[go: up one dir, main page]

JP2017020299A - Crawler type construction machine, removing method of crawler, and transportation method of construction machine body - Google Patents

Crawler type construction machine, removing method of crawler, and transportation method of construction machine body Download PDF

Info

Publication number
JP2017020299A
JP2017020299A JP2015140412A JP2015140412A JP2017020299A JP 2017020299 A JP2017020299 A JP 2017020299A JP 2015140412 A JP2015140412 A JP 2015140412A JP 2015140412 A JP2015140412 A JP 2015140412A JP 2017020299 A JP2017020299 A JP 2017020299A
Authority
JP
Japan
Prior art keywords
frame
crawler
jack
construction machine
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015140412A
Other languages
Japanese (ja)
Other versions
JP6501660B2 (en
Inventor
高好 奥村
Takayoshi Okumura
高好 奥村
信肇 馬場
Nobutoshi Baba
信肇 馬場
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2015140412A priority Critical patent/JP6501660B2/en
Publication of JP2017020299A publication Critical patent/JP2017020299A/en
Application granted granted Critical
Publication of JP6501660B2 publication Critical patent/JP6501660B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a crawler type construction machine, along with a method of removing a crawler, and a method of transporting a construction machine body, equipped with a jack device in detachable manner for easy attaching/detaching of the crawler at the time of transportation in a simple structure.SOLUTION: A crawler type construction machine (earth drill 11) is provided with an upper part swing body 13, for free swinging, on a lower part travel body 12 through a swing bearing, and the lower part travel body includes a truck frame having a swing bearing, a pair of left and right side frames detachably provided on both sides of the truck frame, and a crawler 12a attached to each side frame respectively. At a rear end part of an upper part swig body, a jack-up device 31 equipped with a vertical jack 33 at both ends of a horizontal beam is detachably formed.SELECTED DRAWING: Figure 1

Description

本発明は、クローラ式建設機械及びクローラの取り外し方法並びに建設機械本体の運搬方法に関し、詳しくは、ジャッキ装置を具備しないクローラ式建設機械のクローラを容易に着脱可能としたクローラ式建設機械及びクローラの取り外し方法並びに建設機械本体をトレーラなどの輸送車の荷台に積載して運搬する方法に関する。   The present invention relates to a crawler-type construction machine, a crawler removal method, and a construction machine main body transport method, and more particularly, to a crawler-type construction machine and a crawler in which a crawler of a crawler-type construction machine without a jack device can be easily attached and detached. The present invention relates to a removal method and a method of carrying a construction machine main body on a loading platform of a transport vehicle such as a trailer.

大型のクローラ式建設機械、例えば大型杭打機では、上部旋回体からリーダなどの作業関連機器を取り外すとともに、下部走行体からクローラを装着したサイドフレームを取り外し、分解した状態で運搬することが行われている。このため、クローラの脱着や輸送車の荷台への積み降ろしの際に使用するジャッキを上部旋回体の前後左右の4箇所にあらかじめ設けている。また、小型杭打機は、作業関連機器を収納した状態でクローラの自走によって荷台に昇降するようにしているため、上部旋回体にジャッキを設ける必要はない。   In a large crawler type construction machine, for example, a large pile driving machine, work-related equipment such as a leader is removed from the upper turning body, and a side frame equipped with a crawler is removed from the lower traveling body and transported in a disassembled state. It has been broken. For this reason, jacks that are used when the crawler is detached and loaded onto the loading platform of the transport vehicle are provided in advance at four locations on the front, rear, left and right of the upper swing body. Moreover, since the small pile driving machine is made to move up and down by the crawler self-propelled in the state which accommodated the work-related apparatus, it is not necessary to provide a jack in an upper turning body.

一方、中型杭打機の場合、通常は、自走で荷台に昇降できるように形成しているため、上部旋回体にジャッキを設けてはいないが、何らかの理由でクローラを取り外して運搬する必要が生じたときには、相伴クレーンの他にもう1台の補助クレーンを使用してクローラの着脱及び荷台への積み降ろしを行わなければならなかった。このような中型杭打機と同様のクローラクレーンで、走行体フレームにおけるトラックフレーム(センターフレーム)の4箇所にジャッキアップ装置を取り付けることにより、クローラの着脱を容易に行えるようにした提案がなされている(例えば、特許文献1参照。)。   On the other hand, in the case of a medium-sized pile driver, since it is usually formed so that it can be raised and lowered by self-propelled, there is no jack on the upper swing body, but it is necessary to remove and transport the crawler for some reason When it happened, another auxiliary crane in addition to the companion crane had to be used to attach and detach the crawler and unload it onto the loading platform. A proposal has been made that the crawler crane can be easily attached and detached by attaching a jack-up device to four places of the track frame (center frame) in the traveling body frame in the same crawler crane as that of such a medium-sized pile driving machine. (For example, refer to Patent Document 1).

特開2006−16208号公報JP 2006-16208 A

しかし、特許文献1に記載されたジャッキアップ装置は、トラックフレームの4箇所に、ジャッキアップ装置をクレーンで吊り上げながら取り付けるため、取付作業に長時間を要するだけでなく、上部旋回体の下方での作業であることから作業性も悪いという問題があった。さらに、ジャッキアップ装置の構造が複雑で、トラックフレームにも加工を施す必要があることから、コスト的な問題もあった。   However, since the jack-up device described in Patent Document 1 is attached to the four positions of the track frame while lifting the crane-up device with a crane, not only a long time is required for the installation work but also the lower part of the upper swing body. There was a problem that workability was poor because it was work. Furthermore, since the structure of the jack-up device is complicated and the track frame needs to be processed, there is a problem of cost.

そこで本発明は、簡単な構造で、取付作業性も良好なジャッキ装置を着脱可能に備えたクローラ式建設機械及びジャッキ装置を取り付けた状態でのクローラの取り外し方法並びに建設機械本体の運搬方法を提供することを目的としている。   Accordingly, the present invention provides a crawler-type construction machine having a simple structure and a good jacking detachable jack apparatus, a crawler removing method with the jack apparatus attached, and a construction machine main body transporting method. The purpose is to do.

上記目的を達成するため、本発明のクローラ式建設機械は、下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械において、前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を着脱可能に形成したことを特徴としている。   In order to achieve the above object, a crawler type construction machine according to the present invention is provided such that an upper swing body is turnable on a lower travel body via a swing bearing, and the lower travel body is provided with a track frame having the swing bearing; In the crawler-type construction machine comprising a pair of left and right side frames that are detachably provided on both sides of the track frame, and a crawler attached to each side frame, It is characterized in that a jack-up device having vertical jacks attached to both ends of the beam is detachable.

さらに、本発明のクローラ式建設機械は、前記ジャッキアップ装置が前記ビームの中央部が前記上部旋回体のメインフレームの後端部に取り付けられること、前記ビームは、前記メインフレームの後端部下面にビーム上面を配置し、メインフレームの上部側を覆った状態でビームに取り付けられる取付部材をビームに固着することによってメインフレームの後端部に取り付けられることを特徴としている。   Further, in the crawler type construction machine according to the present invention, the jackup device is configured such that a central portion of the beam is attached to a rear end portion of the main frame of the upper swing body, and the beam is a lower surface of the rear end portion of the main frame. The upper surface of the beam is disposed on the upper side of the main frame, and an attachment member attached to the beam is fixed to the beam in a state of covering the upper side of the main frame.

また、本発明のクローラ式建設機械におけるクローラの取り外し方法は、下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械における前記トラックフレームから前記クローラを含むサイドフレームを取り外す方法であって、作業機器を取り外した前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を取り付け、前記ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げ、トラックフレーム支持用の台座を地上に設置し、前記ジャッキを短縮させながらクレーンを下げてトラックフレームを台座で支持し、サイドフレームをクレーンで支持しながらトラックフレームからサイドフレームを分離することを特徴としている。   Further, the crawler removing method in the crawler type construction machine of the present invention is provided such that the upper swinging body is turnable on the lower traveling body via the swing bearing, and the lower traveling body is provided with a track frame having the swing bearing; A method of removing the side frame including the crawler from the track frame in the crawler-type construction machine configured by a pair of left and right side frames detachably provided on both sides of the track frame and a crawler attached to each side frame. A jack-up device having vertical jacks attached to both ends of a horizontal beam is attached to the rear end of the upper swing body from which work equipment has been removed, and the front of the upper swing body is extended while the jack is extended. Is lifted with a crane, and a pedestal for supporting the truck frame is installed on the ground. The track frame is supported at the base by lowering the crane while shortening the jack is characterized by separating the side frame from the track frame while supporting the side frames with a crane.

さらに、本発明のクローラ式建設機械における建設機械本体の運搬方法は、下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械における建設機械本体の運搬方法であって、作業機器を取り外した前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を取り付け、前記ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げ、トラックフレーム支持用の台座を地上に設置し、前記ジャッキを短縮させながらクレーンを下げてトラックフレームを台座で支持し、サイドフレームをクレーンで支持しながらトラックフレームからサイドフレームを分離し、上部旋回体の前部をクレーンで持ち上げ、ジャッキとクレーンとで上部旋回体を支持した状態でトラックフレームを90度回動させ、ジャッキとクレーンとで上部旋回体を上昇させてトラックフレームの下面を輸送車の荷台より高い位置に上昇させた状態でトラックフレームの下方に輸送車の荷台を進入させ、ジャッキを短縮させながらクレーンを操作してトラックフレームの下面を荷台上に載置し、上部旋回体の後端部から前記ジャッキアップ装置を取り外すことを特徴としている。   Furthermore, the method for transporting the construction machine main body in the crawler type construction machine according to the present invention is provided such that the upper swinging body is turnable on the lower traveling body via the swing bearing, and the lower traveling body is provided on the track having the swing bearing. A method for transporting a construction machine main body in a crawler-type construction machine comprising a frame, a pair of left and right side frames that are detachably provided on both sides of the track frame, and a crawler attached to each side frame. At the rear end of the upper swing body, the jack-up device with the vertical jacks attached to both ends of the horizontal beam is attached, and the front part of the upper swing body is lifted with a crane while extending the jack, Install a pedestal for supporting the truck frame on the ground and lower the crane while shortening the jack. The rack frame is supported by a pedestal, the side frame is separated from the track frame while the side frame is supported by the crane, the front part of the upper swing body is lifted by the crane, and the truck is supported with the upper swing body supported by the jack and the crane. Rotate the frame 90 degrees, raise the upper revolving body with a jack and crane and raise the lower surface of the truck frame to a position higher than the loading platform of the transportation vehicle. The crane is operated while shortening the jack, the lower surface of the track frame is placed on the loading platform, and the jack-up device is removed from the rear end of the upper swing body.

本発明によれば、クローラ式建設機械における上部旋回体の後端部にジャッキアップ装置を着脱可能に設けたので、ジャッキアップ装置を取り付けることにより、クローラの着脱や運搬時の荷台に対する建設機械本体の積み降ろしを、1台の相伴クレーンで行うことができる。したがって、2台のクレーンを用意する必要がなくなる。また、ジャッキアップ装置を、上部旋回体の後方に突出してるメインフレームの後端部に、例えば、メインフレームの上部側を覆った状態でビームに取り付けられる取付部材を用いてジャッキアップ装置を取り付けることにより、作業性を向上できるとともに、作業時間の大幅な短縮を図ることができる。   According to the present invention, since the jackup device is detachably provided at the rear end portion of the upper swing body in the crawler type construction machine, the main body of the construction machine with respect to the loading platform when the crawler is detached or transported by attaching the jackup device. Can be loaded and unloaded with a single companion crane. Therefore, it is not necessary to prepare two cranes. In addition, the jackup device is attached to the rear end portion of the main frame protruding rearward of the upper swing body using, for example, an attachment member attached to the beam in a state of covering the upper side of the main frame. Thus, workability can be improved and work time can be significantly shortened.

本発明のクローラ式建設機械の一形態例を示すもので、上部旋回体の後端部にジャッキアップ装置を取り付けた状態を示す側面図である。The one example of the crawler type construction machine of the present invention is a side view showing a state in which a jackup device is attached to a rear end portion of an upper swing body. 同じく背面図である。It is a back view similarly. 同じく平面図である。It is also a plan view. ジャッキアップ装置の一例を示す正面図である。It is a front view which shows an example of a jackup apparatus. クローラ式建設機械の一種であるアースドリルの側面図である。It is a side view of the earth drill which is a kind of crawler type construction machine. ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げた状態を示す側面図である。It is a side view which shows the state which lifted the front part of the upper revolving body with the crane, extending the jack. 台座でトラックフレームを支持した状態を示す正面図である。It is a front view which shows the state which supported the track frame with the base. トラックフレームから一方のサイドフレームを分離する状態を示す平面図である。It is a top view which shows the state which isolate | separates one side frame from a track frame. 同じく正面図である。It is also a front view. 両側のサイドフレームを分離した状態を示す側面図である。It is a side view which shows the state which isolate | separated the side frames of both sides. ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げて旋回操作を行い、トラックフレームを90度回動させた状態を示す側面図である。It is a side view which shows the state which lifted the front part of the upper revolving body with the crane, extended | stretched a jack, performed turning operation, and rotated the track frame 90 degree | times. ジャッキとクレーンとで上部旋回体を上昇させた状態でトラックフレームの下方にトレーラを進入させる状態を示す側面図である。It is a side view which shows the state which makes a trailer approach under the track frame in the state which raised the upper revolving body with the jack and the crane. トラックフレームの下面を荷台上に載置してジャッキアップ装置を取り外した状態を示す側面図である。It is a side view which shows the state which mounted the lower surface of the track frame on the loading platform, and removed the jackup apparatus.

図1乃至図13は、クローラ式建設機械の一つである大型のアースドリルに本発明を適用した一形態例を示している。本形態例に示すアースドリル11は、図5に示すように、クローラ12aを備えた下部走行体12の上部に旋回ベアリング12bを介して上部旋回体13を旋回可能に設けたベースマシン(建設機械本体)14と、前記上部旋回体13の前部に起伏可能に設けられたテレスコピック式の伸縮ブーム15と、伸縮ブーム15の先端部に装着されたトップシーブブロック15aから垂下した主ワイヤ16にスイベル17を介して回転可能に吊持されたケリーバ18と、前記伸縮ブーム15の下部からフロントフレーム19やバックストッパ20などによって支持されたケリーバ回転駆動装置21と、ケリーバ18の下端部に装着された掘削バケットや拡底バケット22とを備えている。伸縮ブーム15の2段目最上部には、ペンダントロープ23を介してガントリ13aに巻回された起伏ワイヤ24が連結されており、上部旋回体13の後端部には、カウンタウエイト25が設けられている。   1 to 13 show an embodiment in which the present invention is applied to a large earth drill which is one of crawler type construction machines. As shown in FIG. 5, the earth drill 11 shown in this embodiment is a base machine (construction machine) in which an upper swing body 13 is turnably provided on an upper portion of a lower traveling body 12 provided with a crawler 12a via a swing bearing 12b. Main body) 14, a telescopic telescopic boom 15 provided at the front of the upper swing body 13 so as to be raised and lowered, and a main wire 16 suspended from a top sheave block 15 a attached to the distal end of the telescopic boom 15. A kelly bar 18 that is rotatably supported via 17, a kelly bar rotation drive device 21 supported by a front frame 19, a back stopper 20, and the like from the lower part of the telescopic boom 15; and a lower end of the kelly bar 18. An excavation bucket and a bottom expansion bucket 22 are provided. A hoisting wire 24 wound around a gantry 13 a is connected to the uppermost second stage of the telescopic boom 15 via a pendant rope 23, and a counterweight 25 is provided at the rear end of the upper swing body 13. It has been.

このようなアースドリル11を輸送する際には、重量や大きさに応じて複数に分解されてトレーラなどの複数の輸送車にそれぞれ積載される。上部旋回体13からは、伸縮ブーム15、ケリーバ18、ケリーバ回転駆動装置21、拡底バケット22、カウンタウエイト25など、掘削作業に必要な作業機器が取り外される。   When such an earth drill 11 is transported, it is disassembled into a plurality according to the weight and size and loaded on a plurality of transport vehicles such as trailers. From the upper swing body 13, work equipment necessary for excavation work such as the telescopic boom 15, the kelly bar 18, the kelly bar rotation driving device 21, the bottom expansion bucket 22, and the counterweight 25 is removed.

上部旋回体13から各種作業機器を取り外したベースマシン14は、次に下部走行体12のクローラ12aを取り外す作業が行われる。クローラ12aを取り外すには、最初に、図1乃至図4に示すように、上部旋回体13から後方に突出したメインフレーム13bの後端部にジャッキアップ装置31を取り付ける作業が行われる。ジャッキアップ装置31は、水平方向のビーム32の両端に鉛直方向のジャッキ33をそれぞれ装着した門型に形成されている。ビーム32の長さは、左右のジャッキ33同士の間隔が、ベースマシン14を積載する輸送車の荷台の幅寸法より大きく設定されている。ジャッキ33は、最も短縮させた状態では、上部旋回体13へ取付時に接地部33aが接地しない長さに設定されており、最も伸長させた状態で輸送車の荷台より高い位置にベースマシン14を上昇できるように設定されている。   The base machine 14 from which various work devices have been removed from the upper swing body 13 is then subjected to an operation of removing the crawler 12a of the lower traveling body 12. In order to remove the crawler 12a, first, as shown in FIGS. 1 to 4, the work of attaching the jackup device 31 to the rear end portion of the main frame 13b protruding backward from the upper swing body 13 is performed. The jack-up device 31 is formed in a gate shape in which vertical jacks 33 are respectively attached to both ends of a horizontal beam 32. The length of the beam 32 is set such that the distance between the left and right jacks 33 is larger than the width of the loading platform of the transport vehicle on which the base machine 14 is loaded. In the most shortened state, the jack 33 is set to such a length that the grounding portion 33a does not come into contact with the upper swing body 13, and the base machine 14 is positioned higher than the loading platform of the transport vehicle in the most extended state. It is set so that it can rise.

ビーム32の上面には、クレーンで吊り上げるための吊り具34と、上部旋回体13の後端部にジャッキアップ装置31を取り付けるための取付部材35とが設けられ、ビーム32の後面には、ジャッキ33を伸縮させるためのジャッキ操作部36が設けられている。取付部材35は、上部旋回体13の後端から突出した角棒状のメインフレーム13bの高さ寸法及び幅寸法に対応したハット形状に形成されており、ビーム32の上面には、取付部材35の下部両側に設けられた固着片35aを固定ボルト37で固定するための一対の雌ネジ部材38がメインフレーム13bの幅寸法に対応した間隔でそれぞれ設けられている。   On the upper surface of the beam 32, a lifting tool 34 for lifting with a crane and an attachment member 35 for attaching the jack-up device 31 to the rear end portion of the upper swing body 13 are provided. A jack operation unit 36 for extending and contracting 33 is provided. The mounting member 35 is formed in a hat shape corresponding to the height and width dimensions of the rectangular bar-shaped main frame 13 b protruding from the rear end of the upper swing body 13. A pair of female screw members 38 for fixing the fixing pieces 35a provided on both sides of the lower portion with fixing bolts 37 are provided at intervals corresponding to the width dimension of the main frame 13b.

このジャッキアップ装置31の取り付けは、固定ボルト37を外して取付部材35を取り外した状態で、吊り具34を利用してジャッキアップ装置31を吊り上げ、各雌ネジ部材38の間にメインフレーム13bを位置させ、メインフレーム13bを覆うように上方から取付部材35をセットし、固着片35aに設けたボルト孔を通して固定ボルト37を雌ネジ部材38にそれぞれ締結することにより行われる。このような取付部材35を用いることにより、メインフレーム13bに特別な加工を施すことなく、ジャッキアップ装置31を上部旋回体13の後端部に取り付けることができる。また、前記ジャッキ操作部36には、取り外した作業機器の油圧回路を適宜選択して油圧ホース39で接続する。   The jack-up device 31 is attached with the fixing bolt 37 removed and the attachment member 35 removed, and the jack-up device 31 is lifted using the lifting tool 34, and the main frame 13b is interposed between the female screw members 38. The mounting member 35 is set from above so as to cover the main frame 13b, and the fixing bolts 37 are respectively fastened to the female screw members 38 through the bolt holes provided in the fixing pieces 35a. By using such an attachment member 35, the jackup device 31 can be attached to the rear end portion of the upper swing body 13 without performing special processing on the main frame 13b. In addition, a hydraulic circuit of the removed work device is appropriately selected and connected to the jack operation unit 36 by a hydraulic hose 39.

次に、ベースマシン14を運搬するため、下部走行体12において、前記旋回ベアリング12bを有するトラックフレーム41と、クローラ12aを有する左右のサイドフレーム42とを分離して下部走行体12からクローラ12aを取り外し、クローラ12aを取り外したベースマシン14を輸送車の荷台に積載する手順を説明する。   Next, in order to transport the base machine 14, in the lower traveling body 12, the track frame 41 having the swivel bearing 12 b and the left and right side frames 42 having the crawler 12 a are separated to remove the crawler 12 a from the lower traveling body 12. A procedure for loading the base machine 14 from which the crawler 12a has been removed on the loading platform of the transport vehicle will be described.

まず、図6に示すように、上部旋回体13の前部を相伴クレーン(図示せず)の吊りワイヤ26で吊り上げるとともに、ジャッキ操作部36を操作してジャッキ33を伸長させ、ベースマシン14を、水平状態を保ったまま持ち上げる。次に、図7に示すように、ベースマシン14を所定高さに上昇させた状態で、下部走行体12の下方に所定高さの台座43を挿入し、吊りワイヤ26を巻き下げるとともにジャッキ33を短縮させ、下部走行体12の中央部に位置するトラックフレーム41の前部下面を台座43で支持し、ベースマシン14の後部側をジャッキ33で支持した状態にする。これにより、クローラ12aを地面から浮かせた状態でベースマシン14を水平に保持した状態になる。   First, as shown in FIG. 6, the front part of the upper swing body 13 is lifted by a suspension wire 26 of an accompanying crane (not shown), and the jack operation unit 36 is operated to extend the jack 33, thereby Lift while keeping the level. Next, as shown in FIG. 7, with the base machine 14 raised to a predetermined height, a pedestal 43 having a predetermined height is inserted below the lower traveling body 12, the suspension wire 26 is lowered, and the jack 33 is inserted. The front lower surface of the track frame 41 located at the center of the lower traveling body 12 is supported by the pedestal 43 and the rear side of the base machine 14 is supported by the jack 33. As a result, the base machine 14 is held horizontally with the crawler 12a floating from the ground.

図8に示すように、下部走行体12は、旋回ベアリング12bを有する前記トラックフレーム41と、該トラックフレーム41の前後に設けられた前後一対のアクスル44,44と、該アクスル44,44の両端部に、アクスル44の長さ方向にスライド可能に支持された左右一対のサイドフレーム42,42と、該サイドフレーム42をアクスル44に沿って拡縮させる左右一対のクローラ拡縮シリンダ(スパンナ)45,45とを備えている。クローラ12aは、サイドフレーム42の後端に設けたスプロケットホイール(駆動輪)46と、前端に設けたアイドラホイール(従動輪)47とに掛け渡されている。   As shown in FIG. 8, the lower traveling body 12 includes a track frame 41 having a slewing bearing 12 b, a pair of front and rear axles 44, 44 provided at the front and rear of the track frame 41, and both ends of the axles 44, 44. And a pair of left and right side frames 42, 42 slidably supported in the longitudinal direction of the axle 44, and a pair of left and right crawler expansion / contraction cylinders (spanners) 45, 45 that expand and contract the side frame 42 along the axle 44. And. The crawler 12a is stretched over a sprocket wheel (drive wheel) 46 provided at the rear end of the side frame 42 and an idler wheel (driven wheel) 47 provided at the front end.

トラックフレーム41からサイドフレーム42を分離する際には、あらかじめ、図8の上半部に示すように、スパンナ45を伸長させてサイドフレーム42をアクスル44の先端部に移動させ、最大に拡げた状態としておく。そして、スパンナ45のシリンダロッド先端45aとサイドフレーム42の連結部42aとを連結する連結ピン48を抜き取ってからスパンナ45を短縮させる。次に、図8の下半部に示すように、シリンダロッド先端45aと連結部42aとの間にリンク49を挿入して両端をシリンダロッド先端45a及び連結部42aに連結ピン48,48によってそれぞれ連結する。   When separating the side frame 42 from the track frame 41, as shown in the upper half part of FIG. 8, the spanner 45 is extended in advance and the side frame 42 is moved to the tip of the axle 44 to be expanded to the maximum. Leave it in a state. And the spanner 45 is shortened after extracting the connection pin 48 which connects the cylinder rod front-end | tip 45a of the spanner 45 and the connection part 42a of the side frame 42. FIG. Next, as shown in the lower half of FIG. 8, a link 49 is inserted between the cylinder rod tip 45a and the connecting portion 42a, and both ends are connected to the cylinder rod tip 45a and the connecting portion 42a by connecting pins 48, 48, respectively. Link.

この状態で、図9に示すように、クローラ12aを含むサイドフレーム42をクレーンの吊りワイヤ26で支持した状態とし、サイドフレーム連結ボルト50を抜き取った後、スパンナ45を伸長させてサイドフレーム42を押し出し、アクスル44の先端から分離して吊りワイヤ26で吊り上げた状態にする。これにより、一方のクローラ12aを取り外した状態になるので、他方のクローラ12aについても、前記同様に、連結ピン48を抜き取ってスパンナ45を短縮させ、リンク49を挿入して連結ピン48で連結し、連結ボルト50を抜き取り、スパンナ45を伸長させる操作を行うことにより、ベースマシン14から分離することができる。両側のクローラ12aを取り外したベースマシン14は、図10に示すように、トラックフレーム41の前部側が台座43で支持され、上部旋回体13の後部側がジャッキ33で支持された状態になっている。   In this state, as shown in FIG. 9, the side frame 42 including the crawler 12 a is supported by the crane suspension wire 26, and after the side frame connecting bolt 50 is pulled out, the spanner 45 is extended to extend the side frame 42. Extruded, separated from the tip of the axle 44, and lifted by the suspension wire 26. As a result, one of the crawlers 12a is removed, and the other crawler 12a is also connected to the other crawler 12a by pulling out the connecting pin 48 and shortening the spanner 45, inserting the link 49, and connecting with the connecting pin 48. By removing the connecting bolt 50 and extending the spanner 45, the base machine 14 can be separated. As shown in FIG. 10, the base machine 14 from which the crawlers 12 a on both sides are removed is in a state where the front side of the track frame 41 is supported by the pedestal 43 and the rear side of the upper swing body 13 is supported by the jack 33. .

次に、図11に示すように、上部旋回体13の前部を吊りワイヤ26で吊り上げるとともにジャッキ33を伸長させ、台座43を抜き取れる高さまでベースマシン14を僅かに上昇させ、台座43を取り除いた後、90度の旋回操作を行う。これにより、上部旋回体13に対してトラックフレーム41が90度回動し、上部旋回体13の側方に突出していたアクスル44が上部旋回体13の下方に収納された状態になる。   Next, as shown in FIG. 11, the front portion of the upper swing body 13 is lifted by the suspension wire 26 and the jack 33 is extended, and the base machine 14 is slightly raised to a height at which the pedestal 43 can be pulled out, and the pedestal 43 is removed. After that, a 90-degree turning operation is performed. As a result, the track frame 41 rotates 90 degrees with respect to the upper swing body 13, and the axle 44 that protrudes to the side of the upper swing body 13 is housed below the upper swing body 13.

旋回操作後、ジャッキ33を最大に伸長させるとともに、吊りワイヤ26を巻き上げてベースマシン14を上昇させ、トラックフレーム41の下方に輸送車(トレーラ)の荷台51が進入可能な高さにする。そして、図12に示すように、ベースマシン14の下方で、左右のジャッキ33の間に荷台51を進入させて所定位置に停止させる。そして、吊りワイヤ26を巻き下げるとともにジャッキ33を短縮させ、トラックフレーム41を荷台51上に積載した状態にする。   After the turning operation, the jack 33 is extended to the maximum, and the base wire 14 is raised by winding the suspension wire 26 so that the loading platform 51 of the transport vehicle (trailer) can enter below the truck frame 41. Then, as shown in FIG. 12, below the base machine 14, the loading platform 51 enters between the left and right jacks 33 and stops at a predetermined position. Then, the suspension wire 26 is lowered and the jack 33 is shortened so that the track frame 41 is loaded on the loading platform 51.

最後に、ジャッキ33を短縮させ、上部旋回体13からジャッキアップ装置31を取り外し、上部旋回体13の後部を台木52で支持するとともに、ベースマシン14をワイヤなどの固定具で固定することにより、ベースマシン14を輸送状態にすることができる。   Finally, the jack 33 is shortened, the jack-up device 31 is removed from the upper swing body 13, the rear portion of the upper swing body 13 is supported by the rootstock 52, and the base machine 14 is fixed by a fixture such as a wire. The base machine 14 can be brought into a transport state.

このように、上部旋回体13にジャッキアップ装置31を取り付けることにより、1台の相伴クレーンでベースマシン14からクローラ12aを含むサイドフレーム42を取り外すことができ、荷台51上にベースマシン14を積載した後にジャッキアップ装置31を取り外すことにより、輸送時の幅寸法を輸送限界内に収めることができる。   In this way, by attaching the jackup device 31 to the upper swing body 13, the side frame 42 including the crawler 12 a can be removed from the base machine 14 with one accompanying crane, and the base machine 14 is loaded on the loading platform 51. Then, by removing the jack-up device 31, the width dimension during transportation can be kept within the transportation limit.

また、ジャッキアップ装置31の着脱は、上部旋回体13の後端部で行えるので、作業性も良好であり、工数も少ないので、短時間で所定の作業を終えることができる。さらに、作業中のベースマシン14の昇降は、1台の相伴クレーンの操作とジャッキ操作部36の操作とで行えるので、2台のクレーンで行う場合比べて容易に行うことができ、ベースマシン14の後部側がジャッキ33を介して常に接地しているため、安全性の向上も図れる。   Further, since the jackup device 31 can be attached and detached at the rear end portion of the upper swing body 13, workability is good and man-hours are small, so that predetermined work can be completed in a short time. Furthermore, since the base machine 14 can be moved up and down during operation by operating one companion crane and the operation of the jack operation unit 36, the base machine 14 can be easily moved as compared with the case of using two cranes. Since the rear side is always grounded via the jack 33, safety can be improved.

加えて、ベースマシン14には、ジャッキアップ装置31を取り付けるための加工を必要としないので、既出荷のアースドリルにも適用でき、上部旋回体13の後部に突出するメインフレームの後端部の形状が同じなら、杭打機やクレーンなどの各種建設機械に対応可能である。またジャッキアップ装置31の取付構造は、上部旋回体13の後部の形状に応じて適宜設定することができ、上部旋回体13の後部にジャッキアップ装置31を取り付けるのに適当なボルト孔などが形成されている場合は、これを利用してジャッキアップ装置31を取り付けることもできる。   In addition, since the base machine 14 does not require processing for attaching the jackup device 31, it can be applied to a ground drill that has already been shipped, and the rear end portion of the main frame that protrudes to the rear portion of the upper swing body 13 can be applied. If the shape is the same, it can be applied to various construction machines such as pile drivers and cranes. The mounting structure of the jack-up device 31 can be appropriately set according to the shape of the rear part of the upper swing body 13, and a bolt hole or the like suitable for mounting the jack-up device 31 is formed at the rear part of the upper swing body 13. If so, the jack-up device 31 can be attached using this.

なお、ベースマシン14へのクローラ12aの取り付けは、前記作業を逆に行えばよい。また、各種油圧ホースを含む各種作業機器の着脱は、分解して輸送する一般的な大型建設機械と同様にして行うことができるので、詳細な説明は省略する。同様に、下部走行体におけるトラックフレーム及びサイドフレームの構造や取付構造は、従来から実施されている周知の構造であるから、これらの説明も省略する。   The crawler 12a can be attached to the base machine 14 in the reverse manner. Moreover, since attachment / detachment of various work equipment including various hydraulic hoses can be performed in the same manner as a general large construction machine that is disassembled and transported, detailed description thereof is omitted. Similarly, the structure of the track frame and the side frame and the mounting structure in the lower traveling body are well-known structures that have been practiced in the past, and therefore their description is also omitted.

11…アースドリル、12…下部走行体、12a…クローラ、12b…旋回ベアリング、13…上部旋回体、13a…ガントリ、13b…メインフレーム、14…ベースマシン、15…伸縮ブーム、15a…トップシーブブロック、16…主ワイヤ、17…スイベル、18…ケリーバ、19…フロントフレーム、20…バックストッパ、21…ケリーバ回転駆動装置、22…拡底バケット、23…ペンダントロープ、24…起伏ワイヤ、25…カウンタウエイト、26…吊りワイヤ、31…ジャッキアップ装置、32…ビーム、33…ジャッキ、33a…接地部、34…吊り具、35…取付部材、35a…固着片、36…ジャッキ操作部、37…固定ボルト、38…雌ネジ部材、39…油圧ホース、41…トラックフレーム、42…サイドフレーム、42a…連結部、43…台座、44…アクスル、45…スパンナ、45a…シリンダロッド先端、46…スプロケットホイール、47…アイドラホイール、48…連結ピン、49…リンク、50…サイドフレーム連結ボルト、51…荷台、52…台木 DESCRIPTION OF SYMBOLS 11 ... Earth drill, 12 ... Lower traveling body, 12a ... Crawler, 12b ... Turning bearing, 13 ... Upper turning body, 13a ... Gantry, 13b ... Main frame, 14 ... Base machine, 15 ... Telescopic boom, 15a ... Top sheave block , 16 ... main wire, 17 ... swivel, 18 ... kelly bar, 19 ... front frame, 20 ... back stopper, 21 ... kelly bar rotary drive device, 22 ... bottom expansion bucket, 23 ... pendant rope, 24 ... undulating wire, 25 ... counterweight , 26 ... suspension wire, 31 ... jack-up device, 32 ... beam, 33 ... jack, 33a ... grounding part, 34 ... suspension, 35 ... mounting member, 35a ... fixing piece, 36 ... jack operation part, 37 ... fixing bolt 38 ... Female screw member, 39 ... Hydraulic hose, 41 ... Track frame, 42 ... Side hook 42a ... connecting portion 43 ... pedestal 44 ... axle 45 ... spanner 45a ... cylinder rod tip 46 ... sprocket wheel 47 ... idler wheel 48 ... connecting pin 49 ... link 50 ... side frame connected Bolt, 51 ... loading platform, 52 ... rootstock

Claims (5)

下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械において、前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を着脱可能に設けたことを特徴とするクローラ式建設機械。   An upper swinging body is provided on the lower traveling body via a swing bearing so as to be capable of turning, and the lower traveling body is provided with a track frame having the swing bearing and a pair of left and right sides that are detachably provided on both sides of the track frame. In a crawler-type construction machine composed of a frame and a crawler attached to each side frame, a jack-up device in which vertical jacks are attached to both ends of a horizontal beam is attached to and detached from the rear end portion of the upper rotating body. A crawler type construction machine characterized by being provided. 前記ジャッキアップ装置は、前記ビームの中央部が前記上部旋回体のメインフレームの後端部に取り付けられることを特徴とする請求項1記載のクローラ式建設機械。   The crawler-type construction machine according to claim 1, wherein the jackup device has a central portion of the beam attached to a rear end portion of a main frame of the upper swing body. 前記ビームは、前記メインフレームの後端部下面にビーム上面を配置し、メインフレームの上部側を覆った状態でビームに取り付けられる取付部材をビームに固着することによってメインフレームの後端部に取り付けられることを特徴とする請求項2記載のクローラ式建設機械。   The beam is mounted on the rear end of the main frame by placing the upper surface of the beam on the lower surface of the rear end of the main frame and fixing the mounting member attached to the beam in a state of covering the upper side of the main frame. The crawler type construction machine according to claim 2, wherein 下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械における前記トラックフレームから前記クローラを含むサイドフレームを取り外す方法であって、作業機器を取り外した前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を取り付け、前記ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げ、トラックフレーム支持用の台座を地上に設置し、前記ジャッキを短縮させながらクレーンを下げてトラックフレームを台座で支持し、サイドフレームをクレーンで支持しながらトラックフレームからサイドフレームを分離することを特徴とするクローラ式建設機械におけるクローラの取り外し方法。   An upper swinging body is provided on the lower traveling body via a swing bearing so as to be capable of turning, and the lower traveling body is provided with a track frame having the swing bearing and a pair of left and right sides that are detachably provided on both sides of the track frame. A method of removing a side frame including the crawler from the track frame in a crawler-type construction machine configured with a frame and a crawler attached to each side frame, the rear end portion of the upper swing body from which work equipment is removed Next, install a jack-up device with vertical jacks attached to both ends of the horizontal beam, lift the front of the upper revolving unit with a crane while extending the jack, and install a pedestal for supporting the track frame on the ground. The truck frame is lowered by lowering the crane while shortening the jack. In supporting, how to remove the crawler in the crawler construction machine, characterized in that the side frame to separate the side frame from the track frame while being supported by a crane. 下部走行体の上に旋回ベアリングを介して上部旋回体を旋回可能に設け、前記下部走行体を、前記旋回ベアリングを有するトラックフレームと、該トラックフレームの両側に着脱可能に設けられる左右一対のサイドフレームと、各サイドフレームにそれぞれ装着したクローラとで構成したクローラ式建設機械における建設機械本体の運搬方法であって、作業機器を取り外した前記上部旋回体の後端部に、水平方向のビームの両端に鉛直方向のジャッキを装着したジャッキアップ装置を取り付け、前記ジャッキを伸長させながら上部旋回体の前部をクレーンで持ち上げ、トラックフレーム支持用の台座を地上に設置し、前記ジャッキを短縮させながらクレーンを下げてトラックフレームを台座で支持し、サイドフレームをクレーンで支持しながらトラックフレームからサイドフレームを分離し、上部旋回体の前部をクレーンで持ち上げ、ジャッキとクレーンとで上部旋回体を支持した状態でトラックフレームを90度回動させ、ジャッキとクレーンとで上部旋回体を上昇させてトラックフレームの下面を輸送車の荷台より高い位置に上昇させた状態でトラックフレームの下方に輸送車の荷台を進入させ、ジャッキを短縮させながらクレーンを操作してトラックフレームの下面を荷台上に載置し、上部旋回体の後端部から前記ジャッキアップ装置を取り外すことを特徴とするクローラ式建設機械における建設機械本体の運搬方法。   An upper swinging body is provided on the lower traveling body via a swing bearing so as to be capable of turning, and the lower traveling body is provided with a track frame having the swing bearing and a pair of left and right sides that are detachably provided on both sides of the track frame. A method of transporting a construction machine main body in a crawler-type construction machine composed of a frame and a crawler attached to each side frame, wherein a horizontal beam is placed at the rear end of the upper swing body from which work equipment is removed. Attach a jack-up device with vertical jacks at both ends, lift the jack while lifting the front part of the upper revolving unit with a crane, install a pedestal for supporting the truck frame on the ground, and shorten the jack While lowering the crane, the truck frame is supported by the pedestal, and the side frame is supported by the crane. Separate the side frame from the track frame, lift the front part of the upper revolving structure with a crane, rotate the track frame 90 degrees with the upper revolving structure supported by the jack and the crane, and the upper revolving structure with the jack and the crane. With the bottom of the truck frame raised to a position higher than the platform of the transport vehicle, the transport vehicle platform is entered below the truck frame, and the crane is operated while shortening the jack to move the bottom surface of the truck frame. A method for transporting a construction machine main body in a crawler-type construction machine, wherein the construction machine body is placed on a loading platform and the jackup device is removed from a rear end portion of the upper swing body.
JP2015140412A 2015-07-14 2015-07-14 Crawler-type construction machine, method of removing crawler and method of transporting construction machine body Active JP6501660B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015140412A JP6501660B2 (en) 2015-07-14 2015-07-14 Crawler-type construction machine, method of removing crawler and method of transporting construction machine body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015140412A JP6501660B2 (en) 2015-07-14 2015-07-14 Crawler-type construction machine, method of removing crawler and method of transporting construction machine body

Publications (2)

Publication Number Publication Date
JP2017020299A true JP2017020299A (en) 2017-01-26
JP6501660B2 JP6501660B2 (en) 2019-04-17

Family

ID=57887811

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015140412A Active JP6501660B2 (en) 2015-07-14 2015-07-14 Crawler-type construction machine, method of removing crawler and method of transporting construction machine body

Country Status (1)

Country Link
JP (1) JP6501660B2 (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5596934U (en) * 1978-12-26 1980-07-05
JPS55140661A (en) * 1979-04-13 1980-11-04 Hitachi Constr Mach Co Ltd Disassembly transport method of piling machine
JPS55163345U (en) * 1979-05-11 1980-11-22
JPH0431507A (en) * 1990-05-28 1992-02-03 Nippon Sharyo Seizo Kaisha Ltd Disassembly transportation method of large scale pipe driver
JPH0959978A (en) * 1995-08-21 1997-03-04 Sato Kensetsu Kogyo Kk Working device that can be disassembled and assembled
JP2006016208A (en) * 2004-06-01 2006-01-19 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jack up device of construction machinery
JP2008150177A (en) * 2006-12-19 2008-07-03 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jacking machine for construction machinery
JP2009040110A (en) * 2007-08-06 2009-02-26 Ihi Construction Machinery Ltd Jack-up device of crawler type construction machine
US20130328295A1 (en) * 2011-01-17 2013-12-12 C.M.C.S.R.l Societa Unipersonale Stabilizer device for an operating machine

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5596934U (en) * 1978-12-26 1980-07-05
JPS55140661A (en) * 1979-04-13 1980-11-04 Hitachi Constr Mach Co Ltd Disassembly transport method of piling machine
JPS55163345U (en) * 1979-05-11 1980-11-22
JPH0431507A (en) * 1990-05-28 1992-02-03 Nippon Sharyo Seizo Kaisha Ltd Disassembly transportation method of large scale pipe driver
JPH0959978A (en) * 1995-08-21 1997-03-04 Sato Kensetsu Kogyo Kk Working device that can be disassembled and assembled
JP2006016208A (en) * 2004-06-01 2006-01-19 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jack up device of construction machinery
JP2008150177A (en) * 2006-12-19 2008-07-03 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Jacking machine for construction machinery
JP2009040110A (en) * 2007-08-06 2009-02-26 Ihi Construction Machinery Ltd Jack-up device of crawler type construction machine
US20130328295A1 (en) * 2011-01-17 2013-12-12 C.M.C.S.R.l Societa Unipersonale Stabilizer device for an operating machine

Also Published As

Publication number Publication date
JP6501660B2 (en) 2019-04-17

Similar Documents

Publication Publication Date Title
US4138805A (en) Wheeled portable trailer substructure for elevatable drawworks, masts and setback tower
US3929204A (en) Trailer crane with outrigger to crawler conversion
JP5800848B2 (en) Cylinder storage device, boom device and crawler crane
US20100108632A1 (en) Pipelayer Crane Excavator Apparatus and Methods
JP6509016B2 (en) Boom mounting device
JP5732028B2 (en) Construction machine body
US5427256A (en) Crane upper works to lower works alignment system
JP6746207B2 (en) Pile driver and pile driver loading method
JP6525717B2 (en) Boom attaching / detaching device and attaching / detaching method
US20160280118A1 (en) Construction Machine Transport
JP6610314B2 (en) Swivel work machine and float device used therefor
JP5121408B2 (en) Structure loading / unloading device to be attached to / detached from the jack of work equipment with jack
JP2002020081A (en) Counterweight mounting and dismounting method and counterweight support frame for construction machine
JP2017020299A (en) Crawler type construction machine, removing method of crawler, and transportation method of construction machine body
JP2007230747A (en) Working method and working machine
JP6366312B2 (en) Construction machinery
JP6653965B2 (en) Construction machine assembly method
JP7032866B2 (en) crane
JP2018103758A (en) Crawler-type work vehicle
JP7632094B2 (en) Crawler Crane
JP2004293109A (en) Foundation pile execution device
JP7410832B2 (en) How to jack up construction machinery and the vehicle body of construction machinery
JP4875974B2 (en) Jacking machine for construction machinery
JP6628637B2 (en) Crawler crane car body weight mounting method
JPH10147955A (en) Crawler device for construction work

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180604

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190308

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190319

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190319

R150 Certificate of patent or registration of utility model

Ref document number: 6501660

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250