[go: up one dir, main page]

JP2016079002A - Method for lifting elevator equipment - Google Patents

Method for lifting elevator equipment Download PDF

Info

Publication number
JP2016079002A
JP2016079002A JP2014213601A JP2014213601A JP2016079002A JP 2016079002 A JP2016079002 A JP 2016079002A JP 2014213601 A JP2014213601 A JP 2014213601A JP 2014213601 A JP2014213601 A JP 2014213601A JP 2016079002 A JP2016079002 A JP 2016079002A
Authority
JP
Japan
Prior art keywords
lifting
elevator
hoistway
machine room
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2014213601A
Other languages
Japanese (ja)
Inventor
健治 安藤
Kenji Ando
健治 安藤
淳紀 関根
Atsunori Sekine
淳紀 関根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2014213601A priority Critical patent/JP2016079002A/en
Publication of JP2016079002A publication Critical patent/JP2016079002A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for lifting elevator equipment, in which a weight object such as a hoist can be easily lifted to a machinery room by using a simple work process when carrying out renewal construction of an elevator.SOLUTION: A method for lifting elevator equipment of the present invention, in carrying out renewal construction of an elevator, includes the steps of: installing a carry-in device 9 at a hoistway 6 and a top floor entrance 10; lifting a new hoist 8 by using a chain block 12 mounted to the carry-in device 9; carrying-in the hoist 8 to the hoistway 6 by using an electric chain block 3 mounted in a machinery room 1 at an apex of the hoistway 6 and the chain block 12; adjusting a direction of the hoist 8 by removing the chain block 12 from the hoist 8; and lifting the hoist 8 to the machinery room 1 by using the electric chain block 3.SELECTED DRAWING: Figure 1

Description

本発明は、エレベータのリニューアル工事に際し、巻上機等のエレベータ機器を所定の階床から昇降路頂部の機械室へ揚重する揚重方法に関する。   The present invention relates to a lifting method for lifting an elevator device such as a hoisting machine from a predetermined floor to a machine room at the top of a hoistway when renovating an elevator.

ビル新設時において、昇降路の頂部に設けられた機械室ヘエレベータ機器を揚重する作業は、建屋上部に設置したクレーンにより容易に行うことができる。しかし、経年的に老朽化した既設のエレベータ機器をリニューアル工事する場合、既にクレーンは建屋から撤去されているため、比較的軽量なエレベータ機器は作業者が階段等を使用して人力により機械室まで搬送するようにしている。また、エレベータ機器の中でも巻上機等の重量物は人力による搬入ができないため、クレーン車により建屋屋上まで揚重したり、建屋階段上に揚重装置を組立てて機械室まで揚重するようにしている。しかし、これらの揚重方法は、クレーン車の作業スペースを確保できなかったり、建屋階段上の揚重スペースや階段の強度を確保できなかったりと制約が多いものであった。   When building a new building, lifting the elevator equipment to the machine room provided at the top of the hoistway can be easily performed with a crane installed in the upper part of the building. However, when renovating existing elevator equipment that has deteriorated over time, the crane has already been removed from the building, so the relatively lightweight elevator equipment can be manually moved to the machine room by using stairs. I am trying to carry it. In addition, since heavy equipment such as hoisting machines cannot be carried in manually among elevator equipment, lift to the roof of the building with a crane truck, or assemble a lifting device on the stairs of the building and lift it to the machine room. ing. However, these lifting methods have many restrictions such as that it is not possible to secure the working space of the crane truck, and it is not possible to secure the lifting space on the building stairs and the strength of the stairs.

そこで従来より、巻上機等のエレベータ機器を最下階に停止させた乗りかごの床面に載置し、機械室床の開口部から昇降路内に垂下したロープの一端をエレベータ機器に固定した後、このロープを機械室に設置したロープ駆動装置により駆動することで、エレベータ機器を吊上げて機械室へ揚重するようにしたリニューアル工事の施工方法が提案されている(例えば、特許文献1参照)。   Therefore, conventionally, elevator equipment such as a hoisting machine is placed on the floor of a passenger car stopped at the lowest floor, and one end of a rope suspended in the hoistway from the opening of the machine room floor is fixed to the elevator equipment. After that, a renewal construction method has been proposed in which the rope is driven by a rope driving device installed in the machine room to lift the elevator equipment and lift it to the machine room (for example, Patent Document 1). reference).

特開平9−20482号公報Japanese Patent Laid-Open No. 9-20482

特許文献1に記載されたエレベータ機器の揚重方法は、乗りかごの床面を作業床として巻上機等のエレベータ機器を載置した後、このエレベータ機器をロープで引き上げて機械室へ揚重するというものであるが、既設の乗りかごを解体した後、床以外を撤去して乗りかごの上部を開放する必要があるため、これらの作業に多くの手間と時間が掛かるという問題があった。また、エレベータ機器の揚重を開始する乗りかご位置が最下階であり、そこからエレベータ機器を機械室まで吊上げる必要があるため、エレベータ機器の揚重距離が長くなって時間が掛かるという問題もあった。   The elevator apparatus lifting method described in Patent Document 1 is a method of lifting an elevator apparatus such as a hoisting machine with the floor surface of a car as a work floor and then lifting the elevator apparatus to a machine room by a rope. However, after disassembling the existing car, it was necessary to remove the parts other than the floor and open the top of the car, so there was a problem that these operations took a lot of work and time. . In addition, the elevator position of the elevator equipment is on the lowest floor, and it is necessary to lift the elevator equipment from there to the machine room, which increases the lifting distance of the elevator equipment and takes time. There was also.

本発明は、このような従来技術の実情に鑑みてなされたもので、その目的は、エレベータのリニューアル工事に際し、巻上機等の重量物を単純な作業工程で容易に機械室まで揚重することができるエレベータ機器の揚重方法を提供することにある。   The present invention has been made in view of such a state of the art, and an object of the present invention is to lift a heavy object such as a hoisting machine to a machine room easily in a simple work process when renovating an elevator. An object of the present invention is to provide a lifting method for elevator equipment.

上記の目的を達成するために、本発明は、エレベータのリニューアル工事に際し、所定の階床から昇降路内へ搬入したエレベータ機器を、昇降路の頂部に設けられた機械室へ揚重するエレベータ機器の揚重方法において、昇降路内および最上階乗場に搬入装置を設置した後、この搬入装置によりエレベータ機器を最上階から昇降路内へ搬入して機械室まで揚重するようにしたことを特徴としている。   In order to achieve the above object, according to the present invention, an elevator device that lifts an elevator device carried into a hoistway from a predetermined floor to a machine room provided at the top of the hoistway when the elevator is renewed. In this lifting method, after installing a loading device in the hoistway and at the top floor landing, this loading device carries elevator equipment from the top floor into the hoistway and lifts it to the machine room. It is said.

本発明のエレベータ機器の揚重方法によれば、エレベータのリニューアル工事に際し、わざわざ乗りかごを解体したり、昇降路内に特別な足場材や足場板を組合わせて設けなくても、重量物である巻上機等のエレベータ機器を単純な作業工程で容易に機械室まで揚重することができる。前述した以外の課題、構成および効果は、以下の実施形態の説明により明らかにされる。   According to the lifting method of an elevator apparatus of the present invention, it is possible to carry out heavy work even if the elevator car is renewed without the need to dismantle the car or install a special scaffolding material or scaffolding plate in the hoistway. An elevator device such as a hoist can be easily lifted up to the machine room by a simple work process. Problems, configurations, and effects other than those described above will become apparent from the following description of embodiments.

本発明の実施形態例に係る揚重方法が適用されるエレベータシステムの要部を示す構成図である。It is a block diagram which shows the principal part of the elevator system with which the lifting method which concerns on the example of embodiment of this invention is applied. 実施形態例に係る揚重方法で搬入装置を設置する工程を示す斜視図である。It is a perspective view which shows the process of installing a carrying-in apparatus with the lifting method which concerns on the example of embodiment. 図2の搬入装置により重量物を揚重する工程を示す斜視図である。It is a perspective view which shows the process of lifting a heavy article with the carrying-in apparatus of FIG. 図3の重量物を昇降路内へ搬入する工程を示す斜視図である。It is a perspective view which shows the process of carrying in the heavy article of FIG. 3 in a hoistway. 図4の重量物を機械室へ搬送する直前の状態を示す斜視図である。It is a perspective view which shows the state just before conveying the heavy article of FIG. 4 to a machine room. 図5の重量物を機械室へ搬送途中の状態を示す斜視図である。It is a perspective view which shows the state in the middle of conveyance of the heavy article of FIG. 5 to a machine room.

発明の実施の形態について図面を参照して説明すると、図1に示すように、リニューアルするエレベータは、乗りかご11が昇降する昇降路6の最上部に機械室1が設けられており、この機械室1の床には既設の巻上機の支持ビーム間に開口部5が設けられている。   An embodiment of the invention will be described with reference to the drawings. As shown in FIG. 1, an elevator to be renewed is provided with a machine room 1 at the top of a hoistway 6 in which a car 11 is raised and lowered. An opening 5 is provided between the support beams of the existing hoisting machine on the floor of the chamber 1.

リニューアル工事に際しては、エレベータ機器である既設の巻上機や制御盤等を機械室1から撤去し、しかる後、機械室1内に門型揚重雇2を設置する。門型揚重雇2には第2揚重装置として例えば電動チェーンブロック3が設けられており、電動チェーンブロック3のチェーン4先端に新規のエレベータ機器、例えば重量物である巻上機8が固定されている。また、昇降路6および最上階乗場10に搬入装置9を設置し、この搬入装置9には第1揚重装置として例えばチェーンブロック12が設けられており、チェーンブロック12のチェーン13先端にも巻上機8が固定されている。以下、図2〜図6に基づいて、これら2つの揚重装置(電動チェーンブロック3とチェーンブロック12)により巻上機8を最上階乗場10から機械室1まで搬送する作業工程について説明する。   In the renewal work, the existing hoisting machine, control panel, and the like, which are elevator equipment, are removed from the machine room 1, and then the gate-type heavy lifter 2 is installed in the machine room 1. For example, an electric chain block 3 is provided as a second lifting device in the gate-type lifting work 2, and a new elevator device, for example, a hoisting machine 8, which is a heavy object, is fixed to the tip of the chain 4 of the electric chain block 3. Has been. Further, a carry-in device 9 is installed in the hoistway 6 and the top floor landing 10, and this carry-in device 9 is provided with, for example, a chain block 12 as a first lifting device, and is also wound around the end of the chain 13 of the chain block 12. Upper machine 8 is fixed. Hereinafter, based on FIGS. 2-6, the operation | work process which conveys the hoisting machine 8 from the top floor landing 10 to the machine room 1 by these two lifting devices (electric chain block 3 and chain block 12) is demonstrated.

まず、図2に示すように、昇降路6および最上階乗場10に搬入装置9を設置する。この搬入装置9は、昇降路6内のエレベータガイドレール7間に固定された支持材9bと、最上階乗場10の床面上に立設された伸縮可能な支柱9cと、これら支持材9bと支柱9cの上部に固定された揚重ビーム9aと、電動チェーンブロック3のチェーン4を経由させるプーリ9dとから構成されている。   First, as shown in FIG. 2, the carry-in device 9 is installed in the hoistway 6 and the top floor hall 10. The carry-in device 9 includes a support member 9b fixed between the elevator guide rails 7 in the hoistway 6, an extendable column 9c erected on the floor surface of the uppermost landing 10, and the support member 9b. The lifting beam 9a is fixed to the upper part of the column 9c, and the pulley 9d is routed through the chain 4 of the electric chain block 3.

このように構成された搬入装置9を設置する手順を説明すると、まず、最上階から下方へ移動させた乗りかご11上に作業者が乗り込み、乗りかご11を吊りワイヤ等の保持具を用いて固定した後、乗りかご11を吊持している図示せぬ主索を取外す。しかる後、乗りかご11上で支持材9bを対向するエレベータガイドレール7間に固定し、最上階乗場10の床面上に支柱9cを立設してから、これら支持材9bと支柱9cの上部に揚重ビーム9aを固定する。その際、支柱9cは全長を変えられるように伸縮可能であるため、支柱9cを伸縮させることで揚重ビーム9aが水平となるように調整する。最後に、揚重ビーム9aにビームクランプ14とチェーンブロック12を取付け、これらの作業により搬入装置9の設置工程が完了する。   The procedure for installing the carry-in device 9 configured as described above will be described. First, an operator gets on the car 11 moved downward from the top floor, and the car 11 is held using a holder such as a suspension wire. After fixing, the main rope (not shown) that holds the car 11 is removed. After that, the support material 9b is fixed between the elevator guide rails 7 facing each other on the car 11, and the support column 9c is erected on the floor surface of the uppermost landing 10, and then the support material 9b and the upper part of the support column 9c. The lifting beam 9a is fixed to the frame. At that time, since the column 9c can be expanded and contracted so that the entire length can be changed, the lifting beam 9a is adjusted to be horizontal by expanding and contracting the column 9c. Finally, the beam clamp 14 and the chain block 12 are attached to the lifting beam 9a, and the installation process of the carry-in device 9 is completed by these operations.

次に、図3に示すように、チェーンブロック12のチェーン13を巻上機8の頂部に設けられた図示せぬ穴に接続し、この状態でチェーンブロック12を操作することにより、巻上機8を最上階乗場10の床面から吊上げる。   Next, as shown in FIG. 3, the chain 13 of the chain block 12 is connected to a hole (not shown) provided at the top of the hoisting machine 8, and the chain block 12 is operated in this state, thereby 8 is lifted from the floor of the top floor hall 10.

次に、図4に示すように、機械室1内の門型揚重雇2に設けられた電動チェーンブロック3のチェーン4を最上階乗場10まで届くよう垂下させた後、このチェーン4を巻上機8の頂部に接続する。しかる後、電動チェーンブロック3とチェーンブロック12の両方を操作することにより、巻上機8を最上階乗場10から昇降路6内へ搬入する。なお、その際に、巻上機8の荷重に対して支持材9bの強度が問題なければ、ビームクランプ14をトロリに変更し、揚重ビーム9aをレールとしてトロリを移動させることにより、巻上機8を昇降路6内へ搬入するようにしても良い。   Next, as shown in FIG. 4, the chain 4 of the electric chain block 3 provided in the gate-type lifting worker 2 in the machine room 1 is suspended so as to reach the top floor landing 10, and then the chain 4 is wound. Connect to the top of the upper unit 8. Thereafter, by operating both the electric chain block 3 and the chain block 12, the hoisting machine 8 is carried into the hoistway 6 from the top floor landing 10. At that time, if the strength of the support material 9b is not problematic with respect to the load of the hoisting machine 8, the beam clamp 14 is changed to a trolley, and the trolley is moved by using the lifting beam 9a as a rail. The machine 8 may be carried into the hoistway 6.

次に、図5に示すように、昇降路6内へ搬入した巻上機8が機械室1から垂下したチェーン4のみで吊持可能な位置まで来たら、揚重ビーム9aに設けられたチェーンブロック12のチェーン13を巻上機8から取外す。しかる後、巻上機8を機械室1へ揚重する準備段階として、機械室1まで揚重する際に巻上機8が支持材9bと接触しないように、巻上機8の向きを適正な姿勢に調整する。   Next, as shown in FIG. 5, when the hoisting machine 8 carried into the hoistway 6 reaches a position where it can be suspended only by the chain 4 suspended from the machine room 1, the chain provided on the lifting beam 9a. The chain 13 of the block 12 is removed from the hoisting machine 8. After that, as a preparation stage for lifting the hoisting machine 8 to the machine room 1, the hoisting machine 8 is properly oriented so that the hoisting machine 8 does not come into contact with the support material 9b when the hoisting machine 8 is raised to the machine room 1. Adjust to a proper posture.

次に、図6に示すように、機械室1の電動チェーンブロック3を操作して巻上機8を揚重し、この巻上機8をそのまま吊上げて開口部5を通過させて機械室1まで搬送する。その際、揚重ビーム9aを支持材9bと支柱9cから取外して最上階乗場10戸を閉扉することで、作業者を見張りとして配置することが不要となるため、作業者を他の作業へ従事させることが可能となる。   Next, as shown in FIG. 6, the hoisting machine 8 is lifted by operating the electric chain block 3 in the machine room 1, and the hoisting machine 8 is lifted as it is to pass through the opening 5 to pass through the machine room 1. Transport to. At that time, by removing the lifting beam 9a from the support material 9b and the support column 9c and closing the top floor 10 doors, it is not necessary to arrange the worker as a guard, so the worker is engaged in other work. It becomes possible to make it.

なお、機械室1から不要となった撤去品を降ろす場合は、前述した図2に示す作業工程から図6に示す作業工程を順次逆に行えば良い。   Note that when removing the removed product from the machine room 1, the work process shown in FIG. 2 to the work process shown in FIG. 6 may be performed in reverse order.

以上説明したように、本実施形態例に係るエレベータ機器の揚重方法によれば、わざわざ乗りかご11を解体しなくても、あるいは、昇降路6内に特別な足場材や足場板を組合わせて設けなくても、重量物であるエレベータ機器(例えば巻上機8)を単純な作業工程で容易に機械室まで揚重することができる。したがって、従来技術で手間や時間が掛かっていたエレベータのリニューアル工事において、本実施形態例では施工工数および施工費用を低減させることができる。   As described above, according to the elevator apparatus lifting method according to the present embodiment, a special scaffolding material or a scaffolding plate is combined in the hoistway 6 without having to bother to dismantle the car 11. Even if it is not provided, the elevator equipment (for example, the hoisting machine 8), which is a heavy object, can be easily lifted up to the machine room by a simple work process. Therefore, in the renewal work of the elevator, which takes time and effort in the prior art, in the present embodiment example, it is possible to reduce the construction man-hours and the construction cost.

1 機械室
2 門型揚重雇
3 電動チェーンブロック(第2揚重装置)
4 チェーン
5 開口部
6 昇降路
7 エレベータガイドレール
8 巻上機(エレベータ機器)
9 搬入装置
9a 揚重ビーム
9b 支持材
9c 支柱
9d プーリ
10 最上階乗場
11 乗りかご
12 チェーンブロック(第1揚重装置)
13 チェーン13
14 ビームクランプ
1 Machine room 2 Gate-type lifting 3 Electric chain block (second lifting device)
4 Chain 5 Opening 6 Hoistway 7 Elevator Guide Rail 8 Hoisting Machine (Elevator Equipment)
DESCRIPTION OF SYMBOLS 9 Carry-in apparatus 9a Lifting beam 9b Support material 9c Support | pillar 9d Pulley 10 Top floor landing 11 Car 12 Chain block (1st lifting apparatus)
13 Chain 13
14 Beam clamp

Claims (3)

エレベータのリニューアル工事に際し、所定の階床から昇降路内へ搬入したエレベータ機器を、昇降路の頂部に設けられた機械室へ揚重するエレベータ機器の揚重方法において、
昇降路内および最上階乗場に搬入装置を設置した後、この搬入装置によりエレベータ機器を最上階から昇降路内へ搬入して機械室まで揚重するようにしたことを特徴とするエレベータ機器の揚重方法。
In the elevator renewal work, in the lifting method of the elevator equipment that lifts the elevator equipment carried into the hoistway from a predetermined floor to the machine room provided at the top of the hoistway,
After installing the loading device in the hoistway and on the top floor landing, the loading device lifts the elevator equipment into the hoistway from the top floor and lifts it to the machine room. Heavy method.
請求項1に記載のエレベータ機器の揚重方法において、前記搬入装置は、前記昇降路内で対向するエレベータガイドレール間に固定された支持材と、前記最上階乗場の床面上に立設された支柱と、前記支持材と前記支柱によって水平支持された揚重ビームと、前記揚重ビームに設けられた揚重装置とを備えていることを特徴とするエレベータ機器の揚重方法。   The elevator apparatus lifting method according to claim 1, wherein the carry-in device is erected on a support material fixed between elevator guide rails facing each other in the hoistway and a floor surface of the uppermost landing. A lifting method for an elevator apparatus, comprising: a support column; a lifting beam horizontally supported by the support member; and a lifting device provided on the lifting beam. 請求項1に記載のエレベータ機器の揚重方法において、乗りかごの上方の昇降路内および最上階乗場に前記搬入装置を設置する工程と、前記搬入装置に設けられた第1揚重装置により前記エレベータ機器を揚重する工程と、前記機械室に設けられた第2揚重装置と前記第1揚重装置とにより前記エレベータ機器を昇降路内へ搬入する工程と、前記エレベータ機器から前記第1揚重装置を取外して、該エレベータ機器の向きを調整する工程と、前記第2揚重装置により前記エレベータ機器を前記機械室まで揚重する工程とを含むことを特徴とするエレベータ機器の揚重方法。   In the lifting method of the elevator apparatus according to claim 1, the step of installing the carry-in device in the hoistway above the car and the top floor landing, and the first lift device provided in the carry-in device A step of lifting an elevator device, a step of bringing the elevator device into a hoistway by means of a second lifting device and a first lifting device provided in the machine room, and from the elevator device to the first Lifting the elevator equipment, comprising: removing the lifting device and adjusting the orientation of the elevator equipment; and lifting the elevator equipment to the machine room by the second lifting equipment. Method.
JP2014213601A 2014-10-20 2014-10-20 Method for lifting elevator equipment Pending JP2016079002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014213601A JP2016079002A (en) 2014-10-20 2014-10-20 Method for lifting elevator equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014213601A JP2016079002A (en) 2014-10-20 2014-10-20 Method for lifting elevator equipment

Publications (1)

Publication Number Publication Date
JP2016079002A true JP2016079002A (en) 2016-05-16

Family

ID=55955810

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014213601A Pending JP2016079002A (en) 2014-10-20 2014-10-20 Method for lifting elevator equipment

Country Status (1)

Country Link
JP (1) JP2016079002A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018008805A (en) * 2016-07-15 2018-01-18 株式会社日立製作所 Hoisting machine installation method and elevator
CN109110626A (en) * 2018-08-27 2019-01-01 中国建筑股份有限公司 The hoisting structure and hanging method of big ratio of height to thickness prefabricated panel
JP2019210109A (en) * 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method
KR102319977B1 (en) * 2021-07-20 2021-11-01 주식회사 대산엘리베이터 hoistway segment structures for high rise elevator
JP7799875B1 (en) * 2025-03-11 2026-01-15 三菱電機ビルソリューションズ株式会社 Elevator equipment lifting device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018008805A (en) * 2016-07-15 2018-01-18 株式会社日立製作所 Hoisting machine installation method and elevator
JP2019210109A (en) * 2018-06-06 2019-12-12 株式会社日立ビルシステム Lifting device of heavy load and lifting and conveying method
CN109110626A (en) * 2018-08-27 2019-01-01 中国建筑股份有限公司 The hoisting structure and hanging method of big ratio of height to thickness prefabricated panel
CN109110626B (en) * 2018-08-27 2024-04-16 中国建筑股份有限公司 Hoisting structure and hoisting method for prefabricated wallboard with large height-thickness ratio
KR102319977B1 (en) * 2021-07-20 2021-11-01 주식회사 대산엘리베이터 hoistway segment structures for high rise elevator
JP7799875B1 (en) * 2025-03-11 2026-01-15 三菱電機ビルソリューションズ株式会社 Elevator equipment lifting device

Similar Documents

Publication Publication Date Title
CN109153539B (en) Elevator traction machine installation method
JP5538471B2 (en) Lift extension method for construction elevators
JP2016079002A (en) Method for lifting elevator equipment
JP6012578B2 (en) Heavy material transport method and heavy material transport device
JP5955280B2 (en) Lifting method for heavy elevators
CN112566864A (en) Application method of lift extension technology of construction elevator
CN112533855B (en) Method for extending lift of construction elevator and rope descending auxiliary tool for elevator
CN107618959A (en) The installation method and elevator of hoist engine
JP2008222382A (en) Method for moving lifting device for installation
JP5538470B2 (en) Lift extension method for construction elevators
JP4921810B2 (en) Elevator installation apparatus and installation method using the same
JP2011068458A (en) Rail suspending device of elevator
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
JP5806166B2 (en) Elevator repair equipment installation method
JP2023177370A (en) Elevator hoisting machine installation auxiliary equipment and installation method
JP6525328B2 (en) Elevator equipment loading and unloading method and elevator equipment loading and unloading apparatus
JP2016074534A (en) Hoist lifting method
JP5805280B1 (en) Hoisting and lifting machine and elevator manufacturing method
JP2020007108A (en) Elevator heavy object carrying method and elevator apparatus
JP5671386B2 (en) How to replace the elevator control panel
JP2019182609A (en) Heavy object transport method using hoisting machine
JP2015009967A (en) Elevator apparatus and repair method thereof
JP6950458B2 (en) Elevator weight removal device and weight removal method
JP6020735B2 (en) Elevator equipment
JPH01285571A (en) Method of replacing guide rail for elevator