Material lifting-lowering machine using temporary scaffold Download PDF

Info

Publication number
JP2009013771A
JP2009013771A JP2007205924A JP2007205924A JP2009013771A JP 2009013771 A JP2009013771 A JP 2009013771A JP 2007205924 A JP2007205924 A JP 2007205924A JP 2007205924 A JP2007205924 A JP 2007205924A JP 2009013771 A JP2009013771 A JP 2009013771A
Authority
JP
Japan
Prior art keywords
wire
pulley
driving part
hook
materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007205924A
Other languages
Japanese (ja)
Inventor
Kiminori Koyama
公紀 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2007205924A priority Critical patent/JP2009013771A/en
Publication of JP2009013771A publication Critical patent/JP2009013771A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To increase efficiency in work, by reducing manpower work, when lifting-lowering materials by using a temporary scaffold at a construction site. <P>SOLUTION: A driving part incorporated with a motor is arranged on the ground, and a pulley is arranged in a scaffold vertical frame of a stage of trying to take a cargo of an elevated spot. A rope ladder-shaped wire with a hook is circulated between this driving part and the pulley, and materials are successively hooked on the hook, and are lifted and lowered. The wire is doubled at a specific interval (about 200 mm), and is connected by a thin pipe at an equal interval, to be formed in a rope ladder shape. A groove for fitting this pipe is applied to the pulley such as the driving part and a cargo taking part of the elevated spot, and rotation is surely transmitted to the wire. A fixed pulley with a spring for preventing sagging is also installed in the driving part. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、建築現場における仮設足場を利用した、資材等の揚げ降ろしをする方法の技術に関する。  The present invention relates to a technique of a method for lifting and lowering materials and the like using a temporary scaffold at a construction site.

現状、仮設足場資材は足場各段または2段おきに配置した人力によって手渡しで資材を揚げ降ろししている。これでは作業員の疲労も激しく、高所になれば人数も必要になる。
クレーンを使うこともあるが費用もかさみ、その後の不足材や余剰材の揚げ降ろし等のこまかい対応が困難である。また、設置スペースの確保や安全面・作業効率から言っても最善策とはいえない。
ウィンチによる揚げ降ろしに至っては作業員の手待ち時間が長く効率が悪い。仮設エレベーターや常設クレーンのない現場ではこのウィンチによって建築資材の揚げ降ろしをおこなっている。
At present, temporary scaffolding materials are lifted and lowered by hand by human power placed at each stage or every second stage of the scaffolding. This causes severe fatigue of the workers, and the number of people is also required at high altitudes.
Although a crane is sometimes used, the cost is high, and it is difficult to perform a detailed response such as the subsequent lifting and unloading of insufficient materials and surplus materials. In addition, it is not the best policy in terms of securing installation space, safety and work efficiency.
When lifting and lowering with a winch, the worker's waiting time is long and inefficient. On the site where there is no temporary elevator or permanent crane, the winch is used to lift and lower building materials.

人力作業の軽減と資材揚げ降ろし作業の効率化を図る。
クレーンの使用を無くし、工費の削減と作業性の向上を図る。
Reduce manpower work and increase the efficiency of material unloading work.
Eliminate the use of cranes, reduce construction costs and improve workability.

地上と仮設足場の高層(3段以上)部間を無限軌道上のワイヤーで結び、モーターの動力を使ってワイヤーを循環させ、ワイヤーに付いたフックに資材を次々と引掛けて資材を揚げ降ろしする。  Connect the ground and the high-rise part (3 steps or more) of the temporary scaffolding with a wire on an endless track, use the power of the motor to circulate the wire, hook the material on the hook one after another, and lift the material down To do.

作業員の人数はどんなに高層でも2段目を組む時と同じですみ、作業員の疲労もかなり軽減できる。
次々と引掛けて資材を揚げ降ろしするため、作業員の手待ち時間も無く作業効率がよい。
設置スペースがわずかなため、どんな(特にリフォームの)現場にも設置可能である。
通常クレーンを使うような高所でも、モーターのパワーアップやワイヤー強度の強化による高所用機種を作ることによって資材の揚げ降ろしや不足材や残材の揚げ降ろしも随時行うことが出来、作業性の格段の向上が図れる。
足場資材以外の建築資材にも応用できる。
上記の効果により費用削減と工期の短縮も期待できる。
The number of workers is the same as when the second stage is formed, no matter how high the workers are, and the worker's fatigue can be considerably reduced.
Since the material is hung up and down one after another, there is no waiting time for workers and work efficiency is good.
Because the installation space is small, it can be installed at any site (especially remodeling).
Even in high places where normal cranes are used, it is possible to lift and lower materials as needed and to lift and lower missing materials and remaining materials at any time by making models for high places by increasing motor power and strengthening wire strength. Great improvement can be achieved.
It can also be applied to building materials other than scaffolding materials.
The above effects can be expected to reduce costs and shorten the construction period.

モーターが組み込まれた駆動部を地上に設置し、高所の荷取りしようとする段の足場たて枠に滑車を設置する。この駆動部と滑車の間をフックの付いた縄梯子状のワイヤーを循環させ、フックに資材を次々に引掛けて揚げ降ろしをする。
ワイヤーは一定の間隔(200mm位)で二重にし、等間隔(200mm位)に細いパイプで繋ぎ縄梯子状にする。
駆動部や高所の荷取り部等の滑車にこのパイプがはまる溝を施し、モーターの回転をワイヤーに確実に伝え、また滑車とワイヤーのすべりを防止する。
駆動部にはたるみ防止のためスプリング付きと、固定の滑車も取り付ける。
一定間隔(1,800〜2,000mm毎)のパイプの両端に容易に脱着できる「ワイヤー押さえ」を取付けることで延長用ワイヤーの挿入・脱着が出来る様にし、各階層に対応する。この際、たるみ防止のスプリング付き滑車を可動式にすることで2階層毎の延長用ワイヤーの挿入で済むようにする。
上記と違う段のパイプの中空に連結軸を通したフックを同じ間隔(1,800〜2,000mm毎)で取付ける。またこのフックを利用して様々な資材を安全に引掛けられるアタッチメントを開発し、簡単に脱着できるようにする。
リモコンスイッチや自動停止装置により一定間隔(1,800〜2,000mm毎)で引掛け時・荷取り時には停止するように操作する。
A drive unit with a built-in motor will be installed on the ground, and a pulley will be installed on the scaffolding frame of the step to be loaded at a high place. A rope ladder-like wire with a hook is circulated between the drive unit and the pulley, and materials are hooked on the hook one after another for lifting and lowering.
Wires are doubled at regular intervals (about 200 mm), and are connected by thin pipes at regular intervals (about 200 mm) to form a rope ladder.
A groove that fits this pipe is provided on the pulley such as the drive unit and the high load take-up unit to reliably transmit the rotation of the motor to the wire, and to prevent the pulley and the wire from slipping.
A spring and a fixed pulley are attached to the drive unit to prevent sagging.
By attaching “wire pressers” that can be easily attached and detached to both ends of the pipe at regular intervals (every 1,800 to 2,000 mm), the extension wire can be inserted and removed, and corresponds to each level. At this time, by making the pulley with spring for preventing the slack movable, the extension wire can be inserted every two levels.
Hooks through which the connecting shafts are passed through the hollow pipes of different stages are attached at the same interval (every 1,800 to 2,000 mm). In addition, using this hook, we will develop an attachment that allows various materials to be safely hooked so that it can be easily detached.
A remote control switch or automatic stop device is used to stop at the time of hooking or unloading at regular intervals (every 1,800 to 2,000 mm).

機械の主要構成側面図  Machine side view 機械の主要構成正面図  Machine front view 滑車・ワイヤー・フック・ワイヤー脱着部拡大図  Pulley / Wire / Hook / Wire Detachment Zoom 機械の想定製作例側面図  Example side view of an example machine 機械の想定製作例正面図  Assumed production example of machine Front view

Claims (2)

仮設足場を利用した資材揚げ降ろし機。
地上と仮設足場の高層部を結ぶ無限軌道上のワイヤーをモーターで循環させ、ワイヤーに一定の間隔で付けたフックに資材等をつぎつぎと引掛けて資材を揚げ降ろしする仕組み。
Material unloader using temporary scaffolding.
A mechanism that circulates a wire on an endless track that connects the ground and the high-rise part of the temporary scaffold with a motor, and pulls the material one after another on hooks that are attached to the wire at regular intervals.
ワイヤーを一定の間隔(200mm位)で二重にし、等間隔に細いパイプで繋ぎ縄梯子状にする。駆動部や高所の荷取り部等の滑車にこのパイプがはまる溝を施し、回転をワイヤーに確実に伝える。
また、このパイプ部分を利用して延長用ワイヤーの脱着・挿入とフックの取付けを行う。これら一連の形状と方式。
Double the wires at regular intervals (about 200 mm) and connect them with narrow pipes at regular intervals to form a rope ladder. This pipe is provided with a groove that fits in the pulley such as the drive unit and the high load take-up unit, and the rotation is reliably transmitted to the wire.
Also, using this pipe part, the extension wire is attached and detached and the hook is attached. A series of these shapes and methods.
JP2007205924A 2007-07-09 2007-07-09 Material lifting-lowering machine using temporary scaffold Pending JP2009013771A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007205924A JP2009013771A (en) 2007-07-09 2007-07-09 Material lifting-lowering machine using temporary scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007205924A JP2009013771A (en) 2007-07-09 2007-07-09 Material lifting-lowering machine using temporary scaffold

Publications (1)

Publication Number Publication Date
JP2009013771A true JP2009013771A (en) 2009-01-22

Family

ID=40354990

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007205924A Pending JP2009013771A (en) 2007-07-09 2007-07-09 Material lifting-lowering machine using temporary scaffold

Country Status (1)

Country Link
JP (1) JP2009013771A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5814929B2 (en) * 2010-11-08 2015-11-17 関西ペイント株式会社 Anti-stain coating composition with excellent durability

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5814929B2 (en) * 2010-11-08 2015-11-17 関西ペイント株式会社 Anti-stain coating composition with excellent durability

Similar Documents

Publication Publication Date Title
US7407041B2 (en) Method of constructing an elevator installation, and elevator installation for that purpose
WO2014066705A1 (en) Hoisting platform system
CN110482392A (en) Levelling device and leveling method for prefabricated part hanging
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN101830388A (en) Installation method of counter-weight frame of elevator
CN104652803B (en) Attached electric lifting guide rail scaffold
CN201614731U (en) Novel electric lifting scaffold
JP2009013771A (en) Material lifting-lowering machine using temporary scaffold
CN108756199A (en) Attached lifting scaffold lifting gear
CN202544379U (en) Automatic climbing device
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
US1453227A (en) Scaffold
JP2008214062A (en) Lifting device and structural material mounting method
JP3495928B2 (en) Main rope replacement method for side fork type elevator
JP2007205043A (en) Construction method and dismantling method of scaffolding for high-rise building
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN205875672U (en) Hanging flower basket wound form is prevented weighing down and is prevented shaking device
CN105464066B (en) The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed
CN2435463Y (en) Integral climbing and split lowering scaffold
CN205000632U9 (en) From jumping formwork job platform
CN218520918U (en) Real abdomen formula steel crane roof beam installation device
CN103693577A (en) Roller-exchanging roller hanging device
JP2006001739A (en) Installation method of rise-up elevator
CN209721349U (en) A kind of hanging apparatus of skyscraper air-conditioning waterpipe
JP5130720B2 (en) Lifting stage scaffold