JP2014071901A - 需要応答管理のための方法およびシステム - Google Patents
需要応答管理のための方法およびシステム Download PDFInfo
- Publication number
- JP2014071901A JP2014071901A JP2013197651A JP2013197651A JP2014071901A JP 2014071901 A JP2014071901 A JP 2014071901A JP 2013197651 A JP2013197651 A JP 2013197651A JP 2013197651 A JP2013197651 A JP 2013197651A JP 2014071901 A JP2014071901 A JP 2014071901A
- Authority
- JP
- Japan
- Prior art keywords
- demand response
- available
- events
- event
- program
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- H02J13/13—
-
- H02J13/333—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】需要応答事象ごとの優先順位が提供され、需要応答事象ごとのしきい値が決定される。選択された需要応答トリガの観測値よりしきい値の方が低い、利用可能な需要応答事象の中から優先順位の最も高い需要応答事象が選択されて、現在の機会の選択された需要応答事象を利用するための制御信号が顧客サイトに送信される。
【選択図】図1
Description
32 配電変電所
34 需要応答(DR)リソースまたは負荷
35 フィーダー
36 ローカルコントローラ
38 リモートロケーションコントローラ
38 中央コントローラ
40 需要応答(DR)モジュール
42 メモリ
44 ユーザインターフェースモジュール
46 ネットワーク管理モジュール(NMS)
48 データベース(DB)
60 流れ図
80 流れ図
Claims (20)
- 利用可能な需要応答事象の数を決定するステップと、
前記利用可能な需要応答事象を発行するために利用可能な機会の数を決定するステップと、
需要応答事象ごとに優先順位を提供するステップと、
需要応答事象ごとにしきい値を決定するステップと、
選択された需要応答トリガの観測値よりしきい値の方が低い、前記利用可能な需要応答事象の中から優先順位の最も高い需要応答事象を選択するステップと、
現在の機会のために前記選択された需要応答事象を利用するために、通信ネットワークを介して制御信号を顧客サイトに送信するステップとを備える、需要応答管理のための方法。 - 前記利用可能な需要応答事象が、顧客が加入している複数の需要応答プログラムを備える、請求項1記載の方法。
- 前記複数の需要応答プログラムが、一定期間緊急ピーク時価格(CPP−F)プログラム、可変ピーク時価格(VPP)プログラム、可変期間CPP(CPP−V)プログラム、複数グループCPP(CPP−G)プログラム、および複数の需要応答(MDR)プログラムのうちの少なくとも1つを備える、請求項2記載の方法。
- 利用可能な需要応答事象の前記数を決定するステップが、データベースから知られている数を取得するステップ、または履歴データに基づいて新しい数を導き出すステップを備える、請求項1記載の方法。
- 前記新しい数を導き出すステップが、
最適な需要応答事象スケジューリングの2進整数プログラムを形成するステップと、
前年のデータを使用して前記2進整数プログラムを解決するステップと、
タイプごとに、需要応答プログラムおよび利用可能な需要応答事象の合計タイプを決定するステップと、
タイプごとに前記新しい数の需要応答事象を出力するステップとを備える、請求項4記載の方法。 - 前記最適な需要応答事象スケジューリングの前記2進整数プログラムが、複数の制約を備える累積的な節約量を最大にする最適化モデルを備える、請求項5記載の方法。
- 前記複数の制約が、
全ての利用可能な事象の合計が事象の前記合計数以下であることと、
利用可能な事象の合計にそれらの期間をかけたものが、利用可能な時間の前記合計数以下であることと、
利用可能な事象の合計にグループのそれぞれの数をかけたものが、グループの前記合計数を備える事象の前記合計数の積以下であることのうちの少なくとも1つを備える、請求項6記載の方法。 - 前記利用可能な需要応答事象を発行するために利用可能な機会の前記数が、選択された需要応答トリガの確率分布に基づく、請求項1記載の方法。
- 前記選択された需要応答トリガが、温度値、電気の市場価格値、またはそれらの組合せを備える、請求項8記載の方法。
- 前記選択された需要応答トリガの前記確率分布が、履歴データ、または前記選択された需要応答トリガの予測方法、あるいはそれらの任意の組合せに基づいて決定される、請求項8記載の方法。
- 需要応答事象ごとの前記優先順位が価格レベルに基づく、請求項1記載の方法。
- 需要応答事象ごとの前記しきい値が、利用可能な需要応答事象の前記数、前記利用可能な需要応答事象を発行するために利用可能な機会の前記数、および前記選択された需要応答トリガの確率分布に基づく、請求項1記載の方法。
- 需要応答リソースを制御するためのローカルコントローラと、
前記ローカルコントローラおよびユーティリティ事業者と通信可能に結合されたリモートロケーションコントローラとを備え、前記リモートロケーションコントローラが、
利用可能な需要応答事象の数を決定して、
前記利用可能な需要応答事象を発行するために利用可能な機会の数を決定して、
需要応答事象ごとに優先順位を提供して、
需要応答事象ごとにしきい値を決定して、
選択された需要応答トリガの観測値よりしきい値の方が低い、前記利用可能な需要応答事象の中から優先順位の最も高い需要応答事象を決定するように構成された需要応答モジュールを備える、ユーティリティネットワークにおける需要応答事象を制御するためのシステム。 - 前記利用可能な需要応答事象が、顧客が加入している複数の需要応答プログラムに対応する需要応答事象を備える、請求項13記載のシステム。
- 前記複数の需要応答プログラムが、一定期間緊急ピーク時価格(CPP−F)プログラム、可変ピーク時価格(VPP)プログラム、可変期間CPP(CPP−V)プログラム、複数グループCPP(CPP−G)プログラム、および複数の需要応答(MDR)プログラムのうちの少なくとも1つを備える、請求項14記載のシステム。
- 利用可能な需要応答事象の前記数を決定するステップが、履歴データに基づいて新しい数を導き出すステップを備える、請求項13記載のシステム。
- 前記新しい数を導き出すステップが、
最適な需要応答事象スケジューリングの2進整数プログラムを形成するステップと、
前年のデータを使用して前記2進整数プログラムを解決するステップと、
タイプごとに、需要応答プログラムおよび利用可能な需要応答事象の合計タイプを決定するステップと、
タイプごとに前記新しい数の需要応答事象を出力するステップとを備える、請求項16記載のシステム。 - 前記利用可能な需要応答事象を発行するために利用可能な機会の前記数が、選択された需要応答トリガの確率分布に基づく、請求項13記載のシステム。
- 前記選択された需要応答トリガが、温度値、電気の市場価格値、またはそれらの組合せを備える、請求項18記載のシステム。
- 少なくとも1つのプロセッサによって実行されると、顧客サイトのユーティリティネットワークにおける需要応答事象を制御するための方法を前記プロセッサに実行させる、コンピュータプログラムのコンピュータ可読命令を備える持続性コンピュータ可読媒体であって、前記方法が、
利用可能な需要応答事象の数を決定するステップと、
前記利用可能な需要応答事象を発行するために利用可能な機会の数を決定するステップと、
需要応答事象ごとに優先順位を提供するステップと、
需要応答事象ごとにしきい値を決定するステップと、
選択された需要応答トリガの観測値よりしきい値の方が低い、前記利用可能な需要応答事象の中から優先順位の最も高い需要応答事象を選択するステップと、
現在の機会のために前記選択された需要応答事象を利用するために、通信ネットワークを介して制御信号を顧客サイトに出力するステップとを備える、持続性コンピュータ可読媒体。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/629,827 | 2012-09-28 | ||
| US13/629,827 US20140095410A1 (en) | 2012-09-28 | 2012-09-28 | Method and system for demand response management |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2014071901A true JP2014071901A (ja) | 2014-04-21 |
Family
ID=49263179
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2013197651A Pending JP2014071901A (ja) | 2012-09-28 | 2013-09-25 | 需要応答管理のための方法およびシステム |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20140095410A1 (ja) |
| EP (1) | EP2713321A3 (ja) |
| JP (1) | JP2014071901A (ja) |
| KR (1) | KR20140042709A (ja) |
| AU (1) | AU2013234386A1 (ja) |
| BR (1) | BR102013024894A2 (ja) |
| CA (1) | CA2828218A1 (ja) |
| MX (1) | MX349811B (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015215879A (ja) * | 2014-05-12 | 2015-12-03 | 富士通株式会社 | 動的デマンドレスポンスイベント評価 |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10991001B2 (en) | 2013-03-13 | 2021-04-27 | Eversight, Inc. | Systems and methods for intelligent promotion design with promotion scoring |
| US10984441B2 (en) | 2013-03-13 | 2021-04-20 | Eversight, Inc. | Systems and methods for intelligent promotion design with promotion selection |
| US11270325B2 (en) * | 2013-03-13 | 2022-03-08 | Eversight, Inc. | Systems and methods for collaborative offer generation |
| US20220207548A1 (en) | 2013-03-13 | 2022-06-30 | Eversight, Inc. | Systems and methods for contract based offer generation |
| US20140351013A1 (en) * | 2013-05-24 | 2014-11-27 | Honeywell International Inc. | Ancillary service bid generation systems and methods |
| US20160140586A1 (en) * | 2014-11-14 | 2016-05-19 | Opower, Inc. | Behavioral demand response using substation meter data |
| US20180241210A1 (en) * | 2015-08-12 | 2018-08-23 | Kyocera Corporation | Management server, management method and management system |
| JP6653153B2 (ja) * | 2015-10-01 | 2020-02-26 | 株式会社日立製作所 | 電力需要調整計画管理装置 |
| US10832352B2 (en) | 2015-10-28 | 2020-11-10 | International Business Machines Corporation | Determining demand response impact scores and target customer group for energy saving events |
| US10168682B1 (en) | 2015-11-20 | 2019-01-01 | Wellhead Power Solutions, Llc | System and method for managing load-modifying demand response of energy consumption |
| CN107887975B (zh) * | 2016-09-29 | 2022-03-18 | 中国电力科学研究院 | 一种需求侧资源调控方法及系统 |
| US11941659B2 (en) | 2017-05-16 | 2024-03-26 | Maplebear Inc. | Systems and methods for intelligent promotion design with promotion scoring |
| CA3073094A1 (en) * | 2017-08-17 | 2019-02-21 | Zen Ecosystems IP Pty Ltd | Method, system and apparatus for optimising energy consumption |
| CN120601426B (zh) * | 2025-08-11 | 2025-10-03 | 陕西斯瀚实业有限公司 | 一种需求侧动态响应的虚拟电厂负荷ai预测方法 |
| CN121094488A (zh) * | 2025-11-10 | 2025-12-09 | 南京满运冷链科技有限公司 | 一种货源调度优先级的标定方法及装置 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011134325A (ja) * | 2009-12-23 | 2011-07-07 | General Electric Co <Ge> | ネットワークにおける需要応答管理方法及びシステム |
| WO2012120623A1 (ja) * | 2011-03-07 | 2012-09-13 | 株式会社日立製作所 | エネルギー消費管理のためのシステム、方法及びコンピュータプログラム |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2007136456A2 (en) * | 2006-03-24 | 2007-11-29 | Rtp Controls | Method and apparatus for controlling power consumption |
| US8744638B2 (en) * | 2009-09-11 | 2014-06-03 | General Electric Company | Method and system for demand response in a distribution network |
| US20110258018A1 (en) * | 2010-04-19 | 2011-10-20 | General Electric Company | System and method for scheduling demand response events in a network |
| US20120136496A1 (en) * | 2010-11-30 | 2012-05-31 | General Electric Company | System and method for estimating demand response in electric power systems |
-
2012
- 2012-09-28 US US13/629,827 patent/US20140095410A1/en not_active Abandoned
-
2013
- 2013-09-25 JP JP2013197651A patent/JP2014071901A/ja active Pending
- 2013-09-26 KR KR1020130114579A patent/KR20140042709A/ko not_active Withdrawn
- 2013-09-26 EP EP13186252.6A patent/EP2713321A3/en not_active Ceased
- 2013-09-26 CA CA2828218A patent/CA2828218A1/en active Pending
- 2013-09-27 MX MX2013011271A patent/MX349811B/es active IP Right Grant
- 2013-09-27 AU AU2013234386A patent/AU2013234386A1/en not_active Abandoned
- 2013-09-27 BR BR102013024894-0A patent/BR102013024894A2/pt not_active IP Right Cessation
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011134325A (ja) * | 2009-12-23 | 2011-07-07 | General Electric Co <Ge> | ネットワークにおける需要応答管理方法及びシステム |
| WO2012120623A1 (ja) * | 2011-03-07 | 2012-09-13 | 株式会社日立製作所 | エネルギー消費管理のためのシステム、方法及びコンピュータプログラム |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015215879A (ja) * | 2014-05-12 | 2015-12-03 | 富士通株式会社 | 動的デマンドレスポンスイベント評価 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20140095410A1 (en) | 2014-04-03 |
| CA2828218A1 (en) | 2014-03-28 |
| KR20140042709A (ko) | 2014-04-07 |
| MX2013011271A (es) | 2014-07-03 |
| EP2713321A2 (en) | 2014-04-02 |
| BR102013024894A2 (pt) | 2015-06-23 |
| AU2013234386A1 (en) | 2014-04-17 |
| MX349811B (es) | 2017-08-14 |
| EP2713321A3 (en) | 2015-09-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2014071901A (ja) | 需要応答管理のための方法およびシステム | |
| Nizami et al. | A coordinated electric vehicle management system for grid-support services in residential networks | |
| Majzoobi et al. | Application of microgrids in supporting distribution grid flexibility | |
| Chen et al. | A communication-based appliance scheduling scheme for consumer-premise energy management systems | |
| Parvania et al. | Integrating load reduction into wholesale energy market with application to wind power integration | |
| Prüggler | Economic potential of demand response at household level—Are Central-European market conditions sufficient? | |
| US20130066482A1 (en) | Apparatus and method for executing energy demand response process in an electrical power network | |
| US20110258018A1 (en) | System and method for scheduling demand response events in a network | |
| AU2017444938B2 (en) | A multi-agent shared machine learning approach for real-time battery operation mode prediction and control | |
| WO2012098729A1 (ja) | 電力需要調整装置、電力調整ネットワークシステム及び電力調整方法 | |
| EP2779085A1 (en) | Operation planning system and method for creating operation plan | |
| JP5622924B2 (ja) | 電力需要管理システム及び電力需要管理方法 | |
| Gomez-Herrera et al. | Optimization-based estimation of power capacity profiles for activity-based residential loads | |
| EP2503503A1 (en) | Systems and methods for generating a utility bill | |
| JP2016046922A (ja) | 電力需給調整システム、上位地域電力管理装置、および、下位地域電力管理装置 | |
| Al-Rubaye et al. | Dynamic pricing mechanism in smart grid communications is shaping up | |
| EP2503504A1 (en) | Systems and methods for generating a bill | |
| Carpinelli et al. | Demand response and energy storage systems: An industrial application for reducing electricity costs. Part I: Theoretical aspects | |
| Wei et al. | Scenario-based real-time demand response considering wind power and price uncertainty | |
| Jeddi et al. | Network impact of multiple HEMUs with PVs and BESS in a low voltage distribution feeder | |
| EP2503499A1 (en) | Systems and methods for generating a bill | |
| Abdelmotteleb et al. | Incentivizing consumer response through cost-reflective distribution network charges | |
| Zhu et al. | Benefits analysis of all parties participating in demand response | |
| Mishra et al. | management: State of the art | |
| Chen et al. | Stochastic pricing game for aggregated demand response considering comfort level |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160915 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20171005 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20171031 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180125 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20180619 |