[go: up one dir, main page]

JP2002348861A - Steel parts for steel piles - Google Patents

Steel parts for steel piles

Info

Publication number
JP2002348861A
JP2002348861A JP2001158961A JP2001158961A JP2002348861A JP 2002348861 A JP2002348861 A JP 2002348861A JP 2001158961 A JP2001158961 A JP 2001158961A JP 2001158961 A JP2001158961 A JP 2001158961A JP 2002348861 A JP2002348861 A JP 2002348861A
Authority
JP
Japan
Prior art keywords
pile
steel
wing
casting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001158961A
Other languages
Japanese (ja)
Inventor
Shigeyoshi Hirata
茂良 平田
Fujio Itagaki
富士男 板垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Shoji Co Ltd
Daiwa House Industry Co Ltd
Daiwa General Research Institute Co Ltd
Original Assignee
Fuji Shoji Co Ltd
Daiwa House Industry Co Ltd
Daiwa General Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Shoji Co Ltd, Daiwa House Industry Co Ltd, Daiwa General Research Institute Co Ltd filed Critical Fuji Shoji Co Ltd
Priority to JP2001158961A priority Critical patent/JP2002348861A/en
Publication of JP2002348861A publication Critical patent/JP2002348861A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

(57)【要約】 【課題】 翼や先端刃を備えた鋼杭を容易にしかもコス
ト的に有利に製作することができ、それでいて、力学的
に無駄や無理のない合理的構造の鋼杭に製作することが
できる杭用鋼製部品を提供する。 【解決手段】 杭本体鋼管2に接続される管部8と、先
端刃4と、翼5とが、鋳造で一体に備えられている。翼
5は外周端11側の肉厚寸法が内周端12側の肉厚寸法
より小であり、管部8は翼5との境界部領域において鋳
造で増肉13され、管部8内には補強リブ9が鋳造で管
部8と一体に備えられ、管部8には杭本体鋼管2と螺合
接続するためのネジ部6が鋳造で成形されている。
(57) [Summary] [PROBLEMS] To easily and cost-effectively manufacture a steel pile having wings and tip blades, and yet to provide a mechanically reasonable and reasonably structured steel pile. Provide a steel part for piles that can be manufactured. SOLUTION: A pipe portion 8, a tip blade 4, and a wing 5 connected to a pile body steel pipe 2 are integrally provided by casting. The thickness of the wing 5 on the outer peripheral end 11 side is smaller than the thickness of the inner peripheral end 12, and the pipe portion 8 is thickened 13 by casting in the boundary region with the wing 5. The reinforcing rib 9 is provided integrally with the pipe portion 8 by casting, and the thread portion 6 for screwing connection with the pile body steel pipe 2 is formed on the pipe portion 8 by casting.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鋼杭用の鋼製部品
に関する。
The present invention relates to a steel part for a steel pile.

【0002】[0002]

【従来の技術】例えば、回転圧入用の鋼管杭として、鋼
管の先端、即ち下端に、掘削用の先端刃を付けたもの
や、鋼管の先端部や長さ方向中間部に支持力を高めるた
めの翼を付けたものなどが提供されている。そして、従
来、この鋼管杭は、先端刃や翼を、鋼板を用いて製作
し、これを、工場や杭打ち現場において、杭本体鋼管に
溶接で接合して製作し、杭打ちに用いていた。
2. Description of the Related Art For example, as a steel pipe pile for rotary press-fitting, a tip of a steel pipe, that is, a lower end thereof is provided with a cutting edge for excavation, or a steel pipe at a tip portion or a middle portion in a longitudinal direction to increase a supporting force. Are provided. Conventionally, this steel pipe pile was manufactured by using a steel plate for a tip blade and a wing, and this was welded to a pile body steel pipe at a factory or a pile driving site to be manufactured and used for pile driving. .

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記の
ように、鋼管杭を製作するには、杭の構成部品として先
端刃や翼を鋼板から切り出して製作しなければならず、
しかも、これら部品を長い杭本体鋼管に溶接で接合しな
ければならず、そのため、手間を要すると共に、コスト
が高くつくという問題があった。
However, as described above, in order to manufacture a steel pipe pile, it is necessary to cut out a tip blade or a wing from a steel plate as a component of the pile.
In addition, these parts must be welded to the long pile body steel pipe, which requires labor and costs.

【0004】また、杭打ちの過程で翼の内周端側や、杭
本体において翼、先端刃の接合されている部分に大きな
力がかかるため、この部分をそれに耐えられるようにし
ておかなければならない。
[0004] In addition, since a large force is applied to the inner peripheral end side of the wing and the portion where the wing and the tip blade are joined in the pile body during the pile driving process, it is necessary to ensure that this portion can withstand it. No.

【0005】しかるに、翼は、上記のように鋼板からつ
くられているので、内周端側の肉厚寸法を大きく設定す
ると、外周端側の肉厚寸法も大きなものになってしま
い、翼の外周端側が強度的に過剰な設計となり、それが
むしろ有害に作用する場合もあった。
[0005] However, since the wing is made of a steel plate as described above, if the thickness at the inner peripheral end is set to be large, the thickness at the outer peripheral end also becomes large, and the wing of the wing is enlarged. The outer peripheral end side was designed excessively in strength, which sometimes acted harmfully.

【0006】また、杭本体管についても、翼や先端刃の
取り付けられる領域部分において補強を行っておく必要
があり、そのため、鋼板をカットして製作したリブを、
翼や先端刃の接合される鋼管部分の内部に設置して溶接
しておく必要のある場合があり、製作が厄介であった。
[0006] In addition, it is necessary to reinforce the pile body pipe in the area where the wings and the tip blades are attached. Therefore, ribs made by cutting a steel plate are required.
In some cases, it is necessary to install and weld inside the steel pipe portion to which the wings and the tip blade are joined, which makes the production troublesome.

【0007】本発明は、例えば、上記のような従来の問
題点に鑑み、翼や先端刃を備えた鋼杭を容易にしかもコ
スト的に有利に製作することができ、それでいて、力学
的に無駄や無理のない合理的構造の鋼杭に製作すること
ができる杭用鋼製部品を提供することを課題とする。
[0007] In view of the above-mentioned conventional problems, for example, the present invention can easily and cost-effectively manufacture a steel pile having wings and tip blades, and yet is mechanically wasteful. Another object of the present invention is to provide a steel part for piles that can be manufactured on a steel pile having a reasonable and reasonable structure.

【0008】[0008]

【課題を解決するための手段】上記の課題は、鋼杭本体
に接続される芯部と、先端刃及び/又は翼とが、鋳造に
よる成形で一体に備えられていることを特徴とする鋼杭
用鋼製部品によって解決される。
SUMMARY OF THE INVENTION The object of the present invention is to provide a steel material characterized in that a core connected to a steel pile main body and a tip blade and / or a wing are integrally formed by molding by casting. Solved by steel parts for piles.

【0009】この鋼杭用部品には、鋼杭本体に接続され
る芯部が備えられ、この芯部に先端刃及び/又は翼を備
えさせた構造としているから、先端刃や翼を鋼杭本体に
接合するのではなく、この部品の芯部を鋼杭本体に接続
することで鋼杭に先端刃や翼を備えさせることができ、
先端刃や鋼杭を備えた鋼杭を容易に製作することができ
る。
The steel pile component has a core connected to the steel pile main body, and has a structure in which the core has a tip blade and / or a wing. By connecting the core of this part to the steel pile main body instead of joining it to the main body, the steel pile can be provided with a tip blade or wing,
A steel pile having a tip blade and a steel pile can be easily manufactured.

【0010】しかも、この杭用部品において、芯部と、
先端刃及び/又は翼とは、鋳造による成形で一体に備え
られたものであるから、この部品の製作において、鋼板
からの切出しや加工、溶接などを排除し、この部品の製
作を容易にそしてコスト的に有利に行うことができる。
In addition, in this pile component, a core portion,
Since the tip blade and / or the wing are integrally provided by molding by casting, in the production of this part, cutting, processing, welding, etc. from a steel plate are eliminated, and the production of this part is facilitated. It can be performed cost-effectively.

【0011】このように、この鋼杭用部品によれば、こ
の部品それ自体を容易に製作することができるし、鋼杭
もこの部品を用いて容易に製作することができ、それに
よって、翼や先端刃を備えた鋼杭を容易にしかもコスト
的に有利に製作することができる。
As described above, according to the steel pile component, the component itself can be easily manufactured, and the steel pile can also be easily manufactured using the component. And a steel pile having a tip blade can be easily and cost-effectively manufactured.

【0012】しかも、鋳造品であるから、形状や構造の
設計の自由度が高く、先端刃や翼、芯部を強度的に無
駄、無理のない、土質に応じた最適な形状、構造のもの
に容易に製作することができ、効果的な杭打ちを実現す
ることができる。
In addition, since it is a cast product, the degree of freedom in shape and structure design is high, and the tip blade, wing, and core are not wastefully and reasonably strong in strength, and have an optimum shape and structure according to soil characteristics. , And an effective pile driving can be realized.

【0013】上記部品において、翼が備えられている場
合に、この翼について、その外周端側の肉厚寸法が内周
端側の肉厚寸法より小に設定されているとよい。このよ
うな寸法設定は、翼を鋼板からの切り出しや加工によっ
て製作する場合には困難な寸法設定であり、部品を鋳造
品からなるものとすることではじめて容易に実現するこ
とができ、そのような寸法設定をされた翼を備える部品
を、手間をかけずに容易に製作することができる。そし
て、こういう寸法設定をすることで、強度的に無駄や無
理のない合理的構造の翼を設計、製作していくことがで
き、効果的な杭打ちを実現することができる。
In the above-mentioned component, when a blade is provided, it is preferable that the thickness of the blade at the outer peripheral end is set to be smaller than the thickness at the inner peripheral end. Such sizing is difficult when wings are manufactured by cutting or processing from a steel plate, and can be easily realized only when the parts are made of cast products. A component having wings with appropriate dimensions can be easily manufactured without trouble. By setting such dimensions, it is possible to design and manufacture a blade having a rational structure that is not wasteful and reasonable in strength, and that an effective pile driving can be realized.

【0014】また、上記の部品において、芯部が管部か
らなり、管部が翼との境界部領域において鋳造によって
増肉されている場合は、応力集中しやすい管部と翼との
境界部を管部の側から効果的に局部補強することがで
き、無理、無駄のない合理的な構造の部品を、製作上容
易に実現することができる。
In the above-mentioned parts, when the core portion is formed of a tube portion and the wall portion is thickened by casting in a boundary region with the blade, the boundary between the tube portion and the blade tends to concentrate stress. Can be effectively reinforced locally from the side of the pipe portion, and a component having a reasonable and reasonable structure can be easily realized.

【0015】また、上記の部品において、芯部が管部か
らなり、管部内に、補強リブが鋳造による成形で管部と
一体に備えられている場合は、この補強リブによって管
部を効果的に補強することができ、しかも、このような
補強リブを備えた部品を、鋼板からの切り出しや溶接な
ど行わずに、鋳造によって容易に製作することができ
る。
In the above-mentioned parts, when the core portion is formed of a tube portion and the reinforcing rib is provided integrally with the tube portion by molding by casting, the tube portion is effectively formed by the reinforcing rib. A component having such a reinforcing rib can be easily manufactured by casting without cutting out or welding from a steel plate.

【0016】更に、上記の部品において、杭本体と螺合
接続するためのネジ部が、鋳造により一体成形されてい
る場合は、そのようなネジ部を備えた上記の杭用部品
を、ネジ部の精度良く、しかも、極めて容易に製作する
ことができ、厄介なねじ切り加工などを排除することが
できる。加えて、鋳造であるからこそ、ネジ部を部品そ
のものに容易に備えさせることができる。加えて、上記
の部品と杭本体との接続を、ネジで行う構成とすること
により、杭本体と部品とを現場においてであっても作業
性良く接続していくことができ、現場での杭打ち作業を
効率良く行っていくことができると共に、こうして現場
で容易に接続することができることで、現場への杭の輸
送もスペースとらずに効率良く行っていくことができ
る。
Further, in the above-mentioned component, when the screw portion for screwing connection with the pile main body is integrally formed by casting, the above-mentioned pile component provided with such a screw portion is replaced with a screw portion. It can be manufactured with high precision and extremely easily, and troublesome thread cutting can be eliminated. In addition, because of the casting, the screw portion can be easily provided on the component itself. In addition, the connection between the above-mentioned parts and the pile body is made by screws, so that the pile body and the parts can be connected with good workability even at the site, and the pile at the site can be connected. The hammering operation can be performed efficiently, and the connection can be easily made on-site, so that the piles can be efficiently transported to the site without taking up space.

【0017】また、上記の杭において、芯部に、杭本体
と溶接接続するための嵌合部が、鋳造により一体成形さ
れている場合は、芯部を杭本体に嵌合することで杭本体
と部品とを容易に溶接することができ、それでいて、そ
のような嵌合部を備える部品を容易に製作することがで
きる。
Further, in the above-mentioned pile, when a fitting portion for welding connection with the pile body is formed integrally with the core portion by casting, the core portion is fitted to the pile body to thereby form the pile body. And the component can be easily welded, and yet a component having such a fitting portion can be easily manufactured.

【0018】[0018]

【発明の実施の形態】次に、本発明の実施形態を図面に
基づいて説明する。
Next, embodiments of the present invention will be described with reference to the drawings.

【0019】図1に示す第1実施形態の鋼杭1は、回転
圧入用の鋼管杭からなっており、この鋼管杭1におい
て、2は杭本体としての鋼管、3は本発明の杭用部品で
ある鋼製の杭先端部品である。本実施形態では、この杭
先端部品3に、掘削用の先端刃4と、翼5とが備えら
れ、また、杭先端部品3と杭本体鋼管2とはネジ6,7
で接続する構造となっている。
The steel pile 1 of the first embodiment shown in FIG. 1 is made of a steel pipe pile for rotary press-fitting. In this steel pipe pile 1, reference numeral 2 denotes a steel pipe as a pile main body, and reference numeral 3 denotes a pile part of the present invention. This is a steel pile tip part. In the present embodiment, the pile tip part 3 is provided with a tip blade 4 for excavation and a wing 5, and the pile tip part 3 and the pile body steel pipe 2 are connected with screws 6, 7.
It is structured to be connected by.

【0020】上記の杭先端部品3において、8は芯部と
しての管部であり、先端刃4は、管部8に備えられ、こ
の管部8よりも先端側に突出して備えられている。9は
補強リブ、10は底板、6は雄ねじ部であり、杭先端部
品3は、翼5も含めて、これらすべての構成部分が鋳造
による成形で一体に備えられた鋳鋼品からなっている。
In the above-mentioned pile tip part 3, reference numeral 8 denotes a pipe as a core, and the tip blade 4 is provided on the pipe 8, and is provided so as to protrude more distally than the pipe 8. Reference numeral 9 denotes a reinforcing rib, reference numeral 10 denotes a bottom plate, reference numeral 6 denotes a male screw portion, and the pile tip part 3 is a cast steel product in which all of these components including the wing 5 are integrally formed by casting.

【0021】翼5は、拡底等を目的としているもので、
管部8の外周部から側方に張り出して備えられている。
本実施形態では、この翼5として、図1(イ)に示すよ
うに、管部8の外周部を半周程度にわたって延びる対の
分割螺旋翼5a,5aによって管部8の略全周にわたっ
て延びる螺旋翼が採用されている。
The wing 5 is intended to expand the bottom and the like.
The tube portion 8 is provided so as to protrude laterally from the outer peripheral portion.
In the present embodiment, as the blade 5, as shown in FIG. 1A, a spiral extending substantially over the entire circumference of the tube 8 by a pair of divided spiral blades 5 a extending around the outer periphery of the tube 8 about halfway. Wings are employed.

【0022】この翼5において、その外周端11側の肉
厚寸法は内周端12側の肉厚寸法より小につくられてい
る。そして、管部8は、その肉厚寸法が杭本体鋼管2の
肉厚寸法よりも大きくつくられており、しかも、翼5と
の境界部領域13においては管部8内に膨出するよう局
部的に増肉されており、更に、内部に備えられた十字状
補強リブ9によって補強されている。また、雄ネジ部6
は、管部8の基端部に備えられている。
The thickness of the blade 5 on the outer peripheral end 11 side is made smaller than the thickness of the inner peripheral end 12 side. The pipe section 8 is formed so that its wall thickness is larger than the wall thickness of the pile main body steel pipe 2, and at the boundary 13 with the wing 5, the pipe section 8 swells into the pipe section 8. It is reinforced by a cross-shaped reinforcing rib 9 provided inside. In addition, male screw part 6
Is provided at the base end of the tube portion 8.

【0023】上記の杭先端部品3は、例えば、ロストワ
ックス法等を用いることで、このような構造の部品であ
っても一体成形が可能であり、容易に製作することがで
きる。従来のように、鋼板からの切出しや加工、溶接等
の厄介な作業は必要なく、この杭先端部品3の製作を容
易にそしてコスト的に有利に製作することができる。
The above-mentioned pile tip part 3 can be integrally formed by using, for example, the lost wax method, etc., even if it has such a structure, and can be easily manufactured. Unlike the prior art, there is no need for troublesome operations such as cutting, processing, and welding from a steel plate, and the pile tip part 3 can be manufactured easily and cost-effectively.

【0024】なお、杭本体鋼管2の端部には、前記杭先
端部品3の雄ネジ部6に対応する雌ネジ部品7が溶接で
取り付けられている。この雌ネジ部品7については、ネ
ジ部が主たる構造部分であるので、鋳造品であってもよ
いし、ねじ切り加工等の他の加工方法によって製作され
たものであってもよい。
A female screw part 7 corresponding to the male screw part 6 of the pile tip part 3 is attached to the end of the pile main body steel pipe 2 by welding. The female screw part 7 may be a cast product or may be manufactured by another processing method such as thread cutting since the screw portion is a main structural part.

【0025】そして、鋼管杭1の製作は、上記の杭先端
部品3を用い、その管部8の基端部に備えられている雄
ネジ部6を杭本体鋼管2の端部の雌ネジ部品7とを螺合
するだけで容易に製作することができる。
The steel pipe pile 1 is manufactured by using the above-mentioned pile tip part 3 and connecting the male screw part 6 provided at the base end of the pipe part 8 to the female screw part at the end of the pile body steel pipe 2. 7 can be easily manufactured only by screwing them together.

【0026】このように、この杭先端部品3によれば、
この部品3自体を容易に製作することができ、しかも、
鋼管杭1もこの部品3を用いることで容易に製作するこ
とができ、それによって、翼5と先端刃4を備えた鋼管
杭1を容易にしかもコスト的に有利に製作することがで
きる。
As described above, according to the pile tip part 3,
This part 3 itself can be easily manufactured, and
The steel pipe pile 1 can also be easily manufactured by using the part 3, whereby the steel pipe pile 1 provided with the wing 5 and the tip blade 4 can be manufactured easily and cost-effectively.

【0027】のみならず、杭先端部品3は、上記のよう
に、鋳造による一体成形で製作された鋳鋼品からなるの
で、先端刃4や翼5の設計の自由度も高く、先端刃4や
翼5を土質に応じた最適な構造のものに容易に製作する
ことができて、効果的な杭打ちを実現していくことがで
きる。
In addition, since the pile tip part 3 is made of a cast steel product manufactured by integral molding by casting as described above, the design flexibility of the tip blade 4 and the wing 5 is high, and the tip blade 4 The wing 5 can be easily manufactured to have an optimal structure according to the soil quality, and effective pile driving can be realized.

【0028】特に、本実施形態では、翼5について、そ
の外周端11側の肉厚寸法を内周端12側の肉厚寸法よ
り小に設定しており、そのような翼5を備えた杭先端部
品3であっても容易に製作することができ、そして、こ
ういう寸法設定をすることで、強度的に無駄や無理のな
い合理的構造の鋼管杭を設計、製作していくことがで
き、効果的な杭打ちを実現していくことができる。
Particularly, in the present embodiment, the thickness of the wing 5 on the outer peripheral end 11 side is set to be smaller than the thickness of the wing 5 on the inner peripheral end 12 side. Even the tip part 3 can be easily manufactured, and by setting such dimensions, it is possible to design and manufacture a steel pipe pile having a reasonable structure that is not wasteful and reasonable in strength, Effective stakeout can be realized.

【0029】また、上記の杭先端部品3は、管部8が翼
5との境界部領域において増肉され、応力集中しやすい
管部と翼との境界部を管部8の側から効果的に補強する
ことができ、しかも、そのような増肉による補強を鋳造
で容易に実現することができる。
Further, in the above-mentioned pile tip part 3, the pipe 8 is thickened in the boundary region with the wing 5, and the boundary between the pipe and the blade where the stress tends to concentrate is effectively formed from the pipe 8 side. In addition, such reinforcement by thickening can be easily realized by casting.

【0030】また、上記の杭先端部品3では、管部8
は、内部の補強リブ9で補強され、この補強リブ9は管
部8と鋳造による成形で一体に備えられているから、こ
のような補強リブ9を備えた杭先端部品を、鋼板からの
切り出しや溶接など行わずに、容易に製作することがで
きる。底板10についても、鋼板からの切り出しや溶接
など行わずに、容易に管部8に備えさせることができ
る。
In the above-mentioned pile tip part 3, the pipe part 8
Are reinforced by internal reinforcing ribs 9 and the reinforcing ribs 9 are integrally provided with the pipe 8 by molding by casting. Therefore, a pile tip component provided with such reinforcing ribs 9 is cut out from a steel plate. It can be manufactured easily without performing welding or welding. The bottom plate 10 can also be easily provided in the pipe portion 8 without cutting out or welding from a steel plate.

【0031】更に、上記の杭先端部品3において、管部
8の基端部には、杭本体鋼管2と接続するためのネジ部
6が、鋳造で一体に備えられているので、そのようなネ
ジ部6を備えた部品3をネジ部の精度良くしかも極めて
容易に製作することができ、厄介なねじ切り加工などを
排除することができる。しかも、鋳造であるからこそ、
このネジ部6を杭先端部品そのものに容易に備えさせる
ことができる。
Further, in the above-mentioned pile tip part 3, since the screw part 6 for connecting to the pile body steel pipe 2 is integrally provided at the base end of the pipe part 8 by casting, such a part is provided. The component 3 having the screw portion 6 can be manufactured with high precision and extremely easily in the screw portion, and troublesome thread cutting or the like can be eliminated. And because it's casting,
The thread portion 6 can be easily provided on the pile tip component itself.

【0032】杭先端部品3と杭本体鋼管2との螺合接続
は、工場で予め行っておくようにしてもよいし、杭打ち
現場で行うようにするのもよい。接続を現場で行う場合
は、この接続を効率良く行っていくことができ、しか
も、杭の輸送をスペースをとらずに効率良く行っていく
ことができる。
The screw connection between the pile tip part 3 and the pile main body steel pipe 2 may be performed in advance at a factory or may be performed at a pile driving site. When the connection is performed on site, the connection can be performed efficiently, and the pile can be transported efficiently without taking up space.

【0033】図2に示す第2実施形態の鋼管杭1は、杭
先端部品3と杭本体鋼管2とを溶接で接合する構造とな
っている。即ち、杭先端部品3の基端部には、杭本体鋼
管2の端部にしっくりと嵌め込まれる円形嵌合部14
と、嵌合状態において杭本体鋼管2の端面を当接させる
環状の段部15とが備えられ、この環状段部15は開先
斜面に形成されており、この嵌合部14を杭本体鋼管2
の端部にしっくりと嵌合させ、溶接で杭先端部品3と杭
本体鋼管2と接合する構造となっている。本実施形態で
は、この嵌合部14のみならず、段部15等も、杭先端
部品3を製作するための鋳造で一体に形成されている。
The steel pipe pile 1 of the second embodiment shown in FIG. 2 has a structure in which a pile tip part 3 and a pile main body steel pipe 2 are joined by welding. That is, the circular fitting portion 14 that fits snugly into the end of the pile body steel pipe 2 at the base end of the pile tip component 3.
And an annular step portion 15 for contacting the end face of the pile main body steel pipe 2 in the fitted state. The annular step section 15 is formed on a groove slope. 2
, And the pile tip part 3 and the pile main body steel pipe 2 are joined by welding. In the present embodiment, not only the fitting portion 14 but also the step portion 15 and the like are integrally formed by casting for manufacturing the pile tip part 3.

【0034】このように、杭先端部品3の管部8に、杭
本体鋼管2と溶接接続するための嵌合部14等が、鋳造
により一体成形されているので、その形成を容易に行う
ことができ、しかも、杭先端部品3の管部8を杭本体鋼
管2に嵌合することで杭本体鋼管2と杭先端部品3とを
容易に溶接することができる。その他、先端刃4、翼
5、補強手段9,13等が備えられていることは、第1
実施形態の場合と同様である。
As described above, since the fitting portion 14 and the like for welding connection with the pile main body steel pipe 2 are integrally formed on the pipe portion 8 of the pile tip part 3 by casting, it can be easily formed. Further, by fitting the pipe portion 8 of the pile tip part 3 to the pile body steel pipe 2, the pile body steel pipe 2 and the pile tip part 3 can be easily welded. In addition, the fact that the tip blade 4, the wing 5, the reinforcing means 9, 13 and the like are provided is the first.
This is the same as in the embodiment.

【0035】図3に示す第3実施形態の鋼管杭1は、杭
先端部品3と杭本体鋼管2とをネジ6,7で接合するタ
イプの構造において、先端刃4は備えられているが、翼
が省略された構造となっているものである。
The steel pipe pile 1 of the third embodiment shown in FIG. 3 has a structure in which a pile tip part 3 and a pile body steel pipe 2 are joined by screws 6 and 7, and a tip blade 4 is provided. The wing is omitted.

【0036】図4に示す第4実施形態の鋼管杭1は、杭
先端部品3と杭本体鋼管2とを上記の第2実施形態の場
合と同様に溶接で接合するタイプの構造において、先端
刃4は備えられているが、翼が省略された構造となって
いるものである。
The steel pipe pile 1 of the fourth embodiment shown in FIG. 4 has a structure in which a pile tip part 3 and a pile body steel pipe 2 are joined by welding in the same manner as in the second embodiment described above. 4 is provided, but has a structure in which the wings are omitted.

【0037】図5に示す第5実施形態の鋼管杭1は、杭
の長手方向の中間部にも翼5が備えられている。そのた
めの杭中間部部品16は、芯部としての管部8と、その
外周部に側方に張り出して備えられた翼5とが備えら
れ、その他、管部8の側における翼境界増肉部13や、
管部8内の補強リブ9等も備えられ、翼5はその外周端
11側の肉厚寸法が内周端12側の肉厚寸法よりも小に
設定され、全体が鋳造による成形で一体に形成されてい
る。ただ、杭の長さ方向中間部に備えられる翼に関する
ものであるため、この杭中間部部品16には、杭先端部
品3の場合のような先端刃4は備えられていない。ま
た、本実施形態では、杭中間部部品16の両端部に一体
鋳造によるネジ部6,6が備えられ、上下の杭本体鋼管
2,2に備えられたネジ部7,7に対しこの杭中間部部
品16を螺合で接続する構造となっている。なお、杭中
間部部品16の側におけるネジ部6,6も鋳造による成
形で杭中間部部品16に一体に備えられている。ネジに
よる接合であれば杭打ち現場での接続も時間を要さず、
現場への輸送もスペースをとらずに効率良く行っていく
ことができる。
The steel pipe pile 1 of the fifth embodiment shown in FIG. 5 is provided with a wing 5 also at an intermediate portion in the longitudinal direction of the pile. The pile intermediate part 16 for that purpose is provided with a pipe part 8 as a core part and a wing 5 provided on the outer peripheral part so as to protrude laterally, and in addition, a wing boundary thickening part on the pipe part 8 side. 13 and
Reinforcing ribs 9 and the like in the pipe portion 8 are also provided, and the wing 5 has a thickness dimension on the outer peripheral end 11 side smaller than a thickness dimension on the inner peripheral end 12 side, and the whole is integrally formed by casting. Is formed. However, since the present invention relates to the wing provided at the middle part in the length direction of the pile, the middle part 16 of the pile does not include the tip blade 4 as in the case of the tip part 3 of the pile. In the present embodiment, screw parts 6 and 6 are provided by integral casting at both ends of the pile intermediate part 16. The components 16 are connected by screwing. Note that the threaded portions 6 and 6 on the side of the pile middle part 16 are also provided integrally with the pile middle part 16 by molding by casting. If connecting with screws, connection at the pile driving site does not require time,
Transport to the site can be done efficiently without taking up space.

【0038】以上に、本発明の実施形態を示したが、本
発明はこれに限られるものではなく、発明思想を逸脱し
ない範囲で、各種の変更が可能である。例えば、上記の
実施形態では鋼管杭に適用した場合を示しているが、形
鋼杭など各種鋼杭であってもよい。また、芯部について
も管部からなっているものに限らず、鋼管杭であるか型
鋼杭等であるかを問わず、各種形態をしていてよい。翼
も拡底翼であるか掘削翼等であるか、また、螺旋翼であ
るか否かを問わず、各種形態のものが採用されてよい。
また、上記の実施形態では、補強リブ9の形態として横
断面十字状のものが採用されているが、各種形態をして
いてよい。
Although the embodiment of the present invention has been described above, the present invention is not limited to this, and various changes can be made without departing from the spirit of the invention. For example, in the above embodiment, a case where the present invention is applied to a steel pipe pile is shown, but various steel piles such as a shaped steel pile may be used. Further, the core portion is not limited to a tube portion, and may have various forms irrespective of whether it is a steel pipe pile or a shaped steel pile. Regardless of whether the wing is an expanded bottom wing, a digging wing, or the like, or a spiral wing, various wings may be employed.
Further, in the above-described embodiment, a cross-shaped cross section is employed as the form of the reinforcing rib 9, but it may have various forms.

【0039】[0039]

【発明の効果】本発明は、以上のとおりのものであるか
ら、翼や先端刃を備えた鋼杭を容易にしかもコスト的に
有利に製作することができ、それでいて、力学的に無駄
や無理のない合理的構造の鋼杭に製作することができ
る。
According to the present invention as described above, a steel pile having wings and tip blades can be easily and cost-effectively manufactured. It can be manufactured on a steel pile with a rational structure without any.

【図面の簡単な説明】[Brief description of the drawings]

【図1】第1実施形態の杭用部品を示すもので、図
(イ)は側面断面図、図(ロ)は側面図、図(ハ)は図
(イ)のI−I線断面矢視図である。
1A and 1B show a pile component according to a first embodiment, wherein FIG. 1A is a side sectional view, FIG. 1B is a side view, and FIG. FIG.

【図2】第2実施形態の杭用部品を示すもので、図
(イ)は側面断面図、図(ロ)は側面図、図(ハ)は図
(イ)のII−II線断面矢視図である。
FIGS. 2A and 2B show a pile component according to a second embodiment, in which FIG. 1A is a side sectional view, FIG. 2B is a side view, and FIG. FIG.

【図3】第3実施形態の杭用部品を示すもので、図
(イ)は側面断面図、図(ロ)は側面図、図(ハ)は図
(イ)のIII−III線断面矢視図である。
3 (a) is a side sectional view, FIG. 3 (b) is a side view, and FIG. 3 (c) is a sectional arrow taken along line III-III of FIG. 3 (a). FIG.

【図4】第4実施形態の杭用部品を示すもので、図
(イ)は側面断面図、図(ロ)は側面図、図(ハ)は図
(イ)のIV−IV線断面矢視図である。
4 (a) is a side sectional view, FIG. 4 (b) is a side view, and FIG. 4 (c) is a sectional view taken along line IV-IV in FIG. 4 (a). FIG.

【図5】第5実施形態の杭用部品を示すもので、図
(イ)は側面断面図、図(ロ)はこの部品を用いて製作
された杭の側面図である。
FIGS. 5A and 5B show a pile component according to a fifth embodiment, wherein FIG. 5A is a side sectional view and FIG. 5B is a side view of a pile manufactured using this component.

【符号の説明】[Explanation of symbols]

1…鋼管杭(鋼杭) 2…杭本体鋼管(杭本体) 3…杭先端部品(部品) 4…先端刃 5…翼 6…ネジ部 8…管部(芯部) 9…補強リブ 11…外周端 12…内周端 13…増肉部 14…嵌合部 16…杭中間部部品(部品) DESCRIPTION OF SYMBOLS 1 ... Steel pipe pile (steel pile) 2 ... Pile main body steel pipe (pile main body) 3 ... Pile tip part (parts) 4 ... Tip blade 5 ... Wing 6 ... Screw part 8 ... Pipe part (core part) 9 ... Reinforcement rib 11 ... Outer end 12 ... Inner end 13 ... Thickening part 14 ... Mating part 16 ... Pile middle part (part)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 平田 茂良 奈良県奈良市左京六丁目6番地2 株式会 社大和総合技術研究所内 (72)発明者 板垣 富士男 東京都東村山市多摩湖町2丁目11番45号 富士商事株式会社内 Fターム(参考) 2D041 AA02 BA31 CA05 CB06 DB02 DB14 FA14  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shigera Hirata 6-6-2 Sakyo, Nara City, Nara Prefecture Inside Daiwa Institute of Technology, Ltd. No. Fuji Corporation F term (reference) 2D041 AA02 BA31 CA05 CB06 DB02 DB14 FA14

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 鋼杭本体に接続される芯部と、先端刃及
び/又は翼とが、鋳造による成形で一体に備えられてい
ることを特徴とする鋼杭用鋼製部品。
1. A steel part for a steel pile, wherein a core connected to the steel pile main body and a tip blade and / or a wing are integrally provided by molding by casting.
【請求項2】 前記翼は、その外周端側の肉厚寸法が内
周端側の肉厚寸法より小に設定されている請求項1に記
載の鋼杭用鋼製部品。
2. The steel part for a steel pile according to claim 1, wherein the blade has a thickness on an outer peripheral end side smaller than a thickness on an inner peripheral end side.
【請求項3】 前記芯部が管部からなり、管部が翼との
境界部領域において前記鋳造によって増肉されている請
求項1又は2に記載の鋼杭用鋼製部品。
3. The steel part for a steel pile according to claim 1, wherein the core portion comprises a tube portion, and the tube portion is thickened by the casting in a boundary region with the wing.
【請求項4】 前記芯部が管部からなり、管部内に、補
強リブが鋳造による成形で管部と一体に備えられている
請求項1乃至3のいずれか一に記載の鋼杭用鋼製部品。
4. The steel for a steel pile according to claim 1, wherein the core portion comprises a tube portion, and a reinforcing rib is provided integrally with the tube portion by molding in the tube portion. Parts.
【請求項5】 前記芯部に、杭本体と螺合接続するため
のネジ部が、鋳造により一体成形されている請求項1乃
至4のいずれか一に記載の鋼杭用鋼製部品。
5. The steel part for a steel pile according to claim 1, wherein a screw part for screwing connection with the pile body is integrally formed with the core part by casting.
【請求項6】 前記芯部に、杭本体と溶接接続するため
の嵌合部が、鋳造により一体成形されている請求項1乃
至5のいずれか一に記載の鋼杭用鋼製部品。
6. The steel part for a steel pile according to claim 1, wherein a fitting part for welding connection with the pile body is integrally formed on the core part by casting.
JP2001158961A 2001-05-28 2001-05-28 Steel parts for steel piles Pending JP2002348861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001158961A JP2002348861A (en) 2001-05-28 2001-05-28 Steel parts for steel piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001158961A JP2002348861A (en) 2001-05-28 2001-05-28 Steel parts for steel piles

Publications (1)

Publication Number Publication Date
JP2002348861A true JP2002348861A (en) 2002-12-04

Family

ID=19002617

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001158961A Pending JP2002348861A (en) 2001-05-28 2001-05-28 Steel parts for steel piles

Country Status (1)

Country Link
JP (1) JP2002348861A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453741C (en) * 2003-04-04 2009-01-21 株式会社奥特-塞特 Block-type steel pipe pile
JP2011080255A (en) * 2009-10-07 2011-04-21 Masahiro Sugano Bit for rotatingly buried steel pipe pile
JP2014177825A (en) * 2013-03-15 2014-09-25 Tobu:Kk Rotary penetration steel pipe pile
WO2015024108A1 (en) * 2013-08-22 2015-02-26 Goliathtech Inc. Pile, pile head and connector therefor
JP5892677B1 (en) * 2015-05-25 2016-03-23 樋口 雅久 Tip for friction pile
JP2016173028A (en) * 2013-05-31 2016-09-29 株式会社新生工務 Pile and pile installation method
KR101896629B1 (en) * 2017-03-10 2018-09-07 주식회사 정호 Micro pile assembly having supporting force reinforcing member and micro pile constructing method using the same
US10487469B2 (en) 2016-11-16 2019-11-26 Goliathtech Inc. Support assembly for a building structure
US10982460B2 (en) 2017-08-10 2021-04-20 Goliathtech Inc. Support apparatus for supporting a headstone
US11299863B2 (en) 2016-11-16 2022-04-12 Goliathtech, Inc. Support assembly for a building structure
WO2025172854A1 (en) * 2024-02-14 2025-08-21 Goliathtech Inc. Ground pile and method of driving thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS486806Y1 (en) * 1967-05-15 1973-02-21
JPS61202541U (en) * 1985-06-05 1986-12-19
JPH03228914A (en) * 1990-02-05 1991-10-09 Ohbayashi Corp Driving method for steel-pipe pile
JPH11140869A (en) * 1997-11-10 1999-05-25 Nkk Corp Screwed steel pipe pile with wings
JPH11181767A (en) * 1997-12-24 1999-07-06 Sekisui House Ltd Tip fittings for steel pipe piles
JPH11280068A (en) * 1998-03-30 1999-10-12 Kubota Corp Pile with spiral strip and its casting mold
JP2001064959A (en) * 1999-08-31 2001-03-13 Daiwa House Ind Co Ltd Steel pipe pile with screw joint
JP2001098545A (en) * 1999-10-01 2001-04-10 Kubota Corp Spiral foundation pile and buried pile

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS486806Y1 (en) * 1967-05-15 1973-02-21
JPS61202541U (en) * 1985-06-05 1986-12-19
JPH03228914A (en) * 1990-02-05 1991-10-09 Ohbayashi Corp Driving method for steel-pipe pile
JPH11140869A (en) * 1997-11-10 1999-05-25 Nkk Corp Screwed steel pipe pile with wings
JPH11181767A (en) * 1997-12-24 1999-07-06 Sekisui House Ltd Tip fittings for steel pipe piles
JPH11280068A (en) * 1998-03-30 1999-10-12 Kubota Corp Pile with spiral strip and its casting mold
JP2001064959A (en) * 1999-08-31 2001-03-13 Daiwa House Ind Co Ltd Steel pipe pile with screw joint
JP2001098545A (en) * 1999-10-01 2001-04-10 Kubota Corp Spiral foundation pile and buried pile

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100453741C (en) * 2003-04-04 2009-01-21 株式会社奥特-塞特 Block-type steel pipe pile
JP2011080255A (en) * 2009-10-07 2011-04-21 Masahiro Sugano Bit for rotatingly buried steel pipe pile
JP2014177825A (en) * 2013-03-15 2014-09-25 Tobu:Kk Rotary penetration steel pipe pile
JP2016173028A (en) * 2013-05-31 2016-09-29 株式会社新生工務 Pile and pile installation method
US10400413B2 (en) 2013-08-22 2019-09-03 Goliathtech Inc. Pile, pile head and connector therefor
WO2015024108A1 (en) * 2013-08-22 2015-02-26 Goliathtech Inc. Pile, pile head and connector therefor
CN105492696A (en) * 2013-08-22 2016-04-13 格列斯科技股份有限公司 Pile, pile head and connectors therefor
US9631335B2 (en) 2013-08-22 2017-04-25 Goliathtech Inc. Pile, pile head and connector therefor
CN105492696B (en) * 2013-08-22 2018-07-10 格列斯科技股份有限公司 Pile, pile head and connectors therefor
JP5892677B1 (en) * 2015-05-25 2016-03-23 樋口 雅久 Tip for friction pile
US10487469B2 (en) 2016-11-16 2019-11-26 Goliathtech Inc. Support assembly for a building structure
US10870963B2 (en) 2016-11-16 2020-12-22 Goliathtech Inc. Support assembly for a building structure
US11299863B2 (en) 2016-11-16 2022-04-12 Goliathtech, Inc. Support assembly for a building structure
KR101896629B1 (en) * 2017-03-10 2018-09-07 주식회사 정호 Micro pile assembly having supporting force reinforcing member and micro pile constructing method using the same
US10982460B2 (en) 2017-08-10 2021-04-20 Goliathtech Inc. Support apparatus for supporting a headstone
WO2025172854A1 (en) * 2024-02-14 2025-08-21 Goliathtech Inc. Ground pile and method of driving thereof

Similar Documents

Publication Publication Date Title
JP2002348861A (en) Steel parts for steel piles
KR101960671B1 (en) Joint Structure of Circular Hollow Tube Truss and it's Fabrication Method
AU2004243395B2 (en) Method for the production of a connection flange
JP2828898B2 (en) Exhaust pipe joint structure and manufacturing method
JP2016142105A (en) Rock bolt material pipe
JP2002310378A (en) Pipe line lining structure
KR200277683Y1 (en) joint structure for PHC pile
JP2000265617A (en) Rebar and anchors for rebar
JP4578029B2 (en) Pile head structure and pile head bracket
JP2004270204A (en) Steel pipe joint structure and steel pipe joining method
JP2006046019A (en) Steel pipe joint structure
WO2005078329A1 (en) Flange joint with at least one flange being mounted in a rotation allowing manner
JP2021195966A (en) Pipe connection structure
JP2006265868A (en) Segment joint structure
JPH08312294A (en) Segment joint and connected structure of segment
JP2002122000A (en) Structure of tunnel liner and manufacturing method
KR200396405Y1 (en) flange pipe
JP2004019378A (en) Segment joint device
JP4781573B2 (en) Pile head structure of foundation pile and pile head construction method of foundation pile
JPS6027200Y2 (en) Reinforcement structure for bent bolt holes in concrete segments
JPH03229006A (en) Internal enforcing element of pipe fitting and method of manufacturing the same
JP7003744B2 (en) Building pillar material and pillar end joint structure
JPH08120831A (en) Reinforcing bar joint
JP4239610B2 (en) Steel pipe joining method
JP2008156997A (en) Segment piece, lining body having this segment piece and tunnel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080519

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100406

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100420

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100907