GB2531982A - Quantifying a reservoir volume and pump pressure limit - Google Patents
Quantifying a reservoir volume and pump pressure limit Download PDFInfo
- Publication number
- GB2531982A GB2531982A GB1602565.2A GB201602565A GB2531982A GB 2531982 A GB2531982 A GB 2531982A GB 201602565 A GB201602565 A GB 201602565A GB 2531982 A GB2531982 A GB 2531982A
- Authority
- GB
- United Kingdom
- Prior art keywords
- pump pressure
- reservoir volume
- quantifying
- pressure limit
- target zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V99/00—Subject matter not provided for in other groups of this subclass
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/14—Fourier, Walsh or analogous domain transformations, e.g. Laplace, Hilbert, Karhunen-Loeve, transforms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/64—Geostructures, e.g. in 3D data cubes
- G01V2210/646—Fractures
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Geophysics (AREA)
- Analytical Chemistry (AREA)
- Chemical & Material Sciences (AREA)
- Data Mining & Analysis (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Pure & Applied Mathematics (AREA)
- Computational Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Algebra (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Measuring Fluid Pressure (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Methods for computer modelling of a pressure transient behavior after shut-in and during fall-off of an injection event are provided to provide estimates of stimulated reservoir volume, formation permeability, stress contrast across the target and adjacent zones, fracture dimensions, fracture beyond the target zone, and pump pressure limits for maintaining fractures within the target zone, especially in fractured tight reservoirs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB2005438.3A GB2580834B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462010911P | 2014-06-11 | 2014-06-11 | |
| US14/452,525 US10578766B2 (en) | 2013-08-05 | 2014-08-05 | Quantifying a reservoir volume and pump pressure limit |
| PCT/US2015/035433 WO2015191927A1 (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| GB201602565D0 GB201602565D0 (en) | 2016-03-30 |
| GB2531982A true GB2531982A (en) | 2016-05-04 |
| GB2531982B GB2531982B (en) | 2020-06-03 |
Family
ID=54834357
Family Applications (4)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB1602565.2A Active GB2531982B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
| GB2012101.8A Active GB2586349B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
| GB2012106.7A Active GB2586350B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
| GB2005438.3A Active GB2580834B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
Family Applications After (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB2012101.8A Active GB2586349B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
| GB2012106.7A Active GB2586350B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
| GB2005438.3A Active GB2580834B (en) | 2014-06-11 | 2015-06-11 | Quantifying a reservoir volume and pump pressure limit |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | USRE50180E1 (en) |
| AU (1) | AU2015274458B2 (en) |
| CA (2) | CA2920311C (en) |
| GB (4) | GB2531982B (en) |
| MX (2) | MX369007B (en) |
| WO (1) | WO2015191927A1 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2920311C (en) * | 2014-06-11 | 2019-09-03 | Advantek International Corporation | Quantifying a reservoir volume and pump pressure limit |
| US20170191348A1 (en) * | 2016-01-04 | 2017-07-06 | Saudi Arabian Oil Company | Modeling to characterize fractures network in homogeneous petroleum reservoirs |
| CN106202737B (en) * | 2016-07-14 | 2019-08-06 | 中国石油天然气股份有限公司 | Method and device for screening compact reservoir volume fracturing adaptive zone |
| CN107725047B (en) * | 2017-10-31 | 2023-09-08 | 中国石油大学(北京) | Experimental devices, experimental systems and experimental methods for observing oil migration |
| CN108319756B (en) * | 2017-12-29 | 2019-02-15 | 西安石油大学 | A method for simulation and characterization of volumetric fracture network expansion in tight reservoirs |
| CN112282741B (en) * | 2019-07-24 | 2024-05-14 | 中国石油化工股份有限公司 | Target reservoir well test analysis method, computer storage medium and computer equipment |
| CN113605879B (en) * | 2021-08-02 | 2023-03-21 | 中国石油大学(北京) | Method and device for calculating original formation pressure of coal reservoir |
| CN114152555B (en) * | 2022-02-09 | 2022-04-15 | 成都理工大学 | Drilling fluid leakage damage simulation device and method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050216198A1 (en) * | 2004-03-29 | 2005-09-29 | Craig David P | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
| US20070079652A1 (en) * | 2005-10-07 | 2007-04-12 | Craig David P | Methods and systems for determining reservoir properties of subterranean formations |
| US20100218941A1 (en) * | 2009-02-27 | 2010-09-02 | Muthukumarappan Ramurthy | Determining the Use of Stimulation Treatments Based on High Process Zone Stress |
| US20110209868A1 (en) * | 2010-03-01 | 2011-09-01 | Halliburton Energy Services, Inc. | Fracturing a stress-altered subterranean formation |
| US20120158310A1 (en) * | 2010-12-16 | 2012-06-21 | Bp Corporation North America Inc. | Method of determining reservoir pressure |
Family Cites Families (39)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5431236A (en) | 1994-08-19 | 1995-07-11 | Warren; Jasper N. | Method for processing solid material for disposal in an underground porous formation |
| US5589603A (en) | 1994-08-22 | 1996-12-31 | Newpark Resources, Inc. | Method and apparatus for the injection disposal of solid and liquid waste materials from the drilling and production of oil and gas wells |
| GB2327442B (en) | 1997-07-17 | 2000-12-13 | Jeffrey Reddoch | Cuttings injection system |
| US6640912B2 (en) | 1998-01-20 | 2003-11-04 | Baker Hughes Incorporated | Cuttings injection system and method |
| US7440876B2 (en) | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
| US7478020B2 (en) | 2005-03-07 | 2009-01-13 | M-I Llc | Apparatus for slurry and operation design in cuttings re-injection |
| US7721594B2 (en) | 2005-07-29 | 2010-05-25 | M-I L.L.C. | Apparatus and method to monitor slurries for waste re-injection |
| US7389185B2 (en) * | 2005-10-07 | 2008-06-17 | Halliburton Energy Services, Inc. | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures |
| US8165816B2 (en) | 2006-09-20 | 2012-04-24 | Exxonmobil Upstream Research Company | Fluid injection management method for hydrocarbon recovery |
| US8190369B2 (en) | 2006-09-28 | 2012-05-29 | Baker Hughes Incorporated | System and method for stress field based wellbore steering |
| US20080083566A1 (en) | 2006-10-04 | 2008-04-10 | George Alexander Burnett | Reclamation of components of wellbore cuttings material |
| US9085727B2 (en) * | 2006-12-08 | 2015-07-21 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
| US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
| US7730966B2 (en) | 2007-01-31 | 2010-06-08 | M-I L.L.C. | High density slurry |
| WO2009006526A2 (en) | 2007-07-02 | 2009-01-08 | Schlumberger Canada Limited | System and method for performing oilfield simulation operations |
| EA021727B1 (en) | 2007-09-13 | 2015-08-31 | Эм-Ай ЭлЭлСи | Method of using pressure signatures to predict injection well anomalies |
| CN101978372B (en) | 2008-02-22 | 2013-11-06 | M-I有限公司 | Method of estimating well disposal capacity |
| US8794316B2 (en) * | 2008-04-02 | 2014-08-05 | Halliburton Energy Services, Inc. | Refracture-candidate evaluation and stimulation methods |
| AU2009330223B2 (en) | 2008-12-23 | 2013-04-18 | M-I L.L.C. | Waste processing system |
| US8271243B2 (en) | 2009-02-17 | 2012-09-18 | Schlumberger Technology Corporation | System and method of integrating subterranean computer models for oil and gas exploration |
| US8793112B2 (en) * | 2009-08-14 | 2014-07-29 | Bp Corporation North America Inc. | Reservoir architecture and connectivity analysis |
| US8392165B2 (en) | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
| US9390204B2 (en) * | 2010-06-24 | 2016-07-12 | Schlumberger Technology Corporation | Multisegment fractures |
| WO2012031089A2 (en) | 2010-09-03 | 2012-03-08 | Chevron U.S.A. Inc. | Iterative method and system to construct robust proxy models for reservoir simulation |
| WO2012090175A2 (en) | 2010-12-30 | 2012-07-05 | Schlumberger Canada Limited | System and method for performing downhole stimulation operations |
| CN103649463B (en) * | 2011-07-11 | 2017-07-28 | 普拉德研究及开发股份有限公司 | System and method for performing well stimulation job |
| US9176250B2 (en) * | 2011-09-29 | 2015-11-03 | Schlumberger Technology Corporation | Estimation of depletion or injection induced reservoir stresses using time-lapse sonic data in cased holes |
| WO2013050989A1 (en) * | 2011-10-06 | 2013-04-11 | Schlumberger Technology B.V. | Testing while fracturing while drilling |
| MX356996B (en) | 2012-06-26 | 2018-06-22 | Baker Hughes Inc | Methods of improving hydraulic fracture network. |
| US20140122047A1 (en) | 2012-11-01 | 2014-05-01 | Juan Luis Saldivar | Apparatus and method for predicting borehole parameters |
| US10578766B2 (en) * | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
| US9551208B2 (en) * | 2013-08-26 | 2017-01-24 | Halliburton Energy Services, Inc. | Identifying uncertainty associated with a stimulated reservoir volume (SRV) calculation |
| CA2934902C (en) | 2014-02-03 | 2018-08-14 | Halliburton Energy Services, Inc. | Geomechanical and geophysical computational model for oil and gas stimulation and production |
| WO2015126388A1 (en) * | 2014-02-19 | 2015-08-27 | Halliburton Energy Services, Inc. | Estimating permeability in unconventional subterranean reservoirs using diagnostic fracture injection tests |
| US8812236B1 (en) | 2014-04-11 | 2014-08-19 | Particle Size Engineering, LLC | Method for using particle size analysis in near time or real time to create a proper particle size distribution within a drilling fluid management system for improved well drilling efficiency |
| CA2920311C (en) * | 2014-06-11 | 2019-09-03 | Advantek International Corporation | Quantifying a reservoir volume and pump pressure limit |
| US10633953B2 (en) * | 2014-06-30 | 2020-04-28 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
| CN116096544A (en) * | 2020-08-14 | 2023-05-09 | 旭化成株式会社 | Methacrylic resin composition and molded article |
| US11333792B1 (en) * | 2021-05-18 | 2022-05-17 | Sourcewater, Inc. | Systems and method for assessing seismic risk |
-
2015
- 2015-06-11 CA CA2920311A patent/CA2920311C/en active Active
- 2015-06-11 AU AU2015274458A patent/AU2015274458B2/en active Active
- 2015-06-11 GB GB1602565.2A patent/GB2531982B/en active Active
- 2015-06-11 CA CA3051231A patent/CA3051231C/en active Active
- 2015-06-11 GB GB2012101.8A patent/GB2586349B/en active Active
- 2015-06-11 WO PCT/US2015/035433 patent/WO2015191927A1/en not_active Ceased
- 2015-06-11 MX MX2016001661A patent/MX369007B/en active IP Right Grant
- 2015-06-11 GB GB2012106.7A patent/GB2586350B/en active Active
- 2015-06-11 GB GB2005438.3A patent/GB2580834B/en active Active
-
2016
- 2016-02-05 MX MX2019012643A patent/MX2019012643A/en unknown
-
2022
- 2022-03-03 US US17/686,363 patent/USRE50180E1/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050216198A1 (en) * | 2004-03-29 | 2005-09-29 | Craig David P | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
| US20070079652A1 (en) * | 2005-10-07 | 2007-04-12 | Craig David P | Methods and systems for determining reservoir properties of subterranean formations |
| US20100218941A1 (en) * | 2009-02-27 | 2010-09-02 | Muthukumarappan Ramurthy | Determining the Use of Stimulation Treatments Based on High Process Zone Stress |
| US20110209868A1 (en) * | 2010-03-01 | 2011-09-01 | Halliburton Energy Services, Inc. | Fracturing a stress-altered subterranean formation |
| US20120158310A1 (en) * | 2010-12-16 | 2012-06-21 | Bp Corporation North America Inc. | Method of determining reservoir pressure |
Also Published As
| Publication number | Publication date |
|---|---|
| CA3051231C (en) | 2023-01-31 |
| CA3051231A1 (en) | 2015-12-17 |
| GB2580834A (en) | 2020-07-29 |
| AU2015274458B2 (en) | 2017-08-31 |
| GB2586349A (en) | 2021-02-17 |
| GB202005438D0 (en) | 2020-05-27 |
| MX2019012643A (en) | 2019-12-11 |
| GB201602565D0 (en) | 2016-03-30 |
| GB2586350B (en) | 2021-09-08 |
| MX369007B (en) | 2019-10-24 |
| USRE50180E1 (en) | 2024-10-22 |
| CA2920311C (en) | 2019-09-03 |
| GB202012101D0 (en) | 2020-09-16 |
| GB2586350A (en) | 2021-02-17 |
| WO2015191927A1 (en) | 2015-12-17 |
| CA2920311A1 (en) | 2015-12-17 |
| GB2586349B (en) | 2021-06-23 |
| GB202012106D0 (en) | 2020-09-16 |
| AU2015274458A1 (en) | 2016-02-18 |
| GB2580834B (en) | 2021-03-10 |
| MX2016001661A (en) | 2016-11-07 |
| GB2531982B (en) | 2020-06-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2019012643A (en) | Quantifying a reservoir volume and pump pressure limit. | |
| AR101526A1 (en) | METHOD FOR IMPROVING THE COMPLEXITY OF A FRACTURE NETWORK WITHIN A GROUND FORMATION | |
| MX382389B (en) | METHOD FOR OPTIMIZING CONDUCTIVITY IN A HYDRAULIC FRACTURING OPERATION. | |
| MX2024001033A (en) | Proppant compositions and methods of use. | |
| GB2537078A (en) | Settable compositions and uses thereof | |
| MX2017015000A (en) | Hydrocarbon filled fracture formation testing before shale fracturing. | |
| MX2015009248A (en) | Methods and compositions for treating subterranean formations with swellable lost circulation materials. | |
| AR096088A1 (en) | BILLING OPERATIONS THAT USE CHLORINE DIOXIDE | |
| GB2535346A (en) | Methods for enhancing propped fracture conductivity | |
| TN2017000149A1 (en) | Y-grade natural gas liquid stimulation fluids, systems and method | |
| MX2016012726A (en) | SMART LCM TO STRENGTHEN GROUND FORMATIONS. | |
| SA517381327B1 (en) | Fracturing and in-situ proppant injection using a formation testing tool | |
| GB2549428A (en) | Polyamide resins for coating of sand or ceramic proppants used in hydraulic fracturing | |
| AR100614A1 (en) | SOLUBLE COPOSS IN ACID AS MATERIAL FOR LOSS OF CIRCULATION | |
| MX357568B (en) | Methods for minimizing overdisplacement of proppant in fracture treatments. | |
| MX2018003760A (en) | Use of solid surfactant composites in well cementing. | |
| AR096590A1 (en) | CLAY INHIBITORS FOR DRILLING, FRACTURING, AND OTHER PROCEDURES | |
| MX2016016569A (en) | METHOD FOR THE DESIGN OF PRODUCTION WELLS AND INJECTION WELLS. | |
| GB2547128A (en) | Determining depth of loss zones in subterranean formations | |
| GB2556538A (en) | Downhole structures including soluble glass | |
| SA520411763B1 (en) | Self-Propping Surfactant for Well Stimulation | |
| MX2017001912A (en) | Hydraulic fracturing applications employing microenergetic particles. | |
| MX2016007831A (en) | Pressure delivery proppant to offshore frac blender. | |
| MX362947B (en) | Method and device for stimulating a treatment zone near a wellbore area of a subterranean formation. | |
| AR099021A1 (en) | REINFORCEMENT PRODUCTS FOR VISCOSITY REDUCING AGENTS CONTAINING IRON COMPOUNDS AND THEIR USE PROCEDURES |