GB2608555B - Long platform guy-wire hanging basket and construction method for main girder section - Google Patents
Long platform guy-wire hanging basket and construction method for main girder section Download PDFInfo
- Publication number
- GB2608555B GB2608555B GB2214658.3A GB202214658A GB2608555B GB 2608555 B GB2608555 B GB 2608555B GB 202214658 A GB202214658 A GB 202214658A GB 2608555 B GB2608555 B GB 2608555B
- Authority
- GB
- United Kingdom
- Prior art keywords
- construction method
- hanging basket
- main girder
- wire hanging
- girder section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010888770.XA CN112064519B (en) | 2020-08-28 | 2020-08-28 | Long platform guy cable hanging basket and main beam segment construction method |
| PCT/CN2020/123973 WO2022041449A1 (en) | 2020-08-28 | 2020-10-27 | Construction method for long platform guy-wire hanging basket and main girder section |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| GB202214658D0 GB202214658D0 (en) | 2022-11-23 |
| GB2608555A GB2608555A (en) | 2023-01-04 |
| GB2608555B true GB2608555B (en) | 2024-11-20 |
Family
ID=73660093
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB2214658.3A Active GB2608555B (en) | 2020-08-28 | 2020-10-27 | Long platform guy-wire hanging basket and construction method for main girder section |
Country Status (5)
| Country | Link |
|---|---|
| CN (1) | CN112064519B (en) |
| GB (1) | GB2608555B (en) |
| LU (1) | LU501962B1 (en) |
| MA (1) | MA56738B1 (en) |
| WO (1) | WO2022041449A1 (en) |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112709140B (en) * | 2020-12-23 | 2022-08-05 | 中铁广州工程局集团有限公司 | Construction method of concrete box girder of middle-supporting basket concrete-filled steel tube arch bridge |
| CN114737489B (en) * | 2022-03-31 | 2023-04-28 | 中铁第五勘察设计院集团有限公司 | Construction method of self-propelled cantilever bridge fabrication machine |
| CN116084302B (en) * | 2022-09-08 | 2025-03-28 | 中铁广州工程局集团有限公司 | A construction method for constructing concrete box girder segments of cable-stayed bridges using guy-cable hanging basket |
| CN115595891A (en) * | 2022-11-11 | 2023-01-13 | 华西工程科技(深圳)股份有限公司(Cn) | Bearing device for outer formwork for hanging basket |
| CN115897397B (en) * | 2022-11-21 | 2025-08-26 | 中铁十四局集团有限公司 | Construction method of steel-concrete mixed section of cable-stayed bridge |
| CN115748410B (en) * | 2022-12-21 | 2025-06-27 | 上海市城市建设设计研究总院(集团)有限公司 | Full concrete cantilever stiffened beam bridge structure and construction method |
| CN116145561A (en) * | 2022-12-31 | 2023-05-23 | 成都智能挂篮科技有限公司 | A walking foldable hanging basket device and its use method |
| CN116770733B (en) * | 2023-06-20 | 2025-04-15 | 中交第一公路勘察设计研究院有限公司 | A steel-concrete variable cross-section continuous box girder bridge suspended casting basket |
| CN116695589B (en) * | 2023-06-21 | 2024-12-17 | 中铁广州工程局集团有限公司 | Integral assembling and lifting construction method for guy rope hanging basket structure |
| CN116905372B (en) * | 2023-07-27 | 2025-07-11 | 中国五冶集团有限公司 | Vertical prestress steel bar tensioning notch reserved box and mounting method thereof |
| CN117344624A (en) * | 2023-11-16 | 2024-01-05 | 深圳二十冶建设有限公司 | Prestressed anchor installation device and installation method |
| CN121161744A (en) * | 2025-11-19 | 2025-12-19 | 中铁十一局集团有限公司 | Large-section cantilever folding section pouring equipment for bridge construction |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07102531A (en) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | Method and device for overhanging installation of bridge |
| CN1123861A (en) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | Construction of prestressed concrete stayed cable bridge |
| JP2009299418A (en) * | 2008-06-17 | 2009-12-24 | Kajima Corp | Retreating and removing method and retreating device for travelling work vehicle for cantilever construction |
| CN105951611A (en) * | 2016-06-23 | 2016-09-21 | 贵州路桥集团有限公司 | Inverted triangular obliquely-pulling obliquely-climbing hanging basket |
| CN107100074A (en) * | 2017-05-03 | 2017-08-29 | 中铁十六局集团第三工程有限公司 | A kind of lower bearing arch bridge concrete bridge deck construction method |
| WO2018052030A1 (en) * | 2016-09-13 | 2018-03-22 | 清水建設株式会社 | Bridge construction method |
| CN210104575U (en) * | 2019-03-21 | 2020-02-21 | 联建建设工程有限公司 | Bending-resistant structure of large-span front supporting point guyed cradle |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006077521A (en) * | 2004-09-13 | 2006-03-23 | Oriental Construction Co Ltd | Bridge construction device |
| CN201635013U (en) * | 2010-02-26 | 2010-11-17 | 广东省长大公路工程有限公司 | Device for resisting horizontal component force of stayed cable |
| CN102230312B (en) * | 2011-02-28 | 2012-08-15 | 中铁五局(集团)有限公司 | Cable-stayed cradle cambered head |
| CN105887680B (en) * | 2016-06-02 | 2018-04-17 | 中铁第四勘察设计院集团有限公司 | One kind mixing cable beam anchoring structure |
| CN106638318B (en) * | 2016-11-25 | 2019-03-15 | 中铁大桥局集团第五工程有限公司 | Locating method of anchor point at end of cable-stayed bridge and installation method of cable conduit |
| CN110528401A (en) * | 2019-09-02 | 2019-12-03 | 曾勇 | Suspended pouring construction hanging basket system |
-
2020
- 2020-08-28 CN CN202010888770.XA patent/CN112064519B/en active Active
- 2020-10-27 LU LU501962A patent/LU501962B1/en active IP Right Grant
- 2020-10-27 WO PCT/CN2020/123973 patent/WO2022041449A1/en not_active Ceased
- 2020-10-27 GB GB2214658.3A patent/GB2608555B/en active Active
- 2020-10-27 MA MA56738A patent/MA56738B1/en unknown
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07102531A (en) * | 1993-10-06 | 1995-04-18 | Mitsubishi Heavy Ind Ltd | Method and device for overhanging installation of bridge |
| CN1123861A (en) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | Construction of prestressed concrete stayed cable bridge |
| JP2009299418A (en) * | 2008-06-17 | 2009-12-24 | Kajima Corp | Retreating and removing method and retreating device for travelling work vehicle for cantilever construction |
| CN105951611A (en) * | 2016-06-23 | 2016-09-21 | 贵州路桥集团有限公司 | Inverted triangular obliquely-pulling obliquely-climbing hanging basket |
| WO2018052030A1 (en) * | 2016-09-13 | 2018-03-22 | 清水建設株式会社 | Bridge construction method |
| CN107100074A (en) * | 2017-05-03 | 2017-08-29 | 中铁十六局集团第三工程有限公司 | A kind of lower bearing arch bridge concrete bridge deck construction method |
| CN210104575U (en) * | 2019-03-21 | 2020-02-21 | 联建建设工程有限公司 | Bending-resistant structure of large-span front supporting point guyed cradle |
Also Published As
| Publication number | Publication date |
|---|---|
| MA56738A1 (en) | 2023-07-31 |
| GB202214658D0 (en) | 2022-11-23 |
| CN112064519B (en) | 2021-09-14 |
| LU501962B1 (en) | 2022-05-10 |
| WO2022041449A1 (en) | 2022-03-03 |
| WO2022041449A8 (en) | 2022-05-27 |
| CN112064519A (en) | 2020-12-11 |
| MA56738B1 (en) | 2023-12-29 |
| GB2608555A (en) | 2023-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB2608555B (en) | Long platform guy-wire hanging basket and construction method for main girder section | |
| KR102187993B9 (en) | Prefabricated Bridge Structure and Construction Method | |
| EP4019658C0 (en) | WIRE WIRE FOR ULTRA-HIGH STRENGTH STEEL CABLE AND METHOD FOR ITS PRODUCTION | |
| EP3915089A4 (en) | METHOD OF MERGING POINT CLOUDS THAT IDENTIFIES AND RETAINS PREFERRED POINTS | |
| ZA201901348B (en) | System for construction of composite u shaped reinforced girders bridge deck and methods thereof | |
| EP3348711A4 (en) | Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge | |
| HUE059807T2 (en) | Lifting structure and method for lifting bridge | |
| SG11202112773VA (en) | Rebar-equipped lumber form and construction method using rebar-equipped lumber form | |
| SG10201604176SA (en) | Urban forest garden building and building group and method for arranging hanging greenery platforms on multilayer structure | |
| EP3927929A4 (en) | BORING ROD HANDLING SYSTEM AND METHOD | |
| EP3976521A4 (en) | STAIRLIFT RAIL AND FORMATION METHOD THEREFOR | |
| EP4037555A4 (en) | METHOD AND SYSTEM FOR DETERMINING CARDIOVASCULAR PARAMETERS | |
| DE112020003435A5 (en) | Roof connection system and method | |
| EP4121612A4 (en) | PREFABRICATED WALL ARRANGEMENT AND METHOD THEREFOR | |
| ZA202110932B (en) | Multifunctional transverse passage structure for tunnel and construction method thereof | |
| PL3951117T3 (en) | Formwork system and method | |
| EP4064975C0 (en) | CARDIOVASCULAR ANALYTICAL SYSTEM AND METHOD | |
| GB202104104D0 (en) | Platform and method | |
| SG11202111283XA (en) | Construction method of tunnel supporting structure | |
| KR102345263B9 (en) | Composite beam girder and constructing method for the same | |
| IL281154A (en) | Support for decks of bridges, viaducts and the like | |
| GB2612519B (en) | Building and method for constructing building | |
| ZA201802205B (en) | Online monitoring system and method for suspension steel wire ropes of hoisting container | |
| GB201806055D0 (en) | A void platform and a method for providing a platform support across a building void | |
| ZA202208486B (en) | Steel-wood composite bridge deck structure and laying method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 789A | Request for publication of translation (sect. 89(a)/1977) |
Ref document number: 2022041449 Country of ref document: WO |