JP2009285248A - Construction method of water spray piping for fire-fighting laid underground in floor slab - Google Patents

Construction method of water spray piping for fire-fighting laid underground in floor slab Download PDF

Info

Publication number
JP2009285248A
JP2009285248A JP2008141998A JP2008141998A JP2009285248A JP 2009285248 A JP2009285248 A JP 2009285248A JP 2008141998 A JP2008141998 A JP 2008141998A JP 2008141998 A JP2008141998 A JP 2008141998A JP 2009285248 A JP2009285248 A JP 2009285248A
Authority
JP
Japan
Prior art keywords
fire
floor slab
cover
construction method
fire fighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008141998A
Other languages
Japanese (ja)
Other versions
JP5192290B2 (en
Inventor
Gao-Pei Ma
高▲はい▼ 麻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUAN SHIN ENTERPRISE CO Ltd
Original Assignee
YUAN SHIN ENTERPRISE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUAN SHIN ENTERPRISE CO Ltd filed Critical YUAN SHIN ENTERPRISE CO Ltd
Priority to JP2008141998A priority Critical patent/JP5192290B2/en
Publication of JP2009285248A publication Critical patent/JP2009285248A/en
Application granted granted Critical
Publication of JP5192290B2 publication Critical patent/JP5192290B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a construction method of water spray piping for fire-fighting, for raising the height of a ceiling. <P>SOLUTION: In the construction method of water spray piping for fire-fighting laid underground in floor slab, a water supply pipe of a fire-fighting set is laid underground in the floor slab. Therefore, a space for the height of the ceiling is not required, so that feeling of oppression is not given to a tenant. The construction method dispenses with interior and construction of a ceiling etc., saving costs for interior. Moreover, in the construction method, construction is performed to set in concrete soon after removing the slab, and paint is applied, and thereafter a sprinkler head is quickly replaced, so that a construction period is shortened effectively. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、消防用散水配管の施工法に関し、特に床スラブ内に埋設される消防用散水配管の施工法に関する。   The present invention relates to a construction method for firefighting sprinkling pipes, and particularly to a construction method for firefighting sprinkling pipes embedded in a floor slab.

図10は、従来の露出配管の消防用散水設備の結構イメージであるが、それは床スラブ1の下に全ネジロッド2が設けられ、鉄リングで鉄製給水管3を吊り上げて、露出配管の消防用散水設備が形成され、それから、スプリンクラーヘッド5を露出させるために、セーリング4に孔を開けている。   FIG. 10 is a schematic image of a conventional sprinkling system for firefighting of exposed piping. It is provided with a full threaded rod 2 under the floor slab 1, and an iron water pipe 3 is lifted with an iron ring to expose the exposed piping for firefighting. A watering facility is formed, and then a hole is drilled in the sailing 4 to expose the sprinkler head 5.

従来の構造は、施工中に多くの欠点があるが、消防用散水設備の給水管3は、床スラブ1全体の下に配置され、しかも、25〜30cmの施工スペースを保持する必要があるため、利用できる天井高が減少し、住居者に容易に圧迫感を与え、ユーザに好まれない方法といえる。例えば、本来の天井高が3.5メートルだったが、2.9メートルの高さしか残されず、そして、セーリングの内装を終えてから、天井高が2.8メートルだけになってしまう。   The conventional structure has many drawbacks during the construction, but the water supply pipe 3 of the fire-fighting sprinkler system is disposed under the entire floor slab 1 and needs to hold a construction space of 25 to 30 cm. It can be said that the ceiling height that can be used is reduced, the occupant can easily feel pressure, and is not preferred by the user. For example, although the original ceiling height was 3.5 meters, only a height of 2.9 meters is left, and after finishing the interior of the sailing, the ceiling height will be only 2.8 meters.

その上、全ネジロッド2は、床スラブ内の事前埋設ネジにつながり、事前埋設ネジの工事では、一度の埋設工事の時間がかかり、スラブを取り外した後、また全ネジロッド2の接続を行い、鉄リングで給水管3を吊り上げるための工事作業を行うので、相当な時間がかかる。   In addition, the entire threaded rod 2 is connected to the pre-embedded screw in the floor slab, and in the construction of the pre-embedded screw, it takes time for one burial work. Since the construction work for lifting the water supply pipe 3 with the ring is performed, a considerable amount of time is required.

その上、鉄製給水管3の切断と配管の組立は、比較的不便なことであり、鉄製給水管3が重いほかに、工事者がソーイング機、ネジ切り機等設備で、給水管3を必要なサイズに切り取り、配管に接続するためのネジなどを作らなければならないので、工事が不便で、時間もかかる。   In addition, the cutting of the steel water supply pipe 3 and the assembly of the pipes are relatively inconvenient. The iron water supply pipe 3 is heavy, and the construction person needs the water supply pipe 3 with facilities such as a sawing machine and a threading machine. Since it has to be cut to a proper size and made with screws to connect to the piping, the construction is inconvenient and time consuming.

全ネジロッド2と鉄リングで吊り上げた給水管3の構造においては、給水管3の構造が不安定している欠点がある。特に、配管の圧力を測定したとき、配管を揺れたりして、構造の強度にマイナスな影響を与える。   In the structure of the water supply pipe 3 suspended by the whole screw rod 2 and the iron ring, there is a drawback that the structure of the water supply pipe 3 is unstable. In particular, when the pipe pressure is measured, the pipe shakes and negatively affects the strength of the structure.

更に、スラブを取り外した後、床スラブ1にコンクリート流し込み、ペンキ塗りをしてから、やっと消防用散水設備と水電配管工事を行うことができるが、しかし、そこで、ペンキ塗りが完了した床スラブに汚れなどを容易に残し、工事の紛争が起こりがちなため、工事内容に対応する施工タイムが必要となり、面倒になる。   Furthermore, after removing the slab, pouring concrete into the floor slab 1 and painting it, it is finally possible to carry out fire sprinkling equipment and hydroelectric piping work. Since dirt is easily left and construction disputes tend to occur, construction time corresponding to the construction contents is necessary and troublesome.

そのほか、床スラブ1の下に露出した消防用散水設備、乱れた給水管3は、見た目が悪く、風水もよくないため、通常、更に飾り用のセーリング4を増設する必要があり、それで、内装の費用が増加し、天井高が異なり、入居者に見えない圧迫感を与えてしまい、実用性に合わない産業利用の設計となり、それを改良しなければならない。   In addition, the fired watering equipment exposed under the floor slab 1 and the disturbed water supply pipe 3 have poor appearance and poor feng shui, so it is usually necessary to add a decorative sailing 4 to the interior. The cost of the building will increase, the ceiling height will be different, and the tenant will feel incompressible, resulting in a design for industrial use that does not match practicality, and it must be improved.

従来の構造の欠点を鑑みて、本発明の発明者は、研究改良を行い、[床スラブ内に埋設される消防用散水配管の施工法]を発明し、それにより上述した従来の構造の欠点をすべて解決する。   In view of the drawbacks of the conventional structure, the inventors of the present invention have made research improvements and invented [a construction method of fired water sprinkling pipes embedded in a floor slab], thereby the disadvantages of the conventional structure described above. To solve all.

すなわち、本発明の[床スラブ内に埋設される消防用散水配管の施工法]の解決しようとする課題は、天井高を高めるための消防用散水配管の施工法を提供することである。   That is, the problem to be solved by the [method for constructing fired water sprinkling pipes embedded in floor slabs] of the present invention is to provide a method for constructing fire sprinkling pipes for increasing the ceiling height.

本発明の[床スラブ内に埋設される消防用散水配管の施工法]は、次の手順が含まれている。
1. 消防セットの組立:ジョイント接続ユニット、カバーとシールを順次に消防セットに組み合わせる。
2. 消防セットの固定:施工図に基づき、消防セットをスラブの上のプリセット位置に置き、カバーをスラブの上に固定してから、第一段鉄筋の配筋を進む。
3. 消防配管の接続:第一消防配管に接続するため、前記ジョイント接続ユニットに給水管を接続してから、第二段鉄筋の配筋を進める。
4. 床スラブへのコンクリート流し込み:スラブにコンクリートを流し、消防セットと消防配管をコンクリートの中に埋設する。
5. シールの取り外し:スラブを取り外し、床スラブのコンクリートに工事を行い、ペンキ塗りを行ってから、カバー内のシールを直接に取り除く。
6. スプリンクラーヘッドの組立:スプリンクラーヘッドをジョイント接続ユニットのつなぎ側につなげて、消防用散水配管の施工が完了。
[The construction method of fired water sprinkling pipes embedded in the floor slab] of the present invention includes the following procedures.
1. Assembling the fire fighting set: Combine the joint connection unit, cover and seal in order with the fire fighting set.
2. Fixing the fire fighting set: Place the fire fighting set at a preset position on the slab and fix the cover on the slab based on the construction drawing, and then proceed with the reinforcement of the first stage rebar.
3. Connection of firefighting piping: To connect to the first firefighting piping, connect the water supply pipe to the joint connection unit, and then proceed with the reinforcement of the second stage reinforcement.
4). Pour concrete into the floor slab: Pour concrete into the slab and embed the fire set and fire piping in the concrete.
5. Removing the seal: Remove the slab, work on the concrete on the floor slab, paint, and then remove the seal in the cover directly.
6). Assembling the sprinkler head: The sprinkler head is connected to the connecting side of the joint connection unit, and the construction of the sprinkler pipe for fire fighting is completed.

上述の内容により、本発明の長所が以下のようにまとめられる。
1.本発明の[床スラブ内に埋設される消防用散水配管の施工法]では、消防セットの給水管が床スラブ内に埋設され、天井高のスペースがかからず、入居者に圧迫感を与えずにすむし、セーリング等の費用が不要で、不動産の購入意欲が高められ、産業利用性がある施工法である。
2.本発明の[床スラブ内に埋設される消防用散水配管の施工法]では、コンクリートへの埋設時間だけがかかり、それが終わってから、スプリンクラーヘッドでシールの交換が素早く行われ、トリムパネルの設置、施工を終えるもので、従来の全ネジロッドと鉄リングで吊り上げた給水管の煩雑な施行法が避けられ、施工時間が有効に節約、給水管の位置を安定する効果がある。
3.本発明の[床スラブ内に埋設される消防用散水配管の施工法]では、建築防火及び消防関連法規に適合し、床スラブの見た目がきれいになり、露出の乱れた給水管の配置構造が避けられ、スプリンクラーヘッドやトリムパネルの組立作業でも、ペンキ塗り済みの床スラブを汚さずにすむし、大変簡単な施工手順法である。
Based on the above, the advantages of the present invention are summarized as follows.
1. In the [Method of constructing fired water sprinkling pipe embedded in floor slab] of the present invention, the water supply pipe of the fire fighting set is embedded in the floor slab and does not take up the space of the ceiling height, and the occupant feels pressure This is a construction method that eliminates the need for costs, eliminates the need for sailing, increases the willingness to purchase real estate, and has industrial applicability.
2. In the [Method of constructing fired water sprinkling pipe embedded in floor slab] of the present invention, it takes time to embed concrete, and after that, the sprinkler head quickly replaces the seal and trims. The installation and construction of the panel is completed, and the conventional complicated method of implementing a water pipe hung with an all-screw rod and an iron ring can be avoided, the construction time can be effectively saved, and the position of the water pipe can be stabilized.
3. According to the [Method for constructing fired water sprinkling pipes buried in floor slabs] of the present invention, the layout structure of water supply pipes conforming to building fire prevention and fire-related laws and regulations, the appearance of floor slabs is clean, and exposure is disturbed. This is a very simple construction procedure that eliminates contamination of the painted floor slab even when the sprinkler head and trim panel are assembled.

その他の目的、長所及び本発明のオリジナル性は、以下の詳細な説明や関連の図面により詳しく説明する。   Other objects, advantages, and originality of the present invention will be described in detail with reference to the following detailed description and related drawings.

本発明の採用する技術手段及びその効果は、好適な実施例及び図面により詳しく後述するが、これらは説明のために用いられるものであり、特許申請上はこれらの構造に制限されないこととする。   The technical means employed by the present invention and the effects thereof will be described in detail later with reference to preferred embodiments and drawings. However, these are used for explanation, and are not limited to these structures in the patent application.

図1に示すように、本発明の消防用散水配管の施工法には、次の手順が含まれている。   As shown in FIG. 1, the following procedure is included in the construction method of the sprinkling pipe for fire fighting of this invention.

消防セットの組立:ジョイント接続ユニット12、カバー13とシール14を図2のように順次に消防セット10aに組み合わせる。   Assembling the fire fighting set: The joint connection unit 12, the cover 13 and the seal 14 are sequentially assembled to the fire fighting set 10a as shown in FIG.

前記ジョイント接続ユニット12には、前記シール14につながるためのつなぎ側121があり、前記カバー13は、シール14でジョイント接続ユニット12とシール14との間に固定され、前記カバー13の片側の周りに当接部131が設けられ、前記当接部131の上に位置固定孔132と位置固定フック133がある。   The joint connection unit 12 has a connecting side 121 to be connected to the seal 14, and the cover 13 is fixed between the joint connection unit 12 and the seal 14 with the seal 14, and around the one side of the cover 13. The position fixing hole 132 and the position fixing hook 133 are provided on the contact section 131.

消防セットの固定:施工図に基づき、消防セット10aをスラブ90の上のプリセット位置に置き、前記カバー13の当接部131がスラブ90の上に突き、前記カバー13の位置固定孔132に釘134を打ちいれ、図3のようにカバー13をスラブ90の上に固定し、そこで、前記カバー13により、前記ジョイント接続ユニット12のつなぎ側121の軸線方向とスラブ90とは垂直状態を保持することができ、角度の傾きなどを避け、第一段鉄筋92の配筋を進めることができる。   Fixing the fire fighting set: Based on the construction drawing, the fire fighting set 10a is placed at a preset position on the slab 90, the contact portion 131 of the cover 13 projects on the slab 90, and the nail is inserted into the position fixing hole 132 of the cover 13. As shown in FIG. 3, the cover 13 is fixed on the slab 90, and the cover 13 keeps the axial direction of the connecting side 121 of the joint connection unit 12 and the slab 90 perpendicular to each other. It is possible to avoid the inclination of the angle and to advance the reinforcement of the first stage rebar 92.

消防配管の接続: 第一消防配管10bにつなげるために、前記ジョイント接続ユニット12上に給水管11を接続し、第二段鉄筋93の配筋を進め、その配筋作業を終えたら、消防配管10bを第二段鉄筋93に固定し、コンクリート流し込みの時、消防配管10bの位置が傾くことを避け、前記消防配管10bは給水管11をバンドで第二段鉄筋93に固定している。   Fire-fighting pipe connection: To connect to the first fire-fighting pipe 10b, the water supply pipe 11 is connected to the joint connection unit 12, the second-stage reinforcing bar 93 is advanced, and the fire-fitting pipe is finished. 10b is fixed to the second stage reinforcing bar 93, and when the concrete is poured, the position of the fire fighting pipe 10b is avoided, and the fire fighting pipe 10b fixes the water supply pipe 11 to the second stage reinforcing bar 93 with a band.

前記消防配管10bは、消防配管10bの圧力を測定するための末端が設けられ、加圧して測定結果の圧力は12kgの場合、前記消防配管10bが加圧測定に合格し、そこで、消防給水側に接続できる。   The fire fighting pipe 10b is provided with a terminal for measuring the pressure of the fire fighting pipe 10b. When the pressure of the measurement result is 12 kg, the fire fighting pipe 10b passes the pressurization measurement. Can be connected.

前記給水管11とジョイント接続ユニット12との間は、粘着剤で相互に接着しており、本実施例では、前記給水管11とジョイント接続ユニット12は、塩素化塩化ビニル (Chlorinated polyvinyl chloride、CPVC) のようなコンクリートに腐食されない材料で作られたものであり、粘着剤も給水管11とジョイント接続ユニット12と同じ材質の塩素化塩化ビニルで作られたものであり、それで、前記給水管11とジョイント接続ユニット12は接着後、一体化し、接着したところは接着していないところより強度が1.5倍となる。   The water supply pipe 11 and the joint connection unit 12 are bonded to each other with an adhesive, and in this embodiment, the water supply pipe 11 and the joint connection unit 12 are made of chlorinated polyvinyl chloride (CPVC). ) Made of a material that is not corroded by concrete, and the adhesive is also made of chlorinated vinyl chloride made of the same material as the water supply pipe 11 and the joint connection unit 12. The joint connection unit 12 is integrated after bonding, and the strength of the joint connection unit 12 is 1.5 times that of the unbonded portion.

床スラブへのコンクリート流し込み:スラブ90にコンクリート91を流し込み、消防セット10aと消防配管10bをコンクリート91の中に埋設し、図4のようにコンクリート91をカバー13の位置固定フック133へ流し込むようにし、コンクリート91の凝固した後、カバー13の位置固定フック133としっかりと結合し、スラブ90を取り外した時、カバー13の脱落が避けられる。   Concrete pouring into the floor slab: Concrete 91 is poured into the slab 90, the fire fighting set 10a and the fire fighting piping 10b are embedded in the concrete 91, and the concrete 91 is poured into the position fixing hook 133 of the cover 13 as shown in FIG. After the concrete 91 is solidified, the cover 13 is firmly connected to the position fixing hook 133, and when the slab 90 is removed, the cover 13 can be prevented from falling off.

シールの取り外し:スラブ90を取り外してから、床スラブのコンクリートに工事を行い、ペンキ塗りを行ってから、図5のように、カバー13内のシール14の直接に取り除くことができる。   Removal of the seal: After removing the slab 90, the floor slab concrete is constructed and painted, and then the seal 14 in the cover 13 can be removed directly as shown in FIG.

スプリンクラーヘッドの組立:スプリンクラーヘッド15をジョイント接続ユニット12のつなぎ側121につなげて、図6のように消防用散水配管10cの施工が完了。   Assembling the sprinkler head: The sprinkler head 15 is connected to the connecting side 121 of the joint connection unit 12, and the construction of the fire sprinkling pipe 10c is completed as shown in FIG.

スプリンクラーヘッドの施工完了後、更に次の手順が進められる。   After completing the construction of the sprinkler head, the following procedure is further advanced.

トリムパネルの組立:図7、図8に示すように、トリムパネル16をスプリンクラーヘッド15に設けることにより、前記トリムパネル16で、前記カバー13の開放側が覆われ、見た目がよくなる。   Assembling the Trim Panel: As shown in FIGS. 7 and 8, by providing the trim panel 16 on the sprinkler head 15, the trim panel 16 covers the open side of the cover 13 and the appearance is improved.

前述した消防用散水配管10cの施工法により、給水管が11床のスラブ内に埋設され、天井高のスペースがかからず、入居者に圧迫感を与えずにすむし、セーリング等の費用が不要で、不動産の購入意欲が高められ、産業利用性がある施工法である。   By the construction method of the fired water sprinkling pipe 10c described above, the water supply pipe is embedded in the slab of 11 floors, so that there is no space for the ceiling height, and there is no pressure on the occupants, and the cost of sailing etc. A construction method that is unnecessary, increases the willingness to purchase real estate, and has industrial applicability.

そして、本発明の消防用散水配管10cの施工法では、コンクリート91に埋設後、スプリンクラーヘッド15でシール14の交換が素早く行われ、トリムパネル16を設け、施工を終えるための全施工時間は、従来の露出配管の場合の1/3だけであり、従来の全ネジロッドと鉄リングで吊り上げた給水管11の煩雑な施工法が避けられ、施工時間が有効に節約、給水管11の位置を安定する効果を有する。   And in the construction method of the sprinkler pipe 10c for fire fighting of the present invention, after burying in the concrete 91, the replacement of the seal 14 is quickly performed by the sprinkler head 15, the trim panel 16 is provided, and the total construction time for finishing the construction is This is only 1/3 of the conventional exposed piping, avoiding the complicated construction method of the conventional water supply pipe 11 suspended with all screw rods and iron rings, effectively saving the construction time, and stabilizing the position of the water supply pipe 11 Has the effect of

そのほか、本発明の消防用散水配管10cの施工法は、建築防火及び消防関連法規に適合し、床スラブの見た目がきれいになり、露出の乱れた給水管11の配置構造が避けられ、スプリンクラーヘッド15やトリムパネル16の組立作業でも、ペンキ塗り済みの床スラブを汚さずにすみ、大変簡単な施工手順法である。   In addition, the construction method of the water sprinkling pipe 10c for fire fighting according to the present invention conforms to building fire prevention and fire fighting related regulations, the appearance of the floor slab is clean, the arrangement structure of the water supply pipe 11 disturbed in exposure is avoided, and the sprinkler head 15 Even in the assembly work of the panel and the trim panel 16, it is possible to save the painted floor slab without soiling, which is a very simple construction procedure method.

図9に示すように、前記カバー17は二ユニット式プレスパッキング構造であって、それにより、前記カバー17構造の強度が高められる。   As shown in FIG. 9, the cover 17 has a two-unit press packing structure, which increases the strength of the cover 17 structure.

従って、本発明は産業上の利用価値があり、しかも同じ又は類似した発明が、国内海外の発行物に見られず、公開に使用されていないものであって特許法の規定の積極と消極極要件に一致し、特許を取得することができるものである。   Therefore, the present invention has industrial utility value, and the same or similar invention is not found in domestic and overseas publications and is not used for publication. It meets the requirements and can be patented.

但し、上述の内容は、本発明の好適な実施例のみであり、本発明の実施範囲を制限するために用いられるものではなく、本発明の特許請求の範囲に述べられた内容に基づき、なんらかの改造や変更を行って作られたものは、すべて本発明の特許請求の範囲に属するものとする。   However, the above description is only a preferred embodiment of the present invention, and is not used to limit the scope of the present invention, and is based on the content described in the claims of the present invention. Anything made by modification or alteration shall belong to the claims of the present invention.

本発明の消防用散水配管の施工法フローである。It is a construction method flow of the sprinkling piping for fire fighting of this invention. 本発明の消防セットの立体分解図である。It is a three-dimensional exploded view of the fire fighting set of the present invention. 本発明の消防セットがスラブへ組立てられたイメージである。It is the image by which the fire fighting set of this invention was assembled to the slab. 本発明のスラブへのコンクリート流しのイメージである。It is an image of the concrete sink to the slab of this invention. 本発明のシールの取り外し後のイメージである。It is an image after removal of the seal | sticker of this invention. 本発明のスプリンクラーヘッドの組立後のイメージである。It is an image after the assembly of the sprinkler head of this invention. 本発明のトリムパネルの組立後のイメージである。It is an image after the assembly of the trim panel of this invention. 本発明の消防用散水配管の立体分解図である。It is a three-dimensional exploded view of the watering pipe for fire fighting of the present invention. 本発明のカバーの実施形態に関する二ユニット式結構のイメージである。It is an image of the 2 unit type structure regarding embodiment of the cover of this invention. 従来の消防用散水設備の施工結構イメージである。It is a construction image of a conventional fire sprinkler.

符号の説明Explanation of symbols

1 床スラブ
2 全ネジロッド
3 給水管
4 セーリング
5 スプリンクラーヘッド
10a 消防セット
10b 消防配管
11 給水管
12 ジョイント接続ユニット
121 つなぎ側
13 カバー
121 当接部
132 位置固定孔
133 位置固定フック
134 釘
14 シール
15 スプリンクラーヘッド
16 トリムパネル
17 カバー
171 当接部
172 位置固定孔
173 位置固定フック
90 スラブ
91 コンクリート
92 第一段鉄筋
93 第二段鉄筋
DESCRIPTION OF SYMBOLS 1 Floor slab 2 Fully threaded rod 3 Water supply pipe 4 Sailing 5 Sprinkler head 10a Fire fighting set 10b Fire fighting pipe 11 Water supply pipe 12 Joint connection unit 121 Joint side 13 Cover 121 Contact part 132 Position fixing hole 133 Position fixing hook 134 Nail 14 Seal 15 Sprinkler Head 16 Trim panel 17 Cover 171 Contact portion 172 Position fixing hole 173 Position fixing hook 90 Slab 91 Concrete 92 First stage rebar 93 Second stage rebar

Claims (13)

消防セットの組立、すなわち、ジョイント接続ユニット、カバーとシールを順次に消防セットに組み合わせ、
消防セットの固定、すなわち、消防セットをスラブの上のプリセット位置に置き、カバーをスラブの上に固定してから、第一段鉄筋の配筋を進め、
消防配管の接続、すなわち、第一消防配管に接続するため、前記ジョイント接続ユニットに給水管を接続してから、第二段鉄筋の配筋を進め、
床スラブへのコンクリート流し込み、すなわち、スラブにコンクリートを流し、消防セットと消防配管をコンクリートの中に埋設し、
シールの取り外し、すなわち、スラブを取り外してから、カバー内のシールを取り除き、
スプリンクラーヘッドの組立、すなわち、スプリンクラーヘッドをジョイント接続ユニットのつなぎ側につなげて、消防用散水配管の施工を完了させる
という手順が含まれることを特徴とする床スラブ内に埋設される消防用散水配管の施工法。
Assembling the fire fighting set, that is, combining the joint connection unit, cover and seal in order with the fire fighting set,
Fix the fire fighting set, that is, place the fire fighting set in a preset position on the slab, fix the cover on the slab, and then advance the reinforcement of the first stage rebar,
Connection of firefighting piping, that is, to connect to the first firefighting piping, after connecting the water supply pipe to the joint connection unit, advance the second-stage reinforcing bar arrangement,
Pour concrete into the floor slab, that is, pour concrete into the slab, embed the fire fighting set and fire piping in the concrete,
Remove the seal, i.e. remove the slab, then remove the seal in the cover,
Sprinkler head assembly, that is, the sprinkler head is connected to the connecting side of the joint connection unit to complete the construction of the fire sprinkler pipe. The fire sprinkler pipe embedded in the floor slab is included. Construction method.
前記スプリンクラーヘッドの組立は、次の手順、
トリムパネルの組立、すなわち、トリムパネルをスプリンクラーヘッドに設けて、前記トリムパネルで、前記カバーの開放側が覆われ、見た目をきれいにするというトリムパネルの組立が可能であることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。
Assembling the sprinkler head includes the following steps:
The trim panel is assembled, i.e., the trim panel is provided on the sprinkler head, and the trim panel covers the open side of the cover so that the trim panel can be assembled with a clean appearance. Construction method of fired water sprinkling pipes embedded in the floor slab described in 1.
消防セットの組立手順では、前記カバーは、シールにより、ジョイント接続ユニットとシールとの間に固定されていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   2. The fire sprinkling pipe embedded in a floor slab according to claim 1, wherein the cover is fixed between the joint connection unit and the seal by a seal in the assembly procedure of the fire fighting set. Construction method. 前記ジョイント接続ユニットは、前記シール又は前記スプリンクラーヘッドを接続するためのつなぎ側が設けられることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The construction method of the fired water sprinkling pipe embedded in the floor slab according to claim 1, wherein the joint connection unit is provided with a connecting side for connecting the seal or the sprinkler head. 前記消防セットの組立手順では、前記カバーの片側の周りに当接部が設けられ、前記当接部の上に位置固定孔があり、前記カバーの当接部は、スラブの上に突き、前記カバーの位置固定孔に打ちいれ、カバーをスラブの上に固定することにより、前記ジョイント接続ユニットのつなぎ側の軸線方向とスラブとは、垂直状態を保持するように設けられていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   In the assembling procedure of the fire fighting set, a contact portion is provided around one side of the cover, a position fixing hole is provided on the contact portion, the contact portion of the cover projects above the slab, The axial direction of the joint side of the joint connection unit and the slab are provided so as to maintain a vertical state by being driven into the position fixing hole of the cover and fixing the cover on the slab. The construction method of the sprinkling piping for fire fighters embed | buried in the floor slab of Claim 1. 前記消防セットの組立手順では、コンクリートとカバーとの位置固定フックをしっかりと結合するために、前記カバーの当接部に位置固定フックが設けられていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The position fixing hook is provided in the contact portion of the cover in order to firmly connect the position fixing hook between the concrete and the cover in the assembly procedure of the fire fighting set. Of fired water sprinkling pipes embedded in floor slabs. 前記消防セットの組立手順では、前記カバーは、二ユニット式プレスパッキング構造であり、それにより、前記カバーの構造強度が高められることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   2. The embedded fire floor set according to claim 1, wherein the cover has a two-unit press packing structure, thereby increasing the structural strength of the cover. How to install water sprinkling pipes for fire fighting. 消防配管の接続手順では、前記消防配管は第二段鉄筋に固定されていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The construction method of fired water sprinkling pipes embedded in a floor slab according to claim 1, wherein the fire fighting pipes are fixed to the second stage reinforcing bars in the fire fighting pipe connection procedure. 前記消防配管の接続手順では、前記給水管とジョイント接続ユニットとは、コンクリートに腐食されない材料で作られていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   2. The fire sprinkler embedded in a floor slab according to claim 1, wherein the water supply pipe and the joint connection unit are made of a material that is not corroded by concrete. Piping construction method. 前記給水管とジョイント接続ユニットは、塩素化塩化ビニル(Chlorinated polyvinyl chloride、CPVC)の材料で作られていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   2. The fired water sprinkling pipe embedded in a floor slab according to claim 1, wherein the water supply pipe and the joint connection unit are made of a material of chlorinated vinyl chloride (CPVC). 3. Construction method. 前記給水管とジョイント接続ユニットとの間は、粘着剤で相互に接着していることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The construction method of the sprinkling pipe for fire fighters embedded in the floor slab according to claim 1, wherein the water supply pipe and the joint connection unit are bonded to each other with an adhesive. 前記粘着剤は、給水管とジョイント接続ユニットとの材質と同じ塩素化塩化ビニル(Chlorinated polyvinyl chloride、CPVC)で作られていることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The adhesive is embedded in a floor slab according to claim 1, wherein the adhesive is made of the same chlorinated polyvinyl chloride (CPVC) as the material of the water supply pipe and the joint connection unit. How to install water sprinkling pipes for fire fighting. 前記シールの取り外し手順では、スラブを取り外した後、床スラブにコンクリート流しやペンキ塗りを行うことができることを特徴とする、請求項1に記載の床スラブ内に埋設される消防用散水配管の施工法。   The construction of fired water sprinkling pipes embedded in the floor slab according to claim 1, wherein in the procedure for removing the seal, after the slab is removed, the floor slab can be subjected to concrete flow or paint. Law.
JP2008141998A 2008-05-30 2008-05-30 Construction method of fire sprinkling pipes buried in floor slabs. Expired - Fee Related JP5192290B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008141998A JP5192290B2 (en) 2008-05-30 2008-05-30 Construction method of fire sprinkling pipes buried in floor slabs.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008141998A JP5192290B2 (en) 2008-05-30 2008-05-30 Construction method of fire sprinkling pipes buried in floor slabs.

Publications (2)

Publication Number Publication Date
JP2009285248A true JP2009285248A (en) 2009-12-10
JP5192290B2 JP5192290B2 (en) 2013-05-08

Family

ID=41455031

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008141998A Expired - Fee Related JP5192290B2 (en) 2008-05-30 2008-05-30 Construction method of fire sprinkling pipes buried in floor slabs.

Country Status (1)

Country Link
JP (1) JP5192290B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN109680940A (en) * 2019-02-01 2019-04-26 山西三建集团有限公司 Preserved pipeline passes through the pre-embedded device and built-in process in hole in floor concrete casting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0739602A (en) * 1993-07-28 1995-02-10 Shigeo Morimoto Concrete wall and its installation method
JPH0884783A (en) * 1994-09-16 1996-04-02 Ohbayashi Corp Method for construction of sprinkler
JPH10155928A (en) * 1996-11-28 1998-06-16 Ohbayashi Corp Piping structure of sprinkler
JPH11114085A (en) * 1997-10-14 1999-04-27 Hochiki Corp Sprinkler fire extinguishing equipment
JP2000079181A (en) * 1998-09-08 2000-03-21 Kajima Corp Installation structure of sprinkler fire extinguishing equipment
JP2003299748A (en) * 2002-04-10 2003-10-21 Mitsui Chemicals Inc Slab construction and method of laying sprinkler piping

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0739602A (en) * 1993-07-28 1995-02-10 Shigeo Morimoto Concrete wall and its installation method
JPH0884783A (en) * 1994-09-16 1996-04-02 Ohbayashi Corp Method for construction of sprinkler
JPH10155928A (en) * 1996-11-28 1998-06-16 Ohbayashi Corp Piping structure of sprinkler
JPH11114085A (en) * 1997-10-14 1999-04-27 Hochiki Corp Sprinkler fire extinguishing equipment
JP2000079181A (en) * 1998-09-08 2000-03-21 Kajima Corp Installation structure of sprinkler fire extinguishing equipment
JP2003299748A (en) * 2002-04-10 2003-10-21 Mitsui Chemicals Inc Slab construction and method of laying sprinkler piping

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN109432662B (en) * 2018-11-26 2023-08-01 中建三局集团有限公司 Fire-fighting water system and its construction method used in the construction stage of super high-rise buildings
CN109680940A (en) * 2019-02-01 2019-04-26 山西三建集团有限公司 Preserved pipeline passes through the pre-embedded device and built-in process in hole in floor concrete casting

Also Published As

Publication number Publication date
JP5192290B2 (en) 2013-05-08

Similar Documents

Publication Publication Date Title
MX2009002128A (en) Arrangement for conveying concrete with a height-adjustable concrete-distributing mast.
JP5192290B2 (en) Construction method of fire sprinkling pipes buried in floor slabs.
CN106760535A (en) One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete interior wall
DE60308371D1 (en) IMPROVED FINISHING FOR FLOORING
CN203961041U (en) Fire prevention booth case
CN102900233A (en) Dual face raw slurry clean water concrete construction method
CN101660344A (en) Construction method of fire-fighting sprinkler pipeline buried in floor slab
CN201704954U (en) Formwork opposite-pulling device for pouring waterproof walls
CN203097290U (en) Assembled type split bolt
CN103161311B (en) Construction Method of Large Diameter Reinforced Concrete Pipe Crossing Abutment
KR20100002539A (en) A mount for covering fire sprinkler head
CN202899576U (en) Novel piping shaft
CN211200728U (en) Connecting node structure of precast concrete externally-hung wallboard
CN107386335A (en) A kind of composite light lumber and its construction technology for being easy to splicing
CN201214871Y (en) Inside/Outside corner section bar for buildings
CN205822506U (en) Impervious water shear wall
CN201447864U (en) Tool type external scaffold connector
JP3672545B2 (en) Planned height display ruler for concrete placement and planned height finishing method
CN116517153B (en) A connection device and glass installation and positioning method for a long-span cable-stayed curtain wall.
KR200409373Y1 (en) Luminous hoses for ship coating
TWI284169B (en) Working process for building and construction thereof
CN201152401Y (en) Architecture pipeline pre-embedded joint
JP3214895U (en) Installation technology for water creation (toilet, washroom, bathroom, kitchen) space creation unit
CN202073317U (en) Wall-attached support seat for large decorative steel templates
CN202187481U (en) Lower layer steel bar supporting cushion block for controlling thickness of concrete floor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110530

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120903

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20121203

A602 Written permission of extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A602

Effective date: 20121206

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121213

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130131

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160208

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees