JP2018092970A - 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 - Google Patents
部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 Download PDFInfo
- Publication number
- JP2018092970A JP2018092970A JP2016232596A JP2016232596A JP2018092970A JP 2018092970 A JP2018092970 A JP 2018092970A JP 2016232596 A JP2016232596 A JP 2016232596A JP 2016232596 A JP2016232596 A JP 2016232596A JP 2018092970 A JP2018092970 A JP 2018092970A
- Authority
- JP
- Japan
- Prior art keywords
- component mounting
- worker
- component
- mounting
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41805—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by assembly
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/5038—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
- G06F9/505—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5066—Algorithms for mapping a plurality of inter-dependent sub-tasks onto a plurality of physical CPUs
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32258—Resource, machine assignment preferences, actual and anticipated load
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32297—Adaptive scheduling, feedback of actual proces progress to adapt schedule
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Manufacturing & Machinery (AREA)
- Automation & Control Theory (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Supply And Installment Of Electrical Components (AREA)
- General Factory Administration (AREA)
Abstract
【解決手段】部品実装システムは、複数の部品実装ラインを有しており、所定の実装基板を生産するにあたって、複数の部品実装ラインの生産完了時刻が早くなるように複数の部品実装ラインのそれぞれで発生する作業に対する作業者の割り当てを決定する(ST5)。
【選択図】図7
Description
3 管理コンピュータ(作業者割り当てシステム)
L1〜L3 部品実装ライン
Claims (9)
- 複数の部品実装ラインを有する部品実装システムであって、
所定の実装基板を生産するにあたって、前記複数の部品実装ラインの生産完了時刻が早くなるように前記複数の部品実装ラインのそれぞれで発生する作業に対する作業者の割り当てを決定する作業者割り当て決定部を備える、部品実装システム。 - 前記作業者割り当て決定部は、前記複数の部品実装ラインのそれぞれで発生する前記作業に対して各1名の前記作業者を割り当てた後、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業のいずれかに対して、他の割り当て可能な前記作業者を割り当てる、請求項1に記載の部品実装システム。
- 前記作業者割り当て決定部は、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業の中で、その部品実装ラインの前記生産完了時刻が最も早くなると予測される前記作業に対して、他の割り当て可能な前記作業者を割り当てる、請求項2に記載の部品実装システム。
- 所定の実装基板を生産するにあたって、複数の部品実装ラインの生産完了時刻が早くなるように前記複数の部品実装ラインのそれぞれで発生する作業に対する作業者の割り当てを決定する作業者割り当て決定部を備える、作業者割り当てシステム。
- 前記作業者割り当て決定部は、前記複数の部品実装ラインのそれぞれで発生する前記作業に対して各1名の前記作業者を割り当てた後、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業のいずれかに対して、他の割り当て可能な前記作業者を割り当てる、請求項4に記載の作業者割り当てシステム。
- 前記作業者割り当て決定部は、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業の中で、その部品実装ラインの前記生産完了時刻が最も早くなると予測される前記作業に対して、他の割り当て可能な前記作業者を割り当てる、請求項5に記載の作業者割り当てシステム。
- 所定の実装基板を生産するにあたって、複数の部品実装ラインの生産完了時刻が早くなるように前記複数の部品実装ラインのそれぞれで発生する作業に対する作業者の割り当てを決定する作業者割り当て工程を含む、作業者割り当て方法。
- 前記作業者割り当て工程において、前記複数の部品実装ラインのそれぞれで発生する前記作業に対して各1名の前記作業者を割り当てた後、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業のいずれかに対して、他の割り当て可能な前記作業者を割り当てる、請求項7に記載の作業者割り当て方法。
- 前記作業者割り当て工程において、最も前記生産完了時刻が遅いと予測される前記部品実装ラインの前記作業の中で、その部品実装ラインの前記生産完了時刻が最も早くなると予測される前記作業に対して、他の割り当て可能な前記作業者を割り当てる、請求項8に記載の作業者割り当て方法。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016232596A JP6572446B2 (ja) | 2016-11-30 | 2016-11-30 | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 |
| US15/814,898 US10845783B2 (en) | 2016-11-30 | 2017-11-16 | Component mounting system, worker allocation system, and worker allocation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016232596A JP6572446B2 (ja) | 2016-11-30 | 2016-11-30 | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019138922A Division JP6830185B2 (ja) | 2019-07-29 | 2019-07-29 | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2018092970A true JP2018092970A (ja) | 2018-06-14 |
| JP6572446B2 JP6572446B2 (ja) | 2019-09-11 |
Family
ID=62190073
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016232596A Active JP6572446B2 (ja) | 2016-11-30 | 2016-11-30 | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US10845783B2 (ja) |
| JP (1) | JP6572446B2 (ja) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020136875A1 (ja) * | 2018-12-28 | 2020-07-02 | 富士通株式会社 | 情報処理装置、段取り作業修正方法、および段取り作業修正プログラム |
| JP2021114124A (ja) * | 2020-01-20 | 2021-08-05 | パナソニックIpマネジメント株式会社 | 作業割当て作成方法および作業割当て作成システムならびに作業割当て作成プログラム |
| JP2022070432A (ja) * | 2020-10-27 | 2022-05-13 | 三菱電機株式会社 | 作業指示装置及び作業指示方法 |
| JP2023019402A (ja) * | 2021-07-29 | 2023-02-09 | ヤマハ発動機株式会社 | 作業者割り当て方法、作業者割り当てプログラム及び作業者割り当て装置 |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| HUP1600584A2 (hu) * | 2016-10-18 | 2018-05-02 | Econometrix Kft | Termelési folyamat integráló rendszer és eljárás |
| US20220335373A1 (en) * | 2016-10-18 | 2022-10-20 | Econometrix Kft. | Method for integrating production process |
| JP6950089B2 (ja) * | 2018-05-30 | 2021-10-13 | ヤマハ発動機株式会社 | 部品補給管理システム及び部品実装システム |
| WO2020202155A1 (en) * | 2019-04-01 | 2020-10-08 | Ebosistant Ltd. | A system and methods for assisting with manual assembly and testing of printed circuit boards |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005009101A1 (ja) * | 2003-07-18 | 2005-01-27 | Fuji Machine Mfg. Co., Ltd. | 対基板作業システム用支援作業管理装置および対基板作業システム用支援作業管理プログラム |
| WO2015166538A1 (ja) * | 2014-04-28 | 2015-11-05 | 富士機械製造株式会社 | 管理装置 |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002373015A (ja) | 2001-06-15 | 2002-12-26 | Okuma Corp | 生産管理装置 |
| JP2004363312A (ja) | 2003-06-04 | 2004-12-24 | Fuji Mach Mfg Co Ltd | 対基板作業ライン管理システム |
| JP2005025539A (ja) | 2003-07-03 | 2005-01-27 | Dainippon Printing Co Ltd | 段取作業最適化システム |
| US7356518B2 (en) * | 2003-08-27 | 2008-04-08 | Icosystem Corporation | Methods and systems for multi-participant interactive evolutionary computing |
| JP4891528B2 (ja) * | 2004-04-07 | 2012-03-07 | オークマ株式会社 | 加工時間算出装置 |
| US7908163B2 (en) * | 2005-07-15 | 2011-03-15 | The Board Of Trustees Of The University Of Alabama | Method and system for parallel scheduling of complex dags under uncertainty |
| US8548838B1 (en) * | 2005-09-28 | 2013-10-01 | Kyyba, Inc. | Method, software and/or process for optimizing the distribution of labor in a manufacturing environment |
| US8005701B2 (en) * | 2006-06-08 | 2011-08-23 | Bayerische Motoren Werke Aktiengesellschaft | Systems and methods for generating a work schedule |
| WO2009102728A1 (en) * | 2008-02-11 | 2009-08-20 | Clearshift Corporation | Online work management system |
| JP2011198353A (ja) * | 2010-02-24 | 2011-10-06 | Hitachi Ltd | 作業者割付装置、作業者割付プログラム、作業者割付システム及び作業者割付方法 |
| JP5504088B2 (ja) | 2010-07-27 | 2014-05-28 | 富士機械製造株式会社 | 部品実装ラインの部品補給最適化装置及び部品補給最適化方法 |
| EP2788828A1 (de) * | 2011-12-09 | 2014-10-15 | Daimler AG | Verfahren zum betreiben einer produktionsanlage |
| US8896867B2 (en) * | 2012-09-11 | 2014-11-25 | Xerox Corporation | Methods and systems for assigning jobs to production devices |
| JP6395708B2 (ja) * | 2013-08-09 | 2018-09-26 | 株式会社Fuji | 複数の生産ラインを有する電子部品装着システムの管理方法及び管理装置 |
| US20150134386A1 (en) * | 2013-11-08 | 2015-05-14 | Prachi Prasad Jogalekar | Collectively optimizing group schedules to minimize project completion time and cost |
| US9575799B2 (en) * | 2014-07-11 | 2017-02-21 | International Business Machines Corporation | Task association analysis in application maintenance service delivery |
| WO2017187512A1 (ja) * | 2016-04-26 | 2017-11-02 | 富士通株式会社 | 製造計画生成装置、製造計画生成方法及び製造計画生成プログラム |
| CN109074055B (zh) * | 2016-04-26 | 2021-06-15 | 富士通株式会社 | 作业辅助装置、作业辅助方法以及存储作业辅助程序的计算机可读取存储介质 |
-
2016
- 2016-11-30 JP JP2016232596A patent/JP6572446B2/ja active Active
-
2017
- 2017-11-16 US US15/814,898 patent/US10845783B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2005009101A1 (ja) * | 2003-07-18 | 2005-01-27 | Fuji Machine Mfg. Co., Ltd. | 対基板作業システム用支援作業管理装置および対基板作業システム用支援作業管理プログラム |
| WO2015166538A1 (ja) * | 2014-04-28 | 2015-11-05 | 富士機械製造株式会社 | 管理装置 |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020136875A1 (ja) * | 2018-12-28 | 2020-07-02 | 富士通株式会社 | 情報処理装置、段取り作業修正方法、および段取り作業修正プログラム |
| JPWO2020136875A1 (ja) * | 2018-12-28 | 2021-10-07 | 富士通株式会社 | 情報処理装置、段取り作業修正方法、および段取り作業修正プログラム |
| US11640567B2 (en) | 2018-12-28 | 2023-05-02 | Fujitsu Limited | Information processing device and setup operation modification method |
| JP2021114124A (ja) * | 2020-01-20 | 2021-08-05 | パナソニックIpマネジメント株式会社 | 作業割当て作成方法および作業割当て作成システムならびに作業割当て作成プログラム |
| JP7515080B2 (ja) | 2020-01-20 | 2024-07-12 | パナソニックIpマネジメント株式会社 | 作業割当て作成方法および作業割当て作成システムならびに作業割当て作成プログラム |
| JP2022070432A (ja) * | 2020-10-27 | 2022-05-13 | 三菱電機株式会社 | 作業指示装置及び作業指示方法 |
| JP7386777B2 (ja) | 2020-10-27 | 2023-11-27 | 三菱電機株式会社 | 作業指示装置及び作業指示方法 |
| JP2023019402A (ja) * | 2021-07-29 | 2023-02-09 | ヤマハ発動機株式会社 | 作業者割り当て方法、作業者割り当てプログラム及び作業者割り当て装置 |
| JP7628913B2 (ja) | 2021-07-29 | 2025-02-12 | ヤマハ発動機株式会社 | 作業者割り当て方法、作業者割り当てプログラム及び作業者割り当て装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| US10845783B2 (en) | 2020-11-24 |
| JP6572446B2 (ja) | 2019-09-11 |
| US20180150065A1 (en) | 2018-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6572446B2 (ja) | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 | |
| JP6617291B2 (ja) | 部品実装システムおよび段取り作業の進捗表示システム | |
| US10893641B2 (en) | Group determination method and group determination apparatus | |
| US11009860B2 (en) | Preparation schedule creating method and preparation schedule creating apparatus | |
| CN105338801A (zh) | 元件安装方法及元件安装系统 | |
| US10345792B2 (en) | Group determination method and group determination apparatus | |
| JP7570046B2 (ja) | 生産計画作成方法および生産計画作成装置 | |
| JP7029597B2 (ja) | 生産計画作成方法および生産計画作成装置 | |
| JP2024120028A (ja) | 段取り替え作業支援方法および段取り替え作業支援装置 | |
| JP7012198B2 (ja) | 部品実装システムおよび段取り作業管理システムならびに段取り作業管理方法 | |
| JP7220238B2 (ja) | 管理装置、移動型作業装置、実装装置、実装システム及び管理方法 | |
| JP2021125628A (ja) | 生産計画作成方法および生産計画作成システムならびに生産計画作成プログラム | |
| JP6982741B2 (ja) | 設備構成作成支援システムおよび設備構成作成支援方法 | |
| JP6114921B2 (ja) | 部品実装システムおよび部品実装方法 | |
| JP6830185B2 (ja) | 部品実装システムおよび作業者割り当てシステムならびに作業者割り当て方法 | |
| JP2022084091A (ja) | 作業情報作成支援装置および表示プログラム | |
| JP6837198B2 (ja) | 設備構成作成支援システムおよび設備構成作成支援方法 | |
| JP6767627B2 (ja) | 部品配置の決定方法および部品配置の決定装置 | |
| WO2022215312A1 (ja) | メンテナンス支援システムおよびメンテナンス支援方法ならびにメンテナンス支援プログラム | |
| JP2020017762A (ja) | 部品実装システムおよび段取り作業の進捗表示システム | |
| JP2012199319A (ja) | 電子部品装着装置 | |
| WO2015189944A1 (ja) | スケジュール作成装置、対基板作業機、および管理装置 | |
| WO2022254704A1 (ja) | 基板生産管理装置、基板生産管理方法、基板生産管理プログラムおよび記録媒体 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180221 |
|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20190118 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190124 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190226 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190418 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190702 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190715 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 6572446 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |