[go: up one dir, main page]

JP2002339571A - Adjusting jig for measurement and correction on plumbing to plumb for reinforcement - Google Patents

Adjusting jig for measurement and correction on plumbing to plumb for reinforcement

Info

Publication number
JP2002339571A
JP2002339571A JP2001147458A JP2001147458A JP2002339571A JP 2002339571 A JP2002339571 A JP 2002339571A JP 2001147458 A JP2001147458 A JP 2001147458A JP 2001147458 A JP2001147458 A JP 2001147458A JP 2002339571 A JP2002339571 A JP 2002339571A
Authority
JP
Japan
Prior art keywords
steel column
erection piece
pressing
jig
jack device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001147458A
Other languages
Japanese (ja)
Other versions
JP3619170B2 (en
Inventor
Yasuo Wada
保雄 和田
Takaaki Shibamoto
高明 芝本
Shuji Ota
修二 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elephant Chain Block Co Ltd
Original Assignee
Elephant Chain Block Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elephant Chain Block Co Ltd filed Critical Elephant Chain Block Co Ltd
Priority to JP2001147458A priority Critical patent/JP3619170B2/en
Publication of JP2002339571A publication Critical patent/JP2002339571A/en
Application granted granted Critical
Publication of JP3619170B2 publication Critical patent/JP3619170B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an adjusting jig for measurement and correction on a plumbing to plumb for a reinforcement capable of surely adjusting a place between a steel-framed column on the lower side and the steel-framed column on the upper side by simple constitution even in the case of the assembly of a cross beam or the like. SOLUTION: An upper-side mounting section 15 capable of being installed to the upper-side erection piece 75 of the steel-framed column 73 on the upper side and a lower-side mounting section 16 capable of being secured to the lower- side erection piece 74 of the steel-framed column 12 on the lower side are mounted on the adjusting jig 1 while a hydraulic type right-side jack device 36 and a hydraulic type left-side jack device 64 pushing an upper-side erection piece 75 in the thickness direction and a hydraulic type upper-side jack device 66 pushing the upper-side erection piece 75 towards a lower end section from an upper end section are set up.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、下側の鉄骨柱に上
側の鉄骨柱を接合するために用いられる鉄骨建入直し調
整治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jig for refitting a steel frame used for joining an upper steel column to a lower steel column.

【0002】[0002]

【従来の技術】従来より、建設現場において、下側の鉄
骨柱に上側の鉄骨柱を接合する時には、まず、クレーン
によって上側の鉄骨柱を吊り上げて、下側の鉄骨柱の上
方に配置した後、調整治具を用いて、これら下側の鉄骨
柱と上側の鉄骨柱とを連結させた後、その下側の鉄骨柱
の上端部と上側の鉄骨柱の下端部とを溶接または高力ボ
ルトによって、接合するようにしている。
2. Description of the Related Art Conventionally, when joining an upper steel column to a lower steel column at a construction site, the upper steel column is first lifted by a crane, and then placed above the lower steel column. After connecting the lower steel column and the upper steel column using an adjustment jig, the upper end of the lower steel column and the lower end of the upper steel column are welded or bolted with high strength. To join.

【0003】このような調整治具としては、たとえば、
特開平8−189201号公報に記載されるものが知ら
れている。すなわち、特開平8−189201号公報に
記載される調整治具は、エレクションピースの側面を遊
動自在に挟持できるように構成されており、この挟持部
分に、その先端がエレクションピースの側面に対接可能
な水平位置調整ボルトが螺合されている。そして、この
調整治具では、下側の鉄骨柱に上側の鉄骨柱を連結する
時に、この水平位置調整ボルトを進退させてエレクショ
ンピースの側面を調整しながら押圧することにより、下
側の鉄骨柱に対する上側の鉄骨柱の水平位置を調整する
ようにしている。
As such an adjusting jig, for example,
Japanese Patent Application Laid-Open No. 8-189201 is known. That is, the adjustment jig described in Japanese Patent Application Laid-Open No. 8-189201 is configured so that the side surface of the erection piece can be movably pinched, and the front end of the adjustment jig contacts the side surface of the erection piece. Possible horizontal position adjustment bolts are screwed. And, in this adjusting jig, when connecting the upper steel column to the lower steel column, the horizontal position adjusting bolt is advanced and retracted and pressed while adjusting the side surface of the erection piece, so that the lower steel column is pressed. The horizontal position of the upper steel column with respect to is adjusted.

【0004】[0004]

【発明が解決しようとする課題】しかし、実際の現場作
業では、下側の鉄骨柱に接合された上側の鉄骨柱に、横
梁などが組み付けられる場合においては、その横梁の組
み付け精度の誤差や、材料の残留応力、さらには、溶接
時の引っ張り応力などによって、下側の鉄骨柱と上側の
鉄骨柱との間の接合部分に変形応力が作用して、下側の
鉄骨柱と上側の鉄骨柱との接合部分において、水平方向
の位置ずれが生じたりあるいは下側の鉄骨柱に対して上
側の鉄骨柱が浮き上がってしまう場合がある。
However, in the actual work on site, when a cross beam or the like is mounted on the upper steel column joined to the lower steel column, there is an error in the mounting accuracy of the cross beam, Deformation stress acts on the joint between the lower steel column and the upper steel column due to the residual stress of the material and the tensile stress at the time of welding, etc., and the lower steel column and the upper steel column In the joint portion with the above, there is a case where a horizontal displacement occurs or the upper steel column rises with respect to the lower steel column.

【0005】そのような場合において、特開平8−18
9201号公報に記載される調整治具では、水平位置調
整ボルトの進退によってエレクションピースを押圧する
ため、エレクションピースに対してあまり大きな押圧力
を加えることができず、そのような変形応力に起因する
位置ずれなどを調整することができないという不具合が
ある。
In such a case, Japanese Patent Application Laid-Open No.
In the adjusting jig described in Japanese Patent Application Laid-Open No. 9201, the erection piece is pressed by the forward / backward movement of the horizontal position adjustment bolt, so that an excessively large pressing force cannot be applied to the erection piece. There is a problem that it is not possible to adjust the displacement or the like.

【0006】本発明は、このような事情に鑑みなされた
ものであり、その目的とするところは、簡易な構成によ
って、下側の鉄骨柱と上側の鉄骨柱との間の位置調整
を、たとえ横梁などが組み付けられる場合であっても、
確実に行なうことのできる鉄骨建入直し調整治具を提供
することにある。
The present invention has been made in view of such circumstances, and an object of the present invention is to adjust the position between a lower steel column and an upper steel column by a simple configuration. Even when cross beams are installed,
An object of the present invention is to provide a steel frame re-installation adjustment jig that can be reliably performed.

【0007】[0007]

【課題を解決するための手段】上記の目的を達成するた
め、請求項1に記載の発明は、エレクションピースが取
り付けられている下側の鉄骨柱に、エレクションピース
が取り付けられている上側の鉄骨柱を接合するために用
いられる鉄骨建入直し調整治具であって、前記上側の鉄
骨柱のエレクションピースに取付可能な上側取付部と、
前記下側の鉄骨柱のエレクションピースに取付可能な下
側取付部と、前記上側の鉄骨柱のエレクションピースお
よび前記下側の鉄骨柱のエレクションピースの少なくと
もいずれかを、流体の圧力により、その厚さ方向に押圧
するための厚さ方向押圧手段とを備えていることを特徴
としている。
In order to achieve the above object, an invention according to claim 1 is characterized in that an upper steel frame to which an erection piece is attached is attached to a lower steel column to which an erection piece is attached. A steel frame refitting adjustment jig used to join the columns, an upper mounting portion that can be mounted to the erection piece of the upper steel column,
The lower mounting portion attachable to the erection piece of the lower steel column, and at least one of the erection piece of the upper steel column and the erection piece of the lower steel column, the thickness of which is increased by the pressure of the fluid. And a thickness direction pressing means for pressing in the vertical direction.

【0008】このような構成によると、上側取付部を上
側の鉄骨柱のエレクションピースに取り付けるととも
に、下側取付部を下側の鉄骨柱のエレクションピースに
取り付けて、厚さ方向押圧手段によって、上側の鉄骨柱
のエレクションピースおよび下側の鉄骨柱のエレクショ
ンピースの少なくともいずれかを、その厚さ方向に調整
しながら押圧すれば、下側の鉄骨柱に対する上側の鉄骨
柱の目地合わせを、簡易かつ確実に行なうことができ
る。しかも、厚さ方向押圧手段は、流体の圧力によっ
て、大きな押圧力で押圧することができるので、たとえ
ば、下側の鉄骨柱に接合された上側の鉄骨柱に、横梁な
どが組み付けられた場合において、その横梁の組み付け
精度の誤差や、材料の残留応力、さらには、溶接時の引
っ張り応力などによって、下側の鉄骨柱と上側の鉄骨柱
との間の接合部分に変形応力が作用して、下側の鉄骨柱
と上側の鉄骨柱との接合部分において、目地の位置ずれ
が生じた場合であっても、その目地の位置ずれを、大き
な押圧力で、簡易かつ確実に調整することができる。
According to such a configuration, the upper mounting portion is mounted on the erection piece of the upper steel column, and the lower mounting portion is mounted on the erection piece of the lower steel column. By pressing at least one of the erection piece of the steel column and the erection piece of the lower steel column in the thickness direction thereof, the joint of the upper steel column to the lower steel column can be easily and simply adjusted. It can be performed reliably. In addition, since the thickness direction pressing means can be pressed with a large pressing force by the pressure of the fluid, for example, in the case where a horizontal beam or the like is assembled to the upper steel column joined to the lower steel column. , Due to errors in the assembly accuracy of the cross beams, residual stress of the material, and furthermore, tensile stress during welding, etc., deforming stress acts on the joint between the lower steel column and the upper steel column, Even when joint displacement occurs at the joint between the lower steel column and the upper steel column, the joint displacement can be easily and reliably adjusted with a large pressing force. .

【0009】また、請求項2に記載の発明は、請求項1
に記載の発明において、前記厚さ方向押圧手段は、ユニ
ットとして形成され、前記鉄骨建入直し調整治具の治具
本体に対して着脱自在に取り付けられていることを特徴
としている。
The invention described in claim 2 is the first invention.
In the invention described in (1), the thickness direction pressing means is formed as a unit, and is detachably attached to a jig main body of the steel frame refitting adjustment jig.

【0010】このような構成によると、厚さ方向押圧手
段を簡易に装備することができるとともに、不要時には
取り外すこともできるので、その目的および用途によ
り、最適の態様で使用することができる。
According to such a configuration, the thickness direction pressing means can be easily provided and can be detached when it is not necessary, so that it can be used in an optimum manner according to its purpose and application.

【0011】また、請求項3に記載の発明は、請求項1
または2に記載の発明において、前記厚さ方向押圧手段
は、前記エレクションピースに対して、少なくともいず
れか一方側に設けられ、前記エレクションピースを押圧
するための押圧部材と、前記押圧部材を作動させるため
の操作部材とを備えており、前記操作部材は、前記エレ
クションピースが前記鉄骨柱に向かって延びる方向か
ら、操作可能に構成されていることを特徴としている。
[0011] The invention according to claim 3 is based on claim 1.
In the invention described in (2), the thickness direction pressing means is provided on at least one side of the erection piece, and operates a pressing member for pressing the erection piece and the pressing member. And an operating member for operating the erection piece from a direction in which the erection piece extends toward the steel column.

【0012】このような構成によると、操作部材を、エ
レクションピースが延びる最も操作しやすい方向から操
作して、押圧部材によってエレクションピースを押圧す
ることができるので、作業性の向上を図ることができ
る。
According to such a configuration, the operating member can be operated from the direction in which the erection piece is most easily operated and the erection piece can be pressed by the pressing member, so that the workability can be improved. .

【0013】また、請求項4に記載の発明は、エレクシ
ョンピースが取り付けられている下側の鉄骨柱に、エレ
クションピースが取り付けられている上側の鉄骨柱を接
合するために用いられる鉄骨建入直し調整治具であっ
て、前記上側の鉄骨柱のエレクションピースに取付可能
な上側取付部と、前記下側の鉄骨柱のエレクションピー
スに取付可能な下側取付部と、前記上側の鉄骨柱のエレ
クションピースの上端部を、流体の圧力により、下端部
に向けて押圧するための下方押圧手段を備えていること
を特徴としている。
According to a fourth aspect of the present invention, there is provided a steel frame re-installation used for joining an upper steel column to which an erection piece is attached to a lower steel column to which an erection piece is attached. An adjustment jig, an upper mounting portion mountable to an erection piece of the upper steel column, a lower mounting portion mountable to an erection piece of the lower steel column, and erection of the upper steel column. It is characterized in that a lower pressing means for pressing the upper end of the piece toward the lower end by the pressure of the fluid is provided.

【0014】このような構成によると、上側取付部を上
側の鉄骨柱のエレクションピースに取り付けるととも
に、下側取付部を下側の鉄骨柱のエレクションピースに
取り付けて、下方押圧手段によって、上側の鉄骨柱のエ
レクションピースの上端部を、下端部に向けて押圧すれ
ば、上側の鉄骨柱を下側の鉄骨柱に対して密着させて連
結することができ、下側の鉄骨柱に上側の鉄骨柱を良好
な姿勢で接合することができる。しかも、下方押圧手段
は、流体の圧力によって、大きな押圧力で押圧すること
ができるので、たとえば、下側の鉄骨柱に接合された上
側の鉄骨柱に、横梁などが組み付けられた場合におい
て、その横梁の組み付け精度の誤差や、材料の残留応
力、さらには、溶接時の引っ張り応力などによって、下
側の鉄骨柱と上側の鉄骨柱との間の接合部分に変形応力
が作用して、下側の鉄骨柱と上側の鉄骨柱との接合部分
において、下側の鉄骨柱に対して上側の鉄骨柱が浮き上
がってしまっても、再び大きな押圧力で押圧することに
より、簡易かつ確実に密着させることができる。
According to such a configuration, the upper mounting portion is mounted on the erection piece of the upper steel column, and the lower mounting portion is mounted on the erection piece of the lower steel column. By pressing the upper end of the erection piece of the column toward the lower end, the upper steel column can be tightly connected to the lower steel column, and the upper steel column can be connected to the lower steel column. Can be joined in a good posture. Moreover, since the downward pressing means can be pressed with a large pressing force by the pressure of the fluid, for example, when a cross beam or the like is assembled to the upper steel column joined to the lower steel column, Deformation stress acts on the joint between the lower steel column and the upper steel column due to errors in the mounting accuracy of the cross beam, residual stress of the material, and tensile stress during welding, etc. Even if the upper steel column rises with respect to the lower steel column at the joint between the steel column and the upper steel column, it can be easily and reliably adhered by pressing again with a large pressing force. Can be.

【0015】また、請求項5に記載の発明は、請求項4
に記載の発明において、前記下方押圧手段は、ユニット
として形成され、前記鉄骨建入直し調整治具の治具本体
に対して着脱自在に取り付けられていることを特徴とし
ている。
The invention described in claim 5 is the invention according to claim 4.
In the invention described in (1), the downward pressing means is formed as a unit, and is detachably attached to a jig main body of the steel frame refitting adjustment jig.

【0016】このような構成によると、下方押圧手段を
簡易に装備することができるとともに、不要時には取り
外すこともできるので、その目的および用途により、最
適の態様で使用することができる。
According to such a configuration, the downward pressing means can be easily provided and can be detached when it is not needed, so that it can be used in an optimum manner according to its purpose and application.

【0017】また、請求項6に記載の発明は、請求項4
または5に記載の発明において、前記下方押圧手段は、
前記エレクションピースを押圧するための押圧部材と、
前記押圧部材を作動させるための操作部材とを備えてお
り、前記操作部材は、前記エレクションピースが前記鉄
骨柱に向かって延びる方向から、操作可能に構成されて
いることを特徴としている。
Further, the invention described in claim 6 is the same as claim 4.
In the invention described in the item (5), the downward pressing means includes:
A pressing member for pressing the erection piece,
An operating member for operating the pressing member, wherein the operating member is configured to be operable from a direction in which the erection piece extends toward the steel column.

【0018】このような構成によると、操作部材を、エ
レクションピースが延びる最も操作しやすい方向から操
作して、押圧部材によってエレクションピースを押圧す
ることができるので、作業性の向上を図ることができ
る。
According to such a configuration, the operating member can be operated from the direction in which the erection piece is most easily extended, and the erection piece can be pressed by the pressing member, so that the workability can be improved. .

【0019】また、請求項7に記載の発明は、請求項1
ないし6のいずれかに記載の発明において、前記下側取
付部と前記上側取付部との間に設けられ、前記上側の鉄
骨柱のエレクションピースの下端部を、流体の圧力によ
り、上端部に向けて押圧するための上方押圧手段を備え
ていることを特徴としている。
The invention according to claim 7 is the first invention.
7. The invention according to any one of claims 6 to 6, wherein a lower end of the erection piece of the upper steel pillar is provided between the lower mounting portion and the upper mounting portion, and a lower end of the erection piece is directed toward an upper end by a pressure of fluid. And an upper pressing means for pressing by pressing.

【0020】このような構成によると、上方押圧手段に
よって、上側の鉄骨柱のエレクションピースの下端部
を、上端部に向けて押圧すれば、上側の鉄骨柱の下側の
鉄骨柱に対する傾きを修正することができる。しかも、
上方押圧手段は、流体の圧力によって、大きな押圧力で
押圧することができるので、たとえば、下側の鉄骨柱に
接合された上側の鉄骨柱に、横梁などが組み付けられた
場合において、その横梁の組み付け精度の誤差や、材料
の残留応力、さらには、溶接時の引っ張り応力などによ
って、下側の鉄骨柱と上側の鉄骨柱との間の接合部分に
変形応力が作用して、下側の鉄骨柱と上側の鉄骨柱との
接合部分において、下側の鉄骨柱に対して上側の鉄骨柱
の傾きが変化しても、その傾きの変化を、大きな押圧力
で、簡易かつ確実に調整することができる。
According to this configuration, when the lower end of the erection piece of the upper steel column is pressed toward the upper end by the upper pressing means, the inclination of the upper steel column with respect to the lower steel column is corrected. can do. Moreover,
Since the upper pressing means can press with a large pressing force by the pressure of the fluid, for example, when a cross beam or the like is assembled to the upper steel column joined to the lower steel column, Due to errors in assembly accuracy, residual stress of the material, and tensile stress during welding, deformation stress acts on the joint between the lower steel column and the upper steel column, and the lower steel frame Even if the inclination of the upper steel column changes with respect to the lower steel column at the joint between the column and the upper steel column, the change in the inclination can be easily and reliably adjusted with a large pressing force. Can be.

【0021】[0021]

【発明の実施の形態】図1は、本発明の鉄骨建入直し調
整治具の一実施形態としての調整治具を示す斜視図、図
2は、その正面図、図3は、その左側面図、図8は、そ
の使用状態における正断面図である。これら図1ないし
図3および図8を参照して、調整治具を説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a perspective view showing an adjustment jig as one embodiment of a steel frame re-installation adjustment jig according to the present invention, FIG. 2 is a front view thereof, and FIG. FIG. 8 and FIG. 8 are front sectional views in the use state. The adjustment jig will be described with reference to FIGS. 1 to 3 and FIG.

【0022】図1ないし図3において、この調整治具1
は、治具本体としての本体ユニット2、右側押圧ユニッ
ト3、左側押圧ユニット4および上側押圧ユニット5を
備えている。本体ユニット2は、本体フレーム6と、上
方押圧手段としての第1ジャッキ装置7とを備えてい
る。
In FIGS. 1 to 3, this adjusting jig 1
Includes a main unit 2, a right pressing unit 3, a left pressing unit 4, and an upper pressing unit 5 as a jig main body. The main body unit 2 includes a main body frame 6 and a first jack device 7 as an upward pressing means.

【0023】本体フレーム6は、互いに所定の間隔を隔
てて対向する金属製の右側ベースプレート8および左側
ベースプレート9とこれら右側ベースプレート8および
左側ベースプレート9の上端部を連結する上側ベースプ
レート10とが一体として形成される下方が開放される
略逆U字板状のベースフレーム11と、右側ベースプレ
ート8と左側ベースプレート9との間を前面側において
連結する第1連結部12、第2連絡部13および第3連
絡部14とを備えている。
The main body frame 6 is formed integrally with a right metal base plate 8 and a left metal base plate 9 facing each other at a predetermined interval, and an upper base plate 10 connecting the upper end portions of the right metal base plate 8 and the left metal base plate 9. A first connecting portion 12, a second connecting portion 13, and a third connecting portion for connecting the base frame 11 having a substantially inverted U-shaped plate shape whose lower side is opened and the right base plate 8 and the left base plate 9 on the front side. And a unit 14.

【0024】そして、右側ベースプレート8および左側
ベースプレート9における上部が、後述する上側エレク
ションピース75に取付可能な上側取付部15とされ、
また、右側ベースプレート8および左側ベースプレート
9における下部が、後述する下側エレクションピース7
4に取付可能な下側取付部16とされている。
The upper portions of the right base plate 8 and the left base plate 9 serve as an upper mounting portion 15 which can be mounted on an upper erection piece 75 which will be described later.
Further, lower portions of the right base plate 8 and the left base plate 9 correspond to a lower erection piece 7 described later.
The lower mounting portion 16 can be mounted on the lower mounting portion 4.

【0025】また、右側ベースプレート8における上側
取付部15には、図8に示すように、後述する固定ボル
ト61を螺着するための第1螺着孔17と、その第1螺
着孔17の下方に形成され、後述する上側挿通ボルト3
0を螺着するための第2螺着孔18と、後述する右側ジ
ャッキ装置36の押圧筒体47を挿通するための第1挿
通孔19とが形成されている。
As shown in FIG. 8, a first screw hole 17 for screwing a fixing bolt 61 to be described later and a first screw hole 17 of the first screw hole 17 are formed in the upper mounting portion 15 of the right base plate 8. Upper insertion bolts 3 formed below and described later
A second screwing hole 18 for screwing the screw 0 is formed, and a first insertion hole 19 for inserting a pressing cylinder 47 of the right jack device 36 described later.

【0026】また、右側ベースプレート8における下側
取付部16には、後述する固定ボルト62を螺着するた
めの第3螺着孔20と、その第3螺着孔20の下方に形
成され、後述する下側挿通ボルト31を螺着するための
第4螺着孔21とが形成されている。
The lower mounting portion 16 of the right base plate 8 is formed with a third screw hole 20 for screwing a fixing bolt 62, which will be described later, and below the third screw hole 20. And a fourth screw hole 21 for screwing the lower insertion bolt 31 to be screwed.

【0027】また、左側ベースプレート9における上側
取付部15には、第1螺着孔17と対向し、後述する固
定ボルト61を螺着するための第5螺着孔22と、その
第5螺着孔22の下方に形成され、後述する上側挿通ボ
ルト30を螺着するために第2螺着孔18と対向する第
6螺着孔23と、第1挿通孔19と対向し、後述する左
側ジャッキ装置64の押圧筒体47を挿通するための第
2挿通孔24とが形成されている。
The upper mounting portion 15 of the left base plate 9 is opposed to the first screw hole 17 and has a fifth screw hole 22 for screwing a fixing bolt 61 to be described later. A sixth jack hole 23 formed below the hole 22 and opposed to the second screw hole 18 for screwing an upper insertion bolt 30 described later, and a first jack 19 opposed to the first insertion hole 19. The second insertion hole 24 for inserting the pressing cylinder 47 of the device 64 is formed.

【0028】また、左側ベースプレート9における下側
取付部16には、第3螺着孔20と対向し、後述する固
定ボルト62を螺着するために第7螺着孔25と、その
第7螺着孔25の下方に形成され、後述する下側挿通ボ
ルト31を螺着するために第4螺着孔21と対向する第
8螺着孔26と、その第8螺着孔26の前方に形成さ
れ、後述する下側押圧ボルト32を螺着するための第9
螺着孔27とが形成されている。
The lower mounting portion 16 of the left base plate 9 faces the third screw hole 20 and has a seventh screw hole 25 for screwing a fixing bolt 62, which will be described later, and a seventh screw hole 25. An eighth screw hole 26 formed below the attachment hole 25 and opposed to the fourth screw hole 21 for screwing a lower insertion bolt 31 described later, and formed in front of the eighth screw hole 26. And a ninth screw-down screw 32 for screwing a lower pressing bolt 32 described later.
A screw hole 27 is formed.

【0029】また、上側ベースプレート10には、後述
する上側ジャッキ装置66の押圧筒体47を挿通するた
めの第3挿通孔28が形成されている。
The upper base plate 10 has a third insertion hole 28 through which a pressing cylinder 47 of an upper jack device 66 described later is inserted.

【0030】また、図1に示すように、第1連結部12
は、右側ベースプレート8および左側ベースプレート9
における上側取付部15、より具体的には、第1挿通孔
19および第2挿通孔24が形成される部分において、
略コ字状に前方に向かって突出するように形成されてお
り、その前面部には、後述する上側押圧ボルト33を螺
着するための第10螺着孔29が形成されている。
Further, as shown in FIG.
Are the right base plate 8 and the left base plate 9
In the upper mounting portion 15, more specifically, at the portion where the first through hole 19 and the second through hole 24 are formed,
It is formed so as to project forward in a substantially U-shape, and a tenth screw hole 29 for screwing an upper pressing bolt 33 to be described later is formed on the front surface thereof.

【0031】また、第2連結部13および第3連結部1
4は、右側ベースプレート8および左側ベースプレート
9における下側取付部16において、互いに所定の間隔
を隔てて上下方向に平行する状態で、略コ字状に前方に
向かって突出するように形成されている。
The second connecting portion 13 and the third connecting portion 1
Numeral 4 is formed on the lower mounting portion 16 of the right base plate 8 and the left base plate 9 so as to protrude forward in a substantially U shape in a state of being parallel to the up-down direction at a predetermined interval from each other. .

【0032】そして、図8に示すように、右側ベースプ
レート8の第2螺着孔18および左側ベースプレート9
の第6螺着孔23には、上側エレクションピース75の
上側挿通孔76に挿通される上側挿通ボルト30が螺着
されるとともに、右側ベースプレート8の第4螺着孔2
1および左側ベースプレート9の第8螺着孔26には、
下側エレクションピース74の下側挿通孔77に挿通さ
れる下側挿通ボルト31が螺着される。
Then, as shown in FIG. 8, the second screw hole 18 of the right base plate 8 and the left base plate 9
The upper insertion bolt 30 inserted into the upper insertion hole 76 of the upper erection piece 75 is screwed into the sixth screw hole 23, and the fourth screw hole 2 of the right base plate 8 is
In the first and the eighth screw holes 26 of the left base plate 9,
The lower insertion bolt 31 inserted into the lower insertion hole 77 of the lower erection piece 74 is screwed.

【0033】また、左側ベースプレート9の第9螺着孔
27には、下側エレクションピース74を水平方向であ
って下側の鉄骨柱72の周方向に押圧するための下側押
圧ボルト32が螺着されるとともに、図1に示すよう
に、第1連結部12の第10螺着孔29には、上側エレ
クションピース75を水平方向であって上側の鉄骨柱7
3の周方向に直交する方向に押圧するための上側押圧ボ
ルト33が螺着される。
A lower pressing bolt 32 for pressing the lower erection piece 74 in the horizontal direction and in the circumferential direction of the lower steel column 72 is screwed into the ninth screw hole 27 of the left base plate 9. As shown in FIG. 1, the upper erection piece 75 is horizontally inserted into the tenth screw hole 29 of the first connecting portion 12 in the horizontal direction.
An upper pressing bolt 33 for pressing in a direction perpendicular to the circumferential direction of the upper screw 3 is screwed.

【0034】また、下側ジャッキ装置7は、上側取付部
15と下側取付部16との間に設けられ、次に述べる右
側ジャッキ装置36と実質的に同一の構成とされてい
る。ただし、下側ジャッキ装置7は、第2連結部13の
上部に配置され、ベースフレーム11に螺着される略U
字状のホルダ部材34を介して、ベースフレーム11に
取り付けられており、また、後述する押圧筒体47に代
えて、上側エレクションピース75の下端部を受けるた
めに、円板状に形成される断面略コ字状の受け部材35
が設けられている。
The lower jack device 7 is provided between the upper mounting portion 15 and the lower mounting portion 16 and has substantially the same configuration as a right jack device 36 described below. However, the lower jack device 7 is disposed above the second connecting portion 13 and is substantially U-threaded to the base frame 11.
It is attached to the base frame 11 via a letter-shaped holder member 34, and is formed in a disk shape to receive the lower end of the upper erection piece 75 instead of the pressing cylinder 47 described later. Receiving member 35 having a substantially U-shaped cross section
Is provided.

【0035】なお、下側ジャッキ装置7は、このような
取り付けによって、後述するように、その受け部材35
が上側エレクションピース75の下端部に進退自在に対
向するとともに、プランジャ部材45が、上側エレクシ
ョンピース75が上側の鉄骨柱73に向かって延びる方
向に沿って配置される。
The lower jack device 7 is provided with the receiving member 35 by the attachment as described later.
Is opposed to the lower end of the upper erection piece 75 so as to be able to advance and retreat, and the plunger member 45 is arranged along the direction in which the upper erection piece 75 extends toward the upper steel column 73.

【0036】右側押圧ユニット3は、厚さ方向押圧手段
としての右側ジャッキ装置36と、その右側ジャッキ装
置36をベースフレーム11に取り付けるための右側ホ
ルダ部材37とを備えている。すなわち、右側ホルダ部
材37は、図2および図8に示すように、略ハット板状
をなし、2つの平板部38および39と、それら平板部
38および39の間において略コ字状に形成される保持
部40とが一体に形成されている。平板部38および3
9には、後述する固定ボルト61および62が挿通され
る端部挿通孔41および42がそれぞれ形成されるとと
もに、保持部40には、後述するジャッキ固定ボルト6
0が挿通される中央部挿通孔43が形成されている。
The right-side pressing unit 3 includes a right-side jack device 36 as a thickness-direction pressing unit, and a right-side holder member 37 for attaching the right-side jack device 36 to the base frame 11. That is, as shown in FIGS. 2 and 8, the right holder member 37 has a substantially hat-plate shape, and is formed in a substantially U-shape between the two flat plate portions 38 and 39 and the flat plate portions 38 and 39. And the holding part 40 are integrally formed. Plates 38 and 3
9, end insertion holes 41 and 42 through which fixing bolts 61 and 62 described later are inserted, respectively, are formed, and a holding portion 40 includes jack fixing bolts 6 described later.
A central insertion hole 43 into which 0 is inserted is formed.

【0037】また、右側ジャッキ装置36は、1つのユ
ニットとして構成され、図4に示すように、ジャッキ本
体44、操作部材としてのプランジャ部材45、ピスト
ン部材46、押圧部材としての押圧筒体47およびばね
48などを備えている。
The right jack device 36 is formed as a single unit. As shown in FIG. 4, a jack body 44, a plunger member 45 as an operating member, a piston member 46, a pressing cylinder 47 as a pressing member, and A spring 48 and the like are provided.

【0038】ジャッキ本体44は、略L字円筒形状をな
し、プランジャ部材45が収容されるプランジャ筒部4
9と、そのプランジャ筒部49から側方に延び、ピスト
ン部材46が収容されるピストン筒部50とが一体に形
成されており、プランジャ筒部49内とピストン筒部5
0内とは、連通路51によって連通されている。また、
このジャッキ本体44におけるピストン筒部50の底部
は、中央部挿通孔43に対向し、後述するジャッキ固定
ボルト60が当接されている。
The jack main body 44 has a substantially L-shaped cylindrical shape, and the plunger cylinder portion 4 in which the plunger member 45 is housed.
9 and a piston cylinder 50 extending laterally from the plunger cylinder 49 and accommodating the piston member 46 are integrally formed, and the inside of the plunger cylinder 49 and the piston cylinder 5 are formed.
The inside of 0 is communicated with the communication path 51. Also,
The bottom of the piston cylinder 50 in the jack body 44 faces the center insertion hole 43, and a jack fixing bolt 60 described later is in contact with the bottom.

【0039】プランジャ部材45は、軸方向に沿ってね
じ山が形成されるプランジャ軸52と、そのプランジャ
軸52の一端に設けられるボルト頭部53と、その他端
に設けられるプランジャ54とからなり、プランジャ5
4がシールされた状態でプランジャ筒部49内に挿入さ
れるとともに、プランジャ軸52が、プランジャ筒部4
9の遊端部に設けられているシールナット55に螺進お
よび螺退可能に螺着されている。
The plunger member 45 includes a plunger shaft 52 having a thread formed in the axial direction, a bolt head 53 provided at one end of the plunger shaft 52, and a plunger 54 provided at the other end. Plunger 5
4 is inserted into the plunger cylinder 49 in a sealed state, and the plunger shaft 52 is
9 is screwed onto a seal nut 55 provided at the free end so as to be able to advance and retreat.

【0040】また、ピストン部材46は、大径部56と
小径軸部58とが一体に形成されており、大径部56が
シールされるとともに、小径軸部58のまわりにばね4
8が配置された状態で、ピストン筒部50内に収容さ
れ、その状態において、ピストン筒部50の先端に、小
径軸部58を進退自在に挿通する蓋57が設けられてい
る。また、小径軸部58の先端部には、円筒状に形成さ
れる押圧筒体47がボルトを介して取り付けられてい
る。
The piston member 46 has a large-diameter portion 56 and a small-diameter shaft portion 58 formed integrally with each other. The large-diameter portion 56 is sealed, and the spring 4 surrounds the small-diameter shaft portion 58.
In a state in which the piston 8 is disposed, the lid 57 is accommodated in the piston cylinder 50, and in this state, a lid 57 is provided at the tip of the piston cylinder 50 so that the small-diameter shaft 58 can be freely advanced and retracted. Further, a cylindrical pressing cylinder 47 is attached to the distal end of the small-diameter shaft section 58 via a bolt.

【0041】そして、プランジャ筒部49内、ピストン
筒部50内および連通路51内には、オイルが充填され
ており、後述するレンチ78(図7参照)によってボル
ト頭部53をプランジャ軸52の螺進方向に回動させれ
ば、油圧により、ピストン部材46が移動して押圧筒体
47が進出し、一方、レンチ78によってボルト頭部5
3をプランジャ軸52の螺退方向に回動させれば、ばね
48の付勢力により、ピストン部材69が逆方向に移動
して、押圧筒体47が退避される。そのため、この右側
ジャッキ装置36では、ボルト頭部53を、レンチ78
によって正逆方向に回転させることによって、押圧筒体
47を進退させるように構成されている。
The plunger cylinder 49, the piston cylinder 50, and the communication passage 51 are filled with oil, and the bolt head 53 is fixed to the plunger shaft 52 by a wrench 78 (see FIG. 7) described later. If it is rotated in the screwing direction, the piston member 46 moves by hydraulic pressure and the pressing cylinder 47 advances, while the bolt head 5 is moved by the wrench 78.
When the plunger shaft 52 is rotated in the retreating direction of the plunger shaft 52, the urging force of the spring 48 moves the piston member 69 in the opposite direction, and the pressing cylinder 47 is retracted. Therefore, in the right jack device 36, the bolt head 53 is
The pressing cylinder 47 is configured to move forward and backward by rotating in the forward and reverse directions.

【0042】そして、右側ホルダ部材37は、図2およ
び図8に示すように、右側ジャッキ装置36を保持部4
0に受け入れた状態で、かつ、右側ベースプレート8の
第1挿通孔19に、右側ジャッキ装置36の押圧筒体4
7を進退自在に挿通させた状態で、固定ボルト61およ
び62が、端部挿通孔41および42を介して右側ベー
スプレート8の第1螺着孔17および第3螺着孔20に
それぞれ螺着されることにより、右側ベースプレート8
に対して着脱自在に取り付けられている。そして、右側
ジャッキ装置36は、保持部40に受け入れられた状態
で、ジャッキ固定ボルト60が、中央部挿通孔43を介
して、ジャッキ本体44に当接されることにより、右側
ホルダ部材37に支持されている。なお、上側の平板部
38と右側ベースプレート8とは、後述する上側ホルダ
部材67を介して取り付けられるとともに、下側の平板
部39と右側ベースプレート8とは、その上側ホルダ部
材67の厚みに対応するカラー部材63を介して取り付
けられている。
Then, as shown in FIGS. 2 and 8, the right holder member 37 connects the right jack device 36 to the holding portion 4.
0 and the pressing cylinder 4 of the right jack device 36 is inserted into the first insertion hole 19 of the right base plate 8.
The fixing bolts 61 and 62 are screwed into the first screw hole 17 and the third screw hole 20 of the right base plate 8 through the end insertion holes 41 and 42, respectively, in a state where the screw 7 is inserted to be able to advance and retreat. The right base plate 8
It is detachably attached to. The right jack device 36 is supported by the right holder member 37 by the jack fixing bolt 60 abutting on the jack main body 44 via the central through hole 43 in the state of being received by the holding portion 40. Have been. The upper flat plate portion 38 and the right base plate 8 are attached via an upper holder member 67 described later, and the lower flat plate portion 39 and the right base plate 8 correspond to the thickness of the upper holder member 67. It is attached via a collar member 63.

【0043】なお、右側ジャッキ装置36は、このよう
な取り付けによって、後述するように、その押圧筒体4
7が上側エレクションピース75の一方の面に進退自在
に対向するとともに、プランジャ部材45が、上側エレ
クションピース75が上側の鉄骨柱73に向かって延び
る方向に沿って配置される。
The right jack device 36 is attached to the pressing cylinder 4 by the attachment as described later.
7 faces one surface of the upper erection piece 75 so as to be able to advance and retreat, and the plunger member 45 is arranged along the direction in which the upper erection piece 75 extends toward the upper steel column 73.

【0044】また、左側押圧ユニット4は、厚さ方向押
圧手段としての左側ジャッキ装置64と、その左側ジャ
ッキ装置64をベースフレーム11に取り付けるための
左側ホルダ部材65とを備えている。左側ジャッキ装置
64および左側ホルダ部材65は、右側ジャッキ装置3
6および右側ホルダ部材37と同一の構成とされてお
り、右側押圧ユニット3と同様にして、左側ベースプレ
ート9に取り付けられている。すなわち、左側ホルダ部
材65は、左側ジャッキ装置64を保持部40に受け入
れた状態で、かつ、左側ベースプレート9の第2挿通孔
24に、左側ジャッキ装置64の押圧筒体47を進退自
在に挿通させた状態で、固定ボルト61および62が、
端部挿通孔41および42を介して左側ベースプレート
9の第5螺着孔22および第7螺着孔25にそれぞれ螺
着されることにより、左側ベースプレート9に着脱自在
に取り付けられている。そして、左側ジャッキ装置64
は、左側ホルダ部材65の保持部40に受け入れられた
状態で、ジャッキ固定ボルト60が、中央部挿通孔43
を介して、ジャッキ本体44に当接されることにより、
左側ホルダ部材37に支持されている。なお、上側の平
板部38と左側ベースプレート9とは、後述する上側ホ
ルダ部材67を介して取り付けられるとともに、下側の
平板部39と左側ベースプレート9とは、その上側ホル
ダ部材67の厚みに対応するカラー部材63を介して取
り付けられている。
Further, the left pressing unit 4 includes a left jack device 64 as a thickness direction pressing means, and a left holder member 65 for attaching the left jack device 64 to the base frame 11. The left jack device 64 and the left holder member 65 are connected to the right jack device 3.
6 and the right holder member 37, and is attached to the left base plate 9 in the same manner as the right pressing unit 3. That is, the left holder member 65 allows the pressing cylinder 47 of the left jack device 64 to freely advance and retreat through the second insertion hole 24 of the left base plate 9 in a state where the left jack device 64 is received in the holding portion 40. With the fixing bolts 61 and 62
It is detachably attached to the left base plate 9 by being screwed into the fifth screw hole 22 and the seventh screw hole 25 of the left base plate 9 via the end insertion holes 41 and 42, respectively. And the left jack device 64
When the jack fixing bolt 60 is received by the holding portion 40 of the left holder member 65,
Through the jack body 44,
It is supported by the left holder member 37. The upper flat plate portion 38 and the left base plate 9 are attached via an upper holder member 67 described later, and the lower flat plate portion 39 and the left base plate 9 correspond to the thickness of the upper holder member 67. It is attached via a collar member 63.

【0045】なお、左側ジャッキ装置64は、このよう
な取り付けによって、後述するように、その押圧筒体4
7が上側エレクションピース75の他方の面に進退自在
に対向するとともに、プランジャ部材45が、上側エレ
クションピース75が上側の鉄骨柱73に向かって延び
る方向に沿って配置される。これによって、これら右側
ジャッキ装置36と左側ジャッキ装置64とは、後述す
るように、上側エレクションピース75を挟んでその両
側にそれぞれ配置される。
Incidentally, the left jack device 64 is attached to the pressing cylinder 4 by the attachment as described later.
7 faces the other surface of the upper erection piece 75 so as to freely advance and retreat, and the plunger member 45 is arranged along the direction in which the upper erection piece 75 extends toward the upper steel column 73. As a result, the right jack device 36 and the left jack device 64 are respectively disposed on both sides of the upper erection piece 75 as described later.

【0046】上側押圧ユニット5は、上側ジャッキ装置
66と、その上側ジャッキ装置66をベースフレーム1
1に取り付けるための上側ホルダ部材67とを備えてい
る。すなわち、上側ホルダ部材67は、下方が開放され
る略コ字板状をなし、その上部には、後述するジャッキ
固定ボルト71が挿通される上部挿通孔68が形成され
るとともに、その両下端部には、各固定ボルト61がそ
れぞれ挿通される下部挿通孔69および70がそれぞれ
形成されている。なお、上側ホルダ部材67の両側部に
は、重量を軽減するための略矩形状の開口部79がそれ
ぞれ形成されている。
The upper pressing unit 5 includes an upper jack device 66 and the upper jack device 66 connected to the base frame 1.
1 and an upper holder member 67 to be attached to the first holder member. That is, the upper holder member 67 has a substantially U-shaped plate shape whose lower side is opened, and an upper insertion hole 68 through which a jack fixing bolt 71 described later is inserted is formed at an upper portion thereof, and both lower end portions thereof are formed. Are formed with lower insertion holes 69 and 70 through which the fixing bolts 61 are respectively inserted. In addition, substantially rectangular openings 79 for reducing the weight are formed on both sides of the upper holder member 67, respectively.

【0047】そして、上側ジャッキ装置66もまた、右
側ジャッキ装置64と同一の構成とされており、上側ホ
ルダ部材67によって、上側ベースプレート10に取り
付けられている。すなわち、上側ホルダ部材67は、上
側ジャッキ装置66を受け入れた状態で、かつ、上側ベ
ースプレート10の第3挿通孔28に、上側ジャッキ装
置66の押圧筒体47を進退自在に挿通させた状態で、
一方の下端部を、右側ホルダ部材37の上側の平板部3
8と右側ベースプレート8との間に配置させるととも
に、他方の下端部を左側ホルダ部材65の上側の平板部
38と左側ベースプレート9との間に配置させて、下部
挿通孔69および70に、右側ベースプレート8の第1
螺着孔17および左側ベースプレート9の第5螺着孔2
2にそれぞれ螺着される各固定ボルト61が挿通される
ことにより、上側ベースプレート10に着脱自在に取り
付けられている。そして、上側ジャッキ装置66は、上
側ホルダ部材67に受け入れられた状態で、ジャッキ固
定ボルト71が、上部挿通孔68を介して、ジャッキ本
体44に当接されることにより、上側ホルダ部材67に
支持されている。
The upper jack device 66 also has the same configuration as the right jack device 64, and is attached to the upper base plate 10 by the upper holder member 67. That is, in a state where the upper holder member 67 receives the upper jack device 66 and the pressing cylinder 47 of the upper jack device 66 is inserted into the third insertion hole 28 of the upper base plate 10 so as to be able to advance and retreat.
One lower end is connected to the upper flat plate portion 3 of the right holder member 37.
8 and the right base plate 8, and the other lower end is disposed between the upper flat plate portion 38 of the left holder member 65 and the left base plate 9, and the right base plate is inserted into the lower insertion holes 69 and 70. 8 first
Screw hole 17 and fifth screw hole 2 of left base plate 9
2 are detachably attached to the upper base plate 10 by inserting respective fixing bolts 61 screwed to the respective 2. The upper jack device 66 is supported by the upper holder member 67 by the jack fixing bolt 71 abutting on the jack body 44 through the upper insertion hole 68 in a state of being received by the upper holder member 67. Have been.

【0048】なお、上側ジャッキ装置66は、このよう
な取り付けによって、後述するように、その押圧筒体4
7が上側エレクションピース75の上端部に進退自在に
対向するとともに、プランジャ部材45が、上側エレク
ションピース75が上側の鉄骨柱73に向かって延びる
方向に沿って配置される。
In addition, the upper jack device 66 is attached to the pressing cylinder 4 by the attachment as described later.
7 faces the upper end of the upper erection piece 75 so as to be able to advance and retreat, and the plunger member 45 is disposed along the direction in which the upper erection piece 75 extends toward the upper steel column 73.

【0049】また、この調整治具1は、上側取付部15
における右側ベースプレート8および左側ベースプレー
ト9の間は、下側取付部16における右側ベースプレー
ト8および左側ベースプレート9の間よりも幅広に形成
されており、これによって、後述するように、下側エレ
クションピース74に対する下側取付部16の確実な取
り付けを図るとともに、上側エレクションピース75に
対する各押圧筒体47の水平方向の押圧による位置調整
を容易にしている。
The adjusting jig 1 is provided with an upper mounting portion 15.
Is formed wider than the space between the right base plate 8 and the left base plate 9 in the lower mounting portion 16 so that the space between the right base plate 8 and the left base plate 9 in the lower mounting portion 16 can be reduced. The lower mounting portion 16 is securely mounted, and the position adjustment by pressing the pressing cylinders 47 against the upper erection piece 75 in the horizontal direction is facilitated.

【0050】また、この調整治具1では、下側取付部1
6における互いに対向する右側ベースプレート8および
左側ベースプレート9の間が、その互いに対向する対向
距離が下端縁部に向かって拡がるように形成されてお
り、これによって、下側エレクションピース74を良好
に誘い込むことができるようにしている。
Also, in this adjusting jig 1, the lower mounting portion 1
6, the opposing distance between the opposing right base plate 8 and the left base plate 9 is formed so that the opposing distance is widened toward the lower edge, whereby the lower erection piece 74 is favorably guided. I can do it.

【0051】図5は、この調整治具を上側エレクション
ピースに連結した状態を示す正面図、図6は、この調整
治具を上側エレクションピースおよび下側エレクション
ピースに連結した状態を示す正面図、図7は、調整治具
の使用状態を示す斜視図である。
FIG. 5 is a front view showing a state in which the adjusting jig is connected to an upper erection piece, FIG. 6 is a front view showing a state in which the adjusting jig is connected to an upper erection piece and a lower erection piece, FIG. 7 is a perspective view showing a use state of the adjustment jig.

【0052】次に、図5ないし図8を参照して、この調
整治具1を用いて、下側の鉄骨柱72の上に、上側の鉄
骨柱73を連結する方法について説明する。
Next, a method of connecting the upper steel column 73 to the lower steel column 72 using the adjustment jig 1 will be described with reference to FIGS.

【0053】下側の鉄骨柱72は、既にその下端部が他
の鉄骨柱に接合された状態にある鉄骨柱であって、たと
えば、図6および図7に示すように、その断面形状が略
4角形状をなし、その上端部および下端部において、外
周面の各辺の中央部に、4つの略矩形板状の下側エレク
ションピース74が、この下側の鉄骨柱72の周方向に
対する直交方向において、それぞれ溶接固定されてい
る。また、各下側エレクションピース74の中央部に
は、図8に示すように、クレーンの吊り具(図示せず)
を挿通するために用いられる下側挿通孔77が、厚さ方
向を貫通するようにして、それぞれ形成されている。
The lower steel column 72 is a steel column whose lower end is already joined to another steel column, and has a cross-sectional shape substantially as shown in FIGS. 6 and 7, for example. It has a quadrangular shape, and at its upper end and lower end, four substantially rectangular plate-shaped lower erection pieces 74 are provided at the center of each side of the outer peripheral surface at right angles to the circumferential direction of the lower steel column 72. In each direction, they are fixed by welding. In addition, as shown in FIG. 8, a crane suspender (not shown) is provided at the center of each lower erection piece 74.
Are formed so as to penetrate in the thickness direction.

【0054】また、上側の鉄骨柱73は、これから、そ
の下端部を下側の鉄骨柱72の上端部に接合しようとす
る鉄骨柱であって、たとえば、図6および図7に示すよ
うに、その断面形状が略4角形状をなし、その上端部お
よび下端部において、外周面の各辺の中央部に、4つの
略矩形板状の上側エレクションピース75が、この上側
の鉄骨柱73の周方向に対する直交方向において、それ
ぞれ溶接固定されている。また、各上側エレクションピ
ース75の中央部には、図8に示すように、クレーンの
吊り具(図示せず)を挿通するために用いられる上側挿
通孔76が、厚さ方向を貫通するようにして、それぞれ
形成されている。
The upper steel column 73 is a steel column whose lower end is to be joined to the upper end of the lower steel column 72. For example, as shown in FIGS. Its cross-sectional shape is substantially quadrangular. At its upper end and lower end, four substantially rectangular plate-like upper erection pieces 75 are provided at the center of each side of the outer peripheral surface, around the upper steel column 73. Each is fixed by welding in a direction perpendicular to the direction. Also, as shown in FIG. 8, an upper insertion hole 76 used to insert a hanging tool (not shown) of the crane penetrates the center of each upper erection piece 75 in the thickness direction. , Respectively.

【0055】そして、この方法では、まず、上側の鉄骨
柱73の下端部に設けられている4つの上側エレクショ
ンピース75のそれぞれに、4つの調整治具1をそれぞ
れ連結する。各調整治具1を各上側エレクションピース
75に連結するには、図5に示すように、調整治具1の
上側取付部16における右側ベースプレート8および左
側ベースプレート9の間に上側エレクションピース75
を挿入して挟んだ後、図8が参照されるように、この上
側エレクションピース75の上側挿通孔76と、右側ベ
ースプレート8の第2螺着孔18および左側ベースプレ
ート9の第6螺着孔23とを位置合わせして、上側挿通
ボルト30を、上側挿通孔76に挿通するとともに、こ
れら第2螺着孔18および第6螺着孔23に螺着させ
る。これによって、この調整治具1が、上側エレクショ
ンピース75に連結される。
In this method, first, the four adjusting jigs 1 are respectively connected to the four upper erection pieces 75 provided at the lower end of the upper steel column 73. To connect each adjustment jig 1 to each upper erection piece 75, as shown in FIG. 5, the upper erection piece 75 is located between the right base plate 8 and the left base plate 9 in the upper mounting portion 16 of the adjustment jig 1.
8, the upper insertion hole 76 of the upper erection piece 75, the second screw hole 18 of the right base plate 8, and the sixth screw hole 23 of the left base plate 9, as shown in FIG. And the upper insertion bolt 30 is inserted into the upper insertion hole 76 and screwed into the second screw hole 18 and the sixth screw hole 23. Thereby, the adjustment jig 1 is connected to the upper erection piece 75.

【0056】その後、右側ジャッキ装置36および左側
ジャッキ装置64のボルト頭部53をレンチ78で回動
させることにより(図7参照)、押圧筒体47を進退さ
せて、上側エレクションピース75の両面を、適宜、そ
の厚さ方向に押圧するとともに、上側ジャッキ装置66
のボルト頭部53をレンチ78で回動させることにより
(図7参照)、押圧筒体47を進退させて、上側エレク
ションピース75の上端部を、適宜、その下端部に向け
て押圧し、さらには、上側押圧ボルト33を螺進および
螺退させることによって、上側エレクションピース75
の側端部を、適宜、その上側エレクションピース75の
遊端側から基部側に向けて押圧することにより、上側の
鉄骨柱73に対する調整治具1の連結姿勢を調整する。
より具体的には、クレーンよって吊り上げられた状態に
おいて、この調整治具1の下側取付部16における右側
ベースプレート8および左側ベースプレート9の間に、
下側エレクションピース74が円滑に挿入されるよう
に、調整治具1の連結姿勢を調整する。そうすれば、こ
の調整治具1を下側の鉄骨柱72と連結する時に、効率
的な作業を達成することができる。
Thereafter, by rotating the bolt head 53 of the right jack device 36 and the left jack device 64 with a wrench 78 (see FIG. 7), the pressing cylinder 47 is advanced and retracted, and both surfaces of the upper erection piece 75 are moved. If necessary, the upper jack device 66 is pressed in the thickness direction.
By rotating the bolt head 53 with a wrench 78 (see FIG. 7), the pressing cylinder 47 is advanced and retracted, and the upper end of the upper erection piece 75 is appropriately pressed toward the lower end thereof. The upper erection piece 75 is formed by screwing the upper pressing bolt 33 forward and backward.
Is appropriately pressed from the free end side of the upper erection piece 75 toward the base side to adjust the connection posture of the adjustment jig 1 to the upper steel column 73.
More specifically, in a state where the adjustment jig 1 is lifted by a crane, the lower jig 16 of the adjustment jig 1 is located between the right base plate 8 and the left base plate 9.
The connecting posture of the adjusting jig 1 is adjusted so that the lower erection piece 74 is inserted smoothly. Then, when this adjustment jig 1 is connected to the lower steel column 72, efficient work can be achieved.

【0057】そして、このようにして、上側の鉄骨柱7
3に対する調整治具1の連結姿勢が調整された後に、こ
の上側の鉄骨柱73をクレーンによって吊り上げて、下
側の鉄骨柱72の上方において、各上側エレクションピ
ース75と各下側エレクションピース74とが対向する
ように配置する。この上側の鉄骨柱73のクレーンによ
る吊り上げは、公知の方法で行なうことができ、たとえ
ば、上側の鉄骨柱73の上端部に設けられる各上側エレ
クションピース75の上側挿通孔76に、吊り具を挿入
して吊り上げればよい。
Then, in this way, the upper steel column 7
After the connecting posture of the adjustment jig 1 with respect to the third jig 3 is adjusted, the upper steel column 73 is lifted by a crane, and each upper erection piece 75 and each lower erection piece 74 are placed above the lower steel column 72. Are arranged to face each other. The lifting of the upper steel column 73 by a crane can be performed by a known method. For example, a lifting tool is inserted into the upper insertion hole 76 of each upper erection piece 75 provided at the upper end of the upper steel column 73. And lift it.

【0058】そして、下側の鉄骨柱72の上端部に設け
られている4つの下側エレクションピース74のそれぞ
れに、4つの調整治具1をそれぞれ連結する。各調整治
具1を各下側エレクションピース74に連結するには、
まず、図5および図6に示すように、クレーンによって
上側の鉄骨柱73を徐々に下げ、調整治具1の下側取付
部16における右側ベースプレート8および左側ベース
プレート9の間に下側エレクションピース74を挿入し
て挟むようにする。
Then, the four adjustment jigs 1 are respectively connected to the four lower erection pieces 74 provided at the upper end of the lower steel column 72. To connect each adjustment jig 1 to each lower erection piece 74,
First, as shown in FIGS. 5 and 6, the upper steel column 73 is gradually lowered by the crane, and the lower erection piece 74 is placed between the right base plate 8 and the left base plate 9 in the lower mounting portion 16 of the adjustment jig 1. And insert it.

【0059】この挿入においては、上記したように、こ
の調整治具1が、予め右側ベースプレート8および左側
ベースプレート9の間に下側エレクションピース74を
円滑に挿入し得る姿勢として調整されており、さらに、
右側ベースプレート8および左側ベースプレート9の下
端部の間が、その互いに対向する対向距離が下端縁部に
向かって拡がるように形成されているので、下側エレク
ションピース74を良好に誘い込んで、下側取付部16
において簡易かつ円滑に挟むことができる。そのため、
従来では、この調整治具1を誘導するための作業者が4
人程度必要とされていたが、この調整治具1を用いれ
ば、2人程度でも良好な作業が可能であり、効率的な作
業を達成することができる。
In this insertion, as described above, the adjusting jig 1 is adjusted in advance so that the lower erection piece 74 can be smoothly inserted between the right base plate 8 and the left base plate 9. ,
Since the distance between the lower ends of the right base plate 8 and the left base plate 9 is formed so that the opposing distances thereof are widened toward the lower end edge, the lower erection piece 74 is satisfactorily invited to be mounted on the lower side. Part 16
Can be easily and smoothly sandwiched. for that reason,
Conventionally, an operator for guiding the adjustment jig 1 requires four workers.
Although about humans were required, the use of this adjustment jig 1 enables good work even with about two people, and achieves efficient work.

【0060】次いで、図8に示すように、下側エレクシ
ョンピース74の下側挿通孔77と、右側ベースプレー
ト8の第4螺着孔21および左側ベースプレート9の第
8螺着孔26とを位置合わせして、下側挿通ボルト31
を、下側挿通孔77に挿通するとともに、これら第4螺
着孔21および第8螺着孔26に螺着させる。これによ
って、この調整治具1が、下側エレクションピース74
に連結される。
Next, as shown in FIG. 8, the lower insertion hole 77 of the lower erection piece 74 is aligned with the fourth screw hole 21 of the right base plate 8 and the eighth screw hole 26 of the left base plate 9. And the lower insertion bolt 31
Is screwed into the fourth screw hole 21 and the eighth screw hole 26 while being inserted into the lower insertion hole 77. Thereby, the adjustment jig 1 is moved to the lower erection piece 74.
Linked to

【0061】次いで、下側の鉄骨柱72に対する上側の
鉄骨柱73の姿勢を水平方向において修正し、両者の目
地合わせを行なう。上側の鉄骨柱73における水平方向
の修正は、次のようにして行なうことができる。すなわ
ち、図8に示すように、まず、左側ベースプレート9の
第9螺着孔27に螺着される下側押圧ボルト32を螺進
させて、下側エレクションピース74を、右側ベースプ
レート8に向けて押圧することにより、下側取付部16
を下側エレクションピース74に固定する。
Next, the attitude of the upper steel column 73 with respect to the lower steel column 72 is corrected in the horizontal direction, and the joints of both columns are adjusted. The horizontal correction of the upper steel column 73 can be performed as follows. That is, as shown in FIG. 8, first, the lower pressing bolt 32 screwed into the ninth screw hole 27 of the left base plate 9 is screwed to move the lower erection piece 74 toward the right base plate 8. By pressing the lower mounting portion 16
Is fixed to the lower erection piece 74.

【0062】次いで、図7に示すように、右側ジャッキ
装置36のボルト頭部53をレンチ78で回動させるこ
とにより、押圧筒体47を水平方向に進退させて、上側
エレクションピース75の一方の面を、適宜、その厚さ
方向に調整しながら押圧するとともに、左側ジャッキ装
置64のボルト頭部53をレンチ78で回動させること
により、押圧筒体47を水平方向に進退させて、上側エ
レクションピース75の他方の面を、適宜、その厚さ方
向に調整しながら押圧することにより、上側の鉄骨柱7
3の下側の鉄骨柱72に対する水平方向における周方向
の位置調整を行なう。すなわち、右側ジャッキ装置36
および左側ジャッキ装置64の各押圧筒体47によって
上側エレクションピース75の両面を押圧すれば、上側
の鉄骨柱73は、その押圧力が作用する方向に移動され
るので、互いに反対側から対向する各押圧筒体47を適
宜調整して進退させることによって、上側の鉄骨柱73
を、その周方向における正逆方向に移動させることがで
き、これによって、水平方向における周方向の位置を微
調整しながら簡易かつ確実に行なうことができる。
Next, as shown in FIG. 7, by rotating the bolt head 53 of the right jack device 36 with a wrench 78, the pressing cylinder 47 is moved forward and backward in the horizontal direction, and one of the upper erection pieces 75 is moved. The pressing cylinder 47 is advanced and retracted in the horizontal direction by rotating the bolt head 53 of the left jack device 64 with a wrench 78 while pressing the surface while appropriately adjusting the thickness in the thickness direction. By pressing the other surface of the piece 75 while adjusting it in the thickness direction as appropriate, the upper steel column 7
3 to adjust the position of the lower steel column 72 in the horizontal direction in the circumferential direction. That is, the right jack device 36
When the pressing cylinders 47 of the left jack device 64 press both surfaces of the upper erection piece 75, the upper steel column 73 is moved in the direction in which the pressing force acts, so that each of the opposing steel columns 73 faces from the opposite side. By appropriately adjusting the pressing cylinder 47 to advance and retreat, the upper steel column 73
Can be moved in the forward / reverse direction in the circumferential direction, whereby it is possible to perform easily and reliably while finely adjusting the circumferential position in the horizontal direction.

【0063】また、このような、水平方向における周方
向の位置調整とともに、上側押圧ボルト33を螺進およ
び螺退させることによって、上側エレクションピース7
5の側端部を、適宜、その上側エレクションピース75
の遊端側から基部側に向けて押圧することにより、上側
の鉄骨柱73の下側の鉄骨柱72に対する水平方向にお
ける周方向と直交する方向の位置調整を行なう。すなわ
ち、上側押圧ボルト33によって上側エレクションピー
ス75を遊端側から基部側に向けて押圧すれば、上側の
鉄骨柱73は、その押圧力が作用する方向に移動される
ので、上側押圧ボルト33を適宜調整して締め付けるこ
とによって、上側の鉄骨柱73を、その周方向と直交す
る方向に移動させることができ、これによって、水平方
向における周方向と直交する方向の位置調整を行なうこ
とができる。
In addition to such adjustment of the position in the circumferential direction in the horizontal direction, the upper pressing bolt 33 is advanced and retracted, so that the upper erection piece 7 is adjusted.
5 at its upper erection piece 75
Of the upper steel column 73 and the lower steel column 72 in the direction perpendicular to the circumferential direction in the horizontal direction. That is, when the upper erection piece 75 is pressed from the free end side toward the base side by the upper pressing bolt 33, the upper steel column 73 is moved in the direction in which the pressing force acts. By appropriately adjusting and tightening, the upper steel column 73 can be moved in a direction perpendicular to the circumferential direction thereof, whereby the position can be adjusted in the horizontal direction perpendicular to the circumferential direction.

【0064】このようにして、上側の鉄骨柱73におけ
る水平方向の修正を行なえば、上側の鉄骨柱73を、下
側の鉄骨柱72に、その水平方向における周方向および
その直交方向での姿勢を修正して連結することができる
ので、下側の鉄骨柱72に上側の鉄骨柱73を良好な姿
勢で接合することができる。
In this manner, when the horizontal correction of the upper steel column 73 is performed, the upper steel column 73 is attached to the lower steel column 72 in the circumferential direction in the horizontal direction and in the orthogonal direction. Therefore, the upper steel column 73 can be joined to the lower steel column 72 in a good posture.

【0065】次いで、下側の鉄骨柱72に対する上側の
鉄骨柱73の姿勢を鉛直方向において修正する。上側の
鉄骨柱73における鉛直方向の修正は、図7に示すよう
に、下側ジャッキ装置7のボルト頭部53をレンチ78
で回動させることにより、受け部材35を昇降させて、
上側エレクションピース75の下端部を、適宜、持ち上
げ、または、持ち下げることにより、上側エレクション
ピース75を適正位置で支持することにより行なうこと
ができる。このようにして、上側エレクションピース7
5を、適正位置で支持すれば、上側の鉄骨柱73の下側
の鉄骨柱72に対する上下方向での傾きを微調整しなが
ら修正することができるので、これによって、上側の鉄
骨柱73の鉛直方向の姿勢を確実に修正して、下側の鉄
骨柱72に上側の鉄骨柱73をより一層良好な姿勢で接
合することができる。
Next, the posture of the upper steel column 73 with respect to the lower steel column 72 is corrected in the vertical direction. As shown in FIG. 7, the bolt head 53 of the lower jack device 7 is fixed to a wrench 78 by correcting the vertical direction of the upper steel column 73.
To rotate the receiving member 35 up and down,
This can be performed by appropriately lifting or lowering the lower end of the upper erection piece 75 to support the upper erection piece 75 at an appropriate position. Thus, the upper erection piece 7
5 can be corrected while finely adjusting the inclination of the upper steel column 73 with respect to the lower steel column 72 in the vertical direction, so that the vertical position of the upper steel column 73 can be corrected. The orientation in the direction can be surely corrected, and the upper steel column 73 can be joined to the lower steel column 72 in a better posture.

【0066】さらに、このような水平方向および鉛直方
向の位置調整とともに、上側ジャッキ装置66のボルト
頭部53をレンチ78で回動させることにより、押圧筒
体47を上下方向に進退させて、上側エレクションピー
ス75の上端部を、適宜、その下端部に向けて押圧すれ
ば、上側の鉄骨柱73を下側の鉄骨柱72に対して押圧
することができる。そのため、上側の鉄骨柱73を、下
側の鉄骨柱72に対して密着させて連結することがで
き、下側の鉄骨柱72に上側の鉄骨柱73を良好な姿勢
で接合することができる。
In addition to such horizontal and vertical position adjustments, by rotating the bolt head 53 of the upper jack device 66 with a wrench 78, the pressing cylinder 47 is advanced and retracted in the vertical direction. By appropriately pressing the upper end of the erection piece 75 toward the lower end, the upper steel column 73 can be pressed against the lower steel column 72. Therefore, the upper steel column 73 can be closely connected to the lower steel column 72, and the upper steel column 73 can be joined to the lower steel column 72 in a favorable posture.

【0067】なお、上記の説明においては、上側エレク
ションピース75の水平方向の位置調整を行なった後、
上側エレクションピース75の鉛直方向の位置調整を行
なうようにしたが、その順序はいずれが先でもよく、上
側エレクションピース75の鉛直方向の位置調整を行な
った後、上側エレクションピース75の水平方向の位置
調整を行なうようにしてもよく、さらには、これら水平
方向の位置調整と鉛直方向の位置調整とを並行して行な
ってもよい。
In the above description, after the position of the upper erection piece 75 has been adjusted in the horizontal direction,
The position of the upper erection piece 75 in the vertical direction is adjusted, but the order may be any order. After the position of the upper erection piece 75 is adjusted in the vertical direction, the position of the upper erection piece 75 in the horizontal direction is adjusted. The adjustment may be performed, and the horizontal position adjustment and the vertical position adjustment may be performed in parallel.

【0068】そして、このようにして、下側の鉄骨柱7
2に対する上側の鉄骨柱73の姿勢を修正した後に、下
側の鉄骨柱72の上端部と、上側の鉄骨柱73の下端部
とを溶接または高力ボルトによって接合する。なお、こ
の方法においては、各調整治具1によって、上側の鉄骨
柱73と下側の鉄骨柱72とが連結されていれば、その
後、適宜の時点において、クレーンの吊り具を、上側の
鉄骨柱73の上端部に設けられる各上側エレクションピ
ース75から取り外すようにすればよい。
Then, in this way, the lower steel column 7
After correcting the attitude of the upper steel column 73 with respect to 2, the upper end of the lower steel column 72 and the lower end of the upper steel column 73 are joined by welding or high-strength bolts. In this method, if the upper steel column 73 and the lower steel column 72 are connected by the respective adjustment jigs 1, then, at an appropriate time, the hanging tool of the crane is replaced with the upper steel frame. What is necessary is just to remove from each upper erection piece 75 provided in the upper end part of the pillar 73.

【0069】そして、この調整治具1では、このような
下側の鉄骨柱72に対する上側の鉄骨柱73の姿勢の修
正作業、すなわち、水平方向および鉛直方向の位置調整
作業において、右側ジャッキ装置36、左側ジャッキ装
置64、上側ジャッキ装置66および下側ジャッキ装置
7の各プランジャ部材45が、図7に示すように、すべ
て、同一方向、すなわち、上側エレクションピース75
が上側の鉄骨柱73に向かって延びる方向に沿って配置
されているので、作業者は、それらのすべてのプランジ
ャ部材45を、最も操作しやすい前方から、レンチ78
によって操作することができるので、作業性の格段の向
上を図ることができる。
In the adjusting jig 1, the right jack device 36 is used in the operation of correcting the posture of the upper steel column 73 with respect to the lower steel column 72, that is, in the position adjusting operation in the horizontal and vertical directions. 7, the plunger members 45 of the left jack device 64, the upper jack device 66, and the lower jack device 7 are all in the same direction, that is, the upper erection piece 75, as shown in FIG.
Are arranged along the direction extending toward the upper steel column 73, so that the operator can move all the plunger members 45 from the most convenient front side using the wrench 78.
Therefore, the workability can be significantly improved.

【0070】しかも、この調整治具1では、右側ジャッ
キ装置36、左側ジャッキ装置64、上側ジャッキ装置
66および下側ジャッキ装置7は、すべて油圧式のジャ
ッキ装置であって、油圧によって、大きな押圧力で押圧
することができるので、たとえば、図9に示すように、
下側の鉄骨柱72に接合された上側の鉄骨柱73に、横
梁80などが組み付けられた場合において、その横梁8
0の組み付け精度の誤差や、材料の残留応力、さらに
は、溶接時の引っ張り応力などによって、下側の鉄骨柱
72と上側の鉄骨柱73との間の接合部分81に変形応
力が作用して、下側の鉄骨柱72と上側の鉄骨柱73と
の接合部分81において、たとえば、目地の位置ずれが
生じた場合には、その目地の位置ずれを、右側ジャッキ
装置36および左側ジャッキ装置64を用いて大きな押
圧力で、簡易かつ確実に調整することができる。
Further, in the adjusting jig 1, the right jack device 36, the left jack device 64, the upper jack device 66, and the lower jack device 7 are all hydraulic jack devices, and a large pressing force is applied by hydraulic pressure. So that, for example, as shown in FIG.
When the cross beam 80 or the like is attached to the upper steel column 73 joined to the lower steel column 72, the cross beam 8
Deformation stress acts on the joint portion 81 between the lower steel column 72 and the upper steel column 73 due to an error in the assembling accuracy of 0, residual stress of the material, and tensile stress at the time of welding. If, for example, a joint displacement occurs at the joint 81 between the lower steel column 72 and the upper steel column 73, the joint displacement is corrected by the right jack device 36 and the left jack device 64. It can be easily and reliably adjusted with a large pressing force.

【0071】また、下側の鉄骨柱72と上側の鉄骨柱7
3との接合部分81において、たとえば、下側の鉄骨柱
72に対して上側の鉄骨柱73が浮き上がってしまって
も、上側ジャッキ装置66を用いて、再び大きな押圧力
で押圧することにより、簡易かつ確実に密着させること
ができる。
The lower steel column 72 and the upper steel column 7
For example, even if the upper steel column 73 rises up with respect to the lower steel column 72 at the joint portion 81 with the third steel plate 3, the upper steel column 73 is again pressed with a large pressing force by using the upper jack device 66, thereby simplifying the operation. In addition, it is possible to ensure close contact.

【0072】また、下側の鉄骨柱72と上側の鉄骨柱7
3との接合部分81において、たとえば、下側の鉄骨柱
72に対して上側の鉄骨柱73の傾きが変化しても、そ
の傾きの変化を、下側ジャッキ装置7を用いて、大きな
押圧力で、簡易かつ確実に調整することができる。
The lower steel column 72 and the upper steel column 7
For example, even if the inclination of the upper steel column 73 changes with respect to the lower steel column 72 at the joint portion 81 with the third steel column 72, the change in the inclination is changed by a large pressing force using the lower jack device 7. Thus, the adjustment can be easily and reliably performed.

【0073】したがって、この調整治具1を用いれば、
下側の鉄骨柱72に対する上側の鉄骨柱73の接合の前
後を問わず、大きな押圧力によって、下側の鉄骨柱72
に対して上側の鉄骨柱73を良好な姿勢に調整すること
ができる。
Therefore, if this adjusting jig 1 is used,
Regardless of before and after joining of the upper steel column 73 to the lower steel column 72, the large pressing force causes the lower steel column 72.
In contrast, the upper steel column 73 can be adjusted to a favorable posture.

【0074】また、この調整治具1では、上側ジャッキ
装置66は、上側ホルダ部材67によってベースフレー
ム11に着脱自在に装着されているので、この上側ジャ
ッキ装置66を簡易に装備することができるとともに、
不要時には、上側ホルダ部材67をベースフレーム11
から取り外すことにより、たとえば、図10に示すよう
に取り外すこともできるので、その目的および用途によ
り、最適の態様で使用することができる。なお、図10
において、上側ベースプレート10の第3挿通孔28に
は、ねじ山が形成され、上側エレクションピース75の
上端部を下端部に向けて押圧するための押圧ボルト82
が螺着されるとともに、右側ホルダ部材37の平板部3
8と右側ベースプレート8との間、および、左側ホルダ
部材65の平板部38と左側ベースプレート9との間に
は、カラー部材63が介在されている。
In this adjusting jig 1, the upper jack device 66 is detachably mounted on the base frame 11 by the upper holder member 67, so that the upper jack device 66 can be easily equipped. ,
When unnecessary, the upper holder member 67 is attached to the base frame 11.
By removing from the device, for example, it can be removed as shown in FIG. 10, so that it can be used in an optimal manner according to its purpose and application. Note that FIG.
At the third insertion hole 28 of the upper base plate 10, a screw thread is formed, and a pressing bolt 82 for pressing the upper end of the upper erection piece 75 toward the lower end.
Is screwed and the flat plate portion 3 of the right holder member 37 is
A collar member 63 is interposed between the base member 8 and the right base plate 8 and between the flat plate portion 38 of the left holder member 65 and the left base plate 9.

【0075】また、図示しないが、この調整治具1で
は、右側ジャッキ装置36および左側ジャッキ装置64
も、右側ホルダ部材37および左側ホルダ部材65によ
ってベースフレーム11に着脱自在に装着されているの
で、これらの右側ジャッキ装置36および左側ジャッキ
装置64を簡易に装備することができるとともに、不要
時には、たとえば、それらの両方または片方のみを取り
外すこともできるので、その目的および用途により、最
適の態様で使用することができる。
Although not shown, the adjusting jig 1 includes the right jack device 36 and the left jack device 64
Are also removably mounted to the base frame 11 by the right holder member 37 and the left holder member 65, so that the right jack device 36 and the left jack device 64 can be easily equipped, and when unnecessary, for example, It is also possible to remove both or only one of them, so that it can be used in an optimal manner depending on its purpose and application.

【0076】なお、以上の説明においては、調整治具1
に、当初から、右側ジャッキ装置36、左側ジャッキ装
置64および上側ジャッキ装置66を装備している態様
として説明したが、たとえば、下側の鉄骨柱72に対し
て上側の鉄骨柱73を接合する時には、たとえば、押圧
ボルトなどの他の押圧手段によって、水平方向および鉛
直方向の位置調整を行ない、その後に、これら右側ジャ
ッキ装置36、左側ジャッキ装置64および上側ジャッ
キ装置66の少なくともいずれかを、その目的および用
途に応じて、適宜、装着(後付け)するようにしてもよ
い。
In the above description, the adjusting jig 1
From the beginning, it has been described as a mode equipped with the right jack device 36, the left jack device 64 and the upper jack device 66, but for example, when joining the upper steel column 73 to the lower steel column 72, For example, the position is adjusted in the horizontal and vertical directions by other pressing means such as a pressing bolt, and then at least one of the right jack device 36, the left jack device 64, and the upper jack device 66 is used for the purpose. Depending on the application and the purpose, it may be appropriately mounted (post-installed).

【0077】また、以上の説明においては、下側の鉄骨
柱72および上側の鉄骨柱73は、その断面形状が略4
角形状をなし、その外周面の各辺の中央部に形成される
各下側エレクションピース74および各上側エレクショ
ンピース75のそれぞれに、各調整治具1を連結するよ
うにしたが、下側の鉄骨柱72および上側の鉄骨柱73
の形状は、何ら限定されず、たとえば、断面多角形状、
断面円形状などであってもよく、また、各下側エレクシ
ョンピース74および各上側エレクションピース75の
数も限定されず、さらには、各調整治具1を、各下側エ
レクションピース74および各上側エレクションピース
75に必ず対応させて連結する必要もない。
In the above description, the lower steel column 72 and the upper steel column 73 have a cross section of approximately 4 mm.
Each adjusting jig 1 is connected to each of the lower erection piece 74 and each of the upper erection pieces 75 formed at the center of each side of the outer peripheral surface in the shape of a square. Steel column 72 and upper steel column 73
The shape of is not limited at all, for example, a polygonal cross section,
The number of each lower erection piece 74 and each upper erection piece 75 is not limited, and each adjusting jig 1 may be connected to each lower erection piece 74 and each upper erection piece 74. It is not necessary to always connect the erection piece 75 so as to correspond to it.

【0078】[0078]

【発明の効果】以上述べたように、請求項1に記載の発
明によれば、下側の鉄骨柱と上側の鉄骨柱との間の接合
部分に変形応力が作用して、下側の鉄骨柱と上側の鉄骨
柱との接合部分において、目地の位置ずれが生じた場合
であっても、その目地の位置ずれを、大きな押圧力で、
簡易かつ確実に調整することができる。
As described above, according to the first aspect of the present invention, a deformation stress acts on the joint between the lower steel column and the upper steel column, and the lower steel frame is subjected to the deformation stress. Even if the joint displacement occurs at the joint between the column and the upper steel column, the joint displacement is increased by a large pressing force.
Adjustment can be made easily and reliably.

【0079】請求項2に記載の発明によれば、その目的
および用途により、最適の態様で使用することができ
る。
According to the second aspect of the present invention, it can be used in an optimum manner depending on its purpose and application.

【0080】請求項3に記載の発明によれば、操作部材
を、エレクションピースが延びる最も操作しやすい方向
から操作して、押圧部材によってエレクションピースを
押圧することができるので、作業性の向上を図ることが
できる。
According to the third aspect of the present invention, the operation member can be operated from the direction in which the erection piece is most easily operated and the erection piece can be pressed by the pressing member. Can be planned.

【0081】請求項4に記載の発明によれば、下側の鉄
骨柱と上側の鉄骨柱との間の接合部分に変形応力が作用
して、下側の鉄骨柱と上側の鉄骨柱との接合部分におい
て、下側の鉄骨柱に対して上側の鉄骨柱が浮き上がって
しまっても、再び大きな押圧力で押圧することにより、
簡易かつ確実に密着させることができる。
According to the fourth aspect of the present invention, a deformation stress acts on the joint between the lower steel column and the upper steel column, and the joint between the lower steel column and the upper steel column is formed. At the joint, even if the upper steel column rises against the lower steel column, by pressing again with a large pressing force,
Simple and reliable adhesion can be achieved.

【0082】請求項5に記載の発明によれば、その目的
および用途により、最適の態様で使用することができ
る。
According to the fifth aspect of the present invention, it can be used in an optimum manner depending on its purpose and application.

【0083】請求項6に記載の発明によれば、操作部材
を、エレクションピースが延びる最も操作しやすい方向
から操作して、押圧部材によってエレクションピースを
押圧することができるので、作業性の向上を図ることが
できる。
According to the invention, the erection piece can be pressed by the pressing member by operating the operating member from the direction in which the erection piece is most easily operated, thereby improving workability. Can be planned.

【0084】請求項7に記載の発明によれば、下側の鉄
骨柱と上側の鉄骨柱との間の接合部分に変形応力が作用
して、下側の鉄骨柱と上側の鉄骨柱との接合部分におい
て、下側の鉄骨柱に対して上側の鉄骨柱の傾きが変化し
ても、その傾きの変化を、大きな押圧力で、簡易かつ確
実に調整することができる。
According to the seventh aspect of the present invention, a deforming stress acts on a joint between the lower steel column and the upper steel column, and the joint between the lower steel column and the upper steel column is formed. Even if the inclination of the upper steel column changes relative to the lower steel column at the joint, the change in the inclination can be easily and reliably adjusted with a large pressing force.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の鉄骨建入直し調整治具の一実施形態と
しての調整治具を示す斜視図である。
FIG. 1 is a perspective view showing an adjustment jig as one embodiment of a steel frame re-installation adjustment jig of the present invention.

【図2】図1に示す調整治具の正面図である。FIG. 2 is a front view of the adjustment jig shown in FIG.

【図3】図1に示す調整治具の左側面図である。FIG. 3 is a left side view of the adjustment jig shown in FIG.

【図4】図1に示す調整治具の右側ジャッキ装置の平断
面図である。
FIG. 4 is a plan sectional view of a right jack device of the adjustment jig shown in FIG. 1;

【図5】調整治具を上側エレクションピースに連結した
状態を示す正面図である。
FIG. 5 is a front view showing a state where an adjustment jig is connected to an upper erection piece.

【図6】調整治具を上側エレクションピースおよび下側
エレクションピースに連結した状態を示す正面図であ
る。
FIG. 6 is a front view showing a state where an adjustment jig is connected to an upper erection piece and a lower erection piece.

【図7】調整治具の使用状態を示す斜視図である。FIG. 7 is a perspective view showing a use state of the adjustment jig.

【図8】図1に示す調整治具の使用状態における正断面
図である。
FIG. 8 is a front sectional view of the adjustment jig shown in FIG. 1 in a used state.

【図9】上側の鉄骨柱に横梁が組み付けられた状態を示
す概略説明図である。
FIG. 9 is a schematic explanatory view showing a state in which a cross beam is attached to an upper steel column.

【図10】本発明の鉄骨建入直し調整治具の他の実施形
態を示す斜視図である。
FIG. 10 is a perspective view showing another embodiment of the steel frame re-installation adjusting jig of the present invention.

【符号の説明】[Explanation of symbols]

1 調整治具 7 下側ジャッキ装置 15 上側取付部 16 下側取付部 36 右側ジャッキ装置 45 プランジャ部材 47 押圧筒体 64 左側ジャッキ装置 66 上側ジャッキ装置 72 下側の鉄骨柱 73 上側の鉄骨柱 74 下側エレクションピース 75 上側エレクションピース DESCRIPTION OF SYMBOLS 1 Adjusting jig 7 Lower jack device 15 Upper mounting portion 16 Lower mounting portion 36 Right jack device 45 Plunger member 47 Pressing cylinder 64 Left jack device 66 Upper jack device 72 Lower steel column 73 Upper steel column 74 Lower Side erection piece 75 Upper erection piece

フロントページの続き (72)発明者 太田 修二 大阪府大阪狭山市岩室2丁目180番地 象 印チェンブロック株式会社内 Fターム(参考) 2E174 DA32 DA38 Continuation of the front page (72) Inventor Shuji Ota 2-180 Iwamuro, Osaka Sayama City, Osaka Elephant Sealed Chain Block Co., Ltd. F term (reference) 2E174 DA32 DA38

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 エレクションピースが取り付けられてい
る下側の鉄骨柱に、エレクションピースが取り付けられ
ている上側の鉄骨柱を接合するために用いられる鉄骨建
入直し調整治具であって、 前記上側の鉄骨柱のエレクションピースに取付可能な上
側取付部と、 前記下側の鉄骨柱のエレクションピースに取付可能な下
側取付部と、 前記上側の鉄骨柱のエレクションピースおよび前記下側
の鉄骨柱のエレクションピースの少なくともいずれか
を、流体の圧力により、その厚さ方向に押圧するための
厚さ方向押圧手段とを備えていることを特徴とする、鉄
骨建入直し調整治具。
1. A steel-frame refitting adjustment jig used to join an upper steel column to which an erection piece is attached to a lower steel column to which an erection piece is attached, An upper mounting portion that can be mounted on the erection piece of the steel column, a lower mounting portion that can be mounted on the erection piece of the lower steel column, and an erection piece of the upper steel column and the lower steel column. A thickness direction pressing means for pressing at least one of the erection pieces in a thickness direction thereof by a pressure of a fluid, and a steel frame re-installation adjusting jig.
【請求項2】 前記厚さ方向押圧手段は、ユニットとし
て形成され、前記鉄骨建入直し調整治具の治具本体に対
して着脱自在に取り付けられていることを特徴とする、
請求項1に記載の鉄骨建入直し調整治具。
2. The thickness direction pressing means is formed as a unit, and is detachably attached to a jig body of the steel frame refitting adjustment jig.
The steel frame refitting adjustment jig according to claim 1.
【請求項3】 前記厚さ方向押圧手段は、前記エレクシ
ョンピースに対して、少なくともいずれか一方側に設け
られ、前記エレクションピースを押圧するための押圧部
材と、前記押圧部材を作動させるための操作部材とを備
えており、前記操作部材は、前記エレクションピースが
前記鉄骨柱に向かって延びる方向から、操作可能に構成
されていることを特徴とする、請求項1または2に記載
の鉄骨建入直し調整治具。
3. The thickness direction pressing means is provided on at least one side with respect to the erection piece, and a pressing member for pressing the erection piece, and an operation for operating the pressing member. The member according to claim 1 or 2, wherein the operating member is configured to be operable from a direction in which the erection piece extends toward the steel column. Fixing jig.
【請求項4】 エレクションピースが取り付けられてい
る下側の鉄骨柱に、エレクションピースが取り付けられ
ている上側の鉄骨柱を接合するために用いられる鉄骨建
入直し調整治具であって、 前記上側の鉄骨柱のエレクションピースに取付可能な上
側取付部と、 前記下側の鉄骨柱のエレクションピースに取付可能な下
側取付部と、 前記上側の鉄骨柱のエレクションピースの上端部を、流
体の圧力により、下端部に向けて押圧するための下方押
圧手段を備えていることを特徴とする、鉄骨建入直し調
整治具。
4. A steel frame refitting adjustment jig used to join an upper steel column to which an erection piece is attached to a lower steel column to which an erection piece is attached, wherein An upper mounting portion that can be mounted on the erection piece of the steel column; a lower mounting portion that can be mounted on the erection piece of the lower steel column; and And a downward pressing means for pressing toward the lower end portion.
【請求項5】 前記下方押圧手段は、ユニットとして形
成され、前記鉄骨建入直し調整治具の治具本体に対して
着脱自在に取り付けられていることを特徴とする、請求
項4に記載の鉄骨建入直し調整治具。
5. The apparatus according to claim 4, wherein the downward pressing means is formed as a unit, and is detachably attached to a jig main body of the steel frame refitting adjustment jig. Adjustment jig for rebuilding steel frame.
【請求項6】 前記下方押圧手段は、前記エレクション
ピースを押圧するための押圧部材と、前記押圧部材を作
動させるための操作部材とを備えており、 前記操作部材は、前記エレクションピースが前記鉄骨柱
に向かって延びる方向から、操作可能に構成されている
ことを特徴とする、請求項4または5に記載の鉄骨建入
直し調整治具。
6. The downward pressing means includes a pressing member for pressing the erection piece, and an operating member for operating the pressing member, wherein the operating member is such that the erection piece is a steel frame. The steel frame refitting adjustment jig according to claim 4, wherein the jig is configured to be operable from a direction extending toward the column.
【請求項7】 前記下側取付部と前記上側取付部との間
に設けられ、前記上側の鉄骨柱のエレクションピースの
下端部を、流体の圧力により、上端部に向けて押圧する
ための上方押圧手段を備えていることを特徴とする、請
求項1ないし6のいずれかに記載の鉄骨建入直し調整治
具。
7. An upper portion provided between the lower mounting portion and the upper mounting portion for pressing a lower end portion of the erection piece of the upper steel column toward an upper end portion by a pressure of a fluid. The jig for re-installing a steel frame according to any one of claims 1 to 6, further comprising a pressing means.
JP2001147458A 2001-05-17 2001-05-17 Steel frame adjustment jig Expired - Fee Related JP3619170B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001147458A JP3619170B2 (en) 2001-05-17 2001-05-17 Steel frame adjustment jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001147458A JP3619170B2 (en) 2001-05-17 2001-05-17 Steel frame adjustment jig

Publications (2)

Publication Number Publication Date
JP2002339571A true JP2002339571A (en) 2002-11-27
JP3619170B2 JP3619170B2 (en) 2005-02-09

Family

ID=18992944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001147458A Expired - Fee Related JP3619170B2 (en) 2001-05-17 2001-05-17 Steel frame adjustment jig

Country Status (1)

Country Link
JP (1) JP3619170B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007224636A (en) * 2006-02-24 2007-09-06 Kayaba System Machinery Kk Connector
WO2020062966A1 (en) * 2018-09-28 2020-04-02 上海建工集团股份有限公司 Perpendicularity control device for vertical structural column of integrated steel platform formwork and construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594647B (en) * 2014-12-27 2016-08-31 郑州市第一建筑工程集团有限公司 Girder steel location adjusting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007224636A (en) * 2006-02-24 2007-09-06 Kayaba System Machinery Kk Connector
WO2020062966A1 (en) * 2018-09-28 2020-04-02 上海建工集团股份有限公司 Perpendicularity control device for vertical structural column of integrated steel platform formwork and construction method

Also Published As

Publication number Publication date
JP3619170B2 (en) 2005-02-09

Similar Documents

Publication Publication Date Title
US5415383A (en) Clamp arm with slip plane positioning
JP2019058932A (en) Support and welding system for vehicle frame member
US5226638A (en) Clamp arm with slip plane positioning
KR101756728B1 (en) Jig for preventing welding distortion in the manufacture of a structure
JP2002339571A (en) Adjusting jig for measurement and correction on plumbing to plumb for reinforcement
JP5690640B2 (en) Steel column misalignment correction device
JP3641655B2 (en) Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig
JPH0726731A (en) Adjusting jig for joint part of steel frame pillar
JPH0654479U (en) Positioner for joint welding and its jig
JP2001334364A (en) Method for welding steel frame column by articulated welding robot
JPH08311989A (en) Siguchi structure for steel building
JPH09150264A (en) Positioning jig and welding equipment for welding steel segment
JP3581685B2 (en) Steel frame rebuilding adjustment jig
JP2005188136A (en) Steel frame erection auxiliary adjusting tool and steel frame erection adjusting method
JP3641654B2 (en) Steel frame adjustment jig
JP2002364180A (en) Steel-replumbing adjustment jig
JP3024468U (en) Rigid joint structure of beam in weak axis direction of H-shaped steel column
JP2002194897A (en) Dislocation correcting jig for steel column
JP2002339572A (en) Jig for measurement and correction on plumbing to plumb for reinforcement
JP2002364181A (en) Steel-replumbing adjustment jig
CN112091504B (en) A workpiece welding positioning fixture
JPS63137597A (en) Positioner for welding steel-frame member
JP2001152555A (en) Building unit connection method and joint plate
CN220221087U (en) Boats and ships curved surface plate splicing apparatus
JP2002070315A (en) Alignment adjusting jig

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040706

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040831

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041026

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041111

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees