that restarts power transmission to the customer's home,
The watt hour meter is communicably connected, displays information transmitted from the management terminal and the watt hour meter, and is the first power consumption amount transmitted from the watt hour meter before power transmission is stopped. When comparing the power consumption and the second power consumption that is the power consumption after restarting power transmission, and the second power consumption is greater than or equal to the first power consumption, for the management terminal, A monitor device for transmitting a power transmission stop request for requesting the power meter to stop power transmission to the customer's house;
With
The power management system transmits the power transmission stop command to the watt-hour meter based on the power transmission stop request.
前記電力量計は、配電線から引込線を介して供給される電力を、屋内線を介して顧客宅に供給し、
前記モニタ装置は、前記屋内線から供給される電力、又は、前記配電線から前記引込線を介して供給される電力の何れか一方が供給され、前記電力量計によって屋内線を介した電力供給が停止している場合に、前記配電線から前記引込線を介して電力が供給される
請求項1に記載の電力再送電システム。
The watt-hour meter supplies the power supplied from the distribution line via the service line to the customer's house via the indoor line,
The monitor device is supplied with either the power supplied from the indoor line or the power supplied from the distribution line via the service line, and the power meter supplies the power via the indoor line. The power re-transmission system according to claim 1, wherein electric power is supplied from the distribution line via the lead-in line when stopped.
前記モニタ装置は、電子マネーの情報を読み取り、前記管理端末に対して前記電子マネーの情報を送信し、
前記管理端末は、前記電子マネーの情報に基づき、前記顧客宅において使用された電気使用量に応じた電気料金を徴収する
請求項1又は請求項2に記載の電力再送電システム。
The monitor device reads electronic money information, transmits the electronic money information to the management terminal,
The power re-transmission system according to claim 1 or 2, wherein the management terminal collects an electricity bill according to the amount of electricity used at the customer's home based on the information of the electronic money.
前記管理端末は、前記電気料金の徴収状況に応じて、前記モニタ装置に対して前記顧客宅への送電再開に伴う火災を防止するための火災防止確認指令を送信し、
前記モニタ装置は、前記火災防止確認指令に基づき、所定の火災防止確認処理を行う
請求項3に記載の電力再送電システム。
The management terminal transmits a fire prevention confirmation instruction for preventing a fire associated with resumption of power transmission to the customer's house to the monitor device according to the collection status of the electricity bill,
The power re-transmission system according to claim 3, wherein the monitor device performs predetermined fire prevention confirmation processing based on the fire prevention confirmation instruction.
前記管理端末は、前記火災防止確認処理の結果に応じて、前記電力量計に対して前記送電再開指令を送信し、
前記電力量計は、前記送電再開指令に基づき、前記顧客宅への送電を再開する
請求項4に記載の電力再送電システム。
The management terminal transmits the power transmission restart command to the watt hour meter according to the result of the fire prevention confirmation process,
The power re-transmission system according to claim 4, wherein the watt-hour meter resumes power transmission to the customer's home based on the power transmission restart command.
JP2017156051A 2017-08-10 2017-08-10 Power re-transmission system Pending JP2019036068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017156051A JP2019036068A (en) 2017-08-10 2017-08-10 Power re-transmission system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017156051A JP2019036068A (en) 2017-08-10 2017-08-10 Power re-transmission system

Publications (1)

Publication Number Publication Date
JP2019036068A true JP2019036068A (en) 2019-03-07

Family

ID=65637592

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017156051A Pending JP2019036068A (en) 2017-08-10 2017-08-10 Power re-transmission system

Country Status (1)

Country Link
JP (1) JP2019036068A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022551996A (en) * 2019-10-18 2022-12-14 ランディス・ギア イノベーションズ インコーポレイテッド Secure tokens for controlling access to resources in resource distribution networks

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022551996A (en) * 2019-10-18 2022-12-14 ランディス・ギア イノベーションズ インコーポレイテッド Secure tokens for controlling access to resources in resource distribution networks
JP7653008B2 (en) 2019-10-18 2025-03-28 ランディス・ギア・テクノロジー・インコーポレイテッド Secure tokens for controlling access to resources in a resource distribution network - Patents.com

Similar Documents

Publication Publication Date Title
US8407115B2 (en) System and method for monitoring, controlling, and displaying utility information
US20020120569A1 (en) System and method for communication between remote locations
EP2202113A2 (en) System and method for pay as you go charging for electric vehicles
US20070083479A1 (en) Method, apparatus and program storage device for providing a prepaid metering system
US9677909B2 (en) Electricity meter
JP2013105371A (en) Billing system
WO2008026948A2 (en) Managing supply of a utility to a customer premises
CA2979564C (en) Method, system and apparatus for controlling prepaid delivery of utilities
KR101302115B1 (en) Electric vehicle charging device and offline Prepaid charging accounting method
KR20150129970A (en) Electric car charging and cost calcuating system
KR20090071921A (en) Prepaid Electronic Wattmeter and Its Operation Method
JP2019036068A (en) Power re-transmission system
JP2003153466A (en) Energy supply method and device
JP2001356025A (en) Prepaid meter reading meter, prepaid meter reading system, and prepaid meter reading method
CN103674121B (en) Interactive metering system
WO2003046787A1 (en) Rental machine management system and rental machine
JP3945179B2 (en) Energy selling method and processing device for controlling energy selling method
KR20160037324A (en) Method on Intergrated Management on Electricity Vending Machnine
WO2015079832A1 (en) Management device, management system, and program
JP3099438U (en) Lending equipment management system and lending equipment
JP2010501930A (en) Utility sales system and method
KR20160037323A (en) System on Intergrated Management on Electricity Vending Machnine
GB2319384A (en) Electronic funds transfer meter and method
JP2023002906A (en) Demand-responsive power feeding system
EP0741872A1 (en) Energy distributing system