JP2007072754A - 生産工程効率化支援方法 - Google Patents
生産工程効率化支援方法 Download PDFInfo
- Publication number
- JP2007072754A JP2007072754A JP2005259072A JP2005259072A JP2007072754A JP 2007072754 A JP2007072754 A JP 2007072754A JP 2005259072 A JP2005259072 A JP 2005259072A JP 2005259072 A JP2005259072 A JP 2005259072A JP 2007072754 A JP2007072754 A JP 2007072754A
- Authority
- JP
- Japan
- Prior art keywords
- production process
- worker
- simulation
- production
- simulator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 168
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000004088 simulation Methods 0.000 claims abstract description 32
- 230000005540 biological transmission Effects 0.000 claims description 8
- 230000002950 deficient Effects 0.000 claims description 4
- 238000005457 optimization Methods 0.000 abstract description 5
- FFBHFFJDDLITSX-UHFFFAOYSA-N benzyl N-[2-hydroxy-4-(3-oxomorpholin-4-yl)phenyl]carbamate Chemical compound OC1=C(NC(=O)OCC2=CC=CC=C2)C=CC(=C1)N1CCOCC1=O FFBHFFJDDLITSX-UHFFFAOYSA-N 0.000 description 12
- 238000005265 energy consumption Methods 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- General Factory Administration (AREA)
Abstract
【解決手段】 人手作業を含む生産工程の稼働における、稼働率、作業時間、サイクルタイム及び良品率の稼働状況データを生産工程シミュレーターに取り込み、作業工程及び作業者毎のデータベースを作成するとともに、前記データベースに基づいて前記生産工程シミュレーターで、生産工程のシミュレーションを行うことで作業者の疲労度及び作業者の習熟度を考慮した生産工程の人員配置の最適化を図る。
【選択図】 図1
Description
(1)
人手作業を含む生産工程の稼働状況を示す稼働状況データを取り込み生産工程のシミュレーションを行う生産工程シミュレーターを有し、前記生産工程シミュレーターを用いて生産工程の効率化を図る生産工程効率化支援方法であって、
前記人手作業を含む生産工程の稼働における、稼働率、作業時間、サイクルタイム及び良品率の稼働状況データを前記生産工程シミュレーターに取り込み、作業工程及び作業者毎のデータベースを作成するとともに、前記データベースに基づき前記生産工程シミュレーターで、生産工程の進行と略同時進行となるリアルタイムで、もしくは生産工程の進行とは別途に進行するオフラインで、生産工程のシミュレーションを行うことで前記作業者の疲労度及び作業者の習熟度を考慮した生産工程の最適な人員配置を算出することを特徴とする生産工程効率化支援方法。
(2)
前記生産工程シミュレーターに稼働状況データを取り込み、シミュレーションを行う際に、取り込んだ前記稼働状況データを前記データベース上に格納されているデータと比較し、作業者の疲労度及び習熟度の評価を行うとともに、前記生産工程のシミュレーションを行うことを特徴とする(1)項に記載の生産工程効率化支援方法。
(3)
生産工程に生産工程内の作業者に情報伝達する情報伝達手段を有し、前記情報伝達手段で前記生産工程シミュレーターでのシミュレーションの結果を前記作業者に伝達するとともに、前記作業者は、伝達された前記シミュレーションの結果に基づき人員配置の変更と生産工程に配設された生産機器の稼働条件を設定する前記生産機器のパラメータの変更の一方または両方を実施することを特徴とする(1)項または(2)項に記載の生産工程効率化支援方法。
(4)
前記生産機器のパラメータの変更は、前記シミュレーションの結果に基づき前記生産機器に対し自動的に行われることを特徴とする(3)項に記載の生産工程効率化支援方法。
(5)
前記稼働状況データの取り込み、前記シミュレーション及び該シミュレーションの結果に基づく人員配置の変更と前記パラメータの変更の一方または両方の実施を所定周期毎に繰り返すことを特徴とする(1)項乃至(4)項の何れか1項に記載の生産工程効率化支援方法。
2 稼働状況データ
3 生産工程シミュレーター
4 データベース
5 情報伝達手段
6 生産機器表示部
Claims (5)
- 人手作業を含む生産工程の稼働状況を示す稼働状況データを取り込み生産工程のシミュレーションを行う生産工程シミュレーターを有し、前記生産工程シミュレーターを用いて生産工程の効率化を図る生産工程効率化支援方法であって、
前記人手作業を含む生産工程の稼働における、稼働率、作業時間、サイクルタイム及び良品率の稼働状況データを前記生産工程シミュレーターに取り込み、作業工程及び作業者毎のデータベースを作成するとともに、前記データベースに基づき前記生産工程シミュレーターで、生産工程の進行と略同時進行となるリアルタイムで、もしくは生産工程の進行とは別途に進行するオフラインで、生産工程のシミュレーションを行うことで前記作業者の疲労度及び作業者の習熟度を考慮した生産工程の最適な人員配置を算出することを特徴とする生産工程効率化支援方法。 - 前記生産工程シミュレーターに稼働状況データを取り込み、シミュレーションを行う際に、取り込んだ前記稼働状況データを前記データベース上に格納されているデータと比較し、作業者の疲労度及び習熟度の評価を行うとともに、前記生産工程のシミュレーションを行うことを特徴とする請求項1に記載の生産工程効率化支援方法。
- 生産工程に生産工程内の作業者に情報伝達する情報伝達手段を有し、前記情報伝達手段で前記生産工程シミュレーターでのシミュレーションの結果を前記作業者に伝達するとともに、前記作業者は、伝達された前記シミュレーションの結果に基づき人員配置の変更と生産工程に配設された生産機器の稼働条件を設定する前記生産機器のパラメータの変更の一方または両方を実施することを特徴とする請求項1または2に記載の生産工程効率化支援方法。
- 前記生産機器のパラメータの変更は、前記シミュレーションの結果に基づき前記生産機器に対し自動的に行われることを特徴とする請求項3に記載の生産工程効率化支援方法。
- 前記稼働状況データの取り込み、前記シミュレーション及び該シミュレーションの結果に基づく人員配置の変更と前記パラメータの変更の一方または両方の実施を所定周期毎に繰り返すことを特徴とする請求項1乃至4の何れか1項に記載の生産工程効率化支援方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2005259072A JP2007072754A (ja) | 2005-09-07 | 2005-09-07 | 生産工程効率化支援方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2005259072A JP2007072754A (ja) | 2005-09-07 | 2005-09-07 | 生産工程効率化支援方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2007072754A true JP2007072754A (ja) | 2007-03-22 |
Family
ID=37934137
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2005259072A Pending JP2007072754A (ja) | 2005-09-07 | 2005-09-07 | 生産工程効率化支援方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2007072754A (ja) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018205818A (ja) * | 2017-05-30 | 2018-12-27 | ファナック株式会社 | ワーク供給システム |
| CN118504932A (zh) * | 2024-07-15 | 2024-08-16 | 网思科技股份有限公司 | 一种人工智能驱动的智能优化控制方法、系统和介质 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1034499A (ja) * | 1996-07-23 | 1998-02-10 | Hitachi Ltd | 設備能力情報の取得方法および生産管理システム |
| JPH11300585A (ja) * | 1998-04-16 | 1999-11-02 | Nec Corp | 生産管理システム |
| JP2002006934A (ja) * | 2000-06-27 | 2002-01-11 | Matsushita Electric Works Ltd | 製造ラインにおける作業者の配分調整方法とそのシステム |
| JP2004138555A (ja) * | 2002-10-18 | 2004-05-13 | Seiko Epson Corp | 計測支援方法及び製造支援システム、計測支援装置並びに計測支援方法のプログラム |
-
2005
- 2005-09-07 JP JP2005259072A patent/JP2007072754A/ja active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1034499A (ja) * | 1996-07-23 | 1998-02-10 | Hitachi Ltd | 設備能力情報の取得方法および生産管理システム |
| JPH11300585A (ja) * | 1998-04-16 | 1999-11-02 | Nec Corp | 生産管理システム |
| JP2002006934A (ja) * | 2000-06-27 | 2002-01-11 | Matsushita Electric Works Ltd | 製造ラインにおける作業者の配分調整方法とそのシステム |
| JP2004138555A (ja) * | 2002-10-18 | 2004-05-13 | Seiko Epson Corp | 計測支援方法及び製造支援システム、計測支援装置並びに計測支援方法のプログラム |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2018205818A (ja) * | 2017-05-30 | 2018-12-27 | ファナック株式会社 | ワーク供給システム |
| US10384880B2 (en) | 2017-05-30 | 2019-08-20 | Fanuc Corporation | Workpiece supply system |
| CN118504932A (zh) * | 2024-07-15 | 2024-08-16 | 网思科技股份有限公司 | 一种人工智能驱动的智能优化控制方法、系统和介质 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TWI808961B (zh) | 工作計劃最佳化方法 | |
| Van De Ginste et al. | The role of equipment flexibility in Overall Equipment Effectiveness (OEE)-driven process improvement | |
| JP2017199077A (ja) | 複数台の産業機械を有する生産システムの動作を最適化するセルコントローラ | |
| CN114169766A (zh) | 一种工业产能分配的生产管理方法及系统 | |
| CN112446526A (zh) | 生产排程系统及方法 | |
| JP2008257700A (ja) | 品質改善システム | |
| CN109429515A (zh) | 生产线构成变更系统以及生产线构成变更方法 | |
| CN110909917A (zh) | 基于数据挖掘和工艺模型的优化排程方法、系统、介质及设备 | |
| JP2017188038A (ja) | 製造セルの稼働率を向上させる製造管理システム | |
| US10114913B2 (en) | Method and system for determining welding sequences | |
| CN110968058A (zh) | 生产系统模拟装置以及生产系统模拟方法 | |
| Adjogble et al. | Advanced intelligent manufacturing in process industry using industrial artificial intelligence | |
| CN118819092A (zh) | 基于数字孪生的数据实时驱动系统 | |
| EP2339418A1 (en) | Method and device for enhancing production facility performances | |
| Rana et al. | Artificial Intelligence and Internet of Things (IoT) facilitated digital twin for Industry 4.0 application domains | |
| KR20100052634A (ko) | 공장 상황 시뮬레이션을 위한 시스템 및 방법 | |
| WO2020053991A1 (ja) | 製造システム設計支援装置 | |
| CN113837550B (zh) | 一种基于数字孪生的重调度方法、系统及装置 | |
| JP2007072754A (ja) | 生産工程効率化支援方法 | |
| KR20150096191A (ko) | 프로젝트 관리시스템 | |
| JP2007133664A (ja) | 生産工程支援方法 | |
| CN119200521A (zh) | 汽车换向器加强环生产控制方法及设备 | |
| JP2017126148A (ja) | 最適ロット数決定プログラムおよびシステム | |
| JP2007079768A (ja) | 人手作業を含む生産工程の効率化支援方法 | |
| JP2012103804A (ja) | 場所計画装置および場所計画方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080828 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20110210 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110222 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20110224 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20110705 |