[go: up one dir, main page]

JP2011020805A - Rope hooking method of elevator and rope hooking tool used therefor - Google Patents

Rope hooking method of elevator and rope hooking tool used therefor Download PDF

Info

Publication number
JP2011020805A
JP2011020805A JP2009167959A JP2009167959A JP2011020805A JP 2011020805 A JP2011020805 A JP 2011020805A JP 2009167959 A JP2009167959 A JP 2009167959A JP 2009167959 A JP2009167959 A JP 2009167959A JP 2011020805 A JP2011020805 A JP 2011020805A
Authority
JP
Japan
Prior art keywords
rope
sheave
hoistway
dummy
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009167959A
Other languages
Japanese (ja)
Inventor
Naohiro Takamura
尚宏 高村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2009167959A priority Critical patent/JP2011020805A/en
Publication of JP2011020805A publication Critical patent/JP2011020805A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a rope hooking method of an elevator and a rope hooking tool used therefor, capable of instantly coping with it when an accident is caused, by being placed in a range visually confirmable by a worker, by wholly storing a rope in rope hooking work in a hoistway, by setting a rope releasing place on a gondola for installation work or on a car. <P>SOLUTION: The rope hooking tool 10 includes drums 14 and 15 wound with the rope 18 and first and second dummy sheaves 12 and 13, and is arranged on an upper surface of the car 21 existing in the lowest part in the hoistway 25. After winding the rope 18 laid around the dummy sheaves 12 and 13 and a suspending-supporting sheave 22 of the car 21, on a suspending-supporting sheave 30 of a counterweight 29 existing in the lowest part of the hoistway, its one end is locked on the rope hooking tool 10, and the car 21 is hoisted up to the uppermost part of the hoistway, and the rope 18 wound on the second dummy sheave 13 is replaced with a driving sheave of a hoisting machine 28, and one end and the other end are fixed to rope pitches 26 and 27. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、エレベータ設備の昇降路内において、吊支持用のロープを乗りかご、釣合錘及び巻上機の各シーブに巻き掛けるエレベータのロープ掛け方法及びそれに用いられるロープ掛け冶具に関する。   The present invention relates to an elevator rope hanging method in which a rope for suspension support is wound around each sheave of a car, a counterweight, and a hoisting machine in a hoistway of an elevator facility, and a rope hanging jig used for the method.

エレベータの吊指示用のロープを、昇降路内において、吊支持用のロープを乗りかご、釣合錘及び巻上機の各機器に引廻して巻き掛ける場合、ロープの束を昇降路外の、例えば最上階のエレベータホールに仮置きし、順次解きながら昇降路内に搬入し上述した各機器の綱車に巻きかけ、端部を所定のロープ固定金具に取り付けていた。また、ロープが、鋼製や樹脂製のドラムに予め巻かれている場合では、このドラムを同じくエレベータホールに仮置きし、専用のスタンドなどを用いて回動可能なように構成し、同様にロープ掛け作業を行っていた(例えば、特許文献1参照)。   When the rope for lifting the elevator is routed around the hoistway, the rope for hanging support is wound around the car, the counterweight and the hoisting machine, the bundle of ropes is placed outside the hoistway. For example, it was temporarily placed in the elevator hall on the top floor, carried into the hoistway while being sequentially unwound, wrapped around the sheaves of each device described above, and the end portion was attached to a predetermined rope fixing bracket. Also, if the rope is pre-wound around a steel or resin drum, this drum is also temporarily placed in the elevator hall and can be rotated using a dedicated stand, etc. Rope hanging work was performed (for example, refer to Patent Document 1).

特開2008−308248号公報JP 2008-308248 A

上述した従来の方法では、ロープをエレベータホールに仮置しなければならず、据付作業中は、他の業者との共有スペースを占有することになるため、迷惑を掛けることとなる。また、昇降路にてロープの巻き掛け作業を行っているときは、作業者は、ロープを設置している場所を離れなければいけない。このため、ホール前に設置してあるロープの束になんらかの異変、例えば、解けるスピードの変化、障害物への接触などが起こった場合に対応できなかった。   In the conventional method described above, the rope must be temporarily placed in the elevator hall, and during installation work, it occupies a shared space with other contractors, which causes trouble. In addition, when the rope is wound around the hoistway, the worker must leave the place where the rope is installed. For this reason, it was not possible to cope with any change in the bundle of ropes installed in front of the hall, such as a change in the speed at which the rope can be unwound and contact with an obstacle.

本発明の目的は、ロープの解く場所を据付作業用ゴンドラ上、又はかご上とし、ロープ掛け作業中のロープを全て昇降路内に収め、作業員が視認できる範囲に置くことで、異変が起こったときに即座に対応できるようにしたエレベータのロープ掛け方法、及びそれに用いられるロープ掛け冶具を提供することにある。    The object of the present invention is to place the rope on the gondola for installation work or on the cage, place all the ropes being roped in the hoistway, and place them in a range that can be visually recognized by the worker. It is an object of the present invention to provide an elevator rope-hanging method and a rope-hanging jig used in the elevator rope-hanging method that can respond immediately.

本発明によるエレベータのロープ掛け方法は、エレベータ設備の昇降路内において、吊支持用のロープを乗りかご、釣合錘及び巻上機の各シーブに巻き掛けるエレベータのロープ掛け方法であって、前記ロープを巻回したドラムを有し、このドラムから一方の側辺部に設けた第1のダミーシーブを経てロープを繰り出し可能であり、前記第1のダミーシーブの設置位置の反対側辺部に第2のダミーシーブが設けられたロープ掛け冶具を、前記昇降路内の最下位置に位置している前記乗りかごの上面に設置する工程と、前記ドラムから前記ロープの一端を引き出し、前記第1のダミーシーブから、乗りかごの吊支持用シーブを経て前記第2のダミーシーブに引き廻してこれらに巻き掛け、さらに前記昇降路内の最下位置で、乗りかごの側方に位置する前記釣合錘の吊支持用シーブに巻き掛けたのち、その一端をロープ掛け冶具上に係止する工程と、前記釣合錘を前記昇降路最下部に固定した状態で前記乗りかごを前記昇降路の最上部まで揚重し、一端をロープ掛け冶具上に係止した前記ロープを前記ドラムから繰り出させる工程と、前記乗りかごが前記昇降路内の最上部位置に達した状態で、前記第2のダミーシーブに巻き掛けられている前記ロープを、昇降路上部に設けられた巻上機の駆動シーブに掛け替えると共に、前記ロープの、ロープ掛け冶具上に係止された一端、及び前記ドラム側の他端を、それぞれ前記昇降路上部の所定のロープヒッチに固定する工程とを有することを特徴とする。   The elevator rope hanging method according to the present invention is an elevator rope hanging method in which a suspension support rope is wound around each sheave of a car, a counterweight, and a hoisting machine in a hoistway of an elevator facility. It has a drum around which a rope is wound, and the rope can be fed out from this drum through a first dummy sheave provided on one side, and a second side on the side opposite to the installation position of the first dummy sheave. Installing a rope hanging jig provided with a dummy sheave on the upper surface of the car located at the lowest position in the hoistway, pulling out one end of the rope from the drum, and To the second dummy sheave through the suspension support sheave of the car and wrap it around them, and further to the side of the car at the lowest position in the hoistway. A step of hooking one end of the counterweight on a rope-supporting jig after the suspension weight is wrapped around a sheave for supporting the counterweight, and a state where the counterweight is fixed to the lowermost part of the hoistway. The step of lifting the rope, which is lifted up to the uppermost part of the hoistway, and having one end locked on a rope hanging jig, from the drum, and in a state where the car has reached the uppermost position in the hoistway, The rope wound around the second dummy sheave is replaced with a drive sheave of a hoist provided at the upper part of the hoistway, and one end of the rope locked on the rope hooking jig, and the drum And fixing the other end of each side to a predetermined rope hitch above the hoistway.

また、本発明のエレベータのロープ掛け方法は、前記ロープを巻回したドラムを有し、このドラムから一方の側辺部に設けた第1のダミーシーブを経てロープを繰り出し可能なロープ掛け冶具を、前記昇降路内の最下位置に位置している前記乗りかごの上方に位置する作業用のゴンドラ上に設置する工程と、前記ドラムから前記ロープの一端を引き出し、前記第1のダミーシーブから、乗りかごの吊支持用シーブに引き廻して巻き掛け、さらに、その前記一端をロープ掛け冶具上に係止する工程と、前記乗りかごを前記昇降路最下部に固定した状態で前記ゴンドラを前記昇降路の最上部まで揚重し、一端をロープ掛け冶具上に係止した前記ロープを、前記ドラムから繰り出させる工程と、前記ゴンドラが前記昇降路内の最上部位置に達した状態で、前記ロープの一端をロープ掛け冶具上にから取り外し、昇降路上部に設けられた巻上機の駆動シーブを経て前記昇降路の最上部位置に位置する釣合錘の吊支持用シーブに巻き掛け、さらに、このロープの一端を前記昇降路上部の一方のロープヒッチに固定すると共に、前記ロープの前記ドラム側の他端を、前記昇降路上部の他のロープヒッチに固定する工程とを有してもよい。   In addition, the rope hanging method of the elevator of the present invention includes a rope winding jig having a drum around which the rope is wound, and capable of feeding the rope from the drum through a first dummy sheave provided on one side. Installing on a working gondola located above the car located at the lowest position in the hoistway, pulling out one end of the rope from the drum, and from the first dummy sheave And winding the gondola on the hoistway in a state in which the car is fixed to the lowermost part of the hoistway, and the one end is locked on a rope hooking jig. And lifting the rope, one end of which is locked onto a rope hanging jig, from the drum, and the state where the gondola has reached the uppermost position in the hoistway Then, one end of the rope is removed from the rope hanging jig, and is wound around a sheave for supporting the suspension of the counterweight located at the uppermost position of the hoistway through the drive sheave of the hoisting machine provided at the upper part of the hoistway. And fixing one end of the rope to one rope hitch at the upper part of the hoistway and fixing the other end of the rope to the other rope hitch at the upper part of the hoistway. May be.

本発明によるエレベータのロープ掛け冶具は、エレベータの乗りかご上又は作業用ゴンドラに設置可能な架台と、この架台の上方から見た一側辺部に設けられ、この一側辺に沿って平行に配置される複数本のロープをその長さ方向に送りだし可能に支持する第1のダミーシーブと、前記架台上に設置され、それぞれ前記ロープが巻回されており、これらロープの各一端を前記第1のダミーシーブに向って引き出し可能であり、かつこの引き出されたロープが前記第1のダミーシーブに達するまで互いに干渉しないように前記架台上における設置位置が設定された複数のドラムと、前記架台の前記一側辺と対向する他側辺部に設けられ、前記ドラムから繰り出され、前記第1のダミーシーブから、下方に位置するエレベータ乗りかごの吊支持用シーブに巻き掛けられて引き廻されたロープの一端部を係止する係止部とを備えたことを特徴とする。   An elevator rope hanging jig according to the present invention is provided on a base that can be installed on an elevator car or a work gondola, and on one side of the base as viewed from above, and is parallel to the side. A first dummy sheave that supports a plurality of arranged ropes so as to be sent out in the length direction thereof, and is installed on the frame, and each of the ropes is wound around the first dummy sheave. A plurality of drums, the installation positions of which are set on the gantry so as not to interfere with each other until the drawn rope reaches the first dummy sheave, and the one of the gantry Provided on the other side opposite to the side, extended from the drum, and used to support the elevator car located below the first dummy sheave. Characterized by comprising a locking portion for locking the end portion of the wound around and pulled fucked the rope over drive.

また、本発明のエレベータのロープ掛け冶具は、エレベータの乗りかご上又は作業用ゴンドラに設置可能な架台と、この架台の上方から見た一側辺部に設けられ、この一側辺に沿って平行に配置される複数本のロープをその長さ方向に送りだし可能に支持する第1のダミーシーブと、前記架台上に設置され、それぞれ前記ロープが巻回されており、これらロープの各一端を前記第1のダミーシーブに向って引き出し可能であり、かつこの引き出されたロープが前記第1のダミーシーブに達するまで互いに干渉しないように前記架台上における設置位置が設定された複数のドラムと、前記架台の前記一側辺を対向する他側辺部に設けられ、前記ドラムから繰り出され、前記第1のダミーシーブから、下方に位置するエレベータ乗りかごの吊支持用シーブに引き廻されたロープが巻き掛けられる第2のダミーシーブ、及びこの第2のダミーシーブを経て釣合錘の吊支持用シーブに巻き掛けられたロープの前記一端部を係止する係止部とを備えた構成でもよい。   The elevator rope hanging jig of the present invention is provided on a base that can be installed on the elevator car or on a work gondola, and on one side as viewed from above the base, along the one side. A first dummy sheave that supports a plurality of ropes arranged in parallel so as to be able to feed out in the length direction thereof, is installed on the frame, and each of the ropes is wound, and one end of each of the ropes is A plurality of drums that can be pulled out toward the first dummy sheave and that have their installation positions set on the gantry so as not to interfere with each other until the drawn rope reaches the first dummy sheave; A suspension support for an elevator car provided on the other side opposite to the one side, fed from the drum, and positioned below the first dummy sheave A second dummy sheave around which the rope drawn around the sheave is wound, and a locking portion for locking the one end of the rope wound around the sheave for suspension support of the counterweight via the second dummy sheave; The structure provided with may be sufficient.

本発明のエレベータのロープ掛け冶具では、第1のダミーシーブは、下方に位置する乗りかごの下面に設けられたカーシープの一方と、垂直投影面上で同じ位置になるように位置決めされているとよい。   In the elevator rope hanging jig of the present invention, the first dummy sheave may be positioned so as to be at the same position on the vertical projection plane as one of the car sheaves provided on the lower surface of the car located below. .

本発明によれば、昇降路内に揚重可能に設けられたかご又は据付作業用ゴンドラ上にロープを供給用のドラムを設置し、このかご又はゴンドラを揚重させることにより、ロープを繰り出して所定の機器に巻きかけるようにしたので、ロープ掛け作業が容易になると共に、ロープ掛け作業中のロープは、全て昇降路内に収められ、作業員が視認できる範囲に置かれるので、異変が起こったときにも即座に対応することができる。   According to the present invention, a rope for supplying a rope is installed on a car or an installation gondola provided in a hoistway so as to be lifted, and the rope is fed out by lifting the car or gondola. Since it is wrapped around the specified equipment, it is easy to hang the rope, and all the ropes that are being laid are stored in the hoistway and placed in a range that can be visually recognized by the operator, so that abnormalities occur. Can respond immediately.

本発明のロープ掛け冶具の一実施の形態を示す正面図である。It is a front view which shows one Embodiment of the rope hooking jig of this invention. 同上ロープ掛け冶具の平面図である。It is a top view of a rope hanging jig same as the above. 同上ロープ掛け冶具を乗りかご上に設置した場合を示す正面図である。It is a front view which shows the case where a rope hanging jig same as the above is installed on a passenger car. 本発明のロープ掛け冶具を乗りかご上に設置して行うエレベータのロープ掛け方法の実施の形態を説明するフローチャートである。It is a flowchart explaining embodiment of the rope hanging method of the elevator performed by installing the rope hanging jig of this invention on a passenger car. 図4で説明した各ステップの作業を模式的に示す作業説明図である。FIG. 5 is an operation explanatory diagram schematically showing the operation of each step described in FIG. 4. 本発明のロープ掛け冶具を作業用ゴンドラ上に設置して行うエレベータのロープ掛け方法の実施の形態を説明するフローチャートである。It is a flowchart explaining embodiment of the rope hanging method of the elevator performed by installing the rope hanging jig of this invention on the work gondola. 図6で説明した各ステップの作業を模式的に示す作業説明図である。FIG. 7 is an operation explanatory diagram schematically showing the operation of each step described in FIG. 6. 本発明に用いるローブ引き上げ冶具の一例を示しており、(a)は正面図、(b)は側面図である。An example of the lobe raising jig used for this invention is shown, (a) is a front view, (b) is a side view.

以下、本発明によるエレベータのロープ掛け方法、及びそれに用いられるロープ掛け冶具の一実施の形態について、図面を用いて詳細に説明する。   DESCRIPTION OF EMBODIMENTS Hereinafter, an embodiment of an elevator rope hanging method according to the present invention and a rope hanging jig used therefor will be described in detail with reference to the drawings.

まず、図1及び図2によりロープ掛け治具10を説明する。なを、図1はロープ掛け冶具10の正面図、図2はその平面図である。   First, the rope hanging jig 10 will be described with reference to FIGS. 1 and 2. FIG. 1 is a front view of a rope hanging jig 10 and FIG. 2 is a plan view thereof.

これらの図において、ロープ掛け冶具10は、架台11を有する。この架台11は、後述するように、昇降路内に設けられるエレベータの乗りかご又は作業用ゴンドラの上に設置可能に構成されている。この架台11上には、第1及び第2の仮綱車(以下、ダミーシーブと呼ぶ)12,13、ロープ供給用のドラム14,15,16、ロープの一端部を係止する係止部17がそれぞれ設けられている。   In these drawings, the rope hanging jig 10 has a gantry 11. As will be described later, the gantry 11 is configured to be installed on an elevator car or a work gondola provided in a hoistway. On this gantry 11, first and second temporary sheaves (hereinafter referred to as dummy sheaves) 12, 13, rope supply drums 14, 15, 16, a locking portion 17 that locks one end of the rope. Are provided.

第1のダミーシーブ12は、架台11上の、上方から見た一側辺部(図示左辺近く)に設けられ、この一側辺(左側辺:図1の紙面と直交する方向))に沿う回転軸12Aを有し、軸受12Bにより回転可能に支持されている。この第1のダミーシーブ12の外周上には、前記ドラム14,15,16から複数本のロープ18が、前記一側辺に沿って平行な状態でに巻き掛けられ、その回転により、この複数本のロープ18を、図示下方へその長さ方向に送り出すものである。   The first dummy sheave 12 is provided on one side of the gantry 11 as viewed from above (near the left side in the figure), and rotates along this one side (left side: a direction perpendicular to the paper surface of FIG. 1)). It has a shaft 12A and is rotatably supported by a bearing 12B. On the outer periphery of the first dummy sheave 12, a plurality of ropes 18 are wound from the drums 14, 15, and 16 in a parallel state along the one side. The rope 18 is sent out in the length direction downward in the figure.

複数のドラム14,15,16は、第1のダミーシーブ12の回転軸12Aとそれぞれ平行な回転軸14A,15A,16Aを有し、対応する軸受14B,15B,16Bにより架台11上にそれぞれ回転可能に設置されている。これらドラム14,15,16には、それぞれロープ18が巻回されており、その回転により、これらロープの各一端を第1のダミーシーブ12に向って引き出し可能である。   The plurality of drums 14, 15, 16 have rotation shafts 14 A, 15 A, 16 A that are parallel to the rotation shaft 12 A of the first dummy sheave 12, respectively, and can be rotated on the gantry 11 by corresponding bearings 14 B, 15 B, 16 B, respectively. Is installed. A rope 18 is wound around each of the drums 14, 15, and 16, and each end of these ropes can be pulled out toward the first dummy sheave 12 by the rotation.

ここで、各ドラム14,15,16は、図2で示すように、それぞれ3つのロープ巻回部を有し、各ドラム毎に3本ずつ、計9本のロープ18を、並列な状態で第1のダミーシーブ12へ送り出すことができる。この場合、各ドラム14,15,16から引き出されたロープ18が、第1のダミーシーブ12に達するまで互いに干渉しないように架台11上における設置位置を設定している。すなわち、第1のダミーシーブ12は、高さ方向で、ドラム14から繰り出されるロープ(18aとする)と、ドラム15から繰り出されるロープ(18bとする)との間に配置することにより、これらロープ18a、18bが描く軌跡が互いに干渉することなく第1のダミーシーブ12から繰り出すことが可能となる。また、ドラム16は、ドラム14,15より高い位置で、しかも前後方向(図示左右方向)についてはドラム14,15間に配置する。このことで、繰り出されるロープ(18cとする)が他のロープ18a,18bと緩衝せず、架台11上における設置スペースを短縮できる。したがって、ロープ本数が多くなる場合においても、ロープ掛け治具10の全体寸法を小さく構成できる。   Here, as shown in FIG. 2, each of the drums 14, 15, and 16 has three rope winding portions, and three ropes for each drum, a total of nine ropes 18 in parallel. It can be sent to the first dummy sheave 12. In this case, the installation position on the gantry 11 is set so that the ropes 18 drawn from the drums 14, 15, 16 do not interfere with each other until reaching the first dummy sheave 12. That is, the first dummy sheave 12 is disposed between a rope (18a) fed out from the drum 14 and a rope (18b) fed out from the drum 15 in the height direction. , 18b can be drawn out from the first dummy sheave 12 without interfering with each other. The drum 16 is disposed at a position higher than the drums 14 and 15 and between the drums 14 and 15 in the front-rear direction (the left-right direction in the drawing). Thus, the drawn-out rope (referred to as 18c) does not buffer with the other ropes 18a and 18b, and the installation space on the gantry 11 can be shortened. Therefore, even when the number of ropes increases, the overall dimensions of the rope hooking jig 10 can be reduced.

第2のダミーシーブ13は、第1のダミーシーブ12の回転軸12Aと平行な回転軸13Aを有し、軸受13Bにより、架台11上に回転可能に設置されている。この第2のダミーシーブ13は、架台11上の、前記一側辺と対向する他側辺部(図示右辺近く)に設けられており、各ドラム14,15,16から繰り出され、第1のダミーシーブ12から、後述するように、図示しない下方に位置するエレベータ乗りかごの吊支持用シーブに巻き掛けられたロープを、巻上機のシーブに代って巻き掛けるものである。   The second dummy sheave 13 has a rotation shaft 13A parallel to the rotation shaft 12A of the first dummy sheave 12, and is rotatably installed on the gantry 11 by a bearing 13B. The second dummy sheave 13 is provided on the gantry 11 on the other side (near the right side in the figure) facing the one side, and is fed out from the drums 14, 15, 16, and the first dummy sheave 13. 12, a rope wound around a sheave for lifting support of an elevator car located below (not shown) is wound instead of the sheave of a hoisting machine.

さらに、ロープ18の一端部を係止する係止部17は、第2のダミーシーブ13と同じく架台11上の、図示右辺近くに設けられており、後述するように、図示しない釣合錘の吊支持用シーブに巻き掛けられたロープ18の一端部を係止する。   Further, the locking portion 17 for locking one end portion of the rope 18 is provided near the right side in the figure on the gantry 11 like the second dummy sheave 13 and, as will be described later, One end of the rope 18 wound around the supporting sheave is locked.

このように、第1及び第2のダミーシーブ12,13、ロープ供給用の複数のドラム14,15,16、ロープの一端部を係止する係止部17を架台11上に配置したロープ掛け冶具10は、特に、複数のドラム14,15,16を前後(図示左右)及び上下に合理的に配置したことにより、取り扱うロープ18の本数が多くても、全体として占有面積を小さくでき、昇降路内における乗りかご又は作業用のゴンドラ上に装着可能な形状に構成することができる。   In this way, the first and second dummy sheaves 12 and 13, the plurality of drums 14, 15 and 16 for supplying the rope, and the locking portion 17 for locking one end of the rope are arranged on the mount 11. 10, in particular, by arranging a plurality of drums 14, 15 and 16 rationally in the front and rear (left and right in the figure) and up and down, even if the number of ropes 18 to be handled is large, the total occupied area can be reduced, It can be configured in a shape that can be mounted on a car or a working gondola inside.

次に、このようなロープ掛け冶具10を用いて昇降路内においてロープ掛けを行う場合を説明する。まず、ロープ掛け冶具10を、図3で示すように、エレベータの乗りかご21上に設置してロープ掛けを行う場合を説明する。なお、図3はロープ掛け治具10を乗りかご21上に乗せたときの状態を示す概略図である。   Next, the case where a rope is hooked in a hoistway using such a rope hooking jig 10 will be described. First, as shown in FIG. 3, the case where the rope hanging jig 10 is installed on the elevator car 21 and is roped will be described. FIG. 3 is a schematic view showing a state when the rope hanging jig 10 is placed on the car 21.

図3において、乗りかご21は、昇降路内で組み立てられたものであり、その下面には、吊支持用の2つのシーブ(以下、カーシーブと呼ぶ)22が設けられている。ロープ掛け冶具10は、乗りかご21の上面に装着された架台11上に、第1及び第2のダミーシーブ12,13、ロープ供給用の複数のドラム14,15、ロープの一端部を係止する係止部17を、前述した配置構成により取り付けている。なお、図1及び図2では、ロープ供給用として3つのドラム14,15,16を示したが、図3では説明を簡略化するために2つのドラム14,15を取り付けた場合を示している。一般に、ロープ18の本数は、エレベータの定格積載荷重等により種々であり、2つのドラム14,15だけの場合も、実際には充分あり得ることである。   In FIG. 3, a car 21 is assembled in a hoistway, and two sheaves (hereinafter referred to as car sheaves) 22 for supporting suspension are provided on the lower surface thereof. The rope hooking jig 10 locks the first and second dummy sheaves 12 and 13, a plurality of drums 14 and 15 for supplying rope, and one end of the rope on a gantry 11 mounted on the upper surface of the car 21. The locking part 17 is attached by the arrangement configuration described above. 1 and 2 show the three drums 14, 15, and 16 for supplying the rope, but FIG. 3 shows a case in which the two drums 14 and 15 are attached to simplify the explanation. . In general, the number of ropes 18 varies depending on the rated load capacity of the elevator and the like, and in the case where only two drums 14 and 15 are used, it is actually possible.

次に、図4及び図5により、ロープ掛け冶具10を、エレベータの乗りかご21上に設置してロープ掛けを行う場合のロープ掛け方法を説明する。なお、図4はロープ掛け方法の手順を説明するフローチャートであり、図5は、図4で説明した各ステップの作業を模式的に表したものである。   Next, with reference to FIGS. 4 and 5, a description will be given of a rope hanging method when the rope hanging jig 10 is installed on the elevator car 21 and is roped. FIG. 4 is a flowchart for explaining the procedure of the rope hanging method, and FIG. 5 schematically shows the operation of each step described in FIG.

図4及び図5において、始めに、昇降路内における各種用品の据え付け作業が完了しているものとする(ステップ401)。すなわち、図5で示す昇降路25内の上部に、ロープヒッチ26,27や巻上機28が据え付けられ、また、図示しないが、乗りかご用案内レールや釣合錘用の案内レールが据え付けられ、さらに、ロープ掛け作業用の揚重機も設置されているものとする。   4 and 5, first, it is assumed that the installation work of various articles in the hoistway has been completed (step 401). That is, the rope hitches 26 and 27 and the hoisting machine 28 are installed in the upper part of the hoistway 25 shown in FIG. 5, and although not shown, a guide rail for a car and a guide rail for a counterweight are installed. Furthermore, it is assumed that a lifting machine for rope hanging work is also installed.

次に、昇降路25内において乗りかご21のかご枠が組み立てられる(ステップ402)。この乗りかご21は、図3で示した構造のものであり、その下面に2つのカーシーブ22が設けられている。また、釣合錘29も昇降路25内に設置されているものとする。この釣合錘29は、図5で示すように、上部に吊支持用のシーブ(以下、C/Wシーブと呼ぶ)30を有するものである。   Next, the car frame of the car 21 is assembled in the hoistway 25 (step 402). The car 21 has the structure shown in FIG. 3, and two car sheaves 22 are provided on the lower surface thereof. The counterweight 29 is also installed in the hoistway 25. As shown in FIG. 5, the counterweight 29 has a sheave 30 (hereinafter referred to as a C / W sheave) 30 for supporting the suspension at the top.

次に、ロープ掛け冶具10を、図5のAで示すように、昇降路25内において乗りかご21の上面に設置する(ステップ403)。このとき、乗りかご21及び釣合錘29は、共に昇降路25内の最下位置に位置している。ここで、ロープ掛け治具10は、乗りかご21上に設置されたときに、第1のダミーシーブ12が、乗りかご21の下面に設けられたカーシープ22の一方と、垂直投影面上で同じ位置になるように位置決めしておく。これは、後述するように乗りかご21を揚重したときに、ロープが乗りかご21の側面などに干渉することなく繰り出されるための構成である。   Next, as shown in FIG. 5A, the rope hooking jig 10 is installed on the upper surface of the car 21 in the hoistway 25 (step 403). At this time, the car 21 and the counterweight 29 are both located at the lowest position in the hoistway 25. Here, when the rope hanging jig 10 is installed on the car 21, the first dummy sheave 12 has the same position on the vertical projection plane as one of the car sheeps 22 provided on the lower surface of the car 21. Position it so that This is a configuration for drawing out the rope without interfering with the side surface of the car 21 and the like when the car 21 is lifted as will be described later.

この状態で、ロープ掛け冶具10上に乗り込んだ作業員は、図5のBで示すように、巻上機28側に位置する第2のダミーシーブ13の直上付近からロープ引き上げ冶具32を昇降路25内に降ろす(ステップ404)。ロープ引き上げ冶具32は、後述するように、ロープ掛け冶具10上のドラム14,15から繰り出されたロープ18の先端部を保持するもので、図8で示すように、台形状のプレート32aとその表面に設けられた挟み板32bとにより複数本のロープ18の先端部を挟持する。また、このプレート32aには、引き上げ操作用の図示しない器具を取り付けるための孔32cが設けられている。   In this state, the worker who has entered the rope hooking jig 10 moves the rope lifting jig 32 from the vicinity of the second dummy sheave 13 located on the hoisting machine 28 side to the hoistway 25 as shown by B in FIG. (Step 404). As will be described later, the rope pulling jig 32 holds the tip of the rope 18 fed from the drums 14 and 15 on the rope hooking jig 10, and as shown in FIG. The tip portions of the plurality of ropes 18 are sandwiched by the sandwiching plates 32b provided on the surface. Further, the plate 32a is provided with a hole 32c for attaching a tool (not shown) for the lifting operation.

次に、作業員はロープ掛け冶具10上のドラム14,15からそれぞれロープ18の一端を引き出し、図5のCで示すように、第1のダミーシーブ12から、乗りかご21の下面に設けられたカーシーブ22へ引き廻し、これらに巻き掛ける(ステップ405)。そしてこれらロープ18の一端を、予め昇降路25内に降ろしてあるロープ引き上げ冶具32に図5のDで示すように固定し(ステップ406)、その後、かご上のロープ掛け冶具10上に引き上げる(ステップ407)。   Next, the worker pulled out one end of the rope 18 from each of the drums 14 and 15 on the rope hanging jig 10, and was provided on the lower surface of the car 21 from the first dummy sheave 12 as shown by C in FIG. It is drawn around the car sheave 22 and wrapped around them (step 405). Then, one end of these ropes 18 is fixed to a rope pulling jig 32 previously lowered into the hoistway 25 as shown by D in FIG. 5 (step 406), and then pulled up onto the rope hanging jig 10 on the cage (step 406). Step 407).

作業員は、この引き上げたロープ18を、図5のEで示すように、第2のダミーシーブ13に図示右まわりに巻き掛ける(ステップ408)。この後、さらにロープ18を、昇降路25内の最下位置で、乗りかご21の側方に位置する釣合錘29のC/Wシーブ30に引き廻して図示左回りに巻き掛け(ステップ409)、その一端をロープ掛け冶具10の係止部17に係止し、固定する(ステップ410)。   The worker wraps the pulled rope 18 around the second dummy sheave 13 clockwise as shown by E in FIG. 5 (step 408). Thereafter, the rope 18 is further drawn around the C / W sheave 30 of the counterweight 29 located on the side of the car 21 at the lowest position in the hoistway 25 and wound counterclockwise in the figure (step 409). ), One end is locked to the locking portion 17 of the rope hanging jig 10 and fixed (step 410).

次に、図5のFで示すように、釣合錘29を昇降路25の最下部に固定した状態で、乗りかご21を図示しない揚重機により昇降路25の最上部まで揚重する。この乗りかご21の揚重により、その上部に固定されたロープ掛け冶具10も上昇するので、このロープ掛け冶具10上の係止部17に一端が係止されたロープ18は、最下位置のC/Wシーブ30、揚重される第2のダミーシーブ13、カーシーブ22、及び第1のダミーシーブ12を介して、対応するドラム14,15から繰り出される(ステップ411)。   Next, as shown by F in FIG. 5, with the counterweight 29 fixed to the lowermost part of the hoistway 25, the car 21 is lifted up to the uppermost part of the hoistway 25 by a lifting machine (not shown). As the elevator car 21 is lifted, the rope hanging jig 10 fixed to the upper part thereof is also lifted, so that the rope 18 whose one end is locked to the locking portion 17 on the rope hanging jig 10 is located at the lowest position. The drums are fed out from the corresponding drums 14 and 15 through the C / W sheave 30, the second dummy sheave 13 to be lifted, the car sheave 22, and the first dummy sheave 12 (step 411).

このようにして、乗りかご21が昇降路25内の最上部に達すると乗りかご21をこの最上部位置で停止させ、ロープ掛け冶具10上の作業員は、図5のGで示すように、第2のダミーシーブ13に巻き掛けられているロープ18を、昇降路25の上部に設けられた巻上機28の駆動シーブに掛け替える(ステップ412)。また、ロープ19の、ロープ掛け冶具10上に係止された一端を昇降路25の上部に設けられたロープヒッチ27に固定する(ステップ413)。さらに、ドラム14,16側の他端を、昇降路25の上部に設けられたロープヒッチ26に固定する(ステップ414)ことにより、図5のHで示すように、ロープ掛け作業が終了する。   In this way, when the car 21 reaches the uppermost part in the hoistway 25, the car 21 is stopped at this uppermost position, and an operator on the rope hanging jig 10 can move as shown by G in FIG. The rope 18 wound around the second dummy sheave 13 is replaced with the drive sheave of the hoisting machine 28 provided at the upper part of the hoistway 25 (step 412). Further, one end of the rope 19 locked on the rope hooking jig 10 is fixed to the rope hitch 27 provided on the upper part of the hoistway 25 (step 413). Further, by fixing the other end of the drums 14 and 16 to the rope hitch 26 provided at the upper part of the hoistway 25 (step 414), the rope-hanging operation is completed as indicated by H in FIG.

ここで、乗りかご21に取り付けられるカーシープ30が乗りかご25の下部となる場合は、一般的に乗りかご25が昇降路の下部に位置しているときにかご廻りのロープ掛けを終了しなければならない。そのため従来のロープ掛けでは、釣合錘を昇降路上部、かごを昇降路下部に位置させて行う必要があった。しかし、機械室が無いエレベータで、昇降路内上部に各機器(ロープ固定部品、制御盤)が設置される場合では、その昇降路上部でロープ固定作業、エレベータ試運転作業を行わなくてはならず、別途昇降路上部に作業床を設置(空中足場など)しなくてはならなかった。   Here, when the car sheep 30 attached to the car 21 is the lower part of the car 25, generally, the rope hanging around the car must be finished when the car 25 is located at the lower part of the hoistway. Don't be. Therefore, in the conventional rope hanging, it is necessary to carry out by placing the counterweight in the upper part of the hoistway and the cage in the lower part of the hoistway. However, in the case of an elevator that does not have a machine room and equipment (rope fixing parts, control panel) is installed in the upper part of the hoistway, the rope fixing work and the elevator trial operation work must be performed in the upper part of the hoistway. In addition, it was necessary to install a work floor (aerial scaffolding, etc.) at the top of the hoistway.

これに対し、本発明の上記実施の形態では、ステップ404からステップ410までの段階において、釣合錘29を含めた乗りかご21廻りのロープ引廻しを昇降路25の下部において完了する。その後、乗りかご21を上部に揚重しているため、かご揚重後の乗りかご天井を作業床として用いることができる。このようにすれば、昇降路上部に別途作業床を設置する作業を省略することができる。また、乗りかご21の揚重時に、乗りかご21上に設置されたロープ掛け冶具10のドラム14,15から、複数本のロープ18を一斉に繰り出させることができる。そして、乗りかご21を昇降路25の最上位置に揚重後、前述のように、この乗りかご21の天井部を作業床として、繰り出されたロープ18の巻上機28への掛け替えや、ロープ端部のヒッチ部26,27への固定作業を実施できるので、エレベータのロープ掛け作業を従来に比べ、大幅に容易化及び簡略化できる。   On the other hand, in the above embodiment of the present invention, the rope routing around the car 21 including the counterweight 29 is completed in the lower part of the hoistway 25 in the steps from step 404 to step 410. Thereafter, since the car 21 is lifted upward, the car ceiling after the car is lifted can be used as a work floor. In this way, the work of installing a separate work floor at the upper part of the hoistway can be omitted. Further, when the car 21 is lifted, a plurality of ropes 18 can be fed simultaneously from the drums 14 and 15 of the rope hanging jig 10 installed on the car 21. Then, after lifting the car 21 to the uppermost position of the hoistway 25, as described above, using the ceiling portion of the car 21 as a work floor, changing the rope 18 fed to the hoisting machine 28, Since the fixing work to the hitch parts 26 and 27 at the ends can be performed, the rope hanging work of the elevator can be greatly simplified and simplified as compared with the conventional one.

また、このロープ掛け作業は、昇降路25内においてすべて行うことができる。このため、従来のように、ある階のエレベータホール上にロープ束や、ロープ供給ドラムを設置して、他の作業者に迷惑をかけることはない。また、ロープ供給用のドラム14,15は、乗りかご21上のロープ掛け冶具10上に設置されており、この冶具10上にはロープ掛け作業員が常に居ることから、仮にドラム14,15からのロープ繰り出しに不具合が生じても、作業員はこの不具合をただちに発見して対処することができ、ロープ掛け作業をより一層確実なものとすることができる。   Further, this rope hanging work can be performed entirely in the hoistway 25. For this reason, unlike conventional ones, a rope bundle or a rope supply drum is installed on an elevator hall on a certain floor, so that other workers are not disturbed. Moreover, the ropes 14 and 15 for supplying the rope are installed on the rope hanging jig 10 on the car 21, and since there is always a rope hanging worker on the jig 10, the drums 14 and 15 are temporarily Even if a problem occurs in the rope feeding out, the worker can immediately find and deal with this problem, and the rope hanging work can be further ensured.

次に、ロープ掛け冶具10を、エレベータの乗りかご21の上方に位置する作業用ゴンドラに設置してロープ掛けを行う場合のロープ掛け方法を図6及び図7を用いて説明する。なお、図6はロープ掛け方法の手順を説明するフローチャートであり、図7は、図6で説明した各ステップの作業を模式的に表したものある。   Next, a rope hanging method when the rope hanging jig 10 is installed on a work gondola located above the elevator car 21 and is roped will be described with reference to FIGS. FIG. 6 is a flowchart for explaining the procedure of the rope hanging method, and FIG. 7 schematically shows the operation of each step described in FIG.

図6及び図7において、始に、昇降路内における各種用品の据え付け、及び釣合錘(C/W)の昇降路25最上部への揚重が完了しているものとする(ステップ601)。すなわち、図7で示す昇降路25内の上部に、ロープヒッチ26,27や巻上機28が据え付けられ、また、図示しないが、乗りかご用案内レールや釣合錘用の案内レールが据え付けられ、さらに、ロープ掛け作業用の揚重機も設置されており、この揚重機により、図7のAで示すように、釣合錘29の昇降路25の最上位置への揚重が完了して固定されているものとする。なお、釣合錘29は上部に吊支持用のC/Wシーブ30を有するものである。   6 and 7, first, it is assumed that the installation of various articles in the hoistway and the lifting of the counterweight (C / W) to the top of the hoistway 25 have been completed (step 601). . That is, the rope hitches 26 and 27 and the hoisting machine 28 are installed in the upper part of the hoistway 25 shown in FIG. 7, and although not shown, a guide rail for a car and a guide rail for a counterweight are installed. In addition, a lifting machine for rope hanging work is also installed. With this lifting machine, as shown by A in FIG. 7, the lifting of the counterweight 29 to the uppermost position of the hoistway 25 is completed and fixed. It is assumed that The counterweight 29 has a C / W sheave 30 for suspension support at the top.

次に、昇降路25内において乗りかご21のかご枠が組み立てられる(ステップ602)。組み立てられた乗りかご21は、昇降路25内の最下位置に位置している。この乗りかご21は、下面に2つのカーシーブ22が設けられているものとする。   Next, the car frame of the car 21 is assembled in the hoistway 25 (step 602). The assembled car 21 is located at the lowest position in the hoistway 25. The car 21 is assumed to have two car sheaves 22 on the lower surface.

昇降路25内の、最下位置に位置している乗りかご21の上方には、図7のAで示すように、作業用のゴンドラ35が揚重可能に設けられており、このゴンドラ35上に、前述したロープ掛け冶具10を設置する(ステップ603)。このロープ掛け治具10は、図3で示したものと基本的に同じ構造であるが、ゴンドラを用いたロープ掛け方法では、第2のダミーシーブ13は用いないため、この第2のダミーシーブを取り除いた構造でもよい。また、このロープ掛け冶具10は、ゴンドラ35上に設置された状態において、第1のダミーシーブ12が、下方に位置する乗りかご21の下面に設けられたカーシープ22の一方と、垂直投影面上で同じ位置になるように位置決めしておく。これは、後述するようにゴンドラ35を揚重したときに、ロープが乗りかご21の側面などに干渉することなく繰り出されるための構成である。   Above the car 21 located at the lowest position in the hoistway 25, as shown by A in FIG. 7, a working gondola 35 is provided so that it can be lifted. Then, the rope hooking jig 10 described above is installed (step 603). This rope hanging jig 10 has basically the same structure as that shown in FIG. 3, but the second dummy sheave 13 is not used in the rope hanging method using a gondola, so the second dummy sheave is removed. It may be a structure. Further, in the state where the rope hanging jig 10 is installed on the gondola 35, the first dummy sheave 12 is arranged on one side of the car sheep 22 provided on the lower surface of the car 21 positioned below and on the vertical projection plane. Position them so that they are in the same position. This is a configuration for feeding the rope without interfering with the side surface of the car 21 and the like when the gondola 35 is lifted as will be described later.

この状態で、ゴンドラ35上に乗り込んだ作業員は、図7のBで示すように、ゴンドラの図示右側からロープ引き上げ冶具32を昇降路25内に降ろす(ステップ604)。このロープ引き上げ冶具32は、ロープ18の先端部を保持するもので、図8で示したものである。   In this state, the worker who gets on the gondola 35 lowers the rope pulling jig 32 from the right side of the gondola into the hoistway 25 as shown by B in FIG. 7 (step 604). The rope pulling jig 32 holds the tip of the rope 18 and is shown in FIG.

次に、作業員はロープ掛け冶具10上のドラム14,15からそれぞれロープ18の一端を引き出し、図7のCで示すように、第1のダミーシーブ12から、下方に位置する乗りかご21の下面に設けられたカーシーブ22へ引き廻し、これらに巻き掛ける(ステップ605)。そして、これらロープ18の一端を、予め昇降路25内に降ろしてあるロープ引き上げ冶具32に図7のDで示すように固定し(ステップ606)、その後ゴンドラ35上に引き上げ(ステップ607)、図7のEで示すように、ロープ掛け冶具10の係止部17に固定する(ステップ608)。   Next, the worker pulls out one end of the rope 18 from each of the drums 14 and 15 on the rope hooking jig 10, and as shown by C in FIG. 7, the lower surface of the car 21 positioned below from the first dummy sheave 12. Are wound around the car sheaves 22 provided on the belt (step 605). Then, one end of these ropes 18 is fixed to the rope pulling jig 32 previously lowered into the hoistway 25 as shown by D in FIG. 7 (step 606), and then lifted onto the gondola 35 (step 607). As shown by E of 7, it is fixed to the locking portion 17 of the rope hooking jig 10 (step 608).

次に、図7のFで示すように、乗りかご21を昇降路25の最下部に固定した状態で、ゴンドラ35を図示しない揚重機により昇降路25の最上部まで揚重する。このゴンドラ35の揚重によりロープ掛け冶具10も上昇するので、このロープ掛け冶具10上の係止部17に一端が固定されたロープ18は、カーシーブ30、第1のダミーシーブ12を介して、対応するドラム14,15から繰り出される(ステップ609)。   Next, as shown by F in FIG. 7, the gondola 35 is lifted up to the top of the hoistway 25 by a lifting machine (not shown) with the car 21 fixed to the lowermost part of the hoistway 25. Since the rope hanging jig 10 is also lifted by the lifting of the gondola 35, the rope 18 having one end fixed to the locking portion 17 on the rope hanging jig 10 can be accommodated via the car sheave 30 and the first dummy sheave 12. The drums 14 and 15 are fed out (step 609).

このようにして、ゴンドラ35が昇降路25内の最上部位置に達するとゴンドラ35をこの最上部位置で停止させ、ロープ掛け冶具10上の作業員は、ロープ引き上げ冶具32に固定されているロープ18先端を、ロープ掛け冶具10から取り外し、図7のGで示すように、昇降路25の上部に設けられた巻上機28の駆動シーブに図示右廻りに巻き掛け、さらに、C/Wシーブ30に図示左回りに巻き掛ける(ステップ610)。この後、ロープ18の端部のソケッテイングを行い、ロープヒッチ27に固定する(ステップ611)。さらに、ドラム14,16側の他端を、昇降路25の上部に設けられたロープヒッチ26に固定する(ステップ612)ことにより図7のHで示すように、ロープ掛け作業が終了する。   In this way, when the gondola 35 reaches the uppermost position in the hoistway 25, the gondola 35 is stopped at the uppermost position, and the operator on the rope hanging jig 10 fixes the rope fixed to the rope lifting jig 32. The tip of 18 is removed from the rope hanging jig 10, and as shown by G in FIG. 7, it is wound clockwise around the driving sheave of the hoisting machine 28 provided at the upper part of the hoistway 25, and further the C / W sheave. 30 is wound counterclockwise in the figure (step 610). Thereafter, the end of the rope 18 is socketed and fixed to the rope hitch 27 (step 611). Further, the other end on the drum 14 and 16 side is fixed to the rope hitch 26 provided on the upper part of the hoistway 25 (step 612), thereby completing the rope hooking operation as indicated by H in FIG.

この実施の形態でも、ステップ604からステップ608までの段階において、乗りかご21廻りのロープ引廻しを昇降路25の下部において完了し、その後、ゴンドラ35を上部に揚重しているため、揚重後のゴンドラ35を作業床として用いることができる。このようにすれば、昇降路上部に別途作業床を設置する作業を省略することができる。また、ゴンドラ35の揚重時に、ゴンドラ35上に設置されたロープ掛け冶具10のドラム14,15から、複数本のロープ18を一斉に繰り出すことができる。そして、ゴンドラ35を昇降路25の最上位置に揚重後、前述のように、このゴンドラ35を作業床として、繰り出されたロープ18の、巻上機28の駆動シーブやC/Wシーブ30への各巻き掛け作業、さらにはロープ端部のヒッチ部26,27への固定作業を実施できるので、エレベータのロープ掛け作業を従来に比べ、大幅に容易化及び簡略化できる。   Also in this embodiment, in the steps from step 604 to step 608, the rope routing around the car 21 is completed at the lower part of the hoistway 25, and then the gondola 35 is lifted to the upper part. The later gondola 35 can be used as a work floor. In this way, the work of installing a separate work floor at the upper part of the hoistway can be omitted. Further, when the gondola 35 is lifted, a plurality of ropes 18 can be fed out simultaneously from the drums 14 and 15 of the rope hanging jig 10 installed on the gondola 35. Then, after the gondola 35 is lifted to the uppermost position of the hoistway 25, as described above, the gondola 35 is used as a work floor to the drive sheave of the hoisting machine 28 and the C / W sheave 30 of the unwound rope 18. As a result, it is possible to carry out the operation of fixing the end of the rope to the hitch portions 26 and 27, so that the rope operation of the elevator can be greatly simplified and simplified as compared with the conventional one.

また、このロープ掛け作業は、昇降路25内においてすべて行うことができる。このため、従来のように、ある階のホール床上にロープ束や、ロープ供給ドラムを設置することにより、他の作業者に迷惑をかけることはない。また、ロープ供給用のドラム14,15は、ゴンドラ35上のロープ掛け冶具10上に設置されており、この冶具10上にはロープ掛け作業員が常に居ることから、仮にドラム14,15からのロープ繰り出しに不具合が生じても、作業員はこの不具合をただちに発見して対処することができ、ロープ掛け作業をより一層確実なものとすることができる。   Further, this rope hanging work can be performed entirely in the hoistway 25. For this reason, unlike the prior art, installing a rope bundle or rope supply drum on a hall floor on a certain floor does not cause trouble to other workers. Also, the rope supply drums 14 and 15 are installed on the rope hanging jig 10 on the gondola 35, and there is always a rope operator on the jig 10. Even if a trouble occurs in the rope feeding, the worker can immediately find and deal with this trouble, and the rope hanging work can be further ensured.

10…ロープ掛け冶具
11…架台
12…第1のダミーシーブ
13…第2のダミーシーブ
14,15,16…ロープ供給用のドラム
17…係止部
18…ロープ
21…乗りかご
22…吊支持用のシーブ(カーシーブ)
25…昇降路
26,27…ロープヒッチ
28…巻上機
29…釣合錘
30…吊支持用のシーブ(C/Wシーブ)
32…ロープ引き上げ冶具
35…作業用のゴンドラ
DESCRIPTION OF SYMBOLS 10 ... Rope hanging jig 11 ... Stand 12 ... 1st dummy sheave 13 ... 2nd dummy sheave 14, 15, 16 ... Drum for rope supply 17 ... Locking part 18 ... Rope 21 ... Ride car 22 ... Sheave for suspension support (Car Sieve)
25 ... hoistway 26, 27 ... rope hitch 28 ... hoisting machine 29 ... counterweight 30 ... sheave for suspension support (C / W sheave)
32 ... Rope pulling jig 35 ... Gondola for work

Claims (5)

エレベータ設備の昇降路内において、吊支持用のロープを乗りかご、釣合錘及び巻上機の各シーブに巻き掛けるエレベータのロープ掛け方法であって、
前記ロープを巻回したドラムを有し、このドラムから一方の側辺部に設けた第1のダミーシーブを経てロープを繰り出し可能であり、前記第1のダミーシーブの設置位置の反対側辺部に第2のダミーシーブが設けられたロープ掛け冶具を、前記昇降路内の最下位置に位置している前記乗りかごの上面に設置する工程と、
前記ドラムから前記ロープの一端を引き出し、前記第1のダミーシーブから、乗りかごの吊支持用シーブを経て前記第2のダミーシーブに引き廻してこれらに巻き掛け、さらに前記昇降路内の最下位置で、乗りかごの側方に位置する前記釣合錘の吊支持用シーブに巻き掛けたのち、その一端をロープ掛け冶具上に係止する工程と、
前記釣合錘を前記昇降路最下部に固定した状態で前記乗りかごを前記昇降路の最上部まで揚重し、一端をロープ掛け冶具上に係止した前記ロープを前記ドラムから繰り出させる工程と、
前記乗りかごが前記昇降路内の最上部位置に達した状態で、前記第2のダミーシーブに巻き掛けられている前記ロープを、昇降路上部に設けられた巻上機の駆動シーブに掛け替えると共に、前記ロープの、ロープ掛け冶具上に係止された一端、及び前記ドラム側の他端を、それぞれ前記昇降路上部の所定のロープヒッチに固定する工程と、
を有することを特徴とするエレベータのロープ掛け方法。
In the elevator equipment hoistway, an elevator rope hooking method in which a rope for suspension support is wound around each sheave of a car, a counterweight and a hoisting machine,
The drum has a drum around which the rope is wound, and the rope can be fed out from the drum through a first dummy sheave provided on one side, and a first side on the side opposite to the installation position of the first dummy sheave. Installing a rope hanging jig provided with two dummy sheaves on the upper surface of the car located at the lowest position in the hoistway;
One end of the rope is pulled out from the drum, from the first dummy sheave, through the sheave for supporting the suspension of the car, to the second dummy sheave, wound around them, and at the lowest position in the hoistway Wrapping the sheave for supporting the suspension of the counterweight located on the side of the car, and then locking one end on the rope hanging jig;
Lifting the cage to the top of the hoistway with the counterweight fixed to the lowermost part of the hoistway, and feeding out the rope with one end locked on a rope hanging jig from the drum; ,
In the state where the car has reached the uppermost position in the hoistway, the rope wrapped around the second dummy sheave is changed over to the drive sheave of the hoisting machine provided at the upper part of the hoistway. Fixing the one end of the rope locked on the rope hanging jig and the other end on the drum side to a predetermined rope hitch above the hoistway,
An elevator rope hanging method characterized by comprising:
エレベータ設備の昇降路内において、吊支持用のロープを乗りかご、釣合錘及び巻上機の各シーブに巻き掛けるエレベータのロープ掛け方法であって、
前記ロープを巻回したドラムを有し、このドラムから一方の側辺部に設けた第1のダミーシーブを経てロープを繰り出し可能なロープ掛け冶具を、前記昇降路内の最下位置に位置している前記乗りかごの上方に位置する作業用のゴンドラ上に設置する工程と、
前記ドラムから前記ロープの一端を引き出し、前記第1のダミーシーブから、乗りかごの吊支持用シーブに引き廻して巻き掛け、さらに、その前記一端をロープ掛け冶具上に係止する工程と、
前記乗りかごを前記昇降路最下部に固定した状態で前記ゴンドラを前記昇降路の最上部まで揚重し、一端をロープ掛け冶具上に係止した前記ロープを、前記ドラムから繰り出させる工程と、
前記ゴンドラが前記昇降路内の最上部位置に達した状態で、前記ロープの一端をロープ掛け冶具上にから取り外し、昇降路上部に設けられた巻上機の駆動シーブを経て前記昇降路の最上部位置に位置する釣合錘の吊支持用シーブに巻き掛け、さらに、このロープの一端を前記昇降路上部の一方のロープヒッチに固定すると共に、前記ロープの前記ドラム側の他端を、前記昇降路上部の他のロープヒッチに固定する工程と、
を有することを特徴とするエレベータのロープ掛け方法。
In the elevator equipment hoistway, an elevator rope hooking method in which a rope for suspension support is wound around each sheave of a car, a counterweight and a hoisting machine,
A rope hooking jig having a drum around which the rope is wound and capable of feeding the rope from the drum through a first dummy sheave provided on one side is located at the lowest position in the hoistway. Installing on a working gondola located above the car,
Pulling out one end of the rope from the drum, drawing from the first dummy sheave to the suspension support sheave of the car, and further locking the one end on the rope hanging jig;
Lifting the gondola up to the top of the hoistway in a state where the car is fixed at the lowermost part of the hoistway, and feeding out the rope having one end locked on a rope hanging jig from the drum;
With the gondola reaching the uppermost position in the hoistway, one end of the rope is removed from the rope hooking jig, and through the drive sheave of the hoisting machine provided at the upper part of the hoistway, the uppermost part of the hoistway is removed. Wrap it around the suspension support sheave of the counterweight located at the upper position, and fix one end of this rope to one rope hitch at the upper part of the hoistway and the other end of the rope on the drum side Fixing to the other rope hitch at the top of the hoistway;
An elevator rope hanging method characterized by comprising:
エレベータの乗りかご上又は作業用ゴンドラに設置可能な架台と、
この架台の上方から見た一側辺部に設けられ、この一側辺に沿って平行に配置される複数本のロープをその長さ方向に送りだし可能に支持する第1のダミーシーブと、
前記架台上に設置され、それぞれ前記ロープが巻回されており、これらロープの各一端を前記第1のダミーシーブに向って引き出し可能であり、かつこの引き出されたロープが前記第1のダミーシーブに達するまで互いに干渉しないように前記架台上における設置位置が設定された複数のドラムと、
前記架台の前記一側辺と対向する他側辺部に設けられ、前記ドラムから繰り出され、前記第1のダミーシーブから、下方に位置するエレベータ乗りかごの吊支持用シーブに巻き掛けられて引き廻されたロープの一端部を係止する係止部と、
を備えたことを特徴とするエレベータのロープ掛け冶具。
A platform that can be installed on the elevator car or in a work gondola;
A first dummy sheave that is provided on one side portion as viewed from above the gantry and supports a plurality of ropes arranged in parallel along the one side side so as to be fed out in the length direction;
The ropes are installed on the gantry, and the ropes are wound around the ropes. One end of each of the ropes can be drawn out toward the first dummy sheave, and the drawn out rope reaches the first dummy sheave. A plurality of drums whose installation positions on the frame are set so as not to interfere with each other,
Provided on the other side of the gantry opposite to the one side, fed out from the drum, wound around a sheave for supporting a lift of an elevator car located below from the first dummy sheave. A locking portion for locking one end of the rope,
An elevator rope hanging jig characterized by comprising:
エレベータの乗りかご上又は作業用ゴンドラに設置可能な架台と、
この架台の上方から見た一側辺部に設けられ、この一側辺に沿って平行に配置される複数本のロープをその長さ方向に送りだし可能に支持する第1のダミーシーブと、
前記架台上に設置され、それぞれ前記ロープが巻回されており、これらロープの各一端を前記第1のダミーシーブに向って引き出し可能であり、かつこの引き出されたロープが前記第1のダミーシーブに達するまで互いに干渉しないように前記架台上における設置位置が設定された複数のドラムと、
前記架台の前記一側辺を対向する他側辺部に設けられ、前記ドラムから繰り出され、前記第1のダミーシーブから、下方に位置するエレベータ乗りかごの吊支持用シーブに引き廻されたロープが巻き掛けられる第2のダミーシーブ、及びこの第2のダミーシーブを経て釣合錘の吊支持用シーブに巻き掛けられたロープの前記一端部を係止する係止部と、
を備えたことを特徴とするエレベータのロープ掛け冶具。
A platform that can be installed on the elevator car or in a work gondola;
A first dummy sheave that is provided on one side portion as viewed from above the gantry and supports a plurality of ropes arranged in parallel along the one side side so as to be fed out in the length direction;
The ropes are installed on the gantry, and the ropes are wound around the ropes. One end of each of the ropes can be drawn out toward the first dummy sheave, and the drawn out rope reaches the first dummy sheave. A plurality of drums whose installation positions on the frame are set so as not to interfere with each other,
A rope provided on the other side facing the one side of the gantry, drawn out from the drum, and routed from the first dummy sheave to a sheave for supporting the elevator car located below. A second dummy sheave to be wound, and a locking portion for locking the one end of the rope wound around the suspension support sheave of the counterweight via the second dummy sheave;
An elevator rope hanging jig characterized by comprising:
第1のダミーシーブは、下方に位置する乗りかごの下面に設けられたカーシープの一方と、垂直投影面上で同じ位置になるように位置決めされていることを特徴とする請求項3又は請求項4に記載のエレベータのロープ掛け冶具。   The first dummy sheave is positioned so as to be in the same position on the vertical projection plane as one of the car sheeps provided on the lower surface of the car located below. The elevator rope jig described in 1.
JP2009167959A 2009-07-16 2009-07-16 Rope hooking method of elevator and rope hooking tool used therefor Pending JP2011020805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009167959A JP2011020805A (en) 2009-07-16 2009-07-16 Rope hooking method of elevator and rope hooking tool used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009167959A JP2011020805A (en) 2009-07-16 2009-07-16 Rope hooking method of elevator and rope hooking tool used therefor

Publications (1)

Publication Number Publication Date
JP2011020805A true JP2011020805A (en) 2011-02-03

Family

ID=43631222

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009167959A Pending JP2011020805A (en) 2009-07-16 2009-07-16 Rope hooking method of elevator and rope hooking tool used therefor

Country Status (1)

Country Link
JP (1) JP2011020805A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013035684A (en) * 2011-07-13 2013-02-21 Mitsubishi Electric Corp Method and tool for installing elevator
JP2013136432A (en) * 2011-12-28 2013-07-11 Toshiba Elevator Co Ltd Rope hooking method of elevator
WO2018138831A1 (en) * 2017-01-26 2018-08-02 三菱電機株式会社 Elevator installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013035684A (en) * 2011-07-13 2013-02-21 Mitsubishi Electric Corp Method and tool for installing elevator
JP2013136432A (en) * 2011-12-28 2013-07-11 Toshiba Elevator Co Ltd Rope hooking method of elevator
WO2018138831A1 (en) * 2017-01-26 2018-08-02 三菱電機株式会社 Elevator installation method

Similar Documents

Publication Publication Date Title
JP5951104B2 (en) Elevator repair method
US8205720B2 (en) Method for installing the hoisting roping of an elevator
CN1336900A (en) Elevator system
JP5805499B2 (en) Elevator equipment
JP7033513B2 (en) Elevator main rope exchange device and elevator main rope exchange method
JP2011020805A (en) Rope hooking method of elevator and rope hooking tool used therefor
JP6969686B2 (en) How to extend the lift of a construction elevator
JP6270635B2 (en) Renovation method of machine room less elevator
JP2003238047A (en) Elevator main rope replacement method and device
JP5930842B2 (en) Elevator installation method and installation jig
JP4935465B2 (en) Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor
JP6336225B2 (en) Elevator equipment
JP2007210703A (en) Device and method for installing hoist machine in machine-room-less elevator
JP4157750B2 (en) Elevator main rope changer
JP6758461B2 (en) How to repair a machine roomless elevator
JP2011051736A (en) Elevator device
JP5058181B2 (en) How to hang an elevator rope
JP5334026B2 (en) How to hang an elevator rope
JP5410322B2 (en) Structure building method and structure building jig used therefor
JP6525328B2 (en) Elevator equipment loading and unloading method and elevator equipment loading and unloading apparatus
JP6950458B2 (en) Elevator weight removal device and weight removal method
JP2006182461A (en) Temporary elevator
JP2020007108A (en) Elevator heavy object carrying method and elevator apparatus
JPH08133634A (en) Jumping method for jump-up elevator
JPH05262475A (en) Installation method of elevator