JP2010242362A - Demolition method for tower-like building - Google Patents

Demolition method for tower-like building Download PDF

Info

Publication number
JP2010242362A
JP2010242362A JP2009091765A JP2009091765A JP2010242362A JP 2010242362 A JP2010242362 A JP 2010242362A JP 2009091765 A JP2009091765 A JP 2009091765A JP 2009091765 A JP2009091765 A JP 2009091765A JP 2010242362 A JP2010242362 A JP 2010242362A
Authority
JP
Japan
Prior art keywords
building
frame
tower
work
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2009091765A
Other languages
Japanese (ja)
Other versions
JP5561707B2 (en
Inventor
Tetsuya Masui
哲也 枡井
Hiroyuki Ueda
博之 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP2009091765A priority Critical patent/JP5561707B2/en
Publication of JP2010242362A publication Critical patent/JP2010242362A/en
Application granted granted Critical
Publication of JP5561707B2 publication Critical patent/JP5561707B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an economical demolition method for a tower-like building which dispenses with the work for constructing a new foundation for demolition work, when demolishing the tower-like building from its lower part and the work for removing the foundation for the demolition work after demolishing the tower-like building. <P>SOLUTION: In this demolition method for the tower-like building, this tower-like building 1 is separated into an upper part skeleton 2 of the building and a lower part skeleton 3 of the building, the upper part skeleton 2 of the building is pulled down with a jack by making use of the lower part skeleton 3 of the building as a support pedestal, the upper part skeleton 2 of the building is sequentially demolished from a lower layer using an upper face of the lower part skeleton 2 of the building as a work floor 16, and then the lower part skeleton 3 of the building is demolished by the work on the ground. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、例えば、上部が展望室に形成された四角柱状の上部フレームと展望室上部に立設されたアンテナ用鉄塔とから構成されたS造の建物上部躯体とSRC造の建物下部躯体とを備えた塔状建物や、中間階に展望床があるような高い鉄塔などに代表されるアスペクト比の高い塔状建物を下部から解体するための方法に関する。   The present invention includes, for example, an S-structure upper structure and an SRC structure lower structure composed of a rectangular columnar upper frame formed in the observation room and an antenna tower standing on the observation room. The present invention relates to a method for dismantling a tower-shaped building with a high aspect ratio represented by a tower-shaped building with a high aspect ratio such as a tower with an observation floor on the intermediate floor from the bottom.

例えば、100メートルを超えるような高い塔状建物をジャッキダウンしながら下部から順次解体して行く場合、従来では、特許文献1,2に見られるように、塔状建物の周囲に、クレーン車等を用いた地上からの作業で解体できる高さの仮設櫓を構築し、仮設櫓に設置したセンターホールジャッキを用いて建物上部をジャッキダウンする手法が採用されていた。   For example, when dismantling from the lower part while jacking down a tall tower building exceeding 100 meters, conventionally, as seen in Patent Documents 1 and 2, a crane vehicle, etc. A technique was adopted in which a temporary culvert with a height that could be dismantled by working from the ground with a jack was used, and the upper part of the building was jacked down using a center hole jack installed in the temporary casket.

この場合、仮設櫓には、塔状建物を上下に分離した際、分離位置から上方の建物の全重量が作用し、その重量は仮設櫓を介して地盤に伝達されることになる。   In this case, when the tower-like building is separated into the temporary fence, the entire weight of the upper building acts from the separation position, and the weight is transmitted to the ground via the temporary fence.

そのため、上記の従来方法では、仮設櫓の直下に仮設櫓と建物上部の全重量を支持する基礎が必要であり、工期、工費の両面で不利である。即ち、塔状建物の周囲には、通常、不必要な基礎は設けられていないので、上記の従来方法による場合は、塔状建物の基礎の周囲に、解体作業のための基礎(仮設櫓の基礎)を新設することになり、しかも、この基礎は、塔状建物の解体後、撤去する必要があり、それらの結果として、工期も長くなり、非常に不経済である。   For this reason, the above-described conventional method requires a foundation for supporting the entire weight of the temporary fence and the upper part of the building directly under the temporary fence, which is disadvantageous in terms of construction period and construction cost. That is, there is usually no unnecessary foundation around the tower building, so when using the above-mentioned conventional method, the foundation for dismantling work (temporary fences) is placed around the tower building foundation. In addition, it is necessary to remove the foundation after dismantling the tower-like building. As a result, the construction period becomes longer and it is very uneconomical.

尚、特許文献1の従来方法においては、ジャッキダウンした建物上部の下端を仮設櫓の中段に設けられた作業床に載置し、仮設櫓の上端側で建物上部を拘束した状態で、作業床に載置された部分を解体するように構成されているので、仮設櫓として、仮設資材量の多い作業床付きの仮設フレームが用いられることに加え、仮設フレームに対する作業床の構築作業や塔状建物解体後における作業床の撤去作業が必要であり、この点でも不経済である。   In the conventional method of Patent Document 1, the lower end of the upper part of the building that has been jacked down is placed on the work floor provided in the middle stage of the temporary fence, and the work floor is restrained on the upper end side of the temporary fence. In addition to using a temporary frame with a work floor with a large amount of temporary material as a temporary fence, construction work of the work floor with respect to the temporary frame and a tower shape are constructed. The work floor must be removed after the building is demolished, which is also uneconomical.

特開昭53−69437号公報JP-A-53-69437 特開昭61−196072号公報Japanese Patent Laid-Open No. 61-196072

本発明は、上記の問題点を踏まえて成されたものであって、その目的とするところは、塔状建物を下部から解体するにあたり、解体作業のための基礎(仮設櫓の基礎)の新設工事や、塔状建物の解体後における仮設櫓用基礎の撤去工事を不要にした経済的な解体方法を実現することにある。   The present invention has been made in view of the above-mentioned problems, and the purpose of the present invention is to construct a foundation for dismantling work (foundation of a temporary fence) when dismantling a tower building from the bottom. The purpose is to realize an economical dismantling method that eliminates the need for construction and removal of the foundation for temporary dredging after dismantling the tower building.

上記の目的を達成するために本発明が講じた技術的手段は、次のとおりである。即ち、請求項1に記載の発明による塔状建物の解体方法は、塔状建物を建物上部躯体と建物下部躯体に分離し、建物下部躯体を支持架台に利用して建物上部躯体をジャッキダウンすることにより、建物上部躯体を下層から順次解体し、しかる後、地上からの作業により建物下
部躯体を解体することを特徴としている。
The technical means taken by the present invention in order to achieve the above object are as follows. That is, in the method for dismantling a tower building according to the first aspect of the present invention, the tower building is separated into a building upper housing and a building lower housing, and the building upper housing is jacked down using the building lower housing as a support frame. In this way, the upper structure of the building is dismantled sequentially from the lower layer, and then the lower structure of the building is dismantled by work from the ground.

請求項2に記載の発明は、請求項1に記載の塔状建物の解体方法であって、塔状建物を建物上部躯体と建物下部躯体に分離し、建物下部躯体を支持架台に利用して建物上部躯体をジャッキダウンすることにより、建物上部躯体をその一部が残存する状態に下層から順次解体し、しかる後、地上からの作業により残存させた建物上部躯体及び建物下部躯体をこの順に解体することを特徴としている。   Invention of Claim 2 is the dismantling method of the tower-like building of Claim 1, Comprising: A tower-like building is isolate | separated into a building upper housing and a building lower housing, and a building lower housing is utilized for a support frame. By jacking down the upper structure of the building, the upper structure of the building is dismantled in order from the lower layer in a state where part of the structure remains, and then the upper structure of the building and the lower structure of the building left by work from the ground are disassembled in this order. It is characterized by doing.

請求項3に記載の発明は、請求項2に記載の発明をより具体化したものである。即ち、請求項3に記載の発明は、請求項2に記載の塔状建物の解体方法であって、上部が展望室に形成された上部フレームと展望室上部に立設されたアンテナ用鉄塔とから構成された建物上部躯体と建物下部躯体とを備えた塔状建物において、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設け、建物上部躯体と建物下部躯体に分離し、仮設フレームに設置したセンターホールジャッキを用いて建物上部躯体をジャッキダウンすることにより、建物下部躯体の上面を作業床にして、展望室より下の上部フレームを下層から順次解体し、しかる後、クレーン車等を用いた地上からの作業により、アンテナ用鉄塔を撤去し、次いで、展望室と建物下部躯体をこの順に解体することを特徴としている。   The invention described in claim 3 is a more specific embodiment of the invention described in claim 2. That is, the invention according to claim 3 is the dismantling method of the tower-like building according to claim 2, wherein the upper frame formed in the observation room at the upper part and the tower for antennas erected on the upper part of the observation room; In a tower-shaped building with a building upper frame and a building lower frame, the temporary frame for horizontal fixation surrounding the building upper frame is supported by the building lower frame, and the building upper frame and lower building Using the center hall jack installed on the temporary frame, jacking down the upper building frame, the upper frame of the lower building frame is used as the work floor, and the upper frame below the observation room is sequentially disassembled from the lower layer. After that, the antenna tower is removed by work from the ground using a crane vehicle or the like, and then the observation room and the lower building of the building are disassembled in this order.

請求項4に記載の発明は、請求項3に記載の塔状建物の解体方法であって、建物下部躯体の周囲に、荷降ろしステージ、仮設エレベータ、枠組足場を設置した後、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設けることを特徴としている。   The invention according to claim 4 is the dismantling method of the tower building according to claim 3, wherein after the unloading stage, the temporary elevator, and the frame scaffolding are installed around the lower building of the building, the upper building of the building is It is characterized in that a surrounding horizontal fixing temporary frame is provided in a state of being supported by a lower building frame.

請求項1に記載の発明によれば、塔状建物を建物上部躯体と建物下部躯体に分離し、建物下部躯体を支持架台に利用して建物上部躯体をジャッキダウンすることにより、建物上部躯体を下層から順次解体するので、塔状建物の基礎がそのまま解体作業のための基礎として利用されることになる。従って、解体作業のための基礎(仮設櫓の基礎)の新設工事や、塔状建物の解体後における仮設櫓用基礎の撤去工事が不要になり、工期、工費の両面で有利であり、非常に経済的である。また、建物下部躯体については地上からの作業によって解体するので、ジャッキダウン工法に比して迅速に解体することが可能である。   According to invention of Claim 1, a tower-like building is separated into a building upper frame and a building lower frame, and the building upper frame is jacked down by using the building lower frame as a support frame. Since the building is demolished sequentially from the lower layers, the tower building foundation is used as it is as the foundation for the demolition work. This eliminates the need for new construction of foundations for dismantling work (foundation of temporary fences) and removal of the foundations for temporary fences after dismantling tower buildings, which is advantageous in terms of construction period and cost. Economical. In addition, since the lower building of the building is dismantled by work from the ground, it can be dismantled more quickly than the jackdown method.

尚、請求項1に記載の発明は、建物上部躯体の全部を下層から順次解体した後、地上からの作業により建物下部躯体を解体する場合と、建物上部躯体をその一部が残存する状態に下層から順次解体した後、地上からの作業により、残りの建物上部躯体及び建物下部躯体をこの順に解体する場合とを包含している。即ち、建物上部躯体の形状や構造によっては、請求項2に記載のように、建物上部躯体の一部を残存させる状態に下層から順次解体した後、地上からの作業によって、残存させた建物上部躯体と、建物下部躯体をこの順に解体する方が、解体工事全体の迅速化を図ることができ、合理的である。   According to the first aspect of the present invention, the entire upper structure of the building is dismantled sequentially from the lower layer, and then the lower structure of the building is dismantled by work from the ground. This includes the case where the remaining building upper frame and the building lower frame are dismantled in this order by the work from the ground after sequentially dismantling from the lower layer. That is, depending on the shape and structure of the building upper frame, as described in claim 2, after the building is dismantled sequentially from the lower layer in a state in which a part of the building upper frame remains, the building upper unit left by the work from the ground It is more reasonable to dismantle the building and the lower building in this order because the whole building can be expedited.

請求項3に記載の発明によれば、上部が展望室に形成された上部フレームと展望室上部に立設されたアンテナ用鉄塔とから構成された建物上部躯体と建物下部躯体とを備えた塔状建物において、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設け、建物上部躯体と建物下部躯体に分離し、仮設フレームに設置したセンターホールジャッキを用いて建物上部躯体をジャッキダウンするので、仮設フレーム及び建物上部躯体の全重量が建物下部躯体に支持されることになる。従って、塔状建物の基礎がそのまま仮設フレームの基礎(解体作業のための基礎)として利用されることになり、請求項1の発明と同じ効果がある。   According to invention of Claim 3, the tower provided with the building upper frame and the building lower frame comprised from the upper frame in which the upper part was formed in the observation room, and the antenna tower erected in the upper part of the observation room In the shape of a building, a temporary frame for horizontal fixation surrounding the upper building of the building is supported by the lower building of the building, separated into the upper and lower building of the building, and a center hole jack installed on the temporary frame is used. Since the upper part of the building is jacked down, the entire weight of the temporary frame and the upper part of the building is supported by the lower part of the building. Therefore, the foundation of the tower building is used as it is as the foundation of the temporary frame (the foundation for the dismantling work), and the same effect as the invention of claim 1 is obtained.

殊に、請求項3に記載の発明によれば、建物下部躯体の上面を作業床にして、展望室より下の上部フレームを下層から順次解体するので、建物下部躯体の上面が作業床に利用されて、仮設の作業床が不要となり、仮設フレームに対する作業床の構築作業や塔状建物解体後における作業床の撤去作業が不要なため、一層経済的である。   In particular, according to the third aspect of the present invention, the upper surface of the lower building of the building is used as the work floor, and the upper frame below the observation room is sequentially disassembled from the lower layer. This eliminates the need for a temporary work floor, and eliminates the work floor construction work for the temporary frame and the work floor removal work after dismantling the tower building, which is more economical.

また、建物上部躯体の全部を下層から順次解体するのではなく、建物上部躯体のうち、展望室とその上部のアンテナ用鉄塔を残存させ、クレーン車等を用いた地上からの作業により、アンテナ用鉄塔を撤去し、次いで、展望室と建物下部躯体をこの順に解体するようにしたので、解体工事全体の迅速化を図ることができ、合理的である。   Rather than dismantling the entire upper structure of the building from the lower layer, the observation room and the antenna tower above it remain in the upper structure of the building. Since the steel tower was removed, and then the observation room and the lower building of the building were dismantled in this order, the entire dismantling work could be speeded up, which is reasonable.

請求項4に記載の発明によれば、建物下部躯体の周囲に、荷降ろしステージ、仮設エレベータ、枠組足場を設置した後、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設けるので、仮設フレームの構築作業を容易に行うことができる。   According to the invention described in claim 4, after the unloading stage, the temporary elevator, and the frame scaffolding are installed around the lower building of the building, the temporary frame for horizontally fixing surrounding the upper building of the building is supported by the lower building of the building. Since the provisional state is provided, the construction work of the temporary frame can be easily performed.

本発明に係る塔状建物の解体方法を説明する図である。It is a figure explaining the dismantling method of the tower-shaped building which concerns on this invention. 図1に続く塔状建物の解体方法の説明図である。It is explanatory drawing of the dismantling method of the tower-like building following FIG. 図2に続く塔状建物の解体方法の説明図である。It is explanatory drawing of the dismantling method of the tower-like building following FIG. 図3に続く塔状建物の解体方法の説明図である。It is explanatory drawing of the dismantling method of the tower building following FIG. 要部の横断平面図である。It is a cross-sectional top view of the principal part. 要部の縦断正面図である。It is a vertical front view of the principal part. 要部の縦断正面図である。It is a vertical front view of the principal part. 本発明の他の実施形態を示す塔状建物の解体方法の説明図である。It is explanatory drawing of the dismantling method of the tower-like building which shows other embodiment of this invention. 図8に続く塔状建物の解体方法の説明図である。It is explanatory drawing of the dismantling method of the tower building following FIG.

以下、本発明の実施形態を図面に基づいて説明する。図1〜図7は、本発明に係る塔状建物の解体方法の一例を示す。図1の(A)に示す1は、S造の建物上部躯体2とSRC造の建物下部躯体3とを備えた塔状建物である。建物上部躯体2は、上部が展望室4に形成された四角柱状の上部フレーム5と展望室4上部に立設されたアンテナ用鉄塔6とから構成されている。建物下部躯体3の上半側は上部フレーム5と同様な四角柱状で、四隅にSRC造の柱7が配置されている。柱7の上には建物上部躯体2の四隅に配置された円形鋼管よりなるS造の柱8が同芯状に連設されている。建物下部躯体3の柱7の下半側は夫々逆V字状の傾斜柱7aに形成されており、傾斜柱7aの下端は互いに連結されている。そして、傾斜柱7aの連結部直下の地盤には、塔状建物の荷重を地盤に伝達する基礎(図示せず)が設けられている。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1 to 7 show an example of a method for dismantling a tower building according to the present invention. 1 shown in FIG. 1A is a tower-like building including an S building upper housing 2 and an SRC building lower housing 3. The upper structure 2 of the building is composed of a rectangular columnar upper frame 5 formed in the observation room 4 at the upper part and an antenna tower 6 erected on the upper part of the observation room 4. The upper half side of the lower building housing 3 has a quadrangular prism shape similar to that of the upper frame 5, and SRC columns 7 are arranged at the four corners. S pillars 8 made of circular steel pipes arranged at the four corners of the building upper frame 2 are concentrically arranged on the pillars 7. The lower half side of the column 7 of the lower building 3 of the building is formed as an inverted V-shaped inclined column 7a, and the lower ends of the inclined column 7a are connected to each other. And the foundation (not shown) which transmits the load of a tower-like building to the ground is provided in the ground just under the connection part of the inclined column 7a.

上記の塔状建物1を下部から解体するにあたっては、先ず、図1の(B)に示すように、ラフター等のクレーン車aを用いた地上からの作業によって、建物下部躯体3の周囲に、荷降ろしステージ9、仮設エレベータ(図示せず)、枠組足場10を設置する。   In dismantling the tower-shaped building 1 from the lower part, first, as shown in FIG. 1B, by the work from the ground using a crane vehicle a such as a rougher, An unloading stage 9, a temporary elevator (not shown), and a framework scaffold 10 are installed.

しかる後、図2の(A)に示すように、建物上部躯体2を囲繞して、建物上部躯体2の水平移動を拘束する水平固定用の仮設フレーム11を建物下部躯体3に支持させた状態に設ける。仮設フレーム11の設置作業は、ラフター等のクレーン車a、建物下部躯体3の周囲に設置された荷降ろしステージ9、仮設エレベータ、枠組足場10等を用いて行われることになる。   Thereafter, as shown in FIG. 2 (A), the building upper frame 2 is surrounded and the horizontal fixing temporary frame 11 for restraining the horizontal movement of the building upper frame 2 is supported by the building lower frame 3. Provided. The temporary frame 11 is installed using a crane vehicle a such as a rough terrain, an unloading stage 9, a temporary elevator, a frame scaffolding 10 and the like installed around the lower building 3 of the building.

仮設フレーム11は、鉄骨梁や鉄骨ブレースで枠組みされたものであって、図5に示すように、四角柱状の上部フレーム5を当該上部フレーム5の四面と平行状に囲繞する角筒
状に枠組みされている。図5に示す12は、建物上部躯体2の展望室4と建物下部躯体3の下端部とにわたって設けられたエレベータシャフトである。仮設フレーム11の四隅部上部には、既知構造のセンターホールジャッキ13が、建物上部躯体2の柱8を挟んで、2台ずつ設置されている。
The temporary frame 11 is framed by a steel beam or a steel brace. As shown in FIG. 5, the temporary frame 11 is framed in a rectangular tube shape surrounding the quadrangular columnar upper frame 5 in parallel with the four surfaces of the upper frame 5. Has been. Reference numeral 12 shown in FIG. 5 denotes an elevator shaft provided over the observation room 4 of the upper building 2 and the lower end of the lower building 3. Two center hole jacks 13 having a known structure are installed in the upper part of the four corners of the temporary frame 11 with two pillars 8 of the building upper frame 2 interposed therebetween.

仮設フレーム11を建物下部躯体3に支持させた状態に設けるにあたっては、種々の具体的な構成を採用できるが、この実施形態においては、図6、図7に示すように、仮設フレーム11における各辺の下端近傍部を、建物下部躯体3のパラペットや梁に、PC鋼材14と締付けナット15による圧着工法により、仮設フレーム11の自重及び仮設フレーム11に作用する荷重を建物下部躯体3に伝達できるように固定して、建物下部躯体3を支持架台として利用するように構成されている。   In providing the temporary frame 11 in a state where it is supported by the lower building 3 of the building, various specific configurations can be adopted. In this embodiment, as shown in FIGS. The weight of the temporary frame 11 and the load acting on the temporary frame 11 can be transmitted to the building lower frame 3 by the crimping method using the PC steel material 14 and the fastening nut 15 to the parapet or beam of the building lower frame 3 in the vicinity of the lower end of the side. The building lower housing 3 is used as a support frame.

そして、上記の塔状建物1を建物上部躯体2と建物下部躯体3に分離し、図2の(B)、図3の(A)、図6、図7に示すように、仮設フレーム11に設置されたセンターホールジャッキ13を用いて建物上部躯体2をジャッキダウンすることにより、展望室4より下の上部フレーム5を下層から順次解体する。この解体作業(切断と切断した部分の解体撤去)は、図6、図7に示すように、建物下部躯体3の上面(屋根スラブ)を作業床16にして行われる。それ故、仮設フレーム11には仮設の作業床が設けられていない。図6、図7に示す13aはセンターホールジャッキ13で昇降駆動される継足し式の吊下げロッドである。13bは柱8を挟んだ状態に支持する二つ割可能な構造のクランプ機構であり、吊下げロッド13aの下端部に着脱自在に連結されている。   Then, the tower-like building 1 is separated into a building upper housing 2 and a building lower housing 3, and the temporary frame 11 is placed on the temporary frame 11 as shown in FIGS. 2B, 3A, 6 and 7. The upper frame 5 below the observation room 4 is sequentially disassembled from the lower layer by jacking down the building upper frame 2 using the installed center hole jack 13. As shown in FIGS. 6 and 7, this dismantling work (cutting and dismantling and removal of the cut part) is performed with the upper surface (roof slab) of the building lower housing 3 as the work floor 16. Therefore, the temporary frame 11 is not provided with a temporary work floor. Reference numeral 13a shown in FIGS. 6 and 7 is an add-on type suspension rod that is driven up and down by the center hole jack 13. Reference numeral 13b denotes a clamp mechanism having a structure that can be split in half so as to support the pillar 8 in a sandwiched manner, and is detachably connected to the lower end of the suspension rod 13a.

次に、図3の(B)に示すように、ラフター等のクレーン車aを用いた地上からの作業によって仮設フレーム11を解体撤去した後、図4の(A)に示すように、揚程の大きなタワーフロント方式のクレーン車bを用いた地上からの作業により、アンテナ用鉄塔6を撤去し、次いで、図4の(B)、(C)に示すように、走行式解体機cを用いた地上からの作業によって展望室4と建物下部躯体3をこの順に解体することになる。   Next, as shown in FIG. 3B, after the temporary frame 11 is dismantled and removed by work from the ground using a crane vehicle a such as a rough terrain, as shown in FIG. The antenna tower 6 was removed by the work from the ground using a large tower-front type crane vehicle b, and then, as shown in FIGS. 4B and 4C, a traveling dismantling machine c was used. The observation room 4 and the lower building 3 of the building are dismantled in this order by work from the ground.

上記の構成によれば、上部が展望室4に形成された上部フレーム5と展望室4上部に立設されたアンテナ用鉄塔6とから構成された建物上部躯体2と建物下部躯体3とを備えた塔状建物1において、建物上部躯体2を囲繞する水平固定用の仮設フレーム11を建物下部躯体3に支持させた状態に設け、建物上部躯体2と建物下部躯体3に分離し、仮設フレーム11に設置したセンターホールジャッキ13を用いて建物上部躯体2をジャッキダウンするので、仮設フレーム11及び建物上部躯体2の全重量が建物下部躯体3に支持されることになる。   According to the above configuration, the building upper frame 2 and the building lower frame 3 each having an upper frame 5 formed in the observation room 4 and an antenna tower 6 erected on the observation room 4 are provided. In the tower-shaped building 1, a horizontal fixing temporary frame 11 surrounding the building upper frame 2 is provided to be supported by the building lower frame 3, separated into the building upper frame 2 and the building lower frame 3, and the temporary frame 11. Since the building upper frame 2 is jacked down using the center hole jack 13 installed in the building, the entire weight of the temporary frame 11 and the building upper frame 2 is supported by the building lower frame 3.

従って、塔状建物1の基礎がそのまま仮設フレーム11の基礎(解体作業のための基礎)として利用されることになり、解体作業のための基礎の新設工事や、塔状建物の解体後における解体作業用基礎の撤去工事が不要であるから、工期、工費の両面で有利であり、非常に経済的である。   Therefore, the foundation of the tower building 1 is used as it is as the foundation of the temporary frame 11 (the foundation for the dismantling work), and the foundation construction for the dismantling work or the dismantling of the tower building after the dismantling Since the work foundation removal work is unnecessary, it is advantageous both in terms of construction period and construction cost, and is very economical.

殊に、上記の構成によれば、建物下部躯体3の上面を作業床16にして、展望室4より下の上部フレーム5を下層から順次解体するので、建物下部躯体3の上面が作業床16に利用されて、仮設の作業床が不要となり、仮設フレーム11に対する作業床の構築作業や塔状建物1の解体後における作業床の撤去作業が不要なため、一層経済的である。   In particular, according to the above configuration, the upper surface of the lower building 3 is used as the work floor 16 and the upper frame 5 below the observation room 4 is sequentially disassembled from the lower layer. Therefore, there is no need for a temporary work floor, and there is no need for a work floor construction work for the temporary frame 11 or a work floor removal work after the tower building 1 is dismantled.

また、建物上部躯体2の全部を下層から順次解体するのではなく、建物上部躯体2のうち、展望室4とその上部のアンテナ用鉄塔6を残存させ、揚程の大きなクレーン車bを用いた地上からの作業により、アンテナ用鉄塔6を撤去し、次いで、揚程の小さなクレーン車aや走行式解体機cを用いた地上からの作業により、展望室4と建物下部躯体3をこの
順に解体するようにしたので、解体工事全体の迅速化を図ることができ、合理的である。
In addition, instead of sequentially dismantling the entire building upper frame 2 from the lower layer, the observation room 4 and the antenna tower 6 on the upper part of the building upper frame 2 remain, and the ground using a crane vehicle b with a large lift. The tower 6 for the antenna is removed by the work from, and then the observation room 4 and the lower housing 3 of the building are disassembled in this order by the work from the ground using the crane car a having a small lift and the traveling type demolition machine c. As a result, the entire dismantling work can be speeded up, which is reasonable.

また、建物下部躯体3の周囲に、荷降ろしステージ9、仮設エレベータ、枠組足場10を設置した後、建物上部躯体2を囲繞する水平固定用の仮設フレーム11を建物下部躯体3に支持させた状態に設けるので、仮設フレーム11の構築作業もこれらの設備を利用して容易に行うことができる。   In addition, after the unloading stage 9, the temporary elevator, and the frame scaffolding 10 are installed around the lower building 3, the horizontal lower frame 3 surrounding the upper building 2 is supported by the lower building 3. Therefore, the construction work of the temporary frame 11 can be easily performed using these facilities.

図8、図9は、本発明の他の実施形態を示す。この実施形態は、解体方法の対象とする塔状建物1が、図8の(A)に示すように、中間階に展望床17のある先尖な形状の高い鉄塔であって、図8の(B)、(C)に示すように、展望床17の上に水平固定用の仮設フレーム11を設置し、展望床17を支持架台に利用して建物上部躯体2をジャッキダウンする点に特徴がある。   8 and 9 show another embodiment of the present invention. In this embodiment, as shown in FIG. 8A, the tower-shaped building 1 that is the object of the dismantling method is a high-pointed steel tower with an observation floor 17 on the intermediate floor. As shown in (B) and (C), the temporary frame 11 for horizontal fixation is installed on the observation floor 17, and the building upper frame 2 is jacked down using the observation floor 17 as a support frame. There is.

即ち、この実施形態においては、図8の(B)に示すように、ラフター等のクレーン車aを用いた地上からの作業によって、展望床17の上に、水平固定用の仮設フレーム11を展望床17で支持された状態に設置した後、展望床17の上面を作業床16にして、塔状建物1を展望床17より上方の建物上部躯体2と展望床17を含む建物下部躯体3とに分離し、図8の(C)、図9の(A)、(B)に示すように、建物下部躯体3の展望床17を支持架台に利用して建物上部躯体2をジャッキダウンすることにより、建物上部躯体2を下層から順次解体している。具体的には、展望床17の上面を作業床16にして、建物上部躯体2の切断を行い、仮設フレーム11の四隅に設けられたセンターホールジャッキ13で建物上部躯体2を下降し、下端を地上に載置した状態で、下降した部分の解体作業を行っている。   That is, in this embodiment, as shown in FIG. 8B, the horizontal fixed temporary frame 11 is viewed on the observation floor 17 by work from the ground using a crane vehicle a such as a rough terrain. After being installed in a state supported by the floor 17, the upper surface of the observation floor 17 is used as the work floor 16, and the tower-like building 1 is located above the observation floor 17 and the building lower casing 3 including the observation floor 17. 8 (C), FIG. 9 (A), and (B), the upper building 2 is jacked down using the observation floor 17 of the lower building 3 as a support frame, as shown in FIGS. Thus, the building upper frame 2 is dismantled sequentially from the lower layer. Specifically, the upper surface of the building 2 is cut by using the upper surface of the observation floor 17 as the work floor 16, and the building upper frame 2 is lowered by the center hole jacks 13 provided at the four corners of the temporary frame 11, and the lower end is While being placed on the ground, the dismantling work is performed on the lowered part.

地上に建物上部躯体2の重量を支えるに足る頑丈な基盤が無い場合には、図8の(B)、図9の(A)、(B)に示すように、地上に既存の基礎(例えば、杭頭や杭頭のフーチング)の間を繋ぐ仮設梁18を設置し、ジャッキダウンした建物上部躯体2の下端を仮設梁18に載置して、解体作業を行うようにすればよい。   If there is no sturdy foundation on the ground that is sufficient to support the weight of the building upper frame 2, as shown in FIGS. 8B, 9A, and 9B, an existing foundation on the ground (for example, The temporary beam 18 that connects between the pile head and the pile head footing) is installed, and the lower end of the jack-down building upper frame 2 is placed on the temporary beam 18 to perform the dismantling work.

上記の塔状建物1は、建物上部躯体2が上方に行くにつれて次第に細くなる形状となっているため、建物上部躯体2を囲繞して、建物上部躯体2の水平移動を拘束する水平固定用の仮設フレーム11としては、解体作業が進むにつれて、平面的な大きさを縮小するように構成されている。   The tower-like building 1 has a shape that gradually becomes thinner as the building upper frame 2 goes upward. Therefore, the tower-like building 1 surrounds the building upper frame 2 and restrains horizontal movement of the building upper frame 2 for horizontal fixation. The temporary frame 11 is configured to reduce the planar size as the dismantling work proceeds.

解体作業が進むにつれて仮設フレーム11の平面的な大きさを縮小する手段としては、例えば、平面視で四角形状を呈する仮設フレーム11の四辺を各々伸縮可能な構造とし、各辺に設けた油圧シリンダーを互いに同期して縮小作動させることが採用される。仮設フレーム11の四隅に設けられるセンターホールジャッキ13は、仮設フレーム11に対して水平な支軸周りに揺動可能な構成とし、仮設フレーム11の平面的な大きさを縮小しても、センターホールジャッキ13の軸芯(継足し式の吊下げロッド13a)を鉛直姿勢に修正できるように構成されている。   As a means for reducing the planar size of the temporary frame 11 as the dismantling work proceeds, for example, the hydraulic frame provided on each side has a structure in which each of the four sides of the temporary frame 11 having a rectangular shape in a plan view can be expanded and contracted. It is adopted to reduce the operation in synchronization with each other. The center hole jacks 13 provided at the four corners of the temporary frame 11 are configured to be swingable around a support shaft that is horizontal with respect to the temporary frame 11, and even if the planar size of the temporary frame 11 is reduced, the center hole The axial center of the jack 13 (additional suspension rod 13a) can be corrected to a vertical posture.

ジャッキダウンを繰り返して、建物上部躯体2の全部を解体したら、図9の(C)に示すように、走行式解体機cを用いた地上からの作業によって、仮設フレーム11を解体撤去し、しかる後、図9の(D)に示すように、展望床17を含む建物下部躯体3を解体撤去するのである。その他の構成、作用は、図1〜図7の実施形態と同じであるため、説明を省略する。   When jackdown is repeated and the entire upper housing 2 is dismantled, as shown in FIG. 9C, the temporary frame 11 is dismantled and removed by work from the ground using the traveling dismantling machine c. Thereafter, as shown in FIG. 9D, the building lower housing 3 including the observation floor 17 is dismantled and removed. Other configurations and operations are the same as those of the embodiment of FIGS.

尚、解体作業が進むにつれて仮設フレーム11の平面的な大きさを縮小させる構成に代え、仮設フレーム11の四隅に、建物上部躯体2の柱8に向けて伸縮作動する水平固定用
の油圧ジャッキを設け、これらの油圧ジャッキで建物上部躯体2の水平移動を拘束するように構成してもよい。この場合、センターホールジャッキ13の位置を内側に移動可能とし、センターホールジャッキ13の内側への移動により、センターホールジャッキ13の軸芯(継足し式の吊下げロッド13a)を鉛直姿勢に修正することになる。
In addition, instead of the configuration in which the planar size of the temporary frame 11 is reduced as the dismantling work proceeds, hydraulic jacks for horizontal fixation that extend and contract toward the pillars 8 of the building upper frame 2 are provided at the four corners of the temporary frame 11. It is also possible to provide such a hydraulic jack to restrain the horizontal movement of the building upper frame 2. In this case, the position of the center hole jack 13 can be moved inward, and the axial center of the center hole jack 13 (additional suspension rod 13a) is corrected to a vertical posture by moving the center hole jack 13 inward. It will be.

本発明の解体方法は、上部が展望室に形成された四角柱状の上部フレームと展望室上部に立設されたアンテナ用鉄塔とから構成されたS造の建物上部躯体とSRC造の建物下部躯体とを備えた塔状建物や、中間階に展望床があるような高い鉄塔の他、超高層ビルのようなアスペクト比の高い建物の解体にも利用できる。   The dismantling method of the present invention includes an S-structure building upper frame and an SRC structure lower frame composed of a square columnar upper frame formed in the observation room and an antenna tower standing on the observation room. It can be used for dismantling high-aspect ratio buildings such as high-rise towers with tower towers and high steel towers that have an observation floor on the middle floor.

a、b クレーン車
c 走行式解体機
1 塔状建物
2 建物上部躯体
3 建物下部躯体
4 展望室
5 上部フレーム
6 アンテナ用鉄塔
7 建物下部躯体の柱
8 建物上部躯体の柱
9 荷降ろしステージ
10 枠組足場
11 仮設フレーム
12 エレベータシャフト
13 センターホールジャッキ
13a 継足し式の吊下げロッド
13b クランプ機構
14 PC鋼材
15 ナット
16 作業床
17 展望床
18 仮設梁
a, b crane truck c traveling demolition machine 1 tower building 2 building upper frame 3 building lower frame 4 observation room 5 upper frame 6 antenna tower 7 building lower frame column 8 building upper frame column 9 unloading stage 10 frame Scaffold 11 Temporary frame 12 Elevator shaft 13 Center hole jack 13a Additional suspension rod 13b Clamp mechanism 14 PC steel 15 Nut 16 Work floor 17 Observation floor 18 Temporary beam

Claims (4)

塔状建物を建物上部躯体と建物下部躯体に分離し、建物下部躯体を支持架台に利用して建物上部躯体をジャッキダウンすることにより、建物上部躯体を下層から順次解体し、しかる後、地上からの作業により建物下部躯体を解体することを特徴とする塔状建物の解体方法。   The tower building is separated into the upper building and lower building, and the upper building is jacked down using the lower building as a support frame. A method for dismantling a tower-shaped building, comprising dismantling the lower building of the building by the work described above. 塔状建物を建物上部躯体と建物下部躯体に分離し、建物下部躯体を支持架台に利用して建物上部躯体をジャッキダウンすることにより、建物上部躯体をその一部が残存する状態に下層から順次解体し、しかる後、地上からの作業により残存させた建物上部躯体及び建物下部躯体をこの順に解体することを特徴とする請求項1に記載の塔状建物の解体方法。   The tower building is separated into the upper building and lower building, and the upper building is jacked down using the lower building as a support frame. 2. The method for demolishing a tower building according to claim 1, wherein the building upper frame and the building lower frame left by the work from the ground are demolished in this order. 上部が展望室に形成された上部フレームと展望室上部に立設されたアンテナ用鉄塔とから構成された建物上部躯体と建物下部躯体とを備えた塔状建物において、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設け、建物上部躯体と建物下部躯体に分離し、仮設フレームに設置したセンターホールジャッキを用いて建物上部躯体をジャッキダウンすることにより、建物下部躯体の上面を作業床にして、展望室より下の上部フレームを下層から順次解体し、しかる後、クレーン車等を用いた地上からの作業により、アンテナ用鉄塔を撤去し、次いで、展望室と建物下部躯体をこの順に解体することを特徴とする請求項2に記載の塔状建物の解体方法。   In a tower-like building with an upper frame and a lower building made up of an upper frame formed in the observation room and an antenna tower standing on the upper part of the observation room, the horizontal surrounding the upper structure of the building A temporary frame for fixing is supported on the lower housing of the building, separated into the upper and lower housings of the building, and the upper housing of the building is jacked down using the center hole jack installed on the temporary frame, Using the upper surface of the lower housing as the work floor, the upper frame below the observation room is disassembled sequentially from the lower layer, and then the antenna tower is removed by work from the ground using a crane truck, etc., then the observation room 3. The method for demolishing a tower building according to claim 2, wherein the building lower housing is demolished in this order. 建物下部躯体の周囲に、荷降ろしステージ、仮設エレベータ、枠組足場を設置した後、建物上部躯体を囲繞する水平固定用の仮設フレームを建物下部躯体に支持させた状態に設けることを特徴とする請求項3に記載の塔状建物の解体方法。   After installing an unloading stage, a temporary elevator, and a frame scaffolding around the lower building of the building, a temporary frame for horizontally fixing surrounding the upper building of the building is provided in a state of being supported by the lower building of the building. Item 4. A method for dismantling a tower building according to Item 3.
JP2009091765A 2009-04-06 2009-04-06 How to dismantle tower buildings Active JP5561707B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009091765A JP5561707B2 (en) 2009-04-06 2009-04-06 How to dismantle tower buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009091765A JP5561707B2 (en) 2009-04-06 2009-04-06 How to dismantle tower buildings

Publications (2)

Publication Number Publication Date
JP2010242362A true JP2010242362A (en) 2010-10-28
JP5561707B2 JP5561707B2 (en) 2014-07-30

Family

ID=43095667

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009091765A Active JP5561707B2 (en) 2009-04-06 2009-04-06 How to dismantle tower buildings

Country Status (1)

Country Link
JP (1) JP5561707B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022018797A1 (en) * 2020-07-20 2022-01-27 ベステラ株式会社 Method for disassembling tower-type wind power generation facility
JP2022088251A (en) * 2020-12-02 2022-06-14 ベステラ株式会社 Disassembly method of tower type wind turbine generator system
CN115838129A (en) * 2022-10-28 2023-03-24 中国十七冶集团有限公司 A method for dismantling tower cranes for expansion of large factory buildings

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5369437A (en) * 1976-12-03 1978-06-20 Kawasaki Steel Corp Method of dismantling steel tower
JPH07102793A (en) * 1993-10-01 1995-04-18 I H I Plantec:Kk Demolition of tower body and device therefor
JPH0932349A (en) * 1995-07-24 1997-02-04 Shimizu Corp Construction method of building
JP2000257305A (en) * 1999-03-05 2000-09-19 Taisei Corp How to build a tower-like building
JP2002188322A (en) * 2000-12-20 2002-07-05 Shimizu Corp How to build a tower
JP2003343094A (en) * 2002-05-28 2003-12-03 Tomoe Corp How to dismantle tower-like structures
JP2010001649A (en) * 2008-06-20 2010-01-07 Tomoe Corp Demolition method of steel pipe single pole steel tower for power transmission

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5369437A (en) * 1976-12-03 1978-06-20 Kawasaki Steel Corp Method of dismantling steel tower
JPH07102793A (en) * 1993-10-01 1995-04-18 I H I Plantec:Kk Demolition of tower body and device therefor
JPH0932349A (en) * 1995-07-24 1997-02-04 Shimizu Corp Construction method of building
JP2000257305A (en) * 1999-03-05 2000-09-19 Taisei Corp How to build a tower-like building
JP2002188322A (en) * 2000-12-20 2002-07-05 Shimizu Corp How to build a tower
JP2003343094A (en) * 2002-05-28 2003-12-03 Tomoe Corp How to dismantle tower-like structures
JP2010001649A (en) * 2008-06-20 2010-01-07 Tomoe Corp Demolition method of steel pipe single pole steel tower for power transmission

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022018797A1 (en) * 2020-07-20 2022-01-27 ベステラ株式会社 Method for disassembling tower-type wind power generation facility
JPWO2022018797A1 (en) * 2020-07-20 2022-01-27
JP7409720B2 (en) 2020-07-20 2024-01-09 ベステラ株式会社 How to dismantle tower-type wind power generation equipment
US12276123B2 (en) 2020-07-20 2025-04-15 Besterra Co., Ltd. Dismantling method of tower-type wind power generation system
JP2022088251A (en) * 2020-12-02 2022-06-14 ベステラ株式会社 Disassembly method of tower type wind turbine generator system
JP7486187B2 (en) 2020-12-02 2024-05-17 ベステラ株式会社 How to dismantle tower-type wind power generation equipment
CN115838129A (en) * 2022-10-28 2023-03-24 中国十七冶集团有限公司 A method for dismantling tower cranes for expansion of large factory buildings

Also Published As

Publication number Publication date
JP5561707B2 (en) 2014-07-30

Similar Documents

Publication Publication Date Title
US10829927B2 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP2012132145A (en) Lifting device for building
JP6474151B2 (en) Dismantling system and dismantling method
JP6508958B2 (en) Demolition system and demolition method
JP5561707B2 (en) How to dismantle tower buildings
JP5840914B2 (en) New and old building thatched roof method
US20130263549A1 (en) Safety screen system for steel erection work
JP3881343B2 (en) Method and apparatus for disassembling cylindrical structure
JP5701490B2 (en) Roof repair method and structure
JP2010255374A (en) Demolition method for skyscraper building
KR100966083B1 (en) Pier and the construction method for the same
CN210216478U (en) Open caisson construction work platform
JP2016017291A (en) Dismantling method and dismantling system
JP6173771B2 (en) Building demolition method and building demolition support device used therefor
JP6418683B2 (en) Temporary support method
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN114737790B (en) Reverse dismantling method for high-rise frame structure
JP3368483B2 (en) Bridge pier construction method
JP5992218B2 (en) Structure demolition method
JP2696486B2 (en) Building construction method
JP2006022534A (en) Building demolishing method
JP2018150144A (en) Construction method of building
CN116378455A (en) Construction method for adding upright post piles in existing building
JP2023172647A (en) How to build rebar frames and walls

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120327

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130527

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130905

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131009

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140604

R150 Certificate of patent or registration of utility model

Ref document number: 5561707

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150