[go: up one dir, main page]

JP2018178644A - Levee raising structure - Google Patents

Levee raising structure Download PDF

Info

Publication number
JP2018178644A
JP2018178644A JP2017083664A JP2017083664A JP2018178644A JP 2018178644 A JP2018178644 A JP 2018178644A JP 2017083664 A JP2017083664 A JP 2017083664A JP 2017083664 A JP2017083664 A JP 2017083664A JP 2018178644 A JP2018178644 A JP 2018178644A
Authority
JP
Japan
Prior art keywords
rubber packing
plate portion
foundation
concrete block
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017083664A
Other languages
Japanese (ja)
Other versions
JP6933916B2 (en
Inventor
岳生 佐野
Takeo Sano
岳生 佐野
修一 浅利
Shuichi Asari
修一 浅利
浩二 高澤
Koji Takazawa
浩二 高澤
隆 大貫
Takashi Onuki
隆 大貫
飯塚 豊
Yutaka Iizuka
豊 飯塚
英春 宮前
Hideharu Miyamae
英春 宮前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAIEI-KYOWA CONCRETE CO Ltd
Kyowa Concrete Industry Co Ltd
Original Assignee
KAIEI-KYOWA CONCRETE CO Ltd
Kyowa Concrete Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAIEI-KYOWA CONCRETE CO Ltd, Kyowa Concrete Industry Co Ltd filed Critical KAIEI-KYOWA CONCRETE CO Ltd
Priority to JP2017083664A priority Critical patent/JP6933916B2/en
Publication of JP2018178644A publication Critical patent/JP2018178644A/en
Application granted granted Critical
Publication of JP6933916B2 publication Critical patent/JP6933916B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a structure for raising an embankment capable of preventing water leak even when a water level at a front slope side is increased.SOLUTION: A structure for raising an embankment comprises: a foundation 12 and a foundation 13 provided on a top end 11a of an existing embankment 11; first water cutoff rubber packing 14 provided at a front slope side 11b on a top surface of the foundation 13; a height adjusting spacer 15 provided at a rear slope side 11c on the top surface of the foundation 13; a raising concrete block 16 disposed in a state in which a bottom surface of a bottom slab portion 16a is in contact with the first water cutoff rubber packing 14 and the height adjusting spacer 15; and a bonding material 17 provided in a clearance CL between the top surface of the foundation 13 and the bottom surface of the bottom slab portion 16a of the raising concrete block 16.SELECTED DRAWING: Figure 1

Description

本発明は、堤防嵩上げに有用な堤防嵩上げ構造物に関する。   The present invention relates to a levee raising structure useful for levee raising.

後記特許文献1には、堤防嵩上げに関する構造物が開示されている。この構造物は、既存堤防の天端に設けられたスリットまたは鞘状部材と、スリットまたは鞘状部材にその一部分を差し込まれたパネルとから構成されており、パネルの露出部分によって堤防嵩上げが為されている。   Patent Document 1 below discloses a structure related to levee raising. This structure is composed of a slit or sheath-like member provided at the top end of the existing dike, and a panel whose part is inserted into the slit or sheath-like member, and the raised part of the dike is produced by the exposed portion of the panel. It is done.

しかしながら、前記の堤防嵩上げ構造物は、表法面側の水位が上昇したときに、パネルの差し込み部分を通じて表法面側から裏法面側に向かって水漏れが生じる懸念があるとともに、この水漏れを原因としてパネルを支える部分が崩壊してパネルが倒れる懸念もある。   However, when the water level on the surface side rises, the dike raising structure described above has a concern that a water leak may occur from the surface side to the back surface side through the insertion portion of the panel. There is also a concern that the part supporting the panel may collapse due to the leak and the panel may fall down.

特開2015−031068号公報JP, 2015-031068, A

本発明が解決しようとする課題は、表法面側の水位が上昇したときでも表法面側から裏法面側への水漏れを防止できる堤防嵩上げ構造物を提供することにある。   The problem to be solved by the present invention is to provide a levee raising structure capable of preventing water leakage from the front side to the back side even when the water level on the front side rises.

前記課題を解決するため、本発明に係る堤防嵩上げ構造物は、表法面および裏法面を有する既存堤防の天端に設けられた基礎と、前記基礎の上面の前記表法面側に設けられた第1止水ゴムパッキンと、前記基礎の上面の前記裏法面側に設けられた高さ調整スペーサと、底版部と側版部とを連続して有し、かつ、前記底版部の下面が前記第1止水ゴムパッキンおよび前記高さ調整スペーサに接触した状態で設置された嵩上げコンクリートブロックと、前記基礎の上面と前記嵩上げコンクリートブロックの底版部の下面との隙間に設けられた結合材とを備えている。   In order to solve the above-mentioned subject, the embankment raising structure according to the present invention is provided on a foundation provided at the top end of the existing dike having a front slope and a back slope and the front side of the top surface of the foundation. The first water-proof rubber packing, the height adjustment spacer provided on the back slope side of the upper surface of the base, the bottom plate portion and the side plate portion are continuously provided, and the bottom plate portion A joint provided in a gap between a bulked concrete block installed with the lower surface in contact with the first water proof rubber packing and the height adjustment spacer, and the upper surface of the foundation and the lower surface of the bottom plate portion of the bulked concrete block Equipped with materials.

本発明に係る堤防嵩上げ構造物によれば、表法面側の水位が上昇したときでも表法面側から裏法面側への水漏れを防止できる。   According to the dike raising structure according to the present invention, even when the water level on the surface side rises, it is possible to prevent water leakage from the surface side to the back side.

図1は本発明の第1実施形態に係る堤防嵩上げ構造物を表法面側から見た部分図である。FIG. 1 is a partial view of a levee raising structure according to a first embodiment of the present invention as viewed from the front side. 図2は図1に示した堤防嵩上げ構造物のII−II線に沿う縦断面図である。FIG. 2 is a longitudinal sectional view taken along the line II-II of the dike raising structure shown in FIG. 図3は図1に示した堤防嵩上げ構造物のIII−III線に沿う縦断面図である。FIG. 3 is a longitudinal sectional view taken along the line III-III of the dike raising structure shown in FIG. 図4(A)〜図4(C)は図1に示した第1止水ゴムパッキンの断面形状とその変形例を示す図である。FIGS. 4 (A) to 4 (C) are diagrams showing the cross-sectional shape of the first water-proof rubber packing shown in FIG. 1 and its modification. 図5(A)〜図5(C)は図1に示した高さ調整スペーサの外観形状とその変形例を示す図である。FIG. 5A to FIG. 5C are views showing the appearance shape of the height adjustment spacer shown in FIG. 1 and a modification thereof. 図6は第1実施形態に係る堤防嵩上げ構造物の構築方法の説明図である。FIG. 6 is an explanatory view of a method of constructing the levee raising structure according to the first embodiment. 図7は第1実施形態に係る堤防嵩上げ構造物の構築方法の説明図である。FIG. 7: is explanatory drawing of the construction method of the dike raising structure which concerns on 1st Embodiment. 図8は第1実施形態に係る堤防嵩上げ構造物の構築方法の説明図である。FIG. 8 is an explanatory view of a method of constructing the levee raising structure according to the first embodiment. 図9は本発明の第2実施形態に係る堤防嵩上げ構造物を示す図2対応図である。FIG. 9 is a view corresponding to FIG. 2 showing a levee raising structure according to a second embodiment of the present invention. 図10は本発明の第3実施形態に係る堤防嵩上げ構造物を示す図2対応図である。FIG. 10 is a view corresponding to FIG. 2 showing a levee raising structure according to a third embodiment of the present invention. 図11(A)〜図11(C)は第1止水ゴムパッキンの他の形態に係る説明図である。11 (A) to 11 (C) are explanatory views according to another embodiment of the first water-stop rubber packing.

《第1実施形態(図1〜図8)》
まず、図1〜図5を用いて、本発明の第1実施形態に係る堤防嵩上げ構造物の構成について説明する。以下の説明では、便宜上、図2および図3の左側を前、右側を後と表記し、図1の左側を左、右側を右と表記し、図1〜図3の上側を上、下側を下と表記するともに、前後方向の寸法を幅、左右方向の寸法を長さ、上下方向の寸法を高さと表記する。
First Embodiment (FIGS. 1 to 8)
First, the structure of the levee raising structure according to the first embodiment of the present invention will be described using FIGS. 1 to 5. In the following description, for convenience, the left side of FIGS. 2 and 3 is referred to as front, the right side is referred to as back, the left side of FIG. 1 is referred to as left, the right side is referred to as right, and the upper side of FIGS. In addition, the dimension in the front-rear direction is denoted as width, the dimension in the left-right direction as length, and the dimension in the vertical direction as height.

図1〜図3の符号11は既存堤防であり、整地された天端11aを有している。符号11bは既存堤防11の表法面を示し、符号11cは既存堤防11の裏法面を示す。既存堤防11の天端11aには、基礎として、砕石基礎12とコンクリート基礎13が設けられている。この砕石基礎12およびコンクリート基礎13の長さは、後述する嵩上げコンクリートブロック16の並び数に対応している。図1〜図3にはコンクリート基礎13の上面が天端11aと面一になっているものを示したが、コンクリート基礎13の上面は天端11aと必ずしも面一である必要はない。   The code | symbol 11 of FIGS. 1-3 is an existing dike, and has the ground end 11a leveled. The code | symbol 11b shows the facing of the existing dike 11, and the code | symbol 11c shows the back slope of the existing dike 11. As shown in FIG. A crushed stone foundation 12 and a concrete foundation 13 are provided on the top end 11a of the existing dike 11 as a foundation. The lengths of the crushed stone foundation 12 and the concrete foundation 13 correspond to the number of rows of raised concrete blocks 16 described later. Although the upper surface of the concrete foundation 13 is shown to be flush with the top end 11a in FIGS. 1 to 3, the top surface of the concrete foundation 13 does not have to be flush with the top end 11a.

符号14は第1止水ゴムパッキンであり、コンクリート基礎13の上面の表法面11b側に設けられている。この第1止水ゴムパッキン14の材料には、クロロプレンゴムやニトリルゴムやエチレンプロピレンゴム等の合成ゴムの他に天然ゴム等が使用できるが、水膨張性を有する合成ゴムを用いることが好ましい。また、第1止水ゴムパッキン14の断面形状には、図4(A)に示した矩形状の他、図4(B)に示した台形状や図4(C)に示した楕円形状等が適宜使用できる。さらに、第1止水ゴムパッキン14の長さは、後述する嵩上げコンクリートブロック16の並び数に対応している。具体的には、第1止水ゴムパッキン14として、後述する嵩上げコンクリートブロック16の側版部16bの長さ×並び数に相当する長さを有するものを使用しても良いし、これよりも長さが小さい複数のものを直線的に並べて使用しても良い。さらに、第1止水ゴムパッキン14は、クロロプレンゴム系やエポキシ樹脂系や変性シリコーン樹脂系やウレタン樹脂系等の接着剤を用いてコンクリート基礎13の上面に固着されている。   The code | symbol 14 is 1st water-stop rubber packing, and is provided in the surface slope 11b side of the upper surface of the concrete foundation 13. As shown in FIG. As a material of the first water-stopping rubber packing 14, natural rubber and the like can be used in addition to synthetic rubbers such as chloroprene rubber, nitrile rubber and ethylene propylene rubber, but it is preferable to use synthetic rubber having water expansibility. In addition to the rectangular shape shown in FIG. 4 (A), the cross-sectional shape of the first water blocking rubber packing 14 is a trapezoidal shape shown in FIG. 4 (B), an elliptical shape shown in FIG. 4 (C), etc. Can be used as appropriate. Furthermore, the length of the first water-stop rubber packing 14 corresponds to the number of rows of the raised concrete blocks 16 described later. Specifically, as the first water blocking rubber packing 14, one having a length corresponding to the length x number of rows of the side plate portion 16b of the raised concrete block 16 described later may be used, or more than this A plurality of short lengths may be used in a linear arrangement. Furthermore, the first waterproof rubber packing 14 is fixed to the upper surface of the concrete foundation 13 using an adhesive such as chloroprene rubber, epoxy resin, modified silicone resin or urethane resin.

符号15が高さ調整スペーサであり、コンクリート基礎13の上面の裏法面11c側に第1止水ゴムパッキン14と前後方向に間隔をおき、かつ、後述する嵩上げコンクリートブロック16の並び方向に間隔をおいて複数個設けられている。ちなみに、後述する嵩上げコンクリートブロック16それぞれに接触する高さ調整スペーサ15の数は2個以上である。この高さ調整スペーサ15は、モルタル硬化物や合成樹脂硬化物等から成る。また、高さ調整スペーサ15の外観形状には、図5(A)に示した角柱状の他、図5(B)に示した角錐台状や図5(C)に示した円柱状等が適宜使用できる。さらに、高さ調整スペーサ15の厚さは、後述する嵩上げコンクリートブロック16を設置した後の第1止水ゴムパッキン14の厚さに対応している。さらに、高さ調整スペーサ15がモルタル硬化物から成る場合、コンクリート基礎13の上面に硬化前のモルタルを塗布してこれを硬化させることによって同上面に設けられている。一方、高さ調整スペーサ15が合成樹脂硬化物から成る場合、予め作製したものをコンクリート基礎13の上面に非接着で載置するか、あるいは、予め作製したものをクロロプレンゴム系やエポキシ樹脂系や変性シリコーン樹脂系やウレタン樹脂系等の接着剤を用いてコンクリート基礎13の上面に固着することによって同上面に設けられている。   Reference numeral 15 denotes a height adjustment spacer, which is spaced from the first waterproof rubber packing 14 in the front-rear direction on the back slope 11c side of the upper surface of the concrete foundation 13 and in the alignment direction of bulked concrete blocks 16 described later A plurality of sets are provided. Incidentally, the number of height adjustment spacers 15 in contact with each of the raised concrete blocks 16 described later is two or more. The height adjustment spacer 15 is made of hardened mortar, hardened synthetic resin, or the like. In addition to the prismatic shape shown in FIG. 5A, the external shape of the height adjustment spacer 15 may be a truncated pyramid shape shown in FIG. 5B or a cylindrical shape shown in FIG. It can be used appropriately. Furthermore, the thickness of the height adjustment spacer 15 corresponds to the thickness of the first water-stop rubber packing 14 after installing the raised concrete block 16 described later. Furthermore, when the height adjustment spacer 15 is made of a hardened mortar, it is provided on the upper surface of the concrete foundation 13 by applying a mortar before hardening and hardening the mortar. On the other hand, when the height adjusting spacer 15 is made of a synthetic resin cured product, the prepared one is placed on the upper surface of the concrete foundation 13 without adhesion, or the prepared one is made of chloroprene rubber or epoxy resin or It adheres to the upper surface of the concrete foundation 13 by using an adhesive such as a modified silicone resin or urethane resin.

符号16は嵩上げコンクリートブロック(プレキャストコンクリートブロック)であり、底版部16aと側版部16bとを連続して有し、内部に鉄筋16cを有している。ちなみに、図示した嵩上げコンクリートブロック16は、側版部16bの長さ>側版部16bの高さ>底版部16aの幅の関係を有する。この嵩上げコンクリートブロック16は複数個用意され、各々の底版部16aの下面が第1止水ゴムパッキン14および複数個の高さ調整スペーサ15に接触した状態で、底版部16aおよび側版部16bが互いに向き合うように、左右方向(側版部16bの長さ方向)に並べて設置されている。設置状態では、コンクリート基礎13の上面と各嵩上げコンクリートブロック16の底版部16aの下面との間には、第1止水ゴムパッキン14および高さ調整スペーサ15の厚さに基づく隙間CL(図7を参照)が形成される。この嵩上げコンクリートブロック16には、クレーン等によって移送する際に用いられる吊り下げ金具と、左右方向で隣接する嵩上げコンクリートブロック16を相互連結する際に用いられる接続金具が設けられているが、各々の図示を省略している。   The code | symbol 16 is a raised concrete block (precast concrete block), has the bottom plate part 16a and the side plate part 16b continuously, and has the rebar 16c inside. Incidentally, the illustrated raised concrete block 16 has a relationship of length of side plate portion 16 b> height of side plate portion 16 b> width of bottom plate portion 16 a. A plurality of the raised concrete blocks 16 are prepared, and the bottom plate portion 16a and the side plate portion 16b are in a state where the lower surface of each bottom plate portion 16a is in contact with the first waterproof rubber packing 14 and the plurality of height adjustment spacers 15. They are arranged side by side in the left-right direction (the length direction of the side plate portion 16 b) so as to face each other. In the installed state, a clearance CL based on the thickness of the first waterproof rubber packing 14 and the height adjustment spacer 15 between the upper surface of the concrete foundation 13 and the lower surface of the bottom plate portion 16a of each raised concrete block 16 (FIG. 7) ) Is formed. The bulking concrete block 16 is provided with a suspension fitting used when transporting by a crane or the like, and a connection fitting used when interconnecting the bulking concrete block 16 adjacent in the left-right direction. Illustration is omitted.

符号17は結合材であり、コンクリート基礎13の上面と各嵩上げコンクリートブロック16の底版部16aの下面との隙間CL(図7を参照)に設けられている。図3には、後述する各第3止水ゴムパッキン19の下側隙間(符号省略)と、第1止水ゴムパッキン14の前側隙間(符号省略)にも結合材17を設けたものを示しているが、当該結合材17は第3止水ゴムパッキン19の下側隙間と第1止水ゴムパッキン14の前側隙間に必ずしも設ける必要はない。この結合材17の材料には、グラウトやモルタル等が好ましく使用できる。ちなみに、結合材17は、各嵩上げコンクリートブロック16の底版部16aの下面をコンクリート基礎13の上面に結合する役目と、各嵩上げコンクリートブロック16の底版部16aの下面とコンクリート基礎13の上面との間の防水性を第1止水ゴムパッキン14との協働によって高める役目を果たす。   The code | symbol 17 is a bonding material, and it is provided in the clearance gap CL (refer FIG. 7) of the upper surface of the concrete foundation 13 and the lower surface of the bottom plate part 16a of each raised concrete block 16. As shown in FIG. FIG. 3 shows the lower clearances (reference numeral omitted) of the third water blocking rubber packing 19 described later and the front clearances (reference numeral omitted) of the first waterproof rubber packing 14 also provided with the bonding material 17. However, the bonding material 17 is not necessarily provided in the lower gap of the third water blocking rubber packing 19 and in the front gap of the first water blocking rubber packing 14. For the material of the bonding material 17, grout, mortar or the like can be preferably used. Incidentally, the bonding material 17 has a role of connecting the lower surface of the bottom plate portion 16a of each raised concrete block 16 to the upper surface of the concrete foundation 13, and between the lower surface of the lower plate portion 16a of each raised concrete block 16 and the upper surface of the concrete foundation 13. Plays a role of enhancing the waterproofness of the first embodiment by cooperation with the first water proof rubber packing 14.

前記隙間CLに結合材17を設ける手法には、(1)嵩上げコンクリートブロック16を設置した後に前記隙間CLに硬化前のグラウトまたはモルタルを注入してこれを硬化させる手法と、(2)嵩上げコンクリートブロック16を設置する前にコンクリート基礎13の上面に硬化前のグラウトまたはモルタルを塗布してその後に嵩上げコンクリートブロック16を設置してこれを硬化させる手法のいずれかを採用することができる。前記手法(1)における注入は、底版部16aの下面後側から高さ調整スペーサ15の間を通じて行うことができる他、各嵩上げコンクリートブロック16の底版部16aに予め1以上形成した注入用の貫通孔(図示省略)を通じて行うことができる。   In the method of providing the bonding material 17 in the clearance CL, (1) a method of injecting grout or mortar before hardening into the clearance CL after installing the raised concrete block 16 and hardening the same; and (2) raising the concrete It is possible to adopt any of the methods of applying grout or mortar before curing on the upper surface of the concrete foundation 13 before installing the block 16 and thereafter installing the raised concrete block 16 and curing it. The injection in the method (1) can be performed from the lower surface rear side of the bottom plate portion 16a through the space between the height adjustment spacers 15, and one or more injection holes previously formed in the bottom plate portion 16a of each raised concrete block 16 It can be done through holes (not shown).

符号18は第2止水ゴムパッキンであり、左右方向で隣接する嵩上げコンクリートブロック16の側版部16bの間に設けられている。この第2止水ゴムパッキン18の材料には、第1止水ゴムパッキン14と同様、クロロプレンゴムやニトリルゴムやエチレンプロピレンゴム等の合成ゴムの他に天然ゴム等が使用できるが、水膨張性を有する合成ゴムを用いることが好ましい。また、第2止水ゴムパッキン18の断面形状には、第1止水ゴムパッキン14と同様、図4(A)に示した矩形状の他、図4(B)に示した台形状や図4(C)に示した楕円形状等が適宜使用できる。さらに、第2止水ゴムパッキン18の高さ(上下方向の寸法)は、嵩上げコンクリートブロック16の側版部16bの高さに略一致している。さらに、第2止水ゴムパッキン18は、左右方向で隣接する嵩上げコンクリートブロック16の一方の側版部16bの左面または右面にクロロプレンゴム系やエポキシ樹脂系や変性シリコーン樹脂系やウレタン樹脂系等の接着剤を用いて固着されている。   Reference numeral 18 denotes a second waterproof rubber packing, which is provided between the side plate portions 16b of the raised concrete blocks 16 adjacent in the left-right direction. As a material of the second waterproof rubber packing 18, natural rubber etc. can be used in addition to synthetic rubber such as chloroprene rubber, nitrile rubber, ethylene propylene rubber, etc. like the first waterproof rubber packing 14. It is preferable to use a synthetic rubber having In addition to the rectangular shape shown in FIG. 4 (A), the cross-sectional shape of the second water blocking rubber packing 18 is the same as the first water blocking rubber packing 14 but the trapezoidal shape or the figure shown in FIG. 4 (B) The elliptical shape shown in 4 (C) can be used as appropriate. Furthermore, the height (the dimension in the vertical direction) of the second waterproof rubber packing 18 substantially matches the height of the side plate portion 16 b of the raised concrete block 16. Furthermore, the second waterproof rubber packing 18 is made of chloroprene rubber, epoxy resin, modified silicone resin, urethane resin or the like on the left or right side of the side plate portion 16b of the raised concrete block 16 adjacent in the left and right direction. It is fixed using an adhesive.

符号19は第3止水ゴムパッキンであり、左右方向で隣接する嵩上げコンクリートブロック16の底版部16aの間に設けられている。この第3止水ゴムパッキン19の材料には、第1止水ゴムパッキン14と同様、クロロプレンゴムやニトリルゴムやエチレンプロピレンゴム等の合成ゴムの他に天然ゴム等が使用できるが、水膨張性を有する合成ゴムを用いることが好ましい。また、第3止水ゴムパッキン19の断面形状には、第1止水ゴムパッキン14と同様、図4(A)に示した矩形状の他、図4(B)に示した台形状や図4(C)に示した楕円形状等が適宜使用できる。さらに、第3止水ゴムパッキン19の幅(前後方向の寸法)は、嵩上げコンクリートブロック16の底版部16aの幅よりも小さい。さらに、第3止水ゴムパッキン19は、左右方向で隣接する嵩上げコンクリートブロック16の一方の底版部16aの左面または右面にクロロプレンゴム系やエポキシ樹脂系や変性シリコーン樹脂系やウレタン樹脂系等の接着剤を用いて固着されている。   Reference numeral 19 denotes a third waterproof rubber packing, which is provided between bottom plate portions 16a of the raised concrete blocks 16 adjacent in the left-right direction. As a material of the third water blocking rubber packing 19, natural rubber etc. can be used in addition to synthetic rubbers such as chloroprene rubber, nitrile rubber and ethylene propylene rubber as in the first water blocking rubber packing 14. It is preferable to use a synthetic rubber having In addition to the rectangular shape shown in FIG. 4 (A), the cross-sectional shape of the third water blocking rubber packing 19 has a trapezoidal shape or a figure shown in FIG. 4 (B) as in the first water blocking rubber packing 14 The elliptical shape shown in 4 (C) can be used as appropriate. Furthermore, the width (the dimension in the front-rear direction) of the third water blocking rubber packing 19 is smaller than the width of the bottom plate portion 16 a of the raised concrete block 16. Furthermore, the third water-proof rubber gasket 19 is bonded to the left or right surface of one bottom plate portion 16a of the raised concrete block 16 adjacent in the left-right direction, such as chloroprene rubber, epoxy resin, modified silicone resin, urethane resin It is fixed using an agent.

つぎに、前述の堤防嵩上げ構造物の構成の理解を高めるために、図6〜図8を主に用いて、前述の堤防嵩上げ構造物の構築方法について説明する。ここで説明する構築方法は一例であって、前述の堤防嵩上げ構造物の構築方法を制限するものではない。   Next, in order to enhance the understanding of the configuration of the above-described dike raising structure, a method of constructing the above-described dike raising structure will be described mainly using FIGS. The construction method described here is an example, and does not limit the construction method of the above-described dike raising structure.

前述の堤防嵩上げ構造物を構築するときには、図6に示したように、既存堤防11の天端11aを整地し、この天端に砕石基礎12とコンクリート基礎13を設ける。そして、コンクリート基礎13の上面の表法面11b側に嵩上げコンクリートブロック16の並び方向に沿って第1止水ゴムパッキン14を設けるとともに、同コンクリート基礎13の上面の裏法面11c側に嵩上げコンクリートブロック16の並び方向に間隔をおいて複数個の高さ調整スペーサ15を設ける。   When constructing the above-mentioned dike raising structure, as shown in FIG. 6, the top end 11a of the existing dike 11 is leveled, and a crushed stone foundation 12 and a concrete foundation 13 are provided on this top end. And while providing the 1st water-stop rubber packing 14 along the alignment direction of the bulking concrete block 16 on the surface 11b side of the upper surface of the concrete foundation 13, bulking concrete is carried out on the back slope 11c side of the top of the concrete foundation 13. A plurality of height adjustment spacers 15 are provided at intervals in the arrangement direction of the blocks 16.

先に述べたように、第1止水ゴムパッキン14は、嵩上げコンクリートブロック16の側版部16bの長さ×並び数に相当する長さを有するものを使用しても良いし、これよりも長さが小さい複数のものを直線的に並べて使用しても良い。また、高さ調整スペーサ15は、コンクリート基礎13の上面にモルタル硬化物を形成して同上面に設けても良いし、コンクリート基礎13の上面に合成樹脂硬化物を非接着で載置しても良いし、コンクリート基礎13の上面に合成樹脂硬化物を接着材を用いて固着しても良い。   As described above, the first water-stop rubber packing 14 may have a length corresponding to the length x number of rows of the side plate portion 16 b of the raised concrete block 16 or may be more than this. A plurality of short lengths may be used in a linear arrangement. Further, the height adjusting spacer 15 may form a hardened mortar on the upper surface of the concrete foundation 13 and provide the same on the upper surface, or even if the hardened synthetic resin is placed on the upper surface of the concrete foundation 13 without adhesion. The cured synthetic resin may be fixed to the upper surface of the concrete foundation 13 using an adhesive.

そして、図7に示したように、クレーン等によって移送された1番目の嵩上げコンクリートブロック16を、その底版部16aの下面が第1止水ゴムパッキン14および複数個の高さ調整スペーサ15に接触するように設置する。   Then, as shown in FIG. 7, the first raised concrete block 16 transferred by a crane or the like is in contact with the first waterproof rubber packing 14 and the plurality of height adjustment spacers 15 on the lower surface of the bottom plate portion 16a. Install as you want.

そして、図8に示したように、設置後の1番目の嵩上げコンクリートブロック16の側版部16bの左面に第2止水ゴムパッキン18を接着剤を用いて固着するとともに、底版部16aの左面に第3止水ゴムパッキン19を接着剤を用いて固着する。第2止水ゴムパッキン18を固着するときには同様の接着剤を用いてその下面が第1止水ゴムパッキン14の上面に密着するようにし、第3止水ゴムパッキン19を固着するときには同様の接着剤を用いてその前面が第2止水ゴムパッキン18の後面に密着するようにする。第2止水ゴムパッキン18および第3止水ゴムパッキン19の材料が水膨張性を有する合成ゴムの場合には、第2止水ゴムパッキン18の下面と第1止水ゴムパッキン14の上面との密着と、第3止水ゴムパッキン19の前面と第2止水ゴムパッキン18の後面との密着に、必ずしも接着剤を用いる必要はない。   Then, as shown in FIG. 8, the second waterproof rubber packing 18 is fixed to the left surface of the side plate portion 16 b of the first raised concrete block 16 after installation using an adhesive, and the left surface of the bottom plate portion 16 a The third waterproof rubber packing 19 is fixed using an adhesive. The same adhesive is used to fix the second waterproof rubber packing 18 so that the lower surface of the second waterproof rubber packing 18 is in close contact with the upper surface of the first waterproof rubber packing 14, and the same adhesion is used when the third waterproof rubber packing 19 is fixed. An agent is used to ensure that the front face of the second seal is in close contact with the rear face of the second water proof rubber packing 18. When the material of the second water proof rubber packing 18 and the third water proof rubber packing 19 is a synthetic rubber having water expansibility, the lower surface of the second water proof rubber packing 18 and the upper surface of the first water proof rubber packing 14 It is not necessary to use an adhesive for the close contact and the close contact between the front surface of the third water proof rubber packing 19 and the rear surface of the second water proof rubber packing 18.

そして、図8に示した1番目の嵩上げコンクリートブロック16の左側に、2番目の嵩上げコンクリートブロック16(図示省略)を、その底版部16aの下面が第1止水ゴムパッキン14および複数個の高さ調整スペーサ15に接触するように設置する。そして、2番目の嵩上げコンクリートブロック16を右方向に移動させて、その側版部16bが第2止水ゴムパッキン18を介して1番目の嵩上げコンクリートブロック16の側版部16bと向き合い、かつ、その底版部16aが第3止水ゴムパッキン19を介して1番目の嵩上げコンクリートブロック16の側版部16bと向き合うように位置調整し、2番目の嵩上げコンクリートブロック16を1番目の嵩上げコンクリートブロック16に連結する。   Then, the second raised concrete block 16 (not shown) is placed on the left side of the first raised concrete block 16 shown in FIG. 8, and the lower surface of the bottom plate portion 16a is provided with the first waterproof rubber packing 14 and a plurality of higher ones. It is installed in contact with the height adjustment spacer 15. Then, move the second raised concrete block 16 to the right, and the side plate portion 16 b faces the side plate portion 16 b of the first raised concrete block 16 via the second waterproof rubber packing 18, and The bottom plate portion 16 a is positioned so as to face the side plate portion 16 b of the first raised concrete block 16 via the third waterproof rubber packing 19, and the second raised concrete block 16 is subjected to the first raised concrete block 16. Connect to

この後も、前記同様に、2番目以降の嵩上げコンクリートブロック16への第2止水ゴムパッキン18および第3止水ゴムパッキン19の固着と、3番目以降の嵩上げコンクリートブロック16の設置、位置調整および連結を、嵩上げコンクリートブロック16が必要数に達するまで行う。   Also after this, in the same manner as described above, the adhesion of the second waterproof rubber packing 18 and the third waterproof rubber packing 19 to the second and subsequent raised concrete blocks 16, the installation of the third and subsequent raised concrete blocks 16, and position adjustment And connection is performed until the required number of raised concrete blocks 16 is reached.

そして、コンクリート基礎13の上面と各嵩上げコンクリートブロック16の底版部16aの下面との隙間CL(図7を参照)に結合材17を設ける。前記隙間CLに結合材17を設ける手法には、先に述べた手法(1)と手法(2)のいずれを採用しても良いが、硬化前のグラウトまたはモルタルの余剰分が底版部16aの下面後側から漏れ出ることを防止するために、漏れ出し防止用の仕切板等を底版部16aの下面後側に設置して作業後にこれを取り除くようにしても良い。前記手法(1)または前記手法(2)によって前記隙間CLに結合材17を設けるときに、硬化前のグラウトまたはモルタルの余剰分が各第3止水ゴムパッキン19の下側隙間(符号省略、図3を参照)に入り込んでも、各第3止水ゴムパッキン19があるため、当該余剰分が左右方向で隣接する嵩上げコンクリートブロック16の底版部16aの間から上側に漏れ出すことはない。以上で、前述の堤防嵩上げ構造物が構築される。   Then, the bonding material 17 is provided in the gap CL (see FIG. 7) between the upper surface of the concrete foundation 13 and the lower surface of the bottom plate portion 16 a of each raised concrete block 16. As a method of providing the bonding material 17 in the gap CL, any of the method (1) and the method (2) described above may be adopted, but the surplus portion of the grout or mortar before hardening is of the bottom plate portion 16a. In order to prevent leakage from the lower surface rear side, a leakage preventing partition plate or the like may be installed on the lower surface rear side of the bottom plate portion 16a and removed after the operation. When the bonding material 17 is provided in the gap CL by the method (1) or the method (2), the excess of the grout or mortar before curing is the lower gap (the code is omitted,) Even if it enters into FIG. 3, since the third water-stop rubber packings 19 are present, the surplus does not leak upward from between the bottom plate portions 16 a of the raised concrete blocks 16 adjacent in the left-right direction. Above, the above-mentioned dike raising structure is constructed.

つぎに、第1実施形態に係る堤防嵩上げ構造物によって得られる効果について説明する。   Below, the effect obtained by the dike raising structure which concerns on 1st Embodiment is demonstrated.

第1実施形態に係る堤防嵩上げ構造物は、コンクリート基礎13の上面の表法面11b側に第1止水ゴムパッキン14が設けられ、しかも、コンクリート基礎13の上面と各嵩上げコンクリートブロック16の底版部16aの下面との隙間CLに結合材17が設けられている。すなわち、各嵩上げコンクリートブロック16の底版部16aの下面とコンクリート基礎13の上面との間の防水性が第1止水ゴムパッキン14と結合材17との協働によって高められているため、表法面11b側の水位が上昇したときでも、各嵩上げコンクリートブロック16の底版部16aの下面側を通じて表法面11b側から裏法面11c側に向かって水漏れが生じることを防止できるし、この水漏れを原因として各嵩上げコンクリートブロック16の支持部分が崩壊して嵩上げコンクリートブロック16が倒れることも防止できる。   In the levee raising structure according to the first embodiment, the first waterproof rubber packing 14 is provided on the surface 11b side of the upper surface of the concrete foundation 13, and moreover, the upper surface of the concrete foundation 13 and the bottom plate of each raised concrete block 16 The bonding material 17 is provided in the gap CL with the lower surface of the portion 16a. That is, since the waterproofness between the lower surface of the bottom plate portion 16a of each raised concrete block 16 and the upper surface of the concrete foundation 13 is enhanced by the cooperation of the first waterproof rubber packing 14 and the bonding material 17, the surface method Even when the water level on the surface 11b side rises, it is possible to prevent water leakage from the front slope surface 11b side to the back slope surface 11c side through the lower surface side of the bottom plate portion 16a of each raised concrete block 16 It is also possible to prevent the support portion of each raised concrete block 16 from collapsing due to the leak and the raised concrete block 16 from falling down.

また、第1実施形態に係る堤防嵩上げ構造物は、コンクリート基礎13の上面の裏法面11c側に高さ調整スペーサ15が設けられ、しかも、各嵩上げコンクリートブロック16は底版部16aの下面が第1止水ゴムパッキン14および高さ調整スペーサ15に接触した状態で設置されている。すなわち、コンクリート基礎13の上面に第1止水ゴムパッキン14を設けた場合でも、各嵩上げコンクリートブロック16の設置姿勢を高さ調整スペーサ15によって調整できるため、表法面11b側の水位が上昇したときでも、水圧の影響等によって各嵩上げコンクリートブロック16が倒れることを防止できる。   Further, in the levee raising structure according to the first embodiment, the height adjustment spacer 15 is provided on the back slope 11c side of the upper surface of the concrete foundation 13, and each raised concrete block 16 has the bottom surface of the bottom plate portion 16a (1) It is installed in contact with the water blocking rubber packing 14 and the height adjustment spacer 15. That is, even when the first waterproof rubber packing 14 is provided on the upper surface of the concrete foundation 13, the installation posture of each raised concrete block 16 can be adjusted by the height adjustment spacer 15, so the water level on the front side 11b increases. At any time, the raised concrete blocks 16 can be prevented from falling down due to the influence of water pressure or the like.

さらに、第1実施形態に係る堤防嵩上げ構造物は、左右方向で隣接する嵩上げコンクリートブロック16の側版部16bの間に第2止水ゴムパッキン18が設けられている。すなわち、左右方向で隣接する嵩上げコンクリートブロック16の側版部16bの間の防水性が第2止水ゴムパッキン18によって高められているため、表法面11b側の水位が上昇したときでも、前記側版部16bの間を通じて表法面11b側から裏法面11c側に向かって水漏れが生じることを防止できる。   Furthermore, the embankment raising structure according to the first embodiment is provided with the second waterproof rubber packing 18 between the side plate portions 16 b of the raising concrete block 16 adjacent in the left-right direction. That is, since the waterproofness between the side plate portions 16b of the raised concrete blocks 16 adjacent in the left-right direction is enhanced by the second water proof rubber packing 18, even when the water level on the front slope 11b side rises, It is possible to prevent the occurrence of water leakage from the front side 11b to the back side 11c through the side plate portion 16b.

さらに、第1実施形態に係る堤防嵩上げ構造物は、左右方向で隣接する嵩上げコンクリートブロック16の底版部16aの間に第3止水ゴムパッキン19が設けられている。すなわち、左右方向で隣接する嵩上げコンクリートブロック16の底版部16aの間の防水性が第3止水ゴムパッキン19によって高められるとともに、前記手法(1)または前記手法(2)によって前記隙間CLに結合材17を設けるときに、硬化前のグラウトまたはモルタルの余剰分が左右方向で隣接する嵩上げコンクリートブロック16の底版部16aの間から上側に漏れ出すことを防止することができる。   Furthermore, in the dike raising structure according to the first embodiment, the third water blocking rubber packing 19 is provided between the bottom plate portions 16 a of the raised concrete blocks 16 adjacent in the left-right direction. That is, the waterproofness between the bottom plate portions 16a of the raised concrete blocks 16 adjacent in the left-right direction is enhanced by the third water proof rubber packing 19, and the method is combined with the gap CL by the method (1) or the method (2). When the material 17 is provided, it is possible to prevent the excess of the grout or mortar before hardening from leaking upward between the bottom plate portions 16 a of the raised concrete blocks 16 adjacent in the left-right direction.

さらに、第1実施形態に係る堤防嵩上げ構造物は、コンクリート基礎13の上面に第1止水ゴムパッキン14および高さ調整スペーサ15が設けられているので、嵩上げコンクリートブロック16の設置と、設置後の嵩上げコンクリートブロック16への第2止水ゴムパッキン18および第3止水ゴムパッキン19の固着と、固着後の嵩上げコンクリートブロック16の位置調整および連結を繰り返した後に、結合材17を設ける作業を行うことにより、所望数の嵩上げコンクリートブロック16から成る堤防嵩上げ構造物を効率良く構築することができる。   Furthermore, the embankment raising structure according to the first embodiment is provided with the first waterproof rubber packing 14 and the height adjusting spacer 15 on the upper surface of the concrete foundation 13, so installation of the raising concrete block 16 and after installation After repeating the fixing of the second water proof rubber packing 18 and the third water proof rubber packing 19 to the bulking concrete block 16 and the positional adjustment and connection of the bulking concrete block 16 after fixing, the work of providing the bonding material 17 is performed. By doing this, it is possible to efficiently construct a levee raising structure composed of the desired number of raised concrete blocks 16.

なお、第1実施形態に係る堤防嵩上げ構造物にあっては、各嵩上げコンクリートブロック16の姿勢および位置を安定化させるために、各嵩上げコンクリートブロック16の底版部16aの上面を覆うように裏法面11c側に埋め戻し土20を設けても良い(図2および3を参照)。   In addition, in the dike raising structure according to the first embodiment, in order to stabilize the posture and position of each raised concrete block 16, the lining method is performed so as to cover the upper surface of the bottom plate portion 16a of each raised concrete block 16. Backfill soil 20 may be provided on the surface 11c side (see FIGS. 2 and 3).

また、第1実施形態に係る堤防嵩上げ構造物にあっては、左右方向で隣接する嵩上げコンクリートブロック16の側版部16bの間および底版部16aの間の防水性を高めるために、各第2止水ゴムパッキン18の前側隙間(符号省略、図3を参照)と、各第2止水ゴムパッキン18の後側隙間(符号省略、図3を参照)と、各第3止水ゴムパッキン19の上側隙間(符号省略、図3を参照)に目地材(図示省略)を設けても良い。この目地材の材料には、モルタルやグラウトの他、変成シリコーン系やポリサルファイド系等のシーリング材を適宜用いることができる。   Moreover, in the dike raising structure according to the first embodiment, in order to improve the waterproofness between the side plate portions 16 b and the bottom plate portions 16 a of the raising concrete blocks 16 adjacent in the left-right direction, The front gap of the water blocking rubber packing 18 (reference numeral omitted, refer to FIG. 3), the rear gap of each second water blocking rubber packing 18 (reference code omitted, refer to FIG. 3), and the third water blocking rubber packing 19 A joint material (not shown) may be provided in the upper gap (reference numeral omitted, see FIG. 3). As the material of the joint material, in addition to mortar and grout, sealing materials such as modified silicones and polysulfides can be appropriately used.

《第2実施形態(図9)》
図9は本発明の第2実施形態に係る堤防嵩上げ構造物を示す。この堤防嵩上げ構造物の構成が第1実施形態に係る堤防嵩上げ構造物と異なるところは、
・基礎堤防11の表法面11bに護岸コンクリートブロック11dが敷設されている点
・砕石基礎12を排除し、最上位の護岸コンクリートブロック11dの上面と一部が重な
るようにコンクリート基礎13が設けられている点
・コンクリート基礎13の前面と、各嵩上げコンクリートブロック16の側版部16bの 前面が、護岸コンクリートブロック11dの前面と段差無く連続している点
にある。他の構成は第1実施形態に係る堤防嵩上げ構造物と同じであるため、同一符号を用いてその説明を省略する。
Second Embodiment (FIG. 9)
FIG. 9 shows a levee raising structure according to a second embodiment of the present invention. The configuration of this levee raising structure is different from that of the dike raising structure according to the first embodiment,
-A point where a revetment concrete block 11d is laid on the surface 11b of the foundation embankment 11.-The concrete foundation 13 is excluded so that the crushed stone foundation 12 is partially overlapped with the top face of the revetment concrete block 11d. The point provided is that the front surface of the concrete foundation 13 and the front surface of the side plate portion 16b of each raised concrete block 16 are continuous with the front surface of the revetment concrete block 11d without any step. The other configuration is the same as that of the levee raising structure according to the first embodiment, and thus the description will be omitted using the same reference numerals.

この第2実施形態に係る堤防嵩上げ構造物は、護岸コンクリートブロック11dが敷設されている堤防に適用する際に有用であり、最上位の護岸コンクリートブロック11dを利用して基礎の簡略化を図ることができる。他の効果は第1実施形態に係る堤防嵩上げ構造物と同じであるため、その説明を省略する。   The dike raising structure according to the second embodiment is useful when applied to the dike on which the revetment concrete block 11 d is laid, and the foundation is to be simplified using the uppermost revetment concrete block 11 d. Can. The other effects are the same as those of the levee raising structure according to the first embodiment, and thus the description thereof will be omitted.

《第3実施形態(図10)》
図10は本発明の第3実施形態に係る堤防嵩上げ構造物を示す。この堤防嵩上げ構造物の構成が第1実施形態に係る堤防嵩上げ構造物と異なるところは、
・各嵩上げコンクリートブロック16の側版部16bの前面の少なくとも下部が、既存堤
防11の表法面11b側に設けられた埋め戻し土21によって覆われている点
にある。他の構成は第1実施形態に係る堤防嵩上げ構造物と同じであるため、同一符号を用いてその説明を省略する。
Third Embodiment (FIG. 10)
FIG. 10 shows a levee raising structure according to a third embodiment of the present invention. The configuration of this levee raising structure is different from that of the dike raising structure according to the first embodiment,
At least the lower portion of the front surface of the side plate portion 16 b of each raised concrete block 16 is covered by the backfill soil 21 provided on the surface 11 b side of the existing dike 11. The other configuration is the same as that of the levee raising structure according to the first embodiment, and thus the description will be omitted using the same reference numerals.

この第3実施形態に係る堤防嵩上げ構造物は、表法面11b側に設けられた埋め戻し土21、または、先に述べた裏法面11c側の埋め戻し土20との協働によって、各嵩上げコンクリートブロック16の姿勢および位置を安定化させることができる。他の効果は第1実施形態に係る堤防嵩上げ構造物と同じであるため、その説明を省略する。   The levee raising structure according to the third embodiment is each formed by the cooperation with the backfill soil 21 provided on the surface 11b or the backfill soil 20 on the back slope 11c described above. The attitude and position of the raised concrete block 16 can be stabilized. The other effects are the same as those of the levee raising structure according to the first embodiment, and thus the description thereof will be omitted.

《他の実施形態》
(M1)各堤防嵩上げ構造物を構成する第1止水ゴムパッキン14として、嵩上げコンクリートブロック16の側版部16bの長さ×並び数に相当する長さを有するものを使用する場合とこれよりも長さが小さい複数のものを直線的に並べて使用する場合、すなわち、複数の嵩上げコンクリートブロック16で共用する形態の第1止水ゴムパッキン14について説明したが、共用しない形態も採用可能である。
Other Embodiments
(M1) As the first water blocking rubber packing 14 constituting each levee raising structure, a case having a length corresponding to the length x number of rows of the side plate portion 16b of the raising concrete block 16 is used In the case where a plurality of short lengths are linearly arranged and used, that is, the first waterproof rubber packing 14 in a form shared by a plurality of raised concrete blocks 16 has been described, a form not shared can also be adopted. .

図11は複数の嵩上げコンクリートブロック16で共用しない形態の第1止水ゴムパッキン14の例を示す。図11(C)に示したように、この第1止水ゴムパッキン14は、嵩上げコンクリートブロック16の側版部16bの長さよりも僅かに大きく、両端部が上側に折り曲げられている。第1止水ゴムパッキン14の非折り曲げ部分はコンクリート基礎13の上面に接着剤を用いて固着され、両折り曲げ部分14aは嵩上げコンクリートブロック16を設置した後に側版部16bの左面と右面にそれぞれ接着剤を用いて固着される。   FIG. 11 shows an example of the first water-stop rubber packing 14 not shared by a plurality of raised concrete blocks 16. As shown in FIG. 11C, the first water blocking rubber packing 14 is slightly larger than the length of the side plate portion 16b of the raised concrete block 16, and both end portions thereof are bent upward. The non-folded portion of the first waterproof rubber packing 14 is fixed to the upper surface of the concrete foundation 13 using an adhesive, and both the folded portions 14a are respectively adhered to the left surface and the right surface of the side plate portion 16b after installing the raised concrete block 16. It is fixed using an agent.

また、図11(A)および図11(B)に示したように、左右方向で隣接する嵩上げコンクリートブロック16のうち、一方の嵩上げコンクリートブロック16(図11(A)を参照)に対応する第1止水ゴムパッキン14と、他方の嵩上げコンクリートブロック16(図11(A)B参照)に対応する第1止水ゴムパッキン14は、前後に位置がずれていて互いの折り曲げ部分14aがぶつからないようになっている。ちなみに、図11(A)および図11(B)に示したように、第2止水ゴムパッキン18と第3止水ゴムパッキン19の固着位置は同じであるが、第2止水ゴムパッキン18の高さ(上下方向の寸法)は折り曲げ部分14aの高さ(上下方向の寸法)だけ小さくなっている。   Further, as shown in FIGS. 11 (A) and 11 (B), of the raised concrete blocks 16 adjacent in the left-right direction, the second one corresponds to one of the raised concrete blocks 16 (see FIG. 11 (A)). (1) Water-stopping rubber packing 14 and the first water-stopping rubber packing 14 corresponding to the other raised concrete block 16 (see FIG. 11 (A) B) are offset in the front and back, and the bent portions 14a do not collide with each other It is supposed to be. Incidentally, as shown in FIG. 11A and FIG. 11B, the fixed positions of the second water proof rubber packing 18 and the third water proof rubber packing 19 are the same, but the second water proof rubber packing 18 The height (the dimension in the vertical direction) of is smaller by the height (the dimension in the vertical direction) of the bent portion 14a.

すなわち、図11(C)に示したように、左右方向で隣接する嵩上げコンクリートブロック16の側版部16bの間には2つの折り曲げ部分14aが介在するものの、第1止水ゴムパッキン14の位置が前後に位置がずれているため、嵩上げコンクリートブロック16の側版部16bの間の寸法は1つの折り曲げ部分14aの厚さに相当する。   That is, as shown in FIG. 11C, although the two bent portions 14a intervene between the side plate portions 16b of the raised concrete block 16 adjacent in the left-right direction, the position of the first waterproof rubber packing 14 Of the side plates 16b of the raised concrete block 16 correspond to the thickness of one bent portion 14a.

(M2)各堤防嵩上げ構造物を構成する嵩上げコンクリートブロック16として側版部16bの長さ>側版部16bの高さ>底版部16bの幅の関係を有するものを示したが、底版部16aと側版部16bとを連続して有するものであれば、他の寸法関係を有するものでも嵩上げコンクリートブロック16として使用することができる。   (M2) As a raised concrete block 16 which constitutes each levee raising structure, the one having a relation of the length of the side plate portion 16b> the height of the side plate portion 16b> the width of the bottom plate portion 16b is shown. As long as it has the side plate portion 16 b and the side plate portion 16 b continuously, any other dimensional relationship can be used as the raised concrete block 16.

(M3)図示の便宜上、各堤防嵩上げ構造物の既存堤防11の天端11aの幅が嵩上げコンクリートブロック16の底版部11aの幅に比べてさほど大きくないものを示したが、天端11aの幅が図示幅よりも大きくても各堤防嵩上げ構造物を適宜構築することができる。例えば、既存堤防11の天端11aの幅が大きい場合には、各堤防嵩上げ構造物の構築位置を変えることにより、裏法面11c側の埋め戻し土20の幅、または、裏法面11c側の埋め戻し土20の幅と表法面11b側の埋め戻し土21の幅の両方を増加することができる。また、埋め戻し土20の幅を増加できる場合には、この埋め戻し土20の上に人間や自転車や車等が通行可能な道路を構築することもできる。   (M3) For convenience of illustration, the width of the top end 11a of the existing dike 11 of each levee raising structure is not so much larger than the width of the bottom plate portion 11a of the raising concrete block 16, but the width of the top 11a Although it is larger than the illustrated width, each levee raising structure can be constructed appropriately. For example, when the width of the top end 11a of the existing embankment 11 is large, the width of the backfill soil 20 on the back slope 11c side or the back slope 11c side is changed by changing the construction position of each embankment raising structure. Both the width of the backfill soil 20 and the width of the backfill soil 21 on the surface 11b can be increased. In addition, when the width of the backfill soil 20 can be increased, it is also possible to construct a road on which the human being, a bicycle, a car or the like can pass.

(M4)各堤防嵩上げ構造物として第1止水ゴムパッキン14の後側に高さ調整スペーサ15を設けたものを示したが、この高さ調整スペーサ15と同様の第2の高さ調整スペーサ(図示省略)を第1止水ゴムパッキン14の前側に設けて、嵩上げコンクリートブロック16をその底版部16aの下面が第1止水ゴムパッキン14、高さ調整スペーサ15および第2の高さ調整スペーサに接触した状態で設置するようにしても良い。   (M4) Although the thing which provided the height adjustment spacer 15 in the back side of the 1st water-stop rubber packing 14 as each embankment raising structure was shown, the 2nd height adjustment spacer similar to this height adjustment spacer 15 is shown. (Not shown) is provided on the front side of the first water proof rubber packing 14, and the bottom surface of the bottom plate portion 16a of the raised concrete block 16 is the first water proof rubber packing 14, the height adjustment spacer 15, and the second height adjustment You may make it install in the state which contacted the spacer.

11…既存堤防、11a…天端、11b…表法面、11c…裏法面、11d…護岸コンクリートブロック、12…砕石基礎、13…コンクリート基礎、14…第1止水ゴムパッキン、15…高さ調整スペーサ、16…嵩上げコンクリートブロック、16a…底版部、16b…側版部、16c…鉄筋、17…結合材、18…第2止水ゴムパッキン、19…第3止水ゴムパッキン、20…裏法面側の埋め戻し土、21…表法面側の埋め戻し土。   11: Existing embankment, 11a: Heaven end, 11b: Surface slope, 11c: Back slope, 11d: revetment concrete block, 12: crushed stone foundation, 13: concrete foundation, 14: first water proof rubber packing, 15: high Adjusted spacer, 16: Raised concrete block, 16a: Bottom plate portion, 16b: Side plate portion, 16c: Rebar, 17: Binding material, 18: Second water proof rubber packing, 19: Third water proof rubber packing, 20 ... Backfill soil on the back slope side, 21 ... backfill soil on the front slope side.

Claims (5)

表法面および裏法面を有する既存堤防の天端に設けられた基礎と、
前記基礎の上面の前記表法面側に設けられた第1止水ゴムパッキンと、
前記基礎の上面の前記裏法面側に設けられた高さ調整スペーサと、
底版部と側版部とを連続して有し、かつ、前記底版部の下面が前記第1止水ゴムパッキンおよび前記高さ調整スペーサに接触した状態で設置された嵩上げコンクリートブロックと、
前記基礎の上面と前記嵩上げコンクリートブロックの底版部の下面との隙間に設けられた結合材とを備えている、
堤防嵩上げ構造物。
A foundation provided at the top end of the existing dike having a bevel and a back slope,
A first waterproof rubber packing provided on the front surface side of the upper surface of the base;
A height adjustment spacer provided on the back slope side of the upper surface of the foundation;
A bulked concrete block having a bottom plate portion and a side plate portion continuously, and installed in a state in which the bottom surface of the bottom plate portion is in contact with the first water proof rubber packing and the height adjustment spacer;
And a bonding material provided in a gap between the upper surface of the foundation and the lower surface of the bottom plate portion of the raised concrete block.
Levee raising structure.
前記嵩上げコンクリートブロックは複数個であり、前記底版部および前記側版部が互いに向き合うように並べて設置されている、
請求項1に記載の堤防嵩上げ構造物。
The plurality of raised concrete blocks are provided, and the bottom plate portion and the side plate portion are arranged side by side so as to face each other.
The dike raising structure according to claim 1.
前記第1止水ゴムパッキンは、前記嵩上げコンクリートブロックの並び数に対応した長さを有している、
請求項2に記載の堤防嵩上げ構造物。
The first water blocking rubber packing has a length corresponding to the number of rows of the raised concrete blocks.
The dike raising structure according to claim 2.
前記高さ調整スペーサは、前記嵩上げコンクリートブロックの並び方向に間隔をおいて複数個設けられている、
請求項2または3に記載の堤防嵩上げ構造物。
The height adjustment spacer is provided in a plurality at intervals in the arranging direction of the raised concrete blocks,
The dike raising structure according to claim 2 or 3.
隣接する前記嵩上げコンクリートブロックの前記側版部の間には第2止水ゴムパッキンが設けられ、かつ、前記底版部の間には第3止水ゴムパッキンが設けられている、
請求項2〜4のいずれか1項に記載の堤防嵩上げ構造物。
A second water blocking rubber packing is provided between the side plate portions of the adjacent raised concrete blocks, and a third water blocking rubber packing is provided between the bottom plate portions.
The levee raising structure according to any one of claims 2 to 4.
JP2017083664A 2017-04-20 2017-04-20 Embankment raising structure Active JP6933916B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017083664A JP6933916B2 (en) 2017-04-20 2017-04-20 Embankment raising structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017083664A JP6933916B2 (en) 2017-04-20 2017-04-20 Embankment raising structure

Publications (2)

Publication Number Publication Date
JP2018178644A true JP2018178644A (en) 2018-11-15
JP6933916B2 JP6933916B2 (en) 2021-09-08

Family

ID=64282974

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017083664A Active JP6933916B2 (en) 2017-04-20 2017-04-20 Embankment raising structure

Country Status (1)

Country Link
JP (1) JP6933916B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020016061A (en) * 2018-07-25 2020-01-30 東亜建設工業株式会社 Embankment construction method
JP2021105263A (en) * 2019-12-26 2021-07-26 アスザック株式会社 Structure for raising levee and construction method of structure for raising levee
JP2022041056A (en) * 2020-08-31 2022-03-11 株式会社大林組 Overflow suppression structure for river levee

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04194228A (en) * 1990-11-27 1992-07-14 Daiho Constr Co Ltd Caisson and manufacture thereof
JPH1037109A (en) * 1996-07-29 1998-02-10 Hokukon:Kk Concrete block having height adjusting function and concrete block laying method using it
JP2000001863A (en) * 1999-05-19 2000-01-07 Fujibayashi Concrete Kogyo Kk Balancing-toy bearing body for installing large-sized concrete block
US20040096275A1 (en) * 2001-03-16 2004-05-20 Rorheim Thor Olav Portable flood barrier section and flood barrier
JP3186385U (en) * 2013-07-22 2013-10-03 株式会社 復建技術コンサルタント Precast concrete revetment retaining wall block installation structure
JP2014080787A (en) * 2012-10-16 2014-05-08 Mirai Construction Co Ltd Construction of quay wall
JP2015031068A (en) * 2013-08-02 2015-02-16 株式会社 林物産発明研究所 Dike having level-raising function
US20150354160A1 (en) * 2014-06-06 2015-12-10 Larry Ragsdale, JR. Berm or levee expansion system and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04194228A (en) * 1990-11-27 1992-07-14 Daiho Constr Co Ltd Caisson and manufacture thereof
JPH1037109A (en) * 1996-07-29 1998-02-10 Hokukon:Kk Concrete block having height adjusting function and concrete block laying method using it
JP2000001863A (en) * 1999-05-19 2000-01-07 Fujibayashi Concrete Kogyo Kk Balancing-toy bearing body for installing large-sized concrete block
US20040096275A1 (en) * 2001-03-16 2004-05-20 Rorheim Thor Olav Portable flood barrier section and flood barrier
JP2014080787A (en) * 2012-10-16 2014-05-08 Mirai Construction Co Ltd Construction of quay wall
JP3186385U (en) * 2013-07-22 2013-10-03 株式会社 復建技術コンサルタント Precast concrete revetment retaining wall block installation structure
JP2015031068A (en) * 2013-08-02 2015-02-16 株式会社 林物産発明研究所 Dike having level-raising function
US20150354160A1 (en) * 2014-06-06 2015-12-10 Larry Ragsdale, JR. Berm or levee expansion system and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020016061A (en) * 2018-07-25 2020-01-30 東亜建設工業株式会社 Embankment construction method
JP7080760B2 (en) 2018-07-25 2022-06-06 東亜建設工業株式会社 How to build an embankment
JP2021105263A (en) * 2019-12-26 2021-07-26 アスザック株式会社 Structure for raising levee and construction method of structure for raising levee
JP7323931B2 (en) 2019-12-26 2023-08-09 アスザック株式会社 Embankment raising structure and construction method of embankment raising structure
JP2022041056A (en) * 2020-08-31 2022-03-11 株式会社大林組 Overflow suppression structure for river levee
JP7480643B2 (en) 2020-08-31 2024-05-10 株式会社大林組 River levee overflow control structure

Also Published As

Publication number Publication date
JP6933916B2 (en) 2021-09-08

Similar Documents

Publication Publication Date Title
US3527009A (en) Expansion joint seal
US6565289B2 (en) Self-connecting, reinforced retaining wall and masonry units therefor
KR101570939B1 (en) Asphalt core fill dam with core zone using waterstop of corrugated plate
CN107542115B (en) Underground engineering waterproof structure and construction method thereof
JP2018178644A (en) Levee raising structure
KR102193147B1 (en) Precast Concrete Culvert and Method for Constructing The same
JP2015200130A (en) Connection structure, connection method, and structure
JP2009114643A (en) Connecting structure of underground structure
KR101649874B1 (en) Retaning wall using formative block
JP5944970B2 (en) Open shield method
KR101024555B1 (en) Fixed Structure of Corrugated Steel Plate with Adjustable Position
JP4761780B2 (en) Construction method of impermeable layer
JP2012207384A (en) Precast foundation plate, precast structure, foundation of precast structure, and construction method of earth retaining structure
JP2005171505A (en) Partition bulkhead
KR100207283B1 (en) A waterproofing method of concrete structure
CN113530597B (en) Stress barrier type mining subsidence area ground surface structure protection method
KR101544756B1 (en) Retaining wall block construction method using stone
JP2018053466A (en) Open shield method
JP2006257732A (en) Protective material of waterproofing layer and its construction method
JP6043574B2 (en) Caisson method
JP2006009315A (en) Impervious structure of joint
JP4917766B2 (en) Caisson structure
JP7183218B2 (en) Steel impermeable wall, water impermeable method of steel impermeable wall
KR101469412B1 (en) A reclaiming sealant for techspan method of construction
JPH0573099U (en) Expansion joint material

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200416

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210309

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210507

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210817

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210820

R150 Certificate of patent or registration of utility model

Ref document number: 6933916

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250