JP2004092093A
JP2004092093A JP2002252265A JP2002252265A JP2004092093A JP 2004092093 A JP2004092093 A JP 2004092093A JP 2002252265 A JP2002252265 A JP 2002252265A JP 2002252265 A JP2002252265 A JP 2002252265A JP 2004092093 A JP2004092093 A JP 2004092093A
Authority
JP
Japan
Prior art keywords
protector
work
scaffold
attached
work scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002252265A
Other languages
Japanese (ja)
Other versions
JP3922636B2 (en
Inventor
Hideto Mashita
真下 英人
Toshiaki Ishimura
石村 利明
Junichiro Nakamori
中森 純一郎
Yasumasa Fujiwara
藤原 康政
Hideyuki Horiuchi
堀内 秀行
Tatsuya Noma
野間 達也
Yuichi Suzuki
鈴木 裕一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Shimizu Construction Co Ltd
Fujita Corp
Shimizu Corp
Advanced Construction Technology Center ACTEC
National Research and Development Agency Public Works Research Institute
Original Assignee
Taisei Corp
Shimizu Construction Co Ltd
Fujita Corp
Public Works Research Institute
Shimizu Corp
Advanced Construction Technology Center ACTEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Shimizu Construction Co Ltd, Fujita Corp, Public Works Research Institute, Shimizu Corp, Advanced Construction Technology Center ACTEC filed Critical Taisei Corp
Priority to JP2002252265A priority Critical patent/JP3922636B2/en
Publication of JP2004092093A publication Critical patent/JP2004092093A/en
Application granted granted Critical
Publication of JP3922636B2 publication Critical patent/JP3922636B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

【課題】既設トンネルaの拡幅工事において、一般車両等の通行を確保するプロテクタの外側に、場所をとらずに高所作業用の足場を安全に確保する。
【解決手段】既設トンネルa内に設置されるプロテクタ1の一側上部に、折り畳み式の作業足場2が取り付けられている。この作業足場2は、プロテクタ1の屋根15の一側に水平ヒンジ21aを介して俯仰回転可能に取り付けられた足場板21と、プロテクタ1の側面部に鉛直ヒンジ22aを介して取り付けられ足場板21を水平に支持可能な支持材22とからなる。
【選択図】 図1
An object of the present invention is to secure a scaffold for working at a high place without taking a place outside a protector for securing traffic of general vehicles and the like in widening work of an existing tunnel (a).
A folding work scaffold (2) is attached to an upper portion of one side of a protector (1) installed in an existing tunnel (a). The work scaffold 2 is attached to one side of the roof 15 of the protector 1 via a horizontal hinge 21a so as to be able to turn up and down, and a scaffold plate 21 attached to a side surface of the protector 1 via a vertical hinge 22a. And a support member 22 capable of supporting the horizontal.
[Selection diagram] Fig. 1

Description

【0001】
【発明の属する技術分野】
本発明は、既設トンネルの拡幅工事を効率的に行うための技術に関する。
【0002】
【従来の技術】
物流の効率化に関して、ISOの背高海上コンテナに代表される車両の大型化に対応して、既設トンネルの拡幅工事が必要となることがある。図10及び図11は、従来の技術による既設トンネルの拡幅工事を示す説明図で、すなわち、このような拡幅工事においては、図10に示されるように、既設トンネルaの断面を広げるように掘削し、その掘削面に沿って覆工コンクリート打設用の型枠を取り付けて、コンクリートによる覆工cを行う。そして、従来の技術においては、拡幅後のトンネルbの中心が、拡幅前のトンネルaの中心とほぼ同心となるように施工することが多い。
【0003】
しかし、このような方法では、作業エリアが狭く、工事期間中にトンネル内の一般車両の通行が遮断されることのないように配慮することが困難である。
【0004】
そこで、図11に示されるように、既設トンネルaの片側を掘削して、片側拡幅とすれば、広い作業エリアを確保でき、自由断面掘削機dのような大型の重機を使用することによる作業効率の向上、ひいては工期の短縮を図ることができる。そしてこの場合、既設トンネルa内に、予めプロテクタと呼ばれる移動可能な保護設備eを設置し、このプロテクタeによって、一般車両f等の通行及びその安全性を確保することができる。
【0005】
しかし、図11に示されるような片側拡幅工事において、自由断面掘削機dなどの大型の重機を使用した場合、プロテクタeの外側の作業エリアは、この重機でほぼ塞がれてしまい、他の重機の通行が困難となる。
【0006】
ここで、自由断面掘削機dは、一台で掘削、ロックボルトの打設、コンクリート吹き付けによる覆工など、全て行うことができるマルチタイプのものがあるが、作業をすべて機械化することはできない。例えばトンネル天端付近のロックボルト打設等においては、どうしても人力によるロックボルトの挿入作業が必要であり、作業員による高所作業が発生する。通常のトンネル掘削工事の場合は、トンネル天端付近のロックボルト打設等の高所作業は、作業足場として高所作業車を用いるといった手段を講じることができるが、トンネル拡幅工事のように、プロテクタeの外側における作業エリアの対部分が大型の自由断面掘削機dに占有されるような場合、上述のような高所作業車は使用できないため、何らかの方法で高所作業用の足場を確保する必要がある。
【0007】
【発明が解決しようとする課題】
本発明は、上述のような問題に鑑みてなされたもので、その技術的課題は、既設トンネルの拡幅工事において、一般車両等の通行を確保するプロテクタの外側に、場所をとらずに高所作業用の足場を安全に確保することにある。
【0008】
【課題を解決するための手段】
従来の技術的課題は、本発明によって有効に解決することができる。すなわち請求項1の発明に係る作業足場付きプロテクタは、既設トンネルの拡幅工事においてトンネル内の交通を確保するためのプロテクタの側面部に、折り畳み式の作業足場が取り付けられたものである。
【0009】
請求項2の発明に係る作業足場付きプロテクタは、請求項1に記載の作業足場が、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板と、前記プロテクタの側面部に取り付けられ前記足場板を水平に支持可能な支持材とからなるものである。
【0010】
請求項3の発明に係る作業足場付きプロテクタは、請求項1に記載の作業足場が、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板と、この足場板に上端が前記水平ヒンジの軸心と垂直な方向へ移動可能に連結された支持材と、鉛直方向へ移動可能であって前記支持材の下端を支承する昇降体と、この昇降体を鉛直方向へ往復移動させる駆動装置からなるものである。
【0011】
【発明の実施の形態】
以下、本発明に係る作業足場付きプロテクタの好ましい実施の形態を、図面を参照しながら説明する。図1は、第一の実施の形態を、既設トンネルの拡幅工事に使用している状態の説明図、図2は、本形態において作業足場を折り畳んだ状態を示す概略的な斜視図、図3は、本形態において作業足場をプロテクタから張り出させた状態を示す概略的な斜視図である。
【0012】
まず図1において、プロテクタ1は、左右一対の下桁11と、各下桁11上に、その長手方向所定間隔で立設された多数の支柱12及び筋交い(後述)と、左側の各支柱12の上端と右側の各支柱12の上端間に架設された多数の横梁14と、下桁11,11と平行であって左側の支柱12の上端間及び右側の支柱12の上端間をそれぞれ連結している左右一対の縦梁(不図示)と、横梁14上に敷設された平坦な屋根15とからなる。そしてこのプロテクタ1は、既設トンネルa内に設置可能であって、内側に大型貨物車や乗用車などの一般車両fが通行するのに十分な幅及び高さを有する通路10を形成するように構築されている。
【0013】
下桁11、支柱12、筋交い、横梁14、縦梁及び屋根15等、主な構成材は、鉄骨や鋼材等で製作され、工事に伴って発生する落下物等に対する十分な強度が確保されている。また、左右の下桁11,11又は支柱12の下部には、車輪(不図示)を設けることによって、トンネル拡幅工事の進捗に伴うプロテクタ1の移動を容易にすることができる。
【0014】
図2及び図3にも示されるように、プロテクタ1の一側(右側又は左側)の側面部には、トンネル掘削の切羽面側となる端部近傍に、折り畳み式の作業足場2が取り付けられている。この作業足場2は、プロテクタ1の屋根15の一側に水平ヒンジ21aを介して俯仰回転可能に取り付けられた足場板21と、プロテクタ1の側面部のうち、足場板21の幅方向(プロテクタ1の延長方向)両端近傍と対応する位置にある一対の支柱12に、それぞれ鉛直ヒンジ22aを介して旋回可能に取り付けられた支持材22とからなる。
【0015】
また、支持材22は、鉛直ヒンジ22aを介して支柱12に支持された鉛直支持材221と、この鉛直支持材221の上端から水平に延び、足場板21を水平に張り出させた時に上面がこの足場板21の下面高さに位置する水平支持材222と、鉛直支持材221の下部と水平支持材222の先端部とを連結する斜材223とからなる。
【0016】
以上のように構成された第一の形態による作業足場付きプロテクタにおいて、プロテクタ1は、図1に示されるように、既設トンネルa内に配置され、これによって、工事期間中もトンネル内の一般車両f等の通行を確保すると共に、掘削物の落下等から、一般車両fを保護する。なお、トンネル拡幅工事は、既設トンネルaの片側を掘削する片側拡幅による方法が採用される。図1における参照符号bは、拡幅後の新設トンネルを示すものである。このためプロテクタ1は、作業足場2が取り付けられた側面部が拡幅工事の作業エリアA側を向くように、すなわち作業足場2が、トンネル掘削の切羽面側に位置するように、既設トンネルa内に配置される。
【0017】
既設トンネルaの片側拡幅工事には、掘削、ロックボルトの打設、コンクリート吹き付けによる覆工などが可能な大型の自由断面掘削機dが用いられるため、プロテクタ1の側面部と自由断面掘削機dとの間のスペースは狭いものとなっているが、このプロテクタ1の側面部に取り付けられた作業足場2は、通常、図2に示されるように、支持材22,22を、それぞれ鉛直ヒンジ22aを中心として、プロテクタ1の側面部とほぼ平行となる位置へ旋回させて係止すると共に、足場板21を、水平ヒンジ21aを支点として下垂させることによって、折り畳んだ状態としておくことができるので、自由断面掘削機d等による施工の阻害にはならない。
【0018】
そして、トンネル天端付近へのロックボルトの挿入作業など、作業員gによる高所作業が必要となった場合は、図3に示されるように、足場板21を、水平ヒンジ21aを支点として水平に起こすと共に、支持材22,22を、それぞれ鉛直ヒンジ22aを中心としてプロテクタ1の側面部とほぼ平行となる位置へ旋回させて固定し、足場板21の下面を支持することによって、作業足場2を使用可能な状態とする。また、図1に示されるように、足場板21の外周には、パイプ材等からなる落下防止用のフェンス21bが取り付けられる。このようにすれば、作業員gは作業足場2の上で、作業エリアAの上部の高所作業を行うことができる。
【0019】
次に図4は、本発明に係る作業足場付きプロテクタの好ましい第二の実施の形態として、作業足場を折り畳んだ状態を示す説明図、図5は、同じく作業足場を使用している状態を示す説明図である。本形態において、先に説明した第一の形態と異なるところは、一対の支持材22が、足場板21及びプロテクタ1の支柱12に対して着脱可能な斜材からなる点にあり、また、フェンス21bが、ヒンジ21cを介して足場板21に取り付けられている。その他の部分の構成は、基本的に第一の実施の形態とほぼ同様である。
【0020】
したがって、作業足場2は、通常は図4に示されるように、支持材22を、それぞれプロテクタ1の支柱12に、図示されていない係止又は固定手段によって鉛直に添着すると共に、足場板21を、水平ヒンジ21aから下垂させ、フェンス21bを足場板21と平行に倒しておくことによって、折り畳んだ状態としておくことができるので、自由断面掘削機d等による施工の阻害にはならない。
【0021】
また、トンネル天端付近へのロックボルトの挿入作業など、作業員gによる高所作業が必要となった場合は、図5に示されるように、足場板21を、水平ヒンジ21aを支点として水平に起し、各支持材22の一端を足場板21の先端近傍の下面にボルトなどの結合手段を介して固定すると共に、他端をプロテクタ1の支柱12にボルトなどの結合手段を介して固定することによって、足場板21を水平に支持する。また、フェンス21bを垂直に起こした状態に係止する。このようにすれば、作業員gは、作業足場2の上で、作業エリアAの上部の高所作業を行うことができる。
【0022】
次に図6は、本発明に係る作業足場付きプロテクタの好ましい第三の実施の形態を示す斜視図、図7は、同じく作業足場を折り畳んだ状態を示す要部正面図、図7同じく作業足場の張り出し動作の初期状態を示す要部正面図、図8は、同じく作業足場の張り出し動作の過程を示す要部正面図である。図6に示されるように、プロテクタ1の本体部分の構成は、先に説明した第一及び第二の実施の形態とほぼ同様であり、このプロテクタ1の一側(右側又は左側)の側面部には、トンネル掘削の切羽面側となる端部近傍に、折り畳み式の作業足場2が取り付けられている。なお、参照符号13は、プロテクタ1の延長方向へ互いに隣接する支柱12,12,…間にそれぞれX字型に連結された筋交いである。
【0023】
作業足場2は、プロテクタ1の屋根15の一側に水平ヒンジ21aを介して俯仰回転可能に取り付けられた足場板21と、この足場板21の下面における幅方向(プロテクタ1の延長方向)両端近傍に形成され水平ヒンジ21aの軸心と垂直な方向へ延びる一対のスライドレール23と、上端のリンクピン24aが各スライドレール23を介して足場板21に結合されると共にスライドレール23の延長方向へ移動可能な一対の遊動支持材24と、各スライドレール23と対応する位置でプロテクタ1の側面部(例えば支柱12)に沿って鉛直に設けられた一対のスクリュシャフト25と、各スクリュシャフト25に螺合されると共に遊動支持材24の下端に着脱自在に枢結される昇降体26と、各スクリュシャフト25をその軸心の周りに回転させることによって、昇降体26を鉛直方向へ往復移動させる駆動装置27と、図7に示されるように水平ヒンジ21aから下垂した足場板21を外側へ開くように変位させるジャッキ28とからなる。
【0024】
なお、駆動装置27は電動モータ及び減速機を内蔵しており、プロテクタ1の下桁11上に固定されている。また、各スクリュシャフト25の下端部は、駆動装置27の出力軸に継手を介して結合され、上端部は、図7に示されるように、軸受25aを介してプロテクタ1の屋根15の端部に支持されている。
【0025】
したがって、上述の構成を備える第三の実施の形態においても、プロテクタ1は、既設トンネル内に、作業足場2が取り付けられた側面部が拡幅工事の作業エリアA側を向くように、すなわち作業足場2が、トンネル掘削の切羽面側に位置するように配置され、これによって、工事期間中もトンネル内の一般車両等の通行を確保すると共に、掘削物の落下等から、一般車両等を保護する。
【0026】
プロテクタ1の側面部に取り付けられた作業足場2は、通常、図7に示されるように、遊動支持材24の下端のリンクピン24bを、昇降体26に形成された枢結部26aから取り外すことによって、足場板21を、水平ヒンジ21aを支点として下垂させることによって、折り畳んだ状態としておくことができるので、自由断面掘削機等によるトンネル拡幅工事の阻害にはならない。なお、このとき、ジャッキ28の出力軸28aは最も後退した位置にある。
【0027】
トンネル天端付近へのロックボルトの挿入作業など、作業員による高所作業が必要となった場合は、図6に示されるように、作業足場2をプロテクタ1の屋根15から張り出させる。作業足場2を張り出させるには、まず図8に示されるように、遊動支持材24の下端のリンクピン24bを、昇降体26に形成された枢結部26aに枢結し、ジャッキ8の出力軸28aを突出動作させることによって、足場板21を、水平ヒンジ21aを支点として外側へ開くように変位させる。すると、これに伴い、遊動支持材24の上端のリンクピン24aは、足場板21に形成されたスライドレール23に沿って相対移動する。
【0028】
ここで、スライドレール23と遊動支持材24のなす角度θが所定の大きさになると、遊動支持材24の上端のリンクピン24aが、水平ヒンジ21aによる足場板21の支点と、遊動支持材24と昇降体26との結合部(リンクピン24b)とを結ぶ直線Lよりも外側の位置まで変位されるので、この時点で、駆動装置27によって、スクリュシャフト25を、これに螺合した昇降体26を上昇させる方向へ回転させる。すると、昇降体26の上昇力が、遊動支持材24を介してリンクピン24aから足場板21へ伝達されるので、図9に示されるように、足場板21は水平ヒンジ21aを支点として外側へ開いて行き、すなわち角度θが増大して行く。なお、ジャッキ8の出力軸28aは後退させる。
【0029】
そして、昇降体26の上昇によって足場板21が外側へ開いて行く過程では、図8に矢印Rで示されるように、遊動支持材24の上端のリンクピン24aも水平ヒンジ21aを中心として外側へ変位するので、遊動支持材24が徐々に倒れて行く。このため、足場板21が水平に近い一定の角度まで開かれると、スライドレール23と遊動支持材24のなす角度θが90度を超える大きさになり、その時点で、スライドレール23における水平ヒンジ21a寄りの端部を押し上げていたリンクピン24aは、スライドレール23における水平ヒンジ21aと反対側の端部へ移動する。
【0030】
そして、図9に一点差線で示されるように、足場板21がほぼ水平となるまで昇降体26が上昇した時点で、駆動装置27を停止させる。足場板21の外周には、図6に示されるように、パイプ材等からなる落下防止用のフェンス21bが取り付けられるが、このフェンス21bも折り畳み式とすることができる。
【0031】
作業員による高所作業が終わり、作業足場2を折り畳む場合は、駆動装置27によって、スクリュシャフト25を上述の場合とは逆方向に回転させて、昇降体26を降下させれば良い。
【0032】
【発明の効果】
請求項1の発明に係る作業足場付きプロテクタによれば、既設トンネルの拡幅工事においてトンネル内の交通を確保するためのプロテクタの側面部に、折り畳み式の作業足場が取り付けられたものであるため、トンネル拡幅工事に自由断面掘削機等のような大型の重機を用いることによって、高所作業車を足場として使用できない場合でも、必要なときに折り畳み式の作業足場を張り出させて、高所作業用の足場を確保することができ、それ以外の時は、折り畳んで、場所をとらないようにしておくことができる。
【0033】
請求項2の発明に係る作業足場付きプロテクタによれば、作業足場が、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板と、プロテクタの側面部に取り付けられて足場板を水平に支持可能な支持材とからなるため、簡素な構造で、高所作業用の足場を確保することができる。
【0034】
請求項3の発明に係る作業足場付きプロテクタによれば、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板を、駆動装置によって張り出させ、又は折り畳むことの可能な構造であるため、張り出しや折り畳みに手数や労力を必要としない。
【図面の簡単な説明】
【図1】本発明に係る作業足場付きプロテクタの好ましい第一の実施の形態を、既設トンネルの拡幅工事に使用している状態の説明図である。
【図2】図1の形態において作業足場を折り畳んだ状態を示す概略的な斜視図である。
【図3】図1の形態において作業足場をプロテクタから張り出させた状態を示す概略的な斜視図である。
【図4】本発明に係る作業足場付きプロテクタの好ましい第二の実施の形態として、作業足場を折り畳んだ状態を示す説明図である。
【図5】図4の形態において、作業足場を使用している状態を示す説明図である。
【図6】本発明に係る作業足場付きプロテクタの好ましい第三の実施の形態を示す斜視図である。
【図7】第三の実施の形態において、作業足場を折り畳んだ状態を示す要部正面図である。
【図8】第三の実施の形態において、作業足場の張り出し動作の初期状態を示す要部正面図である。
【図9】第三の実施の形態において、作業足場の張り出し動作の過程を示す要部正面図である。
【図10】従来の技術による既設トンネルの拡幅工事を示す説明図である。
【図11】従来の技術によるプロテクタを使用した既設トンネルの拡幅工事を示す説明図である。
【符号の説明】
1 プロテクタ
15 屋根
2 作業足場
21 足場板
21a 水平ヒンジ
22 支持材
22a 鉛直ヒンジ
23 スライドレール
24 遊動支持材
25 スクリュシャフト
26 昇降体
27 駆動装置
28 ジャッキ
a 既設トンネル
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a technique for efficiently performing widening work of an existing tunnel.
[0002]
[Prior art]
Regarding the efficiency of logistics, widening work of existing tunnels may be necessary in response to the increase in the size of vehicles represented by ISO tall marine containers. FIGS. 10 and 11 are explanatory views showing the widening work of the existing tunnel according to the conventional technique, that is, in such widening work, as shown in FIG. Then, a formwork for placing lining concrete is attached along the excavated surface, and lining c with concrete is performed. In the conventional technology, the tunnel is often constructed so that the center of the tunnel b after the widening is substantially concentric with the center of the tunnel a before the widening.
[0003]
However, in such a method, the work area is small, and it is difficult to take care not to block the traffic of general vehicles in the tunnel during the construction period.
[0004]
Therefore, as shown in FIG. 11, if one side of the existing tunnel a is excavated and widened on one side, a large work area can be secured, and work by using a large heavy machine such as a free-section excavator d is performed. The efficiency can be improved, and the construction period can be shortened. In this case, a movable protection facility e called a protector is installed in the existing tunnel a in advance, and the traffic of the general vehicle f and the like and the safety thereof can be secured by the protector e.
[0005]
However, when a large heavy machine such as a free-section excavator d is used in the one-side widening work as shown in FIG. 11, the work area outside the protector e is almost closed by the heavy machine, and other work is performed. It becomes difficult for heavy equipment to pass.
[0006]
Here, the free section excavator d includes a multi-type excavator d that can perform all operations such as excavation, installation of a lock bolt, and lining by spraying concrete, but cannot completely mechanize the work. For example, when a rock bolt is installed near the top of the tunnel, the work of inserting the lock bolt by human power is inevitably required, and a work at a high place by an operator occurs. In the case of ordinary tunnel excavation work, high-altitude work such as rock bolting near the top of the tunnel can be implemented by using a high-altitude work vehicle as a work scaffold, but like tunnel widening work, When the opposite part of the work area outside the protector e is occupied by the large-sized free-section excavator d, the aerial work vehicle as described above cannot be used, and a scaffold for the aerial work is secured by some method. There is a need to.
[0007]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION The present invention has been made in view of the above-described problems, and a technical problem thereof is that, when widening construction of an existing tunnel, a high place without taking up space outside a protector for securing traffic of general vehicles and the like. It is to secure a working scaffold safely.
[0008]
[Means for Solving the Problems]
The conventional technical problem can be effectively solved by the present invention. That is, in the protector with a work scaffold according to the first aspect of the present invention, a foldable work scaffold is attached to a side surface of the protector for securing traffic in the tunnel during widening work of the existing tunnel.
[0009]
According to a second aspect of the present invention, there is provided a protector with a work scaffold according to the first aspect, wherein the work scaffold according to the first aspect is attached to one side of a roof of the protector via a horizontal hinge so as to be able to rotate up and down, and a side surface of the protector. And a support member attached to the section and capable of supporting the scaffold plate horizontally.
[0010]
According to a third aspect of the present invention, there is provided a protector with a work scaffold according to the first aspect, wherein the work scaffold according to the first aspect is attached to one side of a roof of the protector via a horizontal hinge so that the work scaffold can rotate up and down. A support member having an upper end movably connected in a direction perpendicular to the axis of the horizontal hinge, an elevating body movable in a vertical direction, and supporting a lower end of the support material; It is composed of a driving device for reciprocating movement.
[0011]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, preferred embodiments of a protector with a work scaffold according to the present invention will be described with reference to the drawings. FIG. 1 is an explanatory view of a state in which the first embodiment is used for widening work of an existing tunnel, FIG. 2 is a schematic perspective view showing a state in which a work scaffold is folded in this embodiment, and FIG. FIG. 3 is a schematic perspective view showing a state in which a work scaffold is extended from a protector in the present embodiment.
[0012]
First, in FIG. 1, the protector 1 includes a pair of left and right lower girders 11, a plurality of struts 12 and braces (described later) erected on the lower girders 11 at predetermined intervals in the longitudinal direction, and each left strut 12 Are connected between the upper ends of the left supports 12 and the upper ends of the right supports 12 which are parallel to the lower girders 11, 11 and which are connected between the upper ends of the right supports 12 and the upper ends of the right supports 12 respectively. And a pair of left and right vertical beams (not shown) and a flat roof 15 laid on the horizontal beams 14. The protector 1 can be installed in the existing tunnel a, and is constructed so as to form a passage 10 having a width and a height sufficient for a general vehicle f such as a large truck or a passenger car to pass therethrough. Have been.
[0013]
The main components such as the lower girder 11, the struts 12, the braces, the cross beams 14, the vertical beams, and the roof 15 are made of steel, steel, or the like, and have sufficient strength against falling objects generated during construction. I have. Further, by providing wheels (not shown) below the left and right lower girders 11, 11 or the columns 12, the protector 1 can be easily moved with the progress of the tunnel widening work.
[0014]
As shown also in FIGS. 2 and 3, a foldable work scaffold 2 is attached to one side (right or left) of the protector 1 near the end face on the cutting face side of the tunnel excavation. ing. The work scaffold 2 includes a scaffold plate 21 that is attached to one side of a roof 15 of the protector 1 via a horizontal hinge 21a so as to be able to turn up and down, and a width direction of the scaffold plate 21 of the side portions of the protector 1 (the protector 1). (Extending direction of the support member) The support members 22 are pivotally attached to a pair of columns 12 at positions corresponding to the vicinity of both ends via vertical hinges 22a.
[0015]
Further, the support member 22 has a vertical support member 221 supported by the column 12 via a vertical hinge 22a, and extends horizontally from the upper end of the vertical support member 221. It comprises a horizontal support member 222 located at the lower surface height of the scaffold plate 21 and a diagonal member 223 connecting the lower part of the vertical support member 221 and the tip of the horizontal support member 222.
[0016]
In the protector with a work scaffold according to the first embodiment configured as described above, the protector 1 is disposed in the existing tunnel a as shown in FIG. 1, whereby the general vehicle in the tunnel is maintained even during the construction period. In addition to securing traffic such as f, the general vehicle f is protected from falling excavated objects. For the tunnel widening work, a method of one-side widening for excavating one side of the existing tunnel a is adopted. Reference numeral b in FIG. 1 indicates a new tunnel after widening. For this reason, the protector 1 is installed in the existing tunnel a so that the side surface to which the work scaffold 2 is attached faces the work area A side of the widening work, that is, the work scaffold 2 is located on the face side of the tunnel excavation. Placed in
[0017]
For the one-side widening work of the existing tunnel a, a large-sized free-section excavator d capable of excavation, installation of rock bolts, lining by spraying concrete, and the like is used. The work scaffold 2 attached to the side surface of the protector 1 usually has support members 22, 22, each of which is provided with a vertical hinge 22a, as shown in FIG. Can be pivoted to a position substantially parallel to the side surface of the protector 1 and locked, and the scaffolding plate 21 can be kept in a folded state by hanging down on the horizontal hinge 21a as a fulcrum. It does not hinder construction by the free section excavator d or the like.
[0018]
When the worker g needs to perform a high place work such as a work of inserting a lock bolt near the top of the tunnel, as shown in FIG. 3, the scaffold plate 21 is horizontally moved with the horizontal hinge 21a as a fulcrum. In addition, the support members 22 are pivotally fixed about the vertical hinges 22a to positions substantially parallel to the side surfaces of the protector 1, and the lower surface of the scaffold plate 21 is supported, thereby supporting the work scaffold 2. In a usable state. Further, as shown in FIG. 1, a fall prevention fence 21b made of a pipe material or the like is attached to the outer periphery of the scaffold plate 21. In this way, the worker g can perform a high-place work above the work area A on the work platform 2.
[0019]
Next, FIG. 4 is an explanatory view showing a state in which the work scaffold is folded as a preferred second embodiment of the protector with a work scaffold according to the present invention, and FIG. 5 shows a state in which the work scaffold is also used. FIG. This embodiment differs from the first embodiment described above in that the pair of support members 22 are made of a diagonal material that can be attached to and detached from the scaffolding plate 21 and the support 12 of the protector 1. 21b is attached to the scaffolding plate 21 via a hinge 21c. The configuration of other parts is basically substantially the same as that of the first embodiment.
[0020]
Accordingly, the work scaffold 2 normally attaches the support member 22 to the support 12 of the protector 1 vertically by a not-shown locking or fixing means, as shown in FIG. By hanging the fence 21b down from the horizontal hinge 21a and the fence 21b in parallel with the scaffolding plate 21, the folded state can be maintained.
[0021]
When the worker g needs to perform a high-place work such as inserting a lock bolt near the top of the tunnel, as shown in FIG. 5, the scaffold plate 21 is horizontally moved with the horizontal hinge 21a as a fulcrum. And one end of each support member 22 is fixed to the lower surface near the tip of the scaffolding plate 21 via a coupling means such as a bolt, and the other end is fixed to the support 12 of the protector 1 via a coupling means such as a bolt. By doing so, the scaffold plate 21 is supported horizontally. Further, the fence 21b is locked in a vertically raised state. In this way, the worker g can perform a high-place work above the work area A on the work scaffold 2.
[0022]
Next, FIG. 6 is a perspective view showing a third preferred embodiment of the protector with a work scaffold according to the present invention, FIG. 7 is a front view of a main part showing the work scaffold in a folded state, and FIG. 8 is an essential part front view showing an initial state of the overhang operation of the work scaffold, and FIG. 8 is an essential part front view showing the process of the overhang operation of the work scaffold. As shown in FIG. 6, the configuration of the main body of the protector 1 is substantially the same as that of the first and second embodiments described above, and the side portion on one side (right side or left side) of the protector 1. , A foldable work scaffold 2 is attached near an end on the face side of tunnel excavation. Reference numeral 13 denotes a brace connected between the columns 12, 12,... Adjacent to each other in the extension direction of the protector 1 in an X-shape.
[0023]
The work scaffold 2 is mounted on one side of the roof 15 of the protector 1 via a horizontal hinge 21a so as to be able to turn up and down, and near both ends in the width direction (extending direction of the protector 1) on the lower surface of the scaffold plate 21. And a pair of slide rails 23 extending in a direction perpendicular to the axis of the horizontal hinge 21a, and a link pin 24a at the upper end are coupled to the scaffold plate 21 via each slide rail 23 and extend in the direction in which the slide rail 23 extends. A pair of movable floating support members 24, a pair of screw shafts 25 provided vertically along the side surface (for example, the support 12) of the protector 1 at positions corresponding to the slide rails 23, and a pair of screw shafts 25. An elevating body 26 which is screwed and detachably connected to the lower end of the floating support member 24, and each screw shaft 25 is moved around its axis. By rolling, the driving device 27 for reciprocating the lift 26 to the vertical direction, consisting of a jack 28 for displacing to open anchorage plate 21 that is hanging from the horizontal hinge 21a as shown in FIG. 7 outward.
[0024]
The drive device 27 has a built-in electric motor and a speed reducer, and is fixed on the lower spar 11 of the protector 1. The lower end of each screw shaft 25 is connected to the output shaft of the drive device 27 via a joint, and the upper end is connected to the end of the roof 15 of the protector 1 via a bearing 25a as shown in FIG. It is supported by.
[0025]
Therefore, also in the third embodiment having the above-described configuration, the protector 1 is arranged such that the side surface on which the work scaffold 2 is attached faces the work area A side of the widening work in the existing tunnel. 2 is arranged so as to be located on the face side of the tunnel excavation, thereby securing traffic of general vehicles and the like in the tunnel even during the construction period, and protecting general vehicles and the like from falling of excavated objects. .
[0026]
Normally, the work scaffold 2 attached to the side surface of the protector 1 removes the link pin 24b at the lower end of the floating support member 24 from the pivotal connection 26a formed on the elevating body 26, as shown in FIG. Accordingly, the scaffolding plate 21 can be kept in a folded state by hanging down with the horizontal hinge 21a as a fulcrum, so that the tunnel widening work by a free-section excavator or the like is not hindered. At this time, the output shaft 28a of the jack 28 is at the most retracted position.
[0027]
When a worker needs to perform a high-place work such as inserting a lock bolt near the top of the tunnel, the work scaffold 2 is extended from the roof 15 of the protector 1 as shown in FIG. In order to protrude the work scaffold 2, first, as shown in FIG. 8, the link pin 24 b at the lower end of the floating support 24 is pivotally connected to a pivot 26 a formed on the elevating body 26, and By causing the output shaft 28a to protrude, the scaffold plate 21 is displaced so as to open outward with the horizontal hinge 21a as a fulcrum. Then, along with this, the link pin 24 a at the upper end of the floating support member 24 relatively moves along the slide rail 23 formed on the scaffold plate 21.
[0028]
Here, when the angle θ formed by the slide rail 23 and the floating support member 24 becomes a predetermined size, the link pin 24a at the upper end of the floating support member 24 is connected to the fulcrum of the scaffold plate 21 by the horizontal hinge 21a and the floating support member 24. The screw shaft 25 is displaced to a position outside the straight line L connecting the connecting portion (link pin 24b) with the lifting / lowering body 26 at this time. 26 is rotated in the upward direction. Then, the lifting force of the elevating body 26 is transmitted from the link pins 24a to the scaffold plate 21 via the floating support members 24, and as shown in FIG. 9, the scaffold plate 21 moves outward with the horizontal hinge 21a as a fulcrum. Opening, that is, the angle θ increases. The output shaft 28a of the jack 8 is retracted.
[0029]
Then, in the process in which the scaffolding plate 21 is opened outward by the lifting of the elevating body 26, as shown by an arrow R in FIG. 8, the link pin 24a at the upper end of the floating support member 24 is also moved outward around the horizontal hinge 21a. Since it is displaced, the floating support member 24 gradually falls down. Therefore, when the scaffolding plate 21 is opened to a certain angle close to horizontal, the angle θ between the slide rail 23 and the floating support member 24 exceeds 90 degrees, and at that time, the horizontal hinge of the slide rail 23 The link pin 24a that has pushed up the end near the 21a moves to the end of the slide rail 23 opposite to the horizontal hinge 21a.
[0030]
Then, as shown by the dashed line in FIG. 9, when the elevating body 26 rises until the scaffolding plate 21 becomes substantially horizontal, the driving device 27 is stopped. As shown in FIG. 6, a fall prevention fence 21b made of a pipe material or the like is attached to the outer periphery of the scaffold 21. The fence 21b can also be of a foldable type.
[0031]
When the work platform 2 is folded after the worker finishes working at a high place, the screw shaft 25 is rotated by the driving device 27 in the opposite direction to the above-described case, and the lifting body 26 is lowered.
[0032]
【The invention's effect】
According to the protector with a work scaffold according to the first aspect of the present invention, a folding work scaffold is attached to a side surface of the protector for securing traffic in the tunnel during widening work of the existing tunnel. By using a large heavy machine such as a free-section excavator for tunnel widening work, even if an aerial work vehicle cannot be used as a scaffold, a foldable work scaffold can be extended when necessary to work Can be secured, otherwise it can be folded down to save space.
[0033]
According to the protector with a work scaffold according to the second aspect of the present invention, the work scaffold is attached to one side of the roof of the protector via a horizontal hinge so as to be able to turn up and down, and is attached to the side surface of the protector. Since the scaffold is made of a support member capable of horizontally supporting the scaffold plate, it is possible to secure a scaffold for working at heights with a simple structure.
[0034]
According to the protector with a work scaffold according to the invention of claim 3, the scaffold plate attached to one side of the roof of the protector so as to be able to turn up and down via a horizontal hinge can be extended or folded by the driving device. Since it is a simple structure, no effort or labor is required for overhanging or folding.
[Brief description of the drawings]
FIG. 1 is an explanatory view of a state in which a first embodiment of a protector with a work scaffold according to the present invention is used for widening work of an existing tunnel.
FIG. 2 is a schematic perspective view showing a state where the work scaffold is folded in the embodiment of FIG. 1;
FIG. 3 is a schematic perspective view showing a state in which a work platform is extended from a protector in the embodiment of FIG. 1;
FIG. 4 is an explanatory view showing a state in which the work scaffold is folded as a preferred second embodiment of the protector with a work scaffold according to the present invention.
FIG. 5 is an explanatory diagram showing a state in which a work scaffold is used in the embodiment of FIG. 4;
FIG. 6 is a perspective view showing a protector with a working scaffold according to a third preferred embodiment of the present invention.
FIG. 7 is a main part front view showing a state where the work scaffold is folded in the third embodiment.
FIG. 8 is a main part front view showing an initial state of a projecting operation of a work scaffold in the third embodiment.
FIG. 9 is a main part front view showing a process of a projecting operation of a work scaffold in the third embodiment.
FIG. 10 is an explanatory view showing widening work of an existing tunnel according to a conventional technique.
FIG. 11 is an explanatory diagram showing widening work of an existing tunnel using a protector according to a conventional technique.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Protector 15 Roof 2 Work scaffold 21 Scaffold board 21a Horizontal hinge 22 Support material 22a Vertical hinge 23 Slide rail 24 Floating support material 25 Screw shaft 26 Elevating body 27 Drive device 28 Jack a Existing tunnel

Claims (3)

既設トンネルの拡幅工事においてトンネル内の交通を確保するためのプロテクタの側面部に、折り畳み式の作業足場が取り付けられたことを特徴とする作業足場付きプロテクタ。A protector with a work scaffold, characterized in that a foldable work scaffold is attached to a side portion of the protector for securing traffic in the tunnel during widening work of an existing tunnel. 作業足場が、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板と、前記プロテクタの側面部に取り付けられ前記足場板を水平に支持可能な支持材とからなることを特徴とする請求項1に記載の作業足場付きプロテクタ。A work scaffold is composed of a scaffold plate attached to one side of the roof of the protector via a horizontal hinge so as to be rotatable up and down, and a support member attached to a side portion of the protector and capable of horizontally supporting the scaffold plate. The protector with a work scaffold according to claim 1, wherein: 作業足場が、プロテクタの屋根の一側に水平ヒンジを介して俯仰回転可能に取り付けられた足場板と、この足場板に上端が前記水平ヒンジの軸心と垂直な方向へ移動可能に連結された支持材と、鉛直方向へ移動可能であって前記支持材の下端を支承する昇降体と、この昇降体を鉛直方向へ往復移動させる駆動装置とからなることを特徴とする請求項1に記載の作業足場付きプロテクタ。A work scaffold, a scaffold plate attached to one side of the protector roof via a horizontal hinge so as to be capable of elevating rotation, and an upper end connected to the scaffold plate so as to be movable in a direction perpendicular to the axis of the horizontal hinge; 2. The supporting device according to claim 1, further comprising: a supporting member, a vertically movable body that is movable in a vertical direction and supports a lower end of the supporting material, and a driving device that reciprocates the vertically movable body in a vertical direction. Protector with work scaffold.
JP2002252265A 2002-08-30 2002-08-30 Protector with working scaffold Expired - Lifetime JP3922636B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002252265A JP3922636B2 (en) 2002-08-30 2002-08-30 Protector with working scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002252265A JP3922636B2 (en) 2002-08-30 2002-08-30 Protector with working scaffold

Publications (2)

Publication Number Publication Date
JP2004092093A true JP2004092093A (en) 2004-03-25
JP3922636B2 JP3922636B2 (en) 2007-05-30

Family

ID=32058583

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002252265A Expired - Lifetime JP3922636B2 (en) 2002-08-30 2002-08-30 Protector with working scaffold

Country Status (1)

Country Link
JP (1) JP3922636B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020016462A1 (en) * 2018-07-16 2020-01-23 Encofrados J. Alsina, S.A. Fall protection device
CN114233346A (en) * 2021-12-10 2022-03-25 华北科技学院(中国煤矿安全技术培训中心) A temporary support device for roadway excavation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020016462A1 (en) * 2018-07-16 2020-01-23 Encofrados J. Alsina, S.A. Fall protection device
US11459780B2 (en) 2018-07-16 2022-10-04 Encofrados J. Alsina, S.A. Fall protection device
CN114233346A (en) * 2021-12-10 2022-03-25 华北科技学院(中国煤矿安全技术培训中心) A temporary support device for roadway excavation
CN114233346B (en) * 2021-12-10 2023-11-24 华北科技学院(中国煤矿安全技术培训中心) A temporary support device for tunnel excavation

Also Published As

Publication number Publication date
JP3922636B2 (en) 2007-05-30

Similar Documents

Publication Publication Date Title
JP7568805B2 (en) Method for moving heavy objects using a heavy object moving device and a heavy object moving device
US20060219478A1 (en) Construction
WO1996007795A1 (en) Bridge construction machinery and method for constructing bridges
CN113123246A (en) Bridge girder erection machine dismantling method
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP2006028881A (en) Self-propelled PC slab erection machine and PC slab erection method
CN115095269B (en) Novel insulating operation platform
JP2004092093A (en) Protector with work scaffold
CN211973103U (en) Platform and system for bridge bottom detection, maintenance inspection and maintenance
CN114856607B (en) Tunnel working platform vehicle and use method thereof, tunnel maintenance train
CN215366847U (en) Construction platform under portable foldable roof beam
CN212270670U (en) Movable hanging basket for bridge construction
KR200201613Y1 (en) Hight place working device for mount ing pier checking rail
JP7779764B2 (en) Upper column erection support device and upper column erection support method
JP3245221U (en) downstairs work vehicle
CN114412154B (en) Operating system for dismantling vertical mast
CN222668207U (en) A support structure for extremely high ground stress and ultra-long mountain tunnel
CN221400525U (en) Gate-type platform device for repairing segments in shield tunneling
CN112502212B (en) Rapid assembly platform suitable for taking soil in foundation pit and complete construction process
JP3234442B2 (en) Building and scrap type building method
CN223167925U (en) Liftable sheep horn device for movable crossing frame
JP2024170916A (en) Assembly remaining formwork, manufacturing method of remaining formwork, manufacturing method of floor slab with wall parapet
CN121250786A (en) Temporary construction platform for hydraulic climbing formwork and application method thereof
JPS62261000A (en) Truck for repairing tunnel
JP2024129523A (en) Protective curtain material

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20020906

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20021010

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20021114

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040915

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060922

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060927

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070117

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070216

R150 Certificate of patent or registration of utility model

Ref document number: 3922636

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140302

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term