[go: up one dir, main page]

JP2017017792A - Distribution type power supply device - Google Patents

Distribution type power supply device Download PDF

Info

Publication number
JP2017017792A
JP2017017792A JP2015129615A JP2015129615A JP2017017792A JP 2017017792 A JP2017017792 A JP 2017017792A JP 2015129615 A JP2015129615 A JP 2015129615A JP 2015129615 A JP2015129615 A JP 2015129615A JP 2017017792 A JP2017017792 A JP 2017017792A
Authority
JP
Japan
Prior art keywords
power
value
peak cut
command value
distributed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015129615A
Other languages
Japanese (ja)
Other versions
JP6425625B2 (en
Inventor
啓生 東
Hiroo Azuma
啓生 東
純平 早川
Junpei Hayakawa
純平 早川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shindengen Electric Manufacturing Co Ltd
Original Assignee
Shindengen Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shindengen Electric Manufacturing Co Ltd filed Critical Shindengen Electric Manufacturing Co Ltd
Priority to JP2015129615A priority Critical patent/JP6425625B2/en
Publication of JP2017017792A publication Critical patent/JP2017017792A/en
Application granted granted Critical
Publication of JP6425625B2 publication Critical patent/JP6425625B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Inverter Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a distribution type power supply device, executing parallel operation with a plurality of PCSs, capable of preventing a power system from becoming unstable.SOLUTION: The distribution type power supply device includes a plurality of PCSs 21 connected in parallel. Each of the PCSs 21 includes a power inversion part 30, a calculation part 40 and a control part 50. The calculation part 40 calculates a first peak-cut power command value and determines a second peak-cut power command value allotted for each of the PCSs 21. The control part 50 determines a targeted output power value on the basis of the determined second peak-cut power command value and a system power value pout and generates such control signals s1, s2 that an error between an output power value po of each of the PCSs 21 and the targeted output power value reduces. The power inversion part 30 inverts DC power into AC power on the basis of the control signals s1, s2.SELECTED DRAWING: Figure 1

Description

本発明は、電力変換装置であるパワーコンディショナ(以下「PCS」という。)が複数台並列に接続されて並列運転を行う分散型電源装置に関するものである。   The present invention relates to a distributed power supply apparatus in which a plurality of power conditioners (hereinafter referred to as “PCS”), which are power converters, are connected in parallel to perform parallel operation.

従来のPCSは、特許文献1〜5等に記載されているように、受電点の系統電力のピークカット制御を実現するため、系統電力センサ及びPCSと、設定値としてのピークカット電力指令値等と、で構成されている。   As described in Patent Documents 1 to 5 and the like, the conventional PCS implements a system power sensor and a PCS, a peak cut power command value as a set value, etc. in order to realize peak cut control of the system power at the power receiving point. And is composed of.

具体的には、系統電力センサで測定(検出)される系統電力値をPCSに入力し、ピークカット電力指令値との比較を行い、系統電力値がピークカット電力指令値を超えないように、PCSが不足分の電力を負荷へ供給する。これにより、系統電力の最大値(上限値)が抑えられ、電力系統の平準化を行うことができる。   Specifically, the grid power value measured (detected) by the grid power sensor is input to the PCS, compared with the peak cut power command value, and the grid power value does not exceed the peak cut power command value. PCS supplies insufficient power to the load. Thereby, the maximum value (upper limit value) of the system power can be suppressed, and the power system can be leveled.

このような従来の方式で、複数台のPCSによる分散型電源装置を構成した場合、例えば、図2のような回路構成になる。   When a distributed power supply apparatus using a plurality of PCSs is configured by such a conventional method, for example, the circuit configuration is as shown in FIG.

図2は、従来の分散型電源装置を示す概略の構成図である。
この分散型電源装置は、複数の直流電源1(=1−1〜1−n)にそれぞれ接続された複数台のPCS10(=10−1〜10−n)を備えている。各PCS10は、各直流電源1から供給される直流電力を交流電力にそれぞれ変換する装置であり、電力系統17から系統電力を受電する受電点16と、負荷14と、の間の配線13に並列に接続されている。受電点16には、系統電力値poutを検出する系統電力センサ15が設けられている。系統電力値poutは、各PCS10へ与えられる。
FIG. 2 is a schematic configuration diagram showing a conventional distributed power supply apparatus.
This distributed power supply apparatus includes a plurality of PCSs 10 (= 10-1 to 10-n) connected to a plurality of DC power supplies 1 (= 1-1 to 1-n), respectively. Each PCS 10 is a device that converts DC power supplied from each DC power source 1 into AC power, and is parallel to the wiring 13 between the power receiving point 16 that receives the system power from the power system 17 and the load 14. It is connected to the. The power receiving point 16 is provided with a system power sensor 15 that detects the system power value pout. The system power value pout is given to each PCS 10.

各PCS10は、各直流電源1から供給される直流電力を交流電力に変換する装置であり、電力変換部11及び制御部12を有している。電力変換部11は、制御部12から与えられる制御信号に基づいて、直流電源1から供給される直流電力を交流電力に変換するものである。制御部12は、系統電力値poutと、系統電力の上限のピークカット電力指令値pcut1と、に基づいて、出力電力目標値を求め、各PCS10の出力電力から検出された出力電力値と、出力電力目標値と、の誤差が減少するような制御信号を生成して電力変換部11へ与えるものである。   Each PCS 10 is a device that converts DC power supplied from each DC power source 1 into AC power, and includes a power converter 11 and a controller 12. The power conversion unit 11 converts DC power supplied from the DC power supply 1 into AC power based on a control signal given from the control unit 12. The control unit 12 obtains an output power target value based on the system power value pout and the upper limit peak cut power command value pcut1 of the system power, outputs the output power value detected from the output power of each PCS 10, and outputs A control signal that reduces an error from the power target value is generated and supplied to the power conversion unit 11.

この種の分散型電源装置では、電力系統17から負荷14へ供給される負荷電力Pzが、その電力系統17から受電する系統電力の上限のピークカット電力指令値pcut1(例えば、50kW)を超えたとき、複数台のPCS10から負荷14へ出力電力Pc(=Pc1〜Pcn)を供給する。これにより、系統電力の上限値が抑えられ、電力系統17の平準化(即ち、安定化)を図ることができる。   In this type of distributed power supply apparatus, the load power Pz supplied from the power system 17 to the load 14 exceeds the peak cut power command value pcut1 (for example, 50 kW) as the upper limit of the system power received from the power system 17. At this time, output power Pc (= Pc1 to Pcn) is supplied from the plurality of PCSs 10 to the load 14. As a result, the upper limit value of the system power is suppressed, and the power system 17 can be leveled (that is, stabilized).

特開平8−223816号公報JP-A-8-223816 特開2005−295707号公報JP 2005-295707 A 特開2008−43184号公報JP 2008-43184 A 特開2010−55974号公報JP 2010-55974 A 特開2012−33547号公報JP 2012-33547 A

しかしながら、従来の分散型電源装置では、次のような課題があった。
従来の分散型電源装置では、電力系統17の受電点16に設けた系統電力センサ15により、系統電力値poutを検出し、この系統電力値poutを複数台のPCS10へ与えている。各PCS10では、1つの系統電力値poutを共用し、同一のピークカット電力指令値pcut1に系統電力値poutを制御しようとするため、個々のPCS10が持つ検出誤差や制御応答の差により、系統電力の振動といった制御不能に陥ったり、負荷分担の管理ができなくなったりする。
However, the conventional distributed power supply device has the following problems.
In the conventional distributed power supply device, the system power value pout is detected by the system power sensor 15 provided at the power receiving point 16 of the power system 17, and this system power value pout is given to a plurality of PCSs 10. Each PCS 10 shares one system power value pout and tries to control the system power value pout to the same peak cut power command value pcut1, so that the system power varies depending on the detection error and control response of each PCS 10. It becomes impossible to control such as vibration of the load, and it becomes impossible to manage the load sharing.

本発明の分散型電源装置は、電力系統から系統電力を受電する受電点と負荷との間の配線に並列に接続され、直流電力を交流電力にそれぞれ変換する複数台のPCSを備え、前記電力系統から前記負荷へ供給される負荷電力が、前記電力系統から受電する前記系統電力の上限の第1ピークカット電力指令値を超えたとき、前記複数台のPCSから前記負荷へ電力を供給する装置である。   A distributed power supply apparatus according to the present invention includes a plurality of PCSs connected in parallel to a wiring between a power receiving point for receiving system power from a power system and a load, and respectively converting DC power into AC power, An apparatus for supplying power from the plurality of PCSs to the load when load power supplied from the system to the load exceeds a first peak cut power command value of an upper limit of the system power received from the power system It is.

前記各PCSは、前記第1ピークカット電力指令値を演算して前記各PCS毎に分担する第2ピークカット電力指令値を求める演算部と、前記演算部で求められた前記第2ピークカット電力指令値と、前記系統電力から検出された系統電力値と、に基づいて出力電力目標値を求め、前記各PCSの出力電力から検出された出力電力値と、前記出力電力目標値と、の誤差が減少するような制御信号を生成する制御部と、前記制御信号に基づいて、前記直流電力を前記交流電力に変換する電力変換部と、を有している。   Each of the PCSs calculates a first peak cut power command value and obtains a second peak cut power command value to be shared for each PCS; and the second peak cut power obtained by the calculation unit An output power target value is obtained based on the command value and the system power value detected from the system power, and an error between the output power value detected from the output power of each PCS and the output power target value And a power converter that converts the DC power into the AC power based on the control signal.

前記演算部は、前記負荷へ供給する前記電力における負荷分担の順位を設定する順位設定値と、前記複数台のPCSを全て駆動させるために前記負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力と、に基づいて調整値を求め、前記第1ピークカット電力指令値から、前記調整値を減算して、前記第2ピークカット電力指令値を算出することを特徴とする。   The calculation unit includes a rank setting value for setting a rank of load sharing in the power supplied to the load, a rank changing element for changing the rank of the load sharing in order to drive all of the plurality of PCSs, and a predetermined value. An adjustment value is obtained based on the load sharing power, and the second peak cut power command value is calculated by subtracting the adjustment value from the first peak cut power command value.

本発明の分散型電源装置によれば、各PCSに演算部を設け、この演算部により、順位設定値、順位変更要素、及び負荷分担電力に基づいて調整値を求め、第1ピークカット電力指令値からその調整値を減算して、第2ピークカット電力指令値を算出しているので、各PCSの制御目標値である第2ピークカット電力指令値に差が生まれる。この差により、個々のPCSが持つ検出誤差や制御応答のばらつきの影響を受けなくなるため、系統電力の上限値が的確に抑えられ、電力系統の平準化(即ち、安定化)を図ることができる。   According to the distributed power supply device of the present invention, each PCS is provided with a calculation unit, and the calculation unit calculates an adjustment value based on the rank setting value, the rank changing element, and the load sharing power, and the first peak cut power command Since the second peak cut power command value is calculated by subtracting the adjustment value from the value, a difference is generated in the second peak cut power command value that is the control target value of each PCS. This difference eliminates the influence of detection errors and control response variations of individual PCSs, so that the upper limit value of the system power can be accurately suppressed and the power system can be leveled (ie, stabilized). .

図1は本発明の実施例1における分散型電源装置を示す概略の構成図である。FIG. 1 is a schematic configuration diagram illustrating a distributed power supply device according to a first embodiment of the present invention. 図2は従来の分散型電源装置を示す概略の構成図である。FIG. 2 is a schematic configuration diagram showing a conventional distributed power supply apparatus. 図3は図1中のPCS21の構成を示す概略の機能ブロック図である。FIG. 3 is a schematic functional block diagram showing the configuration of the PCS 21 in FIG. 図4は図1の動作を示す説明図である。FIG. 4 is an explanatory diagram showing the operation of FIG.

本発明を実施するための形態は、以下の好ましい実施例の説明を添付図面と照らし合わせて読むと、明らかになるであろう。但し、図面はもっぱら解説のためのものであって、本発明の範囲を限定するものではない。   Modes for carrying out the present invention will become apparent from the following description of the preferred embodiments when read in light of the accompanying drawings. However, the drawings are only for explanation and do not limit the scope of the present invention.

従来の図2に示すように、複数台のPCS10(=10−1〜10−n)を同一の電力系統17に並列に接続して並列運転を行う場合、系統電力の受電点16に設けた系統電力センサ15により系統電力値poutを検出し、この系統電力値poutを基に制御を行うため、検出誤差によって負荷分担がまちまちになって管理不能に陥ってしまう。この状況を改善するため、本実施例1の分散型電源装置では、以下のような構成になっている。   As shown in FIG. 2 of the related art, when performing parallel operation by connecting a plurality of PCSs 10 (= 10-1 to 10-n) in parallel to the same power system 17, they are provided at a power receiving point 16 for system power. Since the system power value pout is detected by the system power sensor 15 and control is performed based on the system power value pout, the load sharing varies depending on the detection error, and management becomes impossible. In order to improve this situation, the distributed power supply device according to the first embodiment has the following configuration.

(実施例1の構成)
図1は、本発明の実施例1における分散型電源装置を示す概略の構成図である。
(Configuration of Example 1)
FIG. 1 is a schematic configuration diagram illustrating a distributed power supply device according to a first embodiment of the present invention.

この分散型電源装置は、複数の直流電源20(=20−1〜20−n、例えば、n=5)にそれぞれ接続された複数台のPCS21(=21−1〜21−n、例えば、n=5)を備えている。各直流電源20は、蓄電池、太陽電池、燃料電池等の分散型直流電源である。複数台のPCS21は、各直流電源20から供給される直流電力を交流電力にそれぞれ変換する装置であり、電力系統58から系統電力を受電する受電点57と、負荷55と、の間の配線54に並列に接続されている。受電点57には、系統電力値poutを検出する系統電力センサ56が設けられている。   This distributed power supply apparatus includes a plurality of PCSs 21 (= 21-1 to 21-n, for example, n) respectively connected to a plurality of DC power sources 20 (= 20-1 to 20-n, for example, n = 5). = 5). Each DC power source 20 is a distributed DC power source such as a storage battery, a solar cell, or a fuel cell. The plurality of PCSs 21 are devices that convert DC power supplied from each DC power supply 20 into AC power, respectively, and a wiring 54 between a power receiving point 57 that receives system power from the power system 58 and the load 55. Connected in parallel. The power receiving point 57 is provided with a system power sensor 56 that detects the system power value pout.

系統電力センサ56は、電力計により構成、或いは、電流計及び電圧計により構成されている。この系統電力センサ56で検出された系統電力値poutは、第1PCS21−1へ送られ、この第1PCS21−1から次の第2PCS21−2、第3PCS21−3、・・・へ順次分配される。   The system power sensor 56 is configured by a power meter, or by an ammeter and a voltmeter. The system power value pout detected by the system power sensor 56 is sent to the first PCS 21-1, and is sequentially distributed from the first PCS 21-1 to the next second PCS 21-2, the third PCS 21-3,.

各PCS21は、電力変換部30と、電力センサ36と、演算部40と、制御部50と、を有している。   Each PCS 21 includes a power conversion unit 30, a power sensor 36, a calculation unit 40, and a control unit 50.

電力変換部30は、制御部50から与えられる複数の制御信号s1,s2に基づいて、直流電源20から供給される直流電力を交流電力に変換するものである。電力センサ36は、電力変換部30の出力電力Pc(=Pc1〜Pcn)を検出し、この出力電力値poを制御部50に与えるものであり、電力計により構成、或いは、電流計及び電圧計により構成されている。   The power conversion unit 30 converts DC power supplied from the DC power source 20 into AC power based on a plurality of control signals s1 and s2 given from the control unit 50. The power sensor 36 detects the output power Pc (= Pc1 to Pcn) of the power conversion unit 30 and supplies the output power value po to the control unit 50. The power sensor 36 is configured by a wattmeter, or an ammeter and a voltmeter. It is comprised by.

演算部40は、外部から与えられる第1ピークカット電力指令値pcut1(例えば、50kW)を演算して各PCS21毎に分担する第2ピークカット電力指令値pcut2を求め、この第2ピークカット電力指令値pcut2を制御部50へ与える機能を有している。制御部50は、演算部40から与えられる第2ピークカット電力指令値pcut2と、系統電力から検出された系統電力値poutと、に基づいて複数の制御信号s1,s2を生成し、電力変換部30へ与える機能を有している。
なお、図1中のPzは、負荷55へ供給される系統負荷電力である。
The calculating unit 40 calculates a first peak cut power command value pcut2 (for example, 50 kW) given from the outside to obtain a second peak cut power command value pcut2 to be shared for each PCS 21, and this second peak cut power command value is calculated. It has a function of giving the value pcut2 to the control unit 50. The control unit 50 generates a plurality of control signals s1 and s2 based on the second peak cut power command value pcut2 given from the calculation unit 40 and the system power value pout detected from the system power, and the power conversion unit 30.
Note that Pz in FIG. 1 is system load power supplied to the load 55.

図3は、図1中のPCS21の構成を示す概略の機能ブロック図である。
各PCS21において、電力変換部30は、例えば、入力用のスイッチング回路31、変圧器(以下「トランス」という。)、整流回路33、フィルタ回路34、及び出力用のスイッチング回路35を有している。
FIG. 3 is a schematic functional block diagram showing the configuration of the PCS 21 in FIG.
In each PCS 21, the power conversion unit 30 includes, for example, an input switching circuit 31, a transformer (hereinafter referred to as “transformer”), a rectifier circuit 33, a filter circuit 34, and an output switching circuit 35. .

入力用のスイッチング回路31は、直流電源20から出力される直流電力を入力し、入力された直流電力をスイッチングして高周波の交流電力に変換し、この交流電力をトランス32へ出力する回路であり、複数の制御信号s1によりオン/オフ動作する複数のスイッチング素子により構成されている。トランス32は、電力変換部30の入力側と出力側とを絶縁するものであり、このトランス32の出力側に、整流回路33が接続されている。   The switching circuit 31 for input is a circuit that inputs DC power output from the DC power supply 20, switches the input DC power to convert it into high-frequency AC power, and outputs this AC power to the transformer 32. , And a plurality of switching elements that are turned on / off by a plurality of control signals s1. The transformer 32 insulates the input side and the output side of the power converter 30, and a rectifier circuit 33 is connected to the output side of the transformer 32.

整流回路33は、トランス32から出力される交流電力を直流電力に変換する回路であり、ダイオードブリッジ回路等により構成され、この出力側に、フィルタ回路34が接続されている。フィルタ回路34は、整流回路33の出力電圧に含まれる高周波成分の除去と平滑を行う回路であり、LC回路等により構成され、この出力側に、出力用のスイッチング回路35が接続されている。   The rectifier circuit 33 is a circuit that converts AC power output from the transformer 32 into DC power, and is configured by a diode bridge circuit or the like. A filter circuit 34 is connected to the output side. The filter circuit 34 is a circuit that removes and smoothes high-frequency components contained in the output voltage of the rectifier circuit 33. The filter circuit 34 is composed of an LC circuit or the like, and an output switching circuit 35 is connected to the output side.

スイッチング回路35は、フィルタ回路34から出力される直流電力を、電力系統58と同一の周波数を有する低周波の交流電力に変換する回路であり、複数の制御信号s2によりオン/オフ動作する複数のスイッチング素子により構成され、この出力側が、配線54に接続されている。配線54には、電力センサ36が設けられている。   The switching circuit 35 is a circuit that converts DC power output from the filter circuit 34 into low-frequency AC power having the same frequency as that of the power system 58, and a plurality of on / off operations performed by a plurality of control signals s2. A switching element is used, and the output side is connected to the wiring 54. A power sensor 36 is provided in the wiring 54.

演算部40は、負荷55へ供給する電力における負荷分担の順位を設定する順位設定値と、複数台のPCS21を全て駆動させるために負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力dと、に基づいて調整値AVを求め、第1ピークカット電力指令値pcut1から、調整値AVを減算して、第2ピークカット電力指令値pcut2を算出する機能を有している。   The computing unit 40 includes a rank setting value for setting the rank of load sharing in the power supplied to the load 55, a rank changing element for changing the rank of load sharing in order to drive all the PCSs 21, and a predetermined load sharing. An adjustment value AV is obtained based on the power d, and the second peak cut power command value pcut2 is calculated by subtracting the adjustment value AV from the first peak cut power command value pcut1.

演算部40において、前記順位設定値は、複数台のPCS21にそれぞれ対応する号機番号aと、複数台のPCS21の運転台数bと、に基づいて設定される値である。前記順位変更要素は、系統電力検出時の年、月、日、時、分、秒のいずれか1つ、又は、それらの複数の組み合わせからなる時計情報cである。更に、前記所定の負荷分担電力dは、各PCS21が持つ検出誤差を吸収して第1ピークカット電力指令値pcut1に差を設けるための電力値である。   In the calculation unit 40, the order setting value is a value set based on the machine number a corresponding to each of the plurality of PCSs 21 and the number of operating units b of the plurality of PCSs 21. The rank changing element is clock information c including any one of year, month, day, hour, minute, and second at the time of system power detection, or a combination thereof. Further, the predetermined load sharing power d is a power value for absorbing a detection error of each PCS 21 and providing a difference in the first peak cut power command value pcut1.

前記調整値AVは、例えば、次式(1)に従って求められる。
調整値AV={(号機番号a+時計情報c)%運転台数b}×負荷分担電力d
但し、「%」は、剰余を求めることを意味する。
・・・(1)
The adjustment value AV is obtained according to the following equation (1), for example.
Adjustment value AV = {(unit number a + clock information c)% number of operating units b} × load sharing power d
However, “%” means obtaining a remainder.
... (1)

このように、本実施例1では、設定値として号機番号a、運転台数b、及び負荷分担電力dを設け、時計情報cである現在時刻を利用し、前記(1)式で、各PCS21の第2ピークカット電力指令値pcut2に差を設ける。つまり、前記(1)式の計算により、各PCS21毎の第2ピークカット電力指令値pcut2は、負荷分担電力dの差を持ち、全てが異なる値となる。   As described above, in the first embodiment, the machine number “a”, the number of operating units “b”, and the load sharing power “d” are provided as set values, and the current time that is the clock information “c” is used. A difference is provided in the second peak cut power command value pcut2. That is, according to the calculation of the equation (1), the second peak cut power command value pcut2 for each PCS 21 has a difference in load sharing power d and all have different values.

本実施例1の演算部40は、例えば、時計41、剰余算出手段42、乗算手段43、及び減算手段44により構成されている。   The calculation unit 40 according to the first embodiment includes, for example, a clock 41, a remainder calculation unit 42, a multiplication unit 43, and a subtraction unit 44.

時計41は、時計情報cを計測するものであり、この出力側に、剰余算出手段42が接続されている。剰余算出手段42は、号機番号aと時計情報cとを加算し、該加算値に対して運転台数bを除算して除算結果の剰余を算出するものであり、この出力側に、乗算手段43が接続されている。乗算手段43は、剰余算出手段42で算出された剰余と、負荷分担電力dと、を乗算して調整値AVを算出するものであり、この出力側に、減算手段44が接続されている。減算手段44は、第1ピークカット電力指令値pcut1から調整値AVを減算して第2ピークカット電力指令値pcut2を算出するものであり、この出力側に、制御部50が接続されている。   The clock 41 measures clock information c, and a remainder calculating means 42 is connected to the output side. The remainder calculating means 42 adds the machine number a and the clock information c, and divides the number of operating units b by the added value to calculate the remainder of the division result. Is connected. The multiplication means 43 multiplies the remainder calculated by the remainder calculation means 42 and the load sharing power d to calculate the adjustment value AV, and the subtraction means 44 is connected to the output side. The subtracting means 44 subtracts the adjustment value AV from the first peak cut power command value pcut1 to calculate the second peak cut power command value pcut2, and the control unit 50 is connected to the output side.

制御部50は、目標値算出手段51、誤差演算手段52、及び制御信号生成手段53により構成されている。   The control unit 50 includes a target value calculation unit 51, an error calculation unit 52, and a control signal generation unit 53.

目標値算出手段51は、第2ピークカット電力指令値pcut2から系統電力値poutを減算して出力電力目標値eを算出するものであり、この出力側に、誤差演算手段52が接続されている。誤差演算手段52は、演算により、出力電力値poと出力電力目標値eとの誤差fを算出するものであり、この出力側に、制御信号生成手段53が接続されている。制御信号生成手段53は、誤差fが減少するようなデューティ比の複数の制御信号s1,s2を生成し、これらの複数の制御信号s1,s2を電力変換部30内のスイッチング回路31、35へ与えるものであり、例えば、パルス幅変調手段(PWM手段)及び駆動手段等により構成されている。   The target value calculation means 51 calculates the output power target value e by subtracting the system power value pout from the second peak cut power command value pcut2, and an error calculation means 52 is connected to this output side. . The error calculation means 52 calculates an error f between the output power value po and the output power target value e by calculation, and a control signal generation means 53 is connected to the output side. The control signal generation unit 53 generates a plurality of control signals s1 and s2 having a duty ratio so that the error f is reduced, and the plurality of control signals s1 and s2 are supplied to the switching circuits 31 and 35 in the power conversion unit 30. For example, it is constituted by pulse width modulation means (PWM means), drive means, and the like.

これらの演算部40及び制御部50は、プロセッサ又は個別回路等により構成されている。   The calculation unit 40 and the control unit 50 are configured by a processor, an individual circuit, or the like.

(実施例1の全体の動作)
図1及び図3に示す分散型電源装置において、外部から系統電力の上限の第1ピークカット電力指令値pcut1が供給されると、この第1ピークカット電力指令値pcut1が、各PCS21内の演算部40へ与えられる。電力系統58の系統電力は、受電点57及び配線54を経由して負荷55へ供給される。
(Overall operation of the first embodiment)
1 and 3, when the first peak cut power command value pcut1 that is the upper limit of the system power is supplied from the outside, the first peak cut power command value pcut1 is calculated in each PCS 21. To part 40. The system power of the power system 58 is supplied to the load 55 via the power receiving point 57 and the wiring 54.

系統電力センサ56で検出された系統電力値poutは、各PCS21へ与えられる。図1の例では、第1PCS21−1を経由して順に第2PCS21−2、第3PCS21−3、第4PCS21−4、及び第5PCS21−5へ同一値として分配される。   The system power value pout detected by the system power sensor 56 is given to each PCS 21. In the example of FIG. 1, the same value is distributed to the second PCS 21-2, the third PCS 21-3, the fourth PCS 21-4, and the fifth PCS 21-5 in order via the first PCS 21-1.

負荷55へ供給される系統負荷電力Pzの変動により、系統電力センサ56で検出された系統電力値poutが増加し、この系統電力値poutが第1ピークカット電力指令値pcut1を超えようとすると、複数台のPCS21が、以下のように動作する。   Due to the fluctuation of the grid load power Pz supplied to the load 55, the grid power value pout detected by the grid power sensor 56 increases, and when this grid power value pout tries to exceed the first peak cut power command value pcut1, A plurality of PCSs 21 operate as follows.

各PCS21内の演算部40において、剰余算出手段42は、号機番号aと時計情報cとを加算し、該加算値に対して運転台数bを除算して除算結果の剰余を算出し、この算出結果を乗算手段43へ与える。乗算手段43は、剰余算出手段42で算出された剰余と、負荷分担電力dと、を乗算して前記(1)式の調整値AVを求め、減算手段44へ与える。減算手段44は、第1ピークカット電力指令値pcut1から調整値AVを減算して第2ピークカット電力指令値pcut2を算出し、各制御部50内の目標値算出手段51へ与える。   In the calculation unit 40 in each PCS 21, the remainder calculating means 42 adds the machine number a and the clock information c, and divides the number of operating units b by the added value to calculate the remainder of the division result. The result is given to multiplication means 43. The multiplying unit 43 multiplies the residue calculated by the residue calculating unit 42 and the load sharing power d to obtain the adjustment value AV of the equation (1), and gives it to the subtracting unit 44. The subtracting means 44 subtracts the adjustment value AV from the first peak cut power command value pcut 1 to calculate the second peak cut power command value pcut 2 and gives it to the target value calculating means 51 in each control unit 50.

各制御部50内の目標値算出手段51は、演算部40から与えられた第2ピークカット電力指令値pcut2から、系統電力センサ56で検出された系統電力値poutを減算して、出力電力目標値eを算出し、誤差演算手段52へ与える。誤差演算手段52は、電力センサ36で検出された出力電力値poと、出力電力目標値eと、の誤差fを算出し、制御信号生成手段53へ与える。これにより、制御信号生成手段53は、誤差fが減少するようなデューティ比の複数の制御信号s1,s2を生成し、電力変換部30へ与える。   The target value calculation means 51 in each control unit 50 subtracts the grid power value pout detected by the grid power sensor 56 from the second peak cut power command value pcut2 given from the calculation unit 40, and outputs power target A value e is calculated and given to the error calculation means 52. The error calculation means 52 calculates an error f between the output power value po detected by the power sensor 36 and the output power target value e, and gives it to the control signal generation means 53. As a result, the control signal generation unit 53 generates a plurality of control signals s1 and s2 having a duty ratio that reduces the error f and supplies the control signals s1 and s2 to the power conversion unit 30.

各電力変換部30において、入力用のスイッチング回路31は、制御部50から与えられた複数の制御信号s1に基づき、直流電源20から出力された直流電力をスイッチングして高周波の交流電力に変換する。変換された交流電力は、トランス32を介して、整流回路33で直流電力に変換され、フィルタ回路34にて、高周波成分の除去と平滑が行われ、出力用のスイッチング回路35へ送られる。   In each power conversion unit 30, the input switching circuit 31 switches the DC power output from the DC power source 20 and converts it into high-frequency AC power based on a plurality of control signals s 1 given from the control unit 50. . The converted AC power is converted into DC power by the rectifier circuit 33 via the transformer 32, high-frequency components are removed and smoothed by the filter circuit 34, and sent to the output switching circuit 35.

スイッチング回路35は、制御部50から与えられた複数の制御信号s2に基づき、フィルタ回路34から出力された直流電力を、電力系統58と同一の周波数を有する低周波の交流電力に変換する。変換された出力電力Pcは、電力センサ36で検出され、この出力電力値poが制御部50へ与えられる。   The switching circuit 35 converts the DC power output from the filter circuit 34 into low-frequency AC power having the same frequency as that of the power system 58, based on the plurality of control signals s2 given from the control unit 50. The converted output power Pc is detected by the power sensor 36, and this output power value po is given to the control unit 50.

制御部50において、系統電力センサ56で検出された系統電力値poutが第2ピークカット電力指令値pcut2を超えないように制御され、この制御信号s1,s2に基づき、複数台のPCS21が動作して不足分の電力が負荷55へ供給される。これにより、系統電力の上限値が抑えられ、電力系統58が平準化される。   The controller 50 is controlled so that the system power value pout detected by the system power sensor 56 does not exceed the second peak cut power command value pcut2, and a plurality of PCSs 21 operate based on the control signals s1 and s2. Insufficient power is supplied to the load 55. Thereby, the upper limit of the system power is suppressed, and the power system 58 is leveled.

(実施例1のPCSの負荷分担動作)
図4(a)〜(c)は、図1の分散型電源装置における動作を示す説明図である。
(Load sharing operation of PCS of Example 1)
4A to 4C are explanatory diagrams showing the operation of the distributed power supply device of FIG.

図4(a)〜(c)において、同図(a)は、並列運転機能無しの従来のPCS10の負荷分担特性図、同図(b)は、並列運転機能有りの本実施例1のPCS21の負荷分担特性図、及び、同図(c)は、並列運転機能有りの本実施例1のPCS21毎の第2ピークカット電力指令値pcut2の算出例を示す図である。   4A to 4C, FIG. 4A shows a load sharing characteristic diagram of the conventional PCS 10 without the parallel operation function, and FIG. 4B shows the PCS 21 of the first embodiment with the parallel operation function. FIG. 4C is a diagram showing a calculation example of the second peak cut power command value pcut2 for each PCS 21 of the first embodiment having a parallel operation function.

図4(a)に示す従来のように、各PCS10(=10−1〜10−5)の出力電力Pc(=Pc1〜Pc5)が同一の目標値になるよう個別に電力制御を行うと、検出誤差のばらつきにより、何れかのPCS10が負荷電力Pzを全て背負い込む動作を行う。誤差ではなく、的確に負荷分担を管理するため、本実施例1では、各PCS21における号機番号a、運転台数b及び負荷分担電力dと、現在時刻と、による制御を行っている。   When the power control is individually performed so that the output power Pc (= Pc1 to Pc5) of each PCS 10 (= 10-1 to 10-5) becomes the same target value as in the conventional case illustrated in FIG. Due to the variation in detection error, one of the PCSs 10 performs an operation of carrying the entire load power Pz. In the first embodiment, control is performed based on the machine number “a”, the number of operating units “b”, the load sharing power “d”, and the current time in each PCS 21 in order to accurately manage load sharing, not errors.

本実施例1において、ピークカット供給運転時の動作イメージが、図4(b)に示されている。例えば、複数台のPCS21(=21−1〜21−5)において、これらの複数の出力電力Pc(=Pc1〜Pc5)により、系統負荷電力Pzが順に分担される。   In the present Example 1, the operation image at the time of peak cut supply driving | operation is shown by FIG.4 (b). For example, in a plurality of PCSs 21 (= 21-1 to 21-5), the system load power Pz is sequentially shared by the plurality of output powers Pc (= Pc1 to Pc5).

図4(b)の動作を実現するため、前記(1)式に基づき、各PCS21毎の第2ピークカット電力指令値pcut2が演算部40で求められる。この結果、各PCS21の第2ピークカット電力指令値pcut2が差を持つため、負荷分担が順に制御されることになる。   In order to realize the operation of FIG. 4B, the calculation unit 40 obtains the second peak cut power command value pcut2 for each PCS 21 based on the equation (1). As a result, since the second peak cut power command value pcut2 of each PCS 21 has a difference, load sharing is sequentially controlled.

図4(c)には、例えば、第1ピークカット電力指令値pcut1を50kW、運転台数bを5台、負荷分担電力dを0.3kW、現在時刻として日を採用した場合の計算例が示されている。   FIG. 4C shows a calculation example in the case where, for example, the first peak cut power command value pcut1 is 50 kW, the number of operating units b is 5, the load sharing power d is 0.3 kW, and the day is adopted as the current time. Has been.

図4(c)において、○月4日の場合、系統電力の負荷55が増大して系統入力電力である系統電力値poutが48.8kWを超えると、PCS21−5が出力を開始する。PCS定格の10kWを超える場合、PCS21−5だけでは制御しきれなくなり、系統電力値poutが48.8kWを超える。その後、49.1kWに到達してPCS21−4が出力を行う。以降同様に、PCS21−3,21−2,21−1が順に出力を行う。   In FIG. 4 (c), on the 4th of May, when the grid power load 55 increases and the grid power value pout which is grid input power exceeds 48.8 kW, the PCS 21-5 starts output. When the PCS rating exceeds 10 kW, the PCS 21-5 alone cannot be controlled, and the system power value pout exceeds 48.8 kW. After that, 49.1 kW is reached and the PCS 21-4 performs output. Thereafter, similarly, the PCS 21-3, 21-2, and 21-1 sequentially output.

なお、計算式に日付があるため、翌5日には、PCS21−4の計算結果が最も低い48.8kWになり、最初に負荷電力Pzを受け持つ。以降同様に、PCS21−3,21−2,21−1,21−5が順に負荷電力Pzを受け持つことになる。
このような動作により、負荷分担が管理される。
Since there is a date in the calculation formula, on the next 5th day, the calculation result of PCS 21-4 is the lowest, 48.8 kW, and it is responsible for load power Pz first. Thereafter, similarly, the PCS 21-3, 21-2, 21-1, 21-5 are responsible for the load power Pz in order.
With this operation, load sharing is managed.

一方で、各直流電源20に蓄電池や太陽電池の他、風力発電や水力発電を起源とした電力を組み合わせた場合においても、本方式により系統電力の制御が可能である。図4(c)の○月4日の場合において、直流電源20−1と直流電源20−2、20−3に蓄電池、直流電源20−4と直流電源20−5に太陽電池を接続した場合、系統電力の負荷55が増大して系統電力値poutが48.8kWを超えると、PCS21−5が出力を開始しようとするが、天候不良等の要因により太陽電池の発電電力が不足すると、十分な電力が供給できずに系統電力値poutが48.8kWを超える。その後、49.1kWに到達してPCS21−4が出力を行うが、同様の理由により太陽電池の供給電力が不足して系統電力値poutが49.4kWを超えるとPCS21−3が出力を開始し、系統電力値poutの制御が行われる。   On the other hand, even when each DC power source 20 is combined with electric power originating from wind power generation or hydroelectric power generation in addition to storage batteries and solar cells, system power can be controlled by this method. In the case of the month 4 in FIG. 4C, a storage battery is connected to the DC power source 20-1 and the DC power sources 20-2, 20-3, and a solar cell is connected to the DC power source 20-4 and the DC power source 20-5. When the grid power load 55 increases and the grid power value pout exceeds 48.8 kW, the PCS 21-5 attempts to start output. However, if the generated power of the solar cell is insufficient due to factors such as bad weather, Power cannot be supplied, and the system power value pout exceeds 48.8 kW. After that, 49.1 kW is reached and the PCS 21-4 performs output. However, for the same reason, when the supply power of the solar cell is insufficient and the system power value pout exceeds 49.4 kW, the PCS 21-3 starts outputting. The system power value pout is controlled.

(実施例1の効果)
本実施例1の分散型電源装置によれば、各PCS21に演算部40を設け、この演算部40により、号機番号a及び運転台数bからなる負荷分担の順位設定値と、時計情報cからなる負荷分担の順位変更要素と、負荷分担電力dと、に基づいて調整値AVを求め、第1ピークカット電力指令値pcut1からその調整値AVを減算して、第2ピークカット電力指令値pcut2を算出しているので、各PCS21の制御目標値である第2ピークカット電力指令値pcut2に差が生まれる。この差により、個々のPCS21が持つ検出誤差や制御応答のばらつきの影響を受けなくなるため、系統電力が、この上限である第1ピークカット電力指令値pcut1以下に的確に抑えられ、電力系統58の平準化を図ることができる。
(Effect of Example 1)
According to the distributed power supply device of the first embodiment, each PCS 21 is provided with a calculation unit 40, and by this calculation unit 40, the load sharing rank setting value consisting of the machine number a and the number of operating units b and the clock information c are included. An adjustment value AV is obtained based on the load sharing rank changing element and the load sharing power d, and the adjustment value AV is subtracted from the first peak cut power command value pcut1, to obtain the second peak cut power command value pcut2. Since the calculation is performed, a difference is generated in the second peak cut power command value pcut2, which is the control target value of each PCS 21. This difference eliminates the influence of the detection error and control response variation of each PCS 21, so that the grid power can be accurately suppressed to the upper limit of the first peak cut power command value pcut 1 or less. Leveling can be achieved.

(変形例)
本発明は、上記実施例1に限定されず、種々の利用形態や変形が可能である。この利用形態や変形例としては、例えば、次の(I)、(II)のようなものがある。
(Modification)
The present invention is not limited to the first embodiment, and various usage forms and modifications are possible. For example, there are the following forms (I) and (II) as usage forms and modifications.

(I) 図3に示すPCS21は、図示の構成に限定されない。例えば、演算部40は、前記(1)式以外の他の数式により、調整値AVを求めても良い。演算部40は、制御部50内に設けても良い。又、各演算部40内に設けられた時計41に代えて、複数の演算部40に共用できる1つの時計を設け、この時計の時計情報cを各演算部40へ与える構成にしても良く、これにより、構成を簡素化できる。   (I) The PCS 21 shown in FIG. 3 is not limited to the illustrated configuration. For example, the calculation unit 40 may obtain the adjustment value AV using a mathematical expression other than the expression (1). The calculation unit 40 may be provided in the control unit 50. Further, instead of the clock 41 provided in each calculation unit 40, a single clock that can be shared by a plurality of calculation units 40 is provided, and the clock information c of this clock may be provided to each calculation unit 40. Thereby, a structure can be simplified.

(II) 図1及び図3に示す分散型電源装置は、図示の構成に限定されない。例えば、電力変換部30は、図示以外の他の回路で構成しても良い。   (II) The distributed power supply device shown in FIGS. 1 and 3 is not limited to the illustrated configuration. For example, the power conversion unit 30 may be configured by a circuit other than that illustrated.

20,20−1〜20−n 直流電源
21,21−1〜21−n PCS(電力変換装置)
30 電力変換部
36 電力センサ
40 演算部
41 時計
42 剰余算出手段
43 乗算手段
44 減算手段
50 制御部
51 目標値算出手段
52 誤差演算手段
53 制御信号生成手段
55 負荷
56 系統電力センサ
57 系統電力の受電点
58 電力系統
20, 20-1 to 20-n DC power supply 21, 21-1 to 21-n PCS (power converter)
DESCRIPTION OF SYMBOLS 30 Power conversion part 36 Power sensor 40 Calculation part 41 Clock 42 Remainder calculation means 43 Multiplication means 44 Subtraction means 50 Control part 51 Target value calculation means 52 Error calculation means 53 Control signal generation means 55 Load 56 System power sensor 57 Power reception of system power Point 58 Power system

Claims (9)

電力系統から系統電力を受電する受電点と負荷との間の配線に並列に接続され、直流電力を交流電力にそれぞれ変換する複数台の電力変換装置を備え、
前記電力系統から前記負荷へ供給される負荷電力が、前記電力系統から受電する前記系統電力の上限の第1ピークカット電力指令値を超えたとき、前記複数台の電力変換装置から前記負荷へ電力を供給する分散型電源装置であって、
前記各電力変換装置は、
前記第1ピークカット電力指令値を演算して前記各電力変換装置毎に分担する第2ピークカット電力指令値を求める演算部と、
前記演算部で求められた前記第2ピークカット電力指令値と、前記系統電力から検出された系統電力値と、に基づいて出力電力目標値を求め、前記各電力変換装置の出力電力から検出された出力電力値と、前記出力電力目標値と、の誤差が減少するような制御信号を生成する制御部と、
前記制御信号に基づいて、前記直流電力を前記交流電力に変換する電力変換部と、
を有し、
前記演算部は、
前記負荷へ供給する前記電力における負荷分担の順位を設定する順位設定値と、前記複数台の電力変換装置を全て駆動させるために前記負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力と、に基づいて調整値を求め、前記第1ピークカット電力指令値から、前記調整値を減算して、前記第2ピークカット電力指令値を算出することを特徴とする分散型電源装置。
It is connected in parallel to the wiring between the power receiving point and the load that receives system power from the power system, and includes a plurality of power conversion devices that respectively convert DC power into AC power,
When load power supplied from the power system to the load exceeds a first peak cut power command value that is an upper limit of the system power received from the power system, power from the plurality of power converters to the load A distributed power supply for supplying
Each of the power conversion devices
A calculation unit that calculates the first peak cut power command value and obtains a second peak cut power command value to be shared for each power converter;
An output power target value is obtained based on the second peak cut power command value obtained by the arithmetic unit and the system power value detected from the system power, and is detected from the output power of each power converter. A control unit that generates a control signal that reduces an error between the output power value and the output power target value;
A power converter that converts the DC power into the AC power based on the control signal;
Have
The computing unit is
A rank setting value for setting a rank of load sharing in the power supplied to the load, a rank changing element for changing the rank of the load sharing in order to drive all the plurality of power converters, and a predetermined load sharing A distributed power supply apparatus that calculates an adjustment value based on power and subtracts the adjustment value from the first peak cut power command value to calculate the second peak cut power command value.
前記順位設定値は、前記複数台の電力変換装置にそれぞれ対応する号機番号と、前記複数台の電力変換装置の運転台数と、に基づき設定される値であり、
前記順位変更要素は、系統電力検出時の年、月、日、時、分、秒のいずれか1つ、又は、それらの複数の組み合わせからなる時計情報であり、
前記所定の負荷分担電力は、前記各電力変換装置が持つ検出誤差を吸収して前記第1ピークカット電力指令値に差を設けるための電力値である、
ことを特徴とする請求項1記載の分散型電源装置。
The rank setting value is a value set based on the number of the machine corresponding to each of the plurality of power converters, and the number of operating units of the plurality of power converters,
The rank changing element is clock information consisting of any one of year, month, day, hour, minute, second at the time of system power detection, or a combination thereof,
The predetermined load sharing power is a power value for absorbing a detection error of each power converter and providing a difference in the first peak cut power command value.
The distributed power supply apparatus according to claim 1.
前記調整値は、
下記の式に従って求めることを特徴とする請求項2記載の分散型電源装置。
調整値={(号機番号+時計情報)%運転台数}×負荷分担電力
但し、「%」は、剰余を求めることを意味する。
The adjustment value is
3. The distributed power supply apparatus according to claim 2, wherein the power distribution is determined according to the following equation.
Adjustment value = {(unit number + clock information)% number of operating units} x load sharing power
However, “%” means obtaining a remainder.
前記演算部は、
前記号機番号と前記時計情報とを加算し、該加算値に対して前記運転台数を除算して除算結果の剰余を算出する剰余算出手段と、
前記剰余算出手段で算出された前記剰余と、前記負荷分担電力と、を乗算して前記調整値を算出する乗算手段と、
前記第1ピークカット電力指令値から前記調整値を減算して前記第2ピークカット電力指令値を算出する減算手段と、
を有することを特徴とする請求項3記載の分散型電源装置。
The computing unit is
A remainder calculating means for adding the number of the machine and the clock information, and dividing the number of operating units with respect to the added value to calculate a remainder of the division result;
Multiplication means for calculating the adjustment value by multiplying the remainder calculated by the remainder calculation means and the load sharing power;
Subtracting means for calculating the second peak cut power command value by subtracting the adjustment value from the first peak cut power command value;
The distributed power supply device according to claim 3, further comprising:
前記系統電力値及び前記出力電力値は、2つの電力センサによりそれぞれ検出されることを特徴とする請求項1〜4のいずれか1項記載の分散型電源装置。   The distributed power supply apparatus according to claim 1, wherein the system power value and the output power value are detected by two power sensors, respectively. 前記時計情報は、時計により計測されることを特徴とする請求項2〜5のいずれか1項記載の分散型電源装置。   The distributed power supply device according to claim 2, wherein the clock information is measured by a clock. 前記制御部は、
前記第2ピークカット電力指令値から前記系統電力値を減算して前記出力電力目標値を算出する目標値算出手段と、
前記出力電力値と前記出力電力目標値との誤差を演算により算出する誤差演算手段と、
前記誤差が減少するようなデューティ比の前記制御信号を生成する制御信号生成手段と、
を有することを特徴とする請求項1〜6のいずれか1項記載の分散型電源装置。
The controller is
Target value calculating means for calculating the output power target value by subtracting the grid power value from the second peak cut power command value;
Error calculation means for calculating an error between the output power value and the output power target value by calculation;
Control signal generating means for generating the control signal having a duty ratio such that the error is reduced;
The distributed power supply device according to any one of claims 1 to 6, wherein:
前記演算部及び前記制御部は、プロセッサ又は個別回路により構成されていることを特徴とする請求項1〜7のいずれか1項記載の分散型電源装置。   The distributed power supply apparatus according to claim 1, wherein the arithmetic unit and the control unit are configured by a processor or an individual circuit. 前記各電力変換装置に入力される前記直流電力は、
蓄電池、太陽電池及び燃料電池を含む分散型直流電源から供給されることを特徴とする請求項1〜8のいずれか1項記載の分散型電源装置。
The DC power input to each power converter is
The distributed power supply device according to any one of claims 1 to 8, wherein the distributed power supply is supplied from a distributed direct current power source including a storage battery, a solar battery, and a fuel cell.
JP2015129615A 2015-06-29 2015-06-29 Distributed power supply Active JP6425625B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015129615A JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015129615A JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Publications (2)

Publication Number Publication Date
JP2017017792A true JP2017017792A (en) 2017-01-19
JP6425625B2 JP6425625B2 (en) 2018-11-21

Family

ID=57831193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015129615A Active JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Country Status (1)

Country Link
JP (1) JP6425625B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019058428A1 (en) * 2017-09-19 2019-03-28 東芝三菱電機産業システム株式会社 Solar photovoltaic power generation system and solar photovoltaic power generation method
CN110417004A (en) * 2019-07-12 2019-11-05 国网甘肃省电力公司经济技术研究院 A kind of extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak regulation potentiality computation model
JP2021061697A (en) * 2019-10-08 2021-04-15 株式会社Gsユアサ Energy management device and energy management method
JP2021141794A (en) * 2020-03-04 2021-09-16 台達電子工業股▲ふん▼有限公司Delta Electronics, Inc. Smart grid system and power management method thereof
US11929621B2 (en) 2019-04-26 2024-03-12 Gs Yuasa International Ltd. Power control apparatus, control method for power control apparatus, and distributed power generating system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002218654A (en) * 2001-01-24 2002-08-02 Furukawa Electric Co Ltd:The Solar power system
JP2013247795A (en) * 2012-05-28 2013-12-09 Shimizu Corp Autonomous operation system for distributed power supply
US20140088778A1 (en) * 2012-09-27 2014-03-27 Lsis Co., Ltd. Control device for distributed generators

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002218654A (en) * 2001-01-24 2002-08-02 Furukawa Electric Co Ltd:The Solar power system
JP2013247795A (en) * 2012-05-28 2013-12-09 Shimizu Corp Autonomous operation system for distributed power supply
US20140088778A1 (en) * 2012-09-27 2014-03-27 Lsis Co., Ltd. Control device for distributed generators

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2019058428A1 (en) * 2017-09-19 2020-10-15 東芝三菱電機産業システム株式会社 Photovoltaic system and photovoltaic method
WO2019058428A1 (en) * 2017-09-19 2019-03-28 東芝三菱電機産業システム株式会社 Solar photovoltaic power generation system and solar photovoltaic power generation method
US11495970B2 (en) * 2017-09-19 2022-11-08 Toshiba Mitsubishi-Electric Industrial Systems Corporation Photovoltaic power generation system and photovoltaic power generation method
US11929621B2 (en) 2019-04-26 2024-03-12 Gs Yuasa International Ltd. Power control apparatus, control method for power control apparatus, and distributed power generating system
CN110417004B (en) * 2019-07-12 2022-08-05 国网甘肃省电力公司经济技术研究院 Extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak shaving potential calculation model
CN110417004A (en) * 2019-07-12 2019-11-05 国网甘肃省电力公司经济技术研究院 A kind of extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak regulation potentiality computation model
JP2021061697A (en) * 2019-10-08 2021-04-15 株式会社Gsユアサ Energy management device and energy management method
JP7404751B2 (en) 2019-10-08 2023-12-26 株式会社Gsユアサ Energy management device, energy management method
JP2024020630A (en) * 2019-10-08 2024-02-14 株式会社Gsユアサ Evaluation device, evaluation method, power conditioner and microgrid
US12088099B2 (en) 2019-10-08 2024-09-10 Gs Yuasa International Ltd. Energy management device and energy management method
JP7579508B2 (en) 2019-10-08 2024-11-08 株式会社Gsユアサ EVALUATION APPARATUS, EVALUATION METHOD, POWER CONDITIONER, AND MICROGRID
JP7014362B2 (en) 2020-03-04 2022-02-01 台達電子工業股▲ふん▼有限公司 Smart grid system and its power management method
JP2021141794A (en) * 2020-03-04 2021-09-16 台達電子工業股▲ふん▼有限公司Delta Electronics, Inc. Smart grid system and power management method thereof

Also Published As

Publication number Publication date
JP6425625B2 (en) 2018-11-21

Similar Documents

Publication Publication Date Title
CN111095008B (en) Electrical Architecture for Electrochemical Impedance Spectroscopy
US7476987B2 (en) Stand-alone wind turbine system, apparatus, and method suitable for operating the same
US8422258B2 (en) Maximum power point tracker, power conversion controller, power conversion device having insulating structure, and method for tracking maximum power point thereof
JP6425625B2 (en) Distributed power supply
US20230261510A1 (en) Method and apparatus for controlling busbar voltage of photovoltaic system
US20140084872A1 (en) Charge and discharge control device and charge and discharge control method
JP5887260B2 (en) Storage battery remaining amount management device
JP6419809B2 (en) Power storage system and characteristic parameter estimation method
JP5644965B2 (en) Battery system
JP6701922B2 (en) Storage controller
JP2011015493A (en) Distributed power supply device
JP2003116225A (en) Distributed power system
KR102211363B1 (en) Energy storage system and method for driving the same
JP2009089534A (en) PWM signal generation circuit, grid-connected inverter system provided with the PWM signal generation circuit, and program for realizing the PWM signal generation circuit
JP7558675B2 (en) Power Conversion Equipment
JP2016163427A (en) Design method for power transfer function in power leveling system and calculation method for battery capacity in power leveling system
JP5573258B2 (en) Power control apparatus, power control system, storage battery control method, and program
JP6851030B2 (en) Controllers, power storage systems and programs
WO2017042973A1 (en) Storage battery system, method, and program
JP5530009B1 (en) Power supply
JP2019041449A (en) Dc/dc converter control device
JP2015008561A (en) Low-loss power converter and control method thereof
JP2015186390A (en) Control device and control method for multi-source pcs group
JP6308014B2 (en) Power management system
JP2013153547A (en) Power leveling device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180926

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181003

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181011

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181023

R150 Certificate of patent or registration of utility model

Ref document number: 6425625

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150