EP3384198B1
(en )
2020-10-21
Pipe restraint and shield
CN102272858B
(zh )
2016-01-06
隔震安全壳容器
US20180025795A9
(en )
2018-01-25
Seismic attenuation system for a nuclear reactor
EP3090432B1
(en )
2019-01-02
Seismic attenuation system for a nuclear reactor
US3965938A
(en )
1976-06-29
Pipe restraint device
Lynch et al.
2020
Pipe restraint and shield
HK1262115A1
(zh )
2020-01-10
管道約束和防禦
HK1262115B
(zh )
2021-07-02
管道約束和防禦
US4687625A
(en )
1987-08-18
Piping of nuclear reactor containment vessel
Wichman et al.
1990
Development of USNRC standard review plan 3.6. 3 for leak-before-break applications to nuclear power plants
Bartholomé
1997
‘German leak-before-break concept’(description of German LBB procedures, practices and applications)
US4118277A
(en )
1978-10-03
Steel containment for nuclear reactor installations
Cofie et al.
2021
Application of Leak-Before-Break to Small Diameter Stainless Steel Piping in PWRs
Li et al.
2011
Safety analysis for hot gas duct vessel in HTR-PM
Ogawa et al.
2015
Analytical study on failure mechanisms by extreme loadings under design extension conditions
McGill et al.
2006
Technical Basis for Proposed Revisions to ASME Code Case N-513 and Some Applications to Moderate Energy Piping
Guide
2013
Protection Against Internally Generated Missiles in Nuclear Power Plants
Thinnes et al.
1985
Postulated breaks and leak cross sections in pipes and in steam generator heating tubes of german PWR's
Stevenson
1984
Summary and comparison of current US regulatory standards and foreign standards
Ayres
1980
Research for the rationalization of nuclear power plant pipe break criteria
Jarman
1985
The Canadian approach to protection against postulated primary heat transport piping failures
McIntyre
1996
Basic information on design features of the AP600
Leisher et al.
1982
Prototype spent-fuel canister design, analysis, and test
HK1221816B
(zh )
2019-07-26
隔震安全壳容器
Hwang et al.
1998
Design requirement on KALIMER control rod assembly duct