[go: up one dir, main page]

JP2001159231A - Temporary structure and its construction method - Google Patents

Temporary structure and its construction method

Info

Publication number
JP2001159231A
JP2001159231A JP34476799A JP34476799A JP2001159231A JP 2001159231 A JP2001159231 A JP 2001159231A JP 34476799 A JP34476799 A JP 34476799A JP 34476799 A JP34476799 A JP 34476799A JP 2001159231 A JP2001159231 A JP 2001159231A
Authority
JP
Japan
Prior art keywords
members
horizontal
brace
diagonal
temporary structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34476799A
Other languages
Japanese (ja)
Other versions
JP4312323B2 (en
Inventor
Eiichi Aikawa
映一 合川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Sangyo Co Ltd
Original Assignee
Asahi Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18371828&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2001159231(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Asahi Sangyo Co Ltd filed Critical Asahi Sangyo Co Ltd
Priority to JP34476799A priority Critical patent/JP4312323B2/en
Publication of JP2001159231A publication Critical patent/JP2001159231A/en
Application granted granted Critical
Publication of JP4312323B2 publication Critical patent/JP4312323B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a temporary structure and its construction method capable of reducing the buckling length of supports in half, improving the load support strength, and capable of reducing the number of components and securing work passages. SOLUTION: Bored flanges 10 are fixed at the described intervals in the vertical axial direction, the supports 2 extendable in sequence are fitted, and two diagonal members 17 are pivotally supported to be flared downward at the middle of a horizontal pipe 15 fitted with connecting metals 14 to the flanges 10 at both ends and connecting the supports 2 erected on both sides. Brace members 3 fitted with the connecting metals 14 to the flanges 10 at the end sections of the diagonal members 17 and scaffolding boards suspended between the horizontal pipes 15 of the opposite brace members 3 are provided. When the connecting metals 13 of the horizontal pipes 15 of the brace members 3 are connected to the upper flange 10, the connecting metals 14 of the diagonal members 17 can be connected to the lower flange 10. When this temporary structure is constructed, the buckling length of the supports 2 can be reduced in half by arranging the brace members 3 of adjacent spans to form vertical steps.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、建設工事の支保
工等に使用する多機能の仮設構造物とその構築方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a multifunctional temporary structure used for supporting construction work and the like, and a method of constructing the same.

【0002】[0002]

【従来の技術】従来、各種建物や土木等の建設工事に使
用される支保工は、図15に示すように、四方に起立さ
せた鋼管製の支柱61の上端部を座屈防止のための水平
材62で結合し、この水平材62の途中と支柱61の途
中を斜材63で結合し、対向する水平材62間に足場板
を架設して角柱枠体とすると共に、これを支柱61の継
ぎ足しと水平材62及び斜材63での結合で上方に伸ば
し、更に必要ならば、上記支柱61の側方に支柱61を
起立配置し、水平材62及び斜材63で支柱61相互を
結合することにより、必要とする平面的な大きさの支保
工を構築するものである。
2. Description of the Related Art Conventionally, a shoring used for construction work of various buildings, civil engineering works, etc., as shown in FIG. The horizontal members 62 are joined together, the middle of the horizontal members 62 and the middle of the columns 61 are joined with diagonal members 63, and a scaffold plate is erected between the opposed horizontal members 62 to form a prism frame. Is extended upward by the connection of the horizontal member 62 and the diagonal member 63, and if necessary, the column 61 is erected on the side of the column 61, and the columns 61 are connected to each other by the horizontal member 62 and the diagonal member 63. By doing so, it is possible to construct a support having a required planar size.

【0003】[0003]

【発明が解決しようとする課題】ところで、上記従来の
支保工においては、各支柱61の上端部を水平材62で
結合し、水平材62の途中と支柱61の途中を斜材63
で結合したパターンを水平方向及び垂直方向に繰り返す
構成になり、各段の水平方向において、水平材62や斜
材63の配置は同一高さとなっているため、隣接する支
柱61を結合する水平材62の上下配置間隔が一本の支
柱の長さに該当することになり、このため、水平材62
の配置間隔によって決定される支柱61の座屈長が長く
なり、当然支柱61の荷重支持強度が弱くなり、図15
に一点鎖線で示すように、支保工に大きな負荷がかかる
と支柱61に座屈が発生するという問題がある。
By the way, in the above-mentioned conventional shoring method, the upper ends of the columns 61 are connected by a horizontal member 62, and the middle of the horizontal member 62 and the middle of the column 61 are connected by a diagonal member 63.
In the horizontal direction of each stage, the horizontal members 62 and the diagonal members 63 are arranged at the same height in the horizontal direction of each stage. The vertical arrangement interval of 62 corresponds to the length of one pillar, and therefore, the horizontal member 62
The buckling length of the column 61 determined by the arrangement intervals of the columns becomes longer, and naturally the load supporting strength of the column 61 becomes weaker.
As shown by a dashed line in FIG. 1, there is a problem that buckling occurs in the column 61 when a large load is applied to the support.

【0004】また、従来、水平材62と斜材63は別の
部材になっているため、組み立て及び解体に手間がかか
ると共に、構成部材数が多くなるという問題がある。
Conventionally, since the horizontal member 62 and the diagonal member 63 are separate members, there is a problem that assembly and disassembly are troublesome and the number of constituent members is increased.

【0005】更に、上下足場板の配置は、一本の支柱6
1の長さに該当する間隔となり、上下足場板間に掛け渡
す階段がその分長くなり、重量も重くなって上げ下ろし
のための取り扱いが不便で重労働になるだけでなく、長
い階段は昇降に危険を伴い、手すりの使用が必要にな
り、そのため、部材数が多くなり、取り付けと解体に余
分な手間がかかることになる。
[0005] Further, the arrangement of the upper and lower scaffold plates is such that one support 6
The length of the stairs between the upper and lower scaffolds is longer, the weight is heavier, the handling for lifting and lowering is inconvenient, and not only heavy labor, but also long stairs are dangerous This requires the use of handrails, which increases the number of members and requires extra time for installation and disassembly.

【0006】また、支柱61を継ぎ足していく作業は、
図14のように、足場板の上に載って行うが、従来の構
築方法ては、支柱61の上端部にかけ渡した水平材62
間に足場板が架設されるため、足場板の上に何もなく、
足場板上での支柱61の継ぎ足し作業が極めて不安定な
状態となり、墜落事故が発生する危険がある。
[0006] In addition, the work of adding the pillar 61 is as follows.
As shown in FIG. 14, it is carried out on a scaffold plate, but according to the conventional construction method, a horizontal member 62 spanned over the upper end of a column 61 is used.
There is nothing on the scaffold plate because the scaffold plate is erected in between,
There is a risk that the work of extending the support pillar 61 on the scaffold plate will be extremely unstable, and a crash will occur.

【0007】そこで、この発明の課題は、支柱の座屈長
を半減でき、荷重支持強度が向上すると共に、構成部材
数の削減と作業通路の確保が可能となり、しかも階段の
短尺軽量化と手すりの省略が図れ、かつ、支柱の継ぎ足
し作業の安全確保が実現できる仮設構造物とその構築方
法を提供することにある。
SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to reduce the buckling length of a column by half, improve the load supporting strength, reduce the number of components and secure a work passage, and reduce the length and length of stairs and reduce handrails. It is an object of the present invention to provide a temporary structure and a method of constructing the temporary structure, which can omit the above-mentioned structure and can secure the safety of the work of extending the columns.

【0008】[0008]

【課題を解決するための手段】上記のような課題を解決
するため、請求項1の発明は、上下軸方向に所定の間隔
で孔付きのフランジが固定され、順次継ぎ足しが可能と
なる支柱と、両端にフランジとの結合金具が取り付けら
れ、両側に起立させた支柱を結合する水平パイプの途中
に、下部広がりに配置することができるよう二本の斜材
を枢止し、この斜材の端部にフランジとの結合金具が取
り付けられた筋交い部材と、対向する筋交い部材の水平
パイプ間にかけ渡す足場板からなり、該筋交い部材は、
水平パイプの結合金具を上位のフランジに結合した状態
で斜材の結合金具が下位のフランジに結合できるように
なっている構成を採用したものである。
In order to solve the above-mentioned problems, a first aspect of the present invention is to provide a support having fixed flanges with holes at predetermined intervals in the vertical axis direction and capable of successively adding. At the both ends, fittings with flanges are attached, and in the middle of the horizontal pipe connecting the uprights on both sides, two diagonal members are pivoted so that they can be arranged in the lower spread, and this diagonal material It consists of a brace member to which a fitting with a flange is attached at the end, and a scaffold plate that bridges between horizontal pipes of the opposed brace members.
The configuration adopts a configuration in which the connecting member of the oblique material can be connected to the lower flange while the connecting member of the horizontal pipe is connected to the upper flange.

【0009】請求項2の発明は、上下軸方向に所定の間
隔で孔付きのフランジが固定され、順次継ぎ足しが可能
となる支柱と、両端に上位フランジとの結合金具が取り
付けられ、両側に起立させた支柱を結合する水平パイプ
の途中に、下部広がりに配置することができるよう二本
の斜材を枢止し、この斜材の端部に下位フランジとの結
合金具が取り付けられた筋交い部材と、対向する筋交い
部材の水平パイプ間にかけ渡す足場板とを用い、所定の
間隔で四方に起立させた支柱の一組の対面する部分にあ
る支柱を筋交い部材で結合し、対向する筋交い部材の水
平パイプ間に足場板をかけ渡して仮設構造物を構築する
場合に、この仮設構造物の一スパン毎に隣接するスパン
の筋交い部材を上下に段差を生じさせた配置とする構成
を採用したものである。
According to a second aspect of the present invention, a flange with holes is fixed at predetermined intervals in the vertical axis direction, and a column which can be successively extended, and fittings for connecting to an upper flange are attached to both ends, and both sides are erected. A brace member in which two diagonal members are pivoted so that the diagonal members can be arranged at the lower part of the horizontal pipe connecting the struts, and a fitting for connecting to the lower flange is attached to an end of the diagonal member. And, using a scaffold plate to be bridged between the horizontal pipes of the opposed brace members, the struts in a set of opposed struts facing each other at a predetermined interval are joined by brace members, and the strut members of the opposed brace members are joined together. When a temporary structure is constructed by laying a scaffolding board between horizontal pipes, a structure is adopted in which the bracing members of adjacent spans are arranged so that a step is formed up and down for each span of this temporary structure. so That.

【0010】請求項3の発明は、請求項2の発明におい
て、上記支柱を筋交い部材で結合した後、筋交い部材の
斜材の下端部間を水平材で結合し、端部支柱の座屈強度
を向上させる構成を採用したものである。
According to a third aspect of the present invention, in the second aspect of the present invention, after connecting the struts with a brace member, the lower ends of the diagonal members of the brace member are joined with a horizontal member, and the buckling strength of the end strut is provided. Is adopted.

【0011】[0011]

【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1乃至図3は、仮設構造物として支保工
を組み立てた状態を示し、この支保工の基本的な構成部
材は、ジャッキベース1と、このジャッキベース1上に
起立させると共に、上方に継ぎ足していく複数種類の支
柱2と、隣接する支柱2を互いに結合する筋交い部材3
と、筋交い部材3の間に架設する足場板4と、段差のあ
る隣接足場板4間に掛け渡す階段5とからなり、更に必
要に応じて、筋交い部材3の下部において、隣接する支
柱2を互いに結合するための補強水平材6と、支柱2の
上端部に取り付ける二又ブラケット7と、この二又ブラ
ケット7に取り付ける大引受け8、隣接する支柱を直接
結合するための水平材9等が用意されている。
FIGS. 1 to 3 show a state in which a shoring is assembled as a temporary structure. The basic components of the shoring are a jack base 1 and an upright standing on the jack base 1. And a brace member 3 for joining adjacent columns 2 to each other
And a scaffold plate 4 erected between the brace members 3, and stairs 5 bridged between adjacent scaffold plates 4 having steps. A reinforced horizontal member 6 for coupling to each other, a bifurcated bracket 7 attached to the upper end of the column 2, a large support 8 attached to this bifurcated bracket 7, and a horizontal member 9 for directly coupling adjacent columns are provided. Have been.

【0013】図7は、ジャッキベース1と支柱2の種類
を示し、四箇所の位置に孔付きのフランジ10が固定さ
れた長さ3600mmの長尺支柱2aと、この長尺支柱
2aの半分の長さを有し、中間部と上端部の位置に孔付
きのフランジ10が固定された繁用の中間支柱2bと、
中間支柱2bの半分の長さを有し、三箇所の位置に孔付
きのフランジ10が固定された上部継ぎ足し支柱2c
と、上部継ぎ足し支柱2cの三分の一の長さを有し、上
端に孔付きのフランジ10が固定された端尺の下部支柱
2dと、四箇所の位置に孔付きのフランジ10が固定さ
れた伸縮支柱2eとがある。
FIG. 7 shows the types of the jack base 1 and the support column 2. A long support column 2a having a length of 3600 mm to which a flange 10 having holes is fixed at four positions, and a half of the long support column 2a. A conventional intermediate support 2b having a length and having a flange 10 with holes fixed at positions of an intermediate portion and an upper end portion;
Upper extension pillar 2c having half the length of intermediate pillar 2b and having flanges 10 with holes fixed at three positions
And an end lower support 2d having a length of one-third of the upper extension support 2c and having a flange 10 with a hole fixed at the upper end, and a flange 10 with a hole fixed at four positions. Telescopic strut 2e.

【0014】上記伸縮支柱2eを除く各支柱2a〜2d
は所定の直径を有する鋼管を用いて形成し、上端に接続
用の小径ジョイントパイプ11が設けられ、ジョイント
パイプ11と各支柱2a〜2dは、嵌合部分をピン結合
したり、ジョイントパイプ11に設けた既知のロック機
構によって結合するようになっていると共に、伸縮支柱
2eは、大径パイプ12とこれに嵌合する小径パイプ1
3からなり、大径パイプ12に対して小径パイプ13を
所望の引き出し位置でピン結合し、小径パイプ13の上
端に大引受け8が取り付けられるようになっている。
Each of the columns 2a to 2d except the telescopic column 2e
Is formed using a steel pipe having a predetermined diameter, and a small-diameter joint pipe 11 for connection is provided at an upper end. The joint pipe 11 and each of the columns 2a to 2d have a fitting portion pin-connected or connected to the joint pipe 11. The telescopic strut 2e comprises a large-diameter pipe 12 and a small-diameter pipe 1 fitted thereto.
The small-diameter pipe 13 is pin-connected to the large-diameter pipe 12 at a desired pull-out position, and the large receiving pipe 8 is attached to the upper end of the small-diameter pipe 13.

【0015】図8は、筋交い部材3を示し、両端に支柱
2のフランジ10との結合金具14が取り付けられ、両
側に起立させた支柱2を結合する鋼管製の水平パイプ1
5と、この水平パイプ15の途中にそれぞれ上端がピン
16で枢止され、ハ字状の下部広がりに配置することが
できる二本の斜材17とからなり、斜材17の下端部に
支柱2の下位フランジ10に対する結合金具14が取り
付けられている。
FIG. 8 shows a brace member 3 having fittings 14 to the flanges 10 of the columns 2 attached to both ends, and a horizontal pipe 1 made of a steel pipe for connecting the columns 2 standing up on both sides.
5 and two diagonal members 17 each having an upper end pivoted by a pin 16 in the middle of the horizontal pipe 15 and can be arranged in a C-shaped lower spread. A fitting 14 for the two lower flanges 10 is mounted.

【0016】この筋交い部材3は、両側の長尺支柱2a
又は中間支柱2bを互いに結合するためのものであり、
上位に位置するフランジ10に結合金具14を締結する
ことで、両側の支柱2を水平パイプ15で結合したと
き、斜材17の結合金具14が下位のフランジ10と結
合できるような条件になっていると共に、使用しないと
きは水平パイプ15に斜材17が沿うよう嵩低く折り畳
むことができる。
The brace member 3 is composed of long struts 2a on both sides.
Or for connecting the intermediate supports 2b to each other,
By fastening the connecting fitting 14 to the upper flange 10, the conditions are such that the connecting fitting 14 of the diagonal member 17 can be connected to the lower flange 10 when the columns 2 on both sides are connected by the horizontal pipe 15. When not in use, it can be folded low so that the diagonal member 17 follows the horizontal pipe 15.

【0017】この筋交い部材3は、例えば長尺支柱2a
又は中間支柱2bの結合間隔が、1800mm、120
0mm、900mmの三種類が用意され、支保工や足場
の組み立て条件に応じて選択できるようにしている。
The brace member 3 includes, for example, a long support 2a.
Or, the connection interval of the intermediate support 2b is 1800 mm, 120
Three types, 0 mm and 900 mm, are prepared so that they can be selected according to the conditions for assembling the support and scaffold.

【0018】前記した足場板4は、両端部に一対のフッ
クを設けた周知の構造を有し、筋交い部材3の水平パイ
プ15間に架設するようになつている。この足場板は1
800mmの間隔の水平パイプ15間に架設することが
でき、また、幅は複数種類の組み合わせによって、18
00mm、1200mm、900mmの三種類に対応し
得るよう、三種類の幅の異なるものが用意されている。
The scaffold plate 4 has a well-known structure in which a pair of hooks are provided at both ends, and is provided between the horizontal pipes 15 of the brace member 3. This scaffold is 1
It can be installed between the horizontal pipes 15 at intervals of 800 mm, and the width is 18
Three types having different widths are prepared so as to correspond to three types of 00 mm, 1200 mm, and 900 mm.

【0019】図11は、二又ブラケット7を示し、支柱
2のジョイントパイプ11に外嵌する端尺パイプ18の
両側に水平パイプ19を直線状に固定し、両水平パイプ
19の端部に大引受け8の保持筒20を垂直に固定し、
両水平パイプ19の端部から下部中央に向かう斜材21
の下端に、支柱2の途中に外嵌してボルト22で固定す
る平面コ字状のクランプ23を設けた構造になってい
る。
FIG. 11 shows the bifurcated bracket 7, in which horizontal pipes 19 are fixed linearly on both sides of an end pipe 18 fitted externally to the joint pipe 11 of the column 2, and large horizontal pipes 19 are attached to the ends of both horizontal pipes 19. Fix the holding cylinder 20 of the undertaking 8 vertically,
Diagonal material 21 from the ends of both horizontal pipes 19 toward the lower center
Is provided with a flat U-shaped clamp 23 which is externally fitted in the middle of the column 2 and is fixed by bolts 22.

【0020】図9は、筋交い部材3における斜材17の
下端部間を結合するための補強水平材6を示し、所定の
長さを有する鋼管パイプの両端にピン24で結合した一
対のリンクプレート25と26の一方を鋼管パイプに溶
接で固定すると共に、他方をピン24を支点に回動自在
とし、固定リンクプレート25の先端に結合用のピン2
7を固定すると共に、回動リンクプレート26の先端下
縁にピン27への嵌合切り欠き28を設けた構造になっ
ている。
FIG. 9 shows a reinforcing horizontal member 6 for connecting the lower ends of the diagonal members 17 of the brace member 3, and a pair of link plates connected to both ends of a steel pipe having a predetermined length by pins 24. One of 25 and 26 is fixed to the steel pipe by welding, and the other is rotatable about a pin 24 as a fulcrum.
7 is fixed, and a notch 28 for fitting to the pin 27 is provided on the lower edge of the tip end of the rotating link plate 26.

【0021】この補強水平材6は、筋交い部材3の斜材
17の下端部間を結合することにより、端部に位置する
支柱2の座屈強度を向上させるためのものであり、斜材
17の下端部には、図7に示すように、ピン27の結合
孔28が設けてあり、図8(B)に一点鎖線のように、
回動リンクプレート26を上方に起こした状態でピン2
7を結合孔28に挿入し、その後回動リンクプレート2
6を倒せば、図1のように、補強水平材6で斜材17の
下端部間を介して支柱2を互いに結合でき、中間支柱2
bの途中を互いに結合することにより、構造物としの支
保工の座屈強度を向上させることができる。
This reinforcing horizontal member 6 is for improving the buckling strength of the column 2 located at the end by connecting the lower ends of the diagonal members 17 of the brace members 3. As shown in FIG. 7, a coupling hole 28 for a pin 27 is provided at the lower end, and as shown by a dashed line in FIG.
With the rotating link plate 26 raised up,
7 into the coupling hole 28, and then the rotating link plate 2
1, the columns 2 can be joined to each other via the reinforcing horizontal members 6 via the lower ends of the diagonal members 17 as shown in FIG.
The buckling strength of the shoring as a structure can be improved by connecting the middle of b to each other.

【0022】図10は、隣接する支柱2を直接結合する
ための水平材9を示し、所定の長さを有する鋼管パイプ
の両端にフランジ10に対する結合金具14を設けた構
造になっている。
FIG. 10 shows a horizontal member 9 for directly connecting the adjacent columns 2, and has a structure in which metal fittings 14 for the flange 10 are provided at both ends of a steel pipe having a predetermined length.

【0023】図12(A)乃至(D)は、各支柱2のフ
ランジ10に対する結合金具14の構造を示しているる
この結合金具14は、筋交い部材3の水平パイプ15や
斜材17の端部、補強水平材6、水平材9等に水平状態
で固定されるホルダー部材31と、このホルダー部材3
1内でフランジ10とホルダー部材31を締結する楔部
材32との組み合わせからなり、ホルダー部材31は、
上下に細長い前壁33の両側に後方へ屈曲する側壁を折
り曲げ連成し、該水平パイプや斜材等の端部に対して対
向する両側壁の後端を溶接し、両側壁間の上下面が楔部
材32を挿通するための開口34になっている。
FIGS. 12 (A) to 12 (D) show the structure of the joint 14 with respect to the flange 10 of each column 2. The joint 14 is an end of the horizontal pipe 15 or the diagonal member 17 of the brace member 3. FIG. And a holder member 31 fixed in a horizontal state to the section, the reinforcing horizontal member 6, the horizontal member 9 and the like, and the holder member 3
1, a combination of a flange 10 and a wedge member 32 for fastening the holder member 31 is provided.
Side walls that are bent rearward are coupled to both sides of the vertically elongated front wall 33, and rear ends of the opposite side walls are welded to the ends of the horizontal pipe, diagonal material, and the like, and the upper and lower surfaces between the both side walls are welded. Is an opening 34 through which the wedge member 32 is inserted.

【0024】このホルダー部材31の前後方向の長さ
が、フランジ10の結合用の孔35を設けた部分の半径
方向の長さよりも長く形成され、このホルダー部材31
には、フランジ10の厚みに対して外嵌挿する切り欠き
36が先端部から水平方向に沿って設けられ、その先端
壁33を支柱2の外周に当接させることができるように
切り欠き36の深さが設定されている。上記切り欠き3
6をフランジ10に外嵌挿すれば、ホルダー部材31と
水平パイプ15や斜材17等は回転が阻止されることに
なる。
The length of the holder member 31 in the front-rear direction is formed longer than the radial length of the portion of the flange 10 where the coupling hole 35 is provided.
A notch 36 is provided along the horizontal direction from the distal end of the flange 10 so that the distal end wall 33 can contact the outer periphery of the column 2. The depth is set. Notch 3 above
If the outer tube 6 is inserted into the flange 10, the holder member 31, the horizontal pipe 15, the diagonal member 17, and the like are prevented from rotating.

【0025】上記楔部材32は、フランジ10の結合用
の孔35に対して上部から差し込む楔部37と、この楔
部37の途中に設けた水平部38と、該水平部38の先
端から直角に垂下してフランジ10の外周と水平水平パ
イプ15や斜材17等の端部間に納まる杆状部39とで
二又状に形成され、楔部37は下端に向けて狭幅とな
り、ホルダー部材31の前壁33の内面に当接させる前
縁が垂直で結合用の孔35の端部に当接する後縁が傾斜
縁になっている。なお、楔部37は図示のような下部狭
幅形状以外に、ストレートな形状を採用してもよい。
The wedge member 32 includes a wedge portion 37 inserted from above into the coupling hole 35 of the flange 10, a horizontal portion 38 provided in the middle of the wedge portion 37, and a right angle from the tip of the horizontal portion 38. The wedge 37 is narrowed toward the lower end, and is formed into a bifurcated shape by the outer periphery of the flange 10 and the rod-like portion 39 which is fitted between the ends of the horizontal horizontal pipe 15 and the diagonal member 17. The front edge of the member 31 that contacts the inner surface of the front wall 33 is vertical, and the rear edge that contacts the end of the coupling hole 35 is an inclined edge. The wedge portion 37 may have a straight shape other than the lower narrow shape as shown.

【0026】この楔部37の上端と杆状部39の下端に
抜け止め用のピン40、41が固定され、ホルダー部材
31内に挿入した楔部材32の楔部37を結合用の孔3
5に差し込んだ状態で、楔部37の上端がホルダー部材
31の上面に突出すると共に、杆状部37の下端がホル
ダー部材31の下面から下方に突出することになる。
Pins 40, 41 for retaining are fixed to the upper end of the wedge portion 37 and the lower end of the rod portion 39, and the wedge portion 37 of the wedge member 32 inserted into the holder member 31 is connected to the hole 3 for connection.
In the state of being inserted into the holder 5, the upper end of the wedge portion 37 protrudes from the upper surface of the holder member 31, and the lower end of the rod portion 37 protrudes downward from the lower surface of the holder member 31.

【0027】また、杆状部39の内側縁には、係止段部
42が設けてあり、この係止段部42をホルダー部材3
1の下部横桟43に係止すれば、図11(A)の如く、
楔部材32の楔部37がフランジ10と干渉しない位置
に保持でき、ホルダー部材31の切り欠き36をフラン
ジ10に対して楔部材32に関係なく嵌挿することがで
きる。
A locking step 42 is provided on the inner edge of the rod 39, and the locking step 42 is
1 and the lower horizontal rail 43, as shown in FIG.
The wedge portion 37 of the wedge member 32 can be held at a position where it does not interfere with the flange 10, and the notch 36 of the holder member 31 can be inserted into the flange 10 regardless of the wedge member 32.

【0028】フランジ10にホルダー部材31を嵌挿す
ると、杆状部39の内側縁がフランジ10に当接するこ
とにより、係止段部42が下部横桟43から外れ、楔部
材32は、自重で落下して楔部37が結合用の孔35に
落ち込み、図11(C)に示すように、前壁33が支柱
2に圧接した状態で楔部37がフランジ10とホルダー
部材31を固定化することになる。
When the holder member 31 is inserted into the flange 10, the inner edge of the rod portion 39 comes into contact with the flange 10, so that the locking step portion 42 comes off the lower horizontal rail 43, and the wedge member 32 is weighted by its own weight. After dropping, the wedge portion 37 falls into the coupling hole 35, and the wedge portion 37 fixes the flange 10 and the holder member 31 in a state where the front wall 33 is pressed against the support post 2, as shown in FIG. Will be.

【0029】次に、仮設構造物である支保工の構築方法
を説明する。
Next, a method of constructing a shoring, which is a temporary structure, will be described.

【0030】先ず、図4と図5のように、床面の四箇所
の位置にジャッキベース1を配置し、このジャッキベー
ス1上に下部支柱2dを接続し、四方の下部支柱2dを
フランジ10への結合金具14の締結により水平材9で
枠状に結合し、続いて上記各下部支柱2d上に中間支柱
2bを接続し、四方に起立させた中間支柱2bの一組の
対面する二面において、水平材9間に足場板4をかけ渡
し、その上に載って四面における中間支柱2bの上位フ
ランジ10を筋交い部材3の水平パイプ15で結合し、
斜材17の下端を中間支柱2bの下位フランジ10と結
合し、上記により筋交い部材3が四面で枠状の配置とな
り、一組の対面する二面において、その水平パイプ15
間に足場板4を架設する。
First, as shown in FIGS. 4 and 5, jack bases 1 are arranged at four positions on the floor surface, a lower support 2d is connected on the jack base 1, and the four lower supports 2d are connected to flanges 10. Are connected to each other in the form of a frame by the horizontal members 9 by fastening the connecting metal fittings 14 to the intermediate supports 2b. Subsequently, the intermediate supports 2b are connected to the lower supports 2d, and a pair of facing two faces of the intermediate supports 2b standing up in four directions. In the above, the scaffold plate 4 is laid across the horizontal members 9, and the upper flange 10 of the intermediate support 2 b on the four surfaces is put on the scaffold plate 4 and joined by the horizontal pipe 15 of the brace member 3,
The lower end of the diagonal member 17 is connected to the lower flange 10 of the intermediate support 2b, whereby the bracing member 3 is arranged in a frame on four sides, and the horizontal pipe 15 is formed on one pair of facing two sides.
A scaffold plate 4 is installed between them.

【0031】上記のように、中間支柱2bの上端への中
間支柱2bの継ぎ足しと、継ぎ足した中間支柱2bの四
面において、上位フランジ10を筋交い部材3の水平パ
イプ15で結合し、かつ斜材17の下端を中間支柱2b
の下位フランジ10と結合し、対向する水平パイプ15
間に足場板4を架設する作業を上方に繰り返すことによ
り、図3のように、基本枠柱体(A)を組み上げてい
く。
As described above, the upper flange 10 is connected to the upper end of the intermediate support 2b by the horizontal pipe 15 of the bracing member 3 on the four surfaces of the added intermediate support 2b and the diagonal member 17 at the four surfaces of the added intermediate support 2b. The lower end of the middle support 2b
Horizontal pipe 15 connected to the lower flange 10 of
By repeating the work of laying the scaffold plate 4 in the upward direction, the basic frame pillar (A) is assembled as shown in FIG.

【0032】図1と図4、図5の例において、上記基本
枠柱体(A)の隣接する部分で、例えば中間支柱2bの
間隔(スパン)に等しい距離だけ離れた位置に同様の手
順で基本枠柱体(A)を組み上げ、基本枠柱体(A)を
平面的に碁盤の目状に配置し、隣接する各基本枠柱体
(A)の中間支柱2bを筋交い部材3により上記と同様
の手順で結合し、対向する水平パイプ15間に足場板4
をかけ渡し、このようにして各基本枠柱体(A)を筋交
い部材3で結合して図1乃至図5のように支保工を構築
する。なお、段差の生じた足場板4間には階段5を配置
すると共に、必要に応じて支保工の外部の所望位置に荷
受けフレーム等を取り付けることができ、基本枠柱体
(A)の組み上げに長尺支柱2aを使用すれば、中間支
柱2bの継ぎ足しに要した作業の回数を削減出来る。
In the examples shown in FIGS. 1, 4 and 5, the same procedure is performed at a position adjacent to the basic frame column (A), for example, at a position separated by a distance equal to the interval (span) of the intermediate column 2b. The basic frame pillars (A) are assembled, the basic frame pillars (A) are arranged in a grid pattern in a plan view, and the intermediate supports 2b of the adjacent basic frame pillars (A) are connected to the above by the brace members 3. In the same manner, the scaffold plate 4 is connected between the horizontal pipes 15 facing each other.
The basic frame pillars (A) are connected with the brace members 3 in this way to construct a shoring as shown in FIGS. In addition, the stairs 5 can be arranged between the scaffolds 4 where the steps have occurred, and a load receiving frame or the like can be attached to a desired position outside the shoring as needed, so that the base frame (A) can be assembled. The use of the long strut 2a can reduce the number of operations required for adding the intermediate strut 2b.

【0033】上記碁盤の目状に配置した各基本枠柱体
(A)を筋交い部材3で結合するとき、図1乃至図5で
示すように、各基本枠柱体(A)の組み立てに用いた筋
交い部材3と、隣接する各基本枠柱体(A)を結合する
ための筋交い部材3の配置を上下に段差を生じさせた配
置とする。
When the basic frame pillars (A) arranged in a grid pattern are joined by the brace members 3, as shown in FIGS. 1 to 5, the basic frame pillars (A) are used for assembling the basic frame pillars (A). The arrangement of the brace members 3 for joining the adjacent brace members 3 and the adjacent basic frame columns (A) is an arrangement in which a step is formed vertically.

【0034】即ち、隣接する各基本枠柱体(A)を結合
する筋交い部材3は、中間支柱2bの下位フランジ10
間に水平パイプ15をかけ渡し、斜材17端を中間支柱
2bの上端に位置する上位フランジ10に結合する。
That is, the brace member 3 connecting the adjacent basic frame columns (A) is connected to the lower flange 10 of the intermediate support 2b.
A horizontal pipe 15 is passed over the gap, and the end of the diagonal member 17 is connected to the upper flange 10 located at the upper end of the intermediate support 2b.

【0035】このような筋交い部材3の配置により、各
基本枠柱体(A)の筋交い部材3と、隣接する基本枠柱
体(A)を結合する筋交い部材3の水平パイプ15は、
上下に半ピッチずれた配置となり、これにより、隣接す
る各基本枠柱体(A)を結合する筋交い部材3を基本枠
柱体(A)の筋交い部材3と同じ高さの配置とした場合
に比べ、支柱2bの座屈長を半減でき、基本枠柱体
(A)の荷重支持強度を向上させることができる。
With the arrangement of the brace members 3 described above, the horizontal pipes 15 of the brace members 3 for connecting the brace members 3 of the respective basic frame columns (A) and the adjacent basic frame columns (A) are formed as follows.
When the arrangement is such that the strut members 3 connecting the adjacent basic frame columns (A) are arranged at the same height as the strut members 3 of the basic frame column (A). In comparison, the buckling length of the column 2b can be reduced by half, and the load supporting strength of the basic frame column (A) can be improved.

【0036】また、筋交い部材3は、水平パイプ15の
下部両側に斜材17を下部広がりのハ字状に配置して使
用するので、筋交い部材3の中央下部に障害物の発生が
なく、このため、水平パイプ15間にかけ渡した足場板
4上に作業通路を確保することができる。
Further, since the brace members 3 are used by arranging the diagonal members 17 on the lower sides of the horizontal pipe 15 in a C-shape extending downward, there is no obstacle at the lower center of the brace members 3. Therefore, a work path can be secured on the scaffold plate 4 spanned between the horizontal pipes 15.

【0037】図6は、構築した支保工における足場板4
の平面的な配列パターンの異なった例を示し、足場板4
で同一平面に通路を形成すると共に、足場板4の欠如し
た部分が下階隣接足場板4との間に階段5を掛ける部分
となる。
FIG. 6 shows the scaffold plate 4 in the constructed shoring.
Different examples of the planar arrangement pattern of the scaffold plate 4
And a passage is formed on the same plane, and a portion where the scaffold plate 4 is missing becomes a portion where the stairs 5 are hung between the scaffold plate 4 and the adjacent scaffold plate 4 on the lower floor.

【0038】また、図2は、基本枠柱体(A)の隣接す
る二面に枠柱体を直接建て増しをしながら支保工を構築
する例を示し、基本枠柱体(A)の対面一に二本の支柱
2を上記と同様にして立設し、基本枠柱体(A)の支柱
2と筋交い部材3で結合するとき、基本枠柱体(A)の
筋交い部材3に対して上下に半ピッチ段差を生じさせた
配置で行うものである。
FIG. 2 shows an example in which a supporting structure is constructed while directly adding and extending frame pillars on two adjacent surfaces of the basic frame pillar (A). When the two columns 2 are erected in the same manner as described above and are connected to the columns 2 of the basic frame column (A) by the brace members 3, the two columns 2 are vertically moved with respect to the column members 3 of the basic frame column (A). In this arrangement, a half pitch step is formed.

【0039】このようよな組み立ての支保工において、
端部に位置する支柱の座屈強度を向上させるときは、筋
交い部材3における斜材17の下端部間を補強水平材6
で結合するようにすればよい。
In the support of such an assembly,
In order to improve the buckling strength of the strut located at the end, the reinforcing horizontal member 6 is provided between the lower ends of the diagonal members 17 in the brace member 3.
What is necessary is just to make it join.

【0040】図13は、上記支保工の構築時における支
柱2bの継ぎ足し作業の状態を示し、筋交い部材3を上
下に半ピッチ段差を生じさせた配置とすることにより、
下位筋交い部材3間に架設した足場板4に載り、支柱2
bの継ぎ足しを行うときに、中間支柱2bの継ぎ足し部
分が作業者の腰の高さ程度の位置となり、足場板4の四
隅には中間支柱2bの上半部が位置することにより、手
すり支柱の役目を果たし、継ぎ足し作業の安全性が確保
でき、墜落の防止が図れる。
FIG. 13 shows a state in which the strut 2b is extended at the time of the construction of the above-mentioned shoring, and the bracing member 3 is arranged so as to have a half pitch step vertically.
The support 2 rests on the scaffold 4 erected between the lower brace members 3.
When performing the extension of b, the extension of the intermediate support 2b is at a position about the height of the worker's waist, and the upper half of the intermediate support 2b is located at the four corners of the scaffold plate 4, so that the railing support It fulfills its role and secures the safety of the replenishment work and prevents the fall.

【0041】また、筋交い部材3を上下に半ピッチ段差
を生じさせた配置とすることにより、筋交い部材3の水
平パイプ15間に掛け渡す足場板4の配置において、隣
接する上下の足場板4の段差が支柱2の上下長さの半分
となり、例えば、図4、図5に示すように、中間支柱2
bが1800mmの長さであれば、隣接する上下足場板
4の段差は900mmと半分になり、これによって、隣
接する上下足場板4間に掛け渡す階段5の長さは従来に
比べて略半分の長さとなり、階段5の短尺化と軽量化が
実現でき、取り付け取り外し作業の容易化だけでなく、
このような短尺の階段5では手すりが不要になり、しか
も昇り降りの安全性も向上する。
Also, by arranging the brace members 3 so as to form a half pitch step vertically, in the arrangement of the scaffold plates 4 to be bridged between the horizontal pipes 15 of the brace members 3, the adjacent upper and lower scaffold plates 4 The step is half of the vertical length of the column 2, and for example, as shown in FIGS.
If b is 1800 mm in length, the step between the adjacent upper and lower scaffolding plates 4 is halved to 900 mm, whereby the length of the stairs 5 bridged between the adjacent upper and lower scaffolding plates 4 is approximately half that of the conventional case. The length of the stairs 5 can be shortened and lightened.
With such a short staircase 5, a handrail is not required, and the safety of climbing and descending is improved.

【0042】図1は、支保工の上部構造の一例を示し、
最上部中間支柱2bの上端に上部継ぎ足し支柱2cを接
続し、基本枠柱体(A)上において、隣接する上部継ぎ
足し支柱2cを水平材9で結合すると共に、上部継ぎ足
し支柱2cにそれぞれ二又ブラケット7を同一面の配置
となるよう取り付け、二又ブラケット7の両側保持筒2
0に大引受け8を装着し、スラブ型枠Bの下面を受ける
大引Cを該大引受け8で支持する。
FIG. 1 shows an example of the upper structure of the shoring,
The upper extension column 2c is connected to the upper end of the uppermost intermediate column 2b, and the adjacent upper extension column 2c is connected with the horizontal member 9 on the basic frame (A), and the upper extension column 2c is bifurcated with each other. 7 are attached so that they are arranged on the same surface,
The large underwear 8 is attached to the slab 0, and the large underwear C that receives the lower surface of the slab formwork B is supported by the large underwear 8.

【0043】図1で示したように、基本枠柱体(A)の
上部継ぎ足し支柱2c上に二又ブラケット7を取り付け
ることにより、大引受け8の配置数を倍増することがで
き、かつ、隣接する二又ブラケット7間に作業通路を確
保できることになる。
As shown in FIG. 1, by mounting the bifurcated bracket 7 on the upper extension column 2c of the basic frame column (A), the number of large undertakings 8 can be doubled, and Thus, a working path can be secured between the forked brackets 7.

【0044】なお、図示実施の形態では、仮設構造物と
して支保工を例示したが、上記各構成部材を用いること
により、仮設構造物として、外部足場、室内作業足場、
イベント等のスタンド、ローリングタワー等を構築する
ことができる。
In the illustrated embodiment, the shoring is exemplified as the temporary structure. However, by using the above-described respective constituent members, the temporary structure can be used as an external scaffold, an indoor working scaffold, or the like.
A stand for events, a rolling tower, and the like can be constructed.

【0045】[0045]

【発明の効果】以上のように、この発明によると、上下
軸方向に所定の間隔で孔付きのフランジが固定された支
柱と、両端にフランジとの結合金具が取り付けられた水
平パイプの途中に、下部広がりに配置できる二本の斜材
を枢止し、この斜材の端部にフランジとの結合金具が取
り付けられた筋交い部材と、対向する筋交い部材の水平
パイプ間にかけ渡す足場板からなり、該筋交い部材は、
水平パイプの結合金具を上位のフランジに結合した状態
で斜材の結合金具が下位のフランジに結合でき、仮設構
造物を構築する場合に、この仮設構造物の一スパン毎に
隣接するスパンの筋交い部材を上下に段差を生じさせた
配置とするようにしたので、隣接する支柱を結合する水
平パイプの上下配置が両側交互に半ピッチごとの間隔に
なり、これにより、支柱の座屈長を半減でき、荷重支持
強度を大幅に向上させることができる。
As described above, according to the present invention, there is provided a support in which flanges with holes are fixed at predetermined intervals in the vertical axis direction and a horizontal pipe in which fittings for connecting the flanges to both ends are mounted. It consists of a brace member with two diagonal members that can be arranged in the lower part of the spread and pivoted to the ends of the diagonal members, and a scaffold plate that passes between the horizontal pipes of the opposing brace members. The brace members are
The diagonal connection fitting can be connected to the lower flange while the connection fitting for the horizontal pipe is connected to the upper flange, and when constructing a temporary structure, the bracing of adjacent spans for each span of this temporary structure Since the members are arranged so that a step is formed vertically, the vertical arrangement of the horizontal pipes connecting the adjacent columns is alternately arranged at half-pitch intervals on both sides, thereby reducing the buckling length of the columns by half. As a result, the load bearing strength can be greatly improved.

【0046】また、筋交い部材が、水平パイプの途中に
下部広がりに配置できる二本の斜材を枢止した構造にな
っているので、筋交い部材の下部中央に障害物がなくな
り、足場板上に連続した作業通路を確保することがで
き、作業性の向上が図れると共に、水平パイプと斜材の
結合により、構成部材数の削減が可能となる。
Further, since the brace member has a structure in which two diagonal members which can be arranged in the lower part of the horizontal pipe are pivoted, there is no obstacle in the lower center of the brace member, and the brace member is placed on the scaffold plate. A continuous work passage can be secured, workability can be improved, and the number of constituent members can be reduced by coupling the horizontal pipe and the diagonal member.

【0047】さらに、仮設構造物の一スパン毎に隣接す
るスパンの筋交い部材を上下に段差を生じさせた配置と
することにより、隣接する足場板の上下間隔を半減で
き、これによって、階段の短尺化と軽量化が図れること
になる。
Further, by arranging the bracing members of the adjacent spans so as to have a vertical step every one span of the temporary structure, the vertical spacing between the adjacent scaffolding plates can be reduced by half, thereby shortening the length of the stairs. The weight and weight can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】仮設構造物として構築した支保工の正面図FIG. 1 is a front view of a shoring constructed as a temporary structure.

【図2】仮設構造物として構築した支保工の斜視図FIG. 2 is a perspective view of a shoring constructed as a temporary structure.

【図3】仮設構造物として構築した支保工の要部を示す
斜視図
FIG. 3 is a perspective view showing a main part of a shoring constructed as a temporary structure.

【図4】仮設構造物として構築する支保工の組み立て途
中を示す正面図
FIG. 4 is a front view showing an intermediate state of a shoring to be constructed as a temporary structure.

【図5】同上の側面図FIG. 5 is a side view of the above.

【図6】(A)と(B)は支保工の足場板の異なった配
列状態を示す平面図
6 (A) and 6 (B) are plan views showing different arrangement states of the scaffolding plate of the shoring work.

【図7】(A)乃至(E)は支柱の異なった例を示す正
面図、(F)はジャッキベースの正面図
FIGS. 7A to 7E are front views showing different examples of a support, and FIG. 7F is a front view of a jack base.

【図8】(A)は筋交い部材の正面図、(B)は同筋交
い部材の支柱への結合状態を示す拡大正面図
FIG. 8A is a front view of a brace member, and FIG. 8B is an enlarged front view showing a state in which the brace member is connected to a support.

【図9】(A)は補強水平材を示す正面図、(B)はこ
の水平材の端部構造を示す拡大正面図、(C)は同拡大
平面図
9A is a front view showing a reinforcing horizontal member, FIG. 9B is an enlarged front view showing an end structure of the horizontal member, and FIG. 9C is an enlarged plan view of FIG.

【図10】水平材の正面図FIG. 10 is a front view of a horizontal member.

【図11】(A)は二又ブラケットを示す正面図、
(B)は同底面図
FIG. 11A is a front view showing a bifurcated bracket,
(B) is the bottom view

【図12】(A)は結合金具の縦断正面図、(B)は同
上のフランジに対する結合途中の状態を示す縦断正面
図、(C)は同結状態を示す縦断正面図、(D)は同結
状態の平面図
12A is a vertical front view of a coupling fitting, FIG. 12B is a vertical front view showing a state in the middle of coupling to the flange, FIG. 12C is a vertical front view showing the coupling state, and FIG. Top view of the connected state

【図13】支柱の接続作業を示す説明図FIG. 13 is an explanatory view showing a connection operation of a support.

【図14】従来の支柱の接続作業を示す説明図FIG. 14 is an explanatory view showing a connection work of a conventional column.

【図15】従来の支保工の座屈発生を示す説明図FIG. 15 is an explanatory view showing the occurrence of buckling of a conventional shoring.

【符号の説明】[Explanation of symbols]

1 ジャッキベース 2 支柱 3 筋交い部材 4 足場板 5 階段 6 補強水平材 7 二又ブラケット 8 大引受け 9 水平材 10 フランジ 14 結合金具 15 水平パイプ 17 斜材 DESCRIPTION OF SYMBOLS 1 Jack base 2 Prop 3 Brace member 4 Scaffolding plate 5 Stairs 6 Reinforcement horizontal member 7 Bifurcated bracket 8 Large undertaking 9 Horizontal member 10 Flange 14 Joint fitting 15 Horizontal pipe 17 Diagonal member

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 上下軸方向に所定の間隔で孔付きのフラ
ンジが固定され、順次継ぎ足しが可能となる支柱と、両
端にフランジとの結合金具が取り付けられ、両側に起立
させた支柱を結合する水平パイプの途中に、下部広がり
に配置することができるよう二本の斜材を枢止し、この
斜材の端部にフランジとの結合金具が取り付けられた筋
交い部材と、対向する筋交い部材の水平パイプ間にかけ
渡す足場板からなり、該筋交い部材は、水平パイプの結
合金具を上位のフランジに結合した状態で斜材の結合金
具が下位のフランジに結合できるようになっていること
を特徴とする仮設構造物。
1. A support having fixed flanges with holes at predetermined intervals in the vertical axis direction, which can be successively reconnected, and fittings for connecting the flanges to both ends, and connecting the supports upright on both sides. In the middle of the horizontal pipe, two diagonal members are pivoted so that they can be arranged in the lower part, and a brace member with a fitting with a flange attached to the end of this diagonal member and a brace member facing the It consists of a scaffold plate that passes between the horizontal pipes, and the brace member is characterized in that the connecting fittings of the diagonal material can be connected to the lower flange while the connecting fittings of the horizontal pipe are connected to the upper flange. Temporary structure.
【請求項2】 上下軸方向に所定の間隔で孔付きのフラ
ンジが固定され、順次継ぎ足しが可能となる支柱と、両
端に上位フランジとの結合金具が取り付けられ、両側に
起立させた支柱を結合する水平パイプの途中に、下部広
がりに配置することができるよう二本の斜材を枢止し、
この斜材の端部に下位フランジとの結合金具が取り付け
られた筋交い部材と、対向する筋交い部材の水平パイプ
間にかけ渡す足場板とを用い、所定の間隔で四方に起立
させた支柱の一組の対面する部分にある支柱を筋交い部
材で結合し、対向する筋交い部材の水平パイプ間に足場
板をかけ渡して仮設構造物を構築する場合に、この仮設
構造物の一スパン毎に隣接するスパンの筋交い部材を上
下に段差を生じさせた配置とすることを特徴とする仮設
構造物の構築方法。
2. A support having fixed flanges with holes at predetermined intervals in the vertical axis direction and capable of successively replenishing the support, and connecting fittings to upper flanges attached to both ends, and connecting supports upright on both sides. In the middle of the horizontal pipe to be made, two diagonal members are pivoted so that they can be placed in the lower spread,
A pair of columns that are erected in four directions at predetermined intervals using a brace member in which a fitting for connecting to a lower flange is attached to an end of the diagonal member, and a scaffold plate that bridges between horizontal pipes of the opposed brace members. When a temporary structure is constructed by connecting the struts at the facing portions of the temporary structure with a brace member and spanning a scaffold plate between the horizontal pipes of the opposed brace members, a span adjacent to each span of the temporary structure A method for constructing a temporary structure, characterized in that the brace members are arranged so that a step is formed vertically.
【請求項3】 上記支柱を筋交い部材で結合した後、筋
交い部材の斜材の下端部間を水平材で結合し、端部支柱
の座屈強度を向上させることを特徴とする請求項2に記
載の仮設構造物の構築方法。
3. The buckling strength of the end support is improved by connecting the lower end portions of the diagonal members of the brace member with a horizontal material after connecting the support post with a brace member. The construction method of the temporary structure described in the above.
JP34476799A 1999-12-03 1999-12-03 Construction method of temporary structure Expired - Lifetime JP4312323B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34476799A JP4312323B2 (en) 1999-12-03 1999-12-03 Construction method of temporary structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34476799A JP4312323B2 (en) 1999-12-03 1999-12-03 Construction method of temporary structure

Publications (2)

Publication Number Publication Date
JP2001159231A true JP2001159231A (en) 2001-06-12
JP4312323B2 JP4312323B2 (en) 2009-08-12

Family

ID=18371828

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34476799A Expired - Lifetime JP4312323B2 (en) 1999-12-03 1999-12-03 Construction method of temporary structure

Country Status (1)

Country Link
JP (1) JP4312323B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013072253A (en) * 2011-09-28 2013-04-22 Mitsui Zosen Tekko Koji Kk Pipe bend structure
JP2013072278A (en) * 2012-06-14 2013-04-22 Mitsui Zosen Tekko Koji Kk Pipe bend structure
JP2018145715A (en) * 2017-03-07 2018-09-20 日建リース工業株式会社 Scaffold beam frame and opening structure of temporary scaffold
WO2025138470A1 (en) * 2023-12-29 2025-07-03 森松(江苏)重工有限公司 Supporting column, process apparatus module and construction method therefor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013072253A (en) * 2011-09-28 2013-04-22 Mitsui Zosen Tekko Koji Kk Pipe bend structure
JP2013072278A (en) * 2012-06-14 2013-04-22 Mitsui Zosen Tekko Koji Kk Pipe bend structure
JP2018145715A (en) * 2017-03-07 2018-09-20 日建リース工業株式会社 Scaffold beam frame and opening structure of temporary scaffold
WO2025138470A1 (en) * 2023-12-29 2025-07-03 森松(江苏)重工有限公司 Supporting column, process apparatus module and construction method therefor

Also Published As

Publication number Publication date
JP4312323B2 (en) 2009-08-12

Similar Documents

Publication Publication Date Title
JP2006176951A (en) Slope work floor construction system, work floor construction device and work floor panel
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP3907367B2 (en) Construction method of temporary structure
JPH10280669A (en) Scaffolding unit
CN100577965C (en) Detachable Platform
JP2878589B2 (en) Temporary structure
JP2001159231A (en) Temporary structure and its construction method
JPH07150767A (en) Beam truss erection method in building with overhead traveling crane
JP3111854B2 (en) Elevating guide mechanism of jumping scaffold for building construction
JP2022189426A (en) Support structure and fixing device for support pipe used therefor
JP3865433B2 (en) L-type work table
RU2199638C1 (en) Set of members for scaffold of manual assembly
JP7411260B2 (en) pillar
JP4183654B2 (en) Handrail support bracket, preceding handrail assembly set, frame scaffold
RU204002U1 (en) Supporting building structure
KR102524591B1 (en) Temporary worktable
JP3638761B2 (en) H-framework scaffold
CN213837623U (en) Multipurpose combined scaffold
JP3115908B2 (en) How to build steel stairs
JP4065798B2 (en) Prop work scaffold and method for constructing support work scaffold
KR200355444Y1 (en) Scaffold
JP4182012B2 (en) How to build frame scaffolds and frame scaffolds
JP4052905B2 (en) Scaffolding equipment
JPH0740595Y2 (en) Suspension for scaffolding and dismantling work
JPH06248794A (en) Large-sized assembled-type moving scaffold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060808

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080122

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081118

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090428

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090513

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120522

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4312323

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120522

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130522

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130522

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

EXPY Cancellation because of completion of term
R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350