GB2608555B - Long platform guy-wire hanging basket and construction method for main girder section - Google Patents

Long platform guy-wire hanging basket and construction method for main girder section Download PDF

Info

Publication number
GB2608555B
GB2608555B GB2214658.3A GB202214658A GB2608555B GB 2608555 B GB2608555 B GB 2608555B GB 202214658 A GB202214658 A GB 202214658A GB 2608555 B GB2608555 B GB 2608555B
Authority
GB
United Kingdom
Prior art keywords
construction method
hanging basket
main girder
wire hanging
girder section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
GB2214658.3A
Other versions
GB202214658D0 (en
GB2608555A (en
Inventor
Chen Dong
Xiao Wei
Yang Zhao
Huang Shaopeng
Xie Hongbing
Cheng Guangjin
Li Haihong
Chen Yifeng
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Publication of GB202214658D0 publication Critical patent/GB202214658D0/en
Publication of GB2608555A publication Critical patent/GB2608555A/en
Application granted granted Critical
Publication of GB2608555B publication Critical patent/GB2608555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
GB2214658.3A 2020-08-28 2020-10-27 Long platform guy-wire hanging basket and construction method for main girder section Active GB2608555B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010888770.XA CN112064519B (en) 2020-08-28 2020-08-28 Long platform guy cable hanging basket and main beam segment construction method
PCT/CN2020/123973 WO2022041449A1 (en) 2020-08-28 2020-10-27 Construction method for long platform guy-wire hanging basket and main girder section

Publications (3)

Publication Number Publication Date
GB202214658D0 GB202214658D0 (en) 2022-11-23
GB2608555A GB2608555A (en) 2023-01-04
GB2608555B true GB2608555B (en) 2024-11-20

Family

ID=73660093

Family Applications (1)

Application Number Title Priority Date Filing Date
GB2214658.3A Active GB2608555B (en) 2020-08-28 2020-10-27 Long platform guy-wire hanging basket and construction method for main girder section

Country Status (5)

Country Link
CN (1) CN112064519B (en)
GB (1) GB2608555B (en)
LU (1) LU501962B1 (en)
MA (1) MA56738B1 (en)
WO (1) WO2022041449A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709140B (en) * 2020-12-23 2022-08-05 中铁广州工程局集团有限公司 Construction method of concrete box girder of middle-supporting basket concrete-filled steel tube arch bridge
CN114737489B (en) * 2022-03-31 2023-04-28 中铁第五勘察设计院集团有限公司 Construction method of self-propelled cantilever bridge fabrication machine
CN116084302B (en) * 2022-09-08 2025-03-28 中铁广州工程局集团有限公司 A construction method for constructing concrete box girder segments of cable-stayed bridges using guy-cable hanging basket
CN115595891A (en) * 2022-11-11 2023-01-13 华西工程科技(深圳)股份有限公司(Cn) Bearing device for outer formwork for hanging basket
CN115897397B (en) * 2022-11-21 2025-08-26 中铁十四局集团有限公司 Construction method of steel-concrete mixed section of cable-stayed bridge
CN115748410B (en) * 2022-12-21 2025-06-27 上海市城市建设设计研究总院(集团)有限公司 Full concrete cantilever stiffened beam bridge structure and construction method
CN116145561A (en) * 2022-12-31 2023-05-23 成都智能挂篮科技有限公司 A walking foldable hanging basket device and its use method
CN116770733B (en) * 2023-06-20 2025-04-15 中交第一公路勘察设计研究院有限公司 A steel-concrete variable cross-section continuous box girder bridge suspended casting basket
CN116695589B (en) * 2023-06-21 2024-12-17 中铁广州工程局集团有限公司 Integral assembling and lifting construction method for guy rope hanging basket structure
CN116905372B (en) * 2023-07-27 2025-07-11 中国五冶集团有限公司 Vertical prestress steel bar tensioning notch reserved box and mounting method thereof
CN117344624A (en) * 2023-11-16 2024-01-05 深圳二十冶建设有限公司 Prestressed anchor installation device and installation method
CN121161744A (en) * 2025-11-19 2025-12-19 中铁十一局集团有限公司 Large-section cantilever folding section pouring equipment for bridge construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102531A (en) * 1993-10-06 1995-04-18 Mitsubishi Heavy Ind Ltd Method and device for overhanging installation of bridge
CN1123861A (en) * 1995-08-28 1996-06-05 铁道部大桥工程局 Construction of prestressed concrete stayed cable bridge
JP2009299418A (en) * 2008-06-17 2009-12-24 Kajima Corp Retreating and removing method and retreating device for travelling work vehicle for cantilever construction
CN105951611A (en) * 2016-06-23 2016-09-21 贵州路桥集团有限公司 Inverted triangular obliquely-pulling obliquely-climbing hanging basket
CN107100074A (en) * 2017-05-03 2017-08-29 中铁十六局集团第三工程有限公司 A kind of lower bearing arch bridge concrete bridge deck construction method
WO2018052030A1 (en) * 2016-09-13 2018-03-22 清水建設株式会社 Bridge construction method
CN210104575U (en) * 2019-03-21 2020-02-21 联建建设工程有限公司 Bending-resistant structure of large-span front supporting point guyed cradle

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006077521A (en) * 2004-09-13 2006-03-23 Oriental Construction Co Ltd Bridge construction device
CN201635013U (en) * 2010-02-26 2010-11-17 广东省长大公路工程有限公司 Device for resisting horizontal component force of stayed cable
CN102230312B (en) * 2011-02-28 2012-08-15 中铁五局(集团)有限公司 Cable-stayed cradle cambered head
CN105887680B (en) * 2016-06-02 2018-04-17 中铁第四勘察设计院集团有限公司 One kind mixing cable beam anchoring structure
CN106638318B (en) * 2016-11-25 2019-03-15 中铁大桥局集团第五工程有限公司 Locating method of anchor point at end of cable-stayed bridge and installation method of cable conduit
CN110528401A (en) * 2019-09-02 2019-12-03 曾勇 Suspended pouring construction hanging basket system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07102531A (en) * 1993-10-06 1995-04-18 Mitsubishi Heavy Ind Ltd Method and device for overhanging installation of bridge
CN1123861A (en) * 1995-08-28 1996-06-05 铁道部大桥工程局 Construction of prestressed concrete stayed cable bridge
JP2009299418A (en) * 2008-06-17 2009-12-24 Kajima Corp Retreating and removing method and retreating device for travelling work vehicle for cantilever construction
CN105951611A (en) * 2016-06-23 2016-09-21 贵州路桥集团有限公司 Inverted triangular obliquely-pulling obliquely-climbing hanging basket
WO2018052030A1 (en) * 2016-09-13 2018-03-22 清水建設株式会社 Bridge construction method
CN107100074A (en) * 2017-05-03 2017-08-29 中铁十六局集团第三工程有限公司 A kind of lower bearing arch bridge concrete bridge deck construction method
CN210104575U (en) * 2019-03-21 2020-02-21 联建建设工程有限公司 Bending-resistant structure of large-span front supporting point guyed cradle

Also Published As

Publication number Publication date
MA56738A1 (en) 2023-07-31
GB202214658D0 (en) 2022-11-23
CN112064519B (en) 2021-09-14
LU501962B1 (en) 2022-05-10
WO2022041449A1 (en) 2022-03-03
WO2022041449A8 (en) 2022-05-27
CN112064519A (en) 2020-12-11
MA56738B1 (en) 2023-12-29
GB2608555A (en) 2023-01-04

Similar Documents

Publication Publication Date Title
GB2608555B (en) Long platform guy-wire hanging basket and construction method for main girder section
KR102187993B9 (en) Prefabricated Bridge Structure and Construction Method
EP4019658C0 (en) WIRE WIRE FOR ULTRA-HIGH STRENGTH STEEL CABLE AND METHOD FOR ITS PRODUCTION
EP3915089A4 (en) METHOD OF MERGING POINT CLOUDS THAT IDENTIFIES AND RETAINS PREFERRED POINTS
ZA201901348B (en) System for construction of composite u shaped reinforced girders bridge deck and methods thereof
EP3348711A4 (en) Method for fabricating prefabricated parallel steel wire preformed cable strands for main cable of suspension bridge
HUE059807T2 (en) Lifting structure and method for lifting bridge
SG11202112773VA (en) Rebar-equipped lumber form and construction method using rebar-equipped lumber form
SG10201604176SA (en) Urban forest garden building and building group and method for arranging hanging greenery platforms on multilayer structure
EP3927929A4 (en) BORING ROD HANDLING SYSTEM AND METHOD
EP3976521A4 (en) STAIRLIFT RAIL AND FORMATION METHOD THEREFOR
EP4037555A4 (en) METHOD AND SYSTEM FOR DETERMINING CARDIOVASCULAR PARAMETERS
DE112020003435A5 (en) Roof connection system and method
EP4121612A4 (en) PREFABRICATED WALL ARRANGEMENT AND METHOD THEREFOR
ZA202110932B (en) Multifunctional transverse passage structure for tunnel and construction method thereof
PL3951117T3 (en) Formwork system and method
EP4064975C0 (en) CARDIOVASCULAR ANALYTICAL SYSTEM AND METHOD
GB202104104D0 (en) Platform and method
SG11202111283XA (en) Construction method of tunnel supporting structure
KR102345263B9 (en) Composite beam girder and constructing method for the same
IL281154A (en) Support for decks of bridges, viaducts and the like
GB2612519B (en) Building and method for constructing building
ZA201802205B (en) Online monitoring system and method for suspension steel wire ropes of hoisting container
GB201806055D0 (en) A void platform and a method for providing a platform support across a building void
ZA202208486B (en) Steel-wood composite bridge deck structure and laying method thereof

Legal Events

Date Code Title Description
789A Request for publication of translation (sect. 89(a)/1977)

Ref document number: 2022041449

Country of ref document: WO