[go: up one dir, main page]

JP2008291541A - Construction machine - Google Patents

Construction machine Download PDF

Info

Publication number
JP2008291541A
JP2008291541A JP2007139014A JP2007139014A JP2008291541A JP 2008291541 A JP2008291541 A JP 2008291541A JP 2007139014 A JP2007139014 A JP 2007139014A JP 2007139014 A JP2007139014 A JP 2007139014A JP 2008291541 A JP2008291541 A JP 2008291541A
Authority
JP
Japan
Prior art keywords
cab
boom
construction machine
receiving member
cab structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2007139014A
Other languages
Japanese (ja)
Inventor
Takeshige Yuchi
毅成 有地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Press Kogyo Co Ltd
Original Assignee
Press Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Press Kogyo Co Ltd filed Critical Press Kogyo Co Ltd
Priority to JP2007139014A priority Critical patent/JP2008291541A/en
Publication of JP2008291541A publication Critical patent/JP2008291541A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a construction machine capable of preventing a cab (a cab structure) from being pressed against a boom and being deformed when a vehicle turns over. <P>SOLUTION: This construction machine constituted by arranging the boom 16 turnably on a side of the cab structure 11 is provided with a retaining member 18 arranged on the boom 16 in close proximity to the cab structure 11 and retaining the cab structure 11 attempting to move onto a boom 16 side to prevent the cab structure 11 from being pressed against the boom 16 and being deformed when the vehicle turns over. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、キャブ(キャブ構造物)の側方にブームを回動自在に配置した油圧ショベル等の建設機械に関する。   The present invention relates to a construction machine such as a hydraulic excavator in which a boom is rotatably disposed on a side of a cab (cab structure).

油圧ショベル等の建設機械は山等の傾斜地で使用されることもあり、その場合、建設機械(車両)がバランスを崩して転倒する(逆さまになる)おそれがある。車両が仮に転倒した場合、車両のキャブ内の乗員の安全を確保するためにキャブの変形を抑制する必要がある。このような安全確保のために、キャブのピラー等に補強部材を取り付けてキャブ自体の剛性を高めることによりキャブの変形を抑制する構成等が知られている(例えば、特許文献1参照)。   A construction machine such as a hydraulic excavator may be used on a slope such as a mountain. In that case, the construction machine (vehicle) may be out of balance and fall (upside down). If the vehicle falls down, it is necessary to suppress deformation of the cab in order to ensure the safety of passengers in the cab of the vehicle. In order to ensure such safety, a configuration is known that suppresses deformation of the cab by attaching a reinforcing member to the pillar of the cab and increasing the rigidity of the cab itself (see, for example, Patent Document 1).

特開2001−279721号公報JP 2001-279721 A

ところで、車両がキャブ側に転倒した場合、キャブが地面に衝突してキャブの上部に地面衝突による横荷重が作用し、その後、車両が逆さまになりキャブの上部に車両自重等による上下荷重が作用することとなる。   By the way, when the vehicle falls to the cab side, the cab collides with the ground, a lateral load due to the ground collision acts on the upper part of the cab, and then the vehicle is turned upside down and a vertical load due to the vehicle's own weight acts on the upper part of the cab. Will be.

ブームが最も下方に回動した状態(ブーム下死点)における車両転倒時のキャブの変形をシミュレートしたところ、最初の横荷重でキャブのフロントピラーの上下方向中間部がブームの角部に押し付けられて、フロントピラーの閉断面がつぶれ、その後の上下荷重でキャブのフロントピラーのつぶれた部分に応力集中して、キャブの大変形(座屈変形)に至ることが分かった。   When simulating the deformation of the cab when the vehicle falls in the state where the boom pivots downward (the bottom dead center of the boom), the vertical middle of the front pillar of the cab is pressed against the corner of the boom with the first lateral load. As a result, it was found that the closed cross section of the front pillar was crushed, and stress was concentrated on the crushed portion of the cab's front pillar due to the subsequent vertical load, leading to large deformation (buckling deformation) of the cab.

そこで、本発明の目的は、車両転倒時にキャブがブームに押し付けられて変形することを防止することができる建設機械を提供することにある。   Accordingly, an object of the present invention is to provide a construction machine that can prevent a cab from being pressed against a boom and deformed when the vehicle falls.

上記目的を達成するために本発明は、キャブ構造物の側方にブームを回動自在に配置した建設機械において、上記ブーム上に、上記キャブ構造物に近接させて、車両転倒時に上記キャブ構造物が上記ブームに押し付けられて変形することを防止するために上記ブーム側に移動しようとする上記キャブ構造物を受け止めるための受け部材を設けたものである。   In order to achieve the above object, the present invention provides a construction machine in which a boom is rotatably disposed on a side of a cab structure, and the cab structure is placed on the boom in the vicinity of the cab structure when the vehicle falls. In order to prevent an object from being pressed against the boom and deformed, a receiving member is provided for receiving the cab structure to be moved to the boom side.

ここで、上記受け部材は、上記ブームが最も下方に回動した状態において上記キャブ構造物の上下方向中間部から上端部に亘って位置するものであっても良い。   Here, the receiving member may be located from the middle part in the up-down direction to the upper end part of the cab structure in a state where the boom is pivoted downward most.

また、上記受け部材は、上記キャブ構造物のフロントヘッダーの延長線上に配置されるものであっても良い。   The receiving member may be disposed on an extension line of the front header of the cab structure.

また、上記受け部材は、上記ブーム上に着脱可能に設けられるものであっても良い。   The receiving member may be detachably provided on the boom.

本発明によれば、車両転倒時にキャブがブームに押し付けられて変形することを防止することができるという優れた効果を発揮するものである。   According to the present invention, an excellent effect is exhibited that the cab can be prevented from being deformed by being pressed against the boom when the vehicle falls.

以下、本発明の好適な実施形態を添付図面に基づいて詳述する。   DESCRIPTION OF EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

図1は、本発明の一実施形態に係る建設機械の側面図である。図2は、図1に示す建設機械の正面図である。   FIG. 1 is a side view of a construction machine according to an embodiment of the present invention. FIG. 2 is a front view of the construction machine shown in FIG.

図1及び図2に示すように、本実施形態に係る建設機械1は油圧ショベルであり、下部機構2、上部機構3及び作業機構4から主に構成される。   As shown in FIGS. 1 and 2, the construction machine 1 according to this embodiment is a hydraulic excavator, and mainly includes a lower mechanism 2, an upper mechanism 3, and a work mechanism 4.

下部機構2は、下部フレーム5を有している。本実施形態にかかる下部機構2はクローラ式のものであり、クローラ6が下部フレーム5に装着されている。なお、下部機構2はホイール式(タイヤ式)のものであっても良い。その場合、ホイール(タイヤ)が下部フレーム5に装着される。   The lower mechanism 2 has a lower frame 5. The lower mechanism 2 according to the present embodiment is of a crawler type, and a crawler 6 is attached to the lower frame 5. The lower mechanism 2 may be of a wheel type (tire type). In that case, a wheel (tire) is attached to the lower frame 5.

上部機構3は、下部フレーム5に旋回装置(図示せず)を介して装着され、下部フレーム5に対して旋回可能な上部フレーム7を有している。上部フレーム7には、エンジン等を収容するエンジンルーム8が設置され、また上部フレーム7の後部には、作業機構4に対する重量バランスをとるためのカウンタウェイト9が設置されている。   The upper mechanism 3 is attached to the lower frame 5 via a turning device (not shown) and has an upper frame 7 that can turn with respect to the lower frame 5. The upper frame 7 is provided with an engine room 8 for accommodating an engine and the like, and the rear portion of the upper frame 7 is provided with a counterweight 9 for balancing the weight of the work mechanism 4.

上部フレーム7の前部には、複数のピラー(柱)等から構成されるキャブフレーム10を有するキャブ構造物(以下キャブという)11が防振マウント装置(図示せず)を介して装着されている。詳しくは、キャブフレーム10は、フロントピラー12、リヤピラー13、ルーフレール14及びフロントヘッダー15等から主に構成される。   A cab structure (hereinafter referred to as a cab) 11 having a cab frame 10 composed of a plurality of pillars (pillars) or the like is attached to the front portion of the upper frame 7 via a vibration-proof mount device (not shown). Yes. Specifically, the cab frame 10 mainly includes a front pillar 12, a rear pillar 13, a roof rail 14, a front header 15, and the like.

キャブ11の前部には、キャブフレーム10のうち、上下方向に延出する左右一対のフロントピラー12が設けられ、キャブ11の後部には、フロントピラー12と略平行に(つまり上下方向に)延出する左右一対のリヤピラー13が設置されている。フロントピラー12とリヤピラー13とは、それらの上端部にて車両前後方向に延出するルーフレール14で接続されており、左右一対のフロントピラー12は、それらの上端部にて車両幅方向に延出するフロントヘッダー15で接続されている。上記のフロントピラー12、リヤピラー13、ルーフレール14及びフロントヘッダー15等は、パイプ(鋼管)からなり或いは板材を複数組み合わせてなる。   A pair of left and right front pillars 12 extending in the vertical direction of the cab frame 10 is provided at the front portion of the cab 11, and the rear portion of the cab 11 is substantially parallel to the front pillar 12 (that is, in the vertical direction). A pair of left and right rear pillars 13 are installed. The front pillars 12 and the rear pillars 13 are connected by roof rails 14 extending in the vehicle front-rear direction at their upper ends, and the pair of left and right front pillars 12 extend in the vehicle width direction at their upper ends. Connected by a front header 15. The front pillar 12, the rear pillar 13, the roof rail 14, the front header 15, and the like are made of pipes (steel pipes) or a combination of plate materials.

作業機構4は、上部フレーム7の前部であってキャブ11(キャブフレーム10)の側方に所定間隔を隔てて配置され、上部フレーム7に回動自在に連結されたブーム16と、ブーム16先端に回動自在に連結されたアーム(図示せず)と、アーム先端に回動自在に連結されたバケット等のアタッチメント(図示せず)とを有している。   The working mechanism 4 is a front portion of the upper frame 7 and is arranged at a predetermined interval on the side of the cab 11 (cab frame 10), and is connected to the upper frame 7 so as to be freely rotatable. It has an arm (not shown) rotatably connected to the tip, and an attachment (not shown) such as a bucket rotatably connected to the arm tip.

上部フレーム7とブーム16との間には油圧シリンダ(ブームシリンダ)17が介設されており、ブームシリンダ17を伸縮させることでブーム16が上部フレーム7に対して回動される。ブーム16とアームとの間には図示しない油圧シリンダ(アームシリンダ)が介設されており、アームシリンダを伸縮させることでアームがブーム16に対して回動される。アームとバケットとの間には図示しない油圧シリンダ(バケットシリンダ)が介設されており、バケットシリンダを伸縮させることでバケットがアームに対して回動される。   A hydraulic cylinder (boom cylinder) 17 is interposed between the upper frame 7 and the boom 16, and the boom 16 is rotated with respect to the upper frame 7 by expanding and contracting the boom cylinder 17. A hydraulic cylinder (arm cylinder) (not shown) is interposed between the boom 16 and the arm, and the arm is rotated with respect to the boom 16 by expanding and contracting the arm cylinder. A hydraulic cylinder (bucket cylinder) (not shown) is interposed between the arm and the bucket, and the bucket is rotated with respect to the arm by expanding and contracting the bucket cylinder.

ブーム16上には、キャブ11に近接させて、車両転倒時にキャブ11がブーム16の角部に押し付けられて変形することを防止するためにブーム16側に移動しようとするキャブ11を受け止めるための受け部材18が設けられている。   On the boom 16, the cab 11 is placed close to the cab 11 to catch the cab 11 that is about to move toward the boom 16 in order to prevent the cab 11 from being deformed by being pushed against the corners of the boom 16 when the vehicle falls. A receiving member 18 is provided.

図3に示すように、本実施形態に係る受け部材18は、角錐台形状(角錐の頂部を切除した形状)の箱状に形成されたフレーム19を有しており、横断面は閉断面になっている。本実施形態では、フレーム19内にリブ20が装着されている。   As shown in FIG. 3, the receiving member 18 according to the present embodiment has a frame 19 formed in a box shape of a truncated pyramid shape (a shape obtained by cutting off the top of the pyramid), and the transverse section is a closed section. It has become. In the present embodiment, the rib 20 is mounted in the frame 19.

受け部材18はキャブ11よりも剛性(或いは強度)が高い材料から形成されており、外力によって容易に破壊されることはない。また、受け部材18が比剛性(或いは比強度)の高い材料から形成されると、ブーム16の重量増を最低限にとどめることができるので有利である。さらに、受け部材18が透明性の高い材料からなり或いは透明性の高い材料からなる部分を含むと、上部機構3及び作業機構4の旋回時に受け部材18が乗員の視界の妨げとなることがないので有利である。   The receiving member 18 is made of a material having higher rigidity (or strength) than the cab 11 and is not easily broken by an external force. Further, if the receiving member 18 is made of a material having high specific rigidity (or specific strength), it is advantageous because the increase in weight of the boom 16 can be minimized. Further, when the receiving member 18 is made of a highly transparent material or includes a portion made of a highly transparent material, the receiving member 18 does not interfere with the occupant's field of view when the upper mechanism 3 and the working mechanism 4 are turned. This is advantageous.

本実施形態では、受け部材18は、ブーム16上にボルト等で着脱可能に取り付けられている。よって、建設機械1を山等の傾斜地で使用するときのみ受け部材18をブーム16上に取り付け、建設機械1を転倒の可能性が低い平地で使用するときや建設機械1の搬送時等には受け部材18をブーム16上から取り外すことができる。   In this embodiment, the receiving member 18 is detachably attached to the boom 16 with a bolt or the like. Therefore, the receiving member 18 is mounted on the boom 16 only when the construction machine 1 is used on a slope such as a mountain, and when the construction machine 1 is used on a flat ground where the possibility of falling is low or when the construction machine 1 is transported. The receiving member 18 can be removed from the boom 16.

受け部材18は、図1及び図2中に一点鎖線で示すようにブーム16が最も下方に回動した状態(ブーム下死点)においてキャブ11(フロントピラー12)の上下方向中間部から上端部に亘って位置するようになっている。   The receiving member 18 has an upper end portion from an intermediate portion in the vertical direction of the cab 11 (front pillar 12) in a state where the boom 16 is pivoted downward (boom bottom dead center) as shown by a one-dot chain line in FIGS. It is located over.

また、受け部材18は、キャブ11のフロントヘッダー15の長手方向の延長線上に配置されている。つまり、受け部材18は、キャブ11のフロントヘッダー15の長手方向端部(或いはフロントピラー12の上端部)に近接させて配置されている。   Further, the receiving member 18 is disposed on an extension line in the longitudinal direction of the front header 15 of the cab 11. That is, the receiving member 18 is disposed close to the longitudinal end of the front header 15 of the cab 11 (or the upper end of the front pillar 12).

次に、本実施形態の作用を図4を用いて説明する。   Next, the operation of this embodiment will be described with reference to FIG.

図4はブーム16が最も下方に回動した状態(ブーム下死点)を示すものであり、図4(a)に示すように、外力F(横荷重)がキャブ11に作用していないときは、キャブ11とブーム16及び受け部材18とは離間されており、キャブ11を構成するフロントピラー12等は当然に変形していない。車両がキャブ11側(図4中の右側)に転倒した場合には、車両中最も上方に位置するキャブ11が最初に地面に衝突してキャブ11の上部に外力Fが作用し、その結果、防振マウント装置を介して上部フレーム7に装着されているキャブ11がブーム16側に移動し始める(上部フレーム7に対して傾斜し始める)。このキャブ11のブーム16側への移動(キャブ11の上部フレーム7に対する傾斜)がある程度進んだときに、図4(b)に示すように、外力Fの作用によってキャブ11の上下方向中間部(フロントピラー12の上下方向中間部)がブーム16の角部16aに押し付けられる前に、キャブ11の上端部(フロントピラー12の上端部或いはフロントヘッダー15の長手方向端部)が受け部材18の上端部に当接して受け止められる。従って、キャブ11のフロントピラー12がブーム16の角部16aに押し付けられることはないので、車両転倒時のキャブ11の大変形(座屈変形)のきっかけとなるキャブ11のフロントピラー12の変形を抑制することが可能となる。   FIG. 4 shows a state in which the boom 16 is rotated most downward (boom bottom dead center). When the external force F (lateral load) is not acting on the cab 11 as shown in FIG. The cab 11, the boom 16, and the receiving member 18 are separated from each other, and the front pillar 12 and the like constituting the cab 11 are not naturally deformed. When the vehicle falls to the cab 11 side (the right side in FIG. 4), the uppermost cab 11 in the vehicle first collides with the ground and an external force F acts on the upper portion of the cab 11, and as a result, The cab 11 attached to the upper frame 7 starts to move toward the boom 16 via the anti-vibration mount device (begins to tilt with respect to the upper frame 7). When the movement of the cab 11 toward the boom 16 (inclination of the cab 11 with respect to the upper frame 7) proceeds to some extent, as shown in FIG. The upper end portion of the cab 11 (the upper end portion of the front pillar 12 or the longitudinal end portion of the front header 15) is the upper end of the receiving member 18 before the front intermediate portion 12 of the front pillar 12 is pressed against the corner 16 a of the boom 16. It is received by contacting the part. Accordingly, since the front pillar 12 of the cab 11 is not pressed against the corner 16a of the boom 16, the deformation of the front pillar 12 of the cab 11 that triggers a large deformation (buckling deformation) of the cab 11 when the vehicle falls. It becomes possible to suppress.

また、受け部材18がブーム18が最も下方に回動した状態においてキャブ11の上下方向中間部から上端部に亘って位置するので、ブーム16が最も下方に回動した状態で車両が転倒した場合、受け部材18とカウンタウェイト9とで建設機械1を支えることになり、キャブ11内の乗員を保護することが可能となる。   In addition, since the receiving member 18 is positioned from the middle part in the vertical direction of the cab 11 to the upper end part in the state where the boom 18 is pivoted downward, the vehicle falls while the boom 16 is pivoted downwards. Since the construction machine 1 is supported by the receiving member 18 and the counterweight 9, the passenger in the cab 11 can be protected.

また、受け部材18をキャブ11のフロントヘッダー15の延長線上に配置したので、車両転倒時のキャブ11に対する外力Fをフロントヘッダー15を介してブーム16に伝えることができ、フロントヘッダー15を強化することで乗員のエリアに及ぶキャブ11の変形を抑制することが可能となる。   Further, since the receiving member 18 is disposed on the extension line of the front header 15 of the cab 11, the external force F applied to the cab 11 when the vehicle falls can be transmitted to the boom 16 via the front header 15 and the front header 15 is strengthened. It becomes possible to suppress the deformation | transformation of the cab 11 over a passenger | crew's area.

以上、本発明の好適な実施形態について説明したが、本発明は上記実施形態には限定されず他の様々な実施形態を採ることが可能である。   The preferred embodiments of the present invention have been described above. However, the present invention is not limited to the above embodiments, and various other embodiments can be adopted.

例えば、図5に示すように、受け部材18を、ブーム16上にヒンジ等で車両後方に回動可能に取り付けても良い。建設機械1の搬送時に、図5中に一点鎖線で示すように受け部材18を車両後方に回動させることで受け部材18の最大高さ位置が変わるので、高さ制限のある箇所を通行する際に受け部材18が支障となることはない。   For example, as shown in FIG. 5, the receiving member 18 may be mounted on the boom 16 so as to be rotatable rearward of the vehicle with a hinge or the like. When the construction machine 1 is transported, the maximum height position of the receiving member 18 is changed by rotating the receiving member 18 toward the rear of the vehicle as shown by a one-dot chain line in FIG. At this time, the receiving member 18 does not become an obstacle.

図1は、本発明の一実施形態に係る建設機械の側面図である。FIG. 1 is a side view of a construction machine according to an embodiment of the present invention. 図2は、図1に示す建設機械の正面図である。FIG. 2 is a front view of the construction machine shown in FIG. 図3は、受け部材の斜視図である。FIG. 3 is a perspective view of the receiving member. 図4(a)はキャブに横荷重が作用していない状態を示す説明図であり、図4(b)はキャブに横荷重が作用した状態を示す説明図である。FIG. 4A is an explanatory view showing a state in which a lateral load is not applied to the cab, and FIG. 4B is an explanatory view showing a state in which a lateral load is applied to the cab. 図5は、受け部材の変形例を示す建設機械の側面図である。FIG. 5 is a side view of the construction machine showing a modification of the receiving member.

符号の説明Explanation of symbols

1 建設機械
11 キャブ(キャブ構造物)
15 フロントヘッダー
16 ブーム
18 受け部材
1 Construction machinery 11 Cab (cab structure)
15 Front header 16 Boom 18 Receiving member

Claims (4)

キャブ構造物の側方にブームを回動自在に配置した建設機械において、上記ブーム上に、上記キャブ構造物に近接させて、車両転倒時に上記キャブ構造物が上記ブームに押し付けられて変形することを防止するために上記ブーム側に移動しようとする上記キャブ構造物を受け止めるための受け部材を設けたことを特徴とする建設機械。   In a construction machine in which a boom is pivotably arranged on the side of a cab structure, the cab structure is pressed on the boom and deformed when the vehicle falls over the boom, in proximity to the cab structure. A construction machine comprising a receiving member for receiving the cab structure to be moved to the boom side in order to prevent the movement. 上記受け部材は、上記ブームが最も下方に回動した状態において上記キャブ構造物の上下方向中間部から上端部に亘って位置する請求項1に記載の建設機械。   2. The construction machine according to claim 1, wherein the receiving member is located from an intermediate portion in an up-down direction of the cab structure to an upper end portion in a state where the boom is rotated downward most. 上記受け部材は、上記キャブ構造物のフロントヘッダーの延長線上に配置される請求項1又は2に記載の建設機械。   The construction machine according to claim 1 or 2, wherein the receiving member is disposed on an extension line of a front header of the cab structure. 上記受け部材は、上記ブーム上に着脱可能に設けられる請求項1から3いずれかに記載の建設機械。   The construction machine according to claim 1, wherein the receiving member is detachably provided on the boom.
JP2007139014A 2007-05-25 2007-05-25 Construction machine Pending JP2008291541A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007139014A JP2008291541A (en) 2007-05-25 2007-05-25 Construction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007139014A JP2008291541A (en) 2007-05-25 2007-05-25 Construction machine

Publications (1)

Publication Number Publication Date
JP2008291541A true JP2008291541A (en) 2008-12-04

Family

ID=40166555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007139014A Pending JP2008291541A (en) 2007-05-25 2007-05-25 Construction machine

Country Status (1)

Country Link
JP (1) JP2008291541A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008105669A (en) * 2006-09-29 2008-05-08 Kobelco Contstruction Machinery Ltd Upper body and construction machine equipped with the same
WO2010122696A1 (en) * 2009-04-20 2010-10-28 キャタピラー エス エー アール エル Cab protection structure for construction machinery
EP2281952A1 (en) 2009-07-29 2011-02-09 Kobelco Construction Machinery Co. Ltd. Construction machine
JP2020169454A (en) * 2019-04-02 2020-10-15 キャタピラー エス エー アール エル Work machine
EP3798370A1 (en) * 2019-09-26 2021-03-31 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008105669A (en) * 2006-09-29 2008-05-08 Kobelco Contstruction Machinery Ltd Upper body and construction machine equipped with the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008105669A (en) * 2006-09-29 2008-05-08 Kobelco Contstruction Machinery Ltd Upper body and construction machine equipped with the same

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008105669A (en) * 2006-09-29 2008-05-08 Kobelco Contstruction Machinery Ltd Upper body and construction machine equipped with the same
WO2010122696A1 (en) * 2009-04-20 2010-10-28 キャタピラー エス エー アール エル Cab protection structure for construction machinery
JP2010248846A (en) * 2009-04-20 2010-11-04 Caterpillar Sarl Cab protection structure in construction machine
EP2281952A1 (en) 2009-07-29 2011-02-09 Kobelco Construction Machinery Co. Ltd. Construction machine
US8287033B2 (en) 2009-07-29 2012-10-16 Kobelco Construction Machinery Co., Ltd. Construction machine
JP2020169454A (en) * 2019-04-02 2020-10-15 キャタピラー エス エー アール エル Work machine
JP7306784B2 (en) 2019-04-02 2023-07-11 キャタピラー エス エー アール エル working machine
EP3798370A1 (en) * 2019-09-26 2021-03-31 Sumitomo (S.H.I.) Construction Machinery Co., Ltd. Shovel
JP2021055261A (en) * 2019-09-26 2021-04-08 住友建機株式会社 Shovel
US11536005B2 (en) 2019-09-26 2022-12-27 Sumitomo Construction Machinery Co., Ltd. Shovel
JP7330837B2 (en) 2019-09-26 2023-08-22 住友建機株式会社 Excavator

Similar Documents

Publication Publication Date Title
US8545163B2 (en) Loader work machine
EP2019883B1 (en) An arrangement for suspension of an operator cab on a work machine frame
JP5009933B2 (en) Wheel loader
US7665801B2 (en) Structure of upper frame for supporting cabin of construction machinery
EP2354327B1 (en) Working machine
JP5996122B2 (en) Work vehicle cab and manufacturing method thereof
KR101108599B1 (en) Cap support
JP4655815B2 (en) Construction machinery cabin
JP2008291541A (en) Construction machine
JP4657212B2 (en) Construction machinery cab
JP5446549B2 (en) Construction machinery
CN100425776C (en) Engineering machine
JPH09109922A (en) Working machine with cab
JP6174969B2 (en) Construction machinery cab support structure
JP2013064239A (en) Scaffold structure of construction machine
KR102627878B1 (en) work vehicle
JP5635558B2 (en) Cab elevator
JP2010065436A (en) Cabin device of loader work machine
JP4415698B2 (en) Canopy structure of construction machinery
JP4994964B2 (en) Construction machinery
JP5533936B2 (en) Construction machinery
JP5563493B2 (en) Work machine
JP2014105455A (en) Cab head guard device for construction machine
JP5265403B2 (en) Construction machine cab protection structure
JP4796012B2 (en) Tractor-mounted backhoe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110826

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120228

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120626