JP2000101291A - Parts supply management system in printed circuit board unit production - Google Patents
Parts supply management system in printed circuit board unit productionInfo
- Publication number
- JP2000101291A JP2000101291A JP26344498A JP26344498A JP2000101291A JP 2000101291 A JP2000101291 A JP 2000101291A JP 26344498 A JP26344498 A JP 26344498A JP 26344498 A JP26344498 A JP 26344498A JP 2000101291 A JP2000101291 A JP 2000101291A
- Authority
- JP
- Japan
- Prior art keywords
- production
- board unit
- parts
- time
- printed board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 229
- 238000007726 management method Methods 0.000 claims abstract description 95
- 238000004088 simulation Methods 0.000 claims abstract description 37
- 238000013439 planning Methods 0.000 claims abstract description 16
- 238000000034 method Methods 0.000 claims description 23
- 238000012790 confirmation Methods 0.000 claims description 17
- 238000004804 winding Methods 0.000 claims description 15
- 238000012384 transportation and delivery Methods 0.000 claims description 7
- 239000000725 suspension Substances 0.000 claims 1
- 238000012545 processing Methods 0.000 description 24
- 230000008569 process Effects 0.000 description 17
- 238000010586 diagram Methods 0.000 description 11
- 239000000463 material Substances 0.000 description 6
- 238000001514 detection method Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 230000001788 irregular Effects 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 101000650817 Homo sapiens Semaphorin-4D Proteins 0.000 description 1
- 101100249083 Human cytomegalovirus (strain Merlin) RL12 gene Proteins 0.000 description 1
- 102100027744 Semaphorin-4D Human genes 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Automatic Assembly (AREA)
- Supply And Installment Of Electrical Components (AREA)
- Control By Computers (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
Abstract
(57)【要約】
【課題】 生産ラインを構成するマシンの部品切れ時刻
を精度よく予測するとともに、プリント板ユニットの生
産を好適に行うことができるプリント板ユニット生産に
おける部品供給管理システムを提供する。
【解決手段】 生産に必要となるデータを保存し生産計
画と出材データとを提供するサーバと、生産計画と出材
データとを受信し生産ラインの効率を考慮して生産計画
を再立案する計画手段と、計画手段で再立案された生産
計画を実施した場合に生産ラインを構成するマシンの部
品切れ停止を予測する機能を有するシミュレーション手
段と、部品補充時刻を作業者へ通知する通知手段とを備
え、前記シミュレーション手段は生産ラインの生産進捗
情報を入手する進捗収集手段が獲得したマシンの部品消
費量実績データに基づいて部品切れ時刻を予測する。
(57) [Problem] To provide a parts supply management system in printed circuit board unit production that can accurately predict the time at which parts of a machine constituting a production line will run out and can appropriately perform production of printed circuit board units. . SOLUTION: A server for storing data required for production and providing a production plan and output data, receiving the production plan and output data, and re-planning the production plan in consideration of the efficiency of the production line. A planning unit, a simulation unit having a function of predicting a stoppage of a part shortage of a machine constituting a production line when a production plan re-planned by the planning unit is performed, and a notifying unit for notifying an operator of a part replenishment time; And the simulation means predicts the part-out time based on the actual machine part consumption data acquired by the progress collecting means for obtaining the production progress information of the production line.
Description
【0001】[0001]
【発明の属する技術分野】この発明は、複数の生産ライ
ンを備え、プリント板ユニットの生産を好適に行うこと
ができるプリント板ユニット生産における部品供給管理
システムに関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a component supply management system in printed circuit board unit production which has a plurality of production lines and can suitably produce printed circuit board units.
【0002】[0002]
【従来の技術】プリント板ユニットを生産する場合にお
いて、プリント板ユニットの生産ラインは、例えば、印
刷機、接着剤の供給、チップ部品を搭載するチップマウ
ンタ、大きい部品を搭載するSOPマウンタ、コネクタ
などの異形部品を搭載するマウンタ、異形部品の供給な
どで構成され、プリント板に所定の部品が搭載された
後、リフローによる加熱処理によってプリント板ユニッ
トの生産が完了する。2. Description of the Related Art When a printed circuit board unit is produced, a production line of the printed circuit board unit includes, for example, a printing machine, an adhesive supply, a chip mounter for mounting chip components, an SOP mounter for mounting large components, and a connector. After mounting a predetermined component on the printed board, the heating process by reflow completes the production of the printed board unit.
【0003】さらに、プリント板ユニットを生産する場
合において、製造機種と、生産枚数と、構成部品とその
使用個数と、製造納期などからなる生産計画は、製造管
理部門で立案され、その指示に基づいて製造部門が生産
を担当する。前述の製造管理部門で管理される部品は当
然部品単位で管理されている。また、製造部門において
は、複数の生産ラインを備えており、各生産ラインにお
いて同一部品を使用することが多い。Further, in the case of producing a printed board unit, a production plan including a production model, a production number, a component part and its use number, a production delivery date, and the like is drafted by a production management department, and based on the instruction. The production department is in charge of production. The parts managed by the manufacturing management section described above are naturally managed in parts. Further, the manufacturing section is provided with a plurality of production lines, and the same parts are often used in each production line.
【0004】一方、例えば、チップコンデンサなどから
なるチップ部品は、例えば、5,000個単位に格納さ
れたリール部材を取扱い単位としている。また、プリン
ト板ユニットを生産する場合において、チップマウンタ
の部品切れが発生した時は、リール部材を交換して部品
補充をする必要がある。[0004] On the other hand, for chip components such as chip capacitors, for example, reel members stored in units of 5,000 are used as handling units. In the case of producing a printed board unit, when the chip mounter has run out of parts, it is necessary to replace the reel member and replenish the parts.
【0005】このリール部材の交換時期を予測する手法
としては、例えば、プリント板ユニット生産計画数量に
対して必要なリール部材数量を算出し、そのリール部材
を交換するまでの時間を、1つのリール部材が保有する
部品数量をプリント板ユニット1枚を生産するために必
要な部品数量で割り、これにプリント板ユニット1枚を
生産するためのタクト時間を掛けた値から算出する手法
がある。As a method of predicting the replacement time of the reel member, for example, a necessary reel member quantity is calculated with respect to the production plan quantity of the printed board unit, and the time until the reel member is replaced is determined by one reel. There is a method in which the number of parts held by a member is divided by the number of parts required to produce one printed board unit, and the result is multiplied by the tact time required to produce one printed board unit.
【0006】すなわち、生産枚数に対する必要なリール
部材数量は次式によって求める。・生産枚数に対する必
要なリール部材数量=(生産枚数×プリント板ユニット
1枚に要する部品数量)÷1つのリール部材が保有する
部品数量つぎに、リール部材を交換するまでの時間は、 ・リール部材を交換するまでの時間=(1つのリール部
材が保有する部品数量÷プリント板ユニット1枚に要す
る部品数量)×プリント板ユニット1枚生産するための
タクト時間 によって求められる。That is, the required number of reel members for the number of sheets to be produced is obtained by the following equation. The required number of reel members relative to the number of production units = (the number of production units × the number of parts required for one printed circuit board unit) / the number of components held by one reel member. Time until the replacement of the printed board = (the number of parts held by one reel member / the number of parts required for one printed board unit) × the tact time for producing one printed board unit.
【0007】前記のタクト時間は、予め設定されたもの
であり、生産ラインを構成するチップマウンタへのプリ
ント板供給/排出時間と、実際に部品を実装している時
間と、チップマウンタのロス時間とを加えたものからな
る。また、生産進捗において、プリント板ユニットの実
際の生産実績と、プリント板ユニットの生産計画とでは
生産数量に誤差が発生する。[0007] The tact time is set in advance, and is a supply / discharge time of a printed board to a chip mounter constituting a production line, a time during which components are actually mounted, and a loss time of the chip mounter. And the addition of In the production progress, an error occurs in the production quantity between the actual production result of the printed board unit and the production plan of the printed board unit.
【0008】これは、リール部材の交換時期を予測する
際に誤差が発生することを意味している。特に、同一機
種のプリント板ユニットを1週間連続して生産し続ける
場合などにおいては、リール部材の交換時期を予測する
際に大きな誤差が発生することになる。[0008] This means that an error occurs when estimating the replacement time of the reel member. In particular, when the same type of printed circuit board unit is continuously produced for one week, a large error occurs in estimating the replacement time of the reel member.
【0009】上記の問題点を解決するため、リール部材
の交換時期を予測する際に、プリント板ユニットの生産
実績に基づいて部品在庫数量の更新を即時処理し、部品
在庫数量を高い精度で把握することで、リール部材の交
換時期を予測する手法がある。以下に詳細を説明する。In order to solve the above problems, when estimating the time to replace a reel member, the parts inventory quantity is immediately updated based on the production results of the printed board unit, and the parts inventory quantity is grasped with high accuracy. By doing so, there is a method of predicting the replacement time of the reel member. The details will be described below.
【0010】図7は従来技術の構成図を示す。同図にお
いて、部品切れ予測システムにおいて、在庫管理部81
と、演算処理部82と、生産実績カウント部83と、バ
ーコードリーダ86と、各マウンタと、各マウンタに対
応する検出部84a,84b,84c,84dとで構成
している。FIG. 7 shows a configuration diagram of the prior art. In the figure, the stock management unit 81
, An arithmetic processing unit 82, a production result counting unit 83, a bar code reader 86, each mounter, and detection units 84a, 84b, 84c, 84d corresponding to each mounter.
【0011】在庫管理部81は、例えば同一機種のプリ
ント板ユニットを生産するに際して、図8(a)に示す
ように、部品図番と、この部品を格納するリール部材の
識別コードと、リール部材が保有するリール内部品個数
とを登録している。When producing the same type of printed board unit, for example, as shown in FIG. 8 (a), the inventory management unit 81 supplies a part drawing number, an identification code of a reel member storing this part, and a reel member. Is registered with the number of parts in the reel held by the company.
【0012】バーコードリーダ86は、リール部材に設
けた識別コードを読取るものである。表示部87は、部
品切れ予測システムにおいて、作業者に適時に作業を指
示するために必要事項を表示するものである。各マウン
タは、チップ部品を格納するリール部材を治具にセット
してプリント板に所定の部品を搭載するものである。検
出部84a,84b,84c,84dは、各マウンタで
プリント板に部品搭載が完了し、プリント板がマウンタ
を通過したことを検出するものである。The bar code reader 86 reads an identification code provided on a reel member. The display unit 87 displays necessary items in order to instruct a worker in a timely manner in the component shortage prediction system. Each mounter sets a reel member for storing chip components in a jig and mounts predetermined components on a printed board. The detectors 84a, 84b, 84c, 84d detect that mounting of components on the printed board by each mounter has been completed and that the printed board has passed through the mounter.
【0013】生産実績カウント部83は、同一機種のプ
リント板ユニットを生産する時に、前記の各検出部84
a,84b,84c,84dからの情報により、プリン
ト板ユニットの生産実績をプリント板ユニットを1枚生
産する毎にカウントするものである。When producing the same type of printed circuit board unit, the production result counting section 83 is provided with each of the detection sections 84 described above.
Based on the information from a, 84b, 84c, and 84d, the production results of the printed board unit are counted each time one printed board unit is produced.
【0014】演算処理部82は、前記生産実績カウント
部83からの入力により、プリント板ユニットを生産し
続ける時に、プリント板ユニットを1枚生産する毎に部
品の消費量を算出し、前記在庫管理部81に登録された
リール部材単位のデータを更新するものである。すなわ
ち、図8(b)に示すプリント板ユニット1枚を生産す
るために必要な部品使用原単位であるマウント情報が予
め設定されており、このマウント情報に生産実績枚数を
掛けた値に基づいて、前述の在庫管理部81のデータの
リール部材が保有するリール内部品個数を減算するもの
である。The arithmetic processing unit 82 calculates the consumption of parts each time one printed board unit is produced when the printed board unit is continuously produced, based on the input from the production result counting unit 83. This is to update the data of each reel member registered in the section 81. That is, mount information, which is a unit use unit required for producing one printed board unit shown in FIG. 8B, is set in advance, and based on a value obtained by multiplying this mount information by the number of actual production sheets. The number of parts in the reel held by the reel member of the data of the inventory management unit 81 is subtracted.
【0015】すなわち、部品消費量は次式によって求め
る。 ・部品消費量=プリント板ユニット生産の使用原単位×
生産実績枚数 例えば、図8(a)に示した在庫管理部のデータからプ
リント板ユニットを1枚生産した場合は、図8(b)に
示したマウント情報に基づいて、図8(c)に示すよう
に、リール内部品個数を変更する。さらに、プリント板
ユニットを1枚生産した場合は、図8(b)に示したマ
ウント情報に基づいて、図8(d)に示すように、リー
ル内部品個数を変更する。That is, the component consumption is obtained by the following equation.・ Parts consumption = Unit consumption of printed board unit production ×
8A. For example, when one printed circuit board unit is produced from the data of the inventory management unit shown in FIG. 8A, based on the mount information shown in FIG. As shown, the number of components in the reel is changed. Further, when one printed board unit is produced, the number of components in the reel is changed as shown in FIG. 8D based on the mount information shown in FIG. 8B.
【0016】つぎに、処理手順について図9を用いて説
明する。Next, the processing procedure will be described with reference to FIG.
【0017】ステップS51において、演算処理部82
は、作業が開始された各マウンタでの部品切れと補充時
刻とを作業者に通知する。例えば、どこのラインで、ど
の部品が何時頃に補充する必要があるかを表示部87に
表示する。In step S51, the arithmetic processing unit 82
Informs the operator of the part exhaustion and replenishment time at each mounter where the work has started. For example, the display unit 87 displays which line is required to replenish which part and at what time.
【0018】ステップS52において、作業者は、部品
切れ発生前に予め治具に補充予定部品を準備する。In step S52, the operator prepares a part to be replenished in the jig before the occurrence of part exhaustion.
【0019】ステップS53において、生産実績カウン
ト部83は、各マウンタで順次に作業が完了したことを
検知する各検出部84a,84b,84c,84dから
の通知により、プリント板ユニットの生産実績を1枚毎
にカウントする。In step S53, the production result counting unit 83 counts the production result of the printed board unit by 1 based on a notification from each of the detection units 84a, 84b, 84c, 84d for detecting that the work is sequentially completed by each mounter. Count each sheet.
【0020】ステップS54において、演算処理部82
は、プリント板ユニットが1枚生産される毎にマウント
情報に基づいて部品消費量を算出し、在庫管理部81に
登録されたリール内部品個数を減算して更新する。In step S54, the arithmetic processing unit 82
Calculates the component consumption based on the mount information every time one printed board unit is produced, and subtracts and updates the number of components in the reel registered in the inventory management unit 81.
【0021】ステップS55において、演算処理部82
は、各マウンタでの部品切れ補充時刻に達したか判定す
る。部品切れ補充時刻に達していればステップS56に
進む。部品切れ補充時刻に達していなければステップS
51に戻る。In step S55, the arithmetic processing unit 82
Determines whether or not the component exhaustion replenishment time has been reached for each mounter. If the time has reached the component replenishment time, the process proceeds to step S56. If it is not time to replenish the parts, step S
Return to 51.
【0022】ステップS56において、作業者は、マウ
ンタが部品切れで停止したら速やかに部品補充を実施す
る。その際、部品が空になって交換されるリール部材の
識別コードと、供給するリール部材の識別コードとをバ
ーコードリーダ86で読取り、交換リール部材の部品情
報と補充リール部材の部品情報とを演算処理部82に送
達する。In step S56, the operator immediately replenishes components when the mounter stops due to running out of components. At this time, the bar code reader 86 reads the identification code of the reel member to be replaced when the component becomes empty and the identification code of the reel member to be supplied, and reads the component information of the replacement reel member and the component information of the refill reel member. It is transmitted to the arithmetic processing unit 82.
【0023】ステップS57において、演算処理部82
は、補充するリール部材の識別コードを在庫管理部81
に通知するとともに、その部品情報を在庫管理部81に
登録する。また、交換されるリール部材の識別コードを
在庫管理部81に通知するとともに、在庫管理部81に
登録された部品情報を廃棄する。In step S57, the arithmetic processing unit 82
Stores the identification code of the reel member to be replenished in the inventory management unit 81
And the part information is registered in the inventory management unit 81. Further, it notifies the inventory management unit 81 of the identification code of the reel member to be replaced, and discards the component information registered in the inventory management unit 81.
【0024】ステップS58において、演算処理部82
は、生産実績カウント部83からの通知により、プリン
ト板ユニットの生産実績を1枚毎にカウントするととも
に、生産計画に対して遅延があるかどうかを確認する。
遅延があれば適切な処置をとる。In step S58, the arithmetic processing unit 82
According to the notification from the production result counting unit 83, the production result of the printed board unit is counted for each sheet, and it is confirmed whether there is a delay in the production plan.
Take appropriate action if there is a delay.
【0025】ステップS59において、生産が終了か判
定する。生産が終了でなければステップS51に戻る。
生産が終了ならば処理を終了する。In step S59, it is determined whether the production is completed. If the production is not completed, the process returns to step S51.
If the production is completed, the processing is terminated.
【0026】[0026]
【発明が解決しようとする課題】前記のごとく、従来の
技術では次のような問題点がある。As described above, the prior art has the following problems.
【0027】1)プリント板ユニットを生産する場合、
マウンタに実装されるリール部材において、リール部材
からチップ部品を吸着してプリント板ユニットに搭載す
る前工程までの過程におていは部品吸着個数が存在す
る。また、プリント板ユニットにチップ部品を搭載完了
した部品実装個数が存在する。さらに、部品吸着個数と
部品実装個数との差異が発生する場合はエラー個数が存
在する。すなわち、エラー個数は、認識ミス、吸着ミス
などにより、正しく搭載できなかった個数を示すもので
ある。1) When producing a printed board unit,
In the reel member mounted on the mounter, there is a component suction number in a process up to a process before the chip component is sucked from the reel member and mounted on the printed board unit. In addition, there is a number of mounted components in which chip components have been completely mounted on the printed board unit. Further, when a difference occurs between the number of picked-up parts and the number of mounted parts, there is an error number. That is, the number of errors indicates the number of components that could not be correctly mounted due to a recognition error, a suction error, or the like.
【0028】2)一方、部品切れ予測に際して、プリン
ト板ユニット1枚を生産するために必要な部品使用原単
位であるマウント情報に生産実績枚数を掛けた値に基づ
いて部品の消費量を算出し、プリント板ユニットを1枚
生産する毎に、在庫管理部のリール部材が保有するリー
ル内部品個数を減算するものである。すなわち、プリン
ト板ユニット1枚を生産するために必要な部品使用原単
位による論理値に基づいて算出している。2) On the other hand, at the time of predicting the running out of parts, the consumption of the parts is calculated based on the value obtained by multiplying the mount information, which is the unit consumption of parts required to produce one printed board unit, by the actual production quantity. Each time one printed board unit is produced, the number of components in the reel held by the reel member of the inventory management unit is subtracted. That is, the calculation is performed based on the logical value based on the unit consumption of parts required to produce one printed board unit.
【0029】3)したがって、部品使用原単位による論
理値に基づいて部品消費量を算出しても、部品吸着個数
と部品実装個数とに差異が発生する場合、すなわち、エ
ラー個数が存在する場合は正確に部品消費量を算出する
ことができない。3) Therefore, even if the component consumption is calculated based on the logical value based on the component usage unit, if there is a difference between the number of picked up components and the number of mounted components, that is, if there is an error number, Parts consumption cannot be calculated accurately.
【0030】4)このため、マウンタに実装されたリー
ル部材の部品切れを予測する際に、エラー個数が存在す
る場合は論理値とに大きな誤差が発生する。4) For this reason, when predicting the running out of parts of the reel member mounted on the mounter, if there is an error number, a large error occurs with the logical value.
【0031】[0031]
【課題を解決するための手段】前記の問題点を解決する
ために、この発明では次のような手段を取る。In order to solve the above problems, the present invention takes the following measures.
【0032】プリント板ユニットを生産する際に、部品
消費量実績データに基づいて部品切れ時刻を予測する。
すなわち、部品消費量実績データはマウンタが実際に消
費する部品吸着個数とする。When producing a printed circuit board unit, the time at which a component will run out is predicted on the basis of the actual data of the component consumption.
That is, the component consumption amount actual data is the component suction number actually consumed by the mounter.
【0033】上記の手段を取ることにより、マウンタが
実際に消費する部品吸着個数に基づいて部品切れ時刻を
予測するので、部品吸着個数と部品実装個数とに差異が
発生する場合、すなわち、エラー個数が存在する場合で
も正確に部品消費量を算出する。このため、部品切れ時
刻の予測が正確になる。By taking the above-described means, the component cut-out time is predicted on the basis of the number of picked-up parts actually consumed by the mounter. Therefore, when there is a difference between the picked-up number of parts and the number of mounted parts, Even if there is, the component consumption is accurately calculated. For this reason, the prediction of the part exhaustion time becomes accurate.
【0034】[0034]
【発明の実施の形態】この発明は、次に示したような実
施の形態をとる。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention adopts the following embodiments.
【0035】図1に示すように、本発明のプリント板ユ
ニット生産における部品供給管理システムは、プリント
板ユニットの生産に必要となるデータを保存し、製造機
種と生産数量とを含む生産計画と、製造機種に対応する
構成部品を含む生産計画に必要な出材データとを提供す
るサーバ1と、前記生産計画と出材データとを受信し、
生産ラインの効率を考慮して生産計画を再立案する計画
手段11と、計画手段11で再立案した生産計画が問題
ないことを確認し、計画手段11で再立案された生産計
画を実施した場合に生産ラインを構成するマシンの部品
切れ停止を予測する機能を有するシミュレーション手段
14と、部品補充時刻を作業者へ通知して部品補充を指
示する通知手段15とをネットワーク19を介して備え
た、プリント板ユニット生産における部品供給管理シス
テムであって、前記シミュレーション手段14は、生産
ラインの生産進捗情報を入手する進捗収集手段16が獲
得したマシンの部品消費量実績データに基づいて部品切
れ時刻を予測する。As shown in FIG. 1, the component supply management system in the production of a printed circuit board unit according to the present invention stores data necessary for production of a printed circuit board unit, a production plan including a production model and a production quantity, and A server 1 for providing output data necessary for a production plan including components corresponding to the production model, and receiving the production plan and output data;
When the planning means 11 for re-planning the production plan in consideration of the efficiency of the production line and the production plan re-planned by the planning section 11 are confirmed to have no problem, and the production plan re-planned by the planning section 11 is executed. A simulation unit 14 having a function of predicting a stoppage of a component running out of a machine constituting a production line, and a notifying unit 15 for notifying an operator of a component replenishment time and instructing a component replenishment via a network 19. In the parts supply management system for printed board unit production, the simulation means predicts a part-out time based on actual machine part consumption data acquired by a progress collection means for obtaining production progress information of a production line. I do.
【0036】上記の実施の形態をとることにより、部品
切れ時刻を予測するためのデータとして、マシンの部品
消費量実績データを利用する。このマシンの部品消費量
実績データは論理値ではなく実績値であるため、部品切
れ時刻を予測する場合の誤差を少なくする。By adopting the above-described embodiment, actual data of the parts consumption of the machine is used as data for estimating the time at which parts will run out. Since the actual component consumption data of this machine is not a logical value but an actual value, an error in estimating a component exhaustion time is reduced.
【0037】さらに、前記進捗収集手段16は、各マシ
ンに対応して設置されるプリント板ユニットの通過を検
知する検出手段17からの通知によってプリント板ユニ
ットを1枚生産する毎に各マシンの部品吸着個数からな
る部品消費量実績データを獲得する。Further, the progress collecting means 16 receives the notification from the detecting means 17 for detecting the passage of the printed board unit installed corresponding to each machine, and each time one printed board unit is produced, the component of each machine is produced. Acquires the part consumption actual data consisting of the number of suctioned parts.
【0038】上記の実施の形態をとることにより、部品
吸着個数はプリント板ユニットに実装した部品実装個数
と、プリント板ユニットに実装できなかったエラー個数
とを含むので、マシンの部品消費量実績データは真の部
品消費量データとなる。By adopting the above-described embodiment, the number of components picked up includes the number of components mounted on the printed board unit and the number of errors that could not be mounted on the printed board unit. Is true component consumption data.
【0039】さらに、前記シミュレーション手段14
は、前記進捗収集手段16からのマシンの部品消費量実
績データを受信し、マシンに実装された各リール部材の
部品残数を算出し、この部品残数を部品切れ時間に変換
する。Further, the simulation means 14
Receives the actual data of the parts consumption of the machine from the progress collecting means 16, calculates the number of remaining parts of each reel member mounted on the machine, and converts the remaining number of parts into a part-out time.
【0040】上記の実施の形態をとることにより、部品
残数はマシンの部品消費量実績データから算出するの
で、実績に基づく正確な部品残数となり、部品切れ時間
を予測する場合の誤差を少なくする。By adopting the above embodiment, the number of remaining parts is calculated from the actual consumption data of the machine. Therefore, the number of remaining parts is an accurate number of remaining parts based on the actual results, and the error in estimating the out-of-part time is reduced. I do.
【0041】さらに、前記シミュレーション手段14
は、前記マシンに実装された各リール部材の部品残数を
算出する際は、プリント板ユニットを1枚生産する毎に
部品消費量実績データを受信し、マシンに実装された各
リール部材の部品総数量から部品消費量実績をその都度
減算して部品残数を算出する。Further, the simulation means 14
When calculating the number of remaining parts of each reel member mounted on the machine, each time a single printed board unit is produced, component consumption actual data is received, and the component of each reel member mounted on the machine is received. The actual number of parts consumed is subtracted from the total amount each time to calculate the remaining number of parts.
【0042】上記の実施の形態をとることにより、部品
切れ時間を予測するに際して、プリント板ユニットを1
枚生産する毎に実績に基づく真の部品残数によって部品
切れ時間を算出するので、部品切れ時間の精度が向上す
る。By adopting the above-described embodiment, when estimating the component outage time, one printed board unit is used.
Since the component outage time is calculated by the true remaining number of parts based on the actual results each time a piece is produced, the accuracy of the component outage time is improved.
【0043】さらに、前記シミュレーション手段14
は、リール部材の部品切れ時刻を予測する際は、プリン
ト板ユニット1枚が通過した実績時刻に、マシンに実装
された単一のリール部材の部品残数をプリント板ユニッ
ト1枚を生産する為に必要な部品数で割り、これにプリ
ント板ユニット1枚を生産する為のタクト時間を掛けた
値を加える。Further, the simulation means 14
In order to predict the time when a reel member will run out, the remaining time of a single reel member mounted on the machine is used to produce one printed board unit at the actual time when one printed board unit has passed. And the value obtained by multiplying this by the tact time required to produce one printed circuit board unit.
【0044】上記の実施の形態をとることにより、リー
ル部材の部品切れ時刻を予測する際に、直前のプリント
板ユニット1枚が生産された実績時刻と、真の部品残数
に基づく部品切れ時間とから算出するので、予測するリ
ール部材の部品切れ時刻は精度が向上し正確な部品切れ
時刻となる。According to the above-described embodiment, when predicting the time at which parts of a reel member will run out, the actual time at which one printed board unit was produced immediately before and the time at which parts are run out based on the true remaining number of parts. , The accuracy of the predicted component cut-out time of the reel member is improved and becomes the accurate component cut-out time.
【0045】さらに、前記計画手段11は、プリント板
ユニットを1枚生産する毎にマシンに実装された各リー
ル部材のリール内部品個数を更新するマウンタ実績管理
部13を備える。Further, the planning means 11 includes a mounter performance management unit 13 for updating the number of components in each reel member mounted on the machine every time one printed board unit is produced.
【0046】上記の実施の形態をとることにより、プリ
ント板ユニットを1枚生産する毎に所在データに基づく
リール部材の真の部品残数とエラー個数とを常に掌握す
る。By adopting the above-described embodiment, every time one printed board unit is produced, the true remaining number of parts and the number of errors of the reel members based on the location data are always controlled.
【0047】さらに、部品切れが生じた際は、マウンタ
実績管理部13のデータに基づく空となったリール部材
と、新しくマシンに実装されるリール部材とを比較し、
部品図番と、巻方向と、出材コードとをチェックして間
違えなく部品補充ができることを確認する交換確認手段
18を備える。Further, when a component runs out, the empty reel member based on the data of the mounter performance management unit 13 is compared with the reel member newly mounted on the machine.
A replacement confirmation unit 18 is provided for checking the part drawing number, the winding direction, and the material output code to confirm that parts can be replenished without error.
【0048】上記の実施の形態をとることにより、部品
補充時のチェック機能を装備することで、部品補充作業
は作業ミスを防止して確実にする。According to the above-described embodiment, by providing a check function at the time of component replenishment, the component replenishment operation can be reliably performed by preventing operation errors.
【0049】さらに、前記通知手段15は、交換確認手
段18が部品補充の確認をチェックする際は、表示画面
および/または音声によって作業者へ通知する。Further, the notifying means 15 notifies the operator by a display screen and / or voice when the replacement confirming means 18 checks the confirmation of component replenishment.
【0050】上記の実施の形態をとることにより、部品
補充時において作業者に確実に指示あるいは通知するの
で、部品補充作業を確実にする。By adopting the above-described embodiment, the operator is surely instructed or notified at the time of component replenishment, so that the component replenishment work is ensured.
【0051】さらに、前記通知手段15は、生産計画を
実行する際に製造部門が保有するリール部材を管理する
在庫管理部12のデータを適時に修正するとともに、生
産管理部門へ部品補充を促す通知を行う。Further, the notifying means 15 corrects the data of the inventory management unit 12 for managing the reel members held by the manufacturing department when executing the production plan, and notifies the production management department of replenishment of parts. I do.
【0052】上記の実施の形態をとることにより、製造
部門において発生する部品数量不足による生産計画に対
する遅延などの影響を未然に防止する。By adopting the above-described embodiment, it is possible to prevent the influence of a shortage of parts occurring in the manufacturing department from being delayed on the production plan.
【0053】さらに、前記プリント板ユニット生産にお
ける部品供給管理システムは、前記在庫管理部12で管
理される部品図番と、巻方向と、出材コードとが同一の
リール部材は実装するマシンを任意に指定可能とする。Further, the parts supply management system in the production of the printed board unit, the parts drawing number managed by the inventory management unit 12, the winding direction, and the material code are the same as the machine on which the reel member is mounted. Can be specified.
【0054】上記の実施の形態をとることにより、製造
部門が保有する部品図番と、巻方向と、出材コードとが
同一のリール部材は実装するマシンを特定しないので、
作業計画時においてリール部材の流用が可能となる。ま
た、部品補充時において最適なリール部材を補充する。
例えば、少量の部品残数を持つリール部材の補充は後回
しとして補充回数を減少する。さらに、部品補充時にお
いてリール部材探しが不要になる。By adopting the above-described embodiment, a machine to mount a reel member having the same part drawing number, winding direction, and output code held by the manufacturing department is not specified.
It is possible to divert the reel members at the time of work planning. In addition, an optimum reel member is replenished when replenishing parts.
For example, the replenishment of a reel member having a small remaining number of parts reduces the number of replenishments later. Further, it is not necessary to search for a reel member when replenishing parts.
【0055】[0055]
【実施例】この発明による代表的な実施例を図2ないし
図6によって説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A representative embodiment according to the present invention will be described with reference to FIGS.
【0056】図2は本発明の実施例の構成図を示す。FIG. 2 is a block diagram showing an embodiment of the present invention.
【0057】同図において、プリント板ユニット生産に
おける部品供給管理システムは、製造管理部門に備える
サーバ31と、製造部門に備える生産計画具体化部32
と、段取支援部38と、実績/フィードバック処理部3
9と、作業計画シミュレーション部42と、生産実績カ
ウント部43と、交換確認部45と、生産ラインとを主
構成とし、LAN(ローカル・エリア・ネットワーク)
回線50を介して相互に送受信可能にしている。In the figure, a parts supply management system in the production of a printed board unit includes a server 31 provided in a manufacturing management section and a production plan materializing section 32 provided in a manufacturing section.
, Setup support unit 38, and result / feedback processing unit 3
9, a work plan simulation unit 42, a production result count unit 43, an exchange confirmation unit 45, and a production line, and have a LAN (local area network).
Transmission and reception can be performed mutually via the line 50.
【0058】サーバ31はプリント板ユニットの生産に
必要となるデータを保存し、製造機種と生産枚数と納期
とを含む生産計画と、製造機種に対応する構成部品を含
む生産計画に必要な出材データとを生成して製造部門に
提供するものである。The server 31 stores data necessary for the production of the printed board unit, and outputs data necessary for the production plan including the production model, the number of products produced, and the delivery date, and the production plan including the components corresponding to the production model. The data is generated and provided to the manufacturing department.
【0059】生産計画具体化部32は、前記生産計画と
出材データとを受信し、生産ラインの効率を考慮して生
産計画を再立案するものである。さらに、生産計画具体
化部32は、在庫管理部33と、マウンタ実績管理部3
4と、マウンタ情報管理部35と、引当て処理部36
と、生産可否判断部37とを備えている。The production plan materializing section 32 receives the production plan and the material output data, and re-plans the production plan in consideration of the efficiency of the production line. Further, the production plan materializing section 32 includes an inventory management section 33 and a mounter performance management section 3.
4, the mounter information management unit 35, and the assignment processing unit 36
And a production availability determination unit 37.
【0060】在庫管理部33は、図3(a)に示すよう
なデータ構成を持ち、生産計画を実行する際に、製造部
門が保有するリール部材を識別コード(IDコード)等
を付与して部品を特定する。また、製造部門で保有する
部品数量、部品所在場所などの登録や変更も実行する。
なお、当該プリント板ユニット生産における部品供給管
理システムは、前記在庫管理部33で管理される部品図
番と、巻方向と、出材コードとが同一のリール部材は実
装するマシンを任意に指定可能とする。The inventory management unit 33 has a data structure as shown in FIG. 3A, and assigns an identification code (ID code) to a reel member held by the manufacturing department when executing a production plan. Identify parts. In addition, registration and change of the number of parts and the location of the parts held by the manufacturing department are also executed.
The component supply management system in the production of the printed board unit can arbitrarily designate a machine on which a reel member having the same component drawing number, winding direction, and output code managed by the inventory management unit 33 is mounted. And
【0061】マウンタ実績管理部34は、図3(b)に
示すようなデータ構成を持ち、リール部材が保有する部
品残数をプリント板ユニット1枚生産する毎にデータ書
き替えされて更新される。The mounter performance management unit 34 has a data structure as shown in FIG. 3B, and the data is rewritten and updated every time one printed board unit is produced for the remaining number of components held by the reel member. .
【0062】マウンタ情報管理部35は、図3(c)に
示すようなデータ構成を持ち、機種毎にプリント板ユニ
ット1枚を生産するために必要な部品使用原単位の情報
を設定している。The mounter information management section 35 has a data structure as shown in FIG. 3C, and sets information on a unit use unit required for producing one printed circuit board unit for each model. .
【0063】引当て処理部36は、製造部門で保有する
在庫管理部33のデータに基づいて仮引当て処理を実行
する。また、生産可否判断部37は、仮引当てに基づい
てロット分割の要否や生産完了予定時刻等を算出して生
産計画シミュレーションを実行する。The allocation processing section 36 executes a temporary allocation processing based on the data of the inventory management section 33 held in the manufacturing section. Further, the production availability determination unit 37 calculates the necessity of lot division, the estimated production completion time, and the like based on the provisional allocation, and executes a production plan simulation.
【0064】なお、生産計画具体化部32は、後述する
部品切れ予測処理が実行された後、生産計画を実行する
際の作業指示票、例えば必要部品リスト、補充部品リス
ト、再部品払い出し対応のための欠品一覧などの前準備
用リスト印刷も実行する。The production plan materializing section 32 executes a work instruction sheet for executing a production plan, for example, a necessary parts list, a replenishment parts list, and a re-parts payout correspondence after a part shortage prediction process described later is executed. Also prints a preparatory list such as a list of missing parts.
【0065】作業計画シミュレーション部42は、生産
計画具体化部32で再立案した生産計画シミュレーショ
ン結果の確認を行い、生産計画が問題ないことを確認す
るとともに、生産計画具体化部32で再立案された生産
計画を実施した場合に生産ラインを構成する各マウンタ
の部品切れ停止を予測する機能を有する。The work plan simulation section 42 confirms the production plan simulation results re-planned by the production plan substantive section 32 to confirm that there is no problem with the production plan. When a production plan is implemented, the system has a function of predicting a stoppage of component outage of each mounter constituting the production line.
【0066】また、前記作業計画シミュレーション部4
2は、生産するプリント板ユニットが必要とするリール
部材を在庫管理部33で管理されるリール部材から引当
てする機能を有する。The work plan simulation section 4
Reference numeral 2 has a function of assigning a reel member required by the printed board unit to be produced from a reel member managed by the inventory management unit 33.
【0067】さらに、作業計画シミュレーション部42
は、生産ラインに備える生産実績カウント部43から通
知を受け、前述の部品切れ停止予測に変更が生じた時
は、進捗情報を実績/フィードバック処理部39へ送信
する。また、生産遅延や部品数量に不足が発生して製造
の順番や製造の開始時間を変更したい場合は、進捗情報
を生産計画具体化部32へも送信する。要するに、各生
産ラインの生産実績管理処理を実行する。Further, the work plan simulation section 42
Receives the notification from the production result counting unit 43 provided on the production line, and transmits the progress information to the result / feedback processing unit 39 when the above-mentioned component outage stop prediction is changed. When it is desired to change the order of production or the start time of production due to a production delay or a shortage of parts, the progress information is also transmitted to the production plan materializing section 32. In short, the production result management process of each production line is executed.
【0068】さらに、作業計画シミュレーション部42
は、後述する生産実績カウント部43からプリント板ユ
ニット1枚生産する毎に、各マウンタの部品吸着個数に
基づく部品消費量の実績データを獲得して、マウンタ実
績管理部34のデータを更新するものである。Further, the work plan simulation section 42
Is to acquire the actual data of the component consumption based on the number of the components picked up by each mounter and update the data of the mounter actual management unit 34 every time one printed board unit is produced from the production actual count unit 43 described later. It is.
【0069】段取支援部38は、機種切り替え時の作業
指示、例えばリール部材を返却するか、流用するかなど
を指示する。The setup support unit 38 gives a work instruction at the time of switching the model, for example, whether to return or divert the reel member.
【0070】実績/フィードバック処理部39は、作業
計画シミュレーション部42からの情報に基づいて、デ
ジタル表示を可能とする表示部41や音声出力部40か
ら部品補充時刻を作業者へ通知して部品補充を指示した
り、生産ライン稼働状況を表示したり、出来高を表示し
たりする。また、部品補充時の確認表示なども行う。The result / feedback processing unit 39 notifies the operator of the component replenishment time from the display unit 41 and the audio output unit 40 that enable digital display based on the information from the work plan simulation unit 42, and replenishes the component. , Display the operation status of the production line, and display the work volume. In addition, a confirmation display at the time of parts replenishment is performed.
【0071】また、実績/フィードバック処理部39
は、在庫管理部33のデータを適時に修正する。修正す
る時期は、例えば毎週ごとに在庫管理部33のデータを
修正することで、必要時は生産管理部門へ部品供給など
のフィードバックを行う。The result / feedback processing section 39
Corrects the data of the inventory management unit 33 in a timely manner. The correction is performed, for example, by correcting the data of the inventory management unit 33 every week, and providing feedback such as parts supply to the production management department when necessary.
【0072】なお、生産ラインは、MV2C(高速マウ
ンタ)、MV(高速マウンタ)、CM92(異形部品装
着機)、CM95R(異形部品装着機)から構成されて
いる。さらに、各マウンタに対応して設置される検出部
44a,44b,44c,44dはプリント板ユニット
の通過を検知する。The production line includes MV2C (high-speed mounter), MV (high-speed mounter), CM92 (irregular component mounting machine), and CM95R (irregular component mounting machine). Further, the detectors 44a, 44b, 44c, 44d installed corresponding to the respective mounters detect the passage of the printed board unit.
【0073】生産実績カウント部43は、生産ラインの
生産進捗情報を入手して進捗情報が収集される。すなわ
ち、機種毎の開始および終了データも収集される。そし
て、作業進捗状況の情報は作業計画シミュレーション部
42に送信される。The production result counting section 43 obtains the production progress information of the production line and collects the progress information. That is, start and end data for each model are also collected. Then, the information on the work progress is transmitted to the work plan simulation unit 42.
【0074】また、生産実績カウント部43は、プリン
ト板ユニット1枚生産する毎に、各マウンタにおけるプ
リント板ユニットの累計生産枚数の実績データと、生産
された実際の時刻データと、部品吸着個数に基づくマウ
ンタの部品消費量の実績データとを獲得して、前記作業
計画シミュレーション部42に送信される。Further, each time one printed circuit board unit is produced, the production result counting section 43 stores the actual data of the total number of printed circuit board units produced in each mounter, the actual time data produced, and the number of parts picked up. The actual data of the component consumption of the mounter based on the acquired data is acquired and transmitted to the work plan simulation unit 42.
【0075】交換確認部45は、部品切れが発生した際
に、空となったリールと、新しくマウンタに実装される
リールとを比較し、間違えなく部品補充ができることを
確認するものである。The replacement confirmation section 45 compares the empty reel with a reel newly mounted on the mounter when a component shortage occurs, and confirms that components can be replenished without mistake.
【0076】つぎに、部品消費量の算出について具体的
に説明する。Next, the calculation of the component consumption will be specifically described.
【0077】図3は、本発明の実施例の説明図を示す。FIG. 3 is an explanatory view of an embodiment of the present invention.
【0078】図3(a)は前記の在庫管理部33のデー
タ構成を示す。在庫管理部33のデータは、リール部材
を特定するためのリールIDと、部品図番と、リール部
材の所在データと、現数量と、使用予定数量と、引当て
可能数量と、リールの巻方向などからなる。FIG. 3A shows the data structure of the inventory management unit 33. The data of the inventory management unit 33 includes a reel ID for identifying a reel member, a part drawing number, location data of a reel member, a current quantity, a scheduled use quantity, an allocatable quantity, and a reel winding direction. Etc.
【0079】図3(b)は前記のマウンタ実績管理部3
4のデータ構成を示す。マウンタ実績管理部34のデー
タは、ラインとマウンタ番号とレーン番号とを示すリー
ル部材の所在データと、リールIDと、部品残数と、部
品図番と、エラー個数などからなる。FIG. 3B shows the mounter performance management unit 3.
4 shows the data configuration of FIG. The data of the mounter performance management unit 34 includes reel member location data indicating a line, a mounter number, and a lane number, a reel ID, a remaining number of parts, a part drawing number, an error number, and the like.
【0080】図3(a)は前記のマウンタ情報管理部3
5のデータ構成を示す。マウンタ情報管理部35のデー
タは、ラインとマウンタ番号とレーン番号とを示すリー
ル部材の所在データと、部品図番と、使用個数などから
なる。FIG. 3A shows the mounter information management unit 3.
5 shows a data configuration of the fifth embodiment. The data of the mounter information management section 35 includes reel member location data indicating a line, a mounter number, and a lane number, a part drawing number, a used number, and the like.
【0081】各マウンタに対応して設置される検出部4
4a,44b,44c,44dがプリント板ユニットの
通過を検知することで、生産実績カウント部43は、プ
リント板ユニットを1枚生産する毎に部品吸着個数に基
づくマウンタの部品消費量実績データを獲得する。Detector 4 installed corresponding to each mounter
4a, 44b, 44c, and 44d detect the passage of the printed board unit, and the production result counting unit 43 obtains the component consumption result data of the mounter based on the component suction number every time one printed board unit is produced. I do.
【0082】部品消費量実績データは累計して計数さ
れ、マウンタに実装された各単一のリール部材の部品吸
着個数と、部品実装個数と、エラー個数とからなる。部
品消費量の算出は、部品吸着個数によって算出する。要
するに、プリント板ユニットを1枚生産する毎に、部品
吸着個数に基づいて、部品消費量実績データが獲得され
る。The actual component consumption data is counted in total, and includes the number of components picked up by each single reel member mounted on the mounter, the number of mounted components, and the number of errors. The calculation of the component consumption is calculated based on the number of picked up components. In short, every time one printed board unit is produced, the actual component consumption data is acquired based on the number of picked up components.
【0083】すなわち、部品消費量は次式によって求め
る。 ・プリント板ユニット1枚生産する毎の部品消費量=今
回生産した時の累計部品消費数−直前に生産した時の累
計部品消費数 によって求められる。また、リール部材の部品残数は次
式によって求める。 ・プリント板ユニット1枚生産する毎のリール部材の部
品残数=1つのリール部材が保有する部品残数−プリン
ト板ユニット1枚生産する毎の部品消費量 によって求められる。また、プリント板ユニット1枚生
産する毎のエラー個数は次式によって求める。 ・プリント板ユニット1枚生産する毎のエラー個数=プ
リント板ユニット1枚生産する毎の部品消費量−マウン
タ情報に基づく部品使用個数 によって求められる。That is, the component consumption is obtained by the following equation. -It can be obtained by the following equation: Component consumption per printed board unit production = total component consumption at the time of this production-total component consumption at the time of last production. The remaining number of components of the reel member is obtained by the following equation. The number of remaining parts of the reel member per production of one printed board unit = the number of remaining parts held by one reel member−the consumption of parts per production of one printed board unit. The number of errors per production of one printed board unit is obtained by the following equation. The number of errors per production of one printed circuit board unit = the amount of parts consumed per production of one printed circuit board unit—the number of parts used based on mounter information.
【0084】プリント板ユニットを1枚生産する毎に各
マウンタの部品消費量の実績データを獲得した生産実績
カウント部43は、プリント板ユニットを1枚生産する
毎に各マウンタの部品消費量の実績データを前記作業計
画シミュレーション部42に通知する。作業計画シミュ
レーション部42は、プリント板ユニット1枚生産する
毎に、部品吸着個数に基づく部品消費量の実績を獲得し
て、マウンタ実績管理部34のデータを書き替えて更新
する。すなわち、プリント板ユニット1枚生産する毎に
リール部材の部品残数を更新する。The production result counting section 43, which has obtained the actual data of the component consumption of each mounter every time one printed board unit is produced, outputs the actual data of the component consumption of each mounter every time one printed board unit is produced. The data is notified to the work plan simulation unit 42. The work plan simulation unit 42 obtains the result of the component consumption based on the number of picked-up components each time one printed board unit is produced, and rewrites and updates the data of the mounter result management unit 34. That is, each time one printed board unit is produced, the number of remaining parts of the reel member is updated.
【0085】図4は、本発明の実施例の説明図を示す。FIG. 4 is an explanatory diagram of an embodiment of the present invention.
【0086】図4はマウンタ実績管理部34のデータ書
き替えを説明するものであり、前述の図3(b)のマウ
ンタ実績管理部34の各リール部材が保有する部品残数
(リール内部品個数)は、プリント板ユニット1枚生産
する毎にその部品消費量が算出され部品残数を書き替え
て更新する。例えば、図4(a)は、プリント板ユニッ
トを1枚生産した場合のリール部材の部品残数を更新し
た場合を示す。また、図4(b)は、プリント板ユニッ
トをさらに1枚生産した場合のリール部材の部品残数を
更新した場合を示す。なお、エラー個数が発生した場合
は、リール部材の部品残数はエラー個数も含んだ個数に
更新され、マウンタの部品消費数とマウンタ情報に基づ
く部品使用個数との差分はエラー個数として更新する。
すなわち、部品残数は各リール部材が保有する真の部品
残数となる。FIG. 4 is a diagram for explaining data rewriting of the mounter performance management unit 34. The remaining number of components (number of components in a reel) held by each reel member of the mounter performance management unit 34 in FIG. In ()), each time one printed circuit board unit is produced, its component consumption is calculated, and the number of remaining components is rewritten and updated. For example, FIG. 4A shows a case where the number of remaining parts of the reel member is updated when one printed board unit is produced. FIG. 4B shows a case where the remaining number of components of the reel member is updated when one more printed board unit is produced. If an error count occurs, the remaining component count of the reel member is updated to a count including the error count, and the difference between the component consumption count of the mounter and the component usage count based on the mounter information is updated as the error count.
That is, the number of remaining components is the true number of remaining components held by each reel member.
【0087】次に、生産ラインの稼働状況と部品切れ通
知について説明する。Next, the operating status of the production line and the notification of running out of parts will be described.
【0088】リール部材を交換するまでの時間は次式に
よって求める。 ・リール部材を交換するまでの時間=(1つのリール部
材の部品残数÷プリント板ユニット1枚に要する部品数
量)×プリント板1枚生産するためのタクト時間 によって求められる。また、部品切れ時刻は次式によっ
て求める。 ・部品切れ時刻=プリント板ユニット1枚が通過した実
績時刻+リール部材を交換するまでの時間 によって求められる。The time until the reel member is replaced is determined by the following equation. Time required to replace the reel member = (remaining number of components of one reel member / number of components required for one printed board unit) × tact time for producing one printed board. Further, the component out time is obtained by the following equation. -Component outage time = Actual time when one printed board unit has passed + Time until the reel member is replaced.
【0089】例えば、部品切れ時刻を算出する場合にお
いて、現在時刻=13:00、リール部材の部品残数=
100個、プリント板ユニット1枚に要する部品数量=
25、タクト時間=1分とした場合、 ・部品切れ時刻=13:00+(100÷25)×1=
13:04 この時の部品切れ時刻は13:04となる。さらに、プ
リント板ユニット1枚が通過した時刻=13:02、リ
ール部材の部品残数=75個とした場合、 ・部品切れ時刻=13:02+(75÷25)×1=1
3:05 この時の部品切れ時刻は13:05となる。一方、プリ
ント板ユニット1枚が通過した時刻=13:02、リー
ル部材の部品残数=74個(部品吸着個数にエラー個数
1個を含む)とした場合、 ・部品切れ時刻=13:02+(74÷25)×1=1
3:04 この時の部品切れ時刻は13:04となる。For example, when calculating the component outage time, the current time = 13: 00, the number of remaining parts of the reel member =
Parts quantity required for 100 printed circuit board units =
25, tact time = 1 minute, parts out time = 13: 00+ (100/25) × 1 =
13:04 The component out time at this time is 13:04. Further, assuming that the time when one printed board unit has passed is 13:02 and the number of remaining parts of the reel member is 75 pieces, the following is obtained: 13: 02+ (75 ÷ 25) × 1 = 1
3:05 The component out time at this time is 13:05. On the other hand, when one printed board unit passes at 13:02 and the remaining number of components of the reel member = 74 (the number of picked-up components includes one error), the time of component outage = 13: 02+ ( 74 ÷ 25) × 1 = 1
3:04 The component out time at this time is 13:04.
【0090】要するに、部品切れ時刻の予測は、プリン
ト板ユニット1枚生産する毎にその生産された実績時刻
にリール部材を交換するまでの論理時間を加えて求める
ものである。さらに、リール部材を交換するまでの論理
時間は、リール部材の部品残数実績データから求めるも
のである。In short, the prediction of the part shortage time is obtained by adding the logical time until the reel member is replaced to the actual production time each time one printed board unit is produced. Further, the logical time until the reel member is replaced is obtained from the data on the remaining number of parts of the reel member.
【0091】ところで、前記実績/フィードバック処理
部39は、交換時刻を早い順に1個づつ交換するマウン
タ名称(マシン)と、そのマウンタレーン番号(レーン
番号)と、交換する時刻とをラインの作業者が遠くから
一目で見えるように表示部41によってデジタルに表示
する。By the way, the performance / feedback processing section 39 determines the mounter name (machine) to be replaced one by one in the order of the replacement time, the mounter lane number (lane number), and the replacement time. Are digitally displayed by the display unit 41 so that they can be seen at a glance from a distance.
【0092】さらに、前記実績/フィードバック処理部
39は、音声出力部40によって部材交換時刻の所定時
刻前に交換が発生することを音声にて通知することもで
きる。例えば1分前にまもなく交換が発生することを知
らせる。Further, the performance / feedback processing section 39 can also use an audio output section 40 to notify by voice that a replacement will occur before a predetermined time before the member replacement time. One minute before, for example, it will signal that an exchange will occur soon.
【0093】つぎに、補充部品の確認について具体的に
説明する。Next, confirmation of replenishment parts will be described in detail.
【0094】リール部材に付与されるバーコード情報は
リールIDと、部品図番と、巻方向と、出庫コードなど
から構成される。また、交換確認部45は、バーコード
リーダを備えている。さらに、交換確認部45は、部品
切れが発生した際、空となったリール部材と、新しくマ
ウンタに実装されるリール部材とを比較する機能を有
し、補充分のリール部材に付与されたバーコード情報を
読取り、マウンタ実績管理部34のデータに基づく空と
なったリール部材と比較することにより、部品図番と、
巻方向と、出庫コードとをチェックし、間違えなく部品
補充ができることを確認する。The bar code information given to the reel member includes a reel ID, a part drawing number, a winding direction, a delivery code, and the like. The exchange confirmation unit 45 includes a barcode reader. Further, the replacement confirmation unit 45 has a function of comparing the reel member that has become empty and the reel member that is newly mounted on the mounter when parts run out. By reading the code information and comparing it with the empty reel member based on the data of the mounter performance management unit 34,
Check the winding direction and delivery code to confirm that parts can be replenished without mistake.
【0095】さらに、交換確認部45は、上記の部品補
充のチェック処理を実行する際、前記実績/フィードバ
ック処理部39を介して、例えば各ライン毎に設置され
た表示部41に図5に示す交換確認画面によって作業者
に通知する。また、音声出力部40によって音声でも通
知する。Further, when executing the above-described parts replenishment check processing, the replacement confirmation section 45 displays, for example, on the display section 41 provided for each line via the results / feedback processing section 39 as shown in FIG. Notify the operator on the exchange confirmation screen. The notification is also made by voice using the voice output unit 40.
【0096】なお、当該実施例のプリント板ユニット生
産における部品供給管理システムは、前記在庫管理部3
3で管理される部品図番と、巻方向と、出材コードとが
同一のリール部材は実装するマウンタを任意に指定可能
とするものである。The parts supply management system in the production of a printed board unit according to the present embodiment includes the inventory management unit 3
The reel member having the same part drawing number, winding direction, and output code managed in 3 allows the mounter to be mounted to be arbitrarily specified.
【0097】つぎに、当該実施例のプリント板ユニット
生産における部品供給管理システムの処理手順を図6を
用いて説明する。なお、符号は図2による。Next, the processing procedure of the component supply management system in the production of a printed board unit according to the present embodiment will be described with reference to FIG. In addition, the code | symbol is based on FIG.
【0098】ステップS01において、生産管理部門は
受注状況によりサーバ31が持つデータから生産する製
造機種と生産枚数とを含む生産計画を立案する。In step S01, the production management department drafts a production plan including the production model to be produced and the number of products to be produced from the data held in the server 31 according to the order receiving situation.
【0099】ステップS02において、生産計画に必要
な製造機種に対応する構成部品を含む使用予定部品であ
る出材データをサーバ31が持つデータから作成する。In step S02, output data, which is a part to be used including a component corresponding to a production model required for a production plan, is created from data held by the server 31.
【0100】ステップS03において、部品管理部門の
作業者は製造部門へ部品を運搬する。次に、ステップS
04において、製造部門の作業者は部品を受取り、製造
部門内の倉庫へ入庫する。In step S03, the worker in the parts management section transports the parts to the manufacturing section. Next, step S
At 04, the worker in the manufacturing department receives the part and enters the warehouse in the manufacturing department.
【0101】ステップS05において、生産計画具体化
部32は生産管理部門で立案した生産計画を受信する。
さらに、ステップS06において、生産管理部門で作成
した出材データを受信する。In step S05, the production plan materializing section 32 receives the production plan drafted by the production management department.
Further, in step S06, the material output data created by the production management department is received.
【0102】ステップS07において、製造部門は生産
計画具体化部32の在庫管理部33のデータやマウンタ
情報管理部35のデータによって生産管理部門の指示と
製造部門が備える生産ラインの効率とを考慮して生産計
画を再立案する。In step S07, the manufacturing department considers the instruction of the production management department and the efficiency of the production line provided in the manufacturing department based on the data of the inventory management part 33 of the production plan materializing part 32 and the data of the mounter information management part 35. To rebuild the production plan.
【0103】ステップS08において、実績/フィード
バック部39は、生産計画具体化部32の在庫管理部3
3のデータを適時(例えば毎週ごと)に修正して、製造
部門が保有する部品在庫の再計算を行う。この修正にお
いて、部品数量が不足して生産計画に対して影響がある
場合、生産管理部門が持つサーバ31へ部品補充手配が
必要である旨の通知を行う。In step S08, the actual / feedback unit 39 sets the inventory management unit 3 of the production plan embodying unit 32.
The data of No. 3 is corrected in a timely manner (for example, every week), and the stock of parts held by the manufacturing department is recalculated. In this modification, if the production quantity is affected due to a shortage of parts, the server 31 of the production management department is notified that parts supply arrangement is necessary.
【0104】ステップS09において、生産計画具体化
部32の引当て処理部36は、再立案された生産計画に
基づいて仮引当てを実施し、再立案した生産計画で生産
が可能かを製造部門で保有する部品で確認を行う。In step S09, the allocation processing section 36 of the production plan materializing section 32 performs a temporary allocation based on the re-planned production plan, and determines whether or not production is possible with the re-planned production plan. Check with the parts held in.
【0105】ステップS10において、生産計画具体化
部32の生産可否判断部37は、製造部門で保有する部
品を確認した内容で生産可能枚数を算出し、生産不可能
ならば生産ロットを分割する必要があるか判定する。ロ
ット分割を必要とする場合は、ステップS07に戻り生
産計画を修正する。ロット分割を必要としない場合は、
ステップS11に進む。In step S10, the production availability judging section 37 of the production plan materializing section 32 calculates the number of producible parts based on the contents of the parts held in the manufacturing department, and if production is impossible, it is necessary to divide the production lot. Is determined. If lot division is required, the process returns to step S07 to correct the production plan. If you don't need lot splitting,
Proceed to step S11.
【0106】ステップS11において、生産計画具体化
部32は再立案した生産計画の生産完了予定時刻を算出
して、生産終了時刻を予測し、次の生産計画の実施予定
を確認する。In step S11, the production plan embodying unit 32 calculates the estimated production completion time of the re-planned production plan, predicts the production end time, and confirms the execution schedule of the next production plan.
【0107】ステップS12において、作業計画シミュ
レーション部42は生産計画具体化部32が再立案した
生産計画を受信し、生産完了時刻のシミュレーション結
果を確認する。すなわち、納期や次工程との流れに問題
がないことを確認する。問題があれば、ステップS11
に戻る。問題がなければ、ステップS13に進む。In step S12, the work plan simulation section 42 receives the production plan re-established by the production plan embodying section 32, and checks the simulation result of the production completion time. That is, it is confirmed that there is no problem in the delivery date and the flow with the next process. If there is a problem, step S11
Return to If there is no problem, go to step S13.
【0108】ステップS13において、作業計画シミュ
レーション部42は、生産計画具体化部32で再立案し
た生産計画を実施した場合における生産ラインを構成す
るマウンタの部品切れ停止を予測する。In step S13, the work plan simulation section 42 predicts a stoppage of a component part stop of a mounter constituting a production line when the production plan re-planned by the production plan materializing section 32 is executed.
【0109】ステップS14において、生産計画具体化
部32は、前準備用のリストを印刷する。例えば、必要
部品リスト、補充部品リスト、再部品払出し対応として
の欠品一覧などを出力する。なお、この時、生産計画具
体化部32の在庫管理部33は、製造部門内倉庫の所定
位置に格納された部品に、在庫管理部33で管理される
リールIDと、部品図番と、巻方向と、出材コードなど
を識別する識別コードを付与してから出材される。In step S14, the production plan embodying unit 32 prints a list for preparation. For example, it outputs a necessary parts list, a replenishment parts list, a missing parts list for re-parts delivery, and the like. At this time, the stock management unit 33 of the production plan materializing unit 32 stores the reel ID managed by the stock management unit 33, the part drawing number, A material is output after an identification code for identifying a direction and a material output code is given.
【0110】ステップS15において、作業者は出材さ
れた生産ラインで扱う部品を生産計画に合わせて部品揃
えを行う。In step S15, the operator arranges parts handled on the production line that has been dispatched in accordance with the production plan.
【0111】ステップS16において、作業者は例えば
SMTラインを構成する各マウンタの準備を行う。すな
わち、マウンタデータに基づいて供給部品を治具にセッ
ト(カセットに取付け)して試運転などを行う。At step S16, the operator prepares, for example, each mounter constituting the SMT line. That is, the supply parts are set on a jig (attached to a cassette) based on the mounter data, and a test operation or the like is performed.
【0112】ステップS17において、作業者は生産を
開始する。すなわち、準備の完了したマウンタから運転
を開始する。At step S17, the worker starts production. That is, the operation is started from the mounter whose preparation is completed.
【0113】ステップS18において、実績/フィード
バック処理部39は、各マウンタでの部品切れと補充時
刻とを作業者へ通知する。例えば、どこのラインで、ど
の部品が、何時頃に補充する必要があるかを通知する。
通知はデジタル表示や音声で行う。In step S18, the result / feedback processing section 39 notifies the worker of the component exhaustion and the replenishment time at each mounter. For example, which line and which part needs to be replenished is notified.
Notification is made by digital display or voice.
【0114】ステップS19において、作業者は部品切
れ発生前に予め治具に補充予定部品を準備する。In step S19, the operator prepares a part to be replenished in a jig in advance before the part runs out.
【0115】ステップS20において、マウンタが部品
切れで停止したか判定する。停止していなければ、ステ
ップS17に戻り、部品切れでマウンタが停止したなら
ばステップS21に進む。In step S20, it is determined whether the mounter has stopped due to lack of parts. If it has not stopped, the process returns to step S17, and if the mounter has stopped due to lack of parts, the process proceeds to step S21.
【0116】ステップS21において、交換確認部45
は、新しくマウンタに実装されるリール部材の識別コー
ドを読取り、マウンタ実績管理部34のデータに基づく
空となったリール部材と、新しくマウンタに実装される
リール部材とを比較し、図番と、巻方向と、出材コード
とをチェックして補充部品が正しくセットされたことを
確認する。このとき、表示部41により、図5に示す交
換確認画面によって作業者に通知する。また、音声出力
部40によって音声でも通知する。In step S21, the exchange confirmation unit 45
Reads the identification code of the reel member newly mounted on the mounter, compares the empty reel member based on the data of the mounter performance management unit 34 with the reel member newly mounted on the mounter, Check the winding direction and the output code to confirm that the replenishment parts have been set correctly. At this time, the operator is notified by the display unit 41 on the exchange confirmation screen shown in FIG. The notification is also made by voice using the voice output unit 40.
【0117】ステップS22において、部品補充を実施
する。その際、交換確認部45は、補充するリール部材
の識別コードを生産計画具体化部32に通知し、部品情
報をマウンタ実績管理部34に登録する。また、マウン
タ実績管理部34に登録されている交換されるリール部
材の部品情報は廃棄される。In step S22, parts replenishment is performed. At this time, the replacement confirmation unit 45 notifies the identification code of the reel member to be replenished to the production plan embodying unit 32 and registers the component information in the mounter performance management unit 34. Also, the component information of the reel member to be replaced, which is registered in the mounter performance management unit 34, is discarded.
【0118】ステップS23において、生産実績カウン
ト部43は、生産ラインの作業進捗状況について生産枚
数をカウントし、作業計画シミュレーション部42にお
いて進捗情報を表示して通知する。In step S23, the production result counting section 43 counts the number of sheets produced for the work progress of the production line, and the work plan simulation section 42 displays and notifies the progress information.
【0119】ステップS24において、生産実績カウン
ト部43は、各マウンタにおいてプリント板ユニットが
通過したかを各検出部からの通知によって判定する。プ
リント板ユニットが通過したならばステップS25に進
む。プリント板ユニットが通過していないならばステッ
プS17に戻る。In step S24, the production result counting section 43 determines whether or not the printed board unit has passed in each mounter based on a notification from each detection section. If the printed board unit has passed, the process proceeds to step S25. If the printed board unit has not passed, the process returns to step S17.
【0120】ステップS25において、生産実績カウン
ト部43は、マウンタの部品消費量の実績データを獲得
する。すなわち、プリント板ユニット1枚生産する毎に
部品吸着個数からなる部品消費量実績データを獲得し
て、作業計画シミュレーション部42に通知し、マウン
タ実績管理部34のデータを更新する。In step S25, the production result counting unit 43 acquires the result data of the component consumption of the mounter. That is, every time one printed circuit board unit is produced, the part consumption actual data including the number of picked-up parts is acquired, notified to the work plan simulation part 42, and the data of the mounter actual management part 34 is updated.
【0121】ステップS26において、作業計画シミュ
レーション部42は、プリント板ユニットが通過した実
績時刻に基づくリール部材交換予定時刻を算出し、リー
ル部材交換予定時刻を修正する必要があるか判定する。
すなわち、実際の部品交換作業時刻がリール部材交換予
定時刻と合わない場合は、ステップS18に戻り、その
リール部材の交換を実際に行った時刻に修正し、2番目
以降のリール部材交換予定時刻を修正した時刻で表示す
る。また、リール部材交換予定時刻を修正する必要がな
ければ、ステップS27に進む。In step S26, the work plan simulation section 42 calculates the reel member replacement scheduled time based on the actual time when the printed board unit has passed, and determines whether the reel member replacement scheduled time needs to be corrected.
That is, if the actual component replacement work time does not match the scheduled reel member replacement time, the process returns to step S18, where the reel member replacement is corrected to the actually performed time, and the second and subsequent reel member replacement scheduled times are set. Display at the corrected time. If it is not necessary to correct the reel member replacement scheduled time, the process proceeds to step S27.
【0122】ステップS27において、作業計画シミュ
レーション部42は、生産計画に対して遅延が生じるか
判定する。その際、在庫管理部33で管理される部品図
番と、巻方向と、出材コードとが同一のリール部材は、
実装するマウンタを任意に指定可能とし、残ったリール
部材のリールIDを在庫管理部33に通知する。なお、
部品数量が不足して生産計画に対して遅延が生じる場合
はステップS07に戻り、引当て順番を変更する必要が
発生した時には任意に引当ての内容を変更する。また、
引当て順番を変更する必要がなければ、ステップS28
に進む。In step S27, the work plan simulation section 42 determines whether a delay occurs in the production plan. At this time, a reel member having the same part drawing number, winding direction, and output code managed by the inventory management unit 33 is
The mounter to be mounted can be arbitrarily specified, and the reel ID of the remaining reel member is notified to the inventory management unit 33. In addition,
If the production quantity is delayed due to a shortage of parts, the process returns to step S07, and if it is necessary to change the allocation order, the content of allocation is arbitrarily changed. Also,
If there is no need to change the allocation order, step S28
Proceed to.
【0123】ステップS28において、生産が終了か判
定する。生産が終了でなければ、ステップS07に戻
る。終了ならば処理を終了する。In step S28, it is determined whether the production is completed. If the production is not completed, the process returns to step S07. If completed, the process ends.
【0124】[0124]
【発明の効果】以上説明したように本発明によれば、次
に示すような効果が期待できる。As described above, according to the present invention, the following effects can be expected.
【0125】生産ラインの生産進捗情報を入手する進捗
収集手段が獲得したマシンの部品消費量実績データに基
づいて部品切れ時刻を予測するシミュレーション手段を
備えることにより、部品切れ時刻を予測するためのデー
タとして、マシンの部品消費量実績データを利用するこ
とができる。このマシンの部品消費量実績データは論理
値ではなく実績値であるため、部品切れ時刻を予測する
場合の誤差を少なくすることができる。By providing simulation means for predicting a part-out time on the basis of actual machine part consumption data acquired by a progress collecting means for obtaining production progress information of a production line, data for predicting a part-out time is provided. As a result, the actual consumption data of the parts of the machine can be used. Since the actual component consumption data of the machine is not a logical value but an actual value, it is possible to reduce an error when estimating a component exhaustion time.
【0126】さらに、前記進捗収集手段は、各マシンに
対応して設置されるプリント板ユニットの通過を検知す
る検出手段からの通知によってプリント板ユニットを1
枚生産する毎に各マシンの部品吸着個数からなる部品消
費量実績データを獲得することにより、部品吸着個数は
プリント板ユニットに実装した部品実装個数と、プリン
ト板ユニットに実装できなかったエラー個数とを含むの
で、マシンの部品消費量実績データは真の部品消費量デ
ータとすることができる。Further, the progress collecting means sets one printed board unit in response to a notification from a detecting means for detecting passage of a printed board unit installed corresponding to each machine.
By acquiring the actual consumption data consisting of the number of parts picked up by each machine every time a sheet is produced, the number of parts picked up is the number of parts mounted on the printed board unit and the number of errors that could not be mounted on the printed board unit. , The actual component consumption data of the machine can be true component consumption data.
【0127】さらに、前記シミュレーション手段は、前
記進捗収集手段からのマシンの部品消費量実績データを
受信し、マシンに実装された各リール部材の部品残数を
算出し、この部品残数を部品切れ時間に変換することに
より、部品残数はマシンの部品消費量実績データから算
出するので、実績に基づく正確な部品残数となり、誤差
の少ない部品切れ時間を予測することができる。Further, the simulation means receives the component consumption actual data of the machine from the progress collecting means, calculates the number of remaining parts of each reel member mounted on the machine, and calculates the remaining number of parts. By converting to time, the number of remaining parts is calculated from the actual data of the parts consumption of the machine. Therefore, the number of remaining parts is an accurate number of remaining parts based on the actual results, and it is possible to predict a part-out time with a small error.
【0128】さらに、前記シミュレーション手段は、前
記マシンに実装された各リール部材の部品残数の算出に
際して、プリント板ユニットを1枚生産する毎に部品消
費量実績データを受信し、マシンに実装された各リール
部材の部品総数量から部品消費量実績をその都度減算し
て部品残数を算出することにより、部品切れ時間を予測
するに際して、プリント板ユニットを1枚生産する毎に
実績に基づく真の部品残数によって部品切れ時間を算出
するので、部品切れ時間の精度を向上することができ
る。Further, when calculating the remaining number of components of each reel member mounted on the machine, the simulation means receives the component consumption actual data every time one printed board unit is produced, and is mounted on the machine. By calculating the remaining number of parts by subtracting the actual consumption of the component from the total number of components of each reel member each time, and calculating the remaining number of components, the prediction based on the actual performance is performed every time one printed board unit is produced when estimating the component outage time. Since the part shortage time is calculated from the remaining number of parts, the accuracy of the part shortage time can be improved.
【0129】さらに、前記シミュレーション手段は、リ
ール部材の部品切れ時刻を予測する際、プリント板ユニ
ット1枚が通過した実績時刻に、マシンに実装された単
一のリール部材の部品残数をプリント板ユニット1枚を
生産する為に必要な部品数で割り、これにプリント板ユ
ニット1枚を生産する為のタクト時間を掛けた値を加え
ることにより、リール部材の部品切れ時刻を予測する際
に、直前のプリント板ユニット1枚が生産された実績時
刻と、真の部品残数に基づく部品切れ時間とから算出す
るので、予測するリール部材の部品切れ時刻は精度が向
上し、正確な部品切れ時刻とすることができる。Further, when estimating the time at which a reel member will run out, the simulation means calculates the remaining number of components of a single reel member mounted on the machine at the actual time when one printed board unit has passed. Dividing by the number of parts required to produce one unit, and adding a value multiplied by the tact time to produce one printed board unit, when predicting the time at which parts of a reel member will run out, Since the calculated time is calculated from the actual time when one printed circuit board unit was produced immediately before and the part-out time based on the true remaining number of parts, the predicted part-out time of the reel member is improved in accuracy, and the accurate part-out time is improved. It can be.
【0130】さらに、プリント板ユニットを1枚生産す
る毎にマシンに実装された各リール部材のリール内部品
個数を更新するマウンタ実績管理部を備えることによ
り、プリント板ユニットを1枚生産する毎に所在データ
に基づくリール部材の真の部品残数とエラー個数とを常
に掌握することができる。Further, by providing a mounter performance management unit for updating the number of parts in the reel of each reel member mounted on the machine every time one printed board unit is produced, every time one printed board unit is produced. The true remaining number of parts and the number of errors of the reel member based on the location data can always be grasped.
【0131】さらに、部品切れが生じた際は、マウンタ
実績管理部のデータに基づく空となったリール部材と、
新しくマシンに実装されるリール部材とを比較し、部品
図番と、巻方向と、出材コードとをチェックして間違え
なく部品補充ができることを確認する交換確認手段を備
えることにより、部品補充時のチェック機能を装備する
ことで、部品補充作業は作業ミスを防止して確実にする
ことができる。Further, when the component runs out, an empty reel member based on the data of the mounter performance management unit
Compared with the reel member newly mounted on the machine, the parts drawing number, winding direction, and output code are checked, and replacement confirmation means is provided to confirm that parts can be replenished without error. By providing the check function of (1), the parts replenishment operation can be reliably performed by preventing operation errors.
【0132】さらに、交換確認手段が部品補充の確認を
チェックする際に、表示画面および/または音声によっ
て作業者へ通知する通知手段を備えることにより、部品
補充時において作業者に確実に指示あるいは通知するの
で、部品補充作業を確実にすることができる。Further, when the replacement confirmation means checks the replenishment of parts, a notification means for notifying the worker by a display screen and / or voice is provided, so that the operator can be surely instructed or notified when replenishing parts. Therefore, the parts replenishment work can be ensured.
【0133】さらに、前記通知手段は、生産計画を実行
する際に製造部門が保有するリール部材を管理する在庫
管理部のデータを適時に修正するとともに、生産管理部
門へ部品補充を促す通知を行うことにより、製造部門に
おいて発生する部品数量不足による生産計画に対する遅
延などの影響を未然に防止することができる。Further, the notifying means corrects the data of the stock management section for managing the reel members held by the manufacturing section at the time of executing the production plan, and notifies the production management section to prompt the parts replenishment. As a result, it is possible to prevent an influence such as a delay on a production plan due to a shortage of parts occurring in the manufacturing department.
【0134】さらに、前記在庫管理部で管理される部品
図番と、巻方向と、出材コードとが同一のリール部材は
実装するマシンを任意に指定可能とすることにより、製
造部門が保有する部品図番と、巻方向と、出材コードと
が同一のリール部材は実装するマシンを特定しないの
で、作業計画時においてリール部材の流用を可能にする
ことができる。また、部品補充時において最適なリール
部材を補充することができ、補充回数を減少することが
できる。さらに、部品補充時においてリール部材探しを
不要にすることができる。Further, a reel member having the same part drawing number, winding direction, and output code managed by the inventory management unit can be arbitrarily designated as a machine on which to mount, so that the manufacturing department holds it. Since the reel member having the same part drawing number, winding direction, and output code does not specify the machine to be mounted, the reel member can be diverted at the time of work planning. In addition, an optimal reel member can be replenished at the time of component replenishment, and the number of replenishments can be reduced. Further, it is not necessary to search for a reel member when replenishing parts.
【図1】本発明の構成図である。FIG. 1 is a configuration diagram of the present invention.
【図2】本発明の実施例の構成図である。FIG. 2 is a configuration diagram of an embodiment of the present invention.
【図3】本発明の実施例の説明図である。FIG. 3 is an explanatory diagram of an embodiment of the present invention.
【図4】本発明の実施例の説明図である。FIG. 4 is an explanatory diagram of an embodiment of the present invention.
【図5】本発明の実施例の説明図である。FIG. 5 is an explanatory diagram of an embodiment of the present invention.
【図6】本発明の実施例のフローチャートである。FIG. 6 is a flowchart of an embodiment of the present invention.
【図7】従来技術の構成図である。FIG. 7 is a configuration diagram of a conventional technique.
【図8】従来技術の説明図である。FIG. 8 is an explanatory diagram of a conventional technique.
【図9】従来技術のフローチャートである。FIG. 9 is a flowchart of a conventional technique.
1:サーバ 11:計画手段 12:在庫管理部 13:マウンタ実績管理部 14:シミュレーション手段 15:通知手段 16:進捗収集手段 17:検出手段 18:交換確認手段 19:ネットワーク 1: Server 11: Planning means 12: Inventory management unit 13: Mounter performance management unit 14: Simulation means 15: Notification means 16: Progress collection means 17: Detection means 18: Exchange confirmation means 19: Network
フロントページの続き Fターム(参考) 3C030 BC02 DA01 DA05 DA09 DA10 3C042 RJ07 RJ12 RJ16 RJ20 RL12 5B049 BB07 CC21 CC27 CC31 DD02 EE01 EE12 EE41 FF03 FF04 FF06 GG04 GG07 5E313 AA01 AA11 AA15 CC03 CC04 DD03 DD09 DD32 DD49 EE24 FG01 FG10 5H215 AA06 AA20 BB09 BB18 BB20 CC07 CX01 GG09 KK04 Continued on the front page F term (reference) 3C030 BC02 DA01 DA05 DA09 DA10 3C042 RJ07 RJ12 RJ16 RJ20 RL12 5B049 BB07 CC21 CC27 CC31 DD02 EE01 EE12 EE41 FF03 FF04 FF06 GG04 GG07 5E313 AA01 AA11 EA03 DD03 CC03 DD03 CC03 AA20 BB09 BB18 BB20 CC07 CX01 GG09 KK04
Claims (10)
ータを保存し、製造機種と生産数量とを含む生産計画
と、製造機種に対応する構成部品を含む生産計画に必要
な出材データとを提供するサーバ(1)と、 前記生産計画と出材データとを受信し、生産ラインの効
率を考慮して生産計画を再立案する計画手段(11)
と、 計画手段(11)で再立案した生産計画が問題ないこと
を確認し、計画手段(11)で再立案された生産計画を
実施した場合に生産ラインを構成するマシンの部品切れ
停止を予測する機能を有するシミュレーション手段(1
4)と、 部品補充時刻を作業者へ通知して部品補充を指示する通
知手段(15)とをネットワーク(19)を介して備え
た、プリント板ユニット生産における部品供給管理シス
テムであって、 前記シミュレーション手段(14)は、生産ラインの生
産進捗情報を入手する進捗収集手段(16)が獲得した
マシンの部品消費量実績データに基づいて部品切れ時刻
を予測する、 ことを特徴とするプリント板ユニット生産における部品
供給管理システム。The present invention saves data required for the production of a printed board unit, and stores a production plan including a production model and a production quantity, and output data required for a production plan including components corresponding to the production model. A server (1) to provide, a planning means (11) for receiving the production plan and the output data, and re-planning the production plan in consideration of the efficiency of the production line
And confirming that there is no problem with the production plan re-planned by the planning means (11), and predicting the suspension of parts shortage of machines constituting the production line when the production plan re-planned by the planning means (11) is implemented. Simulation means (1
4) and a notifying means (15) for notifying a worker of a component replenishment time and instructing a component replenishment via a network (19), the component supply management system in printed board unit production, A printed circuit board unit, wherein the simulation means predicts a part-out time based on actual machine part consumption data acquired by the progress collecting means for obtaining production progress information of the production line. Parts supply management system in production.
過を検知する検出手段(17)からの通知によってプリ
ント板ユニットを1枚生産する毎に各マシンの部品吸着
個数からなる部品消費量実績データを獲得する、 ことを特徴とする請求項1記載のプリント板ユニット生
産における部品供給管理システム。2. The progress collecting means (16) receives a notification from a detecting means (17) for detecting the passage of a printed board unit installed corresponding to each machine, each time one printed board unit is produced. 2. The component supply management system according to claim 1, wherein component consumption result data including the number of components picked up by each machine is acquired.
績データを受信し、 マシンに実装された各リール部材の部品残数を算出し、
この部品残数を部品切れ時間に変換する、 ことを特徴とする請求項1または請求項2記載のプリン
ト板ユニット生産における部品供給管理システム。3. The simulation means (14) receives the component consumption actual data of the machine from the progress collection means (16), calculates the number of remaining parts of each reel member mounted on the machine,
The component supply management system according to claim 1 or 2, wherein the number of remaining components is converted into a component outage time.
する際は、プリント板ユニットを1枚生産する毎に部品
消費量実績データを受信し、 マシンに実装された各リール部材の部品総数量から部品
消費量実績をその都度減算して部品残数を算出する、 ことを特徴とする請求項1,2または3記載のプリント
板ユニット生産における部品供給管理システム。4. When calculating the remaining number of components of each reel member mounted on the machine, the simulation means (14) receives actual component consumption data every time one printed board unit is produced. 4. The printed board unit production according to claim 1, 2, or 3, wherein the actual number of parts consumed is subtracted from the total number of parts of each reel member mounted on the machine each time to calculate the remaining number of parts. Parts supply management system.
ユニット1枚が通過した実績時刻に、マシンに実装され
た単一のリール部材の部品残数をプリント板ユニット1
枚を生産する為に必要な部品数で割り、これにプリント
板ユニット1枚を生産する為のタクト時間を掛けた値を
加える、 ことを特徴とする請求項1,2,3または4記載のプリ
ント板ユニット生産における部品供給管理システム。5. The simulation means according to claim 1, wherein when predicting the time at which the reel member has run out, the simulation means (14) sets the remaining time of the single reel member mounted on the machine at the actual time when one printed board unit has passed. Number of printed board unit 1
5. The method according to claim 1, wherein a value obtained by dividing by a number of parts necessary for producing a sheet and multiplying the result by a tact time for producing one printed board unit is added. Parts supply management system for printed circuit board unit production.
れた各リール部材のリール内部品個数を更新するマウン
タ実績管理部(13)を備える、 ことを特徴とする請求項1記載のプリント板ユニット生
産における部品供給管理システム。6. The planning means (11) includes a mounter performance management unit (13) for updating the number of components in each reel member mounted on the machine every time one printed board unit is produced. The component supply management system according to claim 1, wherein
供給管理システムは、 部品切れが生じた際に、マウンタ実績管理部(13)の
データに基づく空となったリール部材と、新しくマシン
に実装されるリール部材とを比較し、部品図番と、巻方
向と、出材コードとをチェックして間違えなく部品補充
ができることを確認する交換確認手段(18)を備え
る、 ことを特徴とする請求項1記載のプリント板ユニット生
産における部品供給管理システム。7. A component supply management system in the production of a printed board unit, comprising: a reel member which becomes empty based on data of a mounter performance management unit (13) when a component runs out; and a newly mounted machine. The system according to claim 1, further comprising a replacement confirmation unit (18) for comparing the reel member, and checking a part drawing number, a winding direction, and a delivery code to confirm that parts can be replenished without mistake. A parts supply management system in the production of a printed circuit board unit as described above.
際に、表示画面および/または音声によって作業者へ通
知する、 ことを特徴とする請求項1または請求項7記載のプリン
ト板ユニット生産における部品供給管理システム。8. The system according to claim 1, wherein said notifying means notifies the operator by a display screen and / or voice when the replacement confirming means checks the replenishment of parts. A parts supply management system in printed board unit production according to claim 1 or 7.
を管理する在庫管理部(12)のデータを適時に修正す
るとともに、生産管理部門へ部品補充を促す通知を行
う、 ことを特徴とする請求項1記載のプリント板ユニット生
産における部品供給管理システム。9. The notifying means (15) corrects timely data of an inventory management unit (12) for managing reel members held by a manufacturing department when executing a production plan, and sends a part to the production management department. The component supply management system in printed board unit production according to claim 1, wherein notification for prompting replenishment is performed.
品供給管理システムは、 前記在庫管理部(12)で管理される部品図番と、巻方
向と、出材コードとが同一のリール部材は実装するマシ
ンを任意に指定可能とする、 ことを特徴とする請求項1記載のプリント板ユニット生
産における部品供給管理システム。10. A component supply management system in the production of a printed board unit, comprising: a machine for mounting a reel member having the same component drawing number, winding direction, and output code managed by the inventory management unit (12). The component supply management system in printed board unit production according to claim 1, wherein the component supply management system can arbitrarily designate a component.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26344498A JP2000101291A (en) | 1998-09-17 | 1998-09-17 | Parts supply management system in printed circuit board unit production |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26344498A JP2000101291A (en) | 1998-09-17 | 1998-09-17 | Parts supply management system in printed circuit board unit production |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2000101291A true JP2000101291A (en) | 2000-04-07 |
Family
ID=17389603
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP26344498A Pending JP2000101291A (en) | 1998-09-17 | 1998-09-17 | Parts supply management system in printed circuit board unit production |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2000101291A (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003069730A (en) * | 2001-08-28 | 2003-03-07 | Matsushita Electric Ind Co Ltd | Message notification system |
| JP2003101290A (en) * | 2001-09-20 | 2003-04-04 | Matsushita Electric Ind Co Ltd | Component supply method, component mounting machine and component mounting system |
| JP2004182403A (en) * | 2002-12-04 | 2004-07-02 | Daifuku Co Ltd | Article management facility |
| JP2006332402A (en) * | 2005-05-27 | 2006-12-07 | Hitachi High-Tech Instruments Co Ltd | Electronic component mounting device |
| JP2010251511A (en) * | 2009-04-15 | 2010-11-04 | Fuji Mach Mfg Co Ltd | Electronic circuit component mounting system |
| CN101908166A (en) * | 2009-06-05 | 2010-12-08 | 松下电器产业株式会社 | Component management device |
| JP2017097604A (en) * | 2015-11-24 | 2017-06-01 | ヤマハ発動機株式会社 | Parts management apparatus and parts management method |
| JP2017208408A (en) * | 2016-05-17 | 2017-11-24 | Juki株式会社 | Shipping management device, shipping management system, and program |
| CN109143969A (en) * | 2017-06-19 | 2019-01-04 | 波音公司 | In response to the dynamic modification of the production plan of manufacture deviation |
| JP2019061312A (en) * | 2017-09-25 | 2019-04-18 | パナソニックIpマネジメント株式会社 | Material replenishment support device and material replenishment support method |
| KR20190098341A (en) * | 2018-02-14 | 2019-08-22 | 한화정밀기계 주식회사 | Auto material ready system according to production plan |
| CN113994775A (en) * | 2019-08-27 | 2022-01-28 | 雅马哈发动机株式会社 | Component replenishment support device, component mounting system, and component replenishment support method |
| WO2024218827A1 (en) * | 2023-04-17 | 2024-10-24 | 株式会社Fuji | Production management device |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02311223A (en) * | 1989-05-23 | 1990-12-26 | Sanyo Electric Co Ltd | Alarming method for parts residue in parts supplying means |
| JPH0637498A (en) * | 1992-07-20 | 1994-02-10 | Fujitsu Ltd | Parts control system in parts mounting process |
| JPH06252588A (en) * | 1993-02-23 | 1994-09-09 | Matsushita Electric Ind Co Ltd | Component management apparatus for component mounting machine group and method thereof |
| JPH08264998A (en) * | 1995-03-20 | 1996-10-11 | Olympus Optical Co Ltd | Production control system |
| JPH0946094A (en) * | 1995-07-31 | 1997-02-14 | Matsushita Electric Ind Co Ltd | Component mounting method |
| JPH09138820A (en) * | 1995-11-15 | 1997-05-27 | Olympus Optical Co Ltd | Process designing system |
| JPH09223896A (en) * | 1996-02-16 | 1997-08-26 | Sharp Corp | Electronic parts mounter parts management system |
-
1998
- 1998-09-17 JP JP26344498A patent/JP2000101291A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH02311223A (en) * | 1989-05-23 | 1990-12-26 | Sanyo Electric Co Ltd | Alarming method for parts residue in parts supplying means |
| JPH0637498A (en) * | 1992-07-20 | 1994-02-10 | Fujitsu Ltd | Parts control system in parts mounting process |
| JPH06252588A (en) * | 1993-02-23 | 1994-09-09 | Matsushita Electric Ind Co Ltd | Component management apparatus for component mounting machine group and method thereof |
| JPH08264998A (en) * | 1995-03-20 | 1996-10-11 | Olympus Optical Co Ltd | Production control system |
| JPH0946094A (en) * | 1995-07-31 | 1997-02-14 | Matsushita Electric Ind Co Ltd | Component mounting method |
| JPH09138820A (en) * | 1995-11-15 | 1997-05-27 | Olympus Optical Co Ltd | Process designing system |
| JPH09223896A (en) * | 1996-02-16 | 1997-08-26 | Sharp Corp | Electronic parts mounter parts management system |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003069730A (en) * | 2001-08-28 | 2003-03-07 | Matsushita Electric Ind Co Ltd | Message notification system |
| JP2003101290A (en) * | 2001-09-20 | 2003-04-04 | Matsushita Electric Ind Co Ltd | Component supply method, component mounting machine and component mounting system |
| JP2004182403A (en) * | 2002-12-04 | 2004-07-02 | Daifuku Co Ltd | Article management facility |
| JP2006332402A (en) * | 2005-05-27 | 2006-12-07 | Hitachi High-Tech Instruments Co Ltd | Electronic component mounting device |
| JP2010251511A (en) * | 2009-04-15 | 2010-11-04 | Fuji Mach Mfg Co Ltd | Electronic circuit component mounting system |
| CN101908166A (en) * | 2009-06-05 | 2010-12-08 | 松下电器产业株式会社 | Component management device |
| JP2010282458A (en) * | 2009-06-05 | 2010-12-16 | Panasonic Corp | Parts management device |
| JP2017097604A (en) * | 2015-11-24 | 2017-06-01 | ヤマハ発動機株式会社 | Parts management apparatus and parts management method |
| JP2017208408A (en) * | 2016-05-17 | 2017-11-24 | Juki株式会社 | Shipping management device, shipping management system, and program |
| CN109143969A (en) * | 2017-06-19 | 2019-01-04 | 波音公司 | In response to the dynamic modification of the production plan of manufacture deviation |
| CN109143969B (en) * | 2017-06-19 | 2023-08-29 | 波音公司 | Dynamic modification of production plans in response to manufacturing variances |
| JP2019061312A (en) * | 2017-09-25 | 2019-04-18 | パナソニックIpマネジメント株式会社 | Material replenishment support device and material replenishment support method |
| JP7065293B2 (en) | 2017-09-25 | 2022-05-12 | パナソニックIpマネジメント株式会社 | Material supply support device and material supply support method |
| KR20190098341A (en) * | 2018-02-14 | 2019-08-22 | 한화정밀기계 주식회사 | Auto material ready system according to production plan |
| KR102440634B1 (en) * | 2018-02-14 | 2022-09-05 | 한화정밀기계 주식회사 | Auto material ready system according to production plan |
| CN113994775A (en) * | 2019-08-27 | 2022-01-28 | 雅马哈发动机株式会社 | Component replenishment support device, component mounting system, and component replenishment support method |
| WO2024218827A1 (en) * | 2023-04-17 | 2024-10-24 | 株式会社Fuji | Production management device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2000101291A (en) | Parts supply management system in printed circuit board unit production | |
| CN100584183C (en) | management device | |
| JPH11232339A (en) | Printed board unit production system | |
| CN104380852B (en) | Electronic component mounting system and equipment unit management method for electronic component mounting system | |
| JPH11232339A6 (en) | Printed board unit production system | |
| CN105704996A (en) | Management apparatus and management method | |
| WO1991001850A1 (en) | Control system for manufacturing process | |
| JP2001127487A (en) | Component management device and component management method for printed circuit board mounting system | |
| EP3557349B1 (en) | Substrate production control system and substrate production control method | |
| EP3471526B1 (en) | Feeder management method and feeder management apparatus | |
| JP6314319B2 (en) | Electronic component mounting system | |
| JP7203793B2 (en) | Substrate production management system | |
| JP2024114884A (en) | Parts recovery method | |
| JPWO2004103052A1 (en) | Electronic component mounting system | |
| CN111034385B (en) | Manufacturing system and control method of manufacturing system | |
| JP2001092520A (en) | Equipment maintenance/management system | |
| JP4251909B2 (en) | Production management method and system in PCB mounting process | |
| JP2001127401A (en) | Support system in printed circuit board unit production | |
| JP7249403B2 (en) | Management device and mounting system | |
| JPH11312899A (en) | Prediction system for running out of parts in the same model production | |
| JP6798024B2 (en) | Billing system and billing method for rental units for board work machines | |
| EP3553611B1 (en) | Service system and server | |
| JP7105285B2 (en) | Substrate production control system and substrate production control method | |
| US20250005471A1 (en) | Picking guidance system and picking guidance method | |
| JP7105291B2 (en) | Loan system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040706 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20041124 |