[go: up one dir, main page]

HK1210454B - Elevator and method for modernizing an elevator - Google Patents

Elevator and method for modernizing an elevator Download PDF

Info

Publication number
HK1210454B
HK1210454B HK15111287.2A HK15111287A HK1210454B HK 1210454 B HK1210454 B HK 1210454B HK 15111287 A HK15111287 A HK 15111287A HK 1210454 B HK1210454 B HK 1210454B
Authority
HK
Hong Kong
Prior art keywords
suspension rope
elevator
suspension
traction
rope
Prior art date
Application number
HK15111287.2A
Other languages
Chinese (zh)
Other versions
HK1210454A1 (en
Inventor
Tapani Talonen
Original Assignee
通力股份公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 通力股份公司 filed Critical 通力股份公司
Priority claimed from PCT/FI2013/051023 external-priority patent/WO2014068186A1/en
Publication of HK1210454A1 publication Critical patent/HK1210454A1/en
Publication of HK1210454B publication Critical patent/HK1210454B/en

Links

Description

电梯和用于现代化改造电梯的方法Elevator and method for modernizing an elevator

技术领域Technical Field

本发明的目的是一种如权利要求1的前序部分中限定的电梯,以及如在权利要求10的前序部分中限定的用于现代化改造电梯的方法,所述电梯优选地是适合于客运和/或货运的电梯。The object of the invention is an elevator as defined in the preamble of claim 1 and a method for modernizing an elevator as defined in the preamble of claim 10, said elevator preferably being an elevator suitable for passenger and/or freight transport.

背景技术Background Art

在电梯井中运动的电梯轿厢在操作期间通过悬挂绕绳支撑而被支撑和运动,所述绕绳通过提升机直接或间接地运动。提升机通常被支撑在电梯井的顶部上的单独的房间区域的地板上,在所谓的机房中。典型地,在机房中的提升机包括:绳索牵引槽轮,绕绳的绳索在该牵引槽轮上被导引;以及使绳索牵引槽轮旋转用于借助于绕绳使电梯轿厢和配重运动的电机。这种电梯是非常普通的电梯类型。The elevator car, which moves in the elevator shaft, is supported and moved during operation by suspended roping, which is moved directly or indirectly by the hoist. The hoist is usually supported on the floor of a separate room area at the top of the elevator shaft, in a so-called machine room. Typically, the hoist in the machine room includes a rope traction sheave, on which the roping ropes are guided, and a motor that rotates the rope traction sheave to move the elevator car and counterweight with the aid of the roping. This type of elevator is a very common type of elevator.

现有技术中已知的是用于将设置有机房的电梯现代化改造成齿形带驱动的电梯的方法,其中新的提升机设置在电梯井的顶部部分中。在该方法中,旧的提升机从机房被移除,绳索从电梯轿厢和从配重拆卸并被移除。在现有技术中已知的方法中,新的提升机被布置在电梯井的顶部部分中,所述提升机包括齿形带牵引槽轮,在该牵引槽轮之上齿形带被导引并且在它的一端被固定到旧的电梯轿厢并且在它的另一端被固定到旧的配重。Known in the prior art are methods for modernizing an elevator with a machine room to a toothed belt-driven elevator, wherein a new hoisting machine is arranged in the top section of the elevator shaft. In this method, the old hoisting machine is removed from the machine room, and the ropes are detached and removed from the elevator car and counterweight. In this known method, the new hoisting machine is arranged in the top section of the elevator shaft. The hoisting machine comprises a toothed belt traction sheave over which a toothed belt is guided and secured at one end to the old elevator car and at the other end to the old counterweight.

当将旧的绳索电梯现代化改造变为带驱动时,所述电梯将需要具有现有技术的带应用的许多带并且所述带的宽度大于圆形横截面形状的旧的绳索的厚度,特别地,以下问题发生。在现代化改造之前旧的绳索的向下投影(drop projection)与现代化改造之后的带的向下投影不一样宽。由此,机房和电梯井之间的地板的引入孔口的尺寸应当增加,其在不削弱承载地板的结构强度特性的情况下经常是费劲的,昂贵的,和困难的。另外,在电梯轿厢和配重的顶部上,存在用于固定绳索的有限空间。特别地,当配重在电梯轿厢的侧面上时,发生兼容性问题。在该情况下,带需要被转动并且它们需要比为配重预留的空间更多的水平空间。根据现有技术,1:1悬挂比被改变为1:2悬挂比,从机房通到电梯井的地板的引入孔口的尺寸增加,和/或用于大的电梯的布局被设计而没有配重设置在电梯轿厢那侧上。When modernizing an old rope elevator to a belt drive, the elevator requires numerous belts, as used in conventional belt applications, and these belts are wider than the thickness of the old, circular-cross-section ropes. This presents the following problems: the downward projection of the old ropes before modernization is not as wide as the downward projection of the belts after modernization. Consequently, the size of the floor access opening between the machine room and the elevator shaft must be increased, which is often laborious, expensive, and difficult to achieve without compromising the structural strength of the load-bearing floor. Furthermore, there is limited space for securing the ropes above the elevator car and counterweight. Compatibility issues arise, particularly when the counterweight is located to the side of the elevator car. In this case, the belts must be rotated, requiring more horizontal space than the space reserved for the counterweight. According to the prior art, the 1:1 suspension ratio is changed to a 1:2 ratio, the size of the floor access opening from the machine room to the elevator shaft is increased, and/or the layout for a large elevator is designed without a counterweight located on the elevator car side.

机房和电梯井之间的引入孔口的尺寸的增加和从1:1到1:2的悬挂比的改变二者在成本方面是昂贵的并且需要相当多的安装时间。由于承载钢结构,不总是能够增加与电梯井有关的引入孔口的尺寸。关于现代化改造,并不必然能够选择使带适于电梯布局的宽的下降线(drop line)。在许多情况下,不可能制造大的电梯而配重没有设置在侧面。Increasing the size of the lead-in opening between the machine room and the elevator shaft and changing the suspension ratio from 1:1 to 1:2 are both costly and require considerable installation time. Due to the load-bearing steel structure, it is not always possible to increase the size of the lead-in opening relative to the elevator shaft. For modernization, it is not always possible to choose a wide drop line that adapts the belt to the elevator layout. In many cases, it is not possible to build large elevators without a counterweight mounted to the side.

发明内容Summary of the Invention

本发明的目的是要解决前述的现有技术的解决方案的问题以及在以下本发明的说明书中公开的问题。该目的由此是要提供一种用于在没有破坏电梯井和电梯上方的地板结构的情况下现代化改造(modernizing)电梯的方法,当电梯布置成在电梯井中运行时,其电梯轿厢的运动可有效且没有问题地发生,其中在电梯井上方的是由地板限定的空间。The object of the present invention is to solve the problems of the aforementioned prior art solutions and the problems disclosed in the following description of the invention. The object is therefore to provide a method for modernizing an elevator without damaging the elevator shaft and the floor structure above the elevator, in which case the movement of the elevator car can take place efficiently and without problems when the elevator is arranged to run in an elevator shaft, wherein above the elevator shaft is a space defined by the floor.

通过根据本发明的解决方案,实现了一种电梯,与早前的相比,该电梯的电机尺寸较小且在成本方面更便宜。由此整个提升机的尺寸较小且提升机的现代化改造和安装在成本方面更可承受。通过根据本发明的解决方案,在安全性方面更好的电梯也得以实现。The solution according to the invention provides an elevator whose motor is smaller and more economical than previous elevators. This reduces the overall size of the elevator and makes modernization and installation more affordable. The solution according to the invention also provides an elevator that is safer.

通过根据本发明的解决方案,尤其是,由装配者安装的特性可变得更为方便。尤其是公开了一些实施例,通过这些实施例,能够在彼此变化较大的安装场所实施同样的方法。尤其是公开了一些实施例,通过这些实施例,能够快速和有效地现代化改造旧的绳索电梯以变为带驱动。尤其是公开了一些实施例,通过这些实施例,能够进行现代化改造而没有增加电梯井上方的空间,例如旧的机房,和电梯井之间的地板的绕绳引入孔口的尺寸和没有破坏地板结构。尤其是公开了一些实施例,通过这些实施例,能够进行电梯的现代化改造而没有改变1:1的悬挂比。尤其是公开了一些实施例,通过这些实施例,能够进行电梯的现代化改造而没有改变电梯布局并且能够在基于具体情况配置新的绕绳的向下投影以适合于电梯井上方的空间的地板的引入孔口的位置。尤其是公开了一些实施例,通过这些实施例,能够在现代化改造时有效地进行电梯绕绳的安装。The solution according to the present invention makes installation by the installer particularly more convenient. In particular, embodiments are disclosed that allow the same method to be implemented in installation locations that vary widely from one another. In particular, embodiments are disclosed that allow old rope elevators to be quickly and efficiently modernized to belt drives. In particular, embodiments are disclosed that allow modernization without increasing the size of the roping lead-in openings in the floor above the elevator shaft, such as an old machine room, and without damaging the floor structure. In particular, embodiments are disclosed that allow elevator modernization without changing the 1:1 suspension ratio. In particular, embodiments are disclosed that allow elevator modernization without changing the elevator layout and enabling the downward projection of the new roping to be configured on a case-by-case basis to suit the position of the lead-in openings in the floor above the elevator shaft. In particular, embodiments are disclosed that allow efficient installation of elevator roping during modernization.

本发明基于这样的构思:布置电梯绕绳以使得悬挂绕绳的带的向下投影借助于第一悬挂绕绳和第二悬挂绕绳变为紧凑的,所述悬挂绕绳优选地以1:1悬挂比连接前述的电梯轿厢和前述的配重到彼此,并且在彼此平行的竖直平面上运行。优选地,第一悬挂绕绳和第二悬挂绕绳在它们的第一端被固定到电梯轿厢并在它们的第二端被固定到配重。在电梯井上方的空间中布置的是第一悬挂绕绳的一个或多个转向滑轮和第二悬挂绕绳的一个或多个转向滑轮。第一悬挂绕绳形成围绕第一悬挂绕绳的一个或多个转向滑轮的环,第二悬挂绕绳形成围绕第二悬挂绕绳的一个或多个转向滑轮的环。前述的环嵌套并且外环的转向滑轮设置在内环的外侧,悬挂绕绳二者都穿过前述的地板中的引入孔口。The present invention is based on the concept of arranging the elevator roping so that the downward projection of the suspension roping belt is compacted by means of first and second suspension ropings, which preferably connect the elevator car and counterweight to each other with a 1:1 suspension ratio and run in parallel vertical planes. Preferably, the first and second suspension ropings are fixed to the elevator car at their first ends and to the counterweight at their second ends. Arranged in the space above the elevator shaft are one or more diverting pulleys for the first suspension ropings and one or more diverting pulleys for the second suspension ropings. The first suspension ropings form a loop around the diverting pulleys of the first suspension ropings, while the second suspension ropings form a loop around the diverting pulleys of the second suspension ropings. The aforementioned loops are nested, with the diverting pulleys of the outer loop positioned outside the inner loop. Both suspension ropings pass through the aforementioned lead-in openings in the floor.

这样,电梯的悬挂绕绳的结构和带状绳索或带的数目从电梯轿厢和配重的支撑能力和它们之间的悬挂绕绳的纵向载荷的视点可被最优化,向下投影可基于具体情况配置为适合于电梯井上方的空间的地板的引入孔口的位置。In this way, the structure of the suspension roping of the elevator and the number of belt ropes or belts can be optimized from the viewpoint of the supporting capacity of the elevator car and counterweight and the longitudinal load of the suspension roping between them, and the downward projection can be configured on a case-by-case basis to be suitable for the position of the lead-in opening in the floor of the space above the elevator shaft.

另外,电梯包括用于施加竖直力在电梯轿厢上或在配重上的设备,该用于施加竖直力在电梯轿厢上或配重上的设备优选地包括第一悬挂绕绳和第二悬挂绕绳的提升机,该提升机优选地设置在前述的位于电梯井上方的空间中并且包括用于使第一悬挂绕绳和第二悬挂绕绳运动的设备。用于使第一悬挂绕绳和第二悬挂绕绳运动的设备包括一个或多个旋转装置,例如电机,和至少两个可旋转的牵引设备,例如牵引槽轮,每个悬挂绕绳分别至少一个牵引设备。在该情况下,动力传送和传动箱可被简单地制作,例如利用用于电梯的最通常的动力传送解决方案,例如带传动。In addition, the elevator includes a device for exerting a vertical force on the elevator car or on the counterweight. The device for exerting a vertical force on the elevator car or on the counterweight preferably includes a hoisting machine with a first suspension roping and a second suspension roping. The hoisting machine is preferably arranged in the aforementioned space above the elevator shaft and includes a device for moving the first suspension roping and the second suspension roping. The device for moving the first suspension roping and the second suspension roping includes one or more rotating devices, such as motors, and at least two rotatable traction devices, such as traction sheaves, with at least one traction device for each suspension roping. In this case, the power transmission and the gearbox can be simply manufactured, for example using the most common power transmission solutions for elevators, such as belt drives.

优选地,悬挂绕绳以这样的方式被连接到电梯轿厢和配重以使得当电梯轿厢向上运动时所述配重向下运动,反之亦然,悬挂绕绳经由设置在电梯井上方的空间中的转向滑轮运行。优选地,每个悬挂绕绳的转向滑轮之一是从动转向滑轮,例如牵引槽轮,其直接作用于悬挂绕绳上。Preferably, the suspension roping is connected to the elevator car and the counterweight in such a way that the counterweight moves downward when the elevator car moves upward, and vice versa, the suspension roping running via diverting pulleys arranged in the space above the elevator shaft. Preferably, one of the diverting pulleys of each suspension roping is a driven diverting pulley, for example a traction sheave, which acts directly on the suspension roping.

在一个优选实施例中,提升机包括两个单独的电机,其直接地或经由轴传动装置被共轴地连接到两个单独的牵引槽轮,用于使第一和第二悬挂绕绳运动。这样,与早前的相比,个体电机可被做得尺寸较小且在它的成本方面更便宜。In a preferred embodiment, the hoist comprises two separate motors, which are coaxially connected to two separate traction sheaves directly or via shaft transmissions for moving the first and second suspension ropings. In this way, the individual motors can be made smaller in size and more economical in cost than before.

在一个优选实施例中,用于使第一悬挂绕绳和第二悬挂绕绳运动的设备包括提升机,该提升机被布置成以使悬挂绕绳二者都运动并且包括由两个悬挂绕绳共用的电机。In a preferred embodiment, the device for moving the first suspension roping and the second suspension roping comprises a hoisting machine arranged to move both suspension ropings and comprising a motor shared by both suspension ropings.

在一个优选实施例中,提升机包括由第一和第二牵引槽轮共用的一个电机,该牵引槽轮经由一带传动装置与电机连接,所述带传动装置由两个牵引槽轮共用,用于使第一和第二悬挂绕绳运动。由此提升机的尺寸可被做得较小且提升机的现代化改造和安装在成本方面更便宜。In a preferred embodiment, the hoist comprises a motor shared by the first and second traction sheaves, the traction sheave being connected to the motor via a belt drive shared by both traction sheaves for moving the first and second suspension ropes. As a result, the hoist can be made smaller and modernization and installation of the hoist is more cost-effective.

在一个优选实施例中,提升机包括由第一和第二牵引槽轮共用的一个电机,所述牵引槽轮经由单独用于每个牵引槽轮的带传动装置被连接到电机,用于使第一和第二悬挂绕绳运动。这样,在安全性方面的更好的电梯得以实现。In a preferred embodiment, the hoist comprises one motor shared by the first and second traction sheaves, said traction sheaves being connected to the motor via a belt drive separate for each traction sheave for moving the first and second suspension ropes. In this way, an elevator that is better in terms of safety is achieved.

在一个优选实施例中,前述的用于施加竖直力在电梯轿厢上或配重上的设备包括:牵引绕绳,该牵引绕绳被连接到电梯轿厢和配重二者;以及位于电梯轿厢的运动路径的底端附近的提升机。在该情况下,提升机包括用于使所述牵引绕绳运动的设备,该设备优选地包括旋转装置,例如电机,以及可旋转的牵引设备,例如牵引槽轮。在该情况下,没有提升机设置在前述的由地板界定且在电梯井上方的空间中。电梯的悬挂在该情况下可基于绳索悬挂,例如使用带状绳索,并且牵引绕绳可在抗拉特性方面最优化。In a preferred embodiment, the aforementioned device for applying a vertical force to the elevator car or counterweight comprises: traction roping connected to both the elevator car and the counterweight; and a hoist located near the bottom end of the elevator car's path of motion. In this case, the hoist includes a device for moving the traction roping, preferably comprising a rotating device, such as a motor, and a rotatable traction device, such as a traction sheave. In this case, no hoist is located in the aforementioned space bounded by the floor and above the elevator shaft. In this case, the elevator can be suspended by ropes, for example using belt ropes, and the traction roping can be optimized for its tensile properties.

优选地,牵引绕绳在提升机的牵引设备下方旋转。优选地,牵引绕绳被悬挂以在它的第一端从电梯轿厢挂着并且在它的第二端处从配重挂着。Preferably, the traction roping rotates below the traction device of the hoist.Preferably, the traction roping is suspended to hang at its first end from the elevator car and at its second end from the counterweight.

优选地,第一和第二悬挂绕绳和/或牵引绕绳包括一个或多个齿带。在齿带驱动电梯中,齿带的齿与牵引槽轮的齿以正驱动(positively driven)牵引接触形成防滑牵引,其主要基于形状锁定。通过这样的正驱动类型的电梯,其对于零载荷是平衡的,电梯轿厢的重量可被最小化,因为不必确保足够摩擦,配重的量值可最小化。运动质量和平均不平衡可以尽可能有利地最优化,低的能量消耗得以实现。Preferably, the first and second suspension ropings and/or the traction roping comprise one or more toothed belts. In toothed belt-driven elevators, the teeth of the toothed belts engage the teeth of the traction sheave in positively driven traction, creating a non-slip traction mechanism that is primarily based on form locking. With such positive-drive elevators, which are balanced for zero load, the weight of the elevator car can be minimized because sufficient friction does not have to be ensured, and the amount of counterweight can be minimized. This allows for the optimal optimization of moving masses and average imbalance, resulting in low energy consumption.

优选地,齿带被选为这样的齿带:该齿带的齿方向实质上垂直于齿带的纵向,甚至更优选地为拖拉机轮胎图案的齿带。Preferably, the toothed belt is chosen to be a toothed belt having the teeth oriented substantially perpendicular to the longitudinal direction of the toothed belt, even more preferably a tractor tyre pattern toothed belt.

优选地,由橡胶或聚氨酯形成的齿带被选为这样的齿带:在该齿带内部的是多个纵向承载悬挂设备,用于接收施加在齿带上的拉伸载荷。Preferably, a toothed belt formed of rubber or polyurethane is chosen as such a toothed belt: inside the toothed belt are a plurality of longitudinal load-bearing suspension devices for receiving tensile loads applied to the toothed belt.

在一个优选实施例中,前述的悬挂设备是缆绳或绳索,例如钢缆或纤维缆绳,或这些的组合。带状绳索在该情况下可为任何市场上可买到的绳索或齿带。悬挂由此可布置成经济的且是耐用的。In a preferred embodiment, the aforementioned suspension device is a cable or rope, such as a steel cable or a fiber cable, or a combination of these. The belt rope can in this case be any commercially available rope or toothed belt. The suspension can thus be arranged to be economical and durable.

在一个优选实施例中,悬挂绕绳包括一个或多个带状绳索,所述绳索包括承载复合材料部分,所述承载复合材料部分包括在聚合物基质中的加强纤维,例如碳纤维增强材料,玻璃纤维增强材料,或聚芳基酰胺纤维增强材料,优选地平行的纤维增强材料。这样,电梯的紧凑结实且轻重量的悬挂绕绳得以实现。In a preferred embodiment, the suspension roping comprises one or more belt-like ropes, said ropes comprising a load-bearing composite material portion comprising reinforcing fibers in a polymer matrix, such as carbon fiber reinforcement, glass fiber reinforcement, or aramid fiber reinforcement, preferably parallel fiber reinforcement. In this way, a compact, strong, and lightweight suspension roping for an elevator is achieved.

在一个优选实施例中,悬挂绕绳包括一个或多个带状绳索,所述绳索包括一个或多个传动部分,其是编织件。悬挂绕绳的绳索由此可通过传统的技术形成为经济的且以可弯曲的方式形成为较小半径的。编织件可包括金属纤维或,例如,聚芳族酰胺纤维。绳索由此可以是带,在该带内存在一个或多个钢编织件或,例如,聚芳基酰胺纤维编织件。In a preferred embodiment, the suspension roping comprises one or more belt-like ropes, each comprising one or more transmission parts, which are braided. The suspension roping rope can thus be formed economically and bendably to a small radius using conventional techniques. The braid may comprise metal fibers or, for example, aramid fibers. The rope may thus be a belt containing one or more steel braids or, for example, aramid fiber braids.

在一个优选实施例中,前述的第一悬挂绕绳和第二悬挂绕绳每个都包括一个或多个带状的绳索或带,所述带状绳索或带嵌套在相同的平面上运行。In a preferred embodiment, the aforementioned first suspension roping and second suspension roping each comprise one or more belt-like ropes or belts nested and running in the same plane.

在一个优选实施例中,悬挂绕绳包括它们的横截面实质上为带状的至少两个绳索。优选地,绳索的宽度/厚度至少2或以上,优选地至少4,甚至更优选地至少5或以上,甚至更优选地至少6,甚至更优选地至少7或以上,甚至更优选地至少8或以上,可能地超过10。这样,良好的动力传递能力通过小的弯曲半径得以实现。In a preferred embodiment, the suspension roping comprises at least two ropes whose cross-section is essentially ribbon-shaped. Preferably, the rope width/thickness is at least 2 or more, preferably at least 4, even more preferably at least 5 or more, even more preferably at least 6, even more preferably at least 7 or more, even more preferably at least 8 or more, and possibly more than 10. In this way, good power transmission capacity is achieved with a small bending radius.

在一个优选实施例中,在故障情况下电梯轿厢和/或配重的向上急速前进(racing)得以防止。电梯轿厢和/或配重的急速前进是通过用LWD传感器或用安装在带上的单独的开关来测量由电梯轿厢和/或配重施加在带上的力而得以防止的。如果前述的传感器或开关检测到由于偏离加速度引起的由电梯轿厢和/或由配重施加在带上的力的变化,牵引槽轮停止并且急速前进被防止。In a preferred embodiment, upward racing of the elevator car and/or counterweight is prevented in the event of a fault. This racing is prevented by measuring the forces exerted on the belt by the elevator car and/or counterweight using LWD sensors or by separate switches mounted on the belt. If the aforementioned sensors or switches detect a change in the forces exerted on the belt by the elevator car and/or the counterweight due to runaway acceleration, the traction sheave stops and racing is prevented.

在根据本发明的用于现代化改造电梯的方法中,旧的悬挂绕绳和提升机从电梯被移除,新的提升机设置在电梯井上方的空间中,例如在旧的机房中,第一悬挂绕绳和第二悬挂绕绳布置为在彼此平行的竖直平面上运行,第一悬挂绕绳形成围绕第一悬挂绕绳的一个或多个转向滑轮的环,第二悬挂绕绳形成围绕第二悬挂绕绳的一个或多个转向滑轮的环以使得前述的环嵌套,外环的转向滑轮设置在内环的外侧。另外,悬挂绕绳二者都布置为穿过悬挂绕绳的引入孔口,所述孔口在电梯井上方的空间和电梯井之间的地板中。由此,电梯轿厢和配重通过经由第一和第二悬挂绕绳施加竖直牵引力在电梯轿厢上或配重上而通过提升机运动,由此在它们之间的力不平衡下动作,从而控制它们的运动。In the method for modernizing an elevator according to the present invention, the old suspension roping and hoisting machine are removed from the elevator, and a new hoisting machine is installed in the space above the elevator shaft, for example, in the old machine room. A first suspension roping and a second suspension roping are arranged to run in parallel vertical planes. The first suspension roping forms a loop around one or more diverting pulleys of the first suspension roping, and the second suspension roping forms a loop around one or more diverting pulleys of the second suspension roping, such that the loops are nested, with the diverting pulleys of the outer loop positioned outside the inner loop. Furthermore, both suspension ropings are arranged to pass through insertion openings of the suspension ropings in the space above the elevator shaft and in the floor between the hoisting machine and the elevator car. Thus, the elevator car and counterweight are moved by the hoisting machine by applying a vertical traction force to the elevator car or counterweight via the first and second suspension ropings, thereby operating under a force imbalance between them and controlling their movement.

优选地,前述的第一悬挂绕绳和第二悬挂绕绳布置为每个都包括一个或多个带或带状绳索。Preferably, the aforementioned first and second suspension roping arrangements each comprise one or more belts or belt-like ropes.

在根据本发明的方法的一个优选实施例中,旧的悬挂绕绳和提升机被移除,新的提升机布置在电梯轿厢的运动路径的底端附近,第一悬挂绕绳和第二悬挂绕绳布置为在彼此平行的竖直平面上运行,第一悬挂绕绳形成围绕第一悬挂绕绳的一个或多个转向滑轮的环,第二悬挂绕绳形成围绕第二悬挂绕绳的一个或多个转向滑轮的环,以使得前述的环嵌套,外环的转向滑轮设置在内环的外侧。另外,悬挂绕绳二者都布置为穿过绕绳的引入孔口,所述孔口在电梯井和电梯井上方的空间之间的地板中。另外,设备被布置为包括牵引绕绳,该牵引绕绳被连接到电梯轿厢和配重,用于施加竖直力在所述电梯轿厢或配重上。另外,提升机布置为包括用于使牵引绕绳运动的设备,该设备优选地包括旋转装置,例如电机,以及可旋转的牵引设备,例如牵引滑轮。由此电梯轿厢和配重通过经由牵引绕绳施加竖直牵引力在电梯轿厢上或配重上而通过提升机运动,由此在它们之间的力不平衡下动作,从而控制它们的运动。In a preferred embodiment of the method according to the invention, the old suspension roping and hoisting machine are removed, and a new hoisting machine is arranged near the bottom end of the movement path of the elevator car. The first suspension roping and the second suspension roping are arranged to run in parallel vertical planes. The first suspension roping forms a loop around one or more diverting pulleys of the first suspension roping, and the second suspension roping forms a loop around one or more diverting pulleys of the second suspension roping, such that the loops are nested, with the diverting pulleys of the outer loop being arranged outside the inner loop. Furthermore, both suspension ropings are arranged to pass through a roping lead-in opening in the floor between the elevator shaft and the space above the elevator shaft. Furthermore, the arrangement includes traction roping connected to the elevator car and counterweight for applying a vertical force on the elevator car or counterweight. Furthermore, the hoisting machine includes a device for moving the traction roping, preferably comprising a rotating device, such as a motor, and a rotatable traction device, such as a traction sheave. The elevator car and the counterweight are thereby moved by the hoisting machine by exerting a vertical traction force on the elevator car or on the counterweight via the traction roping, thereby acting under a force imbalance between them, thereby controlling their movement.

优选地,前述的牵引绕绳布置为包括一个或多个带或带状绳索。Preferably, the aforementioned traction roping arrangement comprises one or more belt or belt-like ropes.

优选地,当现代化改造旧的电梯时,电梯井上方的空间例如旧的机房和电梯井之间的地板的旧的悬挂绕绳引入孔口的尺寸没有改变。Preferably, when modernizing an old elevator, the dimensions of the space above the elevator shaft, for example the old suspension roping lead-in apertures of the floor between the old machine room and the elevator shaft, are not changed.

优选地,通过根据本发明的方法实施的电梯包括至少两个牵引槽轮,优选地在电梯轿厢的运动路径的顶端附近,通过支撑在该牵引槽轮上,第一和第二悬挂绕绳的带支撑电梯轿厢和配重,优选地以1:1的悬挂比。Preferably, the elevator implemented by the method according to the invention comprises at least two traction sheaves, preferably near the top end of the movement path of the elevator car, by means of which traction sheaves first and second suspension roping belts support the elevator car and the counterweight, preferably with a suspension ratio of 1:1.

优选地,被现代化改造为齿带驱动且零平衡的电梯的配重的质量以这样的方式增大以使得对于电梯轿厢的平均载荷实现了新的平衡。平均载荷指的是电梯轿厢载荷,其相当于大约1-3人的载荷。优选地,零平衡的电梯可以以比设置有根据现有技术定尺寸的配重的电梯更高的速度被驱动。进一步的优点是因为存在较少的重量,需要更少的部件,制造成本,安装成本和维护成本较低。Preferably, the mass of the counterweight of an elevator modernized with a toothed belt drive and zero balance is increased in such a way that a new balance is achieved for the average load of the elevator car. The average load refers to the elevator car load, which is equivalent to approximately 1-3 people. Preferably, a zero-balanced elevator can be driven at higher speeds than an elevator equipped with a counterweight sized according to the prior art. A further advantage is that, due to the reduced weight, fewer components are required, resulting in lower manufacturing, installation, and maintenance costs.

根据本发明的解决方案特别地适合于其中旧的绳索驱动电梯需要变为带驱动电梯的现代化改造。因为将绳索驱动电梯变为带驱动的电梯会需要增加旧的机房和电梯井之间的地板的引入孔口的尺寸,地板的引入孔口的尺寸的增加可通过同时改变电梯的悬挂以使得第一和第二悬挂绕绳的带的向下投影至少在当使用两个单独的牵引槽轮时适合穿过旧的悬挂绕绳的地板的引入孔口而被防止。然而,根据本发明的解决方案不必仅在现代化改造时使用,而是替代地根据本发明的电梯也正好适合作为新安装的电梯。The solution according to the invention is particularly suitable for modernizations in which older rope-driven elevators need to be converted to belt-driven elevators. Since converting a rope-driven elevator to a belt-driven elevator would require increasing the size of the floor lead-in opening between the old machine room and the elevator shaft, this increase in the size of the floor lead-in opening can be prevented by simultaneously modifying the elevator's suspension so that the downward projection of the belts of the first and second suspension ropings fits through the floor lead-in opening of the old suspension ropings, at least when using two separate traction sheaves. However, the solution according to the invention need not be used only in modernizations; instead, the elevator according to the invention is also well-suited for new installations.

所述电梯最优选地是适合于客运和/或货运的电梯,该电梯安装在建筑物中,以在竖直方向上或至少在基本竖直方向上,优选地基于停靠楼层呼叫和/ 或轿厢呼叫,运行。优选地,电梯轿厢具有内部空间,该内部空间最优选地适于接收一个或多个乘客。所述电梯优选地包括至少两个,优选地更多,要被服务的楼层水平。The elevator is most preferably an elevator suitable for passenger and/or freight transport, which is installed in a building to operate in a vertical direction, or at least in a substantially vertical direction, preferably based on landing calls and/or car calls. Preferably, the elevator car has an interior space, which is most preferably suitable for receiving one or more passengers. The elevator preferably includes at least two, and preferably more, floor levels to be served.

本发明的一些实施例也提供在本申请的说明书部分中和附图中。本申请的发明内容还可以限定为不同于以下权利要求中提供的。本发明的内容还可由若干单独的发明组成,尤其是如果鉴于措辞或隐含的子任务或从实现的优点和优点种类的视角考虑本发明。在该情况下,包含在以下权利要求中的一些特性从单独的发明构思的视角看会是多余的。本发明的各个实施例的特征可在基本发明构思的范围内与其他实施例结合应用。Some embodiments of the present invention are also provided in the description and drawings of this application. The inventive content of this application can also be defined differently than in the following claims. The inventive content can also consist of several separate inventions, especially if the invention is considered in terms of wording or implicit subtasks or from the perspective of the advantages and types of advantages achieved. In this case, some characteristics contained in the following claims would be superfluous from the perspective of the separate inventive concepts. The features of the individual embodiments of the present invention can be combined with other embodiments within the scope of the basic inventive concept.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

现在参照附图结合优选实施例更详细地描述本发明,在附图中:The present invention will now be described in more detail in conjunction with preferred embodiments with reference to the accompanying drawings, in which:

图1示出根据本发明的电梯的优选实施例;FIG1 shows a preferred embodiment of an elevator according to the present invention;

图2示出根据本发明的电梯的第二优选实施例;FIG2 shows a second preferred embodiment of an elevator according to the present invention;

图3示出示出根据本发明的电梯的悬挂配置的优选实施例的a)侧视图、 b)顶视图和c)向下投影;FIG3 shows a) a side view, b) a top view and c) a downward projection showing a preferred embodiment of the suspension configuration of the elevator according to the invention;

图4示出根据本发明的电梯的悬挂配置的第二优选实施例的a)侧视图、 b)顶视图和c)向下投影;FIG4 shows a) a side view, b) a top view and c) a downward projection of a second preferred embodiment of the suspension arrangement of an elevator according to the invention;

图5示出根据本发明的电梯的悬挂配置的第三优选实施例的向下投影的顶视图。Fig. 5 shows a top view in downward projection of a third preferred embodiment of the suspension arrangement of the elevator according to the invention.

具体实施方式DETAILED DESCRIPTION

图1示出根据本发明的电梯的一个实施例,其中通过带传动的提升机M 实施的电梯悬挂被采用。电梯的绕绳被布置为以使得悬挂绕绳R1和R2的带的向下投影借助于第一悬挂绕绳R1和第二悬挂绕绳R2被实现为是紧凑的,所述悬挂绕绳R1,R2以1:1悬挂比连接前述的电梯轿厢1和配重2到彼此,并且在彼此平行的竖直平面上运行。第一悬挂绕绳R1和第二悬挂绕绳R2在它们的第一端被固定到电梯轿厢1和在它们的第二端被固定到配重 2。在电梯井上方的空间10中布置了第一悬挂绕绳R1的转向滑轮P1和第二悬挂绕绳R2的转向滑轮P2。第一悬挂绕绳R1形成围绕第一悬挂绕绳的转向滑轮P1的环A,第二悬挂绕绳R2形成围绕第二悬挂绕绳R2的转向滑轮 P2的环B。前述的环A,B嵌套并且外环A的转向滑轮P1设置在内环B的外侧,并且悬挂绕绳R1,R2二者都穿过前述的地板9中的引入孔口7a,7b 中。Figure 1 shows an embodiment of an elevator according to the present invention, in which the elevator is suspended by a belt-driven hoisting machine M. The elevator roping is arranged so that the downward projection of the belts of the suspension ropes R1 and R2 is compact by means of first and second suspension ropes R1, R2. These suspension ropes R1 and R2 connect the elevator car 1 and counterweight 2 to each other with a 1:1 suspension ratio and run in parallel vertical planes. The first and second suspension ropes R1, R2 are fixed at their first ends to the elevator car 1 and at their second ends to the counterweight 2. A diverting pulley P1 for the first suspension rope R1 and a diverting pulley P2 for the second suspension rope R2 are arranged in a space 10 above the elevator shaft. The first suspension rope R1 forms a loop A around the diverting pulley P1 of the first suspension rope, while the second suspension rope R2 forms a loop B around the diverting pulley P2 of the second suspension rope R2. The aforementioned rings A, B are nested and the diverting pulley P1 of the outer ring A is arranged outside the inner ring B, and both suspension ropes R1 , R2 are passed through the aforementioned lead-in openings 7a , 7b in the floor 9 .

由此电梯的悬挂绕绳R1,R2的结构和带状绳索或带的数目从电梯轿厢 1和配重2的支撑能力和它们之间的悬挂绕绳R1,R2的纵向载荷的视点看最优化,向下投影被布置为适合于电梯井S上方的空间10的地板9的引入孔口7a,7b的位置。The structure of the suspension roping R1, R2 of the elevator and the number of belt ropes or belts are thereby optimized from the viewpoint of the supporting capacity of the elevator car 1 and the counterweight 2 and the longitudinal load of the suspension roping R1, R2 between them, and the downward projection is arranged to be suitable for the position of the lead-in openings 7a, 7b of the floor 9 of the space 10 above the elevator shaft S.

另外,电梯包括用于施加竖直力在电梯轿厢1上或配重2上的设备,该用于施加竖直力在电梯轿厢1上或在配重2上的设备包括,除了第一悬挂绕绳R1和第二悬挂绕绳R2之外,提升机M,其设置在前述的位于电梯井S 上方的空间10中并且包括用于使第一悬挂绕绳R1和第二悬挂绕绳R2运动的设备。用于使第一悬挂绕绳R1和第二悬挂绕绳R2运动的设备包括一个或多个旋转装置,例如电机12,和至少两个可旋转的牵引设备,例如牵引槽轮11a,11b,分别用于每个悬挂绕绳R1,R2。动力传送和传动由此可简单地制造,例如,采用两牵引槽轮11a,11b共用的带传动装置11a,11b,12, 13。The elevator also includes a device for applying a vertical force to the elevator car 1 or counterweight 2. The device for applying a vertical force to the elevator car 1 or counterweight 2 includes, in addition to the first and second suspension ropes R1, R2, a hoisting machine M disposed in the aforementioned space 10 above the elevator shaft S and including a device for moving the first and second suspension ropes R1, R2. The device for moving the first and second suspension ropes R1, R2 includes one or more rotating devices, such as a motor 12, and at least two rotatable traction devices, such as traction sheaves 11a, 11b, one for each suspension rope R1, R2. Power transmission and gearing can thus be simplified, for example, by using belt drives 11a, 11b, 12, 13 common to both traction sheaves 11a, 11b.

悬挂绕绳R1和R2以这样的方式被连接到电梯轿厢1和配重2以使得当电梯轿厢1向上运动时,配重2向下运动,反之亦然,悬挂绕绳R1和R2 经由设置在电梯井S上方的空间中的转向滑轮P1和P2和经由牵引槽轮11a 和11b运行,所述牵引槽轮11a和11b直接作用在悬挂绕绳R1和R2上。The suspension ropes R1 and R2 are connected to the elevator car 1 and the counterweight 2 in such a way that when the elevator car 1 moves upwards, the counterweight 2 moves downwards, and vice versa, the suspension ropes R1 and R2 running via diverting pulleys P1 and P2 arranged in the space above the elevator shaft S and via traction sheaves 11a and 11b, which act directly on the suspension ropes R1 and R2.

提升机M包括由第一悬挂绕绳R1的牵引槽轮11a和第二悬挂绕绳R2 的牵引槽轮11b共用的一个电机12,所述牵引槽轮11a和11b经由由牵引槽轮11a和11b二者共用的带传动装置11a,11b,12,13与电机12连接,用于使第一悬挂绕绳R1和第二悬挂绕绳R2运动。由此提升机M的尺寸被制作得较小,提升机的安装和现代化改造在成本方面更便宜。The hoist M includes a motor 12 shared by the traction sheave 11a of the first suspension roping R1 and the traction sheave 11b of the second suspension roping R2. The traction sheaves 11a and 11b are connected to the motor 12 via a belt drive 11a, 11b, 12, 13 shared by both traction sheaves 11a and 11b for moving the first suspension roping R1 and the second suspension roping R2. As a result, the hoist M can be made smaller, making installation and modernization of the hoist more cost-effective.

在一个优选实施例中,提升机M包括两个单独的电机,其直接或经由轴传动装置(shaft gear)被共轴地连接到用于使第一悬挂绕绳R1运动和用于使第二悬挂绕绳R2运动的两个单独的牵引槽轮11a,11b。这样,与早前相比,单个电机尺寸被做得较小且在它的成本方面更便宜。In a preferred embodiment, the hoisting machine M comprises two separate motors which are coaxially connected, directly or via shaft gears, to two separate traction sheaves 11a, 11b for moving the first suspension rope R1 and for moving the second suspension rope R2. This way, the single motor can be made smaller and less expensive than before.

在第三优选实施例中,提升机M包括一个电机12,其由用于使第一悬挂绕绳R1运动的第一牵引槽轮11a和用于使第二悬挂绕绳R2运动的第二牵引槽轮11b共用。前述的牵引槽轮11a和11b经由它们自己的各自用于每个牵引槽轮11a和11b的带传动装置与电机12连接。由此,在安全性方面更好的电梯得以实现。In a third preferred embodiment, the hoisting machine M includes a motor 12 shared by the first traction sheave 11a for moving the first suspension roping R1 and the second traction sheave 11b for moving the second suspension roping R2. The aforementioned traction sheaves 11a and 11b are connected to the motor 12 via their own belt drive for each traction sheave 11a and 11b. As a result, an elevator with improved safety is achieved.

图2示出根据本发明的电梯的第二实施例,其中提升机M设置在电梯轿厢1的运动路径的底端附近。电梯的提升机M被布置在电梯井S的底部部分中,第一悬挂绕绳R1和第二悬挂绕绳R2被布置为在彼此平行的竖直平面上运行,第一悬挂绕绳R1形成围绕第一悬挂绕绳R1的一个或多个,优选地至少两个,转向滑轮P1的环A,第二悬挂绕绳R2形成围绕第二悬挂绕绳R2的一个或多个,优选地至少两个,转向滑轮P2的环B,以使得所述环A和B嵌套,外环A的转向滑轮P1设置在内环B的外侧。另外,悬挂绕绳R1和R2布置为穿过绕绳的引入孔口7a和7b,所述孔口在电梯井S和该电梯井上方的空间10之间的地板9中。另外,电梯被布置为包括牵引绕绳3,其被连接到电梯轿厢1和配重2,用于施加竖直力在所述电梯轿厢1 或配重2上。另外,转向滑轮P和提升机M被布置在电梯轿厢1的运动路径的底端附近以包括用于使牵引绕绳3运动的设备,该设备包括旋转装置,例如电机12,和可旋转的牵引设备,例如牵引槽轮11。由此电梯轿厢1和配重2通过提升机M这样来运动:通过经由牵引绕绳3施加竖直牵引力在电梯轿厢1上或在配重2上,由此在它们之间的力不平衡下动作,从而控制它们的运动。前述的牵引绕绳3优选地包括一个或多个带状的绳索或带,例如齿带。FIG2 shows a second embodiment of an elevator according to the present invention, in which a hoisting machine M is arranged near the bottom end of the movement path of the elevator car 1. The elevator's hoisting machine M is arranged in the bottom portion of the elevator shaft S. The first suspension roping R1 and the second suspension roping R2 are arranged to run in parallel vertical planes. The first suspension roping R1 forms a loop A around one or more, preferably at least two, diverting pulleys P1 of the first suspension roping R1, and the second suspension roping R2 forms a loop B around one or more, preferably at least two, diverting pulleys P2 of the second suspension roping R2, such that the loops A and B are nested, with the diverting pulley P1 of the outer loop A being arranged outside the inner loop B. Furthermore, the suspension ropings R1 and R2 are arranged to pass through roping lead-in openings 7a and 7b in the floor 9 between the elevator shaft S and the space 10 above it. Furthermore, the elevator is arranged to include a traction roping 3 connected to the elevator car 1 and the counterweight 2 for exerting a vertical force on the elevator car 1 or the counterweight 2. Furthermore, a diverting pulley P and a hoisting machine M are arranged near the bottom end of the movement path of the elevator car 1 to include a device for moving the traction roping 3, which includes a rotating device, such as a motor 12, and a rotatable traction device, such as a traction sheave 11. The elevator car 1 and the counterweight 2 are thereby moved by the hoisting machine M by applying a vertical traction force to the elevator car 1 or to the counterweight 2 via the traction roping 3, thereby operating under a force imbalance between them and thereby controlling their movement. The aforementioned traction roping 3 preferably includes one or more belt-like ropes or belts, such as a toothed belt.

图3中的 a) 示出根据本发明的电梯的悬挂配置的一个优选实施例的侧视图,图3中的 b) 示出图3中的 a) 的悬挂配置的顶视图,和图3中的 c) 示出图3中的 a) 的悬挂绕绳R1, R2的向下投影。在电梯中,通过装有带传送装置11a,11b,12,13的提升机M实施的电梯悬挂被采用。电梯的绕绳被布置为以使得悬挂绕绳R1包括两个平行的带状的绳索或带R1’和R1”,和悬挂绕绳R2包括两个平行的带状的绳索或带R2’和R2”。带R1’,R1”,R2’和R2”的向下投影借助于两个嵌套的悬挂绕绳被实现为紧凑的,前述的两个悬挂绕绳为悬挂绕绳R1和悬挂绕绳R2,该悬挂绕绳R1,R2以1:1悬挂比连接前述的电梯轿厢1和配重 2到彼此,并在彼此平行的竖直平面上运行。第一悬挂绕绳R1和第二悬挂绕绳R2在它们的第一端被固定到电梯轿厢1且在它们的第二端被固定到配重2。在电梯井上方的空间10中布置的是第一悬挂绕绳R1的转向滑轮P1 和第二悬挂绕绳R2的转向滑轮P2。第一悬挂绕绳R1形成围绕第一悬挂绕绳的一个或多个转向滑轮P1的环A,第二悬挂绕绳R2形成围绕第二悬挂绕绳R2的一个或多个转向滑轮P2的环B。前述的环A,B嵌套,外环A的转向滑轮P1设置在内环B的外侧,悬挂绕绳R1,R2二者都穿过前述的地板 9中的引入孔口7a,7b。由此电梯的悬挂绕绳R1,R2的结构和带状的绳索或带R1’,R1”,R2’和R2”的数目从电梯轿厢1和配重2的支撑能力的视点和从它们之间的悬挂绕绳R1,R2的纵向载荷的视点看被最优化,图3中的 c) 中示出的向下投影配置为适合于电梯井S上方的空间10的地板9的引入孔口7a, 7b的位置,而没有破坏该地板结构。机器制动器6a,6b被布置为与牵引槽轮11a,11b连接以在没有任何传动的情况下制动牵引槽轮11a,11b。FIG3 a) shows a side view of a preferred embodiment of a suspension arrangement for an elevator according to the present invention, FIG3 b) shows a top view of the suspension arrangement of FIG3 a), and FIG3 c) shows a downward projection of the suspension roping R1 and R2 of FIG3 a). In the elevator, an elevator suspension is implemented by a hoisting machine M equipped with belt conveyors 11a, 11b, 12, and 13. The elevator roping is arranged so that the suspension roping R1 comprises two parallel, belt-like ropes or belts R1' and R1", and the suspension roping R2 comprises two parallel, belt-like ropes or belts R2' and R2". The downward projection of the belts R1', R1", R2', and R2" is made compact by means of two nested suspension ropings, namely, the suspension roping R1 and the suspension roping R2. The suspension ropings R1 and R2 connect the elevator car 1 and counterweight 2 to each other with a 1:1 suspension ratio and run in parallel vertical planes. The first and second suspension ropes R1, R2 are fixed at their first ends to the elevator car 1 and at their second ends to the counterweight 2. Arranged in the space 10 above the elevator shaft are diverting pulleys P1 for the first suspension rope R1 and P2 for the second suspension rope R2. The first suspension rope R1 forms a loop A around one or more diverting pulleys P1 of the first suspension rope, while the second suspension rope R2 forms a loop B around one or more diverting pulleys P2 of the second suspension rope R2. These loops A and B are nested, with the diverting pulleys P1 of the outer loop A positioned outside the inner loop B. Both suspension ropes R1 and R2 pass through the aforementioned lead-in openings 7a and 7b in the floor 9. Thus, the structure of the suspension roping R1, R2 of the elevator and the number of belt-like ropes or belts R1', R1", R2' and R2" are optimized from the perspective of the supporting capacity of the elevator car 1 and the counterweight 2 and from the perspective of the longitudinal load of the suspension roping R1, R2 between them, and the downward projection shown in Figure 3c) is adapted to the position of the lead-in openings 7a, 7b of the floor 9 of the space 10 above the elevator shaft S without destroying the floor structure. The machine brakes 6a, 6b are arranged in connection with the traction sheaves 11a, 11b to brake the traction sheaves 11a, 11b without any transmission.

图4中的 a) 示出根据本发明的电梯的悬挂配置的第二优选实施例的侧视图,图4中的 b) 示出图4中的 a) 的悬挂配置的顶视图,和图4中的 c) 示出图4中的 a) 的悬挂绕绳R1, R2的向下投影。在根据图4中的 a) -4中的 c) 的电梯中,通过装有带传动装置11a,11b, 12,13的提升机M实施的电梯悬挂被采用。电梯的绕绳被布置为以使得悬挂绕绳R1包括两个平行的带状的绳索或带R1’和R1”,悬挂绕绳R2包括两个平行的带状的绳索或带R2’和R2”。带R1’,R1”,R2’和R2”的向下投影借助于两个嵌套的悬挂绕绳R1,R2实现为是紧凑的,所述悬挂绕绳R1, R2以1:1悬挂比连接前述的电梯轿厢1和配重2到彼此,并且在彼此平行的竖直平面上运行。第一悬挂绕绳R1和第二悬挂绕绳R2在它们的第一端被固定到电梯轿厢1且在它们的第二端被固定到配重2。在电梯井上方的空间 10中布置的是第一悬挂绕绳R1的至少两个转向滑轮P1,P1’和第二悬挂绕绳R2的至少两个转向滑轮P2,P2’。第一悬挂绕绳R1形成围绕第一悬挂绕绳的至少两个转向滑轮P1,P1’的环A,第二悬挂绕绳R2形成围绕第二悬挂绕绳R2的至少两个转向滑轮P2,P2’的环B。前述的环A,B嵌套且外环 A的转向滑轮P1,P1’设置在内环B的外侧,悬挂绕绳R1,R2二者都穿过前述的地板9中的引入孔口7a,7b。转向滑轮P1’,P2’实质上具有与悬挂绕绳R1的牵引槽轮11a和与悬挂绕绳R2的牵引槽轮11b相同的尺寸。在根据图4中的 a) -4中的 c) 的悬挂配置中,悬挂绕绳R1,R2绕过牵引槽轮11a,11b一次,在此情况下绳索的接触角在牵引槽轮上大约是180度,在此情况下转向滑轮 P1’,P2’被用作用于带状绳索或带R1’,R1”,R2’和R2”的“接触”的辅助设备,转向滑轮P1’,P2’起到绳索导引装置的作用以及起到用于阻尼振动的阻尼滑轮的作用。通过借助于起到转向滑轮的作用的绳索滑轮P1’,P2’增加牵引槽轮11a,11b的接触角,抓紧力可在牵引槽轮11a,11b和悬挂绕绳R1, R2之间增加。这样,轿厢可被做得更轻且尺寸也可更小,在此情况下电梯的空间节省的可能性增加。由此从电梯的操作和安全性的视点看,可确保带状绳索或带R1’,R1”,R2’,R2”和牵引槽轮11a,11b之间的足够的抓紧力。机械制动器6a,6b被布置成与牵引槽轮11a,11b连接以在没有传动的情况下制动牵引槽轮11a,11b。FIG4(a) shows a side view of a second preferred embodiment of a suspension arrangement for an elevator according to the present invention, FIG4(b) shows a top view of the suspension arrangement of FIG4(a), and FIG4(c) shows a downward projection of the suspension roping R1, R2 of FIG4(a). In the elevators according to FIG4(a) - 4(c), an elevator suspension is implemented by a hoisting machine M equipped with belt drives 11a, 11b, 12, 13. The elevator roping is arranged such that the suspension roping R1 comprises two parallel, belt-like ropes or belts R1' and R1", and the suspension roping R2 comprises two parallel, belt-like ropes or belts R2' and R2". The downward projection of the belts R1', R1", R2', and R2" is made compact by means of two nested suspension ropings R1, R2. The suspension ropings R1, R2 connect the elevator car 1 and counterweight 2 to each other with a 1:1 suspension ratio and run in parallel vertical planes. The first and second suspension ropes R1, R2 are fixed at their first ends to the elevator car 1 and at their second ends to the counterweight 2. Arranged in the space 10 above the elevator shaft are at least two diverting pulleys P1, P1' for the first suspension rope R1 and at least two diverting pulleys P2, P2' for the second suspension rope R2. The first suspension rope R1 forms a loop A around the at least two diverting pulleys P1, P1' of the first suspension rope, while the second suspension rope R2 forms a loop B around the at least two diverting pulleys P2, P2' of the second suspension rope R2. The aforementioned loops A, B are nested, with the diverting pulleys P1, P1' of the outer loop A positioned outside the inner loop B. Both suspension ropes R1, R2 pass through the aforementioned lead-in openings 7a, 7b in the floor 9. The diverting pulleys P1', P2' have substantially the same dimensions as the traction sheave 11a of the suspension rope R1 and the traction sheave 11b of the suspension rope R2. In the suspension configurations according to FIG. 4 a) to FIG. 4 c), the suspension ropes R1 and R2 pass through the traction sheaves 11a and 11b once, in which case the contact angle of the ropes on the traction sheave is approximately 180 degrees. In this case, diverting pulleys P1′ and P2′ are used as auxiliary devices for “contacting” the belt-like ropes or belts R1′, R1″, R2′, and R2″, and the diverting pulleys P1′ and P2′ function as rope guides and as damping pulleys for damping vibrations. By increasing the contact angle of the traction sheaves 11a and 11b by means of the rope pulleys P1′ and P2′ functioning as diverting pulleys, the gripping force can be increased between the traction sheaves 11a and 11b and the suspension ropes R1 and R2. In this way, the car can be made lighter and smaller in size, in which case the space saving potential of the elevator increases. Thereby, from the viewpoint of operation and safety of the elevator, sufficient gripping force between the belts R1', R1", R2', R2" and the traction sheaves 11a, 11b can be ensured. The machinery brakes 6a, 6b are arranged in connection with the traction sheaves 11a, 11b to brake the traction sheaves 11a, 11b in the absence of transmission.

在本发明的一个实施例中,设置在电梯井S上方的空间中的转向滑轮P1, P2,P1’,P2’的支撑梁系统包括多个相继的紧固孔,用于调节牵引槽轮11a, 11b和转向P1,P2,P1’,P2’之间的水平距离。由此牵引槽轮11a,11b的接触角可通过调节牵引槽轮11a,11b和转向滑轮P1,P2,P1’,P2’之间的水平距离被调节为合适的,在此情况下,牵引槽轮11a,11b和悬挂绕绳R1,R2 之间的最佳的抓紧力得以实现。In one embodiment of the present invention, a support beam system for the diverting pulleys P1, P2, P1', P2', which is arranged in the space above the elevator shaft S, includes a plurality of consecutive fastening holes for adjusting the horizontal distance between the traction sheaves 11a, 11b and the diverting pulleys P1, P2, P1', P2'. Thus, the contact angle of the traction sheaves 11a, 11b can be adjusted to a suitable value by adjusting the horizontal distance between the traction sheaves 11a, 11b and the diverting pulleys P1, P2, P1', P2'. In this case, an optimal gripping force between the traction sheaves 11a, 11b and the suspension ropes R1, R2 is achieved.

图5示出当配重2设置在电梯轿厢1的侧面上时的根据本发明的电梯的悬挂绕绳的优选的向下投影的顶视图。被简化的图5除了示出实质上水平的顶梁8的一部分及它的导轨之外没有示出轿厢吊架的其它部分。配重2及它的导轨被布置到电梯轿厢1的那侧。另外,在电梯井上方的空间10和电梯井S之间的地板9的引入孔口7a,7b用虚线示出,所述孔口用于悬挂绕绳 R1和R2。如图5中所示的,电梯根据该图需要四个带状的绳索或带R1’, R1”,R2’和R2”,带R1’,R1”,R2’和R2”的宽度大于圆形横截面形状的旧的绳索的厚度。在根据图5的情况下,在电梯轿厢1和配重2顶上存在用于带状绳索或带的固定的有限空间。当配重2在电梯轿厢1的侧面上时特别地在图5的情况下存在兼容性问题。在该情况下,带状绳索或带R1’,R1”, R2’和R2”需要被转动并且它们在水平方向上比为配重2预留的可用空间需要更多的空间。FIG5 shows a preferred downward-projected top view of the suspension roping of an elevator according to the present invention, when counterweight 2 is positioned on the side of elevator car 1. The simplified FIG5 shows no other parts of the car hanger, except for a portion of the substantially horizontal top beam 8 and its guide rails. Counterweight 2 and its guide rails are arranged on the side of elevator car 1. Furthermore, the lead-in openings 7a, 7b in the floor 9 between the space 10 above the elevator shaft and the elevator shaft S are shown in dashed lines, which are used for the suspension ropings R1 and R2. As shown in FIG5 , the elevator requires four belt-like ropes or belts R1′, R1″, R2′, and R2″. The width of the belts R1′, R1″, R2′, and R2″ is greater than the thickness of conventional ropes with a circular cross-section. In the case of FIG5 , there is limited space for securing the belt-like ropes or belts above elevator car 1 and counterweight 2. Compatibility issues arise, particularly in the case of FIG5 , when counterweight 2 is positioned on the side of elevator car 1. In this case, the belt ropes or belts R1′, R1″, R2′ and R2″ need to be rotated and they require more space in the horizontal direction than the available space reserved for the counterweight 2.

关于悬挂比为1:1的旧的具有传动装置的电梯的现代化改造,电梯悬挂配置以根据本发明的方法实施例如以使得旧的具有传动装置的提升机与所述提升机的牵引槽轮以及可能还有确定悬挂绕绳在侧向方向上的最大水平距离即所谓的L尺度的转向滑轮从电梯井上方的旧的机房被移除,在所述提升机中,提升机和牵引槽轮的旋转速度比借助于一传动装置转换。此后,包括被驱动的牵引槽轮11a,11b的新的装有传动装置的提升机以合适的高度设置在机房中并且在侧向方向上也位于合适的位置。另外,至少两个转向滑轮P1,P2以这样的方式设置在机房中以使得悬挂绕绳R1形成围绕至少第一悬挂绕绳R1的转向滑轮P1的环A,第二悬挂绕绳R2形成围绕至少第二悬挂绕绳R2的转向滑轮P2的环B。In the modernization of an old, geared elevator with a 1:1 suspension ratio, the elevator suspension configuration is implemented using the method according to the present invention, for example, by removing the old, geared hoisting machine, its traction sheave, and possibly the diverting pulley that determines the maximum horizontal distance between the suspension roping in the lateral direction, the so-called L-dimension, from the old machine room above the elevator shaft. In the hoisting machine, the rotational speed ratio between the hoisting machine and the traction sheave is shifted by means of a gear. Thereafter, the new, geared hoisting machine, including the driven traction sheaves 11a, 11b, is positioned in the machine room at a suitable height and also in a suitable lateral position. Furthermore, at least two diverting pulleys P1, P2 are positioned in the machine room such that the suspension roping R1 forms a loop A around the diverting pulley P1 of at least the first suspension roping R1, and the second suspension roping R2 forms a loop B around the diverting pulley P2 of at least the second suspension roping R2.

对本领域内的技术人员明显的是,本发明并不仅限于如上所述的例子,而是它可在以下示出的权利要求的范围内变化。由此,例如,在电梯井上方的空间S中的转向滑轮的数目和位置可不同于以上所示的。另外,每个悬挂绕绳可存在超过两个,优选地三个,甚至更优选地四个平行的带状绳索或带。It is obvious to a person skilled in the art that the invention is not limited to the examples described above, but that it can be varied within the scope of the claims presented below. Thus, for example, the number and position of the diverting pulleys in the space S above the elevator shaft can differ from that shown above. In addition, each suspension roping can have more than two, preferably three, and even more preferably four parallel belt-like ropes or belts.

在本发明的一个实施例中,旧的提升机被新的提升机替换,所述新的提升机包括由电机旋转的牵引槽轮和机械制动器,该机械制动器被布置为无传动地作用于牵引槽轮上。在该情况下,制动器优选地被布置为直接地作用于牵引槽轮上或与牵引槽轮固定连接的部分上并且随着牵引槽轮旋转而旋转。在该情况下,制动器优选地是基于摩擦的制动器,该制动器在制动位置压靠牵引槽轮或压靠与牵引槽轮固定连接的部分,例如压靠与牵引槽轮同轴旋转的圆柱部分。这样,装有传动装置的提升机的问题,其中制动器作用于电机上,被避免。如果提升机和传动装置之间的轴断裂或传动装置的齿断裂,制动器不影响牵引槽轮,其能够自由旋转。在该情况下,在具有配重的负载不足的情形下,轿厢会以一加速度向上运动。In one embodiment of the present invention, an old elevator is replaced by a new elevator comprising a traction sheave rotated by a motor and a mechanical brake arranged to act on the traction sheave without a transmission. In this case, the brake is preferably arranged to act directly on the traction sheave or on a part fixedly connected to the traction sheave and to rotate as the traction sheave rotates. In this case, the brake is preferably a friction-based brake that, in the braking position, presses against the traction sheave or against a part fixedly connected to the traction sheave, such as a cylindrical part that rotates coaxially with the traction sheave. This avoids the problems of elevators equipped with a transmission in which the brake acts on the motor. If the shaft between the elevator and the transmission breaks or if the teeth of the transmission break, the brake does not affect the traction sheave, which can rotate freely. In this case, in the event of an insufficient load with a counterweight, the car will move upward with an accelerated acceleration.

根据本发明的解决方案的优点尤其是较好的能量经济性,其会有益于居民和住宅公司。较好的能量经济性是这样的事实的结果:借助于根据本发明的解决方案,能够在现代化改造时较好地利用新的电机技术,驱动技术和控制技术,在此情况下,例如浪费的能量可反馈到电网中。该解决方案的进一步的优点是旧的轿厢和轿厢吊架可在现代化改造时使用,因此旧的电梯部件也可被用于新的配置中。另一个优点是电梯安全性在一实施例中得以改进,在该实施例中,机械制动器被布置成与牵引槽轮连接以在没有传动装置的情况下制动牵引槽轮。更特别地,轿厢的向上超速的情形可被更可靠地防止。The advantages of the solution according to the invention are, in particular, better energy efficiency, which benefits residents and housing companies. This better energy efficiency is a result of the fact that, with the solution according to the invention, new motor, drive, and control technologies can be better utilized during modernizations, in which case, for example, wasted energy can be fed back into the power grid. A further advantage of this solution is that old cars and car slings can be used during modernizations, so that old elevator components can also be used in new configurations. Another advantage is improved elevator safety in an embodiment in which a machinery brake is arranged in connection with the traction sheave to brake the traction sheave without a transmission. More specifically, upward overspeeding of the car can be more reliably prevented.

Claims (18)

1.一种电梯,用于客运和/或货运,该电梯包括:1. An elevator for passenger and/or freight transport, the elevator comprising: -电梯轿厢(1),该电梯轿厢被布置为在电梯井(S)中运行,在该电梯井(S)上方的是由地板(9)界定的空间(10),- An elevator car (1) is arranged to operate in an elevator shaft (S), above which is a space (10) defined by a floor (9). -配重(2),- counterweight (2), -第一悬挂绕绳(R1)和第二悬挂绕绳(R2),该第一悬挂绕绳(R1)和第二悬挂绕绳(R2)将前述的电梯轿厢(1)和配重(2)连接到彼此,第一悬挂绕绳(R1)和第二悬挂绕绳(R2)在它们的第一端被固定到电梯轿厢(1)并且在它们的第二端被固定到配重(2),- A first suspension rope (R1) and a second suspension rope (R2) connect the aforementioned elevator car (1) and counterweight (2) to each other. The first suspension rope (R1) and the second suspension rope (R2) are fixed to the elevator car (1) at their first ends and to the counterweight (2) at their second ends. -用于使所述第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备,-A device for moving the first suspension rope (R1) and the second suspension rope (R2), -设置在所述空间(10)中的所述第一悬挂绕绳(R1)的一个或多个转向滑轮(P1),-One or more steering pulleys (P1) are provided on the first suspension rope (R1) in the space (10), -设置在所述空间(10)中的所述第二悬挂绕绳(R2)的一个或多个转向滑轮(P2),-One or more steering pulleys (P2) of the second suspension rope (R2) disposed in the space (10), 其特征在于,Its features are, -所述第一悬挂绕绳(R1)和第二悬挂绕绳(R2)在彼此平行的竖直平面上运行,- The first suspension rope (R1) and the second suspension rope (R2) run in a vertical plane parallel to each other. -第一悬挂绕绳(R1)形成围绕第一悬挂绕绳(R1)的一个或多个转向滑轮(P1)的外环(A),- The first suspension rope (R1) forms an outer loop (A) around one or more steering pulleys (P1). -第二悬挂绕绳(R2)形成围绕第二悬挂绕绳(R2)的一个或多个转向滑轮(P2)的内环(B),- The second suspension rope (R2) forms an inner loop (B) around one or more steering pulleys (P2) of the second suspension rope (R2). -外环(A)和内环(B)嵌套并且外环(A)的转向滑轮(P1)被设置在内环(B)的外侧,以及- The outer ring (A) and the inner ring (B) are nested, and the steering pulley (P1) of the outer ring (A) is located outside the inner ring (B), and -所述第一悬挂绕绳(R1)和第二悬挂绕绳(R2)穿过前述的地板(9)中的孔口(7a,7b),- The first suspension rope (R1) and the second suspension rope (R2) pass through the openings (7a, 7b) in the aforementioned floor (9), 前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括提升机(M),该提升机包括由第一悬挂绕绳(R1)的第一牵引槽轮(11a)和第二悬挂绕绳(R2)的第二牵引槽轮(11b)共用的一个电机(12),所述第一牵引槽轮(11a)和第二牵引槽轮(11b)经由二者共用的带传动装置与所述电机(12)连接。The aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) includes a hoist (M) comprising a motor (12) shared by a first traction pulley (11a) of the first suspension rope (R1) and a second traction pulley (11b) of the second suspension rope (R2), the first traction pulley (11a) and the second traction pulley (11b) being connected to the motor (12) via a shared belt drive. 2.根据权利要求1所述的电梯,其特征在于,前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括提升机(M),该提升机(M)被布置为使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)都运动,并包括由第一悬挂绕绳(R1)和第二悬挂绕绳(R2)共用的电机(12)。2. The elevator according to claim 1, wherein the aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) includes a hoist (M) arranged to move both the first suspension rope (R1) and the second suspension rope (R2), and includes a motor (12) shared by the first suspension rope (R1) and the second suspension rope (R2). 3.根据权利要求1所述的电梯,其特征在于,前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括设置在前述的电梯井(S)上方的空间(10)中的提升机(M),该提升机(M)包括一个或多个旋转装置(12),以及至少两个可旋转的牵引槽轮(11a,11b)。3. The elevator according to claim 1, characterized in that the aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) includes a hoist (M) disposed in the space (10) above the aforementioned elevator shaft (S), the hoist (M) including one or more rotating devices (12) and at least two rotatable traction pulleys (11a, 11b). 4.根据权利要求3所述的电梯,其特征在于,所述旋转装置是电机。4. The elevator according to claim 3, wherein the rotating device is a motor. 5.根据前述权利要求1所述的电梯,其特征在于,前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括提升机(M),该提升机包括两个单独的电机,该两个单独的电机直接地或经由轴传动装置共轴地连接到两个单独的牵引槽轮(11a,11b)。5. The elevator according to claim 1, characterized in that the aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) includes a hoist (M) comprising two separate motors coaxially connected, either directly or via a shaft drive, to two separate traction pulleys (11a, 11b). 6.根据前述权利要求1所述的电梯,其特征在于,前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括提升机(M),该提升机包括由第一牵引槽轮(11a)和第二牵引槽轮(11b)共用的一个电机(12),牵引槽轮(11a,11b)经由单独用于每个牵引槽轮(11a,11b)的带传动装置与所述电机(12)连接。6. The elevator according to claim 1, characterized in that the aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) includes a hoist (M), the hoist including a motor (12) shared by the first traction pulley (11a) and the second traction pulley (11b), the traction pulleys (11a, 11b) being connected to the motor (12) via belt drives for each traction pulley (11a, 11b). 7.根据述权利要求1-6中的任一项所述的电梯,其特征在于,在由地板(9)界定的且在电梯井(S)上方的空间(10)中没有设置提升机(M)。7. The elevator according to any one of claims 1-6, characterized in that no hoist (M) is provided in the space (10) defined by the floor (9) and above the elevator shaft (S). 8.根据权利要求1-6中的任一项所述的电梯,其特征在于,前述的第一悬挂绕绳(R1)和前述的第二悬挂绕绳(R2)每个都包括一个或多个带状绳索(R1’,R1”,R2’,R2”)。8. The elevator according to any one of claims 1-6, characterized in that each of the aforementioned first suspension rope (R1) and the aforementioned second suspension rope (R2) comprises one or more strip ropes (R1’, R1”, R2’, R2”). 9.根据权利要求1-6中的任一项所述的电梯,其特征在于,前述的第一悬挂绕绳(R1)和前述的第二悬挂绕绳(R2)每个都包括一个或多个带状绳索(R1’,R1”,R2’,R2”),前述的带状绳索(R1’,R1”,R2’,R2”)在相同的平面上嵌套着地运行。9. The elevator according to any one of claims 1-6, characterized in that each of the aforementioned first suspension rope (R1) and the aforementioned second suspension rope (R2) comprises one or more strip ropes (R1’, R1”, R2’, R2”), which are nested and run on the same plane. 10.根据权利要求1所述的电梯,其特征在于,前述的用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动的设备包括:与第一悬挂绕绳(R1)和第二悬挂绕绳(R2)分开的牵引绕绳(3),该牵引绕绳被连接到电梯轿厢(1)和配重(2);以及提升机(M),该提升机设置在电梯轿厢(1)的运动路径的底端附近,该提升机(M)包括用于使牵引绕绳(3)运动的设备,该用于使牵引绕绳(3)运动的设备包括旋转装置和可旋转的牵引槽轮(11)。10. The elevator according to claim 1, characterized in that the aforementioned device for moving the first suspension rope (R1) and the second suspension rope (R2) comprises: a traction rope (3) separate from the first suspension rope (R1) and the second suspension rope (R2), the traction rope being connected to the elevator car (1) and the counterweight (2); and a hoist (M) disposed near the bottom end of the movement path of the elevator car (1), the hoist (M) comprising a device for moving the traction rope (3), the device for moving the traction rope (3) comprising a rotating device and a rotatable traction pulley (11). 11.根据权利要求8所述的电梯,其特征在于,牵引绕绳(3)包括一个或多个带状绳索。11. The elevator according to claim 8, wherein the traction rope (3) comprises one or more strip ropes. 12.一种用于现代化改造电梯的方法,所述电梯用于客运和/或货运,所述电梯至少包括:电梯轿厢(1),该电梯轿厢被构造为在电梯井(S)中运动;配重(2);改造前悬挂绕绳,该改造前悬挂绕绳被连接到电梯轿厢(1)和配重(2),改造前悬挂绕绳在其第一端被固定到电梯轿厢(1)并且在其第二端被固定到配重(2);以及设置在电梯井(S)上方的空间(10)中的改造前提升机;以及转向滑轮,其特征在于,改造前悬挂绕绳和改造前提升机被移除,改造后提升机(M)被设置在电梯井(S)上方的空间中,以及如下地进行布置:12. A method for modernizing an elevator for passenger and/or freight transport, the elevator comprising at least: an elevator car (1) configured to move in an elevator shaft (S); a counterweight (2); a pre-modification suspension rope connected to the elevator car (1) and the counterweight (2), the pre-modification suspension rope being fixed at a first end to the elevator car (1) and at a second end to the counterweight (2); a pre-modification hoist disposed in a space (10) above the elevator shaft (S); and a steering pulley, characterized in that the pre-modification suspension rope and the pre-modification hoist are removed, and a post-modification hoist (M) is disposed in the space above the elevator shaft (S), and arranged as follows: -第一悬挂绕绳(R1)和第二悬挂绕绳(R2)被布置为在彼此平行的竖直平面上运行,- The first suspension rope (R1) and the second suspension rope (R2) are arranged to run in a vertical plane parallel to each other. -第一悬挂绕绳(R1)被布置为形成围绕第一悬挂绕绳(R1)的一个或多个转向滑轮(P1)的外环(A),- The first suspension rope (R1) is arranged to form an outer loop (A) around one or more steering pulleys (P1) of the first suspension rope (R1). -第二悬挂绕绳(R2)被布置为形成围绕第二悬挂绕绳(R2)的一个或多个转向滑轮(P2)的内环(B),以使得所述外环(A)和内环(B)嵌套,外环(A)的转向滑轮(P1)被设置在内环(B)的外侧,以及- The second suspension rope (R2) is arranged to form an inner loop (B) around one or more steering pulleys (P2) of the second suspension rope (R2), such that the outer loop (A) and the inner loop (B) are nested, with the steering pulley (P1) of the outer loop (A) positioned outside the inner loop (B), and -第一悬挂绕绳(R1)和第二悬挂绕绳(R2)被布置为穿过地板(9)中的孔口(7a,7b),- The first suspension rope (R1) and the second suspension rope (R2) are arranged to pass through the openings (7a, 7b) in the floor (9), 前述的改造后提升机(M)包括由第一悬挂绕绳(R1)的第一牵引槽轮(11a)和由第二悬挂绕绳(R2)的第二牵引槽轮(11b)共用的一个电机(12),所述第一牵引槽轮(11a)和第二牵引槽轮(11b)经由二者共用的带传动装置与所述电机(12)连接,用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动。The aforementioned modified hoist (M) includes a motor (12) shared by a first traction pulley (11a) of a first suspension rope (R1) and a second traction pulley (11b) of a second suspension rope (R2). The first traction pulley (11a) and the second traction pulley (11b) are connected to the motor (12) via a belt drive device shared by the two, for moving the first suspension rope (R1) and the second suspension rope (R2). 13.根据权利要求12所述的方法,其特征在于,前述的改造后提升机(M)包括两个单独的电机,该两个单独的电机直接地或经由轴传动装置被共轴地连接到两个单独的牵引槽轮(11a,11b),用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动。13. The method according to claim 12, wherein the aforementioned modified hoist (M) comprises two separate motors, which are coaxially connected directly or via a shaft drive to two separate traction pulleys (11a, 11b) for moving the first suspension rope (R1) and the second suspension rope (R2). 14.根据权利要求12所述的方法,其特征在于,前述的改造后提升机(M)包括由第一牵引槽轮(11a)和第二牵引槽轮(11b)共用的一个电机(12),牵引槽轮(11a,11b)经由单独用于每个牵引槽轮(11a,11b)的带传动装置与所述电机(12)连接,用于使第一悬挂绕绳(R1)和第二悬挂绕绳(R2)运动。14. The method according to claim 12, wherein the aforementioned modified hoist (M) includes a motor (12) shared by a first traction pulley (11a) and a second traction pulley (11b), the traction pulleys (11a, 11b) being connected to the motor (12) via belt drives for each traction pulley (11a, 11b) to move the first suspension rope (R1) and the second suspension rope (R2). 15.根据权利要求12所述的方法,其特征在于,改造前悬挂绕绳和改造前提升机被移除,改造后提升机(M)被安置在电梯轿厢(1)的运动路径的底端附近,以及如下地进行布置:15. The method according to claim 12, characterized in that the pre-modification suspension rope and the pre-modification hoist are removed, and the post-modification hoist (M) is placed near the bottom end of the movement path of the elevator car (1), and arranged as follows: -第一悬挂绕绳(R1)和第二悬挂绕绳(R2)被布置为在彼此平行的竖直平面上运行,- The first suspension rope (R1) and the second suspension rope (R2) are arranged to run in a vertical plane parallel to each other. -第一悬挂绕绳(R1)被布置为形成围绕第一悬挂绕绳(R1)的一个或多个转向滑轮(P1)的外环(A),- The first suspension rope (R1) is arranged to form an outer loop (A) around one or more steering pulleys (P1) of the first suspension rope (R1). -第二悬挂绕绳(R2)被布置为形成围绕第二悬挂绕绳(R2)的一个或多个转向滑轮(P2)的内环(B),以使得所述外环(A)和内环(B)嵌套,外环(A)的转向滑轮(P1)设置在内环(B)的外侧,以及- The second suspension rope (R2) is arranged to form an inner loop (B) around one or more steering pulleys (P2) of the second suspension rope (R2), such that the outer loop (A) and the inner loop (B) are nested, with the steering pulley (P1) of the outer loop (A) positioned outside the inner loop (B), and -第一悬挂绕绳(R1)和第二悬挂绕绳(R2)被布置为穿过前述的地板(9)中的孔口(7a,7b),- The first suspension rope (R1) and the second suspension rope (R2) are arranged to pass through the openings (7a, 7b) in the aforementioned floor (9), -用于施加竖直力在电梯轿厢(1)上或配重(2)上的设备被布置为包括牵引绕绳(3),该牵引绕绳被连接到电梯轿厢(1)和配重(2);- The device for applying vertical force to the elevator car (1) or the counterweight (2) is arranged to include a traction rope (3) which is connected to the elevator car (1) and the counterweight (2); -改造后提升机(M)被布置为包括用于使牵引绕绳(3)运动的设备,该用于使牵引绕绳(3)运动的设备包括旋转装置和可旋转的牵引槽轮。- The modified hoist (M) is arranged to include a device for moving the traction rope (3), which includes a rotating device and a rotatable traction pulley. 16.根据权利要求12所述的方法,其特征在于,牵引绕绳(3)被布置为包括一个或多个带状绳索。16. The method according to claim 12, wherein the traction rope (3) is arranged to include one or more ribbon ropes. 17.根据权利要求12-14中的任一项所述的方法,其特征在于,当现代化改造电梯时,在电梯井(S)和电梯井(S)上方的空间(10)之间的地板(9)的改造前悬挂绕绳引入孔口(7a,7b)的尺寸没有改变。17. The method according to any one of claims 12-14, characterized in that, when the elevator is modernized, the dimensions of the pre-modification suspension rope inlet holes (7a, 7b) of the floor (9) between the elevator shaft (S) and the space (10) above the elevator shaft (S) remain unchanged. 18.根据权利要求12-14中的任一项所述的方法,其特征在于,前述的第一悬挂绕绳(R1)和前述的第二悬挂绕绳(R2)每个都被布置为包括一个或多个带状绳索。18. The method according to any one of claims 12-14, wherein each of the aforementioned first suspension rope (R1) and the aforementioned second suspension rope (R2) is arranged to include one or more ribbon ropes.
HK15111287.2A 2012-10-31 2013-10-30 Elevator and method for modernizing an elevator HK1210454B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FI20126134 2012-10-31
FI20126134 2012-10-31
PCT/FI2013/051023 WO2014068186A1 (en) 2012-10-31 2013-10-30 Elevator and method for modernizing an elevator

Publications (2)

Publication Number Publication Date
HK1210454A1 HK1210454A1 (en) 2016-04-22
HK1210454B true HK1210454B (en) 2020-05-08

Family

ID=

Similar Documents

Publication Publication Date Title
US20150210509A1 (en) Elevator and method for modernizing an elevator
JP5873884B2 (en) elevator
EP2776355B1 (en) Elevator system
CZ20031764A3 (en) Gearless cable lift with a dual wind drive disk mechanism
JP2006505471A (en) Traction sheave elevator without counterweight
WO2010081935A1 (en) Elevator
KR101148817B1 (en) Elevator rope compensation device
FI118079B (en) Elevator, method which blocks and / or stops the movement of an elevator and the use of a device which blocks and / or stops the movement of the elevator basket in an elevator
EP1685057B1 (en) Elevator pulley arrangement
US20180065831A1 (en) Elevator
US10773925B2 (en) Belt-type traction means and method for fabricating the traction means as well as use of said traction means in an elevator and an elevator provided with said traction means
EP3313765A1 (en) Increased traction of elevator system belt
CN106061881A (en) Drive having a multiple looping for an elevator system
HK1210454B (en) Elevator and method for modernizing an elevator
US20100018810A1 (en) Elevator apparatus
CA2929427A1 (en) Elevator drive
RU85154U1 (en) LIFT (OPTIONS)
HK1116150A1 (en) Lift system
HK1116150B (en) Lift system
HK1257118A1 (en) Elevator system suspension member
HK1083621B (en) Elevator comprising v-belt-like transmission means, particualrly comprising ribbed v-belts, as carrying and/or traction means
HK1100552B (en) Elevator pulley arrangement
HK1207618A1 (en) An elevator
HK1068596B (en) Elevator with a belt-like transmission means, especially with a v-ribbed belt, serving as supporting and/or drive means