JP2002170011A - Order-receiving and delivery system for air conditioning air duct device - Google Patents
Order-receiving and delivery system for air conditioning air duct deviceInfo
- Publication number
- JP2002170011A JP2002170011A JP2000368907A JP2000368907A JP2002170011A JP 2002170011 A JP2002170011 A JP 2002170011A JP 2000368907 A JP2000368907 A JP 2000368907A JP 2000368907 A JP2000368907 A JP 2000368907A JP 2002170011 A JP2002170011 A JP 2002170011A
- Authority
- JP
- Japan
- Prior art keywords
- air
- parts
- order
- conditioning
- predetermined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004378 air conditioning Methods 0.000 title claims abstract description 93
- 238000012384 transportation and delivery Methods 0.000 title claims abstract description 86
- 238000007726 management method Methods 0.000 claims description 67
- 239000002184 metal Substances 0.000 claims description 13
- 229910052751 metal Inorganic materials 0.000 claims description 13
- 238000004904 shortening Methods 0.000 abstract description 4
- 238000003466 welding Methods 0.000 description 22
- 238000004519 manufacturing process Methods 0.000 description 20
- 230000032258 transport Effects 0.000 description 18
- 230000001143 conditioned effect Effects 0.000 description 9
- 230000000694 effects Effects 0.000 description 9
- 229910001335 Galvanized steel Inorganic materials 0.000 description 8
- 239000008397 galvanized steel Substances 0.000 description 8
- 238000010422 painting Methods 0.000 description 8
- 238000003860 storage Methods 0.000 description 8
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 6
- 238000000034 method Methods 0.000 description 6
- 230000007246 mechanism Effects 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 230000002411 adverse Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 3
- 229910002092 carbon dioxide Inorganic materials 0.000 description 3
- 239000001569 carbon dioxide Substances 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 239000007789 gas Substances 0.000 description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 3
- 238000012805 post-processing Methods 0.000 description 3
- 239000000779 smoke Substances 0.000 description 3
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000003546 flue gas Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Duct Arrangements (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、空気調和に用いら
れる空気調和用風道装置の受注から納入までを効率よく
進められる受注・納入システムに関する。なお、ここで
述べる空気調和用風道装置とは、空気調和機器のうち、
空気調和用気体の通風される移送路にあたるダクト、ダ
ンパ、チャンバ、吹出口、吸込口、ガラリ、及び排煙口
を意味するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an order-receiving / delivery system capable of efficiently proceeding from order-receiving to delivery of an air-conditioning wind path device used for air conditioning. In addition, the airway device for air conditioning described here is an air conditioning device,
It means a duct, a damper, a chamber, an air outlet, a suction port, a louver, and a smoke exhaust port, which are transfer paths through which the air-conditioning gas passes.
【0002】[0002]
【従来の技術】空気調和対象空間である室内に調和空気
を吹出す吹出口や、吹出口の前段に配置されて調和空気
の分配を均等化するチャンバ等の空気調和用風道装置で
は、これらの機器の上流側に空気調和用風道装置の一種
であるダンパを組合わせて用いることが多かった。この
ような従来の空気調和用風道装置(ダンパ)の一例を図
6に示す。この図6は従来の空気調和用風道装置の正面
図及び側面図である。2. Description of the Related Art In an air conditioner such as an air outlet that blows out conditioned air into a room that is an object of air conditioning, and a chamber that is disposed in front of the air outlet and that equalizes the distribution of conditioned air, these air conditioners are used. In many cases, a damper, which is a kind of air conditioning wind path device, is used in combination upstream of the above equipment. FIG. 6 shows an example of such a conventional air conditioning wind path device (damper). FIG. 6 is a front view and a side view of a conventional air conditioning wind path device.
【0003】前記図6において従来の空気調和用風道装
置100は、矩形断面の筒状体で形成され、チャンバ
(図示を省略)等の別の空気調和用風道装置の上流側に
接続され、さらに上流側の別の空気調和用風道装置から
送られた調和空気を送給する外筒101と、この外筒1
01の内側に所定角度回動可能に軸支され、外筒101
の内側開口領域を開閉自在とする矩形板状体からなる複
数の羽根102と、外筒101内で各羽根102に連結
されて各羽根102を一様に連動させて回動させる羽根
連動手段103とを備える構成であり、所定の羽根10
2を外筒101外側から回動させ、羽根連動手段103
を通じて各羽根102を外筒101に対し一体に所定角
度回動させ、外筒101内における気流通過の向きであ
る外筒101筒軸方向への開口面積を調整することで、
調和空気の通過量、すなわち下流側へ向う調和空気の風
量を調節するものである。In FIG. 6, a conventional air conditioning wind path device 100 is formed of a tubular body having a rectangular cross section, and is connected to an upstream side of another air conditioning air path device such as a chamber (not shown). An outer cylinder 101 for supplying conditioned air sent from another air conditioning wind path device on the further upstream side;
01, and is rotatably supported by a predetermined angle inside the outer cylinder 101.
A plurality of blades 102 each of which is a rectangular plate-like body capable of freely opening and closing the inner opening area of the blade, and a blade interlocking means 103 connected to each of the blades 102 in the outer cylinder 101 to rotate the respective blades 102 in a uniform manner And a predetermined blade 10
2 is rotated from the outside of the outer cylinder 101 and the blade interlocking means 103 is rotated.
By rotating each blade 102 integrally at a predetermined angle with respect to the outer cylinder 101, and adjusting the opening area in the axial direction of the outer cylinder 101, which is the direction of air flow in the outer cylinder 101,
The amount of conditioned air passing, that is, the amount of conditioned air flowing downstream is adjusted.
【0004】前記外筒101は、筒状に組合わせた複数
の金属製板状体を溶接により一体化させて形成される仕
組みとなっている。また、外筒101内側には、羽根1
02を軸支する軸受架台101aが溶接で一体に配設さ
れる構成である。そして、外筒101を所定の配設位置
に吊支するための吊り金具101bも溶接により外筒1
01外面に固定される。The outer cylinder 101 has a structure in which a plurality of metal plates combined in a cylindrical shape are integrated by welding. In addition, a blade 1 is provided inside the outer cylinder 101.
This is a configuration in which a bearing base 101a that supports the O.2 is integrally provided by welding. Further, a suspending fitting 101b for suspending and supporting the outer cylinder 101 at a predetermined disposition position is also welded to the outer cylinder 1 by welding.
01 is fixed to the outer surface.
【0005】前記羽根102は、金属製の矩形略板状体
で形成される羽根本体102aと、この羽根本体102
aの回動中心に配設される棒状の回転軸102bと、こ
の回転軸102bを羽根本体102aに一体に保持する
略板状の回転軸保持部(図示を省略)とを備える構成で
ある。回転軸保持部が羽根本体102aに溶接で一体に
固定されると共に、回転軸102bが回転軸保持部に溶
接で固定されて、各部品が一体化される仕組みとなって
いる。この羽根102は、回転軸102bの両端を外筒
101内側の軸受架台101aで軸支されて外筒101
内に回動可能に複数配設される。The blade 102 includes a blade main body 102a formed of a substantially rectangular metal plate and a blade main body 102a.
The rotating shaft 102b has a rod-shaped rotating shaft 102b disposed at the center of rotation of a and a substantially plate-shaped rotating shaft holding portion (not shown) for integrally holding the rotating shaft 102b to the blade main body 102a. The rotating shaft holding portion is integrally fixed to the blade main body 102a by welding, and the rotating shaft 102b is fixed to the rotating shaft holding portion by welding to integrate the components. The blade 102 is rotatably supported at both ends of a rotary shaft 102 b by a bearing base 101 a inside the outer cylinder 101.
A plurality is rotatably arranged in the inside.
【0006】前記羽根連動手段103は、互いに所定角
度範囲内回動自在に連結された二つの略腕状部材からな
る複数の連結金具103aと、この各連結金具103a
の一方の略腕状部材端部をそれぞれ所定間隔で溶接によ
り固定される所定長さの連結棒103bとを備える構成
であり、各連結金具103aの他方の略腕状部材端部を
各羽根102に溶接により固定され、各羽根102を連
動させて一様に回動させられる仕組みである。The blade interlocking means 103 includes a plurality of connecting members 103a, each of which includes two substantially arm-shaped members rotatably connected within a predetermined angle range, and each of the connecting members 103a.
And a connecting rod 103b of a predetermined length, which is fixed to each of the substantially arm-shaped member ends by welding at predetermined intervals, and the other substantially arm-shaped member end of each connection fitting 103a is connected to each of the blades 102. Is fixed by welding, and the blades 102 are uniformly rotated in conjunction with each other.
【0007】この従来の空気調和用風道装置100で
は、溶接で各部品を一体に固定しており、各部品の材料
として防錆効果のある亜鉛めっき鋼板を使用しても、溶
接後、亜鉛めっきの無効化した溶接部分に追加の錆止め
処理が必要となり、亜鉛めっき鋼板のメリットが生かせ
ず、コストと手間の面で不利になることから、材料とし
ては、錆止め処理は必要であるものの低コストである普
通鋼板を用いるのが一般的であった。こうした普通鋼板
を溶接によって一体に組立て、組立後、全体に錆止め塗
装を行い、空気調和用風道装置100としていた。[0007] In this conventional air conditioner wind path device 100, each component is integrally fixed by welding, and even if a galvanized steel sheet having a rust-preventive effect is used as a material for each component, it is difficult to maintain the zinc content after welding. Additional rust prevention treatment is required for the welded part where plating has been invalidated, and the advantages of galvanized steel sheet cannot be used, which is disadvantageous in terms of cost and labor, so rust prevention treatment is necessary as a material, but low cost It was common to use an ordinary steel plate. Such a normal steel plate was integrally assembled by welding, and after the assembly, the whole was subjected to rust-preventive painting to obtain an air conditioning wind path device 100.
【0008】また、このような従来の空気調和用風道装
置について、注文を受けてから納入までの流れについて
説明する。通常、空気調和用風道装置の組立は工場で行
っており、受注部門で顧客からの注文を受付けた後、受
注部門から工場の製造部門に空気調和用風道装置の製造
指示がなされる。製造部門で空気調和用風道装置を構成
する部品を割出した後、製造部門から在庫管理部門に部
品の出庫指示がなされる。そして、在庫管理部門で、部
品が在庫の場合はそのまま、部品在庫のない場合は別途
調達した上で、製造部門に部品を移管する。この後、製
造部門で部品を組立てて空気調和用風道装置として出荷
し、車両等の輸送手段で現場まで輸送し、現場に納入し
て取付けるといったプロセスとなっている。The flow from receiving an order to delivery of such a conventional air conditioning wind path device will be described. Usually, the assembly of the air conditioner is performed in a factory, and after receiving an order from a customer in the order receiving section, the order receiving section issues a manufacturing instruction of the air conditioner to the manufacturing section of the factory. After the parts that make up the air-conditioning wind path device have been determined in the manufacturing department, an instruction to take out the parts is issued from the manufacturing department to the inventory management department. Then, in the inventory management section, if the parts are in stock, they are procured separately if they are not in stock, and then the parts are transferred to the manufacturing section. Thereafter, the manufacturing department assembles the parts, ships them as an air conditioning wind path device, transports them to the site by means of vehicles such as vehicles, and delivers them to the site and mounts them.
【0009】[0009]
【発明が解決しようとする課題】従来の空気調和用風道
装置100は以上のように構成されていたことから、外
筒101及び羽根102の組立においては、複数の金属
部品を一体化するのに溶接を用いており、特別な設備や
特殊な技能者が不可欠であり、溶接や塗装設備の揃った
工場で組立て作業を行うのが一般的であった。このた
め、設備費や人件費を含む全体の製造コストを抑えるの
が難しいという課題を有していた。また、工場で部品を
組立てて溶接により一体化し、さらに塗装まで行うこと
から、製品を工場から送出すまでに時間がかかり、迅速
な納入が困難であるという課題を有した。Since the conventional air-conditioning airway device 100 is constructed as described above, in assembling the outer cylinder 101 and the blade 102, a plurality of metal parts are integrated. In particular, special equipment and special technicians are indispensable, and assembly work is generally performed in a factory equipped with welding and painting equipment. For this reason, there has been a problem that it is difficult to suppress the entire manufacturing cost including the equipment cost and the labor cost. In addition, since the parts are assembled at the factory, integrated by welding, and further painted, it takes a long time to send out the product from the factory, and it is difficult to quickly deliver the product.
【0010】さらに組立後、輸送手段で一体の筒体とな
った空気調和用風道装置100を輸送し、現場に納入す
ることから、輸送手段では内部が空洞となっている筒形
状のものをそのまま運ぶこととなり、輸送物の数量の割
に大きなスペースが占有され、輸送効率が極めて悪く、
輸送のコストが高くつくという課題を有していた。一
方、従来の空気調和用風道装置の注文受付において、受
付後の受注管理にコンピュータを用いることは一般的で
あり、また、在庫管理部門でも、部品毎の在庫数量や出
荷実績はコンピュータを用いて管理されている場合が多
かったが、従来、受注部門と在庫管理部門との間にはデ
ータに関して有効な連係が図られていないことが多く、
製造部門から在庫管理部門に部品の出庫依頼がなされて
初めて在庫管理部門で在庫状況が参照され、必要な部品
数に対し在庫数が不足する場合はその時点で部品の調達
が図られるという手順となっていたことから、全ての部
品を用意して製造部門に移管するまでに時間がかかる場
合があり、納期の特定も難しいという課題を有してい
た。Further, after the assembly, the air-conditioning airway device 100, which has been formed into an integral cylindrical body, is transported by the transportation means and delivered to the site, so that the transportation means has a hollow cylindrical shape. As it is transported as it is, a large space is occupied for the quantity of goods transported, transportation efficiency is extremely poor,
There was a problem that transportation costs were high. On the other hand, in order reception of the conventional air conditioning wind path device, it is common to use a computer for order management after the reception, and the inventory management department also uses a computer for the inventory quantity and shipping result of each part. In many cases, there is no effective data link between the ordering department and the inventory management department.
Only when the manufacturing department issues a parts issue request to the inventory management department, the inventory status is referred to by the inventory management department for the first time, and if the stock quantity is insufficient for the required number of parts, the parts can be procured at that time. Therefore, it may take time to prepare all components and transfer them to the manufacturing department, and it is difficult to specify a delivery date.
【0011】加えて、在庫管理部門もおける在庫の管理
は、欠品となる前に発注して在庫を切らさないようにす
る以外に、部品の出庫傾向等を考慮した積極的な在庫数
調整は行われておらず、無駄な在庫が多いという課題を
有していた。本発明は前記課題を解消するためになされ
たもので、組立構造を簡略化し、容易な組立を可能とし
て組立て場所を選ばず、輸送や納入の効率化も図れる空
気調和用風道装置について、受注側から直接在庫管理部
門に出庫部品の情報が送られて、受注の都度蓄積される
部品の利用実績から適切に在庫数調整を要する部品を把
握でき、在庫管理をより効率的に行え、空気調和用風道
装置の受注から納入までの期間を短縮できる空気調和用
風道装置の受注・納入システムを提供することを目的と
する。[0011] In addition, inventory management in the inventory management department is not limited to ordering before stockout, so as not to run out of inventory, and also to aggressive inventory adjustment taking into account the tendency of parts to be delivered. There was a problem that there was a lot of wasted inventory because it was not performed. The present invention has been made in order to solve the above-mentioned problems, and has received an order for an air-conditioning wind path device that simplifies an assembly structure, enables easy assembly, does not select an assembling place, and can improve transportation and delivery efficiency. Information on outgoing parts is sent directly to the inventory management department from the side, and it is possible to grasp the parts that need to be adjusted appropriately based on the use results of parts accumulated each time an order is received, to perform inventory management more efficiently, It is an object of the present invention to provide an order-receiving / delivery system for an air-conditioning wind path device capable of shortening a period from receiving an order to a delivery of a wind path device.
【0012】[0012]
【課題を解決するための手段】本発明に係る空気調和用
風道装置の受注・納入システムは、空気調和用風道装置
の納入注文指示を、所定のネットワークを通じて不特定
多数の顧客側のクライアントから受付ける所定の受注サ
ーバを少なくとも備え、前記受注サーバが、前記注文指
示を受付け後、前記空気調和用風道装置を構成する部品
の情報を所定のデータベースより取得して把握し、前記
部品情報に基づいて在庫管理部門のクライアントに所定
部品の出庫指示を送信した上で、在庫管理部門から出庫
された各部品の納入現場及び/又は所定の輸送中継箇所
への配送指示を所定の輸送手段に対し行い、且つ納入現
場及び/又は所定の輸送中継箇所の組立作業者に部品の
組立指示を行うと共に、前記受注サーバが、前記空気調
和用風道装置を構成する部品について各部品毎に利用実
績数を蓄積取得し、蓄積した利用実績データから全ての
部品について利用頻度を導き、当該利用頻度と在庫管理
部門における前記各部品の在庫状況とを比較検証して、
在庫管理部門に対し各部品の在庫数及び補充頻度を利用
頻度に対応させた状態に調整する指示を与えるものであ
る。An order receiving / delivery system for an air conditioner for an air conditioner according to the present invention provides an order for delivery of an air conditioner for an air conditioner to a client of an unspecified number of clients through a predetermined network. At least a predetermined order receiving server for receiving from the order receiving server, after receiving the order instruction, obtains and grasps information on components constituting the air conditioning wind path device from a predetermined database, and obtains the component information. Based on the instruction for delivery of the specified part to the client of the inventory management department based on the information, the delivery instruction of each part delivered from the inventory management department to the delivery site and / or a predetermined transportation relay point is transmitted to the predetermined transportation means. And at the same time, instructs an assembly worker at a delivery site and / or a predetermined transport relay point to assemble the parts, and the order receiving server configures the air conditioning wind path device. Accumulate and acquire the actual number of use for each component for each component, derive the frequency of use for all components from the accumulated actual use data, and compare and verify the frequency of use with the inventory status of each component in the inventory management department. ,
An instruction is given to the stock management department to adjust the stock quantity and replenishment frequency of each part to a state corresponding to the use frequency.
【0013】このように本発明においては、受注サーバ
が顧客からの注文を受付けた後、空気調和用風道装置を
構成する部品の情報を取得し、部品の利用頻度に応じた
在庫管理を在庫管理部門に指示しつつ、在庫管理部門に
速やかに部品の出庫指示を行い、また輸送手段に在庫管
理部門で揃えられた部品をそのまま部品状態で輸送する
指示を与え、納入現場や納入現場近くの輸送中継箇所ま
で輸送させた後、組立作業者に部品の組立を行わせて、
最終的に製品として納入することにより、受注時点で得
られる情報を在庫管理に利用することであらかじめ適切
な在庫状態とすることができ、在庫不足を生じさせずに
部品の出庫を必要最小限の時間で行え、納入現場又はそ
の近くで短時間に組立てて納入できることと合わせて、
顧客による発注から納入に至るまでのリードタイムの短
縮が図れ、顧客満足度を向上させられる。また、輸送手
段で大きなスペースを占有する空気調和用風道装置の製
品状態での輸送を必要最小限に留めて、可能な限り部品
のままで輸送でき、輸送手段の積載率を向上させて効率
的に輸送が行え、輸送費を大幅に削減できると共に、炭
酸ガス排出などの周囲環境への悪影響も軽減できる。As described above, according to the present invention, after the order receiving server receives an order from a customer, it acquires information on parts constituting the air conditioning wind path device, and performs inventory management according to the frequency of use of the parts. While instructing the management department, the inventory management department is instructed to take out the parts promptly, and the transportation means is instructed to transport the parts prepared by the inventory management department as they are, and the delivery site or near the delivery site After transporting to the transport relay point, have the assembly worker assemble the parts,
Finally, by delivering the product as a product, the information obtained at the time of receiving the order can be used for inventory management to make it possible to set an appropriate inventory state in advance, and the delivery of parts to the minimum necessary without causing inventory shortage In addition to being able to do it in a short time and being able to assemble and deliver it in a short time at or near the delivery site,
The lead time from customer ordering to delivery can be shortened, and customer satisfaction can be improved. In addition, transport of the air conditioner air-conditioning device, which occupies a large space in the transport means, in the product state can be minimized and transported with parts as much as possible, improving the loading ratio of transport means and improving efficiency. Transport can be performed efficiently, and transportation costs can be significantly reduced, and adverse effects on the surrounding environment such as carbon dioxide emissions can also be reduced.
【0014】また、本発明に係る空気調和用風道装置の
受注・納入システムは、前記空気調和用風道装置が、空
気調和用の気体を供給されると共に当該気体を下流側の
空気調和機器へ送出す矩形筒状の外筒と、外筒の内側に
所定角度回動可能に軸支されて配設される複数の羽根
と、当該各羽根を連動させて一様に所定角度回動させる
羽根連動手段とを備え、前記羽根を所定角度回動させて
外筒内部の開口面積を調整可能とし、前記外筒が、四つ
の金属製板状体を筒状に組合わせて形成され、少なくと
も前記外筒をなす金属製板状体同士、及び前記羽根連動
手段と羽根とを含む、当接する部品同士をそれぞれ所定
の固定手段で部品表面性状に変化を与えることなく一体
に固定するものである。Further, in the order-receiving / delivery system for an air-conditioning airway device according to the present invention, the air-conditioning airway device is supplied with an air-conditioning gas and the gas is supplied to a downstream air-conditioning apparatus. And a plurality of blades rotatably supported by a predetermined angle inside the outer cylinder, and the respective blades are uniformly rotated by a predetermined angle in conjunction with each other. A blade interlocking means, wherein the blade is rotated by a predetermined angle so that the opening area inside the outer cylinder can be adjusted, and the outer cylinder is formed by combining four metal plate-like bodies into a cylindrical shape, at least The abutting parts, including the metal plate-like bodies forming the outer cylinder and the blade interlocking means and the blades, are integrally fixed by predetermined fixing means without giving any change to the component surface properties. .
【0015】このように本発明においては、複数の部品
を組合わせて空気調和用風道装置を形成すると共に、組
合わせた各部品を所定の固定手段を用いて一体化し、溶
接無しで部品同士を固定することにより、部品を特殊な
設備や技能を用いずに容易に組立可能となり、工場等の
特殊な設備が不要となる上、溶接等の特殊な技能者も不
要となり、設備費や人件費を含む全体の製造コストを大
きく低減できる。また、工場で組立作業を行う必要がな
くなって作業場所を問わなくなり、工場の他、現場や輸
送中継箇所等で組立を行うことが可能となり、この場合
部品状態で輸送でき、輸送の無駄を抑えられる。さら
に、溶接の必要がないことにより、材料として亜鉛めっ
き鋼板をそのまま使用することができ、亜鉛めっき鋼板
を用いた場合、錆止め塗装等の後加工の必要がなく、塗
装作業を省略して短時間に組立て作業を完了でき、省力
化が図れる。As described above, according to the present invention, a plurality of components are combined to form an air conditioning wind path device, and the combined components are integrated using predetermined fixing means, and the components are joined together without welding. By fixing, parts can be easily assembled without using special equipment and skills, special equipment such as factories is not required, and special technicians such as welding are also unnecessary, equipment costs and personnel costs The overall manufacturing costs including costs can be greatly reduced. Also, there is no need to perform assembling work in a factory, so that work can be performed in any place.In addition to the factory, it is possible to assemble at the site or at a transport relay point. Can be Furthermore, since there is no need for welding, a galvanized steel sheet can be used as a material as it is, and when a galvanized steel sheet is used, there is no need for post-processing such as rust-preventive painting, and the painting work can be omitted and a short time can be achieved. Assembly work can be completed and labor can be saved.
【0016】また、本発明に係る空気調和用風道装置の
受注・納入システムは必要に応じて、前記空気調和用風
道装置の固定手段として、所定の螺子が当接する二つの
部品を螺子止めで一体化させるものである。このように
本発明においては、螺子を固定手段として用い、当接す
る二つの部品の一方を他方に螺子止めし、部品同士を一
体に固定することにより、部品を熟練無しに容易に組立
可能となり、螺子を回す道具等以外の設備も不要とな
り、製造コストを大幅に低減できると共に、組立も短時
間で行え、納期の短縮が図れる。The order-receiving / delivery system for an air-conditioning air channel device according to the present invention may be provided, if necessary, as a fixing means for the air-conditioning air channel device, by screwing two parts with which a predetermined screw abuts. Is integrated. As described above, in the present invention, the screws are used as fixing means, and one of the two abutting parts is screwed to the other, and the parts are integrally fixed, so that the parts can be easily assembled without skill. Equipment other than tools for turning the screws is not required, so that the manufacturing cost can be greatly reduced, and the assembly can be performed in a short time, and the delivery time can be shortened.
【0017】また、本発明に係る空気調和用風道装置の
受注・納入システムは必要に応じて、前記空気調和用風
道装置の固定手段として、所定のボルト及びナットが当
接する二つの部品を挟んで螺合して部品同士を一体化さ
せるものである。このように本発明においては、ボルト
及びナットを固定手段として用い、当接する二つの部品
にボルトを貫通させ、ボルトとナットを螺合させて締付
け、部品同士を一体に固定することにより、部品を熟練
無しに容易に組立可能となり、ボルト及びナットを締付
ける道具等以外の設備も不要となり、製造コストを大幅
に低減できると共に、組立も短時間で行え、納期の短縮
が図れる。Further, the order-receiving / delivery system for the air-conditioning air channel device according to the present invention may include, as required, two parts with which predetermined bolts and nuts abut as fixing means for the air-conditioning air channel device. The components are sandwiched and screwed together to integrate the components. As described above, in the present invention, the bolt and the nut are used as fixing means, the bolt is penetrated through the two contacting parts, the bolt and the nut are screwed together and fastened, and the parts are integrally fixed, thereby fixing the parts. It is easy to assemble without skill, and equipment other than tools for tightening bolts and nuts is not required, so that manufacturing costs can be greatly reduced, assembling can be performed in a short time, and delivery time can be shortened.
【0018】また、本発明に係る空気調和用風道装置の
受注・納入システムは必要に応じて、前記空気調和用風
道装置の固定手段として、所定のリベットが当接する二
つの部品を挟んで離反不可能に係合変形させられ、部品
同士を一体化させるものである。このように本発明にお
いては、リベットを固定手段として用い、当接する二つ
の部品にリベットを貫通させ、貫通したリベット端部を
脱落不可能な状態まで変形させ、部品同士を一体に固定
することにより、部品を熟練無しに容易に組立可能とな
り、リベットを扱う道具等以外の設備も不要となり、製
造コストを大幅に低減できると共に、組立も短時間で行
え、納期の短縮が図れる。The order-receiving / delivery system for an air-conditioning air channel device according to the present invention may be provided, as necessary, as a fixing means for the air-conditioning air channel device by sandwiching two parts with which predetermined rivets come into contact. The parts are deformed so that they cannot be separated from each other, and the parts are integrated. As described above, in the present invention, the rivet is used as a fixing means, the rivet is penetrated through the two contacting parts, the penetrated rivet end is deformed to a state in which the rivet cannot be dropped, and the parts are integrally fixed. In addition, parts can be easily assembled without skill, and equipment other than tools for handling rivets is not required, so that manufacturing costs can be greatly reduced, assembly can be performed in a short time, and delivery time can be shortened.
【0019】また、本発明に係る空気調和用風道装置の
受注・納入システムは必要に応じて、前記空気調和用風
道装置の固定手段として、当接する二つの部品自体に互
いに係合可能な所定の凸部分又は凹部分がそれぞれ形成
され、一方の部品の凸部分を他方の部品の凹部分に外力
でかしめて嵌入し、前記凸部分と凹部分を固定して部品
同士を一体化させるものである。Further, the order-receiving / delivery system for the air-conditioning air channel device according to the present invention can be engaged with the two abutting parts themselves as fixing means for the air-conditioning air channel device as required. A predetermined convex portion or a concave portion is formed, and the convex portion of one component is caulked by external force into the concave portion of the other component, and the convex portion and the concave portion are fixed to integrate the components. It is.
【0020】このように本発明においては、部品自体に
形成した凸部分又は凹部分を固定手段として用い、当接
する二つの部品をその凹凸部分でかしめて係合させ、凸
部分及び凹部分を互いに離反不可能な状態とし、部品同
士を一体に固定することにより、部品を熟練無しに容易
に組立可能となり、凸部分を凹部分に嵌入する道具等以
外の設備も不要となり、製造コストを大幅に低減できる
と共に、組立も短時間で行え、納期の短縮が図れる。As described above, in the present invention, the convex portion or the concave portion formed on the component itself is used as a fixing means, and the two components which are in contact with each other are caulked at the concave and convex portions to engage with each other, and the convex portion and the concave portion are mutually connected. The parts cannot be separated, and the parts are fixed together.This makes it easy to assemble the parts without skill and eliminates the need for equipment other than tools to fit the convex part into the concave part, greatly reducing manufacturing costs. In addition to the reduction, the assembly can be performed in a short time, and the delivery time can be shortened.
【0021】[0021]
【発明の実施の形態】以下、本発明の一実施の形態に係
る空気調和用風道装置の受注・納入システムを図1ない
し図5に基づいて説明する。図1は本実施の形態に係る
空気調和用風道装置の受注・納入システムの概略構成説
明図、図2は本実施の形態に係る空気調和用風道装置の
正面図及び側面図、図3は本実施の形態に係る空気調和
用風道装置における外筒及び羽根の組立状態説明図、図
4は本実施の形態に係る空気調和用風道装置における外
筒への羽根及びストッパー固定状態説明図、図5は本実
施の形態に係る空気調和用風道装置における羽根連動手
段、吊り金具、及びコーナ金具の固定状態説明図であ
る。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An order-receiving / delivery system for an air-conditioning wind path device according to an embodiment of the present invention will be described below with reference to FIGS. FIG. 1 is a schematic configuration explanatory view of an order-receiving / delivery system for an air-conditioning airway device according to the present embodiment. FIG. 2 is a front view and a side view of the air-conditioning airway device according to the present embodiment. FIG. 4 is an explanatory view of an assembled state of an outer cylinder and a blade in the air conditioner according to the present embodiment, and FIG. 4 is an explanatory view of a state in which the blade and the stopper are fixed to the outer tube in the air conditioner according to the present embodiment. FIG. 5 and FIG. 5 are explanatory views of the fixed state of the blade interlocking means, the hanging metal fittings, and the corner metal fittings in the air conditioner wind path device according to the present embodiment.
【0022】前記各図において本実施の形態に係る空気
調和用風道装置の受注・納入システム20は、所定のネ
ットワーク60に接続され、このネットワーク60を通
じて不特定多数の顧客に対し空気調和用風道装置1の販
売注文の受付を行い、注文指示された空気調和用風道装
置1を構成する所定部品の調達指令を送信すると共に、
調達された各部品の納入現場及び/又は所定の輸送中継
箇所への発送指示を行う受注サーバ30と、この受注サ
ーバ30と接続されて在庫管理部門に配設され、製品を
発注した顧客への出荷指示を受注サーバ30から受取る
複数の在庫管理用クライアント40と、受注サーバ30
とネットワーク接続され、利用者の指示操作に基づいて
受注サーバ30に対し製品発注要求を行う顧客側クライ
アント50とを備える構成である。In each of the drawings, the order receiving / delivery system 20 for the air conditioning wind path device according to the present embodiment is connected to a predetermined network 60, and through this network 60, an unspecified number of customers can receive the air conditioning wind. A sales order for the road device 1 is received, and a procurement command for predetermined parts constituting the air-conditioning wind path device 1 specified by the order is transmitted.
An order receiving server 30 for instructing the procured parts to be delivered to a delivery site and / or a predetermined transport relay point, and connected to the order receiving server 30 and arranged in the inventory management department to provide a customer who has ordered a product to a customer. A plurality of inventory management clients 40 for receiving shipping instructions from the order receiving server 30;
And a client-side client 50 for making a product order request to the order receiving server 30 based on a user's instruction operation.
【0023】前記受注サーバ30は、所定のネットワー
ク60上で空気調和用風道装置1の製品情報を顧客側ク
ライアント50の利用者に提供し、空気調和用風道装置
1の注文を受付けるオンライン販売システムを構築され
る一方、利用者から送られた注文依頼に対応する部品出
庫指示を在庫管理用クライアント40へ送信するネット
ワークサーバである。この受注サーバ30は、顧客側ク
ライアント50や在庫管理用クライアント40とやり取
りする各種情報を格納・管理する記憶手段31を備え
る。The order receiving server 30 provides the product information of the air conditioner 1 on a predetermined network 60 to the user of the client-side client 50, and accepts an order for the air conditioner 1 for online sales. A network server that constructs a system and transmits a parts delivery instruction corresponding to an order request sent from a user to the inventory management client 40. The order receiving server 30 includes a storage unit 31 that stores and manages various types of information exchanged with the client 50 and the inventory management client 40.
【0024】また、受注サーバ30は、受注後、注文さ
れた一又は複数の空気調和用風道装置1を構成する全て
の部品情報を記憶手段31に格納された所定の部品デー
タベースより取得して把握し、前記部品情報に基づいて
在庫管理部門の在庫管理用クライアント40に各部品の
調達指令を送信し、且つ、部品の利用数の集積から全て
の部品に対する利用頻度を導き、在庫管理用クライアン
ト40を通じて在庫管理部門に対し利用の多い部品の在
庫を多くする一方、利用の少ない部品の在庫を少なくす
る在庫補充調整の指示を与える仕組みである。After receiving the order, the order receiving server 30 obtains, from a predetermined parts database stored in the storage means 31, information on all the parts constituting the ordered air conditioning wind path device 1 or a plurality of parts. The inventory management client grasps and sends a procurement instruction for each component to the inventory management client 40 of the inventory management department based on the component information, and derives the usage frequency for all components from the accumulation of the number of used components. This is a mechanism for giving an instruction for stock replenishment adjustment to increase the stock of frequently used parts to the stock management department and reduce the stock of less used parts to the stock management department through 40.
【0025】さらに、受注サーバ30は、在庫管理部門
で製品を構成する全ての部品が用意された後、輸送手段
である所定の運送車両70に対し積載品目及び目的地等
を含む輸送指令を送信するものである。前記在庫管理用
クライアント40は、ネットワーク接続された受注サー
バ30から製品発注の結果得られた出荷依頼や在庫状況
等の情報の送受信を行うクライアントとしてのコンピュ
ータであり、利用者からの入力操作を受ける入力手段4
1と受注サーバ30からの送信情報を画面表示として利
用者に示す表示手段42とを備える構成である。この在
庫管理用クライアント40は、受注サーバ30と直接ネ
ットワーク接続される他に、必要に応じた所定のアクセ
ス制限を伴いつつ、インターネット等の外部のネットワ
ークを介して接続される場合もあり得る。Further, after all the parts constituting the product are prepared by the inventory management section, the order receiving server 30 transmits a transportation command including a loaded item and a destination to a predetermined transportation vehicle 70 as a transportation means. Is what you do. The inventory management client 40 is a computer that transmits and receives information such as a shipment request and inventory status obtained as a result of a product order from the order receiving server 30 connected to the network, and receives an input operation from a user. Input means 4
1 and a display means 42 for displaying transmission information from the order receiving server 30 to a user as a screen display. In addition to being directly connected to the order receiving server 30 via a network, the inventory management client 40 may be connected via an external network such as the Internet with a predetermined access restriction as required.
【0026】前記顧客側クライアント50は、利用者の
注文入力操作に基づいて、受注サーバ30に対しネット
ワークを通じて空気調和用風道装置1の注文要求や入力
情報を送信するクライアントとしてのコンピュータであ
り、利用者からの入力操作を受ける入力手段51と受注
サーバ30からの送信情報を画面表示として利用者に示
す表示手段52とを備える構成である。この顧客側クラ
イアント50は、インターネット等の外部のネットワー
クを介して受注サーバ30と接続されるが、必要に応じ
て受注サーバ30と直接ネットワーク接続されてもかま
わない。The client 50 is a computer as a client for transmitting an order request and input information of the air conditioning wind path device 1 to the order receiving server 30 through a network based on a user's order input operation. The configuration includes an input unit 51 that receives an input operation from a user and a display unit 52 that shows transmission information from the order receiving server 30 to the user as a screen display. The customer-side client 50 is connected to the order receiving server 30 via an external network such as the Internet, but may be directly connected to the order receiving server 30 as necessary.
【0027】また、この本実施の形態に係る受注・納入
システム20で取扱われる空気調和用風道装置1は、従
来の空気調和用風道装置100(図6参照)と同様のダ
ンパであり、外筒11と、羽根12と、羽根連動手段1
3とを備える一方、従来と異なる点として、前記外筒1
1をはじめとする各部品同士の固定を螺子止めやリベッ
ト止め、カシメにより行う構成を有するものである。The air conditioner 1 used in the order receiving / delivery system 20 according to the present embodiment is a damper similar to the conventional air conditioner 100 (see FIG. 6). Outer cylinder 11, blade 12, blade interlocking means 1
3 is different from the prior art in that the outer cylinder 1
1 and other components are fixed by screwing, riveting, and caulking.
【0028】前記外筒11は、金属製板状体である縦外
板11a及び横外板11bをそれぞれ二つずつ用い、筒
状に組合わせた上で螺子止めにより一体化させて形成さ
れる仕組みとなっている。また、外筒11の縦外板11
a内側には、羽根12を軸支する軸受架台11cがカシ
メで一体に配設される構成である。そして、外筒11を
所定の配設位置に吊支するための吊り金具11dはボル
ト・ナット止めにより外筒11の縦外板11a外面に固
定される。The outer cylinder 11 is formed by using two vertical outer plates 11a and two horizontal outer plates 11b, each of which is a metal plate, assembled into a cylindrical shape, and integrated by screwing. It has a mechanism. Also, the vertical outer plate 11 of the outer cylinder 11
On the inner side of a, a bearing base 11c that supports the blade 12 is integrally formed by caulking. A hanging metal fitting 11d for suspending and supporting the outer cylinder 11 at a predetermined arrangement position is fixed to the outer surface of the vertical outer plate 11a of the outer cylinder 11 by bolts and nuts.
【0029】外筒11をなす縦外板11a及び横外板1
1bは、端部にフランジ部分が折曲げ形成されて外板部
分とフランジ部分とがあらかじめ一体化した形状となっ
ており、縦外板11a及び横外板11bが外筒11をな
す状態で、両端部の各フランジ部分がコーナ部でコーナ
金具11eとカシメにより一体化されて、複数部材で構
成される共板式のフランジ11fとされる構造である。The vertical outer plate 11a and the horizontal outer plate 1 forming the outer cylinder 11
1b has a shape in which a flange portion is bent at an end and an outer plate portion and a flange portion are integrated in advance, and the vertical outer plate 11a and the horizontal outer plate 11b form the outer cylinder 11, Each of the flange portions at both ends is integrated with a corner fitting 11e at a corner portion by caulking to form a coplanar flange 11f composed of a plurality of members.
【0030】前記羽根12は、前記従来同様、矩形略板
状体の羽根本体12aと、棒状の回転軸12bと、略板
状の回転軸保持部12cとを備える構成である。回転軸
12bの周側面所定位置には、軸方向に連続するV字溝
が形成され、また、回転軸保持部12cには、前記回転
軸12bのV字溝に係合する凸形状部分が成形される構
成となっている。回転軸保持部12cが羽根本体12a
に螺子止めで一体に固定されると共に、回転軸12bが
回転軸保持部12cと係合した状態で羽根本体12aと
回転軸保持部12c間に固定され、各部品が一体化され
る仕組みとなっている。The blade 12 has a substantially plate-like blade main body 12a, a rod-shaped rotation shaft 12b, and a substantially plate-shaped rotation shaft holding portion 12c, as in the conventional case. An axially continuous V-shaped groove is formed at a predetermined position on the peripheral side surface of the rotating shaft 12b, and a convex portion that engages with the V-shaped groove of the rotating shaft 12b is formed in the rotating shaft holding portion 12c. It is configured to be. The rotating shaft holding part 12c is the blade body 12a
To the blade body 12a and the rotating shaft holding portion 12c in a state where the rotating shaft 12b is engaged with the rotating shaft holding portion 12c, and the components are integrated. ing.
【0031】前記羽根連動手段13は、互いに所定角度
範囲内回動自在に連結された二つの略腕状部材からなる
複数の連結金具13aと、この各連結金具13aの一方
の略腕状部材端部をそれぞれ所定間隔でリベット止めに
より固定される所定長さの連結棒13bとを備える構成
であり、各連結金具13aの他方の略腕状部材端部を各
羽根12にカシメにより固定され、従来同様、各羽根1
02を連動させて一様に回動させられる仕組みである。The blade interlocking means 13 includes a plurality of connecting members 13a, each of which includes two substantially arm-shaped members rotatably connected within a predetermined angle range, and one end of each substantially arm-shaped member of each of the connecting members 13a. And a connecting rod 13b of a predetermined length, each of which is fixed by riveting at a predetermined interval, and the other substantially arm-shaped member end of each connecting bracket 13a is fixed to each blade 12 by caulking. Similarly, each blade 1
02 can be rotated uniformly in conjunction with each other.
【0032】これら空気調和用風道装置1を構成する各
部品は、納入現場及び/又は所定の輸送中継箇所におい
て組立作業者により組立てられ、空気調和用風道装置1
として一体化される。次に、前記構成に基づく受注・納
入システムにおける空気調和用風道装置1の受注から納
入までの一連の処理を説明する。あらかじめ、受注サー
バ30は、一又は複数の製品毎の特徴、金額等といった
製品情報を、顧客側クライアント50を通じて利用者が
閲覧可能な形式でネットワーク60上に公開した状態と
なっている。利用者は受注サーバ30から提供される製
品情報を顧客側クライアント50を通じて閲覧し、希望
する製品に対し購入手続を行いたい場合には、顧客側ク
ライアント50上で製品の注文を行うための入力画面を
呼出し、入力画面で注文に必要な所定の情報を入力手段
51から入力して注文を行う。Each component constituting the air conditioning air channel device 1 is assembled by an assembling worker at a delivery site and / or a predetermined transportation relay point, and the air conditioning air channel device 1 is assembled.
Integrated as Next, a series of processes from order receipt to delivery of the air conditioning wind path device 1 in the order receiving / delivery system based on the above configuration will be described. In advance, the order receiving server 30 publishes product information, such as features and prices of one or a plurality of products, on the network 60 in a format that can be viewed by a user through the client-side client 50. The user browses the product information provided from the order receiving server 30 through the client-side client 50 and, when wishing to perform a purchase procedure for a desired product, an input screen for ordering the product on the client-side client 50 Is called, and predetermined information necessary for the order is input from the input means 51 on the input screen to place an order.
【0033】そして、受注サーバ30が、顧客側クライ
アント50からネットワーク60を介して空気調和用風
道装置1の注文を受注すると、注文を指示された空気調
和用風道装置1を構成する全ての部品の情報を記憶手段
31の部品データベースより取得して把握し、前記部品
情報に基づいて、記憶手段31に格納された各部品の在
庫データベースを参照し、部品が空気調和用風道装置1
の組立に十分な在庫数となっているか否かを判断する。When the order receiving server 30 receives an order for the air-conditioning airway device 1 from the client-side client 50 via the network 60, all of the ordered air-conditioning airway devices 1 are ordered. The part information is acquired from the part database of the storage means 31 and grasped, and based on the part information, the stock database of each part stored in the storage means 31 is referred to, and the parts are stored in the air conditioning wind path device 1
It is determined whether or not the number of stocks is sufficient for assembling.
【0034】各部品の在庫数が十分である場合、各部品
の空気調和用風道装置1を構成可能な数量分の出庫指示
を在庫管理用クライアント40に送信し、在庫管理用ク
ライアント40を通じた指示で在庫管理担当者に部品の
出庫作業を行わせる。部品の出庫後、在庫管理担当者が
在庫管理用クライアント40の入力手段41により出庫
完了を入力すると、受注サーバ30は在庫データベース
における各部品の在庫数を出庫分を差引いた値に更新す
る。When the stock quantity of each part is sufficient, a delivery instruction for a quantity that can constitute the air conditioning air duct device 1 of each part is transmitted to the stock management client 40, and the information is transmitted through the stock management client 40. Instruct the inventory manager to take out parts at the instruction. After the parts have been delivered, when the inventory manager inputs the completion of the delivery through the input means 41 of the inventory management client 40, the order receiving server 30 updates the stock quantity of each part in the inventory database to a value obtained by subtracting the delivered quantity.
【0035】ここで、在庫数が不足する場合、受注サー
バ30は在庫管理部門の在庫管理用クライアント40に
対し、出庫指示の他、在庫不足であることを送信し、在
庫管理用クライアント40では在庫不足であることを表
示手段42に表示し、在庫管理担当者による補充処理作
業を促す。在庫管理担当者は出荷指示された部品の在庫
が不足していることを確認したら、不足部品の調達作業
を行うと共に、補充にかかるおおよその期間を在庫管理
用クライアント40に入力する。不足部品の補充後、部
品の補充数を在庫管理担当者が在庫管理用クライアント
40から入力すると、受注サーバ30において補充数が
記憶手段31の在庫データベースの対応する部品在庫数
に加えられる。不足分を含む部品の出庫後、在庫管理担
当者が在庫管理用クライアント40の入力手段により出
庫完了を入力すると、前記同様受注サーバ30が各部品
の在庫数を更新する。Here, when the stock quantity is insufficient, the order receiving server 30 sends an outgoing instruction and a notification that the stock is insufficient to the inventory management client 40 of the inventory management section. The display means 42 displays the shortage, and prompts the replenishment processing work by the stock manager. After confirming that there is a shortage of parts for which shipping has been instructed, the stock management person performs a procurement operation of the missing parts and inputs an approximate period for replenishment to the stock management client 40. After the replenishment of the missing parts, when the inventory management person inputs the replenishment number of the parts from the inventory management client 40, the replenishment number is added to the corresponding parts inventory number in the inventory database of the storage means 31 in the order receiving server 30. After the parts including the shortage have been delivered, when the inventory manager inputs the completion of the delivery using the input means of the inventory management client 40, the order receiving server 30 updates the stock quantity of each part as described above.
【0036】一方、受注サーバ30は、受注した空気調
和用風道装置1を構成する全ての部品について、利用さ
れる各部品の数量を記憶装置13における利用実績デー
タベースの各部品毎の部品利用実績データに追加して格
納する。この利用実績データから全ての部品について利
用頻度を導き、この利用頻度が以前に比べて在庫管理部
門における在庫数の調整が必要な程度変化しているか否
かを判定し、利用頻度の変化が大きい場合は、在庫管理
部門の在庫管理用クライアント40に対し、利用の多い
部品の在庫を多くし、且つ利用の少ない部品の在庫を少
なくする在庫補充調整を行う指示を与える。On the other hand, the order receiving server 30 determines the quantity of each component used for all the components constituting the air conditioning wind path device 1 for which the order has been received, by using the component use record of each component in the use record database in the storage device 13. Store in addition to data. The usage frequency of all parts is derived from the usage result data, and it is determined whether or not the usage frequency has changed to a degree necessary to adjust the number of stocks in the inventory management department compared with the previous case. In this case, an instruction is given to the inventory management client 40 of the inventory management department to perform inventory replenishment adjustment to increase the inventory of frequently used parts and reduce the inventory of underused parts.
【0037】また、受注サーバ30は、在庫データベー
スの部品在庫状況に基づく各製品毎の可能な納入時期を
導き、製品情報と共に顧客側クライアント50を通じて
利用者が閲覧可能な形式で公開する。部品在庫が十分で
ない場合は、在庫管理担当者により在庫管理用クライア
ント40に入力された補充にかかるおおよその期間に基
づいた納入時期を導く。The order receiving server 30 derives a possible delivery time for each product based on the parts stock status of the stock database, and publishes the information together with the product information in a format that can be viewed by the user through the client-side client 50. If the parts inventory is not sufficient, a delivery time is derived based on the approximate period of replenishment input to the inventory management client 40 by the inventory management person.
【0038】空気調和用風道装置1を構成する部品が在
庫管理部門で全て出庫され、在庫管理担当者によって出
庫完了が入力されると、受注サーバ30が、顧客から入
力された受注情報、すなわち、納入現場及び/又は所定
の輸送中継箇所などの配送目的地の位置、部品の種類や
量、積載にあたっての制約条件等の情報を納品指示情報
として受注サーバ30の記憶手段31に格納すると共
に、運送車両70の管理者に送信する。When all the components constituting the air conditioning wind path device 1 are delivered in the inventory management section and the completion of the delivery is input by the inventory manager, the order receiving server 30 receives the order information input by the customer, that is, the order information. In addition to storing information such as the position of a delivery destination such as a delivery site and / or a predetermined transport relay point, the type and quantity of parts, and restrictions on loading, in the storage means 31 of the order receiving server 30 as delivery instruction information, This is transmitted to the administrator of the transportation vehicle 70.
【0039】運送車両70は、納品指示情報に基づいて
運行し、各部品は輸送された後、納入現場及び/又は所
定の輸送中継箇所で組立てられ、空気調和用風道装置1
として一体化されて納入現場に納入される。続いて、前
記構成に基づく空気調和用風道装置の組立工程について
説明する。まず、縦外板11aをあらかじめ折曲げ加工
した端部で横外板11bに螺子止めにより固定し、一体
化して外筒11を形成する。The transportation vehicle 70 operates based on the delivery instruction information, and after each part is transported, assembled at a delivery site and / or a predetermined transportation relay point, and the air conditioning wind path device 1
And delivered to the delivery site. Subsequently, an assembling process of the air-conditioning airway device based on the above configuration will be described. First, the outer casing 11 is formed by fixing the vertical outer casing 11a to the horizontal outer casing 11b with a screw at an end portion which has been bent in advance, and integrating them.
【0040】一方、羽根本体12aと回転軸保持部12
cとの間に回転軸12bを挟み、回転軸12bのV字溝
と回転軸保持部12cの凸形状を係合させた状態で羽根
本体12aと回転軸保持部12cを螺子止めし、羽根本
体12aと回転軸保持部12c、及び回転軸12bを一
体に固定し、羽根12とする。こうして一体化させた各
羽根12の回転軸12bを軸受架台11cの複数の孔に
それぞれ挿通した状態で、軸受架台11cを羽根12ご
と外筒11内に入れ、軸受架台11cを外筒11の縦外
板11a内側にカシメにより固定し、羽根12の外筒1
1内への配設を完了させる。この後、L字断面の型材か
らなるストッパー11gを外筒11の横外板11b内側
にカシメにより取付ける。On the other hand, the blade main body 12a and the rotary shaft holder 12
c, the blade main body 12a and the rotary shaft holding portion 12c are screwed together with the V-shaped groove of the rotary shaft 12b and the convex shape of the rotary shaft holding portion 12c engaged with each other. The blade 12 is fixed integrally with the rotating shaft holding portion 12c and the rotating shaft 12b. With the rotating shafts 12b of the blades 12 integrated in this manner inserted through the plurality of holes of the bearing base 11c, the bearing base 11c is put into the outer cylinder 11 together with the blades 12, and the bearing base 11c is The outer cylinder 1 of the blade 12 is fixed inside the outer plate 11a by caulking.
1 is completed. Thereafter, a stopper 11g made of an L-shaped cross section is attached to the inside of the lateral outer plate 11b of the outer cylinder 11 by caulking.
【0041】そして、あらかじめ羽根連動手段13の連
結棒13bにリベット止めにより連結されている複数の
連結金具13aの端部を、対応する各羽根12の羽根本
体12a端部にカシメにより一体に固定する。さらに、
外筒11の縦外板11a外側上部所定位置に吊り金具1
1dをボルト及びナット止めで固定する。最後に、外筒
11の縦外板11aと横外板11bの各フランジ部分の
コーナ近傍位置にコーナ金具11eをカシメにより一体
に取付けると、一体のフランジ11fとなり、空気調和
用風道装置1が完成する。Then, the ends of the plurality of connecting fittings 13a which are connected to the connecting rod 13b of the blade interlocking means 13 by riveting in advance are integrally fixed to the corresponding ends of the blade main bodies 12a of the respective blades 12 by caulking. . further,
Hanging bracket 1 at a predetermined position on the outer upper side of vertical outer plate 11a of outer cylinder 11
1d is fixed with bolts and nuts. Finally, when the corner fitting 11e is integrally attached by caulking to a position near the corner of each flange portion of the vertical outer plate 11a and the horizontal outer plate 11b of the outer cylinder 11, an integral flange 11f is obtained, and the air conditioning wind path device 1 is provided. Complete.
【0042】これら各部品の組立には全く溶接の必要が
ないことから、材料として亜鉛めっき鋼板をそのまま使
用することができ、亜鉛めっき鋼板を用いた場合、錆止
め塗装等の後加工の必要がなく、塗装作業を省略して短
時間に組立て作業を完了でき、納品までの時間を短縮で
きると共に省力化が図れる。さらに、前記構成に基づく
空気調和用風道装置における風量調整動作について説明
する。従来同様、外筒11外側から所定の羽根12を回
動させ、羽根連動手段13による連動で他の羽根12も
回動させ、各羽根12の回動角度変化で外筒11内の開
口面積を調節し、調和空気通過量、すなわち調和空気の
風量を決定する。Since there is no need for welding at all for the assembly of these parts, a galvanized steel sheet can be used as it is. When a galvanized steel sheet is used, there is no need for post-processing such as rust preventive painting. In addition, the assembling work can be completed in a short time by omitting the painting work, so that the time until delivery can be shortened and labor can be saved. Further, a description will be given of an air volume adjustment operation in the air conditioning wind path device based on the above configuration. As in the prior art, a predetermined blade 12 is rotated from the outside of the outer cylinder 11, the other blades 12 are also rotated by the interlocking of the blade interlocking means 13, and the opening area in the outer cylinder 11 is changed by changing the rotation angle of each blade 12. The conditioned air flow rate, that is, the conditioned air flow rate is determined.
【0043】風量を増やす場合には、従来同様に、各羽
根12を開放方向、すなわち羽根12を外筒11に対し
外筒11の筒軸方向と平行となる向きに近付くように回
動させ、外筒11内側の開口面積を大きくし、調和空気
の通過量を増やす。一方、風量を抑える場合は、外筒1
1に対して各羽根12を閉塞方向、すなわち、羽根12
を外筒の筒軸方向と直角をなす向きに近付くように回動
させ、外筒11内の開口面積を小さくし、調和空気の通
過量を減らす。To increase the air volume, as in the conventional case, each blade 12 is rotated so as to approach the opening direction, that is, the blade 12 approaches the outer cylinder 11 in a direction parallel to the cylinder axis direction of the outer cylinder 11. The opening area inside the outer cylinder 11 is increased to increase the passage amount of conditioned air. On the other hand, when suppressing the air volume, the outer cylinder 1
1 in the closing direction, that is, the blade 12
Is rotated so as to approach a direction perpendicular to the cylinder axis direction of the outer cylinder, the opening area in the outer cylinder 11 is reduced, and the passage amount of conditioned air is reduced.
【0044】このように、本実施の形態に係る空気調和
用風道装置の受注・納入システムにおいては、受注サー
バ30及び在庫管理用クライアント40を導入し、受注
サーバ30が顧客からの注文を受付けた後、空気調和用
風道装置1を構成する部品の情報を取得し、部品の利用
頻度に応じた在庫管理の指示を含む受注情報を在庫管理
部門の在庫管理用クライアント40に送信して在庫管理
部門に速やかに部品の出庫指示を行い、また運送車両7
0に在庫管理部門で揃えられた部品をそのまま部品状態
で輸送する指示を与え、納入現場や納入現場近くの輸送
中継箇所まで輸送させた後、組立作業者に部品の組立を
行わせて、最終的に製品として納入することから、受注
時点で得られる情報を在庫管理に利用して常時適切な在
庫状態とすることができ、在庫不足を生じさせずに部品
の出庫を必要最小限の時間で行え、納入現場又はその近
くで短時間に組立てて納入できることと合わせて、顧客
による発注から納入に至るまでのリードタイムの短縮が
図れ、顧客満足度を向上させられる。また、空気調和用
風道装置においては、従来同様の羽根12を回動させて
外筒11内の開口面積を調整して風量調整を行う機構は
そのままに、組合わせた各部品を固定する固定手段とし
て螺子やボルト・ナット、リベットや凹凸(カシメ)を
用いて溶接無しで容易に組立て可能な構造とされること
から、各部品を組立てるのに工場等の特殊な設備や溶接
等の特殊な技能も不要となり、設備費や人件費を含む全
体の製造コストを大きく低減できる。さらに、運送車両
70で大きなスペースを占有する空気調和用風道装置1
の製品状態での輸送を必要最小限に留めて、可能な限り
部品のままで輸送でき、運送車両70の積載率を向上さ
せて効率的に輸送が行え、輸送費を大幅に削減できると
共に、炭酸ガス排出などの周囲環境への悪影響も軽減で
きる。As described above, in the order receiving / delivery system for the air conditioning wind path device according to the present embodiment, the order receiving server 30 and the inventory management client 40 are introduced, and the order receiving server 30 receives an order from a customer. After that, the information of the parts constituting the air conditioning wind path device 1 is acquired, and the order information including the instruction of the inventory management according to the frequency of use of the parts is transmitted to the inventory management client 40 of the inventory management department to perform the inventory. Immediately instructs the management department to take parts out of the vehicle, and
0 is given an instruction to transport the parts prepared by the inventory management section as they are, and after transporting them to the delivery site or to a transportation relay point near the delivery site, the assembly worker is required to assemble the parts. Since the product is delivered as a product, the information obtained at the time of receiving the order can be used for inventory management to keep the stock in an appropriate state at all times, and parts can be delivered in a minimum time without causing inventory shortage. In addition to being able to assemble and deliver in a short time at or near the delivery site, the lead time from customer ordering to delivery can be shortened, and customer satisfaction can be improved. Further, in the air conditioner wind path device, a fixed mechanism for fixing the combined components without changing a mechanism for adjusting the opening area in the outer cylinder 11 to adjust the opening area in the outer cylinder 11 as it is in a conventional manner. It is a structure that can be easily assembled without welding using screws, bolts and nuts, rivets and unevenness (caulking) as a means, so special equipment such as factories and special welding such as welding are used to assemble each part. No skills are required, and the overall manufacturing costs, including equipment and labor costs, can be significantly reduced. Furthermore, the air conditioning wind path device 1 occupying a large space in the transportation vehicle 70
The transportation in the product state can be minimized, the parts can be transported as much as possible, the loading rate of the transport vehicle 70 can be improved, the transportation can be performed efficiently, and the transportation cost can be greatly reduced. Adverse effects on the surrounding environment such as carbon dioxide emissions can also be reduced.
【0045】なお、前記実施の形態に係る空気調和用風
道装置の受注・納入システムにおいて、取扱う空気調和
用風道装置を風量調節用のダンパとする構成としている
が、これに限らず、防火ダンパや排煙ダンパ等の他のダ
ンパ、また、別の空気調和用風道装置としてのダクト、
チャンバ、吹出口、吸込口、ガラリ、排煙口及び排煙ダ
クト等を受注・納入の品目として取扱う構成とすること
もできる。In the order receiving / delivery system for the air conditioner for air conditioning according to the embodiment, the air conditioner for air conditioning to be handled is configured as a damper for adjusting the air volume, but is not limited to this. Other dampers such as dampers and flue gas dampers, and ducts as other air conditioning wind path devices,
It is also possible to adopt a configuration in which the chamber, the outlet, the suction port, the waste, the smoke outlet, the smoke exhaust duct, and the like are handled as items to be ordered and delivered.
【0046】また、前記実施の形態に係る空気調和用風
道装置の受注・納入システムにおいては、受注サーバ3
0から在庫管理用クライアント40に送信された指示に
基づいて在庫管理担当者が部品の出庫作業を行う仕組み
としているが、これに限らず、部品の入出庫を自動管理
する自動倉庫システムを導入し、受注サーバ30からの
指示に基づいて自動で部品の出庫を行う仕組みとするこ
ともでき、人手を減ることなく短時間で部品の出庫を行
え、さらなる納期短縮が図れる。Further, in the order receiving / delivery system for the air conditioning wind path device according to the above embodiment, the order receiving server 3
Although the system is designed so that the inventory management person performs the part retrieval work based on the instruction transmitted from 0 to the inventory management client 40, the present invention is not limited to this. In addition, it is also possible to adopt a mechanism in which parts are automatically delivered based on an instruction from the order receiving server 30, so that parts can be delivered in a short time without reducing the number of workers, and the delivery time can be further shortened.
【0047】[0047]
【発明の効果】以上のように本発明によれば、受注サー
バが顧客からの注文を受付けた後、空気調和用風道装置
を構成する部品の情報を取得し、部品の利用頻度に応じ
た在庫管理を在庫管理部門に指示しつつ、在庫管理部門
に速やかに部品の出庫指示を行い、また輸送手段に在庫
管理部門で揃えられた部品をそのまま部品状態で輸送す
る指示を与え、納入現場や納入現場近くの輸送中継箇所
まで輸送させた後、組立作業者に部品の組立を行わせ
て、最終的に製品として納入することにより、受注時点
で得られる情報を在庫管理に利用することであらかじめ
適切な在庫状態とすることができ、在庫不足を生じさせ
ずに部品の出庫を必要最小限の時間で行え、納入現場又
はその近くで短時間に組立てて納入できることと合わせ
て、顧客による発注から納入に至るまでのリードタイム
の短縮が図れ、顧客満足度を向上させられるという効果
を有する。さらに、輸送手段で大きなスペースを占有す
る空気調和用風道装置の製品状態での輸送を必要最小限
に留めて、可能な限り部品のままで輸送でき、輸送手段
の積載率を向上させて効率的に輸送が行え、輸送費を大
幅に削減できると共に、炭酸ガス排出などの周囲環境へ
の悪影響も軽減できるという効果を有する。As described above, according to the present invention, after the order receiving server receives an order from a customer, information on the components constituting the air conditioning wind path device is obtained, and the information is obtained according to the frequency of use of the components. While instructing the inventory management department to perform inventory management, the inventory management department is promptly instructed to take out parts, and the transportation means is instructed to transport the parts prepared by the inventory management department as they are in the delivery site. After being transported to the transportation relay point near the delivery site, the assembly worker assembles the parts and finally delivers it as a product, so that the information obtained at the time of ordering can be used for inventory management in advance. Orders can be placed by the customer in addition to being able to keep parts in stock in a short time without the need for inventory, to be able to take out parts without causing a shortage, and to be able to assemble and deliver in a short time at or near the delivery site. Hakare to shorten the lead time of up to al delivery, it has the effect that is to improve the customer satisfaction. Furthermore, transport of the air conditioning air duct device, which occupies a large space in the transportation means, in the product state can be minimized and transported with parts as much as possible, improving the loading ratio of transportation means and improving efficiency This has the effect that transport can be carried out efficiently, transport costs can be greatly reduced, and adverse effects on the surrounding environment such as carbon dioxide emissions can also be reduced.
【0048】また、本発明によれば、複数の部品を組合
わせて空気調和用風道装置を形成すると共に、組合わせ
た各部品を所定の固定手段を用いて一体化し、溶接無し
で部品同士を固定することにより、部品を特殊な設備や
技能を用いずに容易に組立可能となり、工場等の特殊な
設備が不要となる上、溶接等の特殊な技能者も不要とな
り、設備費や人件費を含む全体の製造コストを大きく低
減できるという効果を奏する。また、工場で組立作業を
行う必要がなくなって作業場所を問わなくなり、工場の
他、現場や輸送中継箇所等で組立を行うことが可能とな
り、この場合部品状態で輸送でき、輸送の無駄を抑えら
れるという効果を有する。さらに、溶接の必要がないこ
とにより、材料として亜鉛めっき鋼板をそのまま使用す
ることができ、亜鉛めっき鋼板を用いた場合、錆止め塗
装等の後加工の必要がなく、塗装作業を省略して短時間
に組立て作業を完了でき、省力化が図れるという効果を
有する。Further, according to the present invention, a plurality of components are combined to form an air conditioner wind path device, and the combined components are integrated using a predetermined fixing means, and the components are joined together without welding. By fixing, parts can be easily assembled without using special equipment and skills, special equipment such as factories is not required, and special technicians such as welding are also unnecessary, equipment costs and personnel costs This has the effect of greatly reducing the overall manufacturing cost including costs. Also, there is no need to perform assembling work in a factory, so that work can be performed in any place.In addition to the factory, it is possible to assemble at the site or at a transport relay point. It has the effect that it can be done. Furthermore, since there is no need for welding, a galvanized steel sheet can be used as a material as it is, and when a galvanized steel sheet is used, there is no need for post-processing such as rust-preventive painting, and the painting work can be omitted and a short time can be achieved. This has the effect that the assembling work can be completed and labor can be saved.
【0049】また、本発明によれば、螺子を固定手段と
して用い、当接する二つの部品の一方を他方に螺子止め
し、部品同士を一体に固定することにより、部品を熟練
無しに容易に組立可能となり、螺子を回す道具等以外の
設備も不要となり、製造コストを大幅に低減できると共
に、組立も短時間で行え、納期の短縮が図れるという効
果を有する。Further, according to the present invention, by using a screw as a fixing means, one of the two abutting parts is screwed to the other, and the parts are integrally fixed, so that the parts can be easily assembled without skill. This makes it possible to eliminate the necessity of equipment other than tools for turning the screws, so that the manufacturing cost can be greatly reduced, and the assembly can be performed in a short time, thereby shortening the delivery time.
【0050】また、本発明によれば、ボルト及びナット
を固定手段として用い、当接する二つの部品にボルトを
貫通させ、ボルトとナットを螺合させて締付け、部品同
士を一体に固定することにより、部品を熟練無しに容易
に組立可能となり、ボルト及びナットを締付ける道具等
以外の設備も不要となり、製造コストを大幅に低減でき
ると共に、組立も短時間で行え、納期の短縮が図れると
いう効果を有する。Further, according to the present invention, a bolt and a nut are used as fixing means, a bolt is penetrated through two abutting parts, and the bolt and the nut are screwed and fastened to fix the parts together. , Parts can be easily assembled without skill, and no equipment other than tools for tightening bolts and nuts is required, so that manufacturing costs can be greatly reduced, assembly can be performed in a short time, and the delivery time can be shortened. Have.
【0051】また、本発明によれば、リベットを固定手
段として用い、当接する二つの部品にリベットを貫通さ
せ、貫通したリベット端部を脱落不可能な状態まで変形
させ、部品同士を一体に固定することにより、部品を熟
練無しに容易に組立可能となり、リベットを扱う道具等
以外の設備も不要となり、製造コストを大幅に低減でき
ると共に、組立も短時間で行え、納期の短縮が図れると
いう効果を有する。According to the present invention, the rivet is used as a fixing means, the rivet is penetrated through the two parts in contact with each other, the end of the rivet penetrated is deformed to a state where it cannot be dropped off, and the parts are integrally fixed. By doing so, it is possible to easily assemble parts without skill, eliminating the need for equipment other than tools for handling rivets, greatly reducing manufacturing costs, assembling in a short time, and shortening delivery time. Having.
【0052】また、本発明によれば、部品自体に形成し
た凸部分又は凹部分を固定手段として用い、当接する二
つの部品をその凹凸部分でかしめて係合させ、凸部分及
び凹部分を互いに離反不可能な状態とし、部品同士を一
体に固定することにより、部品を熟練無しに容易に組立
可能となり、凸部分を凹部分に嵌入する道具等以外の設
備も不要となり、製造コストを大幅に低減できると共
に、組立も短時間で行え、納期の短縮が図れるという効
果を有する。Further, according to the present invention, the convex portion or the concave portion formed on the component itself is used as a fixing means, and the two contacting components are caulked and engaged with the concave and convex portions, and the convex portion and the concave portion are mutually joined. The parts cannot be separated, and the parts are fixed together.This makes it easy to assemble the parts without skill and eliminates the need for equipment other than tools to fit the convex part into the concave part, greatly reducing manufacturing costs. In addition to the reduction, the assembly can be performed in a short time, and the delivery time can be shortened.
【図1】本発明の一実施の形態に係る空気調和用風道装
置の受注・納入システムの概略構成説明図である。FIG. 1 is a schematic configuration explanatory diagram of an order receiving / delivery system for an air conditioner wind path device according to an embodiment of the present invention.
【図2】本発明の一実施の形態に係る空気調和用風道装
置の正面図及び側面図である。FIG. 2 is a front view and a side view of the air conditioner wind path device according to one embodiment of the present invention.
【図3】本発明の一実施の形態に係る空気調和用風道装
置における外筒及び羽根の組立状態説明図である。FIG. 3 is an explanatory diagram of an assembled state of an outer cylinder and blades in the air conditioner wind path device according to one embodiment of the present invention.
【図4】本発明の一実施の形態に係る空気調和用風道装
置における外筒への羽根及びストッパー固定状態説明図
である。FIG. 4 is an explanatory view of a state in which the blade and the stopper are fixed to the outer cylinder in the air conditioner wind path device according to one embodiment of the present invention.
【図5】本発明の一実施の形態に係る空気調和用風道装
置における羽根連動手段、吊り金具、及びコーナ金具の
固定状態説明図である。FIG. 5 is an explanatory view showing a fixed state of a blade interlocking means, a suspension metal fitting, and a corner metal fitting in the air conditioner wind path device according to one embodiment of the present invention.
【図6】従来の空気調和用風道装置の正面図及び側面図
である。FIG. 6 is a front view and a side view of a conventional air conditioning wind path device.
1、100 空気調和用風道装置 11、101 外筒 11a 縦外板 11b 横外板 11c、101a 軸受架台 11d、101b 吊り金具 11e コーナ金具 11f フランジ 11g ストッパー 12、102 羽根 12a、102a 羽根本体 12b、102b 回転軸 12c 回転軸保持部 13、103 羽根連動手段 13a、103a 連結金具 13b、103b 連結棒 20 受注・納入システム 30 受注サーバ 31 記憶手段 40 在庫管理用クライアント 41 入力手段 42 表示手段 50 顧客側クライアント 51 入力手段 52 表示手段 60 ネットワーク 70 運送車両 DESCRIPTION OF SYMBOLS 1, 100 Air-conditioning wind path apparatus 11, 101 Outer cylinder 11a Vertical outer panel 11b Horizontal outer panel 11c, 101a Bearing stand 11d, 101b Suspension fitting 11e Corner fitting 11f Flange 11g Stopper 12, 102 Blade 12a, 102a Blade main body 12b, 102b Rotary shaft 12c Rotary shaft holding unit 13, 103 Blade interlocking means 13a, 103a Connecting bracket 13b, 103b Connecting rod 20 Order receiving / delivery system 30 Order receiving server 31 Storage unit 40 Inventory management client 41 Input unit 42 Display unit 50 Customer side client 51 input means 52 display means 60 network 70 transportation vehicle
─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───
【手続補正書】[Procedure amendment]
【提出日】平成13年11月30日(2001.11.
30)[Submission date] November 30, 2001 (2001.11.
30)
【手続補正1】[Procedure amendment 1]
【補正対象書類名】図面[Document name to be amended] Drawing
【補正対象項目名】全図[Correction target item name] All figures
【補正方法】変更[Correction method] Change
【補正内容】[Correction contents]
【図1】 FIG.
【図2】 FIG. 2
【図3】 FIG. 3
【図4】 FIG. 4
【図5】 FIG. 5
【図6】 FIG. 6
───────────────────────────────────────────────────── フロントページの続き (72)発明者 近藤 譲二 福岡県糸島郡志摩町大字小富士968 空調 技研工業株式会社内 (72)発明者 白水 五月男 福岡県糸島郡志摩町大字小富士968 空調 技研工業株式会社内 Fターム(参考) 3L080 AE05 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Joji Kondo Air-conditioning Gifu Kogyo 968, Shima-machi, Itoshima-gun, Fukuoka Prefecture F term in reference (reference) 3L080 AE05
Claims (6)
所定のネットワークを通じて不特定多数の顧客側のクラ
イアントから受付ける所定の受注サーバを少なくとも備
え、 前記受注サーバが、前記注文指示を受付け後、前記空気
調和用風道装置を構成する部品の情報を所定のデータベ
ースより取得して把握し、前記部品情報に基づいて在庫
管理部門のクライアントに所定部品の出庫指示を送信し
た上で、在庫管理部門から出庫された各部品の納入現場
及び/又は所定の輸送中継箇所への配送指示を所定の輸
送手段に対し行い、且つ納入現場及び/又は所定の輸送
中継箇所の組立作業者に部品の組立指示を行うと共に、 前記受注サーバが、前記空気調和用風道装置を構成する
部品について各部品毎に利用実績数を蓄積取得し、蓄積
した利用実績データから全ての部品について利用頻度を
導き、当該利用頻度と在庫管理部門における前記各部品
の在庫状況とを比較検証して、在庫管理部門に対し各部
品の在庫数及び補充頻度を利用頻度に対応させた状態に
調整する指示を与えることを特徴とする空気調和用風道
装置の受注・納入システム。1. A delivery order instruction for an air conditioning wind path device is
At least a predetermined order receiving server that receives from an unspecified number of clients on a predetermined network through a predetermined network, the order receiving server, after receiving the order instruction, obtains information on components constituting the air conditioning wind path device in a predetermined manner. After acquiring from the database and grasping it, transmitting a delivery instruction of a predetermined part to the client of the inventory management department based on the part information, a delivery site of each part delivered from the inventory management department and / or a predetermined transportation relay A delivery instruction to a location is given to a predetermined transportation means, and an assembly instruction is given to a delivery site and / or an assembly worker at a predetermined transportation relay point. Accumulated number of actual use of each component is obtained for each component, and the frequency of use is derived for all components from the accumulated actual use data. Comparing the usage frequency with the stock status of each part in the stock management department, and giving an instruction to the stock management department to adjust the stock quantity and replenishment frequency of each part to a state corresponding to the use frequency. Order and delivery system for air conditioning wind path equipment.
置の受注・納入システムにおいて、 前記空気調和用風道装置が、空気調和用の気体を供給さ
れると共に当該気体を下流側の空気調和機器へ送出す矩
形筒状の外筒と、外筒の内側に所定角度回動可能に軸支
されて配設される複数の羽根と、当該各羽根を連動させ
て一様に所定角度回動させる羽根連動手段とを備え、前
記羽根を所定角度回動させて外筒内部の開口面積を調整
可能とし、 前記外筒が、四つの金属製板状体を筒状に組合わせて形
成され、 少なくとも前記外筒をなす金属製板状体同士、及び前記
羽根連動手段と羽根とを含む、当接する部品同士をそれ
ぞれ所定の固定手段で部品表面性状に変化を与えること
なく一体に固定することを特徴とする空気調和用風道装
置の受注・納入システム。2. The air-conditioning wind path device according to claim 1, wherein the air-conditioning air path device is supplied with an air-conditioning gas and the gas is supplied to a downstream side. A rectangular cylindrical outer cylinder to be sent to the air-conditioning equipment, a plurality of blades arranged to be rotatably supported inside the outer cylinder by a predetermined angle, and the respective blades are interlocked to form a predetermined angle. A blade interlocking means for rotating the blade, wherein the blade is rotated by a predetermined angle so that the opening area inside the outer cylinder can be adjusted, and the outer cylinder is formed by combining four metal plate-like bodies into a cylindrical shape. And at least the abutting parts, including at least the metal plate bodies forming the outer cylinder, and the wing interlocking means and the wings, are integrally fixed by predetermined fixing means without changing the surface properties of the parts. Order and delivery system for air conditioner air conditioner Stem.
置の受注・納入システムにおいて、 前記空気調和用風道装置の固定手段として、所定の螺子
が当接する二つの部品を螺子止めで一体化させることを
特徴とする空気調和用風道装置の受注・納入システム。3. The order-receiving / delivery system for an air-conditioning airway device according to claim 2, wherein two parts with which a predetermined screw abuts are screwed as fixing means of the air-conditioning airway device. An order-receiving / delivery system for air-conditioning air ducts, characterized by being integrated.
置の受注・納入システムにおいて、 前記空気調和用風道装置の固定手段として、所定のボル
ト及びナットが当接する二つの部品を挟んで螺合して部
品同士を一体化させることを特徴とする空気調和用風道
装置の受注・納入システム。4. An order receiving / delivery system for an air conditioner for air conditioning according to claim 2, wherein two parts to which predetermined bolts and nuts abut are sandwiched as fixing means of the air conditioner for air conditioner. An order-receiving / delivery system for air-conditioning air ducts, characterized in that parts are integrated by screwing together.
置の受注・納入システムにおいて、 前記空気調和用風道装置の固定手段として、所定のリベ
ットが当接する二つの部品を挟んで離反不可能に係合変
形させられ、部品同士を一体化させることを特徴とする
空気調和用風道装置の受注・納入システム。5. The air-conditioning air channel device according to claim 2, wherein the air-conditioning air channel device is fixed to the air-conditioning air channel device with two rivets in contact with each other. An order-receiving / delivery system for an air-conditioning wind path device, characterized in that it is impossible to engage and deform, and the parts are integrated.
置の受注・納入システムにおいて、 前記空気調和用風道装置の固定手段として、当接する二
つの部品自体に互いに係合可能な所定の凸部分又は凹部
分がそれぞれ形成され、一方の部品の凸部分を他方の部
品の凹部分に外力でかしめて嵌入し、前記凸部分と凹部
分を固定して部品同士を一体化させることを特徴とする
空気調和用風道装置の受注・納入システム。6. The order receiving / delivery system for an air conditioner for air conditioning according to claim 2, wherein the fixing means of the air conditioner for air conditioning is a predetermined means which can be engaged with two abutting parts themselves. The convex portion or the concave portion is formed, and the convex portion of one component is crimped into the concave portion of the other component by external force, and the convex portion and the concave portion are fixed to integrate the components. An order-receiving and delivery system for air-conditioning air ducts, which is a distinctive feature.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000368907A JP2002170011A (en) | 2000-12-04 | 2000-12-04 | Order-receiving and delivery system for air conditioning air duct device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000368907A JP2002170011A (en) | 2000-12-04 | 2000-12-04 | Order-receiving and delivery system for air conditioning air duct device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2002170011A true JP2002170011A (en) | 2002-06-14 |
Family
ID=18839036
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000368907A Pending JP2002170011A (en) | 2000-12-04 | 2000-12-04 | Order-receiving and delivery system for air conditioning air duct device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2002170011A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7409363B2 (en) | 2002-08-28 | 2008-08-05 | Daifuku Co., Ltd. | Centralized management system for maintenance parts |
| JP2021051812A (en) * | 2021-01-07 | 2021-04-01 | 三菱電機株式会社 | Inventory management device, inventory management system, inventory management method, and program |
| JP2023168701A (en) * | 2022-05-16 | 2023-11-29 | 株式会社新富士空調 | Duct member selling system and method for selling duct |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0668116A (en) * | 1992-08-21 | 1994-03-11 | Daikin Ind Ltd | Produciton supporting device for product made to order |
| JPH07249082A (en) * | 1994-03-10 | 1995-09-26 | Sony Corp | Inventory management method |
| JPH10131492A (en) * | 1996-11-06 | 1998-05-19 | Ishikawajima Harima Heavy Ind Co Ltd | Plant construction management equipment |
-
2000
- 2000-12-04 JP JP2000368907A patent/JP2002170011A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0668116A (en) * | 1992-08-21 | 1994-03-11 | Daikin Ind Ltd | Produciton supporting device for product made to order |
| JPH07249082A (en) * | 1994-03-10 | 1995-09-26 | Sony Corp | Inventory management method |
| JPH10131492A (en) * | 1996-11-06 | 1998-05-19 | Ishikawajima Harima Heavy Ind Co Ltd | Plant construction management equipment |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7409363B2 (en) | 2002-08-28 | 2008-08-05 | Daifuku Co., Ltd. | Centralized management system for maintenance parts |
| JP2021051812A (en) * | 2021-01-07 | 2021-04-01 | 三菱電機株式会社 | Inventory management device, inventory management system, inventory management method, and program |
| JP7179098B2 (en) | 2021-01-07 | 2022-11-28 | 三菱電機株式会社 | Inventory control device, inventory control system, inventory control method and program |
| JP2023168701A (en) * | 2022-05-16 | 2023-11-29 | 株式会社新富士空調 | Duct member selling system and method for selling duct |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102327747B1 (en) | System and Method for managing shelf life and inventory of food distributed through cold chain based on demand prediction model using big data | |
| US20220156695A1 (en) | Intelligent network of autonomous delivery robots | |
| US9474816B2 (en) | Methods for dispersing decontamination products | |
| US20190050802A1 (en) | Systems and methods of preparing food products | |
| US20140019288A1 (en) | Supply Chain Management System and Method | |
| JP2002170011A (en) | Order-receiving and delivery system for air conditioning air duct device | |
| WO2007123968A2 (en) | System and method for enhancing supply chain transactions | |
| CN111950758A (en) | Distribution route planning method, device, server and storage medium | |
| US20180053149A1 (en) | System and method of directing delivery service requests, and a graphical user interface therefor | |
| CN116057551B (en) | Information processing device, information processing method, and storage medium | |
| EP1580633A1 (en) | Shipment management system and shipment management method | |
| CN104850979A (en) | Logistics information management platform | |
| US20050144053A1 (en) | Method of sourcing orders for optimized logistics | |
| CN108922020A (en) | A kind of warm-served food Intelligent Machining vending machine based on wireless network | |
| KR20230158440A (en) | Delivery sharing system using delivery base | |
| JP2004245556A (en) | Online air conditioning temperature setting system, center machine and online air conditioning temperature setting program | |
| JPH11208826A (en) | Sorting system | |
| CN1459069A (en) | System and method for facilitating transations involving distribution of equipment and post-installation supply and/or service of equipment | |
| KR102493278B1 (en) | Drug medicine safety management system | |
| JP2006101493A (en) | Equipment management system, management device, equipment management method and equipment management program | |
| EP1189158A1 (en) | Apparatus and method to carry out remote e-business transactions | |
| Grant | Supply chain restructuring in UK aerospace | |
| JPH11325576A (en) | Damper used for air conveying duct | |
| US20240086800A1 (en) | E-commerce scheduled order apparatus and method | |
| JP4724318B2 (en) | Manufacturing method of semi-finished iron products ordered online |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20071022 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100114 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100202 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20100608 |