[go: up one dir, main page]

JP2007006573A - Power supply system - Google Patents

Power supply system Download PDF

Info

Publication number
JP2007006573A
JP2007006573A JP2005181781A JP2005181781A JP2007006573A JP 2007006573 A JP2007006573 A JP 2007006573A JP 2005181781 A JP2005181781 A JP 2005181781A JP 2005181781 A JP2005181781 A JP 2005181781A JP 2007006573 A JP2007006573 A JP 2007006573A
Authority
JP
Japan
Prior art keywords
power
hybrid electric
power supply
supply
electric vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2005181781A
Other languages
Japanese (ja)
Other versions
JP4426504B2 (en
Inventor
Yasunori Ono
康則 大野
Tomoyuki Uchiyama
倫行 内山
Shinichi Kondo
真一 近藤
Kuniyoshi Tsubouchi
邦良 坪内
Yoshinori Fukasaku
良範 深作
Yasunobu Fujita
康信 藤田
Akihiko Watanabe
明彦 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2005181781A priority Critical patent/JP4426504B2/en
Publication of JP2007006573A publication Critical patent/JP2007006573A/en
Application granted granted Critical
Publication of JP4426504B2 publication Critical patent/JP4426504B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/60Electric or hybrid propulsion means for production processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

【課題】商業施設や工場において、分散型電源によらず、それぞれの負荷パターンを平準化する電力供給システムを提供する。
【解決手段】対象となる電力利用事業者の負荷8に関する電力需要の情報を収集する手段6と、駐車場9内の複数のハイブリッド型電気自動車(HEV)20の電力供給に関する情報を収集する手段7を有している。これらの収集された情報から、需給バランスをとるため、電力供給可能なHEV20の選択と、選択したHEV20に出力指令値を設する需給制御センタ10を備える。
【選択図】図1
A power supply system for leveling each load pattern in a commercial facility or factory without using a distributed power supply is provided.
Means for collecting power demand information relating to a load 8 of a target electric power user and means for collecting information relating to power supply of a plurality of hybrid electric vehicles (HEV) 20 in a parking lot 9 7. In order to balance the supply and demand from these collected information, a HEV 20 that can supply power and a supply and demand control center 10 that sets an output command value to the selected HEV 20 are provided.
[Selection] Figure 1

Description

本発明は、負荷の需要に対しハイブリッド型電気自動車から電力を供給する際の需給調整を行う電力供給システムおよびその運用に関する。   The present invention relates to a power supply system that performs supply and demand adjustment when supplying electric power from a hybrid electric vehicle to load demand and its operation.

CO2排出削減等、地球環境への関心の高まりから、自然エネルギーの導入や省エネルギーが関心を集めている。我国の1次エネルギー消費の動向を見ると、運輸用、民生用が大きな伸びを示している。   With the growing interest in the global environment, such as the reduction of CO2 emissions, the introduction of natural energy and energy conservation are attracting attention. Looking at trends in primary energy consumption in Japan, transportation and consumer use have shown significant growth.

運輸用エネルギーの削減については、ガソリン車の燃費の向上が挙げられるが、ハイブリッド型電気自動車を用いることにより、更に、高い燃費性能が得られる可能性がある(非特許文献1参照)。   As for the reduction of transportation energy, there is an improvement in the fuel efficiency of a gasoline vehicle. However, by using a hybrid electric vehicle, there is a possibility that a higher fuel efficiency can be obtained (see Non-Patent Document 1).

商業施設や工場においては、電力の規制緩和を背景として、省エネルギーと経費削減のため、ガスエンジン等の分散型電源によるコージェネレーションを導入するところが増加している。コージェネレーション導入の目的は、熱利用を含めたエネルギー利用効率を高め、環境負荷を低減すると同時に経費を削減すること、および、分散型電源の導入により商用系統から購入する電力のパターンを調整し、電力会社に支払う電力料金を低減することにある。後者については、熱利用を前提としない場合でも効果が期待できる。   In commercial facilities and factories, cogeneration with a distributed power source such as a gas engine is increasing for energy saving and cost reduction against the backdrop of deregulation of electric power. The purpose of introducing cogeneration is to increase energy use efficiency including heat use, reduce the environmental load and simultaneously reduce costs, and adjust the pattern of power purchased from commercial grids by introducing distributed power sources, The purpose is to reduce the electricity charge paid to the power company. For the latter, an effect can be expected even when heat utilization is not assumed.

将来のエネルギー利用形態として、停車中の電気自動車から電気を供給するという考え方が紹介されている(非特許文献2参照)。また、ビル等の定置型分散型電源の燃料製造装置を利用して燃料電池自動車に燃料(水素)を供給する提案がなされている(特許文献1参照)。   The concept of supplying electricity from a stopped electric vehicle has been introduced as a form of energy utilization in the future (see Non-Patent Document 2). In addition, a proposal has been made to supply fuel (hydrogen) to a fuel cell vehicle using a fuel production apparatus of a stationary distributed power source such as a building (see Patent Document 1).

さらに、燃料電池自動車群から収集した直流電力を連系インバータで交流に変換し、負荷に供給するとともに、商用系統へ売電を行なうシステムに関しての提案がなされている(特許文献2参照)。   Furthermore, a proposal has been made regarding a system that converts DC power collected from a group of fuel cell vehicles into AC using a connected inverter, supplies the load to a load, and sells power to a commercial system (see Patent Document 2).

「電気自動車の最新技術」(電気学会電気自動車駆動システム調査専門委員会、平成11年)"Latest Technology of Electric Vehicle" (The Institute of Electrical Engineers, Electric Vehicle Drive System Research Committee, 1999) 「PEOPLE POWER」(NEWSWEEK SEPT.6/SEPT.13, 2004)"PEOPLE POWER" (NEWSWEEK SEPT.6 / SEPT.13, 2004) 特開2001−240501公報JP 2001-240501 A 特開2002−8673公報JP 2002-8673 A

環境負荷低減の観点からは、高い燃費性能の電気自動車の導入が望ましい。しかし、ガソリン車に比較してコストが高く、特に、主として通勤時にのみ利用の場合、電気自動車の導入には困難がある。   From the viewpoint of reducing environmental impact, it is desirable to introduce an electric vehicle with high fuel efficiency. However, the cost is higher than that of a gasoline vehicle, and it is difficult to introduce an electric vehicle, particularly when it is mainly used only when commuting.

一方、商業施設や工場においては、それぞれの負荷(需要)パターンを調整し、商用系統からの購入電力を均一化し、商用系統への負担を軽減するとともに、電力会社に支払う電力料金を低減するのが望ましい。しかし、昼間の負荷が多い状態に対応するためには、分散型電源等による電力の供給が不可欠である。商業施設や工場が、独自で分散型電源を導入するには、設備費用がかかるため、分散型電源を導入できるところは限られる。   On the other hand, in commercial facilities and factories, each load (demand) pattern is adjusted to equalize the purchased power from the commercial grid, reduce the burden on the commercial grid, and reduce the electricity bill paid to the power company. Is desirable. However, in order to cope with a heavy daytime load, it is indispensable to supply power by a distributed power source or the like. In order for a commercial facility or factory to introduce a distributed power source on its own, equipment costs are high, so there are only a few places where a distributed power source can be installed.

そこで、複数の電気自動車を上記分散型電源に代えることが考えられる。特許文献2の方法は、複数の燃料電池自動車からの電力を集める点では優れた方法であるが、新たに大容量の連系インバータを用意する必要がある、事故時に直流を遮断するための遮断器が交流の遮断器に比べ高価であるなどの問題がある。   Therefore, it is conceivable to replace a plurality of electric vehicles with the distributed power source. The method of Patent Document 2 is an excellent method in terms of collecting electric power from a plurality of fuel cell vehicles, but it is necessary to prepare a large-capacity interconnected inverter. There is a problem that the device is more expensive than an AC circuit breaker.

また、電気自動車は電動機による駆動力を出すため交流出力が使われる。この交流出力を用いれば、上記の連系インバータは必要なくなるが、各電気自動車の出力を単にまとめるだけでは適正な交流出力とはならない。   An electric vehicle uses an alternating current output to generate a driving force by an electric motor. If this AC output is used, the above-described interconnected inverter is not necessary, but an appropriate AC output cannot be obtained simply by combining the outputs of the electric vehicles.

本発明の課題は、上記従来技術の問題点に鑑み、商業施設や工場において分散型電源を独自に導入することなく、複数の電気自動車から交流電力を集め対象施設の負荷に供給することのできる電力供給システムおよび運用方法を提供することである。   In view of the above-described problems of the prior art, the problem of the present invention is that AC power can be collected from a plurality of electric vehicles and supplied to the load of the target facility without independently introducing a distributed power source in a commercial facility or factory. It is to provide a power supply system and an operation method.

前記課題を解決するために、原動機(エンジン)の機械的動力と原動機により発電した電気の双方を利用するハイブリッド型電気自動車(以下、HEVと略称する)と商業施設や工場などの負荷を組み合わせ、HEVを利用して、電力を供給するシステムを構築する。   In order to solve the above-mentioned problem, a hybrid electric vehicle (hereinafter abbreviated as HEV) that uses both mechanical power of a prime mover (engine) and electricity generated by the prime mover is combined with a load of a commercial facility or factory, A system for supplying power is constructed using HEV.

本発明の電力供給システムは、対象となる電力利用事業者の負荷に関する情報を収集する通信手段と、複数のハイブリッド型電気自動車の電力供給に関する情報を収集する通信手段を有し、前記収集された情報から、需給バランスをとるため、前記負荷に電力供給するハイブリッド型電気自動車の選択と出力指令値を設定する制御手段を備える。   The power supply system of the present invention has communication means for collecting information on a load of a target power user and communication means for collecting information on power supply of a plurality of hybrid electric vehicles. In order to balance supply and demand from the information, a control unit is provided for selecting a hybrid electric vehicle that supplies power to the load and setting an output command value.

HEVには、需給調整センタからの指令に基づき、所定の交流電力を需要家の負荷に供給するための情報、および、HEVで発生させる交流の特性を決定するための、需要家内配電系統の交流の特性に関する情報を送るための計測、通信手段を設ける。   In the HEV, based on a command from the supply and demand adjustment center, information for supplying predetermined AC power to a consumer's load, and AC in the customer distribution system for determining characteristics of AC generated in the HEV Measurement and communication means are provided to send information on the characteristics.

HEVによる需給調整システムを運用するに際しては、HEV所有者(複数)を契約者A、電力を利用する需要家を契約者B、サービス提供業者を契約者Cとすると、契約者Cは、契約者A、契約者BとHEVによる電力供給サービスに関する契約を締結する。契約者Aは電力供給の条件、電力提供に対する補償金額等を、契約者Bは需給調整に関わる運用条件、電力料金および需給調整サービス料金を予め定めておく。   When operating the supply and demand adjustment system by HEV, if the HEV owners are a contractor A, a consumer who uses electricity is a contractor B, and a service provider is a contractor C, the contractor C is a contractor. A, contract with contractor B on power supply service by HEV. The contractor A predetermines power supply conditions, compensation amount for power supply, and the like, and the contractor B predetermines operation conditions related to supply and demand adjustment, power charges and supply and demand adjustment service charges.

契約者Cの指令により、契約者AのHEVから、契約者Bに電力が供給される。これに対し、契約者Bは契約者Cに、電力料金および需給調整サービス料金を支払う。契約者Aの電力提供は、契約者Cの需給調整により始めて可能になったものであり、契約者Cから契約者Aへは実績補償がなされる。   Contractor B's HEV supplies power to contractor B from contractor A's HEV. On the other hand, the contractor B pays the contractor C a power charge and a supply and demand adjustment service charge. The power supply of the contractor A is made possible only by the supply and demand adjustment of the contractor C, and performance compensation is made from the contractor C to the contractor A.

本発明のHEVによる需給調整システムによれば、商業施設や工場において、分散型電源を独自に導入することなく、複数の電気自動車から交流電力収集することで、それぞれの負荷(需要)パターンを平準化でき、電力コストを低減できる。これにより、需要家が電力コスト低減のメリットを得るばかりでなく、電力コスト低減のメリットの一部は、HEV所有者に還元される。また、環境負荷低減に望ましい、燃費性能の高い電気自動車の普及促進に効果が期待できる。   According to the supply and demand adjustment system by HEV of the present invention, each load (demand) pattern is leveled by collecting AC power from a plurality of electric vehicles in a commercial facility or factory without independently introducing a distributed power source. Power costs can be reduced. Thereby, not only a consumer obtains the merit of electric power cost reduction, but part of the merit of the electric power cost reduction is returned to the HEV owner. In addition, it can be expected to promote the spread of electric vehicles with high fuel efficiency, which is desirable for reducing environmental impact.

以下、本発明による複数の実施形態を説明する。   Hereinafter, a plurality of embodiments according to the present invention will be described.

図1は、本発明の電力供給システムの1実施例による需給調整システムを示す構成図である。需要家である契約者Bの構内2において、商用系統1から受電した電力は構内変電所3で配電線4により、構内の負荷8に供給される。構内駐車場9に駐車している、HEV(ハイブリッド型電気自動車)20から供給される電力は、低圧配電線5、電圧変換装置25、配電線4を経由して、負荷8に供給される。なお、構内駐車場9には、電力供給の対象となるHEV20が予め決まっている。なお、電力供給を行わない駐車場所の自動車21も駐車している。   FIG. 1 is a configuration diagram showing a supply and demand adjustment system according to an embodiment of the power supply system of the present invention. In the premises 2 of the contractor B who is a consumer, the electric power received from the commercial grid 1 is supplied to the premises load 8 by the distribution line 4 in the premises substation 3. Electric power supplied from an HEV (hybrid electric vehicle) 20 parked in the on-site parking lot 9 is supplied to the load 8 via the low-voltage distribution line 5, the voltage conversion device 25, and the distribution line 4. In the on-site parking lot 9, the HEV 20 to be supplied with power is determined in advance. In addition, the car 21 in a parking place where power supply is not performed is also parked.

複数の負荷8や受電電力に関する情報は通信線6を、HEV20に関する情報は通信線7を経由して、需給制御センタ10にある監視制御装置に送られる。   Information relating to the plurality of loads 8 and received power is sent to the monitoring control device in the supply and demand control center 10 via the communication line 6 and information relating to the HEV 20 via the communication line 7.

図2は、HEVの一例(シリーズ型電気自動車の駆動部分)を示す模式図である。駆動部分は、エンジン30、燃料タンク33、発電機31、2次電池32、モータ34などから構成される。発電機31で発生した電気は整流器36で直流にし、2次電池32に蓄えられる。出力が必要になれば、2次電池32の電気を、インバータ37により交流に変換し、電動機34に供給し、車輪35の駆動力を得る。制御に必要な情報は、通信線40により、コントローラ38に集められる。   FIG. 2 is a schematic diagram showing an example of HEV (a driving part of a series electric vehicle). The drive part is composed of an engine 30, a fuel tank 33, a generator 31, a secondary battery 32, a motor 34, and the like. The electricity generated by the generator 31 is converted into a direct current by the rectifier 36 and stored in the secondary battery 32. When output is required, the electricity of the secondary battery 32 is converted into alternating current by the inverter 37 and supplied to the electric motor 34 to obtain the driving force of the wheels 35. Information necessary for control is collected by the controller 38 through the communication line 40.

更に、需要家構内2の負荷8に電力を供給するため、接続部41と低圧配電線5を連結するためのフレキシブル電力線42が設けられている。また、HEVの状態情報を需給制御センタ10に送り、同センタからの運転指令をコントローラ38に伝えるための、送受信装置43が設けられ、その間は無線によって通信が行なわれる。なお、通信に関しては、有線を用いる通信でも、電力線搬送を用いた通信でも良い。   Furthermore, in order to supply electric power to the load 8 of the customer premises 2, a flexible power line 42 for connecting the connecting portion 41 and the low voltage distribution line 5 is provided. In addition, a transmission / reception device 43 is provided to send HEV status information to the supply and demand control center 10 and to transmit an operation command from the center to the controller 38, during which wireless communication is performed. The communication may be communication using wired communication or communication using power line carrier.

需給制御センタ10からの運転指令がコントローラ38に送信される。HEVから低圧配電線5に送電される場合は、低圧配電線5の電気的特性(電圧の大きさ、位相など)に関する計測が行なわれ、コントローラ38に伝達される。コントローラ38では、インバータ37で発生させる電力の出力を制御するための制御信号とともに、電圧の大きさと位相とを、低圧配電線5に合わせる(同期)ことにより、複数のHEVから低圧配電線5への送電が可能になる。   An operation command from the supply and demand control center 10 is transmitted to the controller 38. When power is transmitted from the HEV to the low-voltage distribution line 5, the measurement of electrical characteristics (voltage magnitude, phase, etc.) of the low-voltage distribution line 5 is performed and transmitted to the controller 38. The controller 38 adjusts the voltage magnitude and phase to the low-voltage distribution line 5 (synchronization) together with a control signal for controlling the output of the electric power generated by the inverter 37, so that a plurality of HEVs are transferred to the low-voltage distribution line 5. Power transmission becomes possible.

契約者Cは、契約者AのHEV、契約者Bの負荷8から送られた需要と供給に関する情報から、電力供給を行うHEVの選択とその出力を決定し、負荷8に供給される電力を計測し、その値に基づく実績補償金等を契約者Aへ支払う。   The contractor C determines the selection and output of the HEV that supplies power from the information on the demand and supply sent from the HEV of the contractor A and the load 8 of the contractor B, and determines the power supplied to the load 8. Measure and pay the contract compensation A based on the value.

次に、図3、4を用いて、契約者Cが所有する需給制御センタの働きについて説明する。図3は、需給制御センタに設置される需給調整機能のブロック図である。本機能は、演算処理装置232、HEVのコントローラ38や各負荷の計測・御装置40と、情報の授受を行う通信装置231、表示装置234、オペレータが条件設定等を行うための入力装置233で構成される。また、需要予測や電力供給のためのHEVの選択や出力指令を算出するのに必要な情報を一定期間保存しておくための、一時保存用記憶装置271を有している。更に、受電データベース(DB)272、需要データベース273、気象情報データベース274、対象となるHEVの状態データベース275、稼働しているHEVの状態データベース277、電力供給実績(各HEV毎の)データベース277を有している。これらによって、電力需給を補償するための情報に関するデータベースが構成される。   Next, the operation of the supply and demand control center owned by the contractor C will be described with reference to FIGS. FIG. 3 is a block diagram of a supply and demand adjustment function installed in the supply and demand control center. This function is performed by the arithmetic processing unit 232, the HEV controller 38 and each load measuring / controlling unit 40, the communication unit 231 for transmitting and receiving information, the display unit 234, and the input unit 233 for the operator to set conditions. Composed. In addition, a temporary storage device 271 is provided for storing information necessary for calculating HEV selection and output commands for demand prediction and power supply for a certain period of time. Furthermore, there is a power reception database (DB) 272, a demand database 273, a weather information database 274, a target HEV status database 275, an operating HEV status database 277, and a power supply record (for each HEV) database 277. is doing. These constitute a database relating to information for compensating for power supply and demand.

図4は、表示装置による監視制御画面の例である。表示装置234は、需要については負荷351毎に、現在の需要352、制御対象となる至近時刻における需要の予測値353を表示する。受電電力については、現在の受電電力354、制御対象となる至近の時刻における計画受電電力355、受電電力のトレンドグラフ356を表示する。受電電力は、上限値357と下限値358の間に維持される。   FIG. 4 is an example of a monitoring control screen by the display device. For the demand, the display device 234 displays the current demand 352 and the predicted value 353 of the demand at the nearest time to be controlled for each load 351. As for the received power, the current received power 354, the planned received power 355 at the nearest time to be controlled, and the trend graph 356 of the received power are displayed. The received power is maintained between an upper limit value 357 and a lower limit value 358.

HEVからの電力供給に関しては、現在の電力供給量359、全てのHEVからの供給可能量360、制御対象となる至近時刻における総供給指令値361が表示される。また、個々のHEVの状態については、供給可能状態(駐車状態)か否かの表示362、供給可能量に対する放出量の割合363を表示している。また、メッセージ欄364には、機器異常情報、処理異常情報等が表示される。   Regarding the power supply from the HEV, the current power supply amount 359, the suppliable amount 360 from all HEVs, and the total supply command value 361 at the nearest time to be controlled are displayed. In addition, for each HEV state, a display 362 indicating whether or not the supply is possible (parking state), and a ratio 363 of the discharge amount with respect to the supply possible amount are displayed. In the message column 364, device abnormality information, processing abnormality information, and the like are displayed.

供給可能量360は、その時点での2次電池残量から適性な2次電池残量(例えば、70%)を差し引いた値である。制御対象となるHEVが複数になる場合は2次電池残量が多い方から段階的に放電させ負荷に電力を供給する。これにより、電力供給が一部のHEVに集中しないようにし、公平性を確保する。   The supplyable amount 360 is a value obtained by subtracting an appropriate secondary battery remaining amount (for example, 70%) from the secondary battery remaining amount at that time. When there are a plurality of HEVs to be controlled, electric power is supplied to the load by discharging in stages from the side where the remaining amount of the secondary battery is larger. This prevents power supply from being concentrated on some HEVs and ensures fairness.

図5は、需給制御センタにおける処理フローである。このフローは、HEVに対する制御周期、1周期分について示している。実運転に際してはこの処理が繰り返される。   FIG. 5 is a processing flow in the supply and demand control center. This flow shows a control cycle for HEV and one cycle. This process is repeated during actual operation.

次の制御時刻において、電力の供給が可能なHEVを把握する(1101)。電力供給が可能なHEVの識別番号、出力制約、2次電池残量制約、電力供給の形態(2次電池からの供給のみか)、電池残量および燃料の計測値などの情報を集める。次に、制御時(X分後)の需要を予測し(1102)、受電電力計画値を考慮し、HEVで供給すべき電力、電力量を算出する(1103)。本時間ステップで電力供給に使用するHEVの選択とHEVへの出力指令値を決定する(1104)。この指令値は、出力制約、2次電池残量制約のもとで、例えば、エネルギー利用効率が最大となる組み合わせが選ばれる(最適化計算)。   At the next control time, the HEV that can supply power is grasped (1101). It collects information such as the identification number of the HEV that can supply power, output restrictions, secondary battery remaining capacity restrictions, power supply form (only from the secondary battery), battery remaining capacity and fuel measurement values. Next, the demand at the time of control (after X minutes) is predicted (1102), and the power and amount of power to be supplied by the HEV are calculated in consideration of the received power plan value (1103). In this time step, the HEV used for power supply is selected and the output command value to the HEV is determined (1104). For this command value, for example, a combination that maximizes the energy use efficiency is selected under the output constraint and the secondary battery remaining amount constraint (optimization calculation).

該当したHEVへは、出力パターン指令を送る(1105)。該当HEVから負荷に供給される電力供給量をそれぞれ計測し(1106)、HEV毎に電力供給量をデータベースに記録する(1107)。該当HEVの電池残量が所定の値に達した場合(1108)は、そのHEVを電力供給が可能なHEVから除く(1109)。   An output pattern command is sent to the corresponding HEV (1105). The amount of power supplied from the HEV to the load is measured (1106), and the amount of power supplied for each HEV is recorded in the database (1107). When the remaining battery level of the HEV reaches a predetermined value (1108), the HEV is excluded from HEVs that can supply power (1109).

2次電池残量推定は次の方法で行なう。図6は代表的なバッテリーの充放電特性(残存容量と開放電圧)を示し、50が鉛バッテリー、51がニッケル・水素バッテリーの例である。バッテリー運転中の電流・電圧から等価回路をリアルタイムで演算し、推定した開放電圧から残存容量を推定する。HEVの2次電池残量は高すぎると効率が悪い。充電量が放電され、残存容量が適切に調整されると、その後のHEV移動時に効率的な動作が可能となる。この適切な残存容量は予め設定され、供給可能量360はその時点での2次電池残量と適切な2次電池残量の差となる。   The secondary battery remaining amount is estimated by the following method. FIG. 6 shows the charge / discharge characteristics (remaining capacity and open circuit voltage) of a typical battery, where 50 is an example of a lead battery and 51 is a nickel-hydrogen battery. The equivalent circuit is calculated in real time from the current and voltage during battery operation, and the remaining capacity is estimated from the estimated open circuit voltage. If the HEV secondary battery is too high, the efficiency is poor. When the amount of charge is discharged and the remaining capacity is appropriately adjusted, an efficient operation is possible during the subsequent HEV movement. The appropriate remaining capacity is set in advance, and the supplyable amount 360 is the difference between the remaining amount of secondary battery and the appropriate amount of remaining secondary battery.

以上は、HEVに対する制御周期、1周期分のフローであるが、図7に全体の制御フローを示す。電力供給の対象となるHEVは、予め登録されている。単位期間、例えば、1ヶ月の処理を開始する(1201)。まず、1日の処理を開始する(1202)。図5に示す時間ステップの処理(1203)を繰り返し、1日が終了すれば(1204)、実績を記録する。単位期間が終了するまで(1205)、1日の処理を繰り返す。単位期間が終了すれば、各HEVからサイトの負荷に供給された電力量を算出(1206)し、各HEV所有者への実績補償代金の算出を行なう(1207)。   The above is the control cycle for HEV, and the flow for one cycle. FIG. 7 shows the overall control flow. The HEV to be supplied with power is registered in advance. Processing for a unit period, for example, one month is started (1201). First, one day processing is started (1202). The time step process (1203) shown in FIG. 5 is repeated, and if one day is completed (1204), the result is recorded. Until the unit period ends (1205), the process for one day is repeated. When the unit period ends, the amount of power supplied from each HEV to the site load is calculated (1206), and the performance compensation price for each HEV owner is calculated (1207).

図8に、本実施例における情報システムの構成を示す。契約者A、契約者B、契約者C間の情報(例えば、運用条件、料金清算に関するもの)の授受は、構内LAN401を介して、契約者Aの処理装置403、405、契約者Bのコンピュータ407、契約者Cのコンピュータ408の間で行なわれる。計測値やHEVに対する制御値は、専用通信回線402を介して、計測・制御装置404,406と制御装置409の間で行なわれる。なお、必要な通信の速度と通信量によっては、専用通信回線402を構内LAN401で代用することも可能である。   FIG. 8 shows the configuration of the information system in this embodiment. The exchange of information (for example, operating conditions and fee settlement) between the contractor A, the contractor B, and the contractor C is performed via the local area LAN 401, the processing devices 403 and 405 of the contractor A, and the computer of the contractor B 407, between the computer 408 of the contractor C. Measurement values and control values for HEV are performed between the measurement / control devices 404 and 406 and the control device 409 via the dedicated communication line 402. The private LAN 402 can be replaced by the local LAN 401 depending on the required communication speed and communication volume.

次に、各契約者間のサービス提供と料金決済、実績補償の方法について説明する。HEVによる需給調整システムを運用するに際しては、分散型電源による需給調整システムを管理するサービス提供業者と、HEV所有者(複数)、および、電力を利用する商業施設、工場などの電力利用事業者とで契約を締結し、契約に従って運用する。この場合、HEV所有者(複数)を契約者A、電力を利用する需要家を契約者B、サービス提供業者を契約者Cとすると、契約者Cは、契約者A、契約者BとHEVによる電力供給サービスに関する契約を締結する。契約者Aは電力供給の条件、電力提供に対する補償金額等を、契約者Bは需給調整に関わる運用条件、電力料金および需給調整サービス料金を予め定めておく。   Next, a description will be given of the method of service provision, fee settlement, and performance compensation between each contractor. When operating a supply and demand adjustment system using HEV, a service provider that manages the supply and demand adjustment system using a distributed power source, HEV owners, and power usage companies such as commercial facilities and factories that use electricity The contract is concluded with and operated according to the contract. In this case, if the HEV owner (s) is the contractor A, the customer who uses the power is the contractor B, and the service provider is the contractor C, the contractor C is the contractor A, the contractor B and the HEV. Enter into a contract for power supply services. The contractor A predetermines power supply conditions, compensation amount for power supply, and the like, and the contractor B predetermines operation conditions related to supply and demand adjustment, power charges and supply and demand adjustment service charges.

なお、このサービス実施する際、契約者Cは、契約者A、契約者Bから情報を集めるための情報収集装置、通信装置、制御装置、さらに、需給調整センタにおける情報処理装置などを、サービス事業者自身の資産を用いるか、第3者の資産をリースなどすることにより運用するかを選択できる。また、情報収集装置、通信装置、制御装置などの一部が、契約者Bの資産であり、それをリースすることにより運用することも可能である。   In carrying out this service, the contractor C supplies information services such as an information collection device, a communication device, and a control device for collecting information from the contractor A and the contractor B, as well as an information processing device in the supply and demand adjustment center. It is possible to select whether to use the asset of the third party or lease the asset of the third party. Some of the information collection device, communication device, control device, etc. are assets of the contractor B, and can be operated by leasing them.

HEVによる需給調整サービスにより、需給調整システムを具体的に運用するに際しては、契約者AのHEVにおいて、その状態を計測し、契約者Cが所有する需給制御センタにその情報を送る。契約者Bの各設備においては、定期的に電力需要の情報を需給制御センタに送る。需給制御センタでは、各設備から集まって情報に基づき、至近の需要を予測するとともに、電力供給を行なうHEVの選択とその出力を決定し、HEVに指令値として送る。指令を受けたHEVでは、指令値に沿って電力供給を行う。   When the supply and demand adjustment system is specifically operated by the supply and demand adjustment service by HEV, the state of the contractor A's HEV is measured and the information is sent to the supply and demand control center owned by the contractor C. Each facility of the contractor B periodically sends information on power demand to the supply and demand control center. The supply and demand control center gathers from each facility and predicts the nearest demand based on the information, determines the HEV to which power is supplied and its output, and sends it to the HEV as a command value. The HEV that has received the command supplies power in accordance with the command value.

図9は本サービスの流れを示している。契約者Cは、契約者AとHEVを利用した電力供給に関わる契約(802)を、契約者Bとは、構内負荷への電力供給と需給調整に関わる契約(801)を結ぶ。   FIG. 9 shows the flow of this service. The contractor C concludes a contract (802) related to power supply using the HEV with the contractor A, and the contractor B concludes a contract (801) related to power supply to the local load and supply / demand adjustment.

上記契約に基づき、契約者Cは、契約者Aが所有するHEVに適切な運転指令を出す(803)。これにより、契約者Bの負荷に電力が供給される(804)。契約者Cの需給調整により、購入電力パターンが調整され(805)、電力購入の費用が低減される。HEVの2次電池残量は適切に調整されるので、その後のHEV移動時に効率的な動作が可能となる(806)。これらのサービスに対し、契約者Bは契約者Cに電力料金を支払う。契約者Cは契約者Aに対し、HEVからの電力供給に対し、実績に基づき、実績補償代金を支払う。   Based on the contract, the contractor C issues an appropriate operation command to the HEV owned by the contractor A (803). Thereby, electric power is supplied to the load of the contractor B (804). The purchased power pattern is adjusted by adjusting the supply and demand of the contractor C (805), and the cost of purchasing power is reduced. Since the remaining amount of the secondary battery of HEV is adjusted appropriately, efficient operation is possible during subsequent HEV movement (806). For these services, the contractor B pays the contractor C a power fee. The contractor C pays the contractor A a performance compensation fee based on the results for the power supply from the HEV.

以上説明したように、本実施形態によれば、契約者Aは、実績補償の形で経済的メリットを受けるばかりでなく、2次電池の残量を適切に調整でき、次の移動時に効率的な運転が可能となる。契約者Bは、独自に分散型電源を持つことなく、負荷の多い時間帯にHEVから供給を受けることで、購入電力パターンが平準化し、電力コストを低く抑えることができる。契約者Cは、需給調整を行なうことにより、サービス料等で、継続的な収入が得られる。社会全体でみれば、高い燃費性能の電気自動車の導入が促進され、結果として、環境負荷低減が実現されるというメリットがある。   As described above, according to the present embodiment, the contractor A not only receives the economic merit in the form of performance compensation, but also can appropriately adjust the remaining amount of the secondary battery and is efficient at the next movement. Driving becomes possible. The contractor B does not have a distributed power source independently, but can receive power from the HEV during a heavy load period, thereby leveling the purchased power pattern and keeping power costs low. The contractor C can obtain continuous income with a service fee and the like by adjusting supply and demand. From the perspective of society as a whole, the introduction of electric vehicles with high fuel efficiency is promoted, and as a result, there is a merit that environmental load reduction is realized.

図10は、本発明の他の実施例を示す需給調整システムの構成図である。構成は、図1の実施例と殆ど同じであるが、商業施設12の場合であり、空調、照明、動力等の負荷13に電力を供給する。この場合、駐車場に停車するHEVは、対象となるHEVが予め決まっている図1の場合と異なり、不特定の来訪者が電力の提供者となる。   FIG. 10 is a configuration diagram of a supply and demand adjustment system showing another embodiment of the present invention. The configuration is almost the same as that of the embodiment of FIG. 1, but is the case of the commercial facility 12 and supplies power to a load 13 such as air conditioning, lighting, and power. In this case, the HEV that stops at the parking lot is different from the case of FIG. 1 in which the target HEV is determined in advance, and an unspecified visitor becomes a power provider.

これに伴い、需給制御センタにおける全体の処理が実施例1の場合(図7)と異なる。図11に実施例2による全体の処理フローを示す。HEVが駐車場に入る(1301)と時刻の記録を行い、電力提供の意思があるかどうかを電子的手段により確認する(1302)。電力提供の意思がある場合、そのHEVは電力提供可能なHEVとなり、定時刻(例えば、1時間毎)の処理を開始する(1303)。定時刻の処理が終るまで(1305)、図5の時間ステップの処理を繰り返す(1304)。また、これを、HEVが駐車場を出るための処理(清算)まで続ける。HEVが駐車場を出る場合(1306)は、そのHEVからサイトに供給された電力量を算出し(1307)、HEV所有者への実績補償代金の計算を行なう(1308)、また、駐車時間から駐車料金を計算する(1309)。以上から、実績補償代金等の清算を行なう(1310)。一方、電力提供の意思表示をしない場合、HEVが駐車場を出るための処理に入ると駐車料金を計算し(1312)、駐車料金の清算を行なう(1313)。   Accordingly, the overall processing in the supply and demand control center is different from that in the first embodiment (FIG. 7). FIG. 11 shows an overall processing flow according to the second embodiment. When the HEV enters the parking lot (1301), the time is recorded, and it is confirmed by electronic means whether there is an intention to provide power (1302). If there is an intention to provide power, the HEV becomes a HEV that can supply power, and processing at a fixed time (for example, every hour) is started (1303). Until the processing at the fixed time ends (1305), the processing of the time step of FIG. 5 is repeated (1304). Moreover, this is continued until the process (liquidation) for HEV to leave a parking lot. When the HEV leaves the parking lot (1306), the amount of power supplied to the site from the HEV is calculated (1307), and the performance compensation price to the HEV owner is calculated (1308). A parking fee is calculated (1309). From the above, the performance compensation fee is settled (1310). On the other hand, when the intention to provide power is not displayed, the HEV calculates the parking fee when it enters the process for leaving the parking lot (1312), and the parking fee is settled (1313).

図12は、各契約者間のサービス提供と料金決済、実績補償の方法を示す。図9とほとんど同じであるが、HEV所有者が不特定多数であるため、契約者Cから契約者Aへの駐車場利用規則の提示(902)および契約者Aから契約者Cに対する電力提供の意思表示(903)で、契約者Aと契約者Cの契約に代えている。   FIG. 12 shows a method of service provision, fee settlement, and performance compensation between each contractor. Although it is almost the same as FIG. 9, since there are an unspecified number of HEV owners, the provision of the parking lot usage rule from the contractor C to the contractor A (902) and the provision of power to the contractor C from the contractor A The intention display (903) replaces the contract between contractor A and contractor C.

本発明は、移動可能な分散電源に限らず、待機状態にある複数の機器の状態を監視し、外部の状況に合わせ、機器を選択的に稼動させられるため、長時間待機状態にある機器を有効に活用するその他の用途にも適用できる。   The present invention is not limited to a distributed power source that can be moved, but monitors the status of a plurality of devices that are in a standby state, and can selectively operate the device according to the external situation. It can be applied to other uses that are effectively utilized.

本発明の1実施例を示す需給調整システムの構成図。The block diagram of the supply-and-demand adjustment system which shows one Example of this invention. ハイブリッド型電気自動車の一例を示す模式図。The schematic diagram which shows an example of a hybrid type electric vehicle. 需給制御センタに設置される需給調整機能のブロック図。The block diagram of the supply-and-demand adjustment function installed in a supply-and-demand control center. 需給調整機能における表示装置の監視画面図。The monitor screen figure of the display apparatus in a demand-and-supply adjustment function. 需給制御センタにおける処理フロー図。The processing flow figure in a supply-and-demand control center. 2次電池残量の計測方法を示す説明図。Explanatory drawing which shows the measuring method of a secondary battery remaining charge. 需給制御センタにおける全体処理フロー図。The whole processing flow figure in a supply-and-demand control center. 需給調整システムにおける情報システムの構成図。The block diagram of the information system in a supply-and-demand adjustment system. 各契約者間のサービス提供と課金、実績補償を示す流れ図。The flowchart which shows service provision between each contractor, charge, and performance compensation. 本発明の他の実施例を示す需給調整システムの構成図。The block diagram of the supply-and-demand adjustment system which shows the other Example of this invention. 他の実施例による需給制御センタでの全体処理フロー図。The whole processing flow figure in the demand-and-supply control center by another Example. 他の実施例による契約者間のサービス提供と課金、実績補償を示す流れ図。The flowchart which shows the service provision between the contractors by another Example, charging, and performance compensation.

符号の説明Explanation of symbols

1…商用系統、3…構内変電所、5…低圧配電線、6…通信線、7…通信線、8…負荷、9…構内駐車場、10…需給制御センタ、20…ハイブリッド型電気自動車、25…電圧変換装置、30…エンジン、31…発電機、32…2次電池、34…電動機、35…車輪、36…整流器、37…インバータ、38…コントローラ、40…通信線、42…フレキシブル電力線、43…送受信装置。   DESCRIPTION OF SYMBOLS 1 ... Commercial system, 3 ... In-house substation, 5 ... Low voltage distribution line, 6 ... Communication line, 7 ... Communication line, 8 ... Load, 9 ... On-site parking lot, 10 ... Supply-and-demand control center, 20 ... Hybrid type electric vehicle, DESCRIPTION OF SYMBOLS 25 ... Voltage converter, 30 ... Engine, 31 ... Generator, 32 ... Secondary battery, 34 ... Electric motor, 35 ... Wheel, 36 ... Rectifier, 37 ... Inverter, 38 ... Controller, 40 ... Communication line, 42 ... Flexible power line 43. Transmission / reception device.

Claims (8)

対象となる電力利用事業者の負荷に関する情報を収集する通信手段と、複数のハイブリッド型電気自動車の電力供給に関する情報を収集する通信手段を有し、前記収集された情報から、需給バランスをとるため、前記負荷に電力供給するハイブリッド型電気自動車の選択と出力指令値を設定する制御手段を備えることを特徴とする電力供給システム。   In order to balance supply and demand from the collected information, including communication means for collecting information on the load of the target electric power provider and information on power supply of a plurality of hybrid electric vehicles A power supply system comprising control means for selecting a hybrid electric vehicle that supplies power to the load and setting an output command value. 商用系統から所定電力の供給を受けている負荷と、前記負荷と配電線で接続された複数の駐車設備に駐車している電力供給可能なハイブリッド型電気自動車と、前記負荷の電力需要に関する情報を収集する通信手段および前記ハイブリッド型電気自動車の電力供給に関する情報を収集する通信手段と、前記通信手段の情報に基いて電力供給するハイブリッド型電気自動車の選択とその出力指令値を設定する需給制御手段を備えることを特徴とする電力供給システム。   A load receiving a predetermined power supply from a commercial system, a hybrid electric vehicle capable of supplying power parked in a plurality of parking facilities connected to the load and a distribution line, and information on the power demand of the load Communication means for collecting, communication means for collecting information relating to power supply of the hybrid electric vehicle, supply / demand control means for selecting a hybrid electric vehicle for supplying power based on information of the communication means and setting an output command value thereof A power supply system comprising: 請求項1または2において、前記ハイブリッド型電気自動車は2次電池の直流を交流に変換して車輪を駆動するためのインバータを設けていて、前記インバータの交流出力を前記負荷に供給することを特徴とする電力供給システム。   3. The hybrid electric vehicle according to claim 1, wherein the hybrid electric vehicle includes an inverter for driving a wheel by converting direct current of the secondary battery into alternating current, and supplies the alternating current output of the inverter to the load. And power supply system. 請求項3において、前記ハイブリッド型電気自動車はコントローラを設け、前記インバータから発生する交流電力の出力を制御するとともに、電圧の大きさと位相とを、前記配電線の電圧に合わせて同期をとることを特徴とする電力供給システム。   4. The hybrid electric vehicle according to claim 3, wherein the hybrid electric vehicle is provided with a controller, controls the output of AC power generated from the inverter, and synchronizes the magnitude and phase of the voltage with the voltage of the distribution line. A featured power supply system. 請求項1または2において、前記ハイブリッド型電気自動車の2次電池から供給可能な量は、現時点の2次電池残存容量と効率の高い所定2次電池残存量との差となることを特徴とする電力供給システム。   3. The amount that can be supplied from the secondary battery of the hybrid electric vehicle according to claim 1 or 2 is a difference between a current remaining capacity of the secondary battery and a remaining capacity of the predetermined secondary battery having high efficiency. Power supply system. 請求項1において、前記駐車設備に駐車するハイブリッド型電気自動車は負荷に対する電力供給を予め決められていて、前記需給制御手段は各ハイブリッド型電気自動車の一定期間における供給実績を求めることを特徴とする電力供給システム。   2. The hybrid electric vehicle parked in the parking facility according to claim 1, wherein power supply to a load is determined in advance, and the supply and demand control means obtains a supply record of each hybrid electric vehicle over a certain period. Power supply system. 請求項2において、前記駐車設備に駐車するハイブリッド型電気自動車から前記負荷への電力供給に関し、前記需給制御手段は各ハイブリッド型電気自動車の駐車時間中における供給実績を求めることを特徴とする電力供給システム。   3. The power supply according to claim 2, wherein the supply and demand control means obtains a supply record during the parking time of each hybrid electric vehicle with respect to power supply from the hybrid electric vehicle parked in the parking facility to the load. system. ハイブリッド型電気自動車からの電力供給と負荷の需要との調整を行う需給制御センタは、複数のハイブリッド型電気自動車が持つコンピュータ及び電力需要負荷が持つコンピュータを通信回線で結び、前記需給制御センタの供給指令に応じたハイブリッド型電気自動車による供給電力の実績を演算することを特徴とする電力供給システム。   A supply and demand control center for adjusting power supply and load demand from a hybrid electric vehicle connects a computer of a plurality of hybrid electric vehicles and a computer of a power demand load by a communication line, and supplies the supply and demand control center. A power supply system that calculates the actual power supplied by a hybrid electric vehicle according to a command.
JP2005181781A 2005-06-22 2005-06-22 Secondary battery supply control device and power supply system for hybrid electric vehicle Expired - Fee Related JP4426504B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005181781A JP4426504B2 (en) 2005-06-22 2005-06-22 Secondary battery supply control device and power supply system for hybrid electric vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005181781A JP4426504B2 (en) 2005-06-22 2005-06-22 Secondary battery supply control device and power supply system for hybrid electric vehicle

Publications (2)

Publication Number Publication Date
JP2007006573A true JP2007006573A (en) 2007-01-11
JP4426504B2 JP4426504B2 (en) 2010-03-03

Family

ID=37691624

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005181781A Expired - Fee Related JP4426504B2 (en) 2005-06-22 2005-06-22 Secondary battery supply control device and power supply system for hybrid electric vehicle

Country Status (1)

Country Link
JP (1) JP4426504B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009183086A (en) * 2008-01-31 2009-08-13 Eco Tribute:Kk Power supply system utilizing on-vehicle storage battery
JP2011520163A (en) * 2008-03-04 2011-07-14 アルカテル−ルーセント Method for transferring energy between a first unit and a second unit
JP2012196028A (en) * 2011-03-16 2012-10-11 Mitsubishi Electric Corp Electric power management system
WO2012148595A1 (en) * 2011-04-29 2012-11-01 Electric Transportation Engineering Corporation, D/B/A Ecotality North America System for electric grid balancing and method of using and providing the same
JP2012228125A (en) * 2011-04-21 2012-11-15 Mazda Motor Corp Charging and discharging control method, charging and discharging control device, and vehicle
JP2012228124A (en) * 2011-04-21 2012-11-15 Mazda Motor Corp Charging and discharging control method, charging and discharging control device, and vehicle
JP2013042634A (en) * 2011-08-19 2013-02-28 Ihi Transport Machinery Co Ltd Parking device
JP2014068485A (en) * 2012-09-26 2014-04-17 Toyota Motor Corp Electric power supply system, and vehicle and management device used in the same
US8710372B2 (en) 2010-07-23 2014-04-29 Blink Acquisition, LLC Device to facilitate moving an electrical cable of an electric vehicle charging station and method of providing the same

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103190051B (en) 2010-08-05 2016-08-03 三菱自动车工业株式会社 Battery information outut device for power supply and demand leveling system
JP7179088B2 (en) 2019-01-17 2022-11-28 本田技研工業株式会社 System and program

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009183086A (en) * 2008-01-31 2009-08-13 Eco Tribute:Kk Power supply system utilizing on-vehicle storage battery
JP2011520163A (en) * 2008-03-04 2011-07-14 アルカテル−ルーセント Method for transferring energy between a first unit and a second unit
KR101203406B1 (en) 2008-03-04 2012-11-21 알까뗄 루슨트 Method of transferring energy between a first unit and a second unit
US8710372B2 (en) 2010-07-23 2014-04-29 Blink Acquisition, LLC Device to facilitate moving an electrical cable of an electric vehicle charging station and method of providing the same
JP2012196028A (en) * 2011-03-16 2012-10-11 Mitsubishi Electric Corp Electric power management system
JP2012228125A (en) * 2011-04-21 2012-11-15 Mazda Motor Corp Charging and discharging control method, charging and discharging control device, and vehicle
JP2012228124A (en) * 2011-04-21 2012-11-15 Mazda Motor Corp Charging and discharging control method, charging and discharging control device, and vehicle
WO2012148595A1 (en) * 2011-04-29 2012-11-01 Electric Transportation Engineering Corporation, D/B/A Ecotality North America System for electric grid balancing and method of using and providing the same
JP2013042634A (en) * 2011-08-19 2013-02-28 Ihi Transport Machinery Co Ltd Parking device
JP2014068485A (en) * 2012-09-26 2014-04-17 Toyota Motor Corp Electric power supply system, and vehicle and management device used in the same

Also Published As

Publication number Publication date
JP4426504B2 (en) 2010-03-03

Similar Documents

Publication Publication Date Title
Yousuf et al. An in-depth exploration of electric vehicle charging station infrastructure: A comprehensive review of challenges, mitigation approaches, and optimization strategies
Pang et al. BEVs/PHEVs as dispersed energy storage for V2B uses in the smart grid
Brooks Vehicle-to-grid demonstration project: Grid regulation ancillary service with a battery electric vehicle
US8744641B2 (en) Electric power supply system
Khalid et al. Impact of public and residential smart EV charging on distribution power grid equipped with storage
US20110276194A1 (en) System and method for energy management
JP2006204081A (en) Supply and demand adjustment method, system and service by distributed power supply
Esmaili et al. Multi-objective optimal charging of plug-in electric vehicles in unbalanced distribution networks
US20110196692A1 (en) Apparatus, system and method for grid storage
JP5404756B2 (en) Power management system
CN114365370B (en) Regional energy management device and regional energy management method
JP7299201B2 (en) power system
Brenna et al. The integration of electric vehicles in smart distribution grids with other distributed resources
JP4426504B2 (en) Secondary battery supply control device and power supply system for hybrid electric vehicle
JP6629482B1 (en) Electric vehicle and electric vehicle charging system
Markel et al. Multi-lab EV smart grid integration requirements study
JP2001258175A (en) System and method for using secondary battery for power storage
JP7472777B2 (en) Power system, server, and method for adjusting power supply and demand
JP2003244841A (en) Information providing method and system for hybrid system using secondary battery for power storage
Sankhwar Suitability of Electric Vehicle Charging Infrastructure and Impact on Power Grid Due to Electrification of Roadway Transportation with Electric Vehicles
JP2007006574A (en) Power supply system
Zhang et al. A review of plug-in electric vehicles as distributed energy storages in smart grid
Hackbarth et al. Plug-in Hybrid Electric Vehicles for CO2-Free Mobility and Active Storage Systems for the Grid (Part 2)
Medeiros et al. Real time operation in electric vehicle smart charging stations: a matheuristic approach considering demand side management, energy storage and distributed generation
Ethirajan et al. Challenges and Barriers Regarding Electric Vehicles in Modern India with Grid Optimization

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070419

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080728

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080805

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081003

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090915

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091208

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091210

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121218

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131218

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees