JP2017005845A - Power control method and power control device - Google Patents

Power control method and power control device Download PDF

Info

Publication number
JP2017005845A
JP2017005845A JP2015116623A JP2015116623A JP2017005845A JP 2017005845 A JP2017005845 A JP 2017005845A JP 2015116623 A JP2015116623 A JP 2015116623A JP 2015116623 A JP2015116623 A JP 2015116623A JP 2017005845 A JP2017005845 A JP 2017005845A
Authority
JP
Japan
Prior art keywords
power
amount
power storage
storage device
command value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015116623A
Other languages
Japanese (ja)
Other versions
JP6210419B2 (en
Inventor
渡辺 健一
Kenichi Watanabe
健一 渡辺
貴大 杉本
Takahiro Sugimoto
貴大 杉本
思含 董
Sihan Dong
思含 董
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2015116623A priority Critical patent/JP6210419B2/en
Publication of JP2017005845A publication Critical patent/JP2017005845A/en
Application granted granted Critical
Publication of JP6210419B2 publication Critical patent/JP6210419B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

【課題】複数の蓄電装置のそれぞれが出力する電力量を適切に制御することができる電力制御方法を提供する。【解決手段】電力制御方法は、複数の蓄電装置のそれぞれについて残容量および定格出力容量を取得する蓄電装置情報取得ステップ(S101)と、複数の蓄電装置のそれぞれについて1以上の負荷の消費電力量を取得する負荷情報取得ステップ(S103)と、制御総量を算出する制御総量算出ステップ(S104)と、制御総量を複数の蓄電装置に配分する配分指令値算出ステップ(S106、S107)とを含み、配分指令値算出ステップ(S106、S107)では、複数の蓄電装置のそれぞれについて、残容量と定格出力容量と消費電力量とのうちの最小値を閾値として算出し(S106)、閾値以下の電力量を配分量として示す蓄電装置配分指令値を算出する(S107)。【選択図】図4A power control method capable of appropriately controlling the amount of power output from each of a plurality of power storage devices. A power control method includes a power storage device information acquisition step (S101) for acquiring a remaining capacity and a rated output capacity for each of a plurality of power storage devices, and power consumption of one or more loads for each of the plurality of power storage devices. A load information acquisition step (S103) for acquiring the control total amount, a control total amount calculation step (S104) for calculating the control total amount, and a distribution command value calculation step (S106, S107) for distributing the control total amount to a plurality of power storage devices, In the distribution command value calculation step (S106, S107), for each of the plurality of power storage devices, the minimum value among the remaining capacity, the rated output capacity, and the power consumption is calculated as a threshold (S106), and the electric energy below the threshold is calculated. Is calculated as a distribution amount (S107). [Selection] Figure 4

Description

本開示は、複数の蓄電装置のそれぞれが出力する電力量を制御するための電力制御方法等に関する。   The present disclosure relates to a power control method for controlling the amount of power output from each of a plurality of power storage devices.

従来、マイクログリッドと電力系統との連系点での電力平滑化のため、各蓄電設備の充放電可能残量比に基づいて分担電力指令値を算出する技術が開示されている(特許文献1参照)。   Conventionally, a technique for calculating a shared power command value based on a chargeable / dischargeable remaining capacity ratio of each power storage facility for smoothing power at a connection point between a microgrid and a power system has been disclosed (Patent Document 1). reference).

特開2012−249374号公報JP 2012-249374 A

しかしながら、特許文献1では、種々の制約により蓄電装置が分担電力指令値の通りに充放電が行われず、制御精度が悪化する可能性がある。   However, in Patent Document 1, due to various restrictions, the power storage device is not charged and discharged according to the shared power command value, and the control accuracy may deteriorate.

そこで、本開示は、複数の蓄電装置のそれぞれが出力する電力量を適切に制御することができる電力制御方法等を提供する。   Therefore, the present disclosure provides a power control method and the like that can appropriately control the amount of power output from each of a plurality of power storage devices.

本開示の一態様に係る電力制御方法は、複数の蓄電装置のそれぞれから所定時間あたりに出力される電力量を制御するための電力制御方法であって、前記複数の蓄電装置のそれぞれについて、当該蓄電装置の残容量、および、当該蓄電装置の前記所定時間あたりの定格出力容量を取得する蓄電装置情報取得ステップと、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と電力系統とから供給される電力を利用可能な1以上の負荷の前記所定時間あたりの消費電力量を取得する負荷情報取得ステップと、前記電力系統から供給される電力に対する所定の目標電力量に従って、前記複数の蓄電装置から出力される総電力量に対応する制御総量を算出する制御総量算出ステップと、前記複数の蓄電装置のそれぞれについて、前記制御総量のうち当該蓄電装置に配分される電力量であり当該蓄電装置に出力させる電力量である配分量を示す蓄電装置配分指令値を算出することによって、前記制御総量を前記複数の蓄電装置に配分する配分指令値算出ステップとを含み、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記残容量と前記定格出力容量と前記消費電力量とのうちの最小値を閾値として算出し、前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する。   A power control method according to an aspect of the present disclosure is a power control method for controlling the amount of power output per predetermined time from each of a plurality of power storage devices, and for each of the plurality of power storage devices, A power storage device information acquisition step for acquiring the remaining capacity of the power storage device and the rated output capacity per predetermined time of the power storage device, and each of the plurality of power storage devices is supplied from the power storage device and the power system Output from the plurality of power storage devices in accordance with a load information acquisition step of acquiring the power consumption amount per predetermined time of one or more loads that can use power, and a predetermined target power amount for the power supplied from the power system A total control amount calculating step for calculating a total control amount corresponding to the total power amount to be performed, and for each of the plurality of power storage devices, the control total amount A distribution command for allocating the total control amount to the plurality of power storage devices by calculating a power storage device distribution command value indicating a distribution amount that is a power amount distributed to the power storage device and output to the power storage device And calculating a minimum value of the remaining capacity, the rated output capacity, and the power consumption amount as a threshold value for each of the plurality of power storage devices. The power storage device distribution command value indicating the amount of power below a threshold as the distribution amount is calculated.

なお、これらの包括的または具体的な態様は、システム、装置、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD−ROMなどの非一時的な記録媒体で実現されてもよく、システム、装置、方法、集積回路、コンピュータプログラムおよび記録媒体の任意な組み合わせで実現されてもよい。   Note that these comprehensive or specific aspects may be realized by a non-transitory recording medium such as a system, an apparatus, an integrated circuit, a computer program, or a computer-readable CD-ROM. The present invention may be realized by any combination of an integrated circuit, a computer program, and a recording medium.

本開示の一態様に係る電力制御方法等によって、複数の蓄電装置のそれぞれが出力する電力量の適切な制御が可能である。   With the power control method according to one embodiment of the present disclosure, it is possible to appropriately control the amount of power output from each of the plurality of power storage devices.

図1は、実施の形態1における電力制御システムの構成を示すブロック図である。FIG. 1 is a block diagram showing the configuration of the power control system in the first embodiment. 図2は、実施の形態1における電力制御装置の構成を示すブロック図である。FIG. 2 is a block diagram showing a configuration of the power control apparatus in the first embodiment. 図3は、実施の形態1における需要家設備の構成を示すブロック図である。FIG. 3 is a block diagram showing the configuration of the customer facility in the first embodiment. 図4は、実施の形態1における電力制御装置の動作を示すフローチャートである。FIG. 4 is a flowchart showing the operation of the power control apparatus in the first embodiment. 図5Aは、参考例における電力制御装置のシミュレーション結果の一例を示す図である。FIG. 5A is a diagram illustrating an example of a simulation result of the power control device in the reference example. 図5Bは、実施の形態1における電力制御装置のシミュレーション結果の一例を示す図である。FIG. 5B is a diagram illustrating an example of a simulation result of the power control device according to Embodiment 1. 図6は、実施の形態2における電力制御システムの構成を示すブロック図である。FIG. 6 is a block diagram showing a configuration of the power control system in the second embodiment. 図7は、実施の形態2における電力制御装置の構成を示すブロック図である。FIG. 7 is a block diagram showing a configuration of the power control apparatus according to the second embodiment. 図8は、実施の形態2における電力制御装置の動作を示すフローチャートである。FIG. 8 is a flowchart showing the operation of the power control apparatus in the second embodiment. 図9は、実施の形態3における電力制御装置の構成を示すブロック図である。FIG. 9 is a block diagram illustrating a configuration of the power control apparatus according to the third embodiment. 図10は、実施の形態3における電力制御装置の動作を示すフローチャートである。FIG. 10 is a flowchart showing the operation of the power control apparatus in the third embodiment. 図11は、実施の形態4における需要家設備の構成を示すブロック図である。FIG. 11 is a block diagram illustrating a configuration of customer equipment in the fourth embodiment. 図12は、実施の形態5における需要家設備の構成を示すブロック図である。FIG. 12 is a block diagram showing a configuration of customer equipment in the fifth embodiment.

(本開示の基礎となった知見)
背景技術の欄で述べた従来技術では、蓄電装置の残容量に応じて、指令値の配分が行われている。しかしながら、需要家の施設に設置された蓄電装置において、分担電力指令値の通りに充放電が行われない場合がある。これにより、制御精度が悪化することが、本発明者らの検討により見出されている。
(Knowledge that became the basis of this disclosure)
In the prior art described in the background art section, command values are distributed according to the remaining capacity of the power storage device. However, in a power storage device installed in a customer's facility, charging / discharging may not be performed according to the shared power command value. As a result, the inventors have found that the control accuracy deteriorates.

具体的には、蓄電装置の充放電は、蓄電装置の残容量のみでなく、蓄電装置の定格に従って制限される。さらに、需要家の施設に設置された蓄電装置の放電は、需要家の施設に設置された負荷の消費電力に従って制限される。すなわち、負荷の消費電力を超えて、蓄電装置が放電を行うことが認められない場合がある。   Specifically, charging / discharging of the power storage device is limited not only according to the remaining capacity of the power storage device but also according to the rating of the power storage device. Furthermore, the discharge of the power storage device installed in the customer's facility is limited according to the power consumption of the load installed in the customer's facility. In other words, the power storage device may not be allowed to discharge beyond the power consumption of the load.

例えば、需要家の施設に設置された負荷の消費電力を超えて、同じ施設に設置された蓄電装置が放電を行った場合、余剰電力が電力系統(商用系統)に流出する。このような電力系統に向かう有効電力の流れは、逆潮流とも呼ばれる。逆潮流は、自然エネルギーを利用した発電の促進のため、例外的に認められる場合があるが、蓄電装置の放電に伴う逆潮流は、認められない場合がある。   For example, when the power storage device installed in the same facility discharges beyond the power consumption of the load installed in the customer's facility, surplus power flows out to the power system (commercial system). Such a flow of active power toward the power system is also called a reverse power flow. The reverse power flow may be exceptionally recognized for promoting power generation using natural energy, but the reverse power flow accompanying the discharge of the power storage device may not be recognized.

そのため、蓄電装置が、負荷の消費電力を超える放電を示す指令値を受けた際に、指令値の通りに放電を行わない場合がある。これにより、蓄電装置の放電に伴う逆潮流が抑制される。しかし、これにより、制御精度が悪化する可能性がある。   For this reason, when the power storage device receives a command value indicating discharge exceeding the power consumption of the load, the power storage device may not discharge according to the command value. Thereby, the reverse power flow accompanying the discharge of the power storage device is suppressed. However, this may deteriorate the control accuracy.

そこで、本開示の一態様に係る電力制御方法は、複数の蓄電装置のそれぞれから所定時間あたりに出力される電力量を制御するための電力制御方法であって、前記複数の蓄電装置のそれぞれについて、当該蓄電装置の残容量、および、当該蓄電装置の前記所定時間あたりの定格出力容量を取得する蓄電装置情報取得ステップと、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と電力系統とから供給される電力を利用可能な1以上の負荷の前記所定時間あたりの消費電力量を取得する負荷情報取得ステップと、前記電力系統から供給される電力に対する所定の目標電力量に従って、前記複数の蓄電装置から出力される総電力量に対応する制御総量を算出する制御総量算出ステップと、前記複数の蓄電装置のそれぞれについて、前記制御総量のうち当該蓄電装置に配分される電力量であり当該蓄電装置に出力させる電力量である配分量を示す蓄電装置配分指令値を算出することによって、前記制御総量を前記複数の蓄電装置に配分する配分指令値算出ステップとを含み、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記残容量と前記定格出力容量と前記消費電力量とのうちの最小値を閾値として算出し、前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する。   Therefore, a power control method according to an aspect of the present disclosure is a power control method for controlling the amount of power output per predetermined time from each of a plurality of power storage devices, and each of the plurality of power storage devices A power storage device information acquisition step for acquiring a remaining capacity of the power storage device and a rated output capacity per predetermined time of the power storage device, and supplying each of the plurality of power storage devices from the power storage device and a power system A plurality of power storage devices according to a load information acquisition step of acquiring power consumption per predetermined time of one or more loads that can use the generated power, and a predetermined target power amount for the power supplied from the power system A control total amount calculating step for calculating a total control amount corresponding to the total power amount output from the control unit, and for each of the plurality of power storage devices, the control The control total amount is distributed to the plurality of power storage devices by calculating a power storage device allocation command value indicating a distribution amount that is a power amount distributed to the power storage device and is output to the power storage device. A distribution command value calculation step, wherein the distribution command value calculation step calculates, as a threshold value, a minimum value among the remaining capacity, the rated output capacity, and the power consumption amount for each of the plurality of power storage devices. Then, the power storage device distribution command value indicating the amount of power equal to or less than the threshold value as the distribution amount is calculated.

これにより、複数の蓄電装置のそれぞれについて、蓄電装置の残容量のみでなく、蓄電装置の定格出力容量(インバータ出力可能量等)、および、蓄電装置に対応する負荷の消費電力量に基づいて、適切な指令値が算出される。そして、複数の蓄電装置のそれぞれは、適切な指令値に基づいて、放電を行うことができる。すなわち、この電力制御方法により、複数の蓄電装置のそれぞれが出力する電力量の適切な制御が可能である。   Thus, for each of the plurality of power storage devices, not only the remaining capacity of the power storage device, but also the rated output capacity of the power storage device (such as an inverter output possible amount) and the power consumption of the load corresponding to the power storage device, An appropriate command value is calculated. Each of the plurality of power storage devices can perform discharge based on an appropriate command value. That is, with this power control method, it is possible to appropriately control the amount of power output from each of the plurality of power storage devices.

例えば、前記配分指令値算出ステップでは、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に、消費電力の変更が可能な負荷である制御可能負荷が含まれている場合、前記制御可能負荷の消費電力の変更量を示す負荷配分指令値を算出し、前記蓄電装置について、前記消費電力量に前記変更量を反映し、前記残容量と、前記定格出力容量と、前記変更量が反映された前記消費電力量とのうちの最小値を前記閾値として算出し、前記制御総量に前記変更量を反映し、前記変更量が反映された前記制御総量を前記閾値に従って前記複数の蓄電装置に配分してもよい。   For example, in the distribution command value calculation step, a load capable of changing power consumption is used as the one or more loads that can use power supplied from the power storage devices included in the plurality of power storage devices and the power system. When a certain controllable load is included, a load distribution command value indicating a change amount of power consumption of the controllable load is calculated, the change amount is reflected in the power consumption amount for the power storage device, and the remaining The minimum value of the capacity, the rated output capacity, and the power consumption amount reflecting the change amount is calculated as the threshold value, the change amount is reflected in the total control amount, and the change amount is reflected. The total control amount may be distributed to the plurality of power storage devices according to the threshold value.

これにより、負荷の消費電力量が削減され、削減された消費電力量に従って、適切な指令値が算出される。例えば、エアコンまたはヒートポンプ給湯器等の消費電力が負荷の消費電力として制御されることによって、蓄電装置の放電量および使用回数が減少し、蓄電装置の劣化が抑制される。   Thereby, the power consumption of the load is reduced, and an appropriate command value is calculated according to the reduced power consumption. For example, when the power consumption of an air conditioner or heat pump water heater is controlled as the power consumption of the load, the amount of discharge and the number of uses of the power storage device are reduced, and deterioration of the power storage device is suppressed.

また、例えば、前記配分指令値算出ステップでは、前記閾値が大きいほど大きい前記配分量を示す前記蓄電装置配分指令値を算出してもよい。   Further, for example, in the distribution command value calculation step, the power storage device distribution command value indicating the larger distribution amount as the threshold value is larger may be calculated.

これにより、閾値に比例する指令値が算出される。したがって、複数の蓄電装置に対して、負担が適切に分散される。   Thereby, a command value proportional to the threshold value is calculated. Therefore, the burden is appropriately distributed to the plurality of power storage devices.

また、例えば、前記配分指令値算出ステップでは、前記複数の蓄電装置の残容量の分散を小さくする前記蓄電装置配分指令値を算出してもよい。   In addition, for example, in the distribution command value calculation step, the power storage device distribution command value that reduces the dispersion of the remaining capacity of the plurality of power storage devices may be calculated.

これにより、複数の蓄電装置の残容量がそれらの平均に近づく。したがって、過充電および過放電が抑制される。   Thereby, the remaining capacities of the plurality of power storage devices approach their average. Therefore, overcharge and overdischarge are suppressed.

また、例えば、前記配分指令値算出ステップでは、前記閾値が下限よりも小さい場合、前記配分量として0を示す前記蓄電装置配分指令値を算出してもよい。   Further, for example, in the distribution command value calculation step, when the threshold value is smaller than a lower limit, the power storage device distribution command value indicating 0 as the distribution amount may be calculated.

これにより、効率の低い放電が抑制され、蓄電装置の劣化が抑制される。また、通知の削減等によって、処理量の削減が可能である。   Thereby, discharge with low efficiency is suppressed and deterioration of the power storage device is suppressed. Further, the amount of processing can be reduced by reducing notifications or the like.

また、例えば、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、当該蓄電装置の放電量の最小分解能以上の分解能で前記配分量を示す前記蓄電装置配分指令値を算出してもよい。   Further, for example, in the distribution command value calculation step, for each of the plurality of power storage devices, the power storage device distribution command value indicating the distribution amount may be calculated with a resolution equal to or higher than a minimum resolution of a discharge amount of the power storage device. Good.

これにより、適切な指令値が算出される。例えば、最小分解能よりも細かい端数の電力量を他の蓄電装置に配分することで、制御精度を向上させることが可能である。   Thereby, an appropriate command value is calculated. For example, it is possible to improve control accuracy by allocating a fractional amount of power smaller than the minimum resolution to other power storage devices.

また、例えば、前記電力制御方法は、さらに、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に電力を供給する太陽光発電装置の前記所定時間あたりの電力供給量を取得する太陽光発電情報取得ステップを含み、前記配分指令値算出ステップでは、前記電力供給量が前記1以上の負荷の前記所定時間あたりの消費電力量よりも小さい場合、前記蓄電装置について、前記消費電力量から前記電力供給量を除外し、前記残容量と、前記定格出力容量と、前記電力供給量が除外された前記消費電力量とのうちの最小値を前記閾値として算出してもよい。   In addition, for example, the power control method further includes a solar power generation device that supplies power to the one or more loads that can use power supplied from the power storage devices included in the plurality of power storage devices and the power system. A solar power generation information acquisition step of acquiring the power supply amount per predetermined time of the power distribution, and in the distribution command value calculation step, the power supply amount is greater than the power consumption amount per predetermined time of the one or more loads. When the power storage device is small, the power supply amount is excluded from the power consumption amount, and the minimum value among the remaining capacity, the rated output capacity, and the power consumption amount from which the power supply amount is excluded. May be calculated as the threshold value.

これにより、太陽光発電装置が設置されている場合でも、太陽光発電装置の電力供給量に応じて、適切な指令値が算出される。   Thereby, even when the solar power generation device is installed, an appropriate command value is calculated according to the power supply amount of the solar power generation device.

また、例えば、前記電力制御方法は、さらに、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に電力を供給する太陽光発電装置の前記所定時間あたりの電力供給量を取得する太陽光発電情報取得ステップを含み、前記配分指令値算出ステップでは、前記電力供給量が0よりも大きい場合、前記蓄電装置の前記配分量として0を示す前記蓄電装置配分指令値を算出してもよい。   In addition, for example, the power control method further includes a solar power generation device that supplies power to the one or more loads that can use power supplied from the power storage devices included in the plurality of power storage devices and the power system. Solar power generation information acquisition step of acquiring the power supply amount per predetermined time, and in the distribution command value calculation step, when the power supply amount is larger than 0, 0 is set as the distribution amount of the power storage device The indicated power storage device distribution command value may be calculated.

これにより、太陽光発電装置が設置されている場合でも、太陽光発電装置が実際に電力を供給しているか否かに応じて、適切な指令値が算出される。   Thereby, even when a solar power generation device is installed, an appropriate command value is calculated depending on whether or not the solar power generation device is actually supplying power.

また、例えば、前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と前記1以上の負荷とを含む設備に前記電力系統から供給される電力の受電点の電圧を取得する電圧取得ステップを含み、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記電圧が上限電圧以上である場合、前記配分量として0を示す前記蓄電装置配分指令値を算出してもよい。   In addition, for example, the power control method further acquires, for each of the plurality of power storage devices, a voltage at a power reception point of power supplied from the power system to a facility including the power storage device and the one or more loads. The distribution command value calculation step calculates a power storage device distribution command value indicating 0 as the distribution amount when the voltage is equal to or higher than an upper limit voltage for each of the plurality of power storage devices. May be.

これにより、電圧が上限電圧以上である場合、蓄電装置の出力が制限され、電圧の異常が抑制される。   Thereby, when a voltage is more than an upper limit voltage, the output of an electrical storage apparatus is restrict | limited and abnormality of a voltage is suppressed.

また、例えば、前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と前記1以上の負荷とを含む設備に前記電力系統から供給される電力の受電点の電圧を取得することにより、前記複数の蓄電装置に対応する複数の電圧を取得する電圧取得ステップを含み、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記複数の電圧、前記複数の電圧に対する上限電圧、および、前記複数の蓄電装置のそれぞれの放電の変動量と前記複数の電圧のそれぞれの変動量との間の所定の関係から、放電可能量を算出し、前記放電可能量が前記閾値よりも小さい場合、前記閾値を前記放電可能量に変更して、変更された前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出してもよい。   In addition, for example, the power control method further acquires, for each of the plurality of power storage devices, a voltage at a power reception point of power supplied from the power system to a facility including the power storage device and the one or more loads. A voltage acquisition step of acquiring a plurality of voltages corresponding to the plurality of power storage devices, and in the distribution command value calculation step, for each of the plurality of power storage devices, the plurality of voltages, the plurality of voltages The dischargeable amount is calculated from a predetermined relationship between the upper limit voltage and the variation amount of discharge of each of the plurality of power storage devices and the variation amount of each of the plurality of voltages. If the threshold value is smaller than the threshold value, the threshold value is changed to the dischargeable amount, and the power storage device distribution command value indicating the changed electric energy amount below the threshold value as the distribution amount is calculated. It may be.

これにより、電圧が上限電圧を超えないように、閾値が調整され、適切な指令値が算出される。   Thereby, the threshold value is adjusted so that the voltage does not exceed the upper limit voltage, and an appropriate command value is calculated.

また、例えば、前記負荷情報取得ステップでは、前記複数の蓄電装置のそれぞれについて、前記1以上の負荷の前記所定時間あたりの消費電力量を予測し、予測された前記消費電力量を前記1以上の負荷の前記所定時間あたりの消費電力量として取得してもよい。   Further, for example, in the load information acquisition step, for each of the plurality of power storage devices, the power consumption amount per predetermined time of the one or more loads is predicted, and the predicted power consumption amount is set to the one or more power consumption devices. You may acquire as power consumption per said predetermined time of load.

これにより、消費電力量の予測に従って、適切な閾値が算出される。したがって、これにより、適切な指令値が算出される。   Thereby, an appropriate threshold value is calculated according to the prediction of the power consumption. Therefore, an appropriate command value is thereby calculated.

また、例えば、前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれに対して、前記配分指令値算出ステップで算出された前記蓄電装置配分指令値を通知する通知ステップを含んでもよい。   Further, for example, the power control method may further include a notification step of notifying each of the plurality of power storage devices of the power storage device distribution command value calculated in the distribution command value calculation step.

これにより、複数の蓄電装置のそれぞれに対して、適切な指令値を通知することが可能である。   Thereby, it is possible to notify an appropriate command value to each of the plurality of power storage devices.

さらに、これらの包括的または具体的な態様は、システム、装置、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD−ROMなどの非一時的な記録媒体で実現されてもよく、システム、装置、方法、集積回路、コンピュータプログラムまたは記録媒体の任意な組み合わせで実現されてもよい。   Furthermore, these comprehensive or specific aspects may be realized by a non-transitory recording medium such as a system, an apparatus, an integrated circuit, a computer program, or a computer-readable CD-ROM. The present invention may be realized by any combination of an integrated circuit, a computer program, or a recording medium.

以下、実施の形態について、図面を参照しながら説明する。なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序などは、一例であり、請求の範囲を限定する主旨ではない。また、以下の実施の形態における構成要素のうち、最上位概念を示す独立請求項に記載されていない構成要素については、任意の構成要素として説明される。   Hereinafter, embodiments will be described with reference to the drawings. It should be noted that each of the embodiments described below shows a comprehensive or specific example. Numerical values, shapes, materials, components, arrangement positions and connection forms of components, steps, order of steps, and the like shown in the following embodiments are merely examples, and are not intended to limit the scope of the claims. In addition, among the constituent elements in the following embodiments, constituent elements that are not described in the independent claims indicating the highest concept are described as optional constituent elements.

また、電力量は、通常、単位時間における電力の積算値を意味し、エネルギーに対応する。ここでは、電力の量を電力量と呼ぶ場合がある。また、電力(パワー)と電力量(エネルギー)とは互いに対応する。そのため、ここでは、電力が、電力量(エネルギー)の意味で用いられる場合があり、電力量が、電力(パワー)の意味で用いられる場合がある。また、電力および電力量は、それらの値を意味する場合がある。   The electric energy usually means an integrated value of electric power per unit time and corresponds to energy. Here, the amount of power may be referred to as power amount. Moreover, electric power (power) and electric energy (energy) correspond to each other. Therefore, here, electric power may be used in the meaning of electric energy (energy), and electric energy may be used in the meaning of electric power (power). Moreover, electric power and electric energy may mean those values.

また、以下の説明において、予測は推定と表現されてもよい。   Moreover, in the following description, prediction may be expressed as estimation.

(実施の形態1)
本実施の形態において、複数の蓄電装置のそれぞれが出力する電力量を制御する電力制御装置について説明する。
(Embodiment 1)
In this embodiment, a power control device that controls the amount of power output from each of a plurality of power storage devices will be described.

図1は、本実施の形態における電力制御装置を含む電力制御システムの構成を示すブロック図である。図1に示されるように、本実施の形態における電力制御システムは、配電用変圧器101と、配電線102と、複数の需要家設備300と、通信線103と、電力制御装置200とを備える。   FIG. 1 is a block diagram showing a configuration of a power control system including a power control apparatus according to the present embodiment. As shown in FIG. 1, the power control system in the present embodiment includes a distribution transformer 101, a distribution line 102, a plurality of customer facilities 300, a communication line 103, and a power control device 200. .

配電用変圧器101は、電力系統から供給される電力を負荷302に供給するため、適切な電圧に変換する変圧器である。配電用変圧器101は、例えば、配電用変電所内の変圧器や柱上変圧器である。   The distribution transformer 101 is a transformer that converts power supplied from the power system into an appropriate voltage to supply the load 302 with power. The distribution transformer 101 is, for example, a transformer or a pole transformer in a distribution substation.

配電線102は、配電用変圧器101と負荷302とを電気的に接続するための電力線であり、配電用変圧器101から負荷302に電力を供給するための電力線である。   The distribution line 102 is a power line for electrically connecting the distribution transformer 101 and the load 302, and is a power line for supplying power from the distribution transformer 101 to the load 302.

需要家設備300は、需要家の施設に設置された設備である。需要家設備300は、負荷302と、蓄電装置303と、需要家設備制御装置301とを備える。需要家設備300が備えるこれらの構成要素も、需要家の施設に設置される。なお、需要家設備300は、複数の負荷302と、複数の蓄電装置303とを備えてもよい。また、需要家は、高圧需要家でもよいし、低圧需要家でもよい。需要家設備300は、通信プロトコルに限定されるものではない。   The customer facility 300 is a facility installed in a customer facility. The customer facility 300 includes a load 302, a power storage device 303, and a customer facility control device 301. These components included in the customer facility 300 are also installed in the customer facility. Note that the customer facility 300 may include a plurality of loads 302 and a plurality of power storage devices 303. Further, the consumer may be a high-pressure consumer or a low-pressure consumer. The customer facility 300 is not limited to the communication protocol.

負荷302は、需要家設備300における機器であり、電力を消費する。負荷302は、例えば、家庭用電気機器などである。上記の通り、需要家設備300は、複数の負荷302を備えてもよい。このうちの一部の負荷302(制御可能負荷)は、電力制御装置200から受信した配分指令値に基づいて、停止、設定変更またはモード変更等を行い、消費電力を調整する。   The load 302 is a device in the customer facility 300 and consumes power. The load 302 is, for example, a household electric device. As described above, the customer facility 300 may include a plurality of loads 302. Some of these loads 302 (controllable loads) adjust power consumption by stopping, changing settings or changing modes based on the distribution command value received from the power control apparatus 200.

蓄電装置303は、電力系統から供給される電力を充電する。また、蓄電装置303は、放電して負荷302へ電力を供給する。蓄電装置303は、蓄電池およびインバータ等を含む。インバータは、蓄電池に充電する際にAC/DC変換を行う。また、インバータは、蓄電池から放電する際にDC/AC変換を行う。   The power storage device 303 charges the power supplied from the power system. In addition, the power storage device 303 discharges and supplies power to the load 302. Power storage device 303 includes a storage battery, an inverter, and the like. The inverter performs AC / DC conversion when charging the storage battery. The inverter performs DC / AC conversion when discharging from the storage battery.

また、蓄電装置303は、残容量等を電力制御装置200に通知する。また、蓄電装置303は、電力制御装置200から受信した配分指令値に基づいて充電または放電を行う。   In addition, the power storage device 303 notifies the power control device 200 of the remaining capacity and the like. The power storage device 303 performs charging or discharging based on the distribution command value received from the power control device 200.

需要家設備制御装置301は、需要家設備300に含まれる負荷302および蓄電装置303等を管理し、これらの動作を制御する。例えば、電力制御装置200と負荷302との間の通信、および、電力制御装置200と蓄電装置303との間の通信を中継する。   The customer facility control device 301 manages the load 302, the power storage device 303, and the like included in the customer facility 300, and controls these operations. For example, the communication between the power control device 200 and the load 302 and the communication between the power control device 200 and the power storage device 303 are relayed.

通信線103は、需要家設備制御装置301と負荷302と蓄電装置303とを含む需要家設備300および電力制御装置200が互いに通信できるようにこれらを接続するための通信線である。通信線103は、例えば、IEEE802.3規格等に適合する有線LAN、IEEE802.11a、b、g規格等に適合する無線LAN、または、携帯電話回線のような公衆通信回線等により実現される。   The communication line 103 is a communication line for connecting the customer facility 300 including the customer facility control device 301, the load 302, and the power storage device 303 so that the power control device 200 can communicate with each other. The communication line 103 is realized by, for example, a wired LAN that conforms to the IEEE 802.3 standard, a wireless LAN that conforms to the IEEE 802.11a, b, g standard, or a public communication line such as a mobile phone line.

電力制御装置200は、蓄電装置303の残容量、蓄電装置303のインバータ定格、および、負荷302の消費電力量等に基づいて、配分指令値を算出し、蓄電装置303に送信する。   The power control device 200 calculates a distribution command value based on the remaining capacity of the power storage device 303, the inverter rating of the power storage device 303, the power consumption amount of the load 302, and transmits it to the power storage device 303.

図2は、図1に示された電力制御装置200の構成を示すブロック図である。図2に示されるように、電力制御装置200は、蓄電装置情報取得部201と、負荷情報取得部202と、制御総量算出部203と、配分指令値算出部204とを備える。   FIG. 2 is a block diagram showing a configuration of power control apparatus 200 shown in FIG. As illustrated in FIG. 2, the power control device 200 includes a power storage device information acquisition unit 201, a load information acquisition unit 202, a total control amount calculation unit 203, and a distribution command value calculation unit 204.

蓄電装置情報取得部201は、蓄電装置303の放電電力量(出力電力量)、蓄電装置303の残容量、および、蓄電装置303のインバータ定格を取得する。さらに、蓄電装置情報取得部201は、定格出力容量としてインバータ定格からインバータ出力可能量を算出する。蓄電装置情報取得部201は、放電電力量を制御総量算出部203に送信し、残容量およびインバータ出力可能量を配分指令値算出部204に送信する。インバータ出力可能量の算出方法については、後で詳しく説明する。   The power storage device information acquisition unit 201 acquires the amount of discharge power (output power amount) of the power storage device 303, the remaining capacity of the power storage device 303, and the inverter rating of the power storage device 303. Furthermore, the power storage device information acquisition unit 201 calculates an inverter output possible amount from the inverter rating as the rated output capacity. The power storage device information acquisition unit 201 transmits the discharge power amount to the control total amount calculation unit 203, and transmits the remaining capacity and the inverter output possible amount to the distribution command value calculation unit 204. A method of calculating the inverter output possible amount will be described in detail later.

なお、インバータの定格の値は、基本的に変更されないため、予め電力制御装置200の記憶部(図示せず)に保存され、蓄電装置情報取得部201は記憶部からインバータの定格の値を読み込んでもよい。インバータの定格は、例えば5kWである。   Since the inverter rating value is not basically changed, it is stored in advance in a storage unit (not shown) of the power control apparatus 200, and the power storage device information acquisition unit 201 reads the inverter rating value from the storage unit. But you can. The rating of the inverter is 5 kW, for example.

負荷情報取得部202は、負荷302の消費電力量を取得し、制御総量算出部203および配分指令値算出部204に送信する。   The load information acquisition unit 202 acquires the power consumption amount of the load 302 and transmits it to the total control amount calculation unit 203 and the distribution command value calculation unit 204.

制御総量算出部203は、制御総量を算出する。制御総量は、全ての蓄電装置303から出力される総電力量に対応する。すなわち、制御総量は、全ての蓄電装置303から出力される総電力量に基づいて定められる。制御総量は、さらに、全ての制御可能負荷に対する総制御電力量に対応していてもよい。具体的には、制御総量は、全ての蓄電装置303および全ての制御可能負荷に対する制御電力量の合計値に対応する量でもよい。   The total control amount calculation unit 203 calculates the total control amount. The total control amount corresponds to the total power amount output from all the power storage devices 303. That is, the total control amount is determined based on the total power output from all the power storage devices 303. The total control amount may further correspond to the total control power amount for all controllable loads. Specifically, the total control amount may be an amount corresponding to the total value of the control power amounts for all power storage devices 303 and all controllable loads.

また、例えば、制御総量は、電力系統から供給される電力量である受電電力量の総和と、その受電電力量の総和に対する目標である目標受電電力量との差に対応する。   For example, the total control amount corresponds to the difference between the total amount of received power that is the amount of power supplied from the power system and the target received power amount that is a target for the total amount of received power.

配分指令値算出部204は、蓄電装置情報取得部201、負荷情報取得部202および制御総量算出部203から取得した残容量、インバータ出力可能量、消費電力量および制御総量に基づいて、負荷302および蓄電装置303の配分指令値を算出して送信する。配分指令値の算出方法については、後で詳しく説明する。   The distribution command value calculation unit 204 is based on the remaining capacity, the inverter output possible amount, the power consumption amount, and the control total amount acquired from the power storage device information acquisition unit 201, the load information acquisition unit 202, and the control total amount calculation unit 203. The distribution command value of power storage device 303 is calculated and transmitted. A method for calculating the distribution command value will be described in detail later.

図3は、図1に示された需要家設備300の構成を示すブロック図である。図3に示されるように、需要家設備300は、負荷302と、蓄電装置303と、需要家設備制御装置301とを備える。なお、既に説明した図1と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。   FIG. 3 is a block diagram showing a configuration of the customer facility 300 shown in FIG. As shown in FIG. 3, the customer facility 300 includes a load 302, a power storage device 303, and a customer facility control device 301. In addition, the same code | symbol is attached | subjected about the component similar to already demonstrated FIG. 1, and detailed description may be abbreviate | omitted.

負荷302は、制御可能負荷302aと制御不可負荷302bとに分類される。すなわち、複数の負荷302は、制御可能負荷302aと制御不可負荷302bとを含む場合がある。   The load 302 is classified into a controllable load 302a and an uncontrollable load 302b. That is, the plurality of loads 302 may include a controllable load 302a and an uncontrollable load 302b.

制御可能負荷302aは、電力制御装置200から受信した配分指令値に基づいて、停止、設定変更またはモード変更等を行い、消費電力を調整することが可能な負荷302である。すなわち、制御可能負荷302aは、配分指令値に基づいて消費電力を調整する制御部を有している。例えば、制御可能負荷302aは、ヒートポンプ給湯器等である。   The controllable load 302a is a load 302 capable of adjusting power consumption by stopping, setting change, mode change, or the like based on the distribution command value received from the power control apparatus 200. That is, the controllable load 302a includes a control unit that adjusts the power consumption based on the distribution command value. For example, the controllable load 302a is a heat pump water heater or the like.

一方、制御不可負荷302bは、電力制御装置200から受信した配分指令値に基づいて、消費電力を調整することができない負荷302である。すなわち、制御不可負荷302bは、配分指令値に基づいて消費電力を調整する制御部、あるいは通信部を有していない。例えば、制御不可負荷302bは、ドライヤー等である。   On the other hand, the uncontrollable load 302b is a load 302 whose power consumption cannot be adjusted based on the distribution command value received from the power control apparatus 200. That is, the uncontrollable load 302b does not have a control unit or a communication unit that adjusts power consumption based on the distribution command value. For example, the uncontrollable load 302b is a dryer or the like.

なお、需要家設備300は、制御可能負荷302aおよび制御不可負荷302bのうちどちらか一方を含んでもよいし、両方を含んでもよい。   Note that the customer facility 300 may include one or both of the controllable load 302a and the non-controllable load 302b.

需要家設備制御装置301は、蓄電装置303の放電電力量と、蓄電装置303の残容量と、蓄電装置303のインバータ定格と、負荷302の消費電力量とを、通信線103を介して、電力制御装置200に送信する。需要家設備制御装置301は、電力制御装置200に送信するための放電電力量と残容量とインバータ定格とを蓄電装置303から取得する。   The customer facility control device 301 uses the communication line 103 to determine the amount of discharge power of the power storage device 303, the remaining capacity of the power storage device 303, the inverter rating of the power storage device 303, and the power consumption of the load 302 via the communication line 103. It transmits to the control apparatus 200. The customer facility control device 301 acquires the amount of discharged power, the remaining capacity, and the inverter rating for transmission to the power control device 200 from the power storage device 303.

なお、インバータの定格の値は、基本的に変更されないため、予め需要家設備制御装置301の記憶部(図示せず)に保存されていてもよい。また、需要家設備制御装置301は、センサまたはメータ(いずれも図示せず)から、負荷302の消費電力量を取得する。なお、負荷302が自身の消費電力量を測定できる場合、需要家設備制御装置301は、負荷302から消費電力量を取得してもよい。   In addition, since the rated value of an inverter is not changed fundamentally, you may preserve | save beforehand at the memory | storage part (not shown) of the consumer equipment control apparatus 301. FIG. Moreover, the consumer equipment control apparatus 301 acquires the power consumption of the load 302 from a sensor or a meter (both not shown). When the load 302 can measure its own power consumption, the customer facility control device 301 may acquire the power consumption from the load 302.

さらに、需要家設備制御装置301は、通信線103を介して、電力制御装置200から、配分指令値を受信し、蓄電装置303および制御可能負荷302aに送信する。なお、蓄電装置303のインバータ定格が電力制御装置200に予め記憶されている場合、需要家設備制御装置301は、蓄電装置303のインバータ定格を送信しなくてもよい。   Furthermore, the customer equipment control device 301 receives the distribution command value from the power control device 200 via the communication line 103 and transmits it to the power storage device 303 and the controllable load 302a. When the inverter rating of power storage device 303 is stored in power control device 200 in advance, customer facility control device 301 does not have to transmit the inverter rating of power storage device 303.

図4は、図2に示された電力制御装置200の動作を示すフローチャートである。まず、ステップS101において、蓄電装置情報取得部201は、需要家設備制御装置301から、蓄電装置情報として放電電力量と残容量とインバータ定格とを取得する。なお、インバータの定格が、予め記憶部に保存されている場合、蓄電装置情報取得部201は、記憶部からインバータ定格を取得する。この場合、蓄電装置情報取得部201は、需要家設備制御装置301からインバータ定格を取得しなくてもよい。   FIG. 4 is a flowchart showing the operation of the power control apparatus 200 shown in FIG. First, in step S <b> 101, the power storage device information acquisition unit 201 acquires the amount of discharged power, the remaining capacity, and the inverter rating as power storage device information from the customer facility control device 301. In addition, when the rating of the inverter is stored in the storage unit in advance, the power storage device information acquisition unit 201 acquires the inverter rating from the storage unit. In this case, the power storage device information acquisition unit 201 may not acquire the inverter rating from the customer facility control device 301.

次に、ステップS102において、蓄電装置情報取得部201は、次の式(1)により、定格出力容量としてインバータ出力可能量を算出する。   Next, in step S102, the power storage device information acquisition unit 201 calculates an inverter output possible amount as a rated output capacity by the following equation (1).

(インバータ出力可能量)=(インバータ定格)×(制御周期)・・・式(1)   (Inverter output possible amount) = (Inverter rating) × (Control cycle) Expression (1)

ここで、制御周期は、蓄電装置303を制御するための周期(所定時間)であり、例えば、5分である。インバータ出力可能量は、蓄電装置303が所定の定格で所定時間あたりに出力する電力量に対応する。なお、制御周期は動的に変更されてもよいし、一律でなくてもよい。   Here, the control cycle is a cycle (predetermined time) for controlling the power storage device 303, and is, for example, 5 minutes. The inverter output possible amount corresponds to the amount of power that the power storage device 303 outputs per predetermined time with a predetermined rating. The control cycle may be changed dynamically or may not be uniform.

次に、ステップS103において、負荷情報取得部202は、需要家設備制御装置301から、負荷情報として消費電力量を取得する。例えば、負荷情報取得部202は、複数の需要家設備制御装置301のそれぞれから、需要家設備制御装置301における1以上の負荷302の制御周期(所定時間)あたりの消費電力量を取得する。なお、ステップS101の前にステップS103が実施されてもよい。   Next, in step S <b> 103, the load information acquisition unit 202 acquires the power consumption amount as load information from the customer facility control device 301. For example, the load information acquisition unit 202 acquires the power consumption per control period (predetermined time) of one or more loads 302 in the customer facility control device 301 from each of the plurality of customer facility control devices 301. Note that step S103 may be performed before step S101.

また、ステップS101(ステップS102)と、ステップS103とが同一周期で実施されなくてもよい。また、例えば、残容量および消費電力量の変動に応じて、ステップS101(ステップS102)の実行周期と、ステップS103の実行周期とが変更されてもよい。   Further, step S101 (step S102) and step S103 need not be performed in the same cycle. Further, for example, the execution cycle of step S101 (step S102) and the execution cycle of step S103 may be changed according to fluctuations in the remaining capacity and the power consumption.

次に、ステップS104において、制御総量算出部203は、例えば、次の式(2)〜式(4)により、制御総量を算出する。なお、式(4)は、式(2)における予測受電電力量の総和の算出方法の一例である。式(2)における予測受電電力量の総和の算出方法には任意の予測方法を適用することが可能である。   Next, in step S104, the total control amount calculation unit 203 calculates the total control amount using, for example, the following formulas (2) to (4). Equation (4) is an example of a method for calculating the total sum of predicted received electric energy in Equation (2). An arbitrary prediction method can be applied to the calculation method of the total sum of the predicted received power amounts in Expression (2).

(制御総量)=(実績受電電力量の総和)+(予測受電電力量の総和)−(目標受電電力量)・・・式(2)
(実績受電電力量の総和)=(実績消費電力量の総和)−(実績放電電力量の総和)・・・式(3)
(予測受電電力量の総和)=(実績消費電力量の総和)×(制御残時間)÷(制御実施時間)・・・式(4)
(Total control amount) = (Total sum of actual received power amount) + (Total sum of predicted received power amount) − (Target received power amount) (2)
(Sum of actual received power) = (Sum of actual power consumption) − (Sum of actual discharge power) Expression (3)
(Sum of predicted power reception amount) = (Sum of actual power consumption) × (Remaining control time) / (Control execution time) (4)

制御実施時間は、制御期間の開始から、制御期間の途中の時点までの時間に対応する。制御期間は、例えば、1つの制御周期よりも長い期間である。制御残時間は、制御期間の途中の時点から、制御期間の終了までの時間に対応する。   The control execution time corresponds to the time from the start of the control period to a point in the middle of the control period. The control period is, for example, a period longer than one control cycle. The remaining control time corresponds to the time from the middle of the control period to the end of the control period.

また、実績消費電力量の総和は、制御実施時間における全ての負荷302の消費電力量の総和に対応する。実績放電電力量の総和は、制御実施時間における全ての蓄電装置303の放電電力量の総和に対応する。また、予測受電電力量の総和は、負荷302の消費電力量が変化せず、かつ、蓄電装置303が電力を出力しないと仮定した場合の予測受電電力量の総和であり、制御残時間における受電電力量として予測される電力量の総和に対応する。   The total of the actual power consumption corresponds to the total power consumption of all the loads 302 during the control execution time. The sum total of the actual discharge power amount corresponds to the sum of the discharge power amounts of all the power storage devices 303 during the control execution time. The sum of the predicted received power amounts is the sum of the predicted received power amounts when it is assumed that the power consumption amount of the load 302 does not change and the power storage device 303 does not output power. Corresponds to the total amount of power predicted as the amount of power.

また、目標受電電力量は、電力系統から供給される電力に対する目標電力量である。例えば、目標受電電力量は、電力系統の電力供給量が所定の範囲に維持されるように、予め定められている。なお、電力系統によって供給される電力は、例えば、需要家の買電電力に対応し、電力系統からの受電電力に対応する。目標受電電力量は、通信によって取得されてもよいし、電力制御装置200の記憶部に予め保存されていてもよい。式(2)の目標受電電力量は、制御期間における目標受電電力量に対応する。   The target received power amount is a target power amount with respect to the power supplied from the power system. For example, the target received power amount is determined in advance so that the power supply amount of the power system is maintained within a predetermined range. Note that the power supplied by the power system corresponds to, for example, the purchased power of the consumer and corresponds to the received power from the power system. The target received power amount may be acquired by communication, or may be stored in advance in the storage unit of the power control apparatus 200. The target received power amount in Expression (2) corresponds to the target received power amount in the control period.

式(2)において、制御総量が0と算出された場合、電力制御装置200は、蓄電装置303および制御可能負荷302aを制御しない。制御総量が正の場合、電力制御装置200は、蓄電装置303に放電させるか、または、制御可能負荷302aの制御を行う。制御総量が負の場合、電力制御装置200は、蓄電装置303に充電させる。また、制御総量が負の場合、電力制御装置200は、制御可能負荷302aを制御しないようにしてもよい。   In Formula (2), when the total control amount is calculated as 0, the power control device 200 does not control the power storage device 303 and the controllable load 302a. When the total control amount is positive, power control device 200 causes power storage device 303 to discharge or controls controllable load 302a. When the total control amount is negative, power control device 200 charges power storage device 303. When the total control amount is negative, the power control apparatus 200 may not control the controllable load 302a.

なお、式(2)において、デッドバンドが設定され、電力制御装置200は、デッドバンド範囲内であれば、制御総量を0とするようにしてもよい。   In Expression (2), the dead band is set, and the power control apparatus 200 may set the total control amount to 0 if it is within the dead band range.

また、式(3)において、実績受電電力量の総和は、制御期間の開始から制御実施時間経過時までの実績消費電力量の総和と実績放電電力量の総和との差である。制御実施時間が0の場合、すなわち制御期間の開始時において、実績受電電力量の総和は0である。この場合、制御総量は、予測受電電力量の総和と目標受電電力量との差に対応する。また、この場合、過去の制御期間(例えば、直前の制御期間)における消費電力量の総和が、予測受電電力量の総和として用いられてもよい。   Moreover, in Formula (3), the sum total of the actual received power amount is the difference between the total sum of the actual power consumption amount and the total sum of the actual discharge power amount from the start of the control period until the control execution time elapses. When the control execution time is 0, that is, at the start of the control period, the total amount of actual received power is 0. In this case, the total control amount corresponds to the difference between the total predicted received power amount and the target received power amount. In this case, the sum of the power consumption amounts in the past control period (for example, the immediately preceding control period) may be used as the sum of the predicted received power amounts.

次に、ステップS105において、配分指令値算出部204は、制御可能負荷302aへの配分指令値を算出する(以下、制御可能負荷302aへの配分指令値を負荷配分指令値と呼ぶ場合がある)。配分指令値算出部204は、制御可能負荷302aの消費電力量が現状よりも小さくなるように、あるいは大きくなるように、制御可能負荷302aへの負荷配分指令値を算出する。   Next, in step S105, the distribution command value calculation unit 204 calculates a distribution command value for the controllable load 302a (hereinafter, the distribution command value for the controllable load 302a may be referred to as a load distribution command value). . The distribution command value calculation unit 204 calculates a load distribution command value for the controllable load 302a so that the power consumption of the controllable load 302a is smaller or larger than the current amount.

次に、ステップS106において、配分指令値算出部204は、各蓄電装置303の閾値を算出する。配分指令値算出部204は、ステップS105で算出した負荷配分指令値に基づいて、閾値の算出方法を変える。   Next, in step S <b> 106, distribution command value calculation section 204 calculates a threshold value for each power storage device 303. The distribution command value calculation unit 204 changes the threshold value calculation method based on the load distribution command value calculated in step S105.

負荷302に対する負荷配分指令値が0である場合、配分指令値算出部204は、次の式(5)により、負荷302に対応する蓄電装置303の閾値を算出する(ここでは、便宜上、この閾値を第1の閾値と呼ぶ場合がある)。負荷302に対する負荷配分指令値が0でない場合、配分指令値算出部204は、次の式(6)により、負荷302に対応する蓄電装置303の閾値を算出する(ここでは、便宜上、この閾値を第2の閾値と呼ぶ場合がある)。   When the load distribution command value for the load 302 is 0, the distribution command value calculation unit 204 calculates the threshold value of the power storage device 303 corresponding to the load 302 by the following equation (5) (here, for convenience, this threshold value is used). May be referred to as a first threshold). When the load distribution command value for the load 302 is not 0, the distribution command value calculation unit 204 calculates the threshold value of the power storage device 303 corresponding to the load 302 by the following equation (6) (here, for convenience, this threshold value is set). May be referred to as a second threshold).

第1の閾値=min(インバータ出力可能量,消費電力量,残容量)・・・式(5)
第2の閾値=min(インバータ出力可能量,消費電力量+負荷配分指令値,残容量)・・・式(6)
First threshold value i = min (inverter output possible amount i , power consumption amount i , remaining capacity i ) Equation (5)
Second threshold value i = min (inverter output possible amount i , power consumption amount i + load distribution command value i , remaining capacity i ) Equation (6)

式(5)および式(6)において、iは蓄電装置303の識別子である。式(5)および式(6)における残容量は、ステップS101において蓄電装置情報取得部201が取得した残容量のうち、制御周期(例えば、10分)において放電可能な残容量である。具体的には、制御周期において放電可能な残容量は、min(残容量,蓄電池の定格容量×(制御周期÷1h)×放電レート)で算出される。 In Expression (5) and Expression (6), i is an identifier of the power storage device 303. The remaining capacity i in Expression (5) and Expression (6) is the remaining capacity that can be discharged in the control cycle (for example, 10 minutes) among the remaining capacity acquired by the power storage device information acquisition unit 201 in Step S101. Specifically, the remaining capacity that can be discharged in the control cycle is calculated by min (remaining capacity, rated capacity of the storage battery × (control cycle ÷ 1h) × discharge rate).

すなわち、蓄電装置303の残容量として、蓄電装置303の所定時間あたりに放電可能な残容量が用いられてもよい。なお、蓄電装置情報取得部201が、所定時間あたりに放電可能な残容量を算出して取得してもよい。   That is, the remaining capacity of the power storage device 303 that can be discharged per predetermined time may be used as the remaining capacity of the power storage device 303. The power storage device information acquisition unit 201 may calculate and acquire the remaining capacity that can be discharged per predetermined time.

インバータ出力可能量は、ステップS102で蓄電装置情報取得部201が式(1)により算出した値である。消費電力量は、ステップS103で負荷情報取得部202が取得した値である。式(6)において、負荷配分指令値は、ステップS105で配分指令値算出部204が算出した値である。また、負荷配分指令値は、消費電力量を増加させる場合に正の値を示し、減少させる場合に負の値を示す。式(6)では、消費電力量に負荷配分指令値が反映(加算)されている。 The inverter output possible amount i is a value calculated by the power storage device information acquisition unit 201 using the equation (1) in step S102. The power consumption amount i is a value acquired by the load information acquisition unit 202 in step S103. In equation (6), the load distribution command value i is a value calculated by the distribution command value calculation unit 204 in step S105. The load distribution command value i indicates a positive value when the power consumption amount is increased, and indicates a negative value when the power consumption amount is decreased. In Expression (6), the load distribution command value i is reflected (added) to the power consumption amount i .

次に、ステップS107において、配分指令値算出部204は、次の式(7)等により、蓄電装置303への配分指令値を算出する(以下、蓄電装置303への配分指令値を蓄電装置配分指令値と呼ぶ場合がある)。式(7)等により算出された蓄電装置配分指令値が、式(5)で算出された第1の閾値、または、式(6)で算出された第2の閾値を超える場合、配分指令値算出部204は、蓄電装置配分指令値を第1の閾値または第2の閾値で制限する。   Next, in step S107, the distribution command value calculation unit 204 calculates the distribution command value to the power storage device 303 by the following equation (7) or the like (hereinafter, the distribution command value to the power storage device 303 is allocated to the power storage device distribution). Sometimes called command value). When the power storage device distribution command value calculated by equation (7) or the like exceeds the first threshold value calculated by equation (5) or the second threshold value calculated by equation (6), the distribution command value Calculation unit 204 restricts the power storage device distribution command value with the first threshold value or the second threshold value.

Figure 2017005845
Figure 2017005845

なお、式(7)では、制御総量に負荷配分指令値が反映される。そして、負荷配分指令値が反映された制御総量が第1の閾値または第2の閾値に従って複数の蓄電装置303に配分される。式(7)は一例であり、最適化手法等が適用されてもよい。例えば、配分指令値算出部204は、複数の蓄電装置303における残容量のばらつきを現状よりも小さくするための蓄電装置配分指令値を算出してもよい。 In Expression (7), the load distribution command value i is reflected in the total control amount. Then, the total control amount reflecting the load distribution command value i is distributed to the plurality of power storage devices 303 according to the first threshold value i or the second threshold value i . Expression (7) is an example, and an optimization method or the like may be applied. For example, the distribution command value calculation unit 204 may calculate a power storage device distribution command value for making the remaining capacity variation among the plurality of power storage devices 303 smaller than the current state.

より具体的には、配分指令値算出部204は、複数の蓄電装置303における残容量の標準偏差を、蓄電池の定格容量の10%に対応する範囲内に調整するための蓄電装置配分指令値を算出してもよい。また、例えば、配分指令値算出部204は、制御後の複数の蓄電装置303における残容量の標準偏差が、制御前の複数の蓄電装置303における残容量の標準偏差から5%小さくなるように蓄電装置配分指令値を算出してもよい。   More specifically, the distribution command value calculation unit 204 sets the power storage device distribution command value for adjusting the standard deviation of the remaining capacity in the plurality of power storage devices 303 within a range corresponding to 10% of the rated capacity of the storage battery. It may be calculated. Further, for example, the distribution command value calculation unit 204 stores the power so that the standard deviation of the remaining capacity in the plurality of power storage devices 303 after the control is 5% smaller than the standard deviation of the remaining capacity in the plurality of power storage devices 303 before the control. A device distribution command value may be calculated.

なお、上記の10%および5%は、標準偏差に関する目標閾値の一例であり、目標閾値はこれに限定されるものではない。   The above 10% and 5% are examples of the target threshold regarding the standard deviation, and the target threshold is not limited to this.

また、例えば、第1の閾値または第2の閾値が所定の下限よりも小さい場合、配分指令値算出部204は、処理を簡素化するため、蓄電装置配分指令値を0として算出してもよい。   For example, when the first threshold value or the second threshold value is smaller than a predetermined lower limit, the distribution command value calculation unit 204 may calculate the power storage device distribution command value as 0 in order to simplify the processing. .

また、例えば、配分指令値算出部204は、蓄電装置303の出力の最小分解能以上の分解能で蓄電装置配分指令値を算出してもよい。ここで、蓄電装置303の出力の最小分解能は、蓄電装置303に対して予め定められた最小分解能であって、蓄電装置303の放電量の階調に対応する。そして、配分指令値算出部204は、最小分解能よりも細かい端数の電力量を他の蓄電装置303に配分してもよい。   For example, the distribution command value calculation unit 204 may calculate the power storage device distribution command value with a resolution equal to or higher than the minimum resolution of the output of the power storage device 303. Here, the minimum resolution of the output of the power storage device 303 is a predetermined minimum resolution for the power storage device 303 and corresponds to the gradation of the discharge amount of the power storage device 303. Then, the distribution command value calculation unit 204 may distribute a fractional amount of power smaller than the minimum resolution to other power storage devices 303.

ステップS108において、配分指令値算出部204は、算出した負荷配分指令値および蓄電装置配分指令値を需要家設備制御装置301に送信(通知)する。配分指令値の送信(通知)は、外部の装置によって行われてもよい。   In step S108, the distribution command value calculation unit 204 transmits (notifies) the calculated load distribution command value and the power storage device distribution command value to the customer facility control device 301. Transmission (notification) of the distribution command value may be performed by an external device.

ここで、需要家設備300に蓄電装置303および制御可能負荷302aが含まれる場合、配分指令値算出部204は、負荷配分指令値および蓄電装置配分指令値を別々に需要家設備制御装置301に送ってもよい。または、配分指令値算出部204は、負荷配分指令値および蓄電装置配分指令値の合算値を需要家設備制御装置301に送ってもよい。   Here, when the power storage device 303 and the controllable load 302a are included in the customer facility 300, the distribution command value calculation unit 204 separately sends the load distribution command value and the power storage device distribution command value to the customer facility control device 301. May be. Alternatively, distribution command value calculation unit 204 may send the sum of the load distribution command value and the power storage device distribution command value to consumer facility control device 301.

配分指令値算出部204が合算値を送る場合、需要家設備制御装置301が、受信した合算値を分解し、蓄電装置303および制御可能負荷302aのそれぞれを制御する。したがって、制御の詳細は、需要家設備制御装置301の裁量に任される。すなわち、需要家設備制御装置301は、負荷配分指令値および蓄電装置配分指令値の合算値を受信した場合、例えば快適性などを考慮して、蓄電装置303のみを制御してもよい。   When the distribution command value calculation unit 204 sends the total value, the customer facility control device 301 disassembles the received total value and controls each of the power storage device 303 and the controllable load 302a. Therefore, the details of the control are left to the discretion of the customer facility control device 301. That is, when the customer facility control device 301 receives the combined value of the load distribution command value and the power storage device distribution command value, it may control only the power storage device 303 in consideration of, for example, comfort.

ステップS108の終了後、制御期間が終了していない場合は、ステップS101から処理が繰り返される。   If the control period has not ended after step S108, the process is repeated from step S101.

なお、図4に示された動作のうち他の装置によって行われる処理等は電力制御装置200によって行われなくてもよい。例えば、配分指令値の送信(通知)が外部の装置によって行われる場合、ステップS108は省略されてもよい。また、制御可能負荷302aが制御されない場合、ステップS105は省略されてもよい。また、定格出力容量が蓄電装置情報の要素として取得される場合、ステップS102は省略されてもよい。   Note that the processing performed by other devices in the operations illustrated in FIG. 4 may not be performed by the power control device 200. For example, when transmission (notification) of the distribution command value is performed by an external device, step S108 may be omitted. Further, when the controllable load 302a is not controlled, step S105 may be omitted. Further, when the rated output capacity is acquired as an element of the power storage device information, step S102 may be omitted.

また、定格出力容量は、ステップS102等において、算出によって蓄電装置情報の要素として取得されてもよい。   In addition, the rated output capacity may be acquired as an element of power storage device information by calculation in step S102 or the like.

次に、電力制御装置によって需要家の施設に設置された蓄電装置の制御を行ったシミュレーション結果について、図5Aおよび図5Bを参照して説明する。   Next, a simulation result in which the power storage device installed in the customer's facility is controlled by the power control device will be described with reference to FIGS. 5A and 5B.

図5Aは、参考例における電力制御装置が行う制御のシミュレーション結果の一例を示す図である。この参考例では、蓄電装置の残容量のみで、制御総量が配分される。   FIG. 5A is a diagram illustrating an example of a simulation result of control performed by the power control apparatus in the reference example. In this reference example, the total control amount is distributed only by the remaining capacity of the power storage device.

図5Aにおいて、横軸は電力制御装置の制御周期(5分〜15分)を表している。縦軸は、制御精度を表している。ここで、制御精度は、制御の達成度合いを表す指標であり、制御総量に対して実際に制御が行われた電力量の割合に対応する。例えば、制御精度は、100%−(目標受電電力量に対する誤差率)で算出され、制御終了時点で、実績受電電力量の総和が目標受電電力量と一致すれば、制御精度は100%である。   In FIG. 5A, the horizontal axis represents the control period (5 to 15 minutes) of the power control apparatus. The vertical axis represents the control accuracy. Here, the control accuracy is an index representing the degree of achievement of control, and corresponds to the ratio of the amount of electric power actually controlled to the total control amount. For example, the control accuracy is calculated by 100% − (error rate with respect to the target received power amount), and if the total of the actual received power amounts coincides with the target received power amount at the end of the control, the control accuracy is 100%. .

図5Aに示されるように、参考例における電力制御装置の制御周期が5分であれば、100%に近い精度で制御を行うことが可能である。しかしながら、制御周期が長くなるほど制御精度が大きく低下する。これは、参考例では、配分指令値に対応する充放電が消費電力量等の制約によって行われていないためである。電力制御装置は、充放電が行われかった電力量を他の蓄電装置に再配分する。しかし、制御周期が長くなるほど再配分の機会が減少し、制御精度が大きく低下する。   As shown in FIG. 5A, if the control cycle of the power control apparatus in the reference example is 5 minutes, it is possible to perform control with an accuracy close to 100%. However, the control accuracy is greatly lowered as the control period is longer. This is because, in the reference example, charging / discharging corresponding to the distribution command value is not performed due to restrictions such as power consumption. The power control device redistributes the amount of power that has not been charged / discharged to other power storage devices. However, the longer the control cycle is, the fewer the opportunities for redistribution, and the greater the control accuracy.

一方、図5Bは、本実施の形態における電力制御装置200が行う制御のシミュレーション結果の一例を示す図である。図5Bにおいて、横軸は本実施の形態における電力制御装置200の制御周期(5分〜15分)を表している。縦軸は、制御精度を表している。   On the other hand, FIG. 5B is a diagram illustrating an example of a simulation result of control performed by the power control apparatus 200 according to the present embodiment. In FIG. 5B, the horizontal axis represents the control cycle (5 to 15 minutes) of power control apparatus 200 in the present embodiment. The vertical axis represents the control accuracy.

図5Bに示されるように、本実施の形態における電力制御装置200では、制御周期が15分であっても100%に近い制御精度が得られる。これは、本実施の形態における電力制御装置200が、需要家の施設に設置された蓄電装置303の制約に基づいて配分指令値を生成することで、蓄電装置303が配分指令値に対応する充放電を行えるためである。   As shown in FIG. 5B, in power control apparatus 200 in the present embodiment, control accuracy close to 100% can be obtained even if the control period is 15 minutes. This is because the power control device 200 in the present embodiment generates the distribution command value based on the constraints of the power storage device 303 installed in the customer's facility, so that the power storage device 303 corresponds to the distribution command value. This is because discharging can be performed.

また、本実施の形態における電力制御装置200の制御周期が15分の場合の制御精度は、参考例における電力制御装置の制御周期が5分の場合の制御精度よりも高い。すなわち、本実施の形態における電力制御装置200では、蓄電装置303に送信する配分指令値の送信頻度が参考例の1/3であっても、参考例と同等以上の制御精度が得られる。   Further, the control accuracy when the control cycle of the power control apparatus 200 in this embodiment is 15 minutes is higher than the control accuracy when the control cycle of the power control apparatus in the reference example is 5 minutes. That is, in power control device 200 in the present embodiment, even if the transmission frequency of the distribution command value transmitted to power storage device 303 is 1/3 of the reference example, control accuracy equal to or higher than that of the reference example can be obtained.

以下、具体例を説明する。本具体例の前提として、制御期間は30分であり、制御周期は10分であり、制御期間における目標受電電力量は6kWhである。制御可能負荷302aは存在せず、第1の蓄電装置303および第2の蓄電装置303の2台の蓄電装置303が制御される。第1の蓄電装置303のインバータ定格は60kWであり、残容量は40kWhである。一方、第2の蓄電装置303のインバータ定格は30kWであり、残容量は20kWhである。   Specific examples will be described below. As a premise of this specific example, the control period is 30 minutes, the control cycle is 10 minutes, and the target received power amount in the control period is 6 kWh. There is no controllable load 302a, and two power storage devices 303, the first power storage device 303 and the second power storage device 303, are controlled. The inverter rating of the first power storage device 303 is 60 kW, and the remaining capacity is 40 kWh. On the other hand, the inverter rating of the second power storage device 303 is 30 kW, and the remaining capacity is 20 kWh.

さらに、本具体例の前提として、制御実施時間は10分であり、その10分間における第1の蓄電装置303に対応する負荷302の消費電力量は1kWhであり、第2の蓄電装置303に対応する負荷302の消費電力量は2kWhである。また、制御実施時間(10分間)における第1の蓄電装置303および第2の蓄電装置303のそれぞれの放電電力量は0kWhである。   Further, as a premise of this specific example, the control execution time is 10 minutes, and the power consumption amount of the load 302 corresponding to the first power storage device 303 in that 10 minutes is 1 kWh, which corresponds to the second power storage device 303. The power consumption of the load 302 is 2 kWh. In addition, each of the first power storage device 303 and the second power storage device 303 in the control execution time (10 minutes) is 0 kWh.

上記の前提において、式(1)から、第1の蓄電装置303および第2の蓄電装置303のインバータ出力可能量は、それぞれ、10kWhおよび5kWhと算出される。また、式(3)から、実績受電電力量の総和は、3kWhと算出される。また、式(4)から、予測受電電力量の総和は、6kWhと算出される。したがって、式(2)より、目標受電電力量である6kWhに対し、制御総量は3kWhと算出される。   Based on the above assumption, the inverter output possible amounts of the first power storage device 303 and the second power storage device 303 are calculated as 10 kWh and 5 kWh, respectively, from Expression (1). Further, the total sum of the actual received power amounts is calculated as 3 kWh from Equation (3). Moreover, the sum total of predicted received electric energy is calculated as 6 kWh from Formula (4). Therefore, the total control amount is calculated as 3 kWh with respect to 6 kWh, which is the target received power amount, from Equation (2).

次に、第1の蓄電装置303のインバータ出力可能量は10kWhである。また、第1の蓄電装置303に対応する負荷302の消費電力量は1kWhである。また、第1の蓄電装置303の放電可能な残容量は6.67kWh(=40kWh×(10分÷1h)×放電レート1C)である。したがって、式(5)より第1の閾値は1kWhと算出される。同様に、第2の蓄電装置303の第1の閾値は、式(5)から、2kWhと算出される。   Next, the inverter output possible amount of the first power storage device 303 is 10 kWh. Further, the power consumption of the load 302 corresponding to the first power storage device 303 is 1 kWh. The remaining capacity of the first power storage device 303 that can be discharged is 6.67 kWh (= 40 kWh × (10 minutes ÷ 1 h) × discharge rate 1C). Therefore, the first threshold value is calculated as 1 kWh from Equation (5). Similarly, the first threshold value of second power storage device 303 is calculated as 2 kWh from Equation (5).

次に、式(7)より、第1の蓄電装置303に対する蓄電装置配分指令値は1kWhと算出される。一方、第2の蓄電装置303に対する蓄電装置配分指令値は2kWhと算出される。したがって、第1の蓄電装置303は、次の10分間で1kWhの放電を行い、第2の蓄電装置303は、次の10分間で2kWhの放電を行う。この場合、放電量の合計値は、3kWhであり、制御総量と一致する。したがって、次の10分間における制御精度は100%となる。   Next, from Equation (7), the power storage device distribution command value for the first power storage device 303 is calculated as 1 kWh. On the other hand, the power storage device distribution command value for the second power storage device 303 is calculated as 2 kWh. Therefore, the first power storage device 303 discharges 1 kWh in the next 10 minutes, and the second power storage device 303 discharges 2 kWh in the next 10 minutes. In this case, the total value of the discharge amount is 3 kWh, which matches the total control amount. Therefore, the control accuracy in the next 10 minutes is 100%.

ここで、参考例のように、残容量のみに応じて配分が行われた場合、第1の蓄電装置303および第2の蓄電装置303に対する蓄電装置配分指令値は、それぞれ2kWhおよび1kWhと算出される。   Here, as in the reference example, when the distribution is performed only according to the remaining capacity, the power storage device distribution command values for the first power storage device 303 and the second power storage device 303 are calculated as 2 kWh and 1 kWh, respectively. The

しかし、蓄電装置303に対応する負荷302の消費電力量を超えて放電は行われない。そのため、第1の蓄電装置303は次の10分間で1kWhの放電を行い、第2の蓄電装置303は次の10分間で1kWhの放電を行う。   However, discharging is not performed beyond the power consumption of the load 302 corresponding to the power storage device 303. Therefore, the first power storage device 303 discharges 1 kWh in the next 10 minutes, and the second power storage device 303 discharges 1 kWh in the next 10 minutes.

したがって、次の10分間における放電量の合計値は2kWhであり、3kWhの制御総量に対して1kWhの放電が不足する。よって、次の10分間における制御精度は、66.67%である。   Therefore, the total value of the discharge amount in the next 10 minutes is 2 kWh, and the discharge of 1 kWh is insufficient for the total control amount of 3 kWh. Therefore, the control accuracy in the next 10 minutes is 66.67%.

これに対して、本実施の形態における電力制御装置200は、残容量のみでなく、定格出力容量(インバータ出力可能量)および消費電力量に基づいて、指令値を算出する。これにより、電力制御装置200は、制御精度の悪化を抑制することができる。   In contrast, power control device 200 in the present embodiment calculates a command value based not only on the remaining capacity but also on the rated output capacity (inverter output possible amount) and the power consumption. Thereby, the power control apparatus 200 can suppress deterioration of the control accuracy.

なお、本実施の形態では、第1の閾値および第2の閾値の算出において、負荷302の直前の消費電力量(例えば、制御周期が10分であれば、過去10分間の消費電力量)が用いられている。しかし、直前の消費電力量ではなく、次の制御周期の予測消費電力量が用いてもよい。予測消費電力量の算出方法には任意の予測方法を適用することが可能である。例えば、負荷情報取得部202は、過去の消費電力量の変化から線形的に消費電力量を予測することで、予測された消費電力量を取得してもよい。   In the present embodiment, in the calculation of the first threshold value and the second threshold value, the power consumption immediately before the load 302 (for example, if the control period is 10 minutes, the power consumption for the past 10 minutes) is It is used. However, the predicted power consumption amount of the next control cycle may be used instead of the previous power consumption amount. Any prediction method can be applied to the calculation method of the predicted power consumption. For example, the load information acquisition unit 202 may acquire the predicted power consumption amount by linearly predicting the power consumption amount from a change in the past power consumption amount.

(実施の形態2)
本実施の形態では、需要家の施設に太陽光発電装置が設置されている場合について説明する。なお、既に説明した実施の形態1と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。
(Embodiment 2)
This Embodiment demonstrates the case where the solar power generation device is installed in the customer's facility. In addition, the same code | symbol is attached | subjected about the component similar to Embodiment 1 already demonstrated, and detailed description may be abbreviate | omitted.

図6は、本実施の形態における電力制御システムの構成を示すブロック図である。なお、既に説明した図1と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。   FIG. 6 is a block diagram showing the configuration of the power control system in the present embodiment. In addition, the same code | symbol is attached | subjected about the component similar to already demonstrated FIG. 1, and detailed description may be abbreviate | omitted.

図6に示されるように、実施の形態1と比較して、本実施の形態では、需要家設備300は、太陽光を利用して発電を行う太陽光発電装置(発電装置)304を追加の構成要素として備える。すなわち、需要家の施設において、太陽光発電装置304が設置されている。   As shown in FIG. 6, compared to the first embodiment, in the present embodiment, the customer facility 300 is additionally provided with a solar power generation device (power generation device) 304 that generates power using sunlight. As a component. That is, the solar power generation device 304 is installed in the customer's facility.

太陽光発電装置304は、負荷302および蓄電装置303に電力を供給する。また、太陽光発電装置304は、電力系統に電力を供給してもよい。そして、太陽光発電装置304は、需要家設備制御装置301を介して電力制御装置200へ電力供給量を通知する。太陽光発電装置304の電力供給量は、太陽光発電装置304の出力電力量、または、太陽光発電装置304の発電電力量と表現される場合がある。   The solar power generation device 304 supplies power to the load 302 and the power storage device 303. Moreover, the solar power generation device 304 may supply power to the power system. Then, the solar power generation device 304 notifies the power control device 200 of the power supply amount via the customer facility control device 301. The power supply amount of the solar power generation device 304 may be expressed as the output power amount of the solar power generation device 304 or the power generation power amount of the solar power generation device 304.

図7は、図6に示された電力制御装置200の構成を示すブロック図である。なお、既に説明した図2と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。   FIG. 7 is a block diagram showing a configuration of power control apparatus 200 shown in FIG. In addition, about the component similar to FIG. 2 already demonstrated, the same code | symbol may be attached | subjected and detailed description may be abbreviate | omitted.

図7に示されるように、電力制御装置200は、蓄電装置情報取得部201と、負荷情報取得部202と、制御総量算出部203と、配分指令値算出部204と、太陽光発電情報取得部205とを備える。すなわち、実施の形態1と比較して、本実施の形態における電力制御装置200は、太陽光発電情報取得部205を追加の構成要素として備える。   As illustrated in FIG. 7, the power control device 200 includes a power storage device information acquisition unit 201, a load information acquisition unit 202, a control total amount calculation unit 203, a distribution command value calculation unit 204, and a solar power generation information acquisition unit. 205. That is, compared with Embodiment 1, the power control apparatus 200 according to the present embodiment includes a photovoltaic power generation information acquisition unit 205 as an additional component.

太陽光発電情報取得部205は、太陽光発電装置304が設置されている需要家設備300の需要家設備制御装置301から、太陽光発電装置304の発電電力量を太陽光発電情報として取得する。   The solar power generation information acquisition unit 205 acquires the amount of power generated by the solar power generation device 304 as solar power generation information from the customer facility control device 301 of the customer facility 300 in which the solar power generation device 304 is installed.

図8は、図7に示された電力制御装置200の動作を示すフローチャートである。まず、ステップS201において、太陽光発電情報取得部205は、需要家設備制御装置301から、太陽光発電装置304の発電電力量を太陽光発電情報として取得する。   FIG. 8 is a flowchart showing the operation of the power control apparatus 200 shown in FIG. First, in step S <b> 201, the solar power generation information acquisition unit 205 acquires the generated power amount of the solar power generation device 304 from the customer facility control device 301 as solar power generation information.

次に、ステップS202において、蓄電装置情報取得部201は、需要家設備制御装置301から、蓄電装置303の放電電力量と残容量とインバータ定格とを蓄電装置情報として取得する。次に、ステップS203において、蓄電装置情報取得部201は、蓄電装置303の定格出力容量を算出する。次に、ステップS204において、負荷情報取得部202は、負荷302の消費電力量を負荷情報として算出する。これらの処理は、実施の形態1と同様である。   Next, in step S <b> 202, the power storage device information acquisition unit 201 acquires the amount of discharged power, the remaining capacity, and the inverter rating of the power storage device 303 as power storage device information from the customer facility control device 301. Next, in step S <b> 203, the power storage device information acquisition unit 201 calculates the rated output capacity of the power storage device 303. Next, in step S204, the load information acquisition unit 202 calculates the power consumption amount of the load 302 as load information. These processes are the same as those in the first embodiment.

次に、ステップS205において、制御総量算出部203は、消費電力量および太陽光発電装置304の出力電力量等に従って、制御総量を算出する。制御総量算出部203は、例えば、次の式(8)により、制御総量を算出する。   Next, in step S205, the total control amount calculation unit 203 calculates the total control amount according to the power consumption amount, the output power amount of the solar power generation device 304, and the like. The total control amount calculation unit 203 calculates the total control amount by, for example, the following equation (8).

(制御総量)=(実績受電電力量の総和)−(実績発電電力量の総和)+(予測受電電力量の総和)−(予測発電電力量の総和)−(目標受電電力量)・・・式(8)   (Total control amount) = (Sum of actual received power amount) − (Sum of actual generated power amount) + (Sum of predicted received power amount) − (Sum of predicted generated power amount) − (Target received power amount) Formula (8)

式(8)は、式(2)に対応する式である。具体的には、式(8)における実績受電電力量の総和、予測受電電力量の総和、および、目標受電電力量は、式(2)における実績受電電力量の総和、予測受電電力量の総和、および、目標受電電力量に対応する。   Expression (8) is an expression corresponding to Expression (2). Specifically, the sum of the actual received power amount, the sum of the predicted received power amount, and the target received power amount in Expression (8) are the sum of the actual received power amount and the predicted received power amount in Expression (2). And the target received power amount.

そして、式(8)には、式(2)と比較して、実績発電電力量の総和の減算、および、予測発電電力量の総和の減算が含まれている。式(8)における実績発電電力量の総和は、制御実施時間における全ての太陽光発電装置304の発電電力量(電力供給量)の総和である。予測発電電力量の総和は、制御残時間における全ての太陽光発電装置304の予測発電電力量(予測電力供給量)の総和である。   Then, Expression (8) includes subtraction of the total of the actual generated electric energy and subtraction of the total of the predicted generated electric energy as compared with Expression (2). The sum total of the actual power generation amount in Expression (8) is the sum total of the power generation amounts (power supply amounts) of all the solar power generation devices 304 during the control execution time. The total predicted power generation amount is the sum of the predicted power generation amounts (predicted power supply amounts) of all the solar power generation devices 304 in the remaining control time.

式(8)において、制御実施時間が0の場合、すなわち制御期間の開始時において、実績受電電力量の総和および実績発電電力量の総和はそれぞれ0である。この場合、制御総量は、予測受電電力量の総和、予測発電電力量の総和、および、目標受電電力量から算出される。また、この場合、前の制御期間における消費電力量の総和が予測受電電力量の総和として用いられてもよい。また、前の制御期間における発電電力量の総和が予測発電電力量の総和として用いられてもよい。   In the equation (8), when the control execution time is 0, that is, at the start of the control period, the total of the actual received power amount and the total of the actual generated power amount are each 0. In this case, the control total amount is calculated from the sum of the predicted received power amount, the sum of the predicted generated power amount, and the target received power amount. In this case, the sum of the power consumption amounts in the previous control period may be used as the sum of the predicted received power amounts. Moreover, the sum total of the power generation amount in the previous control period may be used as the sum of the predicted power generation amount.

なお、予測発電電力量の算出方法には任意の予測方法を適用することが可能である。例えば、式(4)の消費電力量を発電電力量に置き換えた式を用いて、予測発電電力量が算出されてもよい。   An arbitrary prediction method can be applied to the calculation method of the predicted power generation amount. For example, the predicted power generation amount may be calculated using a formula in which the power consumption amount in Formula (4) is replaced with the power generation amount.

式(8)において、制御総量が0である場合、電力制御装置200は、蓄電装置303および制御可能負荷302aを制御しない。制御総量が正の場合、電力制御装置200は、蓄電装置303に放電させるか、または、制御可能負荷302aを制御する。制御総量が負の場合、電力制御装置200は、蓄電装置303に充電させる。また、制御総量が負の場合、電力制御装置200は、制御可能負荷302aを制御しないようにしてもよい。   In Expression (8), when the total control amount is 0, the power control device 200 does not control the power storage device 303 and the controllable load 302a. When the total control amount is positive, power control device 200 causes power storage device 303 to discharge or controls controllable load 302a. When the total control amount is negative, power control device 200 charges power storage device 303. When the total control amount is negative, the power control apparatus 200 may not control the controllable load 302a.

次に、ステップS206において、配分指令値算出部204は、制御可能負荷302aへの配分指令値を算出する。この処理は、実施の形態1と同様である。   Next, in step S206, the distribution command value calculation unit 204 calculates a distribution command value for the controllable load 302a. This process is the same as in the first embodiment.

次に、ステップS207において、配分指令値算出部204は、次の式(9)により、各蓄電装置303の閾値を算出する(ここでは、便宜上、この閾値を第3の閾値と呼ぶ場合がある)。式(9)は、発電電力量>0において、蓄電装置303の出力が制限される場合に用いられる閾値の算出方法である。 Next, in step S207, the distribution command value calculation unit 204 calculates a threshold value of each power storage device 303 by the following equation (9) (here, for convenience, this threshold value may be referred to as a third threshold value). ). Equation (9) is a threshold value calculation method used when the output of the power storage device 303 is limited when the generated power amount i > 0.

[発電電力量≦消費電力量の場合]
第3の閾値=min(インバータ出力可能量,消費電力量−発電電力量,残容量
[発電電力量>消費電力量の場合]
第3の閾値=min(インバータ出力可能量,0,残容量)=0
・・・式(9)
[In case of generated electric energy i ≤ consumed electric energy i ]
Third threshold value i = min (inverter output possible amount i , power consumption amount i -generated power amount i , remaining capacity i )
[When power generation amount i > power consumption amount i ]
Third threshold value i = min (inverter output possible amount i , 0, remaining capacity i ) = 0
... Formula (9)

また、発電電力量>0において、蓄電装置303の出力が制限されない場合、配分指令値算出部204は、式(9)の代わりに式(5)または式(6)を用いて、蓄電装置303の閾値を算出してもよい。 In addition, when the output of power storage device 303 is not limited when power generation amount i > 0, distribution command value calculation unit 204 uses Formula (5) or Formula (6) instead of Formula (9) to store the power storage device. A threshold value of 303 may be calculated.

また、式(9)において、消費電力量は、消費電力量+負荷配分指令値に置き換えられてもよい。すなわち、負荷配分指令値が反映された消費電力量が用いられてもよい。 Further, in the equation (9), the power consumption amount i may be replaced with a power consumption amount i + load distribution command value i. That is, the power consumption amount reflecting the load distribution command value may be used.

次に、ステップS208において、配分指令値算出部204は、次の式(10)等により、蓄電装置303への蓄電装置配分指令値を算出する。式(10)等により算出された蓄電装置配分指令値が、式(9)で算出された第3の閾値を超える場合、配分指令値算出部204は、その蓄電装置配分指令値を第3の閾値で制限する。式(10)は一例であり、最適化手法等が適用されてもよい。   Next, in step S208, the distribution command value calculation unit 204 calculates a power storage device distribution command value to the power storage device 303 using the following equation (10) or the like. When the power storage device distribution command value calculated by equation (10) or the like exceeds the third threshold value calculated by equation (9), distribution command value calculation unit 204 sets the power storage device distribution command value to the third threshold value. Limit by threshold. Expression (10) is an example, and an optimization method or the like may be applied.

Figure 2017005845
Figure 2017005845

なお、発電電力量>0において蓄電装置303の出力が0に制限される場合、発電電力量と消費電力量との関係によらず、発電電力量>0において第3の閾値が0と定められてもよい。これにより、発電電力量>0において、蓄電装置配分指令値は0に制限され、蓄電装置303の出力が0に制限される。 Incidentally, if the output of the power storage device 303 is limited to 0 in the generated power quantity i> 0, regardless of the relationship between the generated power quantity i and the power consumption amount i, the third threshold value i in power generation amount i> 0 May be set to zero. As a result, when the generated power amount i > 0, the power storage device distribution command value i is limited to 0, and the output of the power storage device 303 is limited to 0.

次に、ステップS209において、配分指令値算出部204は、需要家設備制御装置301を介して、蓄電装置配分指令値を蓄電装置303に送信し、負荷配分指令値を負荷302に送信する。これにより、配分指令値算出部204は、各配分指令値を通知する。この処理は、実施の形態1と同様である。   Next, in step S <b> 209, the distribution command value calculation unit 204 transmits the power storage device distribution command value to the power storage device 303 and transmits the load distribution command value to the load 302 via the customer facility control device 301. Thereby, the distribution command value calculation unit 204 notifies each distribution command value. This process is the same as in the first embodiment.

以下、具体例を説明する。本具体例の前提として、制御期間は30分であり、制御周期は10分であり、制御期間における目標受電電力量は4kWhである。制御可能負荷302aは存在せず、第1の蓄電装置303および第2の蓄電装置303の2台の蓄電装置303が制御される。第1の蓄電装置303のインバータ定格は60kWであり、残容量は40kWhである。一方、第2の蓄電装置303のインバータ定格は30kWであり、残容量は20kWhである。   Specific examples will be described below. As a premise of this specific example, the control period is 30 minutes, the control cycle is 10 minutes, and the target received power amount in the control period is 4 kWh. There is no controllable load 302a, and two power storage devices 303, the first power storage device 303 and the second power storage device 303, are controlled. The inverter rating of the first power storage device 303 is 60 kW, and the remaining capacity is 40 kWh. On the other hand, the inverter rating of the second power storage device 303 is 30 kW, and the remaining capacity is 20 kWh.

さらに、本具体例の前提として、制御実施時間は10分であり、その10分間における第1の蓄電装置303に対応する負荷302の消費電力量は1kWhであり、第2の蓄電装置303に対応する負荷302の消費電力量は2kWhである。また、制御実施時間(10分間)における第1の蓄電装置303および第2の蓄電装置303のそれぞれの放電電力量は0kWhである。   Further, as a premise of this specific example, the control execution time is 10 minutes, and the power consumption amount of the load 302 corresponding to the first power storage device 303 in that 10 minutes is 1 kWh, which corresponds to the second power storage device 303. The power consumption of the load 302 is 2 kWh. In addition, each of the first power storage device 303 and the second power storage device 303 in the control execution time (10 minutes) is 0 kWh.

また、本具体例の前提として、太陽光発電装置304が第2の蓄電装置303を備える需要家設備300に備えられている。そして、制御実施時間(10分間)において、第2の蓄電装置303に対応する太陽光発電装置304の発電電力量は1kWhである。   Moreover, as a premise of this specific example, the solar power generation device 304 is provided in the customer facility 300 including the second power storage device 303. And in control implementation time (10 minutes), the electric power generation amount of the solar power generation device 304 corresponding to the 2nd electrical storage apparatus 303 is 1 kWh.

上記の前提において、式(1)から、第1の蓄電装置303および第2の蓄電装置303のインバータ出力可能量は、それぞれ、10kWhおよび5kWhと算出される。また、式(3)から、実績受電電力量の総和は、3kWhと算出される。また、式(4)から、予測受電電力量の総和は、6kWhと算出される。また、予測発電電力量の総和は、式(4)と同様の方式で算出される場合(式(4)に限定されるものではない)、2kWhと算出される。   Based on the above assumption, the inverter output possible amounts of the first power storage device 303 and the second power storage device 303 are calculated as 10 kWh and 5 kWh, respectively, from Expression (1). Further, the total sum of the actual received power amounts is calculated as 3 kWh from Equation (3). Moreover, the sum total of predicted received electric energy is calculated as 6 kWh from Formula (4). In addition, the total sum of the predicted power generation amounts is calculated as 2 kWh when calculated by the same method as in equation (4) (not limited to equation (4)).

したがって、式(8)より、目標受電電力量である4kWhに対し、制御総量は2kWhと算出される。   Therefore, the total control amount is calculated as 2 kWh with respect to 4 kWh, which is the target received power amount, from Equation (8).

次に、第1の蓄電装置303に関して、式(9)において、インバータ出力可能量は10kWh、消費電力量は1kWh、発電電力量は0kWh、放電可能な残容量は6.67kWh(=40kWh×(10分÷1h)×放電レート1C)である。したがって、式(9)より、第1の蓄電装置303の第3の閾値は1kWhと算出される。   Next, with respect to the first power storage device 303, in Expression (9), the inverter output possible amount is 10 kWh, the power consumption amount is 1 kWh, the generated power amount is 0 kWh, and the dischargeable remaining capacity is 6.67 kWh (= 40 kWh × ( 10 minutes ÷ 1h) × discharge rate 1C). Therefore, from Equation (9), the third threshold value of the first power storage device 303 is calculated as 1 kWh.

一方、第2の蓄電装置303に関して、式(9)において、インバータ出力可能量は5kWh、消費電力量は2kWh、発電電力量は1kWh、残容量は3.33kWh(=20kWh×(10分÷1h)×放電レート1C)である。したがって、式(9)より、第2の蓄電装置303の第3の閾値は1kWhと算出される。   On the other hand, with respect to the second power storage device 303, in Expression (9), the inverter output possible amount is 5 kWh, the power consumption amount is 2 kWh, the generated power amount is 1 kWh, and the remaining capacity is 3.33 kWh (= 20 kWh × (10 minutes ÷ 1h). ) × discharge rate 1C). Therefore, from Equation (9), the third threshold value of the second power storage device 303 is calculated as 1 kWh.

次に、式(10)より、第1の蓄電装置303の蓄電装置配分指令値は、1kWhと算出され、第2の蓄電装置303の蓄電装置配分指令値は、1kWhと算出される。したがって、第1の蓄電装置303は次の10分間で1kWhの放電を行い、第2の蓄電装置303は次の10分間で1kWhの放電を行う。放電量の合計値は2kWhであり、制御総量と一致する。よって、次の10分間における制御精度は100%である。   Next, from equation (10), the power storage device distribution command value of the first power storage device 303 is calculated as 1 kWh, and the power storage device distribution command value of the second power storage device 303 is calculated as 1 kWh. Therefore, the first power storage device 303 discharges 1 kWh in the next 10 minutes, and the second power storage device 303 discharges 1 kWh in the next 10 minutes. The total value of the discharge amount is 2 kWh, which matches the total control amount. Therefore, the control accuracy in the next 10 minutes is 100%.

ここで、残容量のみに応じて配分が行われた場合、第1の蓄電装置303および第2の蓄電装置303の蓄電装置配分指令値は、それぞれ1.33kWh、0.67kWhと算出される。しかし、蓄電装置303において、(消費電力量−発電電力量)を超えて放電は行われない場合がある。この場合、第1の蓄電装置303は、次の10分間で1kWhの放電を行い、第2の蓄電装置303は次の10分間で0.67kWhの放電を行う。   Here, when distribution is performed according to only the remaining capacity, the power storage device distribution command values of the first power storage device 303 and the second power storage device 303 are calculated as 1.33 kWh and 0.67 kWh, respectively. However, in the power storage device 303, discharge may not be performed exceeding (power consumption-generated power amount). In this case, the first power storage device 303 discharges 1 kWh in the next 10 minutes, and the second power storage device 303 discharges 0.67 kWh in the next 10 minutes.

したがって、この場合、次の10分間における放電量の合計値は1.67kWhであり、制御総量2kWhに対して0.33kWhの放電が不足する。よって、次の10分間における制御精度は、83.5%である。   Accordingly, in this case, the total value of the discharge amount in the next 10 minutes is 1.67 kWh, and the discharge of 0.33 kWh is insufficient for the total control amount of 2 kWh. Therefore, the control accuracy in the next 10 minutes is 83.5%.

これに対して、本実施の形態における電力制御装置200は、残容量のみでなく、定格出力容量、消費電力量および発電電力量に基づいて、指令値を算出する。これにより、電力制御装置200は、制御精度の悪化を抑制することができる。   On the other hand, the power control apparatus 200 according to the present embodiment calculates the command value based on not only the remaining capacity but also the rated output capacity, the power consumption amount, and the generated power amount. Thereby, the power control apparatus 200 can suppress deterioration of the control accuracy.

なお、本実施の形態では、第3の閾値の算出において、直前の消費電力量および直前の発電電力量(例えば、制御周期が10分であれば、過去10分間の消費電力量および発電電力量)が用いられている。しかし、直前の消費電力量および直前の発電電力量ではなく、次の制御周期の予測消費電力量および予測発電電力量が用いられてもよい。予測消費電力量および予測発電電力量の算出方法には任意の予測方法を適用することが可能である。   In the present embodiment, in the calculation of the third threshold value, the immediately preceding power consumption amount and the immediately preceding generated power amount (for example, if the control cycle is 10 minutes, the consumed power amount and the generated power amount for the past 10 minutes). ) Is used. However, the predicted power consumption and predicted power generation amount of the next control cycle may be used instead of the immediately previous power consumption amount and the previous power generation power amount. An arbitrary prediction method can be applied to the calculation method of the predicted power consumption and the predicted power generation amount.

(実施の形態3)
本実施の形態では、電圧に基づいて、複数の蓄電装置を制御する電力制御装置について説明する。なお、既に説明した実施の形態1または実施の形態2と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。
(Embodiment 3)
In this embodiment, a power control device that controls a plurality of power storage devices based on a voltage will be described. In addition, the same code | symbol is attached | subjected about the component similar to Embodiment 1 or Embodiment 2 already demonstrated, and detailed description may be abbreviate | omitted.

図9は、本実施の形態における電力制御装置の構成を示すブロック図である。なお、既に説明した図2と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。   FIG. 9 is a block diagram showing a configuration of the power control apparatus in the present embodiment. In addition, about the component similar to FIG. 2 already demonstrated, the same code | symbol may be attached | subjected and detailed description may be abbreviate | omitted.

図9に示されるように、電力制御装置200は、蓄電装置情報取得部201と、負荷情報取得部202と、制御総量算出部203と、配分指令値算出部204と、電圧取得部206とを備える。すなわち、実施の形態1と比較して、本実施の形態における電力制御装置200は、電圧取得部206を追加の構成要素として備える。なお、簡易化のため、図7で示した太陽光発電情報取得部205は省略している。   As illustrated in FIG. 9, the power control device 200 includes a power storage device information acquisition unit 201, a load information acquisition unit 202, a total control amount calculation unit 203, a distribution command value calculation unit 204, and a voltage acquisition unit 206. Prepare. That is, compared with Embodiment 1, power control apparatus 200 in the present embodiment includes voltage acquisition unit 206 as an additional component. For simplification, the photovoltaic power generation information acquisition unit 205 shown in FIG. 7 is omitted.

電圧取得部206は、各需要家設備300における受電点の電圧を需要家設備制御装置301から取得する。なお、需要家設備制御装置301は、需要家設備300において電力系統から得られる電力の電圧を測定するセンサまたはメータ(いずれも図示せず)から得られる電圧を受電点の電圧として取得してもよい。   The voltage acquisition unit 206 acquires the power receiving point voltage in each customer facility 300 from the customer facility control device 301. Note that the customer facility control device 301 may acquire a voltage obtained from a sensor or meter (none of which is shown) that measures the voltage of power obtained from the power system in the customer facility 300 as the voltage at the power receiving point. Good.

図10は、図9に示された電力制御装置200の動作を示すフローチャートである。まず、ステップS301において、電圧取得部206は、需要家設備制御装置301から電圧を取得する。   FIG. 10 is a flowchart showing the operation of the power control apparatus 200 shown in FIG. First, in step S <b> 301, the voltage acquisition unit 206 acquires a voltage from the customer facility control device 301.

次に、ステップS302において、蓄電装置情報取得部201は、放電電力量と残容量とインバータ定格とを蓄電装置情報として取得する。ステップS303において、蓄電装置情報取得部201は、定格出力容量を算出する。ステップS304において、負荷情報取得部202は、消費電力量を負荷情報として取得する。ステップS305において、制御総量算出部203は、制御総量を算出する。ステップS306において、配分指令値算出部204は、負荷配分指令値を算出する。これらの処理は、実施の形態1と同様である。   Next, in step S302, the power storage device information acquisition unit 201 acquires the amount of discharged power, the remaining capacity, and the inverter rating as power storage device information. In step S303, the power storage device information acquisition unit 201 calculates a rated output capacity. In step S304, the load information acquisition unit 202 acquires power consumption as load information. In step S305, the total control amount calculation unit 203 calculates the total control amount. In step S306, the distribution command value calculation unit 204 calculates a load distribution command value. These processes are the same as those in the first embodiment.

次に、ステップS307において、配分指令値算出部204は、閾値を算出する。配分指令値算出部204は、第1の閾値を算出してもよいし、第2の閾値を算出してもよい。また、配分指令値算出部204は、実施の形態2に示された構成および動作に基づいて、第3の閾値を算出してもよい。また、配分指令値算出部204は、以下の式(11)により放電可能量を算出する。   Next, in step S307, the distribution command value calculation unit 204 calculates a threshold value. The distribution command value calculation unit 204 may calculate a first threshold value or a second threshold value. In addition, the distribution command value calculation unit 204 may calculate the third threshold based on the configuration and operation shown in the second embodiment. In addition, the distribution command value calculation unit 204 calculates the dischargeable amount by the following equation (11).

Figure 2017005845
Figure 2017005845

上記の式(11)において、Pは、iで示される蓄電装置303の放電可能量である。αijは、iで示される蓄電装置303の放電が増えたときにjで示される蓄電装置303に対応する受電点の電圧がどの程度上昇するのかを表す感度係数である。Vは、(電圧の上限値)−(電圧取得部206が取得した電圧値)である。Tは制御周期であり、例えば5分である。 In the above formula (11), P i is the dischargeable quantity of the power storage device 303 indicated by i. α ij is a sensitivity coefficient representing how much the voltage at the power receiving point corresponding to the power storage device 303 indicated by j increases when the discharge of the power storage device 303 indicated by i increases. V i is (the upper limit value of the voltage) − (the voltage value i acquired by the voltage acquisition unit 206). T is a control period, for example, 5 minutes.

なお、例えば、Vが負である場合、配分指令値算出部204は、V=0として、蓄電装置303の放電可能量を算出する。これにより、Vが上限値を逸脱している場合、放電可能量が0と算出される。 For example, when V i is negative, the distribution command value calculation unit 204 calculates the dischargeable amount of the power storage device 303 with V i = 0. Thus, if V i is out of the upper limit, discharge amount is 0 is calculated.

次に、配分指令値算出部204は、以下の式(12)により、各蓄電装置303の閾値を算出する(ここでは、便宜上、この閾値を第4の閾値と呼ぶ場合がある)。なお、式(12)では第1の閾値、第2の閾値、および、第3の閾値のすべてが記載されているが、配分指令値算出部204は、必ずしも放電可能量に対して、第1の閾値、第2の閾値、および、第3の閾値のすべてを比較する必要はなく、ステップS106、あるいはステップS207で算出した閾値を使用すればよい。 Next, the distribution command value calculation unit 204 calculates the threshold value of each power storage device 303 by the following formula (12) (here, for convenience, this threshold value may be referred to as a fourth threshold value). Note that, although all of the first threshold value i , the second threshold value i , and the third threshold value i are described in the expression (12), the distribution command value calculation unit 204 does not necessarily require the dischargeable amount i. Te, the first threshold value i, the second threshold value i, and is not necessary to compare all the third threshold value i, may be used to threshold i calculated in step S106 or step S207,.

第4の閾値=min(第1の閾値,第2の閾値,第3の閾値,放電可能量)・・・式(12) Fourth threshold value i = min (first threshold value i , second threshold value i , third threshold value i , dischargeable amount i ) Equation (12)

すなわち、事前に算出された閾値が放電可能量よりも大きい場合、配分指令値算出部204は、閾値を放電可能量に制限する。これにより、電圧が上限を超えないように閾値が調整される。   That is, when the threshold value calculated in advance is larger than the dischargeable amount, the distribution command value calculation unit 204 limits the threshold value to the dischargeable amount. Thereby, the threshold value is adjusted so that the voltage does not exceed the upper limit.

なお、上限は、負荷302またはその他の回路が破損しないように、基準電圧に対して予め定められた電圧である。日本では、100Vの基準電圧に対して、107Vが上限として予め定められている。例えば、電圧値が上限値以上である場合、配分指令値算出部204は、放電可能量を0と定める。これにより、電圧値が上限値以上である場合、閾値が0に制限され、蓄電装置303の出力が0に制限される。 The upper limit is a voltage that is predetermined with respect to the reference voltage so that the load 302 or other circuits are not damaged. In Japan, 107V is predetermined as the upper limit for a reference voltage of 100V. For example, when the voltage value i is greater than or equal to the upper limit value, the distribution command value calculation unit 204 determines the dischargeable amount i as 0. Thus, when voltage value i is equal to or higher than the upper limit value, threshold value i is limited to 0, and the output of power storage device 303 is limited to 0.

次に、ステップS308において、配分指令値算出部204は、次の式(13)等により、蓄電装置303への蓄電装置配分指令値を算出する。なお、式(13)等により算出された蓄電装置配分指令値が、式(12)で算出された第4の閾値を超える場合、配分指令値算出部204は、その蓄電装置配分指令値を第4の閾値で制限する。なお、式(13)は一例であり、最適化手法等が適用されてもよい。   Next, in step S308, the distribution command value calculation unit 204 calculates a power storage device distribution command value to the power storage device 303 by the following equation (13) or the like. If the power storage device distribution command value calculated by equation (13) or the like exceeds the fourth threshold value calculated by equation (12), distribution command value calculation unit 204 sets the power storage device distribution command value to the first value. Limit with a threshold of 4. Expression (13) is an example, and an optimization method or the like may be applied.

Figure 2017005845
Figure 2017005845

次に、ステップS309において、配分指令値算出部204は、需要家設備制御装置301を介して、蓄電装置配分指令値を蓄電装置303に送信し、負荷配分指令値を負荷302に送信する。これにより、配分指令値算出部204は、各配分指令値を通知する。この処理は、実施の形態1と同様である。   Next, in step S <b> 309, the distribution command value calculation unit 204 transmits the power storage device distribution command value to the power storage device 303 and transmits the load distribution command value to the load 302 via the customer facility control device 301. Thereby, the distribution command value calculation unit 204 notifies each distribution command value. This process is the same as in the first embodiment.

本実施の形態における電力制御装置200は、残容量のみでなく、定格出力容量、消費電力量および電圧に基づいて、指令値を算出する。これにより、電力制御装置200は、制御精度の悪化および電圧の異常等を抑制することができる。   The power control apparatus 200 in the present embodiment calculates a command value based on not only the remaining capacity but also the rated output capacity, the power consumption amount, and the voltage. Thereby, the power control apparatus 200 can suppress deterioration in control accuracy, voltage abnormality, and the like.

以下、具体例を説明する。本具体例の前提として、制御期間は30分であり、制御周期は10分であり、制御期間における目標受電電力量は4kWhである。制御可能負荷302aは存在せず、第1の蓄電装置303および第2の蓄電装置303の2台の蓄電装置303が制御される。第1の蓄電装置303のインバータ定格は60kWであり、残容量は40kWhである。一方、第2の蓄電装置303のインバータ定格は30kWであり、残容量は20kWhである。   Specific examples will be described below. As a premise of this specific example, the control period is 30 minutes, the control cycle is 10 minutes, and the target received power amount in the control period is 4 kWh. There is no controllable load 302a, and two power storage devices 303, the first power storage device 303 and the second power storage device 303, are controlled. The inverter rating of the first power storage device 303 is 60 kW, and the remaining capacity is 40 kWh. On the other hand, the inverter rating of the second power storage device 303 is 30 kW, and the remaining capacity is 20 kWh.

さらに、本具体例の前提として、制御実施時間は10分であり、その10分間における第1の蓄電装置303に対応する負荷302の消費電力量は1kWhであり、第2の蓄電装置303に対応する負荷302の消費電力量は2kWhである。また、制御実施時間(10分間)における第1の蓄電装置303および第2の蓄電装置303のそれぞれの出力電力量は0kWhである。   Further, as a premise of this specific example, the control execution time is 10 minutes, and the power consumption amount of the load 302 corresponding to the first power storage device 303 in that 10 minutes is 1 kWh, which corresponds to the second power storage device 303. The power consumption of the load 302 is 2 kWh. Further, the output power amounts of the first power storage device 303 and the second power storage device 303 in the control execution time (10 minutes) are 0 kWh.

また、本具体例の前提として、太陽光発電装置304が第2の蓄電装置303を備える需要家設備300に備えられている。そして、制御実施時間(10分間)において、第2の蓄電装置303に対応する太陽光発電装置304の発電電力量は1kWhである。   Moreover, as a premise of this specific example, the solar power generation device 304 is provided in the customer facility 300 including the second power storage device 303. And in control implementation time (10 minutes), the electric power generation amount of the solar power generation device 304 corresponding to the 2nd electrical storage apparatus 303 is 1 kWh.

また、本具体例の前提として、電圧取得部206は、第1の蓄電装置303に対応する受電点の電圧値として105Vを取得し、第2の蓄電装置303に対応する受電点の電圧値として104Vを取得する。電圧上限値は107Vである。したがって、式(11)において、V=2V、V=3Vと定められる。また、前提として、式(11)における感度係数αは、α11=0.0001、α12=0.0001、α21=0.0001、α22=0.0002である。 As a premise of this specific example, the voltage acquisition unit 206 acquires 105 V as the voltage value of the power receiving point corresponding to the first power storage device 303 and as the voltage value of the power receiving point corresponding to the second power storage device 303. 104V is acquired. The upper voltage limit is 107V. Therefore, in the formula (11), V 1 = 2V and V 2 = 3V are determined. As a premise, the sensitivity coefficient α in the equation (11) is α 11 = 0.0001, α 12 = 0.0001, α 21 = 0.0001, α 22 = 0.0002.

上記の前提において、式(1)から、第1の蓄電装置303および第2の蓄電装置303のインバータ出力可能量は、それぞれ、10kWhおよび5kWhと算出される。また、式(3)から、実績受電電力量の総和は、3kWhと算出される。また、式(4)から、予測受電電力量の総和は、6kWhと算出される。また、予測発電電力量は、式(4)と同様の方式で算出される場合(式(4)に限定されるものではない)、2kWhと算出される。   Based on the above assumption, the inverter output possible amounts of the first power storage device 303 and the second power storage device 303 are calculated as 10 kWh and 5 kWh, respectively, from Expression (1). Further, the total sum of the actual received power amounts is calculated as 3 kWh from Equation (3). Moreover, the sum total of predicted received electric energy is calculated as 6 kWh from Formula (4). In addition, the predicted amount of generated power is calculated as 2 kWh when calculated in the same manner as in equation (4) (not limited to equation (4)).

したがって、式(8)より、目標受電電力量である4kWhに対し、制御総量は2kWhと算出される。   Therefore, the total control amount is calculated as 2 kWh with respect to 4 kWh, which is the target received power amount, from Equation (8).

次に、第1の蓄電装置303に関して、式(9)において、インバータ出力可能量は10kWh、消費電力量は1kWh、発電電力量は0kWh、放電可能な残容量は6.67kWh(=40kWh×(10分÷1h)×放電レート1C)である。したがって、式(9)より、第1の蓄電装置303の第3の閾値は1kWhと算出される。   Next, with respect to the first power storage device 303, in Expression (9), the inverter output possible amount is 10 kWh, the power consumption amount is 1 kWh, the generated power amount is 0 kWh, and the dischargeable remaining capacity is 6.67 kWh (= 40 kWh × ( 10 minutes ÷ 1h) × discharge rate 1C). Therefore, from Equation (9), the third threshold value of the first power storage device 303 is calculated as 1 kWh.

一方、第2の蓄電装置303に関して、式(9)において、インバータ出力可能量は5kWh、消費電力量は2kWh、発電電力量は1kWh、残容量は3.33kWh(=20kWh×(10分÷1h)×放電レート1C)である。したがって、式(9)より、第2の蓄電装置303の第3の閾値は1kWhと算出される。   On the other hand, with respect to the second power storage device 303, in Expression (9), the inverter output possible amount is 5 kWh, the power consumption amount is 2 kWh, the generated power amount is 1 kWh, and the remaining capacity is 3.33 kWh (= 20 kWh × (10 minutes ÷ 1h). ) × discharge rate 1C). Therefore, from Equation (9), the third threshold value of the second power storage device 303 is calculated as 1 kWh.

また、式(11)より、P=1.667kWh、P=1.667kWhと算出される。式(12)より、第1の蓄電装置303における第4の閾値は1kWhと算出され、同様に、第2の蓄電装置303における第4の閾値は1kWhと算出される。 Further, P 1 = 1.667 kWh and P 2 = 1.667 kWh are calculated from Equation (11). From Expression (12), the fourth threshold value in the first power storage device 303 is calculated as 1 kWh, and similarly, the fourth threshold value in the second power storage device 303 is calculated as 1 kWh.

次に、式(13)より、第1の蓄電装置303の蓄電装置配分指令値は、1kWhと算出され、第2の蓄電装置303の蓄電装置配分指令値は、1kWhと算出される。   Next, from Equation (13), the power storage device distribution command value of the first power storage device 303 is calculated as 1 kWh, and the power storage device distribution command value of the second power storage device 303 is calculated as 1 kWh.

なお、電力制御装置200は、電圧変動に応じて、制御周期を決定するようにしてもよい。例えば、電圧取得部206が取得した電圧値の変動が大きい場合や、電圧取得部206が取得した電圧が電圧の上限値に近い場合は、電力制御装置200は、制御周期を短くするようにしてもよい。一方、電力制御装置200は、電圧取得部206が取得した電圧が電圧の下限値に近い場合は制御周期を長くするようにしてもよい。   Note that the power control apparatus 200 may determine the control cycle according to the voltage fluctuation. For example, when the fluctuation of the voltage value acquired by the voltage acquisition unit 206 is large, or when the voltage acquired by the voltage acquisition unit 206 is close to the upper limit value of the voltage, the power control device 200 shortens the control cycle. Also good. On the other hand, the power control apparatus 200 may extend the control cycle when the voltage acquired by the voltage acquisition unit 206 is close to the lower limit value of the voltage.

(実施の形態4)
本実施の形態では、需要家の施設における複数の蓄電装置および制御可能負荷を制御する電力制御装置について説明する。なお、既に説明した実施の形態1〜3と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。
(Embodiment 4)
In this embodiment, a power control device that controls a plurality of power storage devices and controllable loads in a customer's facility will be described. In addition, about the component similar to Embodiment 1-3 already demonstrated, the same code | symbol may be attached | subjected and detailed description may be abbreviate | omitted.

図11は、本実施の形態における需要家設備の構成を示すブロック図である。図11に示されるように、需要家設備300は、負荷302と、複数の蓄電装置303と、需要家設備制御装置301と、電力制御装置200とを備える。   FIG. 11 is a block diagram showing the configuration of customer equipment in the present embodiment. As shown in FIG. 11, the customer facility 300 includes a load 302, a plurality of power storage devices 303, a customer facility control device 301, and a power control device 200.

すなわち、実施の形態1〜3では、複数の需要家設備300のそれぞれが蓄電装置303を備えているが、本実施の形態では、1つの需要家設備300が複数の蓄電装置303を備える。また、本実施の形態では、需要家設備300が電力制御装置200を備える。本実施の形態における構成要素の配置は、実施の形態1〜3とは異なるが、各構成要素の具体的な動作は、実施の形態1〜3と同様である。   That is, in the first to third embodiments, each of the plurality of customer facilities 300 includes the power storage device 303, but in this embodiment, one customer facility 300 includes the plurality of power storage devices 303. In the present embodiment, the customer facility 300 includes the power control device 200. Although the arrangement of the components in the present embodiment is different from those in the first to third embodiments, the specific operation of each component is the same as in the first to third embodiments.

例えば、需要家設備制御装置301は、蓄電装置303から受信した放電電力量、残容量およびインバータ定格と、センサまたはメータ(いずれも図示せず)から取得した負荷302の消費電力量とを電力制御装置200に送信する。   For example, the customer facility control device 301 performs power control on the discharge power amount, the remaining capacity and the inverter rating received from the power storage device 303 and the power consumption amount of the load 302 acquired from a sensor or meter (none of which is shown). To device 200.

電力制御装置200は、受信した放電電力量と、残容量と、インバータ定格と、消費電力量とから、複数の蓄電装置303の蓄電装置配分指令値、および、制御可能負荷302aの負荷配分指令値を算出し、需要家設備制御装置301に送信する。   The power control device 200 determines the power storage device distribution command value of the plurality of power storage devices 303 and the load distribution command value of the controllable load 302a from the received discharge power amount, remaining capacity, inverter rating, and power consumption amount. Is calculated and transmitted to the customer equipment control device 301.

需要家設備制御装置301は、受信した蓄電装置配分指令値および負荷配分指令値を、複数の蓄電装置303および制御可能負荷302aに送信する。   The customer facility control device 301 transmits the received power storage device distribution command value and load distribution command value to the plurality of power storage devices 303 and the controllable load 302a.

本実施の形態では、複数の蓄電装置303が、同じ負荷302に対応付けられる。すなわち、各蓄電装置303の放電電力量は、同じ負荷302の消費電力量に基づく閾値で制限される。したがって、閾値に消費電力量が用いられない場合に比べて、制御精度の悪化は抑制される。   In the present embodiment, a plurality of power storage devices 303 are associated with the same load 302. That is, the amount of power discharged from each power storage device 303 is limited by a threshold value based on the amount of power consumed by the same load 302. Therefore, the deterioration of the control accuracy is suppressed as compared with the case where the power consumption is not used for the threshold value.

しかし、全体の放電電力量が負荷302の消費電力量を超える可能性がある。そのため、負荷302の消費電力量は、複数の蓄電装置303に配分されて閾値として利用されてもよい。例えば、消費電力量は、複数の蓄電装置303に等分されて閾値として利用されてもよい。これにより、さらに、制御精度の悪化が抑制される。   However, there is a possibility that the total discharge power amount exceeds the power consumption amount of the load 302. Therefore, the power consumption amount of the load 302 may be distributed to a plurality of power storage devices 303 and used as a threshold value. For example, the power consumption amount may be equally divided into a plurality of power storage devices 303 and used as a threshold value. Thereby, the deterioration of control accuracy is further suppressed.

(実施の形態5)
本実施の形態では、需要家の施設における複数の蓄電装置および制御可能負荷を制御する電力制御装置について説明する。なお、既に説明した実施の形態1〜4と同様の構成要素については、同様の符号を付し、詳細な説明を省略する場合がある。
(Embodiment 5)
In this embodiment, a power control device that controls a plurality of power storage devices and controllable loads in a customer's facility will be described. In addition, about the component similar to Embodiment 1-4 already demonstrated, the same code | symbol may be attached | subjected and detailed description may be abbreviate | omitted.

図12は、本実施の形態における需要家設備の構成を示すブロック図である。図12に示されるように、需要家設備300は、負荷302と、複数の蓄電装置303と、電力制御装置200とを備える。   FIG. 12 is a block diagram showing the configuration of customer equipment in the present embodiment. As shown in FIG. 12, the customer facility 300 includes a load 302, a plurality of power storage devices 303, and a power control device 200.

電力制御装置200は、実施の形態4に示された電力制御装置200および需要家設備制御装置301の両方の役割を果たす。例えば、電力制御装置200は、蓄電装置303から放電電力量と残容量とインバータ定格とを取得し、センサまたはメータ(いずれも図示せず)から負荷302の消費電力量を取得する。   The power control apparatus 200 serves as both the power control apparatus 200 and the customer facility control apparatus 301 shown in the fourth embodiment. For example, the power control device 200 acquires the amount of discharged power, the remaining capacity, and the inverter rating from the power storage device 303, and acquires the amount of power consumed by the load 302 from a sensor or meter (none of which is shown).

そして、電力制御装置200は、取得した放電電力量と残容量とインバータ定格と消費電力量とから、複数の蓄電装置303に対する複数の蓄電装置配分指令値、および、制御可能負荷302aに対する負荷配分指令値を算出する。そして、電力制御装置200は、複数の蓄電装置配分指令値および負荷配分指令値を複数の蓄電装置303および制御可能負荷302aに送信する。   Then, the power control device 200 determines the plurality of power storage device distribution command values for the plurality of power storage devices 303 and the load distribution command for the controllable load 302a from the acquired discharge power amount, remaining capacity, inverter rating, and power consumption amount. Calculate the value. Then, power control device 200 transmits the plurality of power storage device distribution command values and the load distribution command value to the plurality of power storage devices 303 and controllable load 302a.

本実施の形態では、電力制御装置200が需要家設備制御装置301の役割を果たすことにより、需要家設備300における装置の数が減少する。そして、構成が簡素化され、設置スペースが削減される。   In the present embodiment, the power control device 200 plays the role of the customer facility control device 301, thereby reducing the number of devices in the customer facility 300. And a structure is simplified and an installation space is reduced.

(まとめ、および、補足)
上記の複数の実施の形態に示された電力制御装置200は、複数の蓄電装置303のそれぞれから所定時間あたりに出力される電力量を制御する。所定時間は、例えば、制御周期である。所定時間は、その他の期間でもよい。また、例えば、電力制御装置200は、蓄電装置情報取得部201と、負荷情報取得部202と、制御総量算出部203と、配分指令値算出部204とを備える。
(Summary and supplement)
The power control devices 200 shown in the plurality of embodiments described above control the amount of power output from each of the plurality of power storage devices 303 per predetermined time. The predetermined time is, for example, a control cycle. The predetermined time may be another period. For example, the power control apparatus 200 includes a power storage device information acquisition unit 201, a load information acquisition unit 202, a total control amount calculation unit 203, and a distribution command value calculation unit 204.

蓄電装置情報取得部201は、複数の蓄電装置303のそれぞれについて、蓄電装置303の残容量、および、蓄電装置303の所定時間あたりの定格出力容量を取得する。   The power storage device information acquisition unit 201 acquires the remaining capacity of the power storage device 303 and the rated output capacity per predetermined time of the power storage device 303 for each of the plurality of power storage devices 303.

ここで、残容量は、所定時間あたりに放電可能な残容量でもよい。定格出力容量は、例えば、上記の複数の実施の形態に示されたインバータ出力可能量である。   Here, the remaining capacity may be a remaining capacity that can be discharged per predetermined time. The rated output capacity is, for example, the inverter output possible amount shown in the plurality of embodiments.

また、蓄電装置303の所定時間あたりの定格出力容量は、所定時間あたりの蓄電池の放電可能容量が反映されてもよい。すなわち、蓄電池の放電レートと所定時間とで算出される放電可能容量は、上記の残容量に反映されてもよいし、上記の定格出力容量に反映されてもよい。   Further, the rated output capacity per predetermined time of the power storage device 303 may reflect the dischargeable capacity of the storage battery per predetermined time. That is, the dischargeable capacity calculated from the discharge rate of the storage battery and the predetermined time may be reflected in the remaining capacity or the rated output capacity.

負荷情報取得部202は、複数の蓄電装置303のそれぞれについて、蓄電装置303に対応する1以上の負荷302の所定時間あたりの消費電力量を取得する。蓄電装置303に対応する1以上の負荷302は、蓄電装置303および電力系統から供給される電力を利用可能な1以上の負荷302である。例えば、蓄電装置303に対応する1以上の負荷302は、蓄電装置303と同じ施設に設置された1以上の負荷302である。   The load information acquisition unit 202 acquires the power consumption per predetermined time of one or more loads 302 corresponding to the power storage device 303 for each of the plurality of power storage devices 303. The one or more loads 302 corresponding to the power storage device 303 are one or more loads 302 that can use the power supplied from the power storage device 303 and the power system. For example, the one or more loads 302 corresponding to the power storage device 303 are one or more loads 302 installed in the same facility as the power storage device 303.

負荷情報取得部202は、別の単位時間の消費電力量から所定時間あたりの消費電力量を算出することにより、所定時間あたりの消費電力量を取得してもよい。   The load information acquisition unit 202 may acquire the power consumption per predetermined time by calculating the power consumption per predetermined time from the power consumption of another unit time.

制御総量算出部203は、電力系統から供給される電力の所定の目標電力量に従って、複数の蓄電装置303から出力される総電力量に対応する制御総量を算出する。例えば、目標電力量は、電力系統の目標供給電力量に対応し、目標受電電力量に対応する。また、例えば、制御総量は、実績受電電力量の総和に予測受電電力量の総和を加え、目標受電電力量を引くことにより得られる。また、例えば、制御総量は、予測受電電力量の総和と目標受電電力量との差でもよい。   Total control amount calculation unit 203 calculates a total control amount corresponding to the total power amount output from the plurality of power storage devices 303 according to a predetermined target power amount of power supplied from the power system. For example, the target power amount corresponds to the target power supply amount of the power system and corresponds to the target received power amount. Further, for example, the total control amount can be obtained by adding the sum of the predicted received power amount to the sum of the actual received power amount and subtracting the target received power amount. Further, for example, the total control amount may be a difference between the total predicted received power amount and the target received power amount.

予測受電電力量の総和は、複数の蓄電装置303のそれぞれについて取得された消費電力量等から算出される。例えば、予測受電電力量の総和は、複数の蓄電装置303に対応する全ての負荷302の総消費電力量でもよい。制御総量および目標受電電力量は、所定時間に対応する電力量でもよいし、その他の時間に対応する電力量でもよい。   The sum total of the predicted received power amounts is calculated from the power consumption amounts acquired for each of the plurality of power storage devices 303. For example, the total sum of predicted received power amounts may be the total power consumption amount of all loads 302 corresponding to the plurality of power storage devices 303. The total control amount and the target received power amount may be a power amount corresponding to a predetermined time or may be a power amount corresponding to another time.

配分指令値算出部204は、複数の蓄電装置303のそれぞれについて蓄電装置303に対する配分量を示す蓄電装置配分指令値を算出することにより、制御総量を複数の蓄電装置303に配分する。ここで、蓄電装置303に対する配分量は、制御総量のうち蓄電装置303に配分される電力量であり、蓄電装置303に出力させる電力量である。   The distribution command value calculation unit 204 distributes the total control amount to the plurality of power storage devices 303 by calculating the power storage device distribution command value indicating the distribution amount for the power storage devices 303 for each of the plurality of power storage devices 303. Here, the amount of distribution to the power storage device 303 is the amount of power distributed to the power storage device 303 out of the total control amount, and is the amount of power to be output to the power storage device 303.

また、配分指令値算出部204は、蓄電装置配分指令値の算出において、複数の蓄電装置303のそれぞれについて、残容量と定格出力容量と消費電力量とのうちの最小値を閾値として算出する。そして、配分指令値算出部204は、閾値以下の電力量を配分量として示す蓄電装置配分指令値を算出する。   In addition, in the calculation of the power storage device distribution command value, the distribution command value calculation unit 204 calculates, for each of the plurality of power storage devices 303, the minimum value among the remaining capacity, the rated output capacity, and the power consumption amount as a threshold value. Then, distribution command value calculation unit 204 calculates a power storage device distribution command value indicating the amount of power that is equal to or less than the threshold value as the distribution amount.

これにより、複数の蓄電装置303のそれぞれについて、蓄電装置303の残容量のみでなく、蓄電装置303の定格出力容量、および、蓄電装置303に対応する負荷302の消費電力量に基づいて、適切な指令値が算出される。そして、複数の蓄電装置303のそれぞれは、適切な指令値に基づいて、放電を行うことができる。よって、電力制御装置200は、複数の蓄電装置303のそれぞれが出力する電力量を適切に制御することができる。   As a result, for each of the plurality of power storage devices 303, an appropriate value is determined based on not only the remaining capacity of the power storage device 303 but also the rated output capacity of the power storage device 303 and the power consumption of the load 302 corresponding to the power storage device 303. A command value is calculated. Each of the plurality of power storage devices 303 can perform discharge based on an appropriate command value. Therefore, the power control device 200 can appropriately control the amount of power output from each of the plurality of power storage devices 303.

蓄電装置配分指令値の算出に用いられる制御総量および消費電力量は、制御可能負荷302aの消費電力の変更量等に基づいて調整されてもよい。例えば、複数の蓄電装置303に含まれる蓄電装置303に対応する1以上の負荷302に、消費電力の削減が可能な負荷302である制御可能負荷302aが含まれている場合がある。   The total control amount and the power consumption amount used for calculating the power storage device distribution command value may be adjusted based on a change amount of the power consumption of the controllable load 302a. For example, one or more loads 302 corresponding to the power storage devices 303 included in the plurality of power storage devices 303 may include a controllable load 302a that is a load 302 that can reduce power consumption.

この場合、配分指令値算出部204は、制御可能負荷302aの消費電力の変更量を示す負荷配分指令値を算出してもよい。そして、配分指令値算出部204は、その蓄電装置303について、取得された消費電力量に変更量を反映し、残容量と、定格出力容量と、変更量が反映された消費電力量とのうちの最小値を閾値として算出してもよい。また、配分指令値算出部204は、制御総量に変更量を反映し、変更量が反映された制御総量を閾値(閾値によって規定される範囲)に従って複数の蓄電装置303に配分してもよい。   In this case, the distribution command value calculation unit 204 may calculate a load distribution command value indicating the amount of change in power consumption of the controllable load 302a. Then, the distribution command value calculation unit 204 reflects the change amount in the acquired power consumption amount for the power storage device 303, and among the remaining capacity, the rated output capacity, and the power consumption amount in which the change amount is reflected. May be calculated as the threshold value. Further, the distribution command value calculation unit 204 may reflect the change amount in the total control amount, and distribute the control total amount in which the change amount is reflected to the plurality of power storage devices 303 according to a threshold value (a range defined by the threshold value).

これにより、1以上の負荷302の消費電力量が削減され、削減された消費電力量に従って、適切な指令値が算出される。例えば、エアコンまたはヒートポンプ給湯器等のような制御可能負荷302aの消費電力が制御されることで、蓄電装置303の放電量および使用回数が減少し、蓄電装置303のサイクル劣化が抑制される。   Thereby, the power consumption of one or more loads 302 is reduced, and an appropriate command value is calculated according to the reduced power consumption. For example, by controlling the power consumption of the controllable load 302a such as an air conditioner or a heat pump water heater, the amount of discharge and the number of uses of the power storage device 303 are reduced, and cycle deterioration of the power storage device 303 is suppressed.

また、例えば、配分指令値算出部204は、閾値が大きいほど大きい配分量を示す蓄電装置配分指令値を算出してもよい。これにより、電力制御装置200は、閾値に比例する蓄電装置配分指令値を算出することができる。したがって、電力制御装置200は、複数の蓄電装置303に対して、負担を適切に分散することができる。   For example, the distribution command value calculation unit 204 may calculate a power storage device distribution command value that indicates a larger distribution amount as the threshold value is larger. Thereby, power control device 200 can calculate a power storage device distribution command value proportional to the threshold value. Therefore, power control device 200 can appropriately distribute the burden to a plurality of power storage devices 303.

また、例えば、配分指令値算出部204は、複数の蓄電装置303の残容量の分散を小さくする蓄電装置配分指令値を算出してもよい。これにより、電力制御装置200は、複数の蓄電装置303の残容量をそれらの平均に近づけることができる。したがって、電力制御装置200は、過充電および過放電を抑制することができる。   Further, for example, the distribution command value calculation unit 204 may calculate a power storage device distribution command value that reduces the dispersion of the remaining capacity of the plurality of power storage devices 303. Thereby, the power control device 200 can bring the remaining capacities of the plurality of power storage devices 303 close to their average. Therefore, the power control apparatus 200 can suppress overcharge and overdischarge.

また、例えば、配分指令値算出部204は、閾値が下限よりも小さい場合、配分量として0を示す蓄電装置配分指令値を算出してもよい。これにより、電力制御装置200は、効率の低い放電を抑制し、蓄電装置303の劣化を抑制することができる。また、電力制御装置200は、蓄電装置303の制御のための処理量を削減することができる。   For example, the distribution command value calculation unit 204 may calculate a power storage device distribution command value indicating 0 as the distribution amount when the threshold value is smaller than the lower limit. Thereby, power control device 200 can suppress low-efficiency discharge and suppress deterioration of power storage device 303. In addition, the power control device 200 can reduce the amount of processing for controlling the power storage device 303.

また、例えば、配分指令値算出部204は、複数の蓄電装置303のそれぞれについて、蓄電装置303の放電量の最小分解能以上の分解能で配分量を示す蓄電装置配分指令値を算出してもよい。ここで、蓄電装置303の放電量の最小分解能は、蓄電装置303に対して予め定められた最小分解能であって、蓄電装置303の放電量の階調に対応する。   For example, the distribution command value calculation unit 204 may calculate a power storage device distribution command value indicating the distribution amount with a resolution equal to or higher than the minimum resolution of the discharge amount of the power storage device 303 for each of the plurality of power storage devices 303. Here, the minimum resolution of the discharge amount of the power storage device 303 is a minimum resolution predetermined for the power storage device 303 and corresponds to the gradation of the discharge amount of the power storage device 303.

これにより、電力制御装置200は、適切な蓄電装置配分指令値を算出することができる。例えば、電力制御装置200は、最小分解能よりも細かい端数の電力量を他の蓄電装置303に配分することで、制御精度を向上させることができる。   Thereby, power control device 200 can calculate an appropriate power storage device distribution command value. For example, the power control device 200 can improve control accuracy by allocating a fractional amount of power smaller than the minimum resolution to the other power storage devices 303.

また、例えば、電力制御装置200は、さらに、太陽光発電装置304の所定時間あたりの電力供給量を取得する太陽光発電情報取得部205を備えてもよい。ここで、太陽光発電装置304は、複数の蓄電装置303に含まれる蓄電装置303に対応する1以上の負荷302に電力を供給する装置である。   Further, for example, the power control device 200 may further include a solar power generation information acquisition unit 205 that acquires the power supply amount per predetermined time of the solar power generation device 304. Here, the solar power generation device 304 is a device that supplies power to one or more loads 302 corresponding to the power storage devices 303 included in the plurality of power storage devices 303.

そして、太陽光発電装置304の電力供給量が1以上の負荷302の所定時間あたりの消費電力量よりも小さい場合、配分指令値算出部204は、その蓄電装置303について、消費電力量から電力供給量を除外してもよい。すなわち、配分指令値算出部204は、その蓄電装置303に対する閾値の算出において、消費電力量から電力供給量を除外してもよい。そして、配分指令値算出部204は、残容量と、定格出力容量と、電力供給量が除外された消費電力量とのうちの最小値を閾値として算出してもよい。   When the power supply amount of the solar power generation device 304 is smaller than the power consumption amount per predetermined time of the load 302 of 1 or more, the distribution command value calculation unit 204 supplies power from the power consumption amount for the power storage device 303. The amount may be excluded. That is, the distribution command value calculation unit 204 may exclude the power supply amount from the power consumption amount when calculating the threshold value for the power storage device 303. Then, the distribution command value calculation unit 204 may calculate the minimum value among the remaining capacity, the rated output capacity, and the power consumption amount excluding the power supply amount as a threshold value.

これにより、太陽光発電装置304が設置されている場合でも、電力制御装置200は、太陽光発電装置304の電力供給量に従って、適切な蓄電装置配分指令値を算出することができる。   Thereby, even when the solar power generation device 304 is installed, the power control device 200 can calculate an appropriate power storage device distribution command value according to the power supply amount of the solar power generation device 304.

また、例えば、配分指令値算出部204は、太陽光発電装置304の所定時間あたりの電力供給量が0よりも大きい場合、蓄電装置303の配分量として0を示す蓄電装置配分指令値を算出してもよい。これにより、太陽光発電装置304が設置されている場合でも、電力制御装置200は、太陽光発電装置304が実際に電力を供給しているか否かに従って、適切な蓄電装置指令値を算出することができる。   For example, the distribution command value calculation unit 204 calculates a power storage device distribution command value indicating 0 as the distribution amount of the power storage device 303 when the power supply amount per predetermined time of the solar power generation device 304 is larger than 0. May be. Thereby, even when the solar power generation device 304 is installed, the power control device 200 calculates an appropriate power storage device command value according to whether or not the solar power generation device 304 actually supplies power. Can do.

また、例えば、電力制御装置200は、さらに、複数の蓄電装置303のそれぞれについて、蓄電装置303に対応する受電点の電圧を取得する電圧取得部206を備えてもよい。蓄電装置303に対応する受電点は、蓄電装置303と1以上の負荷302とを含む設備300に電力系統から供給される電力の受電点である。そして、配分指令値算出部204は、複数の蓄電装置303のそれぞれについて、電圧が上限電圧以上である場合、配分量として0を示す蓄電装置配分指令値を算出してもよい。   In addition, for example, the power control apparatus 200 may further include a voltage acquisition unit 206 that acquires the voltage of the power receiving point corresponding to the power storage device 303 for each of the plurality of power storage devices 303. The power receiving point corresponding to the power storage device 303 is a power receiving point of power supplied from the power system to the facility 300 including the power storage device 303 and one or more loads 302. Then, distribution command value calculation unit 204 may calculate a power storage device distribution command value indicating 0 as the distribution amount when the voltage is equal to or higher than the upper limit voltage for each of the plurality of power storage devices 303.

これにより、電力制御装置200は、電圧が上限電圧以上である場合、蓄電装置303の出力を制限し、電圧の異常を抑制することができる。   Thereby, when the voltage is equal to or higher than the upper limit voltage, power control device 200 can limit the output of power storage device 303 and suppress voltage abnormality.

また、例えば、電力制御装置200は、さらに、複数の蓄電装置303のそれぞれについて、蓄電装置303に対応する受電点の電圧を取得することにより、複数の蓄電装置303に対応する複数の電圧を取得する電圧取得部206を備えてもよい。   In addition, for example, the power control device 200 further acquires a plurality of voltages corresponding to the plurality of power storage devices 303 by acquiring a voltage at a power receiving point corresponding to the power storage device 303 for each of the plurality of power storage devices 303. The voltage acquisition unit 206 may be provided.

そして、配分指令値算出部204は、複数の蓄電装置303のそれぞれについて、複数の電圧、複数の電圧に対する上限電圧、および、所定の関係から放電可能量を算出してもよい。そして、放電可能量が閾値よりも小さい場合、配分指令値算出部204は、閾値を放電可能量に変更して、変更された閾値以下の電力量を配分量として示す蓄電装置配分指令値を算出してもよい。   Then, distribution command value calculation unit 204 may calculate the dischargeable amount for each of the plurality of power storage devices 303 from a plurality of voltages, an upper limit voltage for the plurality of voltages, and a predetermined relationship. When the dischargeable amount is smaller than the threshold value, the distribution command value calculation unit 204 changes the threshold value to the dischargeable amount, and calculates a power storage device distribution command value indicating the power amount equal to or less than the changed threshold value as the distribution amount. May be.

所定の関係は、複数の蓄電装置303のそれぞれの放電の変動量と複数の電圧のそれぞれの変動量との間の関係であり、例えば、上記の実施の形態3に示された感度係数、または、感度係数の行列に対応する。   The predetermined relationship is a relationship between a variation amount of each discharge of the plurality of power storage devices 303 and a variation amount of each of the plurality of voltages. For example, the sensitivity coefficient indicated in the above-described third embodiment, or Corresponds to a matrix of sensitivity coefficients.

これにより、電力制御装置200は、電圧が上限電圧を超えないように、閾値を調整し、適切な蓄電装置配分指令値を算出することができる。   Thereby, power control device 200 can adjust the threshold value so that the voltage does not exceed the upper limit voltage, and calculate an appropriate power storage device distribution command value.

また、例えば、負荷情報取得部202は、複数の蓄電装置303のそれぞれについて、蓄電装置303に対応する1以上の負荷302の所定時間あたりの消費電力量を予測してもよい。そして、負荷情報取得部202は、予測された消費電力量を1以上の負荷302の所定時間あたりの消費電力量として取得してもよい。   For example, the load information acquisition unit 202 may predict the power consumption amount per predetermined time of one or more loads 302 corresponding to the power storage device 303 for each of the plurality of power storage devices 303. Then, the load information acquisition unit 202 may acquire the predicted power consumption as the power consumption per predetermined time for one or more loads 302.

これにより、電力制御装置200は、消費電力量の予測に従って、適切な閾値を算出することができる。したがって、これにより、電力制御装置200は、適切な蓄電装置配分指令値を算出することができる。   Thereby, the power control apparatus 200 can calculate an appropriate threshold according to the prediction of the power consumption. Therefore, power control device 200 can thereby calculate an appropriate power storage device distribution command value.

また、例えば、配分指令値算出部204は、複数の蓄電装置303のそれぞれに対して、配分指令値算出部204で算出された蓄電装置配分指令値を通知してもよい。これにより、電力制御装置200は、複数の蓄電装置303のそれぞれに対して、蓄電装置配分指令値を適切に通知することができる。   For example, the distribution command value calculation unit 204 may notify each of the plurality of power storage devices 303 of the power storage device distribution command value calculated by the distribution command value calculation unit 204. Thereby, power control device 200 can appropriately notify each of the plurality of power storage devices 303 of the power storage device distribution command value.

また、例えば、配分指令値算出部204は、需要家設備制御装置301を介して、複数の蓄電装置303のそれぞれに対して、蓄電装置配分指令値を通知してもよい。また、例えば、配分指令値算出部204は、制御可能負荷302aに対して、配分指令値算出部204で算出された負荷配分指令値を通知してもよい。蓄電装置配分指令値と同様に、配分指令値算出部204は、需要家設備制御装置301を介して、制御可能負荷302aに対して、負荷配分指令値を通知してもよい。   For example, the distribution command value calculation unit 204 may notify each of the plurality of power storage devices 303 of the power storage device distribution command value via the customer facility control device 301. For example, the distribution command value calculation unit 204 may notify the controllable load 302a of the load distribution command value calculated by the distribution command value calculation unit 204. Similar to the power storage device distribution command value, the distribution command value calculation unit 204 may notify the controllable load 302a of the load distribution command value via the customer facility control device 301.

なお、上記実施の形態では、蓄電装置303を中心に説明したが、電力制御装置200は、蓄電装置303の代わりに、同様に逆潮流できない可能性がある発電機を制御することも可能である。ここで、発電機とは、燃料電池またはガスエンジン等である。例えば、電力制御装置200は、式(1)〜式(4)および式(7)をそのまま用い、式(5)および式(6)の代わりに、以下の式(14)および式(15)を用いることで、配分指令値を算出する(以下、発電機への配分指令値を発電機指令値と呼ぶ場合がある)。   Although the power storage device 303 has been mainly described in the above embodiment, the power control device 200 can also control a generator that may not be able to reversely flow similarly to the power storage device 303. . Here, the generator is a fuel cell or a gas engine. For example, the power control apparatus 200 uses the expressions (1) to (4) and (7) as they are, and replaces the expressions (5) and (6) with the following expressions (14) and (15). Is used to calculate the distribution command value (hereinafter, the distribution command value to the generator may be referred to as the generator command value).

第1の閾値=min(インバータ出力可能量,消費電力量)・・・式(14)
第2の閾値=min(インバータ出力可能量,消費電力量+負荷配分指令値)・・・式(15)
First threshold i = min (inverter output possible amount i , power consumption i ) Equation (14)
Second threshold value i = min (inverter output possible amount i , power consumption amount i + load distribution command value i ) (15)

なお、式(14)および式(15)はインバータによる連系を行っている発電機に関する式である。交流発電機による連系が行われている場合、別の式が用いられる。例えば、インバータ出力可能量の代わりに、交流発電機の出力可能量が用いられてもよい。   In addition, Formula (14) and Formula (15) are formulas regarding the generator that performs interconnection by the inverter. When interconnection by an AC generator is performed, another formula is used. For example, the output possible amount of an AC generator may be used instead of the inverter output possible amount.

また、上記の複数の実施の形態において、各構成要素は、専用のハードウェアで構成されるか、各構成要素に適したソフトウェアプログラムを実行することによって実現されてもよい。各構成要素は、CPUまたはプロセッサなどのプログラム実行部が、ハードディスクまたは半導体メモリなどの記録媒体に記録されたソフトウェアプログラムを読み出して実行することによって実現されてもよい。ここで、上記実施の形態の電力制御装置200などを実現するソフトウェアは、次のようなプログラムである。   In the above-described plurality of embodiments, each component may be configured by dedicated hardware or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a CPU or a processor reading and executing a software program recorded on a recording medium such as a hard disk or a semiconductor memory. Here, the software that realizes the power control apparatus 200 and the like of the above embodiment is the following program.

すなわち、このプログラムは、コンピュータに、複数の蓄電装置のそれぞれから所定時間あたりに出力される電力量を制御するための電力制御方法であって、前記複数の蓄電装置のそれぞれについて、当該蓄電装置の残容量、および、当該蓄電装置の前記所定時間あたりの定格出力容量を取得する蓄電装置情報取得ステップと、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と電力系統とから供給される電力を利用可能な1以上の負荷の前記所定時間あたりの消費電力量を取得する負荷情報取得ステップと、前記電力系統から供給される電力に対する所定の目標電力量に従って、前記複数の蓄電装置から出力される総電力量に対応する制御総量を算出する制御総量算出ステップと、前記複数の蓄電装置のそれぞれについて、前記制御総量のうち当該蓄電装置に配分される電力量であり当該蓄電装置に出力させる電力量である配分量を示す蓄電装置配分指令値を算出することによって、前記制御総量を前記複数の蓄電装置に配分する配分指令値算出ステップとを含み、前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記残容量と前記定格出力容量と前記消費電力量とのうちの最小値を閾値として算出し、前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する電力制御方法を実行させる。   In other words, this program is a power control method for controlling the amount of power output per predetermined time from each of a plurality of power storage devices to a computer, and for each of the plurality of power storage devices, A power storage device information acquisition step of acquiring a remaining capacity and a rated output capacity per predetermined time of the power storage device, and using power supplied from the power storage device and a power system for each of the plurality of power storage devices A load information acquisition step of acquiring the power consumption amount per predetermined time of one or more possible loads, and a total output output from the plurality of power storage devices according to a predetermined target power amount for the power supplied from the power system A total control amount calculating step for calculating a total control amount corresponding to the amount of electric power, and the control for each of the plurality of power storage devices The control total amount is distributed to the plurality of power storage devices by calculating a power storage device allocation command value indicating a distribution amount that is a power amount distributed to the power storage device and is output to the power storage device. A distribution command value calculation step, wherein the distribution command value calculation step calculates, as a threshold value, a minimum value among the remaining capacity, the rated output capacity, and the power consumption amount for each of the plurality of power storage devices. Then, a power control method for calculating the power storage device distribution command value indicating the amount of power equal to or less than the threshold as the distribution amount is executed.

また、電力制御装置200の各構成要素は、回路でもよい。これらの回路は、全体として1つの回路を構成してもよいし、それぞれ別々の回路でもよい。また、これらの回路は、それぞれ、汎用的な回路でもよいし、専用の回路でもよい。   Each component of the power control apparatus 200 may be a circuit. These circuits may constitute one circuit as a whole, or may be separate circuits. Each of these circuits may be a general-purpose circuit or a dedicated circuit.

以上、一つまたは複数の態様に係る電力制御装置200等について、実施の形態に基づいて説明したが、本開示は、この実施の形態に限定されるものではない。本開示の趣旨を逸脱しない限り、当業者が思いつく各種変形を本実施の形態に施したものや、異なる実施の形態における構成要素を組み合わせて構築される形態も、一つまたは複数の態様の範囲内に含まれてもよい。   As mentioned above, although the power control apparatus 200 etc. which concern on the one or some aspect were demonstrated based on embodiment, this indication is not limited to this embodiment. Unless it deviates from the gist of the present disclosure, various modifications conceived by those skilled in the art have been made in this embodiment, and forms constructed by combining components in different embodiments are also within the scope of one or more aspects. May be included.

例えば、上記実施の形態において、特定の構成要素が実行する処理を特定の構成要素の代わりに別の構成要素が実行してもよい。また、複数の処理の順序が変更されてもよいし、複数の処理が並行して実行されてもよい。   For example, in the above-described embodiment, a process executed by a specific component may be executed by another component instead of the specific component. Further, the order of the plurality of processes may be changed, and the plurality of processes may be executed in parallel.

本開示は、例えば、複数の蓄電装置を制御することにより、ネガワットサービスを提供する電力制御装置等に利用可能であり、電力制御システム、需要家設備制御システム、蓄電装置管理システム、または、負荷管理システム等に適用可能である。   The present disclosure can be used for, for example, a power control device that provides a negative watt service by controlling a plurality of power storage devices, and includes a power control system, a customer facility control system, a power storage device management system, or a load. It can be applied to management systems.

101 配電用変圧器
102 配電線
103 通信線
200 電力制御装置
201 蓄電装置情報取得部
202 負荷情報取得部
203 制御総量算出部
204 配分指令値算出部
205 太陽光発電情報取得部
206 電圧取得部
300 需要家設備(設備)
301 需要家設備制御装置
302 負荷
302a 制御可能負荷
302b 制御不可負荷
303 蓄電装置
304 太陽光発電装置(発電装置)
DESCRIPTION OF SYMBOLS 101 Distribution transformer 102 Distribution line 103 Communication line 200 Power control apparatus 201 Power storage apparatus information acquisition part 202 Load information acquisition part 203 Control total amount calculation part 204 Distribution command value calculation part 205 Solar power generation information acquisition part 206 Voltage acquisition part 300 Demand House facilities (equipment)
301 Customer Facility Control Device 302 Load 302a Controllable Load 302b Uncontrollable Load 303 Power Storage Device 304 Solar Power Generation Device (Power Generation Device)

た、電力および電力量は、それらの値を意味する場合がある。 Also, power and amount of power may refer to those values.

Claims (13)

複数の蓄電装置のそれぞれから所定時間あたりに出力される電力量を制御するための電力制御方法であって、
前記複数の蓄電装置のそれぞれについて、当該蓄電装置の残容量、および、当該蓄電装置の前記所定時間あたりの定格出力容量を取得する蓄電装置情報取得ステップと、
前記複数の蓄電装置のそれぞれについて、当該蓄電装置と電力系統とから供給される電力を利用可能な1以上の負荷の前記所定時間あたりの消費電力量を取得する負荷情報取得ステップと、
前記電力系統から供給される電力に対する所定の目標電力量に従って、前記複数の蓄電装置から出力される総電力量に対応する制御総量を算出する制御総量算出ステップと、
前記複数の蓄電装置のそれぞれについて、前記制御総量のうち当該蓄電装置に配分される電力量であり当該蓄電装置に出力させる電力量である配分量を示す蓄電装置配分指令値を算出することによって、前記制御総量を前記複数の蓄電装置に配分する配分指令値算出ステップとを含み、
前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、
前記残容量と前記定格出力容量と前記消費電力量とのうちの最小値を閾値として算出し、
前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する
電力制御方法。
A power control method for controlling the amount of power output per predetermined time from each of a plurality of power storage devices,
For each of the plurality of power storage devices, a remaining capacity of the power storage device and a power storage device information acquisition step of acquiring the rated output capacity per predetermined time of the power storage device;
For each of the plurality of power storage devices, a load information acquisition step of acquiring power consumption per predetermined time of one or more loads that can use power supplied from the power storage device and the power system;
A total control amount calculating step for calculating a total control amount corresponding to the total power amount output from the plurality of power storage devices according to a predetermined target power amount for the power supplied from the power system;
For each of the plurality of power storage devices, by calculating a power storage device distribution command value indicating a distribution amount that is the amount of power distributed to the power storage device in the total control amount and output to the power storage device, A distribution command value calculation step of distributing the total control amount to the plurality of power storage devices,
In the distribution command value calculation step, for each of the plurality of power storage devices,
Calculate the minimum value of the remaining capacity, the rated output capacity and the power consumption as a threshold,
A power control method for calculating the power storage device distribution command value indicating the amount of power equal to or less than the threshold as the distribution amount.
前記配分指令値算出ステップでは、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に、消費電力の変更が可能な負荷である制御可能負荷が含まれている場合、
前記制御可能負荷の消費電力の変更量を示す負荷配分指令値を算出し、
前記蓄電装置について、前記消費電力量に前記変更量を反映し、前記残容量と、前記定格出力容量と、前記変更量が反映された前記消費電力量とのうちの最小値を前記閾値として算出し、
前記制御総量に前記変更量を反映し、前記変更量が反映された前記制御総量を前記閾値に従って前記複数の蓄電装置に配分する
請求項1に記載の電力制御方法。
In the distribution command value calculation step, control is a load capable of changing power consumption to the one or more loads that can use power supplied from power storage devices included in the plurality of power storage devices and the power system. If possible load is included,
Calculate a load distribution command value indicating the amount of change in power consumption of the controllable load,
For the power storage device, the change amount is reflected in the power consumption amount, and the minimum value among the remaining capacity, the rated output capacity, and the power consumption amount in which the change amount is reflected is calculated as the threshold value. And
The power control method according to claim 1, wherein the change amount is reflected in the control total amount, and the control total amount in which the change amount is reflected is distributed to the plurality of power storage devices according to the threshold value.
前記配分指令値算出ステップでは、前記閾値が大きいほど大きい前記配分量を示す前記蓄電装置配分指令値を算出する
請求項1または2に記載の電力制御方法。
The power control method according to claim 1, wherein, in the distribution command value calculation step, the power storage device distribution command value indicating the distribution amount that is larger as the threshold value is larger is calculated.
前記配分指令値算出ステップでは、前記複数の蓄電装置の残容量の分散を小さくする前記蓄電装置配分指令値を算出する
請求項1または2に記載の電力制御方法。
The power control method according to claim 1, wherein, in the distribution command value calculation step, the power storage device distribution command value that reduces a dispersion of remaining capacity of the plurality of power storage devices is calculated.
前記配分指令値算出ステップでは、前記閾値が下限よりも小さい場合、前記配分量として0を示す前記蓄電装置配分指令値を算出する
請求項1または2に記載の電力制御方法。
The power control method according to claim 1 or 2, wherein, in the distribution command value calculation step, when the threshold value is smaller than a lower limit, the power storage device distribution command value indicating 0 as the distribution amount is calculated.
前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、当該蓄電装置の放電量の最小分解能以上の分解能で前記配分量を示す前記蓄電装置配分指令値を算出する
請求項1〜5のいずれか1項に記載の電力制御方法。
6. The power storage device distribution command value indicating the distribution amount is calculated with a resolution equal to or higher than a minimum resolution of a discharge amount of the power storage device for each of the plurality of power storage devices in the distribution command value calculation step. The power control method according to any one of claims.
前記電力制御方法は、さらに、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に電力を供給する太陽光発電装置の前記所定時間あたりの電力供給量を取得する太陽光発電情報取得ステップを含み、
前記配分指令値算出ステップでは、前記電力供給量が前記1以上の負荷の前記所定時間あたりの消費電力量よりも小さい場合、
前記蓄電装置について、前記消費電力量から前記電力供給量を除外し、前記残容量と、前記定格出力容量と、前記電力供給量が除外された前記消費電力量とのうちの最小値を前記閾値として算出する
請求項1〜6のいずれか1項に記載の電力制御方法。
The power control method further includes the predetermined time of the solar power generation device that supplies power to the one or more loads that can use power supplied from the power storage devices included in the plurality of power storage devices and the power system. Including a photovoltaic power generation information acquisition step for acquiring the power supply amount per unit,
In the distribution command value calculation step, when the power supply amount is smaller than the power consumption amount per predetermined time of the one or more loads,
For the power storage device, the power supply amount is excluded from the power consumption amount, and the minimum value among the remaining capacity, the rated output capacity, and the power consumption amount from which the power supply amount is excluded is the threshold value. The power control method according to any one of claims 1 to 6.
前記電力制御方法は、さらに、前記複数の蓄電装置に含まれる蓄電装置と前記電力系統とから供給される電力を利用可能な前記1以上の負荷に電力を供給する太陽光発電装置の前記所定時間あたりの電力供給量を取得する太陽光発電情報取得ステップを含み、
前記配分指令値算出ステップでは、前記電力供給量が0よりも大きい場合、前記蓄電装置の前記配分量として0を示す前記蓄電装置配分指令値を算出する
請求項1〜7のいずれか1項に記載の電力制御方法。
The power control method further includes the predetermined time of the solar power generation device that supplies power to the one or more loads that can use power supplied from the power storage devices included in the plurality of power storage devices and the power system. Including a photovoltaic power generation information acquisition step for acquiring the power supply amount per unit,
The power distribution device distribution command value indicating 0 as the distribution amount of the power storage device is calculated when the power supply amount is greater than 0 in the distribution command value calculation step. The power control method described.
前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と前記1以上の負荷とを含む設備に前記電力系統から供給される電力の受電点の電圧を取得する電圧取得ステップを含み、
前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、前記電圧が上限電圧以上である場合、前記配分量として0を示す前記蓄電装置配分指令値を算出する
請求項1〜8のいずれか1項に記載の電力制御方法。
The power control method further includes, for each of the plurality of power storage devices, a voltage acquisition step of acquiring a voltage at a power receiving point of power supplied from the power system to a facility including the power storage device and the one or more loads. Including
The distribution command value calculation step calculates, for each of the plurality of power storage devices, the power storage device distribution command value indicating 0 as the distribution amount when the voltage is equal to or higher than an upper limit voltage. The power control method according to claim 1.
前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれについて、当該蓄電装置と前記1以上の負荷とを含む設備に前記電力系統から供給される電力の受電点の電圧を取得することにより、前記複数の蓄電装置に対応する複数の電圧を取得する電圧取得ステップを含み、
前記配分指令値算出ステップでは、前記複数の蓄電装置のそれぞれについて、
前記複数の電圧、前記複数の電圧に対する上限電圧、および、前記複数の蓄電装置のそれぞれの放電の変動量と前記複数の電圧のそれぞれの変動量との間の所定の関係から、放電可能量を算出し、
前記放電可能量が前記閾値よりも小さい場合、前記閾値を前記放電可能量に変更して、変更された前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する
請求項1〜8のいずれか1項に記載の電力制御方法。
The power control method further acquires, for each of the plurality of power storage devices, a voltage at a power reception point of power supplied from the power system to a facility including the power storage device and the one or more loads. Including a voltage acquisition step of acquiring a plurality of voltages corresponding to the plurality of power storage devices,
In the distribution command value calculation step, for each of the plurality of power storage devices,
The dischargeable amount is determined from a predetermined relationship between the plurality of voltages, the upper limit voltage for the plurality of voltages, and the variation amount of each of the plurality of power storage devices and the variation amount of each of the plurality of voltages. Calculate
When the dischargeable amount is smaller than the threshold value, the threshold value is changed to the dischargeable amount, and the power storage device distribution command value indicating the amount of power less than the changed threshold value as the distribution amount is calculated. The power control method according to any one of 1 to 8.
前記負荷情報取得ステップでは、前記複数の蓄電装置のそれぞれについて、前記1以上の負荷の前記所定時間あたりの消費電力量を予測し、予測された前記消費電力量を前記1以上の負荷の前記所定時間あたりの消費電力量として取得する
請求項1〜10のいずれか1項に記載の電力制御方法。
In the load information acquisition step, for each of the plurality of power storage devices, a power consumption amount per predetermined time of the one or more loads is predicted, and the predicted power consumption amount is calculated as the predetermined power of the one or more loads. The power control method according to claim 1, wherein the power control method is acquired as a power consumption amount per hour.
前記電力制御方法は、さらに、前記複数の蓄電装置のそれぞれに対して、前記配分指令値算出ステップで算出された前記蓄電装置配分指令値を通知する通知ステップを含む
請求項1〜11のいずれか1項に記載の電力制御方法。
The power control method further includes a notification step of notifying each of the plurality of power storage devices of the power storage device distribution command value calculated in the distribution command value calculation step. The power control method according to Item 1.
複数の蓄電装置のそれぞれから所定時間あたりに出力される電力量を制御するための電力制御装置であって、
前記複数の蓄電装置のそれぞれについて、当該蓄電装置の残容量、および、当該蓄電装置の前記所定時間あたりの定格出力容量を取得する蓄電装置情報取得部と、
前記複数の蓄電装置のそれぞれについて、当該蓄電装置と電力系統とから供給される電力を利用可能な1以上の負荷の前記所定時間あたりの消費電力量を取得する負荷情報取得部と、
前記電力系統から供給される電力に対する所定の目標電力量に従って、前記複数の蓄電装置から出力される総電力量に対応する制御総量を算出する制御総量算出部と、
前記複数の蓄電装置のそれぞれについて、前記制御総量のうち当該蓄電装置に配分される電力量であり当該蓄電装置に出力させる電力量である配分量を示す蓄電装置配分指令値を算出することによって、前記制御総量を前記複数の蓄電装置に配分する配分指令値算出部とを備え、
前記配分指令値算出部は、前記複数の蓄電装置のそれぞれについて、
前記残容量と前記定格出力容量と前記消費電力量とのうちの最小値を閾値として算出し、
前記閾値以下の電力量を前記配分量として示す前記蓄電装置配分指令値を算出する
電力制御装置。
A power control device for controlling the amount of power output per predetermined time from each of a plurality of power storage devices,
For each of the plurality of power storage devices, a remaining capacity of the power storage device, and a power storage device information acquisition unit that acquires the rated output capacity per predetermined time of the power storage device;
For each of the plurality of power storage devices, a load information acquisition unit that acquires the power consumption per predetermined time of one or more loads that can use power supplied from the power storage device and the power system;
A total control amount calculation unit for calculating a total control amount corresponding to the total power amount output from the plurality of power storage devices according to a predetermined target power amount for the power supplied from the power system;
For each of the plurality of power storage devices, by calculating a power storage device distribution command value indicating a distribution amount that is the amount of power distributed to the power storage device in the total control amount and output to the power storage device, A distribution command value calculation unit that distributes the total control amount to the plurality of power storage devices,
The distribution command value calculation unit is configured for each of the plurality of power storage devices.
Calculate the minimum value of the remaining capacity, the rated output capacity and the power consumption as a threshold,
The power control device that calculates the power storage device distribution command value indicating the amount of power that is equal to or less than the threshold as the distribution amount.
JP2015116623A 2015-06-09 2015-06-09 Power control method and power control apparatus Active JP6210419B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015116623A JP6210419B2 (en) 2015-06-09 2015-06-09 Power control method and power control apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015116623A JP6210419B2 (en) 2015-06-09 2015-06-09 Power control method and power control apparatus

Publications (2)

Publication Number Publication Date
JP2017005845A true JP2017005845A (en) 2017-01-05
JP6210419B2 JP6210419B2 (en) 2017-10-11

Family

ID=57752819

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015116623A Active JP6210419B2 (en) 2015-06-09 2015-06-09 Power control method and power control apparatus

Country Status (1)

Country Link
JP (1) JP6210419B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018121450A (en) * 2017-01-25 2018-08-02 三菱電機株式会社 Charge / discharge device
JP2019068707A (en) * 2017-09-29 2019-04-25 積水化学工業株式会社 Power management system and power management method
WO2019230600A1 (en) * 2018-05-31 2019-12-05 パナソニックIpマネジメント株式会社 Power control method, program, power control system, and power management system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011135822A1 (en) * 2010-04-27 2011-11-03 パナソニック株式会社 Voltage control device, voltage control method, and voltage control program
JP2012034514A (en) * 2010-07-30 2012-02-16 Toshiba Corp Output distribution control device
US20120130556A1 (en) * 2010-11-18 2012-05-24 Marhoefer John J Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization
JP2012130106A (en) * 2010-12-13 2012-07-05 Tokyo Electric Power Co Inc:The Power storage device managing device, power storage device managing method, and power supply system
WO2013038458A1 (en) * 2011-09-16 2013-03-21 株式会社日立製作所 Power distribution device
JP2013172483A (en) * 2012-02-17 2013-09-02 Mitsubishi Heavy Ind Ltd Power control system and host controller
JP2014168315A (en) * 2013-01-30 2014-09-11 Sekisui Chem Co Ltd Local power demand control system
JP2014207751A (en) * 2013-04-11 2014-10-30 株式会社エプコ Power saving supporting system, power saving supporting method, and power saving supporting program
WO2015045552A1 (en) * 2013-09-27 2015-04-02 日本電気株式会社 Power-storage-cell management device, power-storage cell, method for managing power-storage cell, and program

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011135822A1 (en) * 2010-04-27 2011-11-03 パナソニック株式会社 Voltage control device, voltage control method, and voltage control program
JP2012034514A (en) * 2010-07-30 2012-02-16 Toshiba Corp Output distribution control device
US20120130556A1 (en) * 2010-11-18 2012-05-24 Marhoefer John J Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization
JP2012130106A (en) * 2010-12-13 2012-07-05 Tokyo Electric Power Co Inc:The Power storage device managing device, power storage device managing method, and power supply system
WO2013038458A1 (en) * 2011-09-16 2013-03-21 株式会社日立製作所 Power distribution device
JP2013172483A (en) * 2012-02-17 2013-09-02 Mitsubishi Heavy Ind Ltd Power control system and host controller
JP2014168315A (en) * 2013-01-30 2014-09-11 Sekisui Chem Co Ltd Local power demand control system
JP2014207751A (en) * 2013-04-11 2014-10-30 株式会社エプコ Power saving supporting system, power saving supporting method, and power saving supporting program
WO2015045552A1 (en) * 2013-09-27 2015-04-02 日本電気株式会社 Power-storage-cell management device, power-storage cell, method for managing power-storage cell, and program

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018121450A (en) * 2017-01-25 2018-08-02 三菱電機株式会社 Charge / discharge device
JP2019068707A (en) * 2017-09-29 2019-04-25 積水化学工業株式会社 Power management system and power management method
JP7007202B2 (en) 2017-09-29 2022-01-24 積水化学工業株式会社 Power management system and power management method
WO2019230600A1 (en) * 2018-05-31 2019-12-05 パナソニックIpマネジメント株式会社 Power control method, program, power control system, and power management system
JPWO2019230600A1 (en) * 2018-05-31 2021-06-10 パナソニックIpマネジメント株式会社 Power control methods, programs, power control systems, and power management systems
JP7065291B2 (en) 2018-05-31 2022-05-12 パナソニックIpマネジメント株式会社 Power control methods, programs, power control systems, and power management systems

Also Published As

Publication number Publication date
JP6210419B2 (en) 2017-10-11

Similar Documents

Publication Publication Date Title
US9893526B2 (en) Networked power management and demand response
EP2824789B1 (en) Frequency control method
EP2822138B1 (en) Control device, control system, and storage cell control method
JP2015167461A (en) Control method of photovoltaic power generation system
JP6192531B2 (en) Power management system, power management apparatus, power management method, and program
JP2013192401A (en) Power demand control apparatus
JP6173382B2 (en) Control device, energy management system, control method and program
KR101445738B1 (en) Method and apparatus for controling status of charge of electric energy storage system
JP2017500836A (en) Charging method and charging system
US10496060B2 (en) Power management system and method for power management
JP2016063629A (en) Storage battery control device, storage battery control method and program
JPWO2017085915A1 (en) Received power control apparatus and received power control method
JP6210419B2 (en) Power control method and power control apparatus
KR101517395B1 (en) Method for controlling power usage of building and appratus for managing building energy
JP7102182B2 (en) Power systems, controls, power management methods, programs, and power management servers
JP6210337B2 (en) Received power control method, received power control device, and electrical equipment
CN117200338A (en) Distributed photovoltaic peak shaving method based on collection terminal
JP5995804B2 (en) Storage system management device and control target value determination method
JP2021151017A (en) Power management device and power management method
JP2021119727A (en) Distributed power supply system and distributed power supply device
US10790669B2 (en) Power saving control device and power saving control method
JP2013162560A (en) Demand and supply adjusting system
JP6213931B2 (en) Group control method and group control apparatus
AU2016293631B2 (en) Storage battery control system, storage battery control method, and program
JP2016126983A (en) Fuel cell controller, fuel cell control system, fuel cell control method and computer program

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161011

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161020

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170221

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170309

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170829

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170901

R151 Written notification of patent or utility model registration

Ref document number: 6210419

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151